1 TRANSPORTATION IMPACT ASSESSMENT DRI No. 631 Tisbury Farm Market Consolidation State Road Tisbury, Massachusetts April prepared for Martha s Vineyard Commission by C3 Consulting Group

2 CONTENTS Page 1 PROPOSED TISBURY FARM MARKET DESCRIPTION TRAFFIC 2.1 EXISTING TRAFFIC FUTURE NO-BUILD TRAFFIC EXISTING ROAD CONFIGURATION TRIP GENERATION FUTURE BUILD TRAFFIC - EXISTING ROAD CONFIGURATION TISBURY CONNECTOR ROADS LEVEL-OF-SERVICE ASSESSMENTS ROAD SAFETY 3.1 SAFE SIGHT DISTANCE VEHICLE CRASH HISTORY PARKING AND SITE LAYOUT SITE ACCESS SITE CIRCULATION PARKING PUBLIC TRANSPORTATION BICYCLE ACCESSIBILITY SUMMARY APPENDIX Level of Service Calculations April C3 Consulting Group 2

3 FIGURES 1 Preliminary Site Plan Base Year Traffic High Point Lane & State Road No-Build Traffic High Point & State Road - Existing Road Configuration Build Traffic - High Point & State Road Existing Road Configuration No-Build Traffic High Point & State Road Tisbury Connector Roads All Three Connections Build Traffic - High Point & State Road Tisbury Connector Roads All Three Connections No-Build Traffic High Point & State Road - Connector Road High Point Lane Only Build Traffic - High Point & State Road Connector Road High Point Lane Only TABLES 1 Trip Generation Calculations LOS Control Delay Guidelines for Intersections Analyzed Intersection Scenarios Intersection Capacity Utilization (ICU) LOS Criteria Existing LOS No-Build LOS Existing Road Configuration No-Build Connect LOS -. Existing Road Configuration Build LOS - Connector Roads All Three Connections Build LOS - Connector Roads All Three Connections Build LOS - Connector Roads High Point Only Build LOS - - Connector Roads High Point Only Vehicular Crash History Summary of Parking Supply and Demand APPENDIX April C3 Consulting Group 3

4 1. PROPOSED TISBURY FARM MARKET DESCRIPTION Location and Site Plan The proposed market consolidation is located at 412 State Road, Tisbury, Massachusetts. State Road is a two-lane roadway at that location. The proposed consolidation facility is located in the southwest corner of the intersection of High Point Lane and State Road. A preliminary site plan for the project is presented in Figure 1. It is anticipated that the application will submit a revised site plan. Characteristics The proposed consolidation will result in a 7,400 square-foot grocery with four apartments on a second floor. The preliminary site plan shows 36 parking spaces for the retail and apartment uses. Access to the site is by two driveway openings as shown on the site plan: one at High Point Lane and one at State Road. FIGURE 1 PRELIMINARY SITE PLAN April C3 Consulting Group 4

5 2. TRAFFIC 2.1 EXISTING (2011) TRAFFIC EXISTING ROAD CONFIGURATION Most of the traffic data available and used in this report were collected in 2005 and The Tisbury Connector Road Study, explained in more detail later, uses a one (1) percent per year growth factor, which was applied in developing 2011 and 2014 travel estimates from documents that contain automatic traffic recorders (ATR) and turning movement counts (TMC) data. The traffic estimates focused on the weekday PM peak period during the summer as the most critical time period. Traffic was studied at the intersections of State Road and High Point Lane and data and State Road and the Edgartown Vineyard Haven Road (abbreviated in this report as Edgartown-VH Road). Turning movement counts were increased by one (1) percent per year to establish a 2011 base year for the analysis of future build conditions. However, the traffic on High Point Lane and the turning movements onto and from High Point Lane were further increased to reflect the significant increase in the use of the Parkand-Ride as well as the establishment of temporary town offices there (20 trips to and from Up-Island and 10 trips to and from Down-Island entering or leaving High Point Lane). The 2011 estimates represent the background traffic. The 2011 PM weekday forecast turning movements is presented in Figure 2. FIGURE Base Year Traffic: High Point Lane & State Road April C3 Consulting Group 5

6 FUTURE (2014) NO-BUILD TRAFFIC EXISTING ROAD CONFIGURATION This study looks at several possible future configurations of the roads in the area. The first option, discussed in this sub-section, looks at the potential impact of building the Tisbury Farm Market based on the existing road configuration. Later (section 2.6) the study looks at the impact of the Farm Market if the Tisbury Connector Road System is built. For the study of the existing configuration, the 2011 traffic levels and turning movement counts presented in the previous sub-section were increased by one (1) percent per year to project the levels in 2014 without the farm market, referred to as the No-Build scenario. The traffic movements for the 2014 No-Build scenario at High Point Lane is presented in Figure 3. FIGURE No-Build Traffic: High Point Lane & State Road April C3 Consulting Group 6

7 TRIP GENERATION The next step is to estimate the traffic that will be generated from the Farm Market. The trips into and out of the proposed consolidated market site are estimated by applying data published in the Institute of Transportation Engineers (ITE) Trip Generation Manual for the following land use codes: Land Use Code 850, Supermarket. Land Use Code 220, Apartment. The description of supermarkets offered in the ITE manual is: Supermarkets are typically free-standing retail stores selling a complete assortment of food, food preparation and wrapping materials, and household cleaning and servicing items. Supermarkets may also contain facilities such as money machines, photo centers, pharmacies, and video rental areas. The trip generation rates for grocery stores indicate a wide variation, ranging from about 5 to about 20 trips per thousand square feet (ksf) in the PM Peak Hour, with an average of In this case, a trip generation rate of 8 trips per thousand square feet for the proposed Tisbury Farm Market is considered reasonable for two reasons: the market will not be offering many of the products and services that generate extra short trips, such as cigarettes and lottery tickets, and the Farm Market is replacing a furniture store that currently generates an estimated 5 to 10 trips at peak hour that have already been included in the traffic counts for the area; only the net increase needs to be accounted for. The estimates for trips generated by the proposed four apartments, as presented in the ITE manual, are reasonable. Table 1 contains the average peak-hour trip generation rates for weekday PM peak hours for the proposed market and apartments. The rates applied in this analysis are for trips made during the evening peak traffic hours of the adjacent street. The 7,400 square feet GFA is expected to generate 60 trips according to ITE published data. The four apartments are estimated to produce four trips. TABLE 1 - Trip Generation Calculations 412 State Road Farm Market - ITE L.U.C. 850 Units Trips per Unit Trips Enter Exit Weekday PM Peak Hour 7.4 (ksf) Apartments - ITE L.U.C 220 Trips per Apt Trips Enter Exit Weekday PM Peak Hour 4 apts Total April C3 Consulting Group 7

8 2.4 FUTURE (2014) BUILD TRAFFIC EXISTING ROAD CONFIGURATION Of the 32 trips entering or leaving the site during the PM peak hour, based on the turning movement counts and previous traffic studies for this intersection, an estimated two thirds of the trips (22 trips) will enter the site coming from Down- Island or leave the site in that direction, with the remaining trips (10) coming from or heading towards Up-Island. It is assumed that with the existing road configuration, the 32 additional trips entering and 32 additional trips leaving the site during the PM peak hour will enter or leave the site from State Road, either via High Point Lane or via the driveway giving direct access to State Road. A small number of vehicles may enter or exit from or onto High Point Lane coming from or going to the Park-and-Ride or another destination at the top of the hill. These were not excluded from the calculation of the intersection of High Point Lane and State Road. The following is the estimated distribution of how vehicles will approach the site: the 10 vehicles coming on State Road from Up-Island will turn right into the Farm Market driveway, of the 22 vehicles coming on State Road from Down-Island, half (11) will turn left onto High Point Lane and half (11) will pass this intersection and turn left into the driveway. The following is the estimated distribution of how vehicles will leave the site. The distribution is based on the recommendation that left turns be prohibited from the Farm Market site onto High Point Lane, for the reasons discussed in the section on Parking and Site Layout (section 4). The calculations are based on the assumption that all vehicles will exit directly onto State Road via the Farm Market driveway. The estimated intersection volumes from the trip generation step in the process are added and distributed accordingly to the subject intersections to derive a 2014 Build scenario. The results are presented graphically in Figure 4. April C3 Consulting Group 8

9 FIGURE Build Traffic: High Point Lane & State Road Existing Road Configuration TISBURY CONNECTOR ROADS The Town of Tisbury is considering construction of a system of connector roads, linking the Edgartown Vineyard Haven Road with State Road, in order to reduce the traffic congestion at the intersection of the Edgartown-VH Road & State Road. It would also provide a number of roads that would structure future development of the area. The proposal is to build a road from the Edgartown-VH Road that would go around the Park-and-Ride and link to State Road by means of connections to three existing roads: Evelyn Way, High Point Lane, and Holmes Hole Road. The Martha's Vineyard Commission carried out a traffic study of various possible configurations of these connector roads, indicating what would happen if only two connections were built or if all three were built. The conclusion of the study was that it is preferable that all three connections be built in order to disburse the traffic. The study indicated that if only one or even just two of the connections are built, it could worsen the traffic situation. The study also indicated that congestion would be best mitigated if there were a left-turn lane added to High Point Lane at the intersection with State Road. However, because of financial constraints, the Town might start out by building only the High Point Lane connection as a temporary solution, with other roads to be added as funding permits. So in addition to looking at the impact of the project based on the existing road configuration discussed in the previous sections, this traffic study also looks at the April C3 Consulting Group 9

10 impact of the construction of the Farm Market with two possible configurations for the Connector Roads, namely: All Three Connections: The three connections to State Road as recommended in the report, and including a left-turn lane at the foot of High Point Lane at State Road, and High Point Lane Only: A worst-case scenario of only the High Point Lane being built. The methodology is similar to the analysis of the Existing Road Configuration, namely estimating the 2014 No-Build and 2014 Build conditions for each of the two configurations. The term Build refers to the absence or presence of the proposed market and not to whether or not a roadway is built. The traffic volumes for the two configurations are based on the Tisbury Road Connector System Study with the adjustments as discussed above, namely one percent annual increase plus 30 additional PM peak hour trips due to increased use of the Park-and-Ride and town offices. Figures 5 and 6 present the estimated traffic movements for the No-Build and Build scenarios. FIGURE No-Build Traffic: High Point Lane & State Road Tisbury Connector Roads All Three Connections April C3 Consulting Group 10

11 FIGURE Build Traffic: High Point Lane & State Road Tisbury Connector Roads All Three Connections FIGURE No-Build Traffic: High Point Lane & State Road Tisbury Connector Roads - High Point Lane Only April C3 Consulting Group 11

12 FIGURE Build Traffic: High Point Lane & State Road Tisbury Connector Roads - High Point Lane Only April C3 Consulting Group 12

13 2.6 LEVEL-OF-SERVICE ASSESSMENTS The Level of Service (LOS), according to information published in the Highway Capacity Manual, is a standard used to describe how an intersection, signalized or un-signalized, is operating. The LOS is a measure of delay, in seconds, to conflicting movements in an intersection. Table 2 presents the delay times and measures of effectiveness which expressed in letters from A to F, LOS F representing the worst condition. The LOS calculations were performed using the Synchro 7 software which is a digitized version of the Highway Capacity Manual analysis. TABLE 2 LOS Control Delay Guidelines For Un-Signalized Intersections LOS Seconds/Vehicle Descriptions A <10 Free flow, minimal delays B >10 and <15 Stable flow, occasional delays C >15 and <25 Stable flow, periodic delays D >25 and <35 Restricted flow, regular delays E >35 and <50 Maximum capacity, extended delays F >50 Forced flow, excessive delays Source: Highway Capacity Manual, Transportation Research Board, A summary of intersections, years, and scenarios are presented in Table 3. TABLE 3 - Analyzed Intersection Scenarios Intersection With State Road Year Scenario Existing Situation High Point Lane 2011 Base Existing Road Configuration High Point Lane 2014 No-Build High Point Lane 2014 Build Tisbury Connector Roads All Three Connections High Point Lane 2014 No-Build High Point Lane 2014 Build Tisbury Connector Roads High Point Lane Only Connection High Point Lane 2014 No-Build High Point Lane 2014 Build The intersections are specified as two-way stop controlled (TWSC) with STOP signs. All approaches have one lane with the Existing Road Configuration. With the Connector Road, High Point Lane is proposed to have a two-lane approach at State Road. The default Peak Hour Factor (PHF) is 0.98 for the PM peak hour. A default value of two (2) percent trucks was used for all analyses. The levels of service were calculated using the latest version of the Synchro software and the 2000 Highway Capacity Manual procedures. Table 4 presents the LOS results for the various intersections and time periods. The table shows April C3 Consulting Group 13

14 the volume over capacity ratio (V/C), average control delay, level of service, intersection capacity utilization (ICU) and the 95 th percentile queue. The 95 th percentile queue column shows the queue length in feet and signifies that the queue lengths at the intersection will be less than those shown in the table 95% of the time. TABLE 4 - Intersection Capacity Utilization (ICU) LOS Criteria LOS ICU Description A <=55% No congestion - can accommodate 40% more traffic B >55% to 64% Has very little congestion - can accommodate 30% more traffic C >64% to 73% Has no major congestion - can accommodate 20% more traffic D >73 % to 82% Normally has no major congestion - can accommodate 10% more traffic E >82% to 91% On the verge of congestion conditions - less than 10% reserve capacity F >91% to 100% Over capacity - congestion periods of 15 to 60 minutes G >100% to 109% Up to 9% over capacity - congestion periods of 60 to 120 minutes H >109% 9% over capacity - congestion periods over 120 minutes Note that the approach delays and levels of service calculated by Synchro are likely to overstate the actual impacts from a project for a number of reasons, such as the fact that polite Vineyard drivers on main roads are likely to allow waiting drivers to enter from secondary roads before the delays predicted in the computer model. However, it is general planning practice to use data from this type of computer analysis to analyze and compare applications for development projects and to evaluate possible mitigation measures. Unfortunately, some engineers use the results of analytical software literally when it should only be used a guide for knowledgeable applications. Existing (2011) Conditions To assess the traffic operations under existing (2011) conditions, level of service analysis was conducted at the following two un-signalized intersections during weekday PM peak hour during the summer season: High Point Lane & State Road, Provided in Table 5 is a description of the results of the traffic analysis for each of the above three intersections under STOP sign control. Table 4 shows the levels of service, delay, queue lengths, and intersection capacity utilization for the various traffic movements. TABLE Existing LOS (Summer Weekday PM Peak) State Road Delay 95th Q ICU ICU and: Movement V/C (secs) LOS (ft) % LOS High Point Lane WB LR F D State Road at High Point Lane: Traffic operations at this intersection are at LOS F during the summer weekday PM peak hour. The 55.8 second delay is about April C3 Consulting Group 14

15 mid-way into the range presented in Table 4. The ICU LOS indicates the intersection normally has no major congestion and has an ability to accommodate an additional 10 percent traffic. Existing Road Configuration Future (2014) No-Build Conditions (Existing Road Configuration) Table 6 lists the levels of service, delay, queue lengths, and intersection capacity utilization (ICU) for various traffic movements. TABLE No-Build LOS Existing Road Configuration State Road and: Movement V/C Delay (secs) LOS 95th Q (ft) High Point Lane WB LR F 154 State Road at High Point Lane: Traffic exiting High Point Lane will be at LOS F during the 2014 summer weekday PM peak hour under the No-Build condition with an average approach delay of 89.4 seconds and an average queue length of 154 feet. Future Build (2014) Conditions (Existing Road Configuration) Table 7 provides similar analyses as above except the data are for Build conditions and allows for comparisons between No-Build and Build scenarios. TABLE Build LOS Existing Road Configuration State Road Delay and: Movement V/C (secs) LOS 95th Q (ft) High Point Lane WB LR F 161 State Road at High Point Lane: Traffic exiting High Point Lane will be at LOS F during the 2014 summer weekday PM peak hour under the Build condition with an average approach delay of 84.1 seconds and an average queue length of 161 feet. April C3 Consulting Group 15

16 Tisbury Connector Roads All Three Connections Future (2014) No-Build Conditions (Connector Roads - All Three Connections) Table 8 lists the levels of service, delay, queue lengths, and intersection capacity utilization (ICU) for various traffic movements. TABLE No-Build LOS Connector Road All Three Connections State Road and: Movement V/C Delay (secs) LOS 95th Q (ft) High Point Lane WB L F 111 State Road at High Point Lane (with all three connections leading to Edgartown Road): If the connection is established between the Edgartown Vineyard Haven Road and State Road with three connections at State Road, as recommended in the study of the Tisbury Connector Roads, vehicles turning left from High Point Lane onto State Road could experience a LOS of F (58 second approach delay). Future Build (2014) Conditions (Connector Road All Three Connections) TABLE Build LOS Connector Road - All Three Connections State Road Delay 95th Q and: Movement V/C (secs) LOS (ft) High Point Ln. WB L F 131 State Road at High Point Lane (with all three connections to Edgartown Road): With the construction of the Farm Market, the level of service will go down slightly, but will remain at LOS F (68 second approach delay) for the left turns coming out of High Point Lane. April C3 Consulting Group 16

17 Tisbury Connector Roads Connector Roads - High Point Lane Only Future (2014) No-Build Conditions (Connector Roads - High Point Lane Only) Table 7 lists the levels of service, delay, queue lengths, and intersection capacity utilization (ICU) for various traffic movements. TABLE No-Build LOS Connector Road High Point Lane Only State Road and: Movement V/C Delay (secs) LOS 95th Q (ft) High Point Lane WB L F 290 WB R C 31 State Road at High Point Lane (with only High Point Lane connection to Edgartown Road): If the connection is established between High Point Lane and Edgartown Road, on High Point Lane only, the level of service will drop to LOS F (approach delay of over 564 seconds) for the left turns coming out of High Point Lane. This is due to the large number of vehicles making this left turn and the heavy congestion on State Road. Given that High Point Lane will have two approach lanes, the right turns from High Point Lane will operate at LOS C. Overall, the intersection is over capacity with long periods of congestion. Future Build (2014) Conditions Connector Road High Point Lane Only TABLE Build LOS Connector Road High Point Lane Only State Road and: Movement V/C Delay (secs) LOS 95th Q (ft) High Point Ln WB L F 306 WB R C 32 State Road at High Point Lane (with only High Point Lane connection to Edgartown Road): With the construction of the Farm Market, the level of service will remain at LOS F for the left turns coming out of High Point Lane. The right turns from High Point Lane will continue to operate at LOS C. Overall, the intersection is over capacity with long periods of congestion. April C3 Consulting Group 17

18 3. ROAD SAFETY 3.1 SAFE SIGHT DISTANCE The segment of State Road at High Point Lane and the nearby driveway to the proposed market consolidation site was reviewed for conformance with current sight distance requirements. The safe sight distance (SSD), according to American Association of State Highway Officials (AASHTO), for a passenger vehicle to complete a left turn from a two-lane highway with an operating speed of 30 mph is 360 feet. Further, the intersection sight distance (ISD) for vehicles exiting a side street onto a roadway that has an average speed of 30 mph is 110 feet. This distance provides the exiting vehicle driver the time required to react and accelerate to a safe merge (right turn) or cross movement (left turn). Sight distances at the proposed market consolidation driveway at State Road are greater than 400 feet and adequate according to published standards. 3.2 VEHICLE CRASH HISTORY Vehicle Crash History The MassHighway Crash Records System for the years was reviewed for vehicular crash data on the section of State Road under study for the intersections of Evelyn Way, High Point Lane, and Holmes Hole Road. There were no reported fatalities. There was one property damage and one personal injury. The results of the reported crashes are summarized in Table 10. Table 12 Vehicular Crash History Crashes Location Totals State Road and Evelyn Way State Road and High Point Lane State Road and Holmes Hole Road Totals PARKING AND SITE LAYOUT 4.1 SITE ACCESS As mentioned above, the property presently has two access points, namely driveways from State Road and from High Point Lane. Each access is likely to be used by those coming from or going to locations in that direction. Entering: Allowing continued entry at both driveways will help disperse the traffic and reduce the impact on the problematic intersection of High Point Lane & State Road. The State Road access will be used for people arriving from Up-Island and April C3 Consulting Group 18

19 some people coming from Down-Island will likely go through the High Point Lane intersection and use the markets State Road entrance. Some drivers on State Road from the Down-Island direction heading to the farm market are likely to turn left onto High Point Lane and then turn right into the property. If they cannot easily enter the property, this could result in vehicles backing up onto High Point Lane and even onto State Road. This impact should be minimal for the following reasons. The parking lot is fairly large and has sufficient circulation areas to hold several vehicles waiting to find a parking spot. The applicant has offered to move the entrance point somewhat farther from State Road, though this relocation is limited by the difference in elevation and the presence of the truck docks. This shift, of about 20 to 30 feet, would take place in conjunction with the improvements to High Point Lane as part of the Connector Roads project. There is a relatively low number of vehicles expected to make this maneuver (11 per peak hour). Exiting: With respect to leaving the site, there are several problems associated with having vehicles exit on High Point Lane and then turning left to reach State Road. The traffic analysis indicates that the most problematic movement is the left turn from High Point Lane onto State Road, and it would be preferable if the farm market traffic not be permitted to add to this; this will be even more problematic if some, but not all of the connector roads are built. If a left-turn lane is added at the foot of High Point Lane as part of the construction of the connector road(s), there could be two lanes of vehicles stacked up at the foot of High Point Lane waiting to turn left or right. Vehicles turning left coming out of the farm market and wanting to head Down-Island on State Road would have to cut across two lanes to get to the right-turn lane. If there were vehicles there, they could block traffic heading up High Point Lane and this could impact traffic on State Road. Therefore, it is recommended that there be no left turn on High Point Lane from the farm market. The right-hand turn would allow vehicles to head up to the Parkand-Ride and other activities at the top of High Point Lane, and if the connector roads are built, would allow access to the Edgartown Vineyard Haven Road. 4.2 SITE CIRCULATION The physical layout of the parking stalls, as indicated on the preliminary site plan in Figure1, cause pedestrians going from vehicles to the market entrance to walk between parked vehicles and then step out into the travel aisles. Potential pedestrian/vehicle conflicts can occur under these conditions. A safer layout would have the travel aisles perpendicular to the market entrance. This arrangement will allow pedestrians to walk from vehicle to store front via the April C3 Consulting Group 19

20 aisle, without stepping out between parked vehicles, thereby increasing safer access to market entrance. The parking lot configuration should be able to accommodate the maneuvers of delivery vehicles destined to the loading dock. The large semi-tractor-trailer vehicle (WD-50) requires a 45-foot radius to turn around and back into up to the loading dock. 4.3 PARKING Table 13: Summary of Parking Supply and Demand Supermarket Apartment Total Parking 7,400 s.f. 4 Units Spaces Proposed Parking (Preliminary Site Plan) Tisbury Zoning Requirements (plus employees) Parking Demand based on ITE Parking Manual (supermarket) and common practice (apartments) Proposed Parking: The preliminary site plan shows a total of 36 parking spaces within the parking lot layout. The applicant proposes to provide employee parking in the Tisbury Park-and-Ride, which is in easy walking distance from the site. Tisbury Zoning Requirements: The Town of Tisbury Zoning Bylaw for a B-II District requires one (1 space) per 150 square feet of retail space. In making this calculation, 20% is deducted from the floor area. Based on this requirement a total of 39 spaces would be needed for the supermarket (7,400 sq. ft X 80% = 5,920/150=39) In addition to the parking needs of shoppers, the Zoning Bylaw requires one (1) parking space for each person employed on the premises. The applicant has offered to accommodate employee parking in the Park-and-Ride, The Tisbury Zoning by-law requires 2 parking spaces for each of the four dwelling units for a total of 8 spaces. Based on the Tisbury Zoning requirement, the parking demand is not met by this proposal. However, the Town of Tisbury Zoning Bylaw allows the Zoning Board of Appeals to reduce the required number of parking spaces. April C3 Consulting Group 20

21 Parking Demand: The ITE Parking Manual calls for 4.36 parking spaces per thousand square feet, for a total of 32 spaces (7.4 x 4.36 = 32). The manual does not have a parking requirement for an apartment but it is common practice to provide one space per unit for small apartments, for a total of four spaces. Based on the employees parking off site, this would result in a total parking demand of 36 parking spaces. 5 PUBLIC TRANSPORTATION The Martha s Vineyard Transportation Authority (VTA) provides service in the area of the site of the proposed market consolidation. Route Number 2 and Route Number 3 pass by the site. Route Number 10 terminates at the Tisbury Park & Ride facility and provides free shuttle bus service to downtown Vineyard Haven and to the SSA ferry terminal. The frequency of VTA service varies by time of year. 6 BICYCLE ACCESSIBILITY The closest designated bicycle route to the proposed farm market site by bicycle is on West Spring Street, which is relatively close along State Road. The plans for the Tisbury Connector Roads incorporate a number of Shared Use Paths and bicycle routes that would pass immediately in front of the farm market site and would provide links to the Island-wide network of Shared Use Paths and bicycle routes. 7 SUMMARY Traffic The base year (2011) traffic movements at the intersection of State Road with High Point Lane show levels of service ranging from A to D. These locations also show an ability to accommodate an additional 10 percent to 30 percent availability. With the existing road configuration: The 2014 No-Build estimates of traffic for the two intersections with State Road generally follow the 2011 pattern with an ability to accommodate an additional 10 percent to 30 percent availability. The 2014 Build scenarios at the High Point Lane intersection shows that the addition of the farm market would result in a slight decrease in the ability to accommodate excess capacity. April C3 Consulting Group 21

22 With the Tisbury Connector Roads All Three Connections; The 2014 No-Build scenarios show that adding a connection between Edgartown Road with three connections to State Road at Evelyn Way, High Point Lane, and Holmes Hole Road, results in a level of service of LOS F (58 second approach delay) for the left turns coming out of High Point Lane. With the High Point Lane having two approach lanes, the right turns from High Point Lane will operate at LOS C. The 2014 Build scenarios show that the delay on High Point Lane turning left onto State Road would be about ten (10) seconds longer with the Farm Market than without it. With the Tisbury Connector Roads High Point Lane connection only; The 2014 No-Build scenarios show that adding a connection between High Point Lane and Edgartown Road results in the level of service dropping to LOS F for the left turns coming out of High Point Lane. With the High Point Lane having two approach lanes, the right turns from High Point Lane will operate at LOS C. According to the ICU LOS, the intersection is over capacity with expectation of long periods of congestion. The problem is that high volumes on State Road delay the movements and cause congestion into the unacceptable ranges. The 2014 Build scenarios show that the delay on High Point Lane turning left onto State Road would be greater with the farm market than without it, with a queue length increasing from 290 to 306 feet. Parking and Site Layout Site Access: It is recommended that no left turns be permitted for vehicles exiting the site onto High Point Lane as that would exacerbate traffic problems on High Point Lane. Parking: The parking proposal appears to meet the demand but not the Tisbury Zoning Bylaw; The preliminary site plan indicates 36 parking spaces. The parking demand is estimated at 36 parking spaces, based on ITE standards for the farm market, on common practice for the apartments, and on employees parking in the nearby Park-and-Ride. The Town of Tisbury Zoning Bylaw calls for about 47 parking spaces, which would not be met by the proposal. The town Zoning Board of Appeals could reduce the minimal parking requirements. Site Layout: The Attention should be given to the physical layout of the parking lot. Pedestrian safety can be enhanced by providing as much of a direct route to the market entrance as possible with the least amount of vehicular conflict, such as by rotating the orientation of the parking lot layout. April C3 Consulting Group 22

23 Safe Sight Distance Sight distances at the proposed market consolidation driveway at State Road are greater than 400 feet and are according to AASHTO standards. Vehicle Crash History There were two reported vehicle crashes in 2006: one at State Road and Evelyn Way and one at State Road and Holmes Hole Road. Neither involved fatalities. There were no reported crashes at the study locations in 2007 or Public Transportation VTA Route Number 2 and Route Number 3 pass by the site. Route Number 10 terminates at the Tisbury Park & Ride facility and links to downtown and the ferry. Bicycle Access Bicycle access is possible from the nearest bicycle route, West Spring Street, via State Road. The construction of the Tisbury Connector Roads would significantly enhance bicycle access to the site. April C3 Consulting Group 23

24 APPENDIX Level of Service Calculations April C3 Consulting Group 24

25 April C3 Consulting Group 25

26 April C3 Consulting Group 26

27 April C3 Consulting Group 27

28 April C3 Consulting Group 28

29 April C3 Consulting Group 29

30 April C3 Consulting Group 30

TRANSPORTATION IMPACT ANALYSIS PROCEDURES MANUAL

TRANSPORTATION IMPACT ANALYSIS PROCEDURES MANUAL TRANSPORTATION IMPACT ANALYSIS PROCEDURES MANUAL INTRODUCTION The Town of Harrisburg is committed to establishing an interconnected, multimodal transportation system that increases mobility, safety, connectivity,

More information

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application):

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application): Transportation Assessment and Management Study Guidelines for Consultants INTRODUCTION This document is intended to provide guidelines for transportation consultants who produce Transportation reports

More information

Goals & Objectives. Chapter 9. Transportation

Goals & Objectives. Chapter 9. Transportation Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system

More information

Guidelines for the Preparation of Transportation Impact Studies 8 th Revision

Guidelines for the Preparation of Transportation Impact Studies 8 th Revision Guidelines for the Preparation of Transportation Impact Studies 8 th Revision Halifax Regional Municipality Traffic and Right of Way Transportation and Public Works P.O. Box 1749 Halifax, Nova Scotia B3J

More information

Retooling School Drop-off/Pick-up Zones to Meet Demand Keith B. Higgins, PE, TE

Retooling School Drop-off/Pick-up Zones to Meet Demand Keith B. Higgins, PE, TE Abstract Retooling School Drop-off/Pick-up Zones to Meet Demand Keith B. Higgins, PE, TE Student drop-off and pick-up activity at school sites throughout the country have increased in recent years as a

More information

6: LANE POSITIONS, TURNING, & PASSING

6: LANE POSITIONS, TURNING, & PASSING 6: LANE POSITIONS, TURNING, & PASSING BASIC LANE POSITIONS Traffic law says that slower vehicles should stay to the right. But where exactly should bicycles ride? Here are some basics. Never Ride Against

More information

Median Bus Lane Design in Vancouver, BC: The #98 B-Line

Median Bus Lane Design in Vancouver, BC: The #98 B-Line Li 1 Median Bus Lane Design in Vancouver, BC: The #98 B-Line Simon Li, P.Eng. PTOE Acting Program Manager, Road and Bridge Projects TransLink (Greater Vancouver Transportation Authority) 1600 4720 Kingsway

More information

SIGHT DISTANCE. Presented by Nazir Lalani P.E. Traffex Engineers Inc. N_lalani@hotmail.com WHY IS SIGHT DISTANCE SO IMPORTANT?

SIGHT DISTANCE. Presented by Nazir Lalani P.E. Traffex Engineers Inc. N_lalani@hotmail.com WHY IS SIGHT DISTANCE SO IMPORTANT? SIGHT DISTANCE Presented by Nazir Lalani P.E. Traffex Engineers Inc. N_lalani@hotmail.com WHY IS SIGHT DISTANCE SO IMPORTANT? Drivers must be able to: Stop for objects in the roadway Stop for stationary

More information

How To Design A Crash Investigation Site

How To Design A Crash Investigation Site CHAPTER 7 CRASH INVESTIGATION SITES December, 2000 7. Crash Investigation Sites (CIS) 7.1. Introduction and Usage The idea of "crash investigation sites" or areas outside of the freeway mainline where

More information

9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015

9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Kunzman Associates, Inc. 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Prepared by: Bryan Crawford Carl Ballard,

More information

MEMORANDUM. Robert Nichols, Acting Corridor Design Manager Northgate Link Extension

MEMORANDUM. Robert Nichols, Acting Corridor Design Manager Northgate Link Extension MEMORANDUM DATE: September 23, 2014 TO: Robert Nichols, Acting Corridor Design Manager Northgate Link Extension FROM: SUBJECT: COPIES: Katherine Casseday, PE, PTOE, Casseday Consulting Tony Lo, PE, Parsons

More information

TABLE OF CONTENTS TABLES FIGURES

TABLE OF CONTENTS TABLES FIGURES TABLE OF CONTENTS Introduction...1 1. On-Site Stacking...2 2. Number of School Driveways...2 3. School Driveway Standards...3 3A. Driveway Spacing...3 3B. Driveway Location...4 3C. Driveway Lane Widths

More information

4.5 TRANSPORTATION - YEAR 2025 TRAFFIC CONDITIONS WITH PROPOSED TIMP 4.5-1 ESTIMATION OF TRIP REDUCTIONS WITH TIMP TRANSIT AND TDM PROGRAMS

4.5 TRANSPORTATION - YEAR 2025 TRAFFIC CONDITIONS WITH PROPOSED TIMP 4.5-1 ESTIMATION OF TRIP REDUCTIONS WITH TIMP TRANSIT AND TDM PROGRAMS Draft Environmental Impact Report State Clearinghouse No. 2002061090 City of LA EIR No. 2003-1922-EIR CPC No. 98-0010 (CPU) 4.5 TRANSPORTATION - YEAR 2025 TRAFFIC CONDITIONS WITH PROPOSED TIMP This chapter

More information

CHAPTER 2 TRAFFIC SIGNS AND HIGHWAY MARKINGS

CHAPTER 2 TRAFFIC SIGNS AND HIGHWAY MARKINGS CHAPTER 2 TRAFFIC SIGNS AND HIGHWAY MARKINGS This chapter summarizes traffic signs, signals and road markings that control the flow of traffic, making streets and highways safer for motorists, bicyclists

More information

Chapter 6. Intersections. 6 Intersections

Chapter 6. Intersections. 6 Intersections Chapter 6 Intersections 6 Intersections Chapter 6 Intersection Design 6.1 Introduction An intersection is the area where two or more streets join or cross at-grade. The intersection includes the areas

More information

Bromley Town Centre. Transport Strategy Supporting the Area Action Plan. Evidence Base

Bromley Town Centre. Transport Strategy Supporting the Area Action Plan. Evidence Base Bromley Town Centre Transport Strategy Supporting the Area Action Plan Evidence Base Produced on behalf of London Borough of Bromley by Peter Brett Associates LLP April 29 Bromley Town Centre AAP Evidence

More information

Multi-Modal Corridor Degree of Complexity: High Cost/Benefit: High

Multi-Modal Corridor Degree of Complexity: High Cost/Benefit: High Multi-Modal Corridor Degree of Complexity: Cost/Benefit: Maintain the same level of service for Ensures continuous flow through the Might impact other transportation Consider road diet and/or different

More information

DRAFT. Martha's Vineyard Coordinated Human Services Transportation Plan

DRAFT. Martha's Vineyard Coordinated Human Services Transportation Plan DRAFT Martha s Vineyard Transit Authority (VTA) and Martha s Vineyard Commission (MVC) Martha's Vineyard Coordinated Human Services Transportation Plan January 2015 Martha s Vineyard Coordinated Human

More information

Walkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps

More information

11. Monitoring. 11.1 Performance monitoring in LTP2

11. Monitoring. 11.1 Performance monitoring in LTP2 178 11. Monitoring 11.1 Performance monitoring in LTP2 Performance against the suite of indicators adopted for LTP2 is shown in the following table. This shows progress between 2005/06 and 2009/10 (the

More information

Appendix E Traffic Impact Analysis

Appendix E Traffic Impact Analysis Appendix E Traffic Impact Analysis 2010 Facility Master Plan Factoria Recycling and Transfer Station November 2010 2010 Facility Master Plan Factoria Recycling and Transfer Station November 2010 Department

More information

CAPACITY AND LEVEL-OF-SERVICE CONCEPTS

CAPACITY AND LEVEL-OF-SERVICE CONCEPTS CHAPTER 2 CAPACITY AND LEVEL-OF-SERVICE CONCEPTS CONTENTS I. INTRODUCTION...2-1 II. CAPACITY...2-2 III. DEMAND...2-2 IV. QUALITY AND LEVELS OF SERVICE...2-2 Service Flow Rates...2-3 Performance Measures...2-3

More information

Best Practice For Selecting Bus Stop Locations

Best Practice For Selecting Bus Stop Locations Best Practice For Selecting Bus Stop Locations There is no perfect school bus stop, because it is impossible to eliminate all potential hazards, but guidelines and training are still necessary to ensure

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Presenter Gerry Harter, PE, Area Traffic Engineer Acting Transportation and Land Use Director Why a TIA? Roads are a critical public resource and a major investment of public funds

More information

1500 Hamilton Avenue Primrose Daycare Center Project

1500 Hamilton Avenue Primrose Daycare Center Project 15 Hamilton Avenue Primrose Daycare Center Project Traffic Impact Analysis Prepared for: Denise Duffy & Associates, Inc. January 16, 215 Hexagon Transportation Consultants, Inc. Hexagon Office: 111 W.

More information

Advantages and Disadvantages of One Way Streets October 30, 2007

Advantages and Disadvantages of One Way Streets October 30, 2007 Advantages and Disadvantages of One Way Streets October 30, 2007 0 P age Background As the revitalization of the Central Waterfront area moves forward, one issue that might need closer analysis is the

More information

0.0 Curb Radii Guidelines Version 1.0.2

0.0 Curb Radii Guidelines Version 1.0.2 Background In early 2014, Transportation Services initiated a review of the Division's design guidelines and standards to move our organization in a direction consistent with the transportation departments

More information

INSTITUTIONAL MASTER PLAN NOTIFICATION FORM / PROJECT NOTIFICATION FORM BOSTON UNIVERSITY MEDICAL CENTER

INSTITUTIONAL MASTER PLAN NOTIFICATION FORM / PROJECT NOTIFICATION FORM BOSTON UNIVERSITY MEDICAL CENTER INSTITUTIONAL MASTER PLAN NOTIFICATION FORM / PROJECT NOTIFICATION FORM BOSTON UNIVERSITY MEDICAL CENTER JUNE 7, 2013 SUBMITTED TO: BOSTON REDEVELOPMENT AUTHORITY ONE CITY HALL SQUARE BOSTON, MA 02201

More information

BEFORE-AND-AFTER STUDY OF THE EFFECTIVENESS OF RECTANGULAR RAPID-FLASHING BEACONS USED WITH SCHOOL SIGN IN GARLAND, TEXAS

BEFORE-AND-AFTER STUDY OF THE EFFECTIVENESS OF RECTANGULAR RAPID-FLASHING BEACONS USED WITH SCHOOL SIGN IN GARLAND, TEXAS BEFORE-AND-AFTER STUDY OF THE EFFECTIVENESS OF RECTANGULAR RAPID-FLASHING BEACONS USED WITH SCHOOL SIGN IN GARLAND, TEXAS Marcus A. Brewer (corresponding author) Associate Research Engineer Texas Transportation

More information

FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST

FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST August 2003 Background: The Federal Highway Administration (FHWA) has retained all approval rights to the control

More information

Seagull Intersection Layout. Island Point Road - A Case Study. Authors: John Harper, Wal Smart, Michael de Roos

Seagull Intersection Layout. Island Point Road - A Case Study. Authors: John Harper, Wal Smart, Michael de Roos Seagull Intersection Layout. Island Point Road - A Case Study Authors: John Harper, Wal Smart, Michael de Roos Presented by Mr John Harper, Road Safety and Traffic Services Manager Phone: 4221 2456 Mobile:

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRANSPORTATION Section 6-1 TRAFFIC IMPACT ANALYSIS The Town Of Buckeye Arizona Engineering Design Standards Section 6-1 Adopted December 2012 TABLE OF CONTENTS 6-1.000 GENERAL INFORMATION:...3 6-1.001

More information

Appendix A In-Car Lessons

Appendix A In-Car Lessons Driver Education Classroom and In-Car Curriculum Appendix A In-Car Lessons Table of Contents In-Car Lessons Introduction..... A-4 Overview and Objectives Teacher Information and Resources Lesson #1 Developing

More information

APPENDIX F. Access Management Design Standards for Entrances and Intersections

APPENDIX F. Access Management Design Standards for Entrances and Intersections APPENDIX F Access Management Design Standards for Entrances and Intersections PREFACE The access management regulations and standards do not apply in cities, towns of more than 3,500 and in counties (Henrico

More information

ROAD SIGNS IN JAPAN PARKING SIGNS. No Parking or Stopping Anytime SIZE & WEIGHT LIMIT SIGNS SPEED LIMIT SIGNS

ROAD SIGNS IN JAPAN PARKING SIGNS. No Parking or Stopping Anytime SIZE & WEIGHT LIMIT SIGNS SPEED LIMIT SIGNS ROAD SIGNS IN JAPAN Stop Slow & all Do Not Enter & Motorcycles Road Large Sized Trucks & Special Duty Road All Except Two Wheeled Light Except Bicycles Large Passenger No Right Turn No Passing No U-Turn

More information

Lawson Outline Plan External Traffic Analysis Working Paper

Lawson Outline Plan External Traffic Analysis Working Paper Total Lawson Development ACTPLA 16 January 2009 Document No.: Prepared for ACTPLA Prepared by Maunsell Australia Pty Ltd Level 2, 60 Marcus Clarke Street, Canberra ACT 2600, Australia T +61 2 6201 3000

More information

APPENDIX J TRAFFIC STUDY

APPENDIX J TRAFFIC STUDY APPENDIX J TRAFFIC STUDY May 7, 2014 Ms. Leianne Humble Denise Duffy and Associates, Inc. 947 Cass Street, Suite 5 Monterey, CA 93940 Re: Traffic Study for the Heritage Oaks Memorial Park in San Jose,

More information

Major Improvement Schemes in Basingstoke

Major Improvement Schemes in Basingstoke Major Improvement Schemes in Basingstoke 1. Welcome Welcome to this exhibition, which provides information about the planned highway improvements being delivered in Basingstoke from 2015 2018. A30 Winchester

More information

FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005

FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005 FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005 Background: It is in the national interest to maintain the Interstate System to provide the highest level of

More information

Supplemental Plan Check Corrections Sheet for Bicycle Parking Ordinance (Effective 3/13/2013)

Supplemental Plan Check Corrections Sheet for Bicycle Parking Ordinance (Effective 3/13/2013) Supplemental Plan Check Corrections Sheet for Bicycle Parking Ordinance (Effective 3/13/2013) Plan Check PCIS application number: - - Job Address Zone: P.C. Engineer (E-mail: firstname.lastname@lacity.org)

More information

TRANSPORTATION ENGINEERING DESIGN STANDARDS. Adopted by City Council Ordinance

TRANSPORTATION ENGINEERING DESIGN STANDARDS. Adopted by City Council Ordinance TRANSPORTATION ENGINEERING DESIGN STANDARDS Adopted by City Council Ordinance City of Lakewood Traffic Engineering Division Department of Public Works 480 South Allison-80226-3105 March 2007 TABLE OF CONTENTS

More information

Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL

Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Chapter Forty-seven RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Illinois RURAL TWO-LANE/MULTILANE STATE HIGHWAYS December 2009 2 Illinois

More information

These "rules of the road" are based on Texas Transportation Code statutes. Find the complete bicycle code at the bottom of the page

These rules of the road are based on Texas Transportation Code statutes. Find the complete bicycle code at the bottom of the page Texas Bicycle Laws These "rules of the road" are based on Texas Transportation Code statutes. Find the complete bicycle code at the bottom of the page Bicyclists have the rights and duties of other vehicle

More information

Guelph Driving School. 246 WOOLWICH ST. Unit C Guelph, Ontario N1H 3V9. Office: 519-829-8801 Cell: 519-362-5664. Email: info@guelphdrivingschool.

Guelph Driving School. 246 WOOLWICH ST. Unit C Guelph, Ontario N1H 3V9. Office: 519-829-8801 Cell: 519-362-5664. Email: info@guelphdrivingschool. 246 WOOLWICH ST. Unit C Guelph, Ontario N1H 3V9 Office: 519-829-8801 Cell: 519-362-5664 Email: info@guelphdrivingschool.com Dear Student, We would like to take this opportunity to thank you for choosing

More information

WYDOT Quick Facts TRAFFIC SIGNALS

WYDOT Quick Facts TRAFFIC SIGNALS TRAFFIC SIGNALS WYDOT Quick Facts 2 Advantages of traffic signals WYDOT Quick Facts Traffic signals control vehicle and pedestrian traffic by assigning priorities to various traffic movements to influence

More information

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. WELCOME WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. The purpose of the exhibition is to provide the community with the opportunity to view our initial ideas

More information

TRANSPORTATION IMPACT ASSESSMENT (TIA) GUIDELINES. Section 1 Introduction

TRANSPORTATION IMPACT ASSESSMENT (TIA) GUIDELINES. Section 1 Introduction TRANSPORTATION IMPACT ASSESSMENT (TIA) GUIDELINES Section 1 Introduction MassDOT s mission is to deliver excellent customer service to people who travel in the Commonwealth, and to provide our nation's

More information

School Bus Safety Transportation Rules & Regulations

School Bus Safety Transportation Rules & Regulations Transportation Office The State Department of Education (SDE) Regulates School Bus Transportation A local school system can give service only within the limits of the resources made available by state

More information

VEHICLE CROSSOVER INFORMATION PACK

VEHICLE CROSSOVER INFORMATION PACK VEHICLE CROSSOVER INFORMATION PACK CONTENTS Introduction Section A Section B Section C Section D Section E Criteria for approving a vehicle crossover application (Diagrams to demonstrate measurement criteria)

More information

Transportation Impact Analysis and Mitigation Plan Procedures Manual

Transportation Impact Analysis and Mitigation Plan Procedures Manual Transportation Impact Analysis and Mitigation Plan Procedures Manual February 2011 Table of Contents 1 Overview 1 2 Applicability of Traffic Impact Analysis and Mitigation Requirements 2 21 General Applicability:2

More information

Why Do We Bike? And where, how, who, when, and with what

Why Do We Bike? And where, how, who, when, and with what Why Do We Bike? And where, how, who, when, and with what What will I learn today? Knowledge of laws for bikes in traffic: your rights and responsibilities as a bicyclist and motorist Examples of safe and

More information

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24 Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge

More information

MassDOT s Work Zone Transportation Management Procedures. By: Neil Boudreau, MassDOT and Michael Sutton, P.E., VHB

MassDOT s Work Zone Transportation Management Procedures. By: Neil Boudreau, MassDOT and Michael Sutton, P.E., VHB MassDOT s Work Zone Transportation Management Procedures By: Neil Boudreau, MassDOT and Michael Sutton, P.E., VHB What is the Work Zone Safety and Mobility Rule? 23 CFR 630 Subpart J, effective October

More information

Appendix G.3 Crain & Associates, Peer Review

Appendix G.3 Crain & Associates, Peer Review Appendix G.3 Crain & Associates, Peer Review Transportation Planning / Traffic Engineering VIA HAND DELIVERED Wendy Lockwood Sirius Environmental 1478 N. Altadena Drive Pasadena, California 91107 Subject:

More information

Roundabouts: An Informational Guide 6: Geometric Design

Roundabouts: An Informational Guide 6: Geometric Design 6 Geometric Design 6.1 Introduction 130 6.1.1 Geometric elements 130 6.1.2 Design process 130 6.2 General Design Principles 132 6.2.1 Speeds through the roundabout 132 6.2.2 Design vehicle 142 6.2.3 Nonmotorized

More information

A Bicycle Accident Study Using GIS Mapping and Analysis

A Bicycle Accident Study Using GIS Mapping and Analysis A Bicycle Accident Study Using GIS Mapping and Analysis Petra Staats, Graduate Assistant, Transportation Policy Institute, Rutgers University, New Brunswick, NJ, USA pstaats@eden.rutgers.edu Summary Surveys

More information

Design Simulations Deliver Measurable Performance

Design Simulations Deliver Measurable Performance Design Simulation for TransCar Automated Guided Vehicle System (AGVS) Forecast the ability of an automated material transport system design to perform the defined workload within the available space and

More information

Accident Analysis of Sheridan Road between Isabella Street and South Boulevard

Accident Analysis of Sheridan Road between Isabella Street and South Boulevard Accident Analysis of Sheridan Road between Isabella Street and South Boulevard Prepared for TranSystems Corporation for the City of Evanston Submitted by Regina Webster & Associates, Inc. Date: 08/15/2008

More information

BEST PRACTICE FOR TRAFFIC ENGINEERING DEVICES & OPERATIONS IN SCHOOL AREAS

BEST PRACTICE FOR TRAFFIC ENGINEERING DEVICES & OPERATIONS IN SCHOOL AREAS C I T Y O F C O L O R A D O S P R I N G S E N G I N E E R I N G D I V I S I O N T R A F F I C E N G I N E E R I N G T E A M SCHOOL SAFETY PROGRAM POLICY MANUAL BEST PRACTICE FOR TRAFFIC ENGINEERING DEVICES

More information

City of Kamloops Notre Dame Corridor Access Plan

City of Kamloops Notre Dame Corridor Access Plan FINAL REPORT This report is prepared for the sole use of ICBC. No representations of any kind are made by Urban Systems Ltd. or its employees to any party with whom Urban Systems Ltd. does not have a contract.

More information

A PPENDICES C OLLIERVILLE 2040 LAND USE PLAN UPDATE

A PPENDICES C OLLIERVILLE 2040 LAND USE PLAN UPDATE A PPENDICES C OLLIERVILLE 2040 LAND USE PLAN UPDATE Traditional Neighborhood Character Study with a Neighborhood Center Commercial Node Aldi s is appropriate in a Neighborhood Center School Greenbelt Trail

More information

Executive Director s Recommendation Commission Meeting: March 5, 2015

Executive Director s Recommendation Commission Meeting: March 5, 2015 Executive Director s Recommendation Commission Meeting: March 5, 2015 PROJECT Curseen-Morris Processing and Distribution Center Parking Lot 900 Brentwood Avenue NE Washington, DC SUBMITTED BY United States

More information

Section 6 Traffic Analysis

Section 6 Traffic Analysis Section 6 Traffic Analysis Traffic Operations of the Preferred Network Alternative After the Preferred Network was identified and confirmed by local policy makers and area residents, detailed traffic analysis

More information

PART 2 BUS TRANSIT CAPACITY CONTENTS

PART 2 BUS TRANSIT CAPACITY CONTENTS PART 2 BUS TRANSIT CAPACITY CONTENTS 1. BUS CAPACITY BASICS... 2-1 Overview... 2-1 Definitions... 2-1 Types of Bus Facilities and Service... 2-3 Factors Influencing Bus Capacity... 2-5 Vehicle Capacity...

More information

Mercer County Multi-Modal Transportation Plan Year 2025 Travel Demand Model

Mercer County Multi-Modal Transportation Plan Year 2025 Travel Demand Model Mercer County Multi-Modal Transportation Plan Year 2025 Travel Demand Model Prepared For West Virginia Department of Transportation Transportation Planning Division Building 5, Room 824 1900 Kanawha Blvd.

More information

Teaching Your Teen to Drive

Teaching Your Teen to Drive MetLife Auto & Home Teaching Your Teen to Drive Without driving each other crazy! Dear Parent/Guardian, One of the best ways for you to influence your teen s driving habits is to sit in the copilot seat

More information

CHAPTERTWO. Alternatives 2.1 ALTERNATIVES DEVELOPMENT PROCESS

CHAPTERTWO. Alternatives 2.1 ALTERNATIVES DEVELOPMENT PROCESS 2. Section 2 TWO CHAPTERTWO 2.1 ALTERNATIVES DEVELOPMENT PROCESS This EIS has been prepared in compliance with the Council on Environmental Quality (CEQ) regulations for implementing NEPA (40 CFR 1500-1508).

More information

TRANSPORTATION MODELLING IN CALGARY

TRANSPORTATION MODELLING IN CALGARY TRANSPORTATION MODELLING IN CALGARY Why Do We Use Transportation Models? There are three approaches that can be used for proceeding to develop a transportation system for Calgary s future. One approach

More information

The partnership has selected three intersections where enforcement, education, and engineering initiatives are being implemented to improve safety:

The partnership has selected three intersections where enforcement, education, and engineering initiatives are being implemented to improve safety: Hamilton-Finn Suite 310 Tel. (403) 207-6000 Road Safety 3016 5th Avenue N.E. Fax. (403) 273-3440 Consultants Ltd. Calgary, Alberta dawatt.dawatt.com www.hamiltonfinn.ca January 19, 2005 Mr. Don Szarko,

More information

TOWN OF NEW HAVEN ROAD PLAN

TOWN OF NEW HAVEN ROAD PLAN 1 TOWN OF NEW HAVEN ROAD PLAN BACKGROUND The Town of New Haven, Vermont consists of 42 square miles of land and a population of approximately 1400 people. At the start of the 21 st century, it is served

More information

Public Worksessions - A Summary of the New York City Zoning and Planning Study

Public Worksessions - A Summary of the New York City Zoning and Planning Study APPENDIX F Third Public Work Session Notice Presentation July 27, 2004 For Immediate Release July 12, 2004 Town of Rotterdam Notice of Public Meeting The Town of Rotterdam Public Works Department will

More information

TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES

TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES Background One of the most critical public services provided by a community is the community s transportation system. An effective

More information

Two-Way Street Networks: More Efficient than Previously Thought?

Two-Way Street Networks: More Efficient than Previously Thought? Two-Way Street Networks: More Efficient than Previously Thought? V I K A S H V. G A Y A H N E - WAY S T R E E T S I N D W N T W N A R E A S A R E R E C E I V I N G A critical look. City officials and urban

More information

Rural Road Safety Policy in Korea: Lesson Learned

Rural Road Safety Policy in Korea: Lesson Learned Regional Seminar on Safe, Climate Adaptive and Disaster Resilient Transport for Sustainable Development Nov. 17 th, Seoul Rural Road Safety Policy in Korea: Lesson Learned Sangjin HAN Korea Transport Institute

More information

Transportation Impact Assessment Guidelines

Transportation Impact Assessment Guidelines Transportation Impact Assessment Guidelines Preface The following TIA Guidelines have been developed jointly by the City s Planning and Growth Management and Public Works and Services departments in an

More information

Operating Vehicle Control Devices

Operating Vehicle Control Devices Module 2 Topic 3 Operating Vehicle Control Devices 1. Identify the vehicle controls in the pictures below: 1. 2. 3. 4. 7. 7. 5. 6. 1. accelerator 2. parking brake 3. foot brake 4. gear shift lever_ 5.

More information

Evaluation of the Shared-Use Arrow

Evaluation of the Shared-Use Arrow Evaluation of the Shared-Use Arrow Table of Contents Page Evaluation of the Shared-Use ARROW Background... 1 ARROW Design... 1 ARROW Placement... 2 Wayne E. Pein William W. Hunter J. Richard Stewart Report

More information

Back to School Car Safety. Direct Buy Warranty Staff September 19, 2014

Back to School Car Safety. Direct Buy Warranty Staff September 19, 2014 Back to School Car Safety Direct Buy Warranty Staff September 19, 2014 It s back to school season, and that means kids are picking out new clothes, putting on their backpacks, and hitting the road to get

More information

TRAFFIC IMPACT ANALYSIS HANDBOOK VOLUME I METHODOLOGIES & REQUIREMENTS

TRAFFIC IMPACT ANALYSIS HANDBOOK VOLUME I METHODOLOGIES & REQUIREMENTS TRAFFIC IMPACT ANALYSIS HANDBOOK VOLUME I METHODOLOGIES & REQUIREMENTS Downtown panoramic photo provided by 1stACT Silicon Valley (blank below this line) Volume I Methodologies and Requirements TABLE OF

More information

TRANSPORT ASSESSMENT GUIDANCE

TRANSPORT ASSESSMENT GUIDANCE TRANSPORT ASSESSMENT GUIDANCE Contents 1 INTRODUCTION...1 Purpose of the Guidance...1 Policy Context...1 Who Should Read This Document?...2 Structure of Guidance...3 2 ASSESSMENT PRINCIPLES AND PROCESS...4

More information

GLEN ISLE MIXED USE DEVELOPMENT GLEN COVE, NEW YORK

GLEN ISLE MIXED USE DEVELOPMENT GLEN COVE, NEW YORK SHARED PARKING ANALYSIS GLEN ISLE MIXED USE DEVELOPMENT Prepared for: REXCORP-GLEN ISLE PARTNERS, LLC JULY 27, 2011 WALKER PARKING CONSULTANTS 50 West 23 rd Street, Suite 704 New York, NY 10010 Voice:

More information

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN December 21, 2009 Public Works Department 171 N. Ross Street, Suite 200 Auburn,

More information

Access Management Manual

Access Management Manual Access Management Manual July 2011 2011 by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2011-1 From: Manual: Mark A Marek, P.E. Access Management Manual Effective

More information

What roundabout design provides the highest possible safety?

What roundabout design provides the highest possible safety? What roundabout design provides the highest possible safety? In Sweden, as in several other countries, the number of roundabouts is on the increase. According to a study recently carried out by the VTI,

More information

Financial Analysis for the Ambleside Centre Zoning Districts

Financial Analysis for the Ambleside Centre Zoning Districts Financial Analysis for the Ambleside Centre Zoning Districts July 2013 Prepared for: The District of West Vancouver By: Coriolis Consulting Corp. Table of Contents 1.0 Introduction... 1 1.1 Purpose...

More information

CHAPTER 11: PEDESTRIAN SIGNS AND SIGNALS

CHAPTER 11: PEDESTRIAN SIGNS AND SIGNALS CHAPTER 11: PEDESTRIAN SIGNS AND SIGNALS Traffic signs and signals should be useful for all pedestrians. It is essential to provide signals that are phased and timed to allow senior citizens, children,

More information

Chapter 7 ZONING PLAN

Chapter 7 ZONING PLAN Chapter 7 ZONING PLAN Introduction This Chapter opens with a general description of a zoning plan. It is followed by a brief explanation of the relationship between this Growth Management Plan and the

More information

Intersection Cost Comparison Spreadsheet User Manual ROUNDABOUT GUIDANCE VIRGINIA DEPARTMENT OF TRANSPORTATION

Intersection Cost Comparison Spreadsheet User Manual ROUNDABOUT GUIDANCE VIRGINIA DEPARTMENT OF TRANSPORTATION Intersection Cost Comparison Spreadsheet User Manual ROUNDABOUT GUIDANCE VIRGINIA DEPARTMENT OF TRANSPORTATION Version 2.5 i Virginia Department of Transportation Intersection Cost Comparison Spreadsheet

More information

Videos for Safety Meetings

Videos for Safety Meetings Videos for Safety Meetings 2474 2005, ERI Safety Videos OPERATING ELECTRIC PALLET JACKS SAFELY This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation. Featured are:

More information

Review of Shuttle Bus Operations

Review of Shuttle Bus Operations Report of The President s Advisory Committee on Transportation and Parking (PACT&P) August 30, 2005 Table of Contents 2 1.0 Introduction...3 2.0 Existing Service...4 2.1 The Users of Zones 6 & 7... 4 2.2

More information

TEST ON Driving Safely Among Bicyclists and Pedestrians

TEST ON Driving Safely Among Bicyclists and Pedestrians TEST ON Driving Safely Among Bicyclists and Pedestrians Next you will take a 16 question test about driving safely among bicyclists and pedestrians. Please take out a sheet of paper to mark down and score

More information

Measuring Success: Transportation Improvements along Sandy Boulevard between NE 13 th and NE 47 th Avenues

Measuring Success: Transportation Improvements along Sandy Boulevard between NE 13 th and NE 47 th Avenues Measuring Success: Transportation Improvements along Sandy Boulevard between NE 13 th and NE 47 th Avenues FINAL REPORT pared by Dan Bower and Scott Cohen City of Portland, Office of Transportation January

More information

ACCELERATION CHARACTERISTICS OF VEHICLES IN RURAL PENNSYLVANIA

ACCELERATION CHARACTERISTICS OF VEHICLES IN RURAL PENNSYLVANIA www.arpapress.com/volumes/vol12issue3/ijrras_12_3_14.pdf ACCELERATION CHARACTERISTICS OF VEHICLES IN RURAL PENNSYLVANIA Robert M. Brooks Associate Professor, Department of Civil and Environmental Engineering,

More information

The principle of excess land is a fundamental concept in appraisal practice,

The principle of excess land is a fundamental concept in appraisal practice, A Discussion of Excess Land Concepts and Theory by Joseph M. Webster, MAI The principle of excess land is a fundamental concept in appraisal practice, but surprisingly few articles have been devoted to

More information

Executive Summary. Transportation Needs CHAPTER. Existing Conditions

Executive Summary. Transportation Needs CHAPTER. Existing Conditions CHAPTER 1 Executive Summary The City of Forest Grove Transportation System Plan (TSP) was updated to keep it consistent with recent growth trends in the city and other transportation planning efforts in

More information

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure Department of State Development, Infrastructure and Planning State Planning Policy state interest guideline State transport infrastructure July 2014 Great state. Great opportunity. Preface Using this state

More information

TRANSPORTATION IMPACT ANALYSIS (TIA) Guidelines

TRANSPORTATION IMPACT ANALYSIS (TIA) Guidelines TRANSPORTATION IMPACT ANALYSIS (TIA) Guidelines Methodology For Development Applications Requiring a TIA in Volusia County, Florida TIA Guidelines As adopted on November 24, 2009 (The Volusia Transportation

More information

ENGINEERING REPORT. College Street: Interstate 85 to Donahue Drive Traffic Signal System Feasibility Study Auburn, Alabama

ENGINEERING REPORT. College Street: Interstate 85 to Donahue Drive Traffic Signal System Feasibility Study Auburn, Alabama ENGINEERING REPORT College Street: Interstate 85 to Donahue Drive Traffic Signal System Feasibility Study Auburn, Alabama Prepared for: The City of Auburn Prepared by: 3644 Vann Road Suite 100 Birmingham,

More information

Revere Beach Transit-Oriented Development Parcels Revere, Massachusetts. Design and Development Guidelines. Part Two.

Revere Beach Transit-Oriented Development Parcels Revere, Massachusetts. Design and Development Guidelines. Part Two. Revere Beach Transit-Oriented Development Parcels Revere, Massachusetts Design and Development Guidelines Request for Qualifications and Expressions of Interest with Preliminary Development Plans Part

More information

HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES

HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES Approved 6/26/01 HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES All new, modified and/or changed use access(es) onto county roads shall be subject to the access and corridor protection guidelines

More information