1 Goose Creek Water Treatment Plant Water Treatment Assessment and Financial Evaluation September 20, 2011 City of Fairfax Utilities Department 1
2 City Council Goal No. 2 ( ) Develop cost scenarios for future water treatment alternatives to enable the City Council to determine the most efficient and effective long term water treatment options. Adopted October 10,
3 AGENDA A. Purpose of Work Session B. Introductions C. Assessments & Capital Needs 1. Intake, Safe Yield and Dams Assessment 2. Treatment Assessment and Upgrade Program 3. Transmission Main Assessment 4. Market Analysis of Land Assets 5. Risk Considerations D. Financial Analysis of Alternatives E. Review by City s Financial Advisor 3
4 A. Purpose of Work Session 1. Summary Assessments & Cost Scenarios using: Capital Cost Estimates Comparison of Projected User Rates 2. Select 2 Alternatives for further detailed evaluation: Stay in Water Treatment Purchase from Fairfax Water Both: Full Service Area w/ Redundancy 4
5 B. Introductions Dick Dyne Design-Build Manager (CH2M HILL) Mike Matichich Financial Analysis (CH2M HILL) Mark Notheis Project Engineer (CH2M HILL) Jimmie Jenkins Consulting (CH2M HILL) Aaron Keno Water Source & Dams (Gannett Fleming) Lauren Sufleta Transmission Main (City) (WRA) Bob Woodruff Land Use Valuation (William H. Gordon & Assoc.) David Rose Financial Review (Davenport) 5
6 C. Assessments & Capital Needs 6
7
8 PLUS + The envelope of accuracy in estimating construction costs Order of Magnitude MINUS - Planning Estimate Accuracy Increases Plans & Specifications Actual Bid(s) 8
9 C.1 Intake, Safe Yield and Dams Assessment The Intake is on Goose Creek Intake baskets; manually cleaned Single 24-inch pipeline to wet well Goose Creek is subject to siltation Reservoir was 200 million gallons (MG) in 1980 and was restored to 200 MG again in 1997 Current reservoir is approximately 120 MG 9
10 Safe Yield The Safe Yield of Goose Creek and Beaverdam Creek Reservoir is 9.9 million gallons per day (mgd) Recent hydrological and safe yield study by Gannett Fleming Adequate capacity for City Service Area for the 20 year period Subject to water conservation and manual refill operations 10
11 Goose Creek Dam The concrete Dam at Goose Creek is in good condition. Limited dredging is planned. Rehabilitation is expected to be composed of new drain valve; seepage monitoring; and other minor changes. Capital Costs are estimated to be $1.25 M 11
12 12
13 Beaverdam Creek Dam The earthen Dam at Beaverdam Creek is homogeneous and in good condition. New legislation (Code of VA; ) (2010) requires a new or expanded spillway and outlet system. Monitoring systems will be provided this year. Capital Costs are estimated to be $11.6 M 13
14 Major Improvements Required: - Outlet Capacity - Channel Capacity & Stability 14
15 Weathered Rock
16
17
18 Embankment, $2.5 Other, $0.8 Dredging, $1.0 Improvements to Dams $ 12.9 M Spillway, $8.6 18
19 C.2 - Treatment Assessment and Upgrade Program Source is Goose Creek with a side-storage reservoir (Beaverdam Creek) for low stream flow periods. Treatment includes 9 different chemicals, sedimentation, filtration and disinfection. Single Transmission Main to City is 22 miles 19
20 20
21 Raw Water Pump Station is constructed on the shore of Goose Creek with one intake approximately 120-feet off-shore. 21
22 Original plant commissioned in The major upgrade and expansion was in
23 Plant is limited to the conventional process that meets current SDWA requirements. 23
24 Most of the chemicals used for treatment will be consolidated in a new Chemical Feed Building. 24
25 The Planning Estimate: for 22 scope items New Flocculator, $1.0 Generators, $1.3 Other, $4.3 Raw Water P.S., $4.1 Chemical Building, $6.1 Treatment Plant $ 16.8 M 25
26 C.3 - Transmission Main Assessment P-Wave 12,000 LF of Electromagnetic Investigation Pipe condition (structural, i.e., wire) Three (3) broken wire sections identified: inch inch inch 26
27 Smartball 66,500 LF of Ultrasonic Sound Investigation Two (2) leaks detected An air valve to be replaced Other not easily identified Transmission Main is in good condition Capital Costs are estimated to be $0.325 M 27
28 Transmission, $0.3 Dams, $12.9 Treatment, $16.8 Treatment Program $ 30.0 M 28
29 C.4 - Market Analysis of Land Assets Plant and Reservoirs are on the edge of the Loudoun County Transition Policy Area (TPA) Land is zoned as Industrial and low density Residential Land has limited frontage Land is inefficient; subject to flood plain and deep setbacks 29
30 TOWN OF LEESBURG GOOSE CREEK TREATMENT PLANT BEAVERDAM RESERVIOR DULLES AIRPORT
31 SUBURBAN POLICY AREA
32 TRANSITION POLICY AREA
33
34 TR-10 ZONE PD-IP ZONE PD-GI ZONE
35 MAJOR FLOODPLAIN
36 300 SETBACK MAJOR FLOODPLAIN 100 SETBACK
37 QUARRY NOTIFICATION OVERLAY DISTRICT 300 SETBACK MAJOR FLOODPLAIN 100 SETBACK
38
39 TR-10 ZONE
40 TR-10 ZONE R-1 ZONE
41 300 SETBACK MAJOR FLOODPLAIN
42 Maximum Theoretical Density under Perfect Conditions (By-Right) Zoning Net Area Dwelling Units TR R Area (FAR= 0.4) X 1,000 PD-IP PD-GI ,467 42
43 C.5 Risk Considerations Reliability Power Failure The 2-Year Drought Lack of Redundant Conveyance Limited Fairfax Water Emergency Agreement Cost Uncertainty Employment Energy Compliance with SDWA 43
44 All manageable except: Lack of Redundant Conveyance 44
45 Introduce Option 1B = 1A with Redundancy New Submersible Raw Water P.S. Pump-back Improvement at Beaverdam Creek Raw Water Force Main Emergency Connection Transmission Main in County TOTAL Redundancy Program (Add-in) $ 1.18 M $ 1.30 M $ 0.78 M $ 1.00 M $ M $ 15.5 M 45
46 D - Financial Analysis of Alternatives Options were developed through a participatory process that included: Loudoun Water Fairfax Water Falls Church Consultants for each Discipline City Management 46
47 Five Options Were Developed & Evaluated Option 1A: City Stays in the Water Treatment Business Option 2A: City Purchases Capacity from Fairfax Water (In- City only) Option 2B: City Purchases Capacity from Fairfax Water (Full Service Area) Option 2C: City Purchases Capacity from Fairfax Water (Full Service Area less County Residential) and later: Option 1B: City Stays in the Water Treatment Business with Redundancy 47
48 Order of Magnitude Valuation of City Assets $ 10 M for 620 Acres at Reservoir Unknown Market Conditions at Plant $ 5 M for Transmission Main to Loudoun Up to $ 15 M for Transmission/Distribution and partial storage at University Tank Conclusion: Assets are not of high values 48
49 Factor Max. Day 10.0 MGD Capital Costs Potential Sales Options - Treatment Only 1A 1B 2A 2B 2C 10.0 MGD 7.0 MGD 10.0 MGD 8.5 MGD $ 30.0 M $ 45.5 M $ 31.5 M $ 45.0 M $ 38.25M N/A N/A $ 30.0 M $ 15.0 M $ 22.0 M Bond $ 30.0 M $ 45.5 M $ 1.5 M $ 30.0 M $ 16.25M Median User Rate $6.77 $7.47 $7.31 $6.70 $6.94 Table excludes Inflation for User Rate Median User Rate demonstrates impact to customer City still borrows money for Line Maintenance 49
50 Financial Model Assumptions 20 year solution 30 year borrowing at 6.0 % Best available estimates in today s dollars All Capital Costs are bonded Purchase Price for Fairfax Water supply = $4.5M per MGD Treatment Costs for Fairfax Water = $1.20 per 1,000 gallons purchased Loss of Loudoun Water by
51 51
52 Factors Used to Illustrate Inflation Component Standard Factor Labor ECI 3.0 % Fixed Costs CPI-Urban 2.5 % Variable Costs CPI-Urban 2.5 % Capital Expenses ENR % Future Debt Service 6.0 % Wholesale Water Price 4.0 % Increase in Consumption 0.0 % Availability Fee Revenue Zero 52
53 $16.00 Alternative Comparison ($ per Kgal) Inflationary $14.00 Retail Rate ($ per Kgal) $12.00 $10.00 $8.00 $6.00 Alternative 1A - City Stays in Water Treatment Business Alternative 2A - City Purchases Capacity from FW (In-City only) Alternative 2B - City Purchases Capacity from FW (Full Service Area) Alternative 2C - City Purchases Capacity from FW (Full Service Area less County Residential) Alternative 1B - Ciy Stays in Water Treatment Business with Higher Reliability $
54 E - Peer Review of Financial Analysis Davenport & Company LLC, in our capacity as Financial Advisor to the City of Fairfax, has attended meetings, provided input on Key Assumptions, and reviewed the five options prepared by the City s other Key Utility Advisors. Davenport s goal was to provide insight on key assumptions in order to further refine the relative Cost / Benefit Analysis of the options.
55 Initial Observations Capital Related Retaining ownership of the entire system (i.e. Option #1B) will require the City to make considerable capital investments over the next several fiscal years (i.e. $34 million between fiscal years 2012 and 2013 alone and $48.5 million total by fiscal year 2016). That said, under all other options, the City will still need to make a substantial capital investment by fiscal year 2016.
56 Projected 5 Year Capital Requirements Given the uncertain nature of the revenues from sale of assets in Options #2A, 2B, and 2C there is risk that the amount of capital the City will need to fund with new borrowing could be greater. Projected 5 Year Capital Requirements 1A 1B 2A 2B 2C $0 $10 $20 $30 $40 $50 $60 Millions Capital Requirements net of Estimated Asset Sales Estimated Asset Sales to Offset Capital
57 Projected 20 Year Capital Requirements After fiscal year 2016 all of the options require approximately the same capital per year. As such, total projected capital needs over a 20 year period are within the same order of magnitude for each option. Projected 20 Year Capital Requirements 1A 1B 2A 2B 2C $0 $20 $40 $60 $80 $100 Millions Capital Requirements net of Estimated Asset Sales Estimated Asset Sales to Offset Capital
58 Debt Structuring For purposes of initial modeling all options assume that new debt is repaid at a 6% interest rate with 30 years of level annual debt service. Thus, under all scenarios, there is the ability to incorporate strategic debt structuring to lessen the budgetary impact of new debt as well as the ability to obtain a lower interest rate (based on current market conditions).
59 Summary Observations When viewed on a projected user rate basis, Option #1B (i.e. retain City ownership) is approximately 10% to 12% more costly than options 2B and 2C (i.e. the lowest cost of the sell the system options) after the loss of Loudoun Water as a wholesale customer is fully incorporated (i.e. 2018). That said, the water rate per 1,000 gallons for Option #1B is higher than Options #2B and 2C by approximately 75 per 1,000 gallons. For a customer that uses 5,000 gallons per month this equates to a bill that is approximately $3.75 higher per month with Option #1B than with the Options #2B or 2C.
60 Summary Observations (cont.) After 20 years (i.e. 2031), the City still retains ownership/control over substantial assets under Option #1B. Assumptions as to the disposition of City assets are uncertain (i.e. sale of the reservoir, sale of land to other entities). As such, the relative cost/benefit could be more (or less) favorable toward Option #1B.
61 Summary Observations (cont.) The City will retain the greatest amount of control with Option #1B. With that control also comes a greater concentration of risk as it relates to primary ownership of the reservoir, dam, transmission main, etc. and potential equipment failure risk, regulatory risk, etc.
62 Questions? Course of Action? 62
North San Jose Neighborhoods Planning Taskforce
North San Jose Neighborhoods Planning Taskforce Key Topics Water Supply Flooding Related Topics Storm Water Storm Sewer Sanitary Sewer Water Conservation Treatment Plant Water Background Responsible Agencies
More informationWATER AND WASTEWATER UTILITY RATE STUDY CITY OF
WATER AND WASTEWATER UTILITY RATE STUDY CITY OF MAY 2013 WATER AND WASTEWATER UTILITY RATE STUDY FOR CITY OF YREKA 701 4 TH STREET YREKA, CA 96097 JOB NO. 69.39 MAY 2013 PREPARED BY: TABLE OF CONTENTS
More informationDesign Criteria & Service Goals
4.1 Design Life of Improvements The design life of a water system component is sometimes referred to as its useful life or service life. The selection of a design life is a matter of judgment based on
More informationPreliminary Engineering Report Lake Huron Water Supply Karegnondi Water Authority
Preliminary Engineering Report Lake Huron Water Supply Karegnondi Water Authority September 2009 Prepared by: AECOM Jones & Henry Engineers, LTD Lockwood, Andrews and Newnam, Inc. O'Malia Consulting ROWE
More informationMokeWISE Program Scope of Work: Project 8b: Rehabilitation of Transmission Main
MokeWISE Program Scope of Work: April 2015 Abstract... 2 Background Information... 2 Calaveras Public Utility District... 2 Water Rights... 2 Water Supply... 2 Project Information... 3 Project Description...
More informationBEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK
BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD Re Application of the Philadelphia Water Department for Increased Rates and Related Charges Fiscal Years 2017-2018 DIRECT TESTIMONY OF STEPHEN
More informationREPORT ON FINANCIAL PLAN, COST OF SERVICE AND RATES WATER AND SEWER OPERATING FUND
REPORT ON FINANCIAL PLAN, COST OF SERVICE AND RATES WATER AND SEWER OPERATING FUND Harford County, Maryland APRIL 2016 Black & Veatch Holding Company 2011. All rights reserved. Harford County Report on
More informationLEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN
1 AUGUST 2011 LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN KEY ELEMENTS OF THE PLAN: 1. Replace the existing unsafe Ragged Mountain dam with a new dam and raise the reservoir pool level initially
More informationHistoric Flood Impact on the Nashville Drinking Water System. Scott Potter, Director Metro Water Services, Nashville, TN
Historic Flood Impact on the Nashville Drinking Water System Scott Potter, Director Metro Water Services, Nashville, TN Historic Event = 13.53 /48 Hours May 1 6.32 of Rain = 3rd greatest one-day rainfall
More informationCity of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP
City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP PROJECT ESTIMATED COST ESTIMATED COUNCIL IDENTIFIED FUNDING SOURCES STRATEGIC COMPLETION INITIATIVES FM 2351/Beamer
More informationSanitary Sewers LINK TO THE COMPREHENSIVE PLAN
Sanitary Sewers PROGRAM DESCRIPTION Fairfax County provides sewer service to its residents through a system of nearly 3,412 miles of sewer lines, 59 sewage pumping stations, 5 storm water pumping stations,
More informationExecutive Summary: PA No. 12 Micro-hydro at Graham Hill Water Treatment Plant
Executive Summary: PA No. 12 Micro-hydro at Graham Hill Water Treatment Plant Description A micro-hydro project at SCWD s Graham Hill Water Treatment Plant (WTP) would replace an exisiting non-operational
More informationCity of San Diego Water Demand Forecast
Presentation to Scripps Institute of Oceanography City of San Diego Water Demand Forecast Public Utilities Department Engineering Program Management Division Feryal Moshavegh, Associate Engineer Michael
More informationCLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE
1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,
More informationWSSC Ad-Hoc Committee on Large Diameter Water Mains. November 22, 2013
WSSC Ad-Hoc Committee on Large Diameter Water Mains November 22, 2013 Purpose: To Gain an Understanding of WSSC s Current Approach to Prioritizing PCCP Inspections and Repairs 2 PCCP Inspection Prioritization
More informationCHECKLIST FOR FILING AN APPLICATION FOR A GROUND AND/OR SURFACE WATER WITHDRAWAL PROJECT IN THE DELAWARE RIVER BASIN
CHECKLIST FOR FILING AN APPLICATION FOR A GROUND AND/OR SURFACE WATER WITHDRAWAL PROJECT IN THE DELAWARE RIVER BASIN PLEASE COMPLETE CHECKLIST AND ENCLOSE WITH THE APPLICATION. If you need assistance,
More informationMaricopa Association of Governments. Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS. August 2001
Maricopa Association of Governments Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS August 2001 3033 NORTH 44TH STREET, SUITE 101 PHOENIX, ARIZONA 85018 (602) 263-9500 FAX (602) 265-1422 Technical
More informationPlan Groundwater Procurement, Implementation and Costs, prepared for the Brazos River Authority, July 2005.
6 Conjunctive Use 6.1 Lake Granger Augmentation 6.1.1 Description of Option Rapid population growth and development in Williamson County require additional water supplies throughout the planning period.
More informationKansas City s Overflow Control Program
Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater
More informationDrinking Water Sector - Damage Assessment Report
Drinking Water Sector - Damage Assessment Report The Division s Drinking Water Sector Damage Assessment Report (available on-line at the Division s Website http://www.state.nj.us/dep/watersupply ) and
More informationSANITARY SEWER MASTER PLAN
SANITARY SEWER MASTER PLAN PREPARED FOR: VILLAGE OF GALENA, OHIO PREPARED BY: POGGEMEYER DESIGN GROUP, INC. 1168 NORTH MAIN STREET BOWLING GREEN, OHIO 43402 JOB NO. 3550-030 MARCH, 2006 TABLE OF CONTENTS
More informationCHAN & PARTNERS ENGINEERING, LLC
July 2012 CHAN & PARTNERS ENGINEERING, LLC Consulting Civil Engineers Imagine Austin Comprehensive Plan Infrastructure, Operations, Maintenance & Service Cost Comparison Preferred Growth Scenario and Trend
More informationTENNESSEE GAS PIPELINE COMPANY, L.L.C.
TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC & HYDRAULIC CALCULATIONS FOR WATERBODIES CROSSED BY CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,
More informationBrushy Creek Municipal Utility District (the District) Brushy Bend Waterline Replacement Project Community Meeting February 6, 2014
Brushy Creek Municipal Utility District (the District) Brushy Bend Waterline Replacement Project Community Meeting February 6, 2014 Recap of Question & Answer Session Sorted by topic not necessarily in
More informationGlen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1
Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1 The Montgomery County Dept. of Environmental Protection, in cooperation with the Dept. of Permitting Services and the Washington
More informationAddressing Declining Elevations in Lake Mead
Integrated Resource Planning Advisory Committee July 23, 2014 Addressing Declining Elevations in Lake Mead 1 Meeting Topics Drought update Attribute finalization Interbasin Cooperation Intake Pumping Station
More informationCity of Fort Collins Water Supply and Demand Management Policy
City of Fort Collins Water Supply and Demand Management Policy The City of Fort Collins Water Supply and Demand Management Policy provides a foundational framework for water supply and demand management
More information# 14-28: Water Enterprise Plan Development
City of Beverly Hills Public Works Services Department 345Foothill Road Beverly Hills, CA. 90210 # 14-28: Water Enterprise Plan Development Request for Proposal For Professional Planning and Engineering
More informationDeSoto County is not a water service provider and does not operate any
Water and Sewer DeSoto County is not a water service provider and does not operate any water delivery systems. There are 14 certificated, non-municipal water associations operating in the county that are
More information2007 Operating Budget 2007-2016 Capital Budget 2007 Proposed Water and Wastewater Service Rate
2007 Operating Budget 2007-2016 Capital Budget 2007 Proposed Water and Wastewater Service Rate Toronto City Council February 1 5, 2007 Multi-Year Toronto Water Business Plan was approved by Council February
More informationFrequently Asked Transmission Pipeline Questions
Frequently Asked Transmission Pipeline Questions Who is PennEast, LLC? PennEast was formed by the partnership of AGL Resources, NJR Pipeline Company, South Jersey Industries and UGI Energy Services (UGIES).
More informationFrom and after January 1, 2015, through December 31, 2015, the following rates for water deliveries to each class of service are established:
Article 21. Water and Sewer Rates and Service Charges. From and after January 1, 2015, through December 31, 2015, the following rates for water deliveries to each class of service are established: Sec.
More informationJackson Gulch Outlet Canal Rehabilitation Project
Jackson Gulch Outlet Canal Rehabilitation Project Preliminary Budgetary Estimate for Rehabilitation February 2004 Prepared for the Mancos Water Conservancy District Jackson Gulch Reservoir 42888 County
More informationCAPE COD. Regional Wastewater Management Plan Understanding the Cost Factors of Wastewater Treatment and Disposal
CAPE COD Regional Wastewater Management Plan Understanding the Cost Factors of Wastewater Treatment and Disposal MARCH 2013 Table of Contents INTRODUCTION...1 COST COMPARISON OF ON-SITE, CLUSTER, SATELLITE,
More informationConsolidated Debt Service. #254 Consolidated Debt Service
#254 Consolidated Debt Service Fund Overview This LOB provides for the debt service expenditures for the general obligation bonds of the County as well as the general obligation bonds for the Fairfax County
More informationAGENDA ITEM C9. COST/FUNDING SOURCE: $431,847.40/ Uniform Rate
AGENDA ITEM C9 DATE: February 2, 2015 TO: FROM: SUBJECT: Matt Jordan, General Manager Charles Carden, Chief Operating Officer South Pasco Transmission Main Condition Assessment Services with Pure Technologies
More informationSource Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water
United States Office of Water EPA 916-F-01-032 Environmental Protection (4606) July 2001 Agency Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows
More informationM E M O R A N D U M. Among the standard conditions contained in the NPDES permit is also a Duty to
M E M O R A N D U M DATE: August 7, 2015 TO: FROM: SUBJECT: Metropolitan Wastewater Management Commission (MWMC) Matt Stouder, MWMC General Manager Capacity Management, Operations, and Maintenance (CMOM)
More informationAltoona Water Authority. Infrastructure Overview
Altoona Water Authority Infrastructure Overview Mission Statement As stewards of the community s water system, our mission is to provide a clean, safe, reliable water supply and to collect and treat wastewater
More informationCost Estimating Procedures for Raw Sewage Overflow Control Program
Raw Sewage Overflow Control Program April 23, 2004 Raw Sewage Overflow Control Program City of Indianapolis Department of Public Works Table of Contents Section Page 1.0 Introduction... 1 2.0 General Project
More informationDWSRF GREEN PROJECT RESERVE BUSINESS CASE EVALUATION STATE FISCAL YEAR 2015 INTENDED USE PLAN PROJECT NUMBER
City of Gorman DWSRF GREEN PROJECT RESERVE BUSINESS CASE EVALUATION STATE FISCAL YEAR 2015 INTENDED USE PLAN PROJECT NUMBER 62660 COMMITMENT DATE: January 29, 2015 DATE OF LOAN CLOSING: May 21, 2015 GREEN
More informationDry Weather Flow from Footing Drains and Service Connections
Wastewater Master Plan DWSD Project No. CS-1314 Dry Weather Flow from Footing Drains and Service Connections Technical Memorandum Original Date: May 2, 2002 Revision Date: September 2003 Author: CDM Table
More informationLDPCSD Water Supply Emergency Response Plan Status Update 2-4-15
LDPCSD Water Supply Emergency Response Plan Status Update 2-4-15 1 EMERGENCY OVERVIEW The Lake Don Pedro Community Services District (LDPCSD) provides domestic potable water service to 1450 connections
More informationRoseman Technology Site *Caroline County, Virginia 110 Acres Seconds off Interstate 95
Roseman Technology Site *Caroline County, Virginia 110 Acres Seconds off Interstate 95 Water Service Provider: Caroline Location: I - 95 Route 639, Ladysmith Exit 110 County Suitable for Construction:110
More information* 765 million tons of recoverable reserves as of 1970; W.E. Edmonds, Pennsylvania Geologic Survey
IV. PROPOSED PLAN FOR AMD ABATEMENT GOALS AND OBJECTIVES Although the major natural resource in the Wyoming Valley is anthracite coal*, its importance to the present and future economy of the area is limited
More informationFacing The Challenges In Houston s Water System: Past, Present, and Future
Facing The Challenges In Houston s Water System: Past, Present, and Future Jun Chang, P.E. D.WRE Deputy Director Department of Public Works and Engineering Presented to HCEC February 17, 2012 Past Regulatory
More information4 Water supply description
4 Water supply description A description of the drinking-water system is equally applicable to large utilities with piped distribution systems, piped and non-piped community supplies, including handpumps
More informationSan Diego Water Resources Mix and Drought Planning
Supply Reliability for San Diego through a Diverse Water Resources Mix and Drought Planning Dana L. Friehauf, San Diego County Water Authority DWR/NWRI Drought Response Workshop November 6, 2012 1990-91:
More informationIndoor Water Conservation and I&I Reduction (EIR Alternatives 1 and 2)
SECTION 2 Description of Master Plan Alternatives The six alternatives that constitute the building blocks of the IRWP Master Plan are as follows: Indoor Water Conservation (EIR Alternative 1) I&I Reduction
More informationTask F: Financial Plan
Task F: Financial Plan Comprehensive Water Master Plan DWSD Contract No. CS-1278 Final Report For Submittal to Detroit Water and Sewerage Department June 2004 IN ASSOCIATION WITH CDM Task F: Financial
More informationHow To Plan For A County Budget
CHAPTER 10 CAPITAL IMPROVEMENTS ELEMENT The 1978 and 1985 Levy County Comprehensive Plans contained a statement of economic feasibility as a part of the Future Land Use Plan. This chapter updates that
More informationAquatera 2015/16 Business Plan Highlights
Who We Are Aquatera 2015/16 Business Plan Highlights Aquatera is a full-service utility corporation the provider of choice for governments, businesses, and communities. Our business is to provide high-quality
More informationChagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices
Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices Amy H. Brennan (440) 975-3870 www.crwp.org abrennan@crwp.org Chagrin River Watershed Partners Formed
More informationTerms of Reference. Aqaba Water and Wastewater Utility Asset Valuation
Technical Support for Procurement and Project Management and Private Sector Participation to the Ministry of Water and Irrigation, Water Authority of Jordan and the Jordan Valley Authority Support for
More informationCondition Assessment of a 48 PCCP Water Main Within an Abandon Subway Tunnel
OAWWA 73 rd Annual Conference Condition Assessment of a 48 PCCP Water Main Within an Abandon Subway Tunnel By Jason DeLaet, P.E. Supervising Engineer Greater Cincinnati Water Works & Michael J. Livermore
More informationPART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET
PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET Name of Municipality or Sewer District Name of Project Original Township and Lot Number Name of Engineer of Firm Preparing Plans
More informationEWEB s Approach to Resiliency Through Master Planning and Emergency Preparedness
EWEB s Approach to Resiliency Through Master Planning and Emergency Preparedness 2015 PNWS-AWWA Annual Conference Bellevue, WA W a l l y M c C u l l o u g h, P E Presentation Outline EWEB s Water System
More informationApril 30, 2013 E M. Environmental Management. www.em.doe.gov. safety performance cleanup closure
April 30, 2013 1 Facility Stabilization and Deactivation C.1.3 - (Period 3) After facilities are turned over by USEC and accepted by DOE: Perform minimal stabilization and deactivation activities for facilities
More informationTechnical Memorandum 9B Approach to Incorporating Cost Risk into the Economic Model - FINAL
City of Hillsboro Capital Improvement Master Planning Services Water Supply Evaluation Project To: Dave Carlson, Project Manager, Black & Veatch Carmen Nale, P.E., Black & Veatch From: Nicki Pozos, P.E.,
More informationThe Basics of Chapter 105 Waterways and Wetlands Permitting in PA
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers
More informationZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022
ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 Town of Zionsville, Indiana December 19, 2012 PREPARED BY BEAM, LONGEST & NEFF, LLC. 8126 Castleton Road Indianapolis, Indiana
More information3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN
3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards
More informationAppendix S Pump Station Evaluation
Appendix S Pump Station Evaluation Technical Memorandum Date: October 12, 2001 To: Re: Orange County Utilities Task 6.4 Raw Wastewater Pump Stations 1.0 Summary In accordance with Task 6.4 of the Orange
More informationInnovative Methods to Assess Sewer Pipe Risk and Improve Replacement Planning Decisions
Innovative Methods to Assess Sewer Pipe Risk and Improve Replacement Planning Decisions Seth Anderson, GISP Management Consultant Celine Hyer, P.E. Associate Vice President Presentation Topics The Infrastructure
More informationWastewater Collection Practice Test #3 Page 1 of 15
Wastewater Collection Practice Test #3 Page 1 of 15 1) A 54 in. storm sewer flowing half full, at a velocity of 1.35 Ft./sec., will discharge how much flow into a creek in MGD? 13.85 MGD 10.73 MGD 1.85
More informationSTEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS. SECTION DESCRIPTION Page
STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS SECTION DESCRIPTION Page 1 Executive Summary / Brief History 2 2 Services Provided / Administration
More informationAnn Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015
Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015 The Facilities Master Plan was completed in 2004 and identified the need for improvements to the City of Ann Arbor s Wastewater
More information05-15-98 CIVIL ENGINEERING ASSOCIATE, 7246
CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION POSTED JUNE 1999 05-15-98 CIVIL ENGINEERING ASSOCIATE, 7246 Summary of Duties: Performs professional civil engineering work in researching,
More informationCALIFORNIA AMERICAN WATER LOS ANGELES DISTRICT 2009 GENERAL RATE CASE CHAPTER: 1 INTRODUCTION AND SUMMARY OF APPLICATION
DISCUSSION OF INFORMATION PRESENTED IN THIS CHAPTER This chapter contains information regarding the operation of the Los Angeles District of California American Water as well as tables that summarize the
More informationClean Water State Revolving Fund (CWSRF) Requirements and Guidance for a Fiscal Sustainability Plan (FSP)
Clean Water State Revolving Fund (CWSRF) Requirements and Guidance for a Fiscal Sustainability Plan (FSP) Maine CWSRF Fiscal Sustainability Plan Requirements Starting October 1, 2014, a Fiscal Sustainability
More informationSanitation District No. 1 of Northern Kentucky. SD1's Sanitary and Storm Water Asset Management Program. KSPE Annual Convention
Sanitation District No. 1 of Northern Kentucky SD1's Sanitary and Storm Water Asset Management Program KSPE Annual Convention April 28, 2011 Background Outline CSAP Program Development CSAP Program Implementation
More informationSewer System Improvement Program Update
August 20, 2014 Sewer System Improvement Program Update Tommy T. Moala SFPUC Assistant General Manager, Wastewater Enterprise Agenda 1. SF Sewer System 2. Our Challenges 3. Sewer System Improvement Program
More informationCITY OF ORANGE PROPOSED INCREASE OF WATER RATES AND CHARGES FREQUENTLY ASKED QUESTIONS (FAQ) REGARDING ORANGE S PROPOSED WATER RATES AND CHARGES
CITY OF ORANGE PROPOSED INCREASE OF WATER RATES AND CHARGES On Tuesday March 27, 2012, the Orange City Council will hold a public hearing to consider a rate adjustment for water service rates and charges.
More informationDemand for Natural Gas*
Taking Control Over Natural Gas Gathering and Transmission Pipelines and Compressor Stations* 2009 Texas City Attorneys Association Summer Conference South Padre Island, Texas June 11, 2009 Presented by:
More informationRegional Wastewater Treatment Alternatives Technical Memorandum
Southern Ridge Wastewater Treatment Study Goal: To define a framework for Sarpy County Regional Sewer Service Regional Wastewater Treatment Alternatives Technical Memorandum To: From: Sarpy County Joe
More information4.3 Cisterns and Rain Barrels
4.3 Cisterns and Rain Barrels Rain barrels, cisterns, and tanks are structures designed to intercept and store runoff from rooftops. Rain barrels are used on a small scale while cisterns and tanks may
More informationJuly 2012 Report No. 12-042
John Keel, CPA State Auditor An Audit Report on The Water Infrastructure Fund at the Water Development Board Report No. 12-042 An Audit Report on The Water Infrastructure Fund at the Water Development
More informationSOLD. Lot 1. 1 Mile: Population: 10,200 Median HH Income: $33,100. 3 Mile: Population: 80,200 Median HH Income: $34,900
Walmart Outparcels For Sale College Station, TX Store # 1150 1815 Brothers Blvd FM 2818 W SOLD Texas Ave S/ Hwy 6 Longmire Dr Brothers Blvd Lot 1 For more information about this site, contact: Lot 1: ±2.41
More information2-Party Shared Well Users Agreement (If Applicable)
2-Party Shared Well Users Agreement (If Applicable) 2 PARTY SHARED WELL WATER USERS AGREEMENT Well ID Number: Serves Parcel Number: Lot Number: of Subdivision Physical Address: AND Parcel Number: Lot Number:
More informationSERVING WITH SUCCESS WILLOWS WATER. Willows Water District 6930 South Holly Circle Centennial, Colorado 80112 303-770-8625 www.willowswater.
Willows Water District 6930 South Holly Circle Centennial, Colorado 80112 303-770-8625 www.willowswater.org WILLOWS WATER. SERVING WITH SUCCESS Willows office building is located at 6930 S. Holly Circle.
More informationRhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.
American Recovery and Reinvestment Act (ARRA) Emergency Watershed Protection Program Floodplain Easements Rhode Island Natural Resources Conservation Service Rhode Island NRCS received approximately $2.4
More informationNavigating the Facilities Process
Navigating the Facilities Process Site Application Process 4/26/2012 1 Site Approval 1. When do you get a site approved? a. All new sites on which an educational facility will be constructed. b. Additional
More informationCity of Crescent City Water Enterprise Fund September 16, 2013
City of Crescent City Water Enterprise Fund September 16, 2013 Provide overview of City s Water System Recap Capital Improvement Plan Provide update on System s Financial Status June 30, 2013 Update for
More informationF 3 STANDING COMMITTEES. Finance and Asset Management Committee. Debt Management Annual Report INFORMATION
STANDING COMMITTEES F 3 Finance and Asset Management Committee Debt Management Annual Report INFORMATION The Board of Regents is charged with adopting the University s Debt Management Policy, establishing
More informationUnderstanding Value Capture as a Transportation Finance Strategy in Massachusetts. March 15, 2013
Understanding Value Capture as a Transportation Finance Strategy in Massachusetts March 15, 2013 Background The Massachusetts Legislature will soon explore options to increase transportation revenue. One
More informationWHAT DO YOU KNOW? HOW TO GET THE BEST INFORMATION OUT OF YOUR SYSTEM AND THE FOLKS THAT RUN IT.
WHAT DO YOU KNOW? HOW TO GET THE BEST INFORMATION OUT OF YOUR SYSTEM AND THE FOLKS THAT RUN IT. ABSTRACT Steve Shoaf, City Of Asheville Nicholas Dierkes, Brown and Caldwell Understanding how well our Utilities
More informationFinancial and Business Metrics Report as of August 31, 2015
Financial and Business Metrics Report as of August 31, 2015 Sammamish Plateau Water and Sewer District will provide safe, efficient, and reliable AS OF water MARCH and sewer 31, 2007 services by being
More informationOHIO ENGINEERING JOB APPROVAL AUTHORITY ETHICS STATEMENT
Sheet 1 of 9 NAME TITLE GRADE LOCATION DELEGATED BY (Responsible Engineer) TITLE DATE 210-NEM-501-A, Third Ed., Amend. OH1, February 2015 CONCURRED BY (Line Supervisor) (non-nrcs) TITLE DATE TITLE ETHICS
More information5.1 SIZING OF FACILITIES 5.2 PHASING CONSIDERATIONS
SECTION 5: COST ESTIMATING PROCESS Section 5 As part of the alternatives development, conceptual (planning level) cost estimates were developed for the options being proposed. These estimates would be
More informationJohnson Ferry Landing
Atlanta Investment Opportunity The Offering Through its exclusive broker CBRE, the owner of 30 prime acres in East Cobb referred to as Johnson Ferry Landing is seeking quality-oriented, well-capitalized
More informationTUALATIN VALLEY WATER DISTRICT BOARD OF COMMISSIONERS. 1850 SW 170 th AVENUE BEAVERTON, OREGON WORK SESSION JUNE 1, 2004 6:00 P.M.
TUALATIN VALLEY WATER DISTRICT BOARD OF COMMISSIONERS 1850 SW 170 th AVENUE BEAVERTON, OREGON WORK SESSION JUNE 1, 2004 6:00 P.M. Present: Commissioners: Jim Doane, Jim Duggan, Gordon Martin and Lisa Melyan
More information5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES
5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES Flood damage reduction consists of two basic techniques structural and non-structural. Structural methods modify the flood and take the flood away from people
More informationEXECUTIVE SUMMARY. VISION CONSIDERATION: All Vision areas are taken into consideration and are an important part of the City s budgeting process
Meeting: City Council Meeting Date: December 1, 2014 Public Hearing Agenda Item: 6a EXECUTIVE SUMMARY TITLE: 2015 Proposed Budget, Tax Levies and Truth in Taxation Public Hearing RECOMMENDED ACTION: Information
More informationFor more information, please contact: W. David Lee, Administrator, Statewide Planning and Policy Analysis Florida Department of Transportation 605
For more information, please contact: W. David Lee, Administrator, Statewide Planning and Policy Analysis Florida Department of Transportation 605 Suwannee Street MS 28 Tallahassee, Florida 32399 (850)
More informationCapital Construction and Debt Service
Capital Construction and Debt Service This section includes an overview and summary of appropriations and expenditures for the design, construction, and repair of major capital assets such as roads, bridges,
More informationUnit 4: Measuring GDP and Prices
Unit 4: Measuring GDP and Prices ECO 120 Global Macroeconomics 1 1.1 Reading Reading Module 10 - pages 106-110 Module 11 1.2 Goals Goals Specific Goals: Understand how to measure a country s output. Learn
More informationPartnerships in Achieving Green Infrastructure Goals
Partnerships in Achieving Green Infrastructure Goals Debra Mitchell, FASLA, LEED AP SmithGroupJJR Patrick Brawley, ASLA SmithGroupJJR Aaron Durnbaugh, Director of Sustainability Loyola University Chicago
More informationPotential Impacts of Hydrofracturing on Dam & Levee Safety
Potential Impacts of Hydrofracturing on Dam & Levee Safety Anita Branch, P.E. Senior Geotechnical Engineer Dam Fort Safety Worth Production District Center, Tulsa SAGEEP, 29 March 2012 29 January 2013
More informationVOCABULARY INVESTING Student Worksheet
Vocabulary Worksheet Page 1 Name Period VOCABULARY INVESTING Student Worksheet PRIMARY VOCABULARY 1. Savings: 2. Investments: 3. Investing: 4. Risk: 5. Return: 6. Liquidity: 7. Stocks: 8. Bonds: 9. Mutual
More informationFlow Measurement Options for Pipeline and Open Channel Flow
Flow Measurement Options for Pipeline and Open Channel Flow October 2013 Presented by Molly Skorpik - 2013 Montana Association of Dam and Canal Systems Conference Irrigation Training and Research Center
More information