Investigation of short-circuit analysis conducted at Kromco

Size: px
Start display at page:

Download "Investigation of short-circuit analysis conducted at Kromco"

Transcription

1 Investigation of short-circuit analysis conducted at Kromco by Bantubonke Matika and Alan Meru, Cape Peninsula University of Technology This article presents a short-circuit analysis conducted for the Kromco electrical power system using power system modelling, analysis and simulation software called DIgSilent PowerFactory. The main focus is determining the maximum short-circuit currents and fault levels at various locations on the network, and verifying the adequacy of power system components, to see if they can withstand rated prospective short-circuits. An efficient and reliable power system is a vital component of any industry especially manufacturing and packaging industries. Hence, a need arose to conduct short-circuit analysis in industrial power systems to evaluate the power delivery and utilisation operation efficiency [1]. Symmetrical three phase faults were investigated using the superposition method. Three operating conditions are analysed: 100%, 80% transformer full load, and when plant 2A is feeding via plant 1, which is normally open. Kromco is one of the large deciduous packing facilities in the Western Cape situated in Grabow, near Cape Town. Its dedication to delivering quality fruit to local and international markets makes Kromco a trusted brand. With its high tech cold stores and machinery for supplying consistent quality fruit it is vital that Kromco s electrical power system operates efficiently with minimal interruptions as each interruption may cause loss in production which can lead to high losses of revenue. Due to the modernisation programme of replacing old ring main units with new digitally controlled systems, a need arose for the study which was motivated to re-evaluate and verify the existing power system components and reliability. The system consists of an 11 kv feeder from Eskom as its source of electrical power. The supply voltage for the distribution system is then stepped down to 400 V, and 220 V as required by the loadings, from the main substation to ring main units feeding the transformers located at the packing shed, and plants 1, 2, 3 and 4. There are a total of eleven operating transformers in Kromco. These transformers range from 315 kva to 1000 kva. System models are constructed and simulations are conducted with certain assumptions being made in order to commence with the study. Loads are modelled as inductive loads at a power factor of 0,8 due to the fact that is was difficult to obtain actual load rated capacity and real time data. The IEC standard was used to obtain transformer X/R ratios. Research statement The main objective of the short-circuit analysis is to properly determine the shortcircuit currents and fault levels at various system locations using simulation software. This is to verify the adequacy of existing power system components as to whether they can withstand prospective shortcircuits. This was deemed necessary due to the fact that the current electrical system has never been revised and lacks proper documentation of load addition and system expansion since the establishment of the distribution network. Theoretical background Short-circuit analysis Electrical power systems in industrial plants are designed to supply loads in a safe, economical and reliable manner. However, even in a perfectly designed system, the occurrence of short-circuit currents are unavoidable [2]. According to IEC 60909, a short-circuit, or fault as its commonly known, is the accidental or unintentional conductive connection through a relatively low resistance or impedance between two or more points of a circuit which are normally at different potentials [3]. Fig. 1: Fault types. The duration of this fault can be at divided into three different areas: energize - December Page 49

2 Source IVI V Ideal voltage source 1 p.u. 0 Table 1: Source parameters. Transformer Z [%] Voltage X/R ratio kva Vector group T 1 5,11 11 kv/400 V 3, Dyn 11 T 2 5,11 11 kv/400 V 3, Dyn 11 T 3 5,12 11 kv/400 V 3, Dyn 11 T 4 4, kv/400 V 3, Dyn 11 Fig. 2: Symmetrical fault. T 5 4,91 11 kv/400 V 3, Dyn 11 T 6 4,66 11 kv/400 V 3, Dyn 11 T 7 4,29 11 kv/400 V 1,5 315 Dyn 11 T 8 5,16 11 kv/400 V 3, Dyn 11 T 9 5, kv/400 V 3, Dyn 11 T 10 5,01 11 kv/400 V 3, Dyn 11 T 11 4,8 11 kv/400 V 3, Dyn 11 Table 2: Transformer parameters. Cable R1 [Ω/km] X1 [Ω/km] Main sub to pack shed RMU (XLPE) 0, ,01848 Main sub to plant 1 RMU1 (XLPE) 0, ,04587 Main sub to plant 2 RMU2A (XLPE) 0, ,02688 Main sub to plant 3 RMU3 (XLPE) 0, ,00792 Main sub to plant 4 RMU4 (ABC) 0, ,09639 Pack shed RMU to plant 2 RMU2B (XLPE) 0, ,03475 Plant 1 RMU1 to plant 2 RMU2A (XLPE) 0, ,01529 Plant 2 RMU2B to offices TRF (XLPE) 0, ,03475 Table 3: Cable parameters. Load kva Voltage pf Load V 0,75 inductive Load V 0,75 inductive Load V 0,75 inductive Load V 0,75 inductive Load V 0,75 inductive Load V 0,75 inductive Load V 0,75 inductive Load V 0,75 inductive Load V 0,75 inductive Load V 0,75 inductive Load V 0,75 inductive Table 4: Load parameters. The sub-transient period, which occurs directly at the fault point and only lasts for a few cycles The transient period, which occurs for tens of cycles The steady-state period, which will last for a longer time, usually until there is a change in the system such as a line-fail or if a circuit breaker is opened. Fig. 1 shows the different states. Types of faults Fault currents may involve all three phases in a symmetrical manner, or may be asymmetrical where usually only one or two phases are involved. Faults may also be caused by either short-circuits to earth or between live conductors, or may be caused by broken conductors in one or more phases. Sometimes simultaneous faults may occur involving both shortcircuit and broken conductor faults (also known as open-circuit faults). Symmetrical three phase faults This study will be confined to symmetrical three phase faults as they are the most severe faults that can occur in a power system. These faults give the maximum short-circuit currents (SCC) and fault MVA. Hence, this worst-case result is then used as the basis to select the shortcircuit capabilities of switchgear from manufacturers tables. A three phase fault is a function of three equal fault impedances to the three phases as shown in Fig. 2. If = 0 then the fault is called a solid or bolted fault. These faults can be of two types: (a) phase to phase to phase to ground (PPPG) fault or (b) phase to phase to phase (PPP) fault. The system will remain balanced because all three phases are affected equally. Since the system is balanced we only need to know the positive sequence to analyse the fault. A single line diagram can be used, as energize - December Page 50

3 CS1 11 kv Main sub to plant 1 19, ,03824 Plant 1to T 2 (primary) 19, ,00418 T 2 (secondary) to 400 V busbar 19, ,6154 Plant V busbar 11 kv Main sub to plant , ,03633 Plant 1 to T 3 (primary) 19, ,00226 T 3 (secondary) to 400 V busbar 19, ,56223 Pack shed 400 V busbar 11 kv Main sub to pack shed 20, ,06490 Pack shed to T 1 (primary) 19, ,01945 T 1 (secondary) to 400 V busbar 19, ,03500 Pack shed to plant 2B cable 1, , kv Main sub to plant 3 19, ,04874 Plant 3 to T 4 (primary) 19, ,01403 T 4 (secondary) to 400 V busbar 19, , kv Main sub to plant 3 19, ,02280 Plant 3 to T 5 (primary) 18, ,99612 T 5 (secondary) to 4 00 V busbar 18, , kv Main sub to plant 2A 22, ,16926 Plant 2A to T 6 (primary) 21, ,13467 T 6 (secondary) to 400 V busbar 21, , kv Main sub to plant 2A 20, ,09611 Plant 2A to T 8 (primary) 20, ,06145 T 8 (secondary) to 400 V busbar 20, , kv Main sub to plant 4 19, ,02929 Plant 4 to T 10 (primary) 18, ,99612 T 10 (secondary) to 400 V busbar 18, , kv Main sub to plant 4 20, ,07050 Plant 4 to T 9 (primary) 19, ,03744 T 9 (secondary) to 400 V busbar 19, ,52953 Plant 2B 400 V busbar Pack shed cable to plant 2B 21, ,10768 Plant 2B to T 11 (primary) 20, ,09710 T 11 (secondary) to 400 V busbar 20, ,17038 Office transformer 400 V busbar Pack shed to plant 2B 7,0409 0,41489 Plant 2B to office transformer (primary) 7, ,37577 Office transformer (secondary) to 400 V busbar 7, ,33381 Table 5: 80% load capacity. Fig. 3: Equivalent single phase circuit. all three phases are equal but displaced by 120 [4]. where: I sc3 = Three-phase short-circuit V ph = Phase voltage [1] Z SC = Positive sequence impedance per phase Power system analysis tools Complete method The complete method is utilised to perform the short-circuit study. This method is commonly known as the superposition method and is summarised in Fig. 4. Modelling consideration The network consists of an ideal 11 kv voltage source with no internal impedance. Two winding transformer The two-winding transformer is modelled with a positive sequence network. Shortcircuit voltage Uk (%) and ratio X/R or copper losses. The magnetising circuit is not included due to the magnetising current being negligible [5]. Cables The positive sequence network for cables is modelled identically using the nominal π-method. The values for positive and negative is assumed to be equal. The sequence impedances consist of series resistance R in ( /km), series reactance X ( /km) [5]. DIgSilent neglects the capacitance in the positive and negative sequence networks when the nominal π-method is used. The positive sequence network of the simulation is illustrated in Fig. 5. Linear load The loads are modelled as fixed impedance loads. The loads contain static components which do not provide short-circuit contribution to a fault. Network parameters The parameters for the AC voltage source, energize - December Page 52

4 CS2 11 kv Main sub to plant 1 19, ,04618 Plant 1to T 2 (primary) 19, ,00380 T 2 (secondary) to 400 V busbar 19, ,60438 Plant V busbar 11 kv Main sub to plant 1 19, ,04427 Plant 1 to T 3 (primary) 19, ,00188 T 3 (secondary) to 400 V busbar 19, ,55163 Pack shed 400 V Busbar 11 kv Main sub to pack shed 20, ,07585 Pack shed to T 1 (primary) 19, ,01929 T 1 (secondary) to 400 V busbar 19, ,03050 Pack shed to plant 2B cable 1, , kv Main sub to plant 3 20, ,05718 Fig. 4: Superposition calculation method flow diagram. Plant 3 to T 4 (primary) 19, ,01398 T 4 (secondary) to 400 V busbar 19, , kv Main sub to plant 3 19, ,03125 Plant 3 to T 5 (primary) 18, ,98801 T 5 (secondary) to 400 V busbar 18, ,17037 Fig. 5: Short-circuit nominal π model for a cable in DIgSilent. transformers, cables and loads are indicated in Tables 1, 2, 3 and 4. Simulation case study Three case studies were conducted. For all studies, firstly a load flow investigation was conducted to obtain pre-fault conditions. Secondly, a short-circuit study was performed using the superposition calculation method to attain maximum fault currents and fault levels. Case study 1 (CS1) For the first case study a symmetrical threephase fault on plant V busbar, and then plant 2A 400 V busbar was performed at 80% full load capacity. Case study 2 (CS2) For the second case study a symmetrical three-phase fault on plant V busbar, and then plant 2A 400 V busbar was performed 100% full load capacity. Case study 3 (CS3) A symmetrical three-phase fault was performed when plant 2 is fed via plant 1, which is normally open. Results Only the short-circuit power and phase 11 kv Main sub to plant 2A 22, ,17763 Plant 2A to T 6 (primary) 21, ,13457 T 6 (secondary) to 400 V busbar 21, , kv Main sub to plant 2A 21, ,1453 Plant 2A to T 8 (primary) 20, ,06135 T 8 (secondary) to 400 V busbar 20, , kv Main sub to plant 4 19, ,03659 Plant 4 to T 10 (primary) 18, ,99532 T 10 (secondary) to 400 V busbar 18, , kv Main sub to plant 4 20, ,07773 Plant 4 to T 9 (primary) 19, ,03661 T 9 (secondary) to 400 V busbar 19, ,50664 Plant 2B 400 V busbar Pack shed cable to plant 2B 21, ,10995 Plant 2B to T 11 (primary) 20, ,09683 T 11 (secondary) to 400 V busbar 20, ,16272 Office transformer 400 V busbar Pack shed cable to plant 2B 8,0896 0,42414 Plant 2B to office transformer (primary) 7, ,37558 Office transformer (secondary) to 400 V busbar 7, ,32832 Table 6: 100% load capacity. energize - December Page 53

5 cable between the main sub and plant 4 being buried in the ground does not comply with regulations. Buried cables must be mechanically protected, e.g. by being armoured or by being laid in a protective pipe, or otherwise protected by laying concrete slabs above the cable mm below ground level. ABC cables are not meant to be buried, although this is done in some instances. It is advisable to use Bucholtz relay protection on transformers rated at 1 MVA or higher. This type of protection can give early warning of faults developing within the transformer thus preventing catastrophic failure. The low voltage switchgear on the secondary of the transformers should be rated at, or higher then obtained values of fault level on the 400 V busbar. 11 kv Main sub to plant 1 21, ,12805 Plant 1 to T 1 (primary) 19, ,99974 T 1 (secondary) to 400 V busbar 19, ,49297 Fig. 6: Kromco's electrical network. Plant 1 to plant 2A 21, ,14196 Plant 2Ato T 6 (primary) 20, ,10020 T 6 (secondary) to 400 V busbar 20, ,25559 CS3 Table 7: Plant 2A fed via plant 1. Cable Size (mm 2 ) Current rating (A) 1 s short circuit rating XLPE ,58 XLPE ,01 XLPE ,6 ABC currents results were obtained for each case study. Table 5 indicates the results of the total short circuit power and the short circuit currents at 80% load capacity. Table 6 indicates the results of the total short-circuit power and the short-circuit currents at 100% load capacity. Table 8: Typical cable ratings. Table 7 indicates the results of the total short-circuit power and the short-circuit currents when plant 2A is fed via plant 1. Analysis of results Table 8 compares cables for short-circuit results. All cables will operate well within their rated short-circuit capacity. The ABC At 100% load capacity the transformers are heavily loaded from about 95,06 to 95,11% rated capacity which will operate the protection continuously if transformers are overloaded. Conclusion Fault analysis plays a vital role in a power system analysis as it is used to determine the appropriate protection scheme for a power system. The short circuit current based on the rated equipment values are used in properly determining the minimum protection requirement as the obtained fault current is the maximum fault current that may occur within the system. Thus, the obtained fault levels in this paper acts as prerequisite for protection coordination studies. Despite limitations of obtaining the necessary data PowerFactory simulations can be a guide line on loading of the network and short-circuit currents flowing in the network, for the system expansions. A thorough investigation can be conducted in future with cost implications for attaining time synchronous data loggers for measuring real time data of the different loading conditions of the plant. Therefore contingency plans can be drafted on a more efficient manner on the operation of the plant. References [1] MH Hairi, H Zainuddin, MHN Talib, A Khamis and JY Lichun: An investigation of short circuit analysis in Komag Sarawak operations factory, World Academy of Science, Engineering and Technology, [2] IEEE Violet Book: Recommended practice for calculating short-circuit currents in industrial and commercial power systems, [3] IEC : Short-circuit currents in threephase ac systems, [4] John J Grainger, William Stevenson. [5] DIgSILENT PowerFactory: DIgSILENT PowerFactory version 14v0E Technical Reference, DIgSILENT, Contact Bantubonke Matika, Metrorail, Tel , bmatika@metrorail.co.za energize - December Page 54

The following table shows approximate percentage wise the

The following table shows approximate percentage wise the SHORT-CIRCUIT CALCULATION INTRODUCTION Designing an electrical system is easy and simple, if only the normal operation of the network is taken into consideration. However, abnormal conditions which are

More information

Chapter 9 Balanced Faults

Chapter 9 Balanced Faults Chapter 9 alanced Faults 9.1 Introduction The most common types of fault are (in order) single-line-to-ground fault, line-to-line fault, and double-line-to-ground fault. All of these are unbalanced faults.

More information

Simple Methods for Calculating Short Circuit Current Without a Computer By Dennis McKeown, PE GE Senior System Application Engineer

Simple Methods for Calculating Short Circuit Current Without a Computer By Dennis McKeown, PE GE Senior System Application Engineer Simple Methods for Calculating Short Circuit Current Without a Computer By Dennis McKeown, PE GE Senior System Application Engineer A Short Circuit analysis is used to determine the magnitude of short

More information

Short Circuit Current Calculations

Short Circuit Current Calculations Introduction Several sections of the National Electrical Code relate to proper overcurrent protection. Safe and reliable application of overcurrent protective devices based on these sections mandate that

More information

LIMITING SHORT-CIRCUIT CURRENTS IN MEDIUM-VOLTAGE APPLICATIONS

LIMITING SHORT-CIRCUIT CURRENTS IN MEDIUM-VOLTAGE APPLICATIONS LIMITING SHORT-CIRCUIT CURRENTS IN MEDIUM-VOLTAGE APPLICATIONS Terence Hazel Senior Member IEEE Schneider Electric 38050 Grenoble France Abstract The power requirements for large industrial sites is increasing.

More information

How To Choose A Transformer

How To Choose A Transformer Consider open loop MV network as an example source 1 source 2 NC NC NC or NO main MV switchboard A B Detail design of substation NC NC NC NO NC NC switchboard 1 switchboard 2 switchboard 3 MV MV MV LV

More information

DIMENSIONING OF CURRENT TRANSFORMERS FOR PROTECTON APPLICATION

DIMENSIONING OF CURRENT TRANSFORMERS FOR PROTECTON APPLICATION ÿþ üûúùø öõöôùóùõò CT Dimensioning DIMENSIONING OF CURRENT TRANSFORMERS FOR PROTECTON APPLICATION Application note GER3973 1 CT Dimensioning ÿþ üûúùø öõöôùóùõò GER-3973 Application note ÿþ üûúùø öõöôùóùõò

More information

SIMULATING HYBRID ENERGY GRIDS IN SMART CITIES FOCUS ON ELECTRIC ENERGY SYSTEMS

SIMULATING HYBRID ENERGY GRIDS IN SMART CITIES FOCUS ON ELECTRIC ENERGY SYSTEMS Sawsan Henein AIT Austrian Institute of Technology Electric Energy Systems Research Group SIMULATING HYBRID ENERGY GRIDS IN SMART CITIES FOCUS ON ELECTRIC ENERGY SYSTEMS Sustainable Places 2015 Savona,

More information

SYNCHRONOUS MACHINES

SYNCHRONOUS MACHINES SYNCHRONOUS MACHINES The geometry of a synchronous machine is quite similar to that of the induction machine. The stator core and windings of a three-phase synchronous machine are practically identical

More information

The Importance of the X/R Ratio in Low-Voltage Short Circuit Studies

The Importance of the X/R Ratio in Low-Voltage Short Circuit Studies The Importance of the X/R Ratio in Low-Voltage Short Circuit Studies DATE: November 17, 1999 REVISION: AUTHOR: John Merrell Introduction In some short circuit studies, the X/R ratio is ignored when comparing

More information

CIRCUIT BREAKER INTERRUPTING CAPACITY AND SHORT-TIME CURRENT RATINGS

CIRCUIT BREAKER INTERRUPTING CAPACITY AND SHORT-TIME CURRENT RATINGS CIRCUIT BREAKER INTERRUPTING CAPACITY AND SHORT-TIME CURRENT RATINGS David D. Roybal, P.E. Senior Member, IEEE Eaton Electrical 3697 Mount Diablo Boulevard Lafayette, CA 94549 Abstract Low-voltage circuit

More information

SPECIAL TOPICS ON GROUND FAULT PROTECTION AND PROTECTION COORDINATION IN INDUSTRIAL AND COMMERCIAL POWER SYSTEMS

SPECIAL TOPICS ON GROUND FAULT PROTECTION AND PROTECTION COORDINATION IN INDUSTRIAL AND COMMERCIAL POWER SYSTEMS SPECIAL TOPICS ON GROUND FAULT PROTECTION AND PROTECTION COORDINATION IN INDUSTRIAL AND COMMERCIAL POWER SYSTEMS Claudio S. Mardegan claudio.mardegan@engepower.com www.engepower.com Phone: 55 3579-8777

More information

Simulation of Cable Overloading Problem on a University Distribution System

Simulation of Cable Overloading Problem on a University Distribution System Advance in Electronic and Electric Engineering. ISSN 2231-1297, Volume 3, Number 6 (2013), pp. 765-770 Research India Publications http://www.ripublication.com/aeee.htm Simulation of Cable Overloading

More information

Power Quality Paper #3

Power Quality Paper #3 The Effect of Voltage Dips On Induction Motors by: M D McCulloch 1. INTRODUCTION Voltage depressions caused by faults on the system affect the performance of induction motors, in terms of the production

More information

6 ELECTRICAL PARAMETERS

6 ELECTRICAL PARAMETERS 6 ELECTRICAL PARAMETERS For power, low voltage and medium voltage cables, cross section nominal areas are calculated in taking into account several parameters as: permissible current carrying capacities

More information

Generator Stator Protection, under/over voltage, under /over frequency and unbalanced loading. Ramandeep Kaur Aujla S.NO 250447392

Generator Stator Protection, under/over voltage, under /over frequency and unbalanced loading. Ramandeep Kaur Aujla S.NO 250447392 1 Generator Stator Protection, under/over voltage, under /over frequency and unbalanced loading By Ramandeep Kaur Aujla S.NO 250447392 ES 586b: Theory and applications of protective relays Department of

More information

Chapter 1. Network Structures

Chapter 1. Network Structures Chapter 1 Network Structures Definition Standard IEC 60038 defines voltage ratings as follows: Low voltage (): for a phase-to-phase voltage of between 100 V and 1,000 V, the standard ratings are: 400 V

More information

Rule 5.500 Fast Track Analysis for National Life Insurance Co.

Rule 5.500 Fast Track Analysis for National Life Insurance Co. Rule 5.500 Fast Track Analysis for National Life Insurance Co. For a 500 kw Solar array to be located at 155 Northfield Street in Montpelier, Vermont Green Mountain Power Pam Allen Date: 5/31/13 SECTION

More information

Unified requirements for systems with voltages above 1 kv up to 15 kv

Unified requirements for systems with voltages above 1 kv up to 15 kv (1991) (Rev.1 May 2001) (Rev.2 July 2003) (Rev.3 Feb 2015) Unified requirements for systems with voltages above 1 kv up to 15 kv 1. General 1.1 Field of application The following requirements apply to

More information

Module Title: Electrotechnology for Mech L7

Module Title: Electrotechnology for Mech L7 CORK INSTITUTE OF TECHNOLOGY INSTITIÚID TEICNEOLAÍOCHTA CHORCAÍ Autumn Examinations 2012 Module Title: Electrotechnology for Mech L7 Module Code: ELEC7007 School: School of Mechanical, Electrical and Process

More information

Low Voltage Transformer Through-Fault Protection: A System Approach

Low Voltage Transformer Through-Fault Protection: A System Approach Data Bulletin 7400DB1001 Nashville, TN USA Low Voltage Transformer Through-Fault Protection: A System Approach Introduction Low Voltage Transformer Protection Criteria NEC Article 450 Transformers and

More information

For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690 V - 1000 V (at 50 Hz)

For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690 V - 1000 V (at 50 Hz) 24 1. NETWORK CONFIGURATIONS definition Standard IEC 38 defines voltage ratings as follows: - Low voltage () For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690

More information

ELECTRICAL INSULATION TESTING OF HV EQUIPMENT UP TO 33kV

ELECTRICAL INSULATION TESTING OF HV EQUIPMENT UP TO 33kV 1. SCOPE This document details PowerSystems requirements for electrical testing of HV Equipment up to and including 33kV. 2. ISSUE RECORD This is a Reference document. The current version of Controlled

More information

EVALUATION OF FAULT ANALYSIS IN TRANSMISSION LINES USING RELAY SETTINGS

EVALUATION OF FAULT ANALYSIS IN TRANSMISSION LINES USING RELAY SETTINGS EVALUATION OF FAULT ANALYSIS IN TRANSMISSION LINES USING RELAY SETTINGS N.VIJAYSIMHA 1*, CH.CHENGAIAH 2 1* M-TECH (PSOC), Department of Electrical and Electronics Engineering, Sri Venkateshwara University

More information

Power Technology Issue 104. Modeling of Two-Winding Voltage Regulating Transformers for Positive Sequence Load Flow Analysis in PSS E

Power Technology Issue 104. Modeling of Two-Winding Voltage Regulating Transformers for Positive Sequence Load Flow Analysis in PSS E SIEMENS Siemens Energy, Inc. Power Technology Issue 104 Modeling of TwoWinding Voltage Regulating Transformers for Positive Sequence Load Flow Analysis in PSS E Carlos GrandeMoran, Ph.D. Principal Consultant

More information

Typical Data Requirements Data Required for Power System Evaluation

Typical Data Requirements Data Required for Power System Evaluation Summary 66 Carey Road Queensbury, NY 12804 Ph: (518) 792-4776 Fax: (518) 792-5767 www.nepsi.com sales@nepsi.com Harmonic Filter & Power Capacitor Bank Application Studies This document describes NEPSI

More information

General Validation Test Program for Wind Power Plants Connected to the Hydro-Québec Transmission System

General Validation Test Program for Wind Power Plants Connected to the Hydro-Québec Transmission System General Validation Test Program for Wind Power Plants Connected to the Hydro-Québec Transmission System Direction Planification des actifs et expertise de transport February 2011 TABLE OF CONTENTS 1. CONDUCTING

More information

Loading Considerations When Paralleling Transformers

Loading Considerations When Paralleling Transformers Application Guide 7400DB0701 02/2007 Nashville, TN, USA Loading Considerations When Paralleling Transformers Class 7400 Retain for future use. Introduction Principles of Paralleling This application guide

More information

Hyperlinks are Inactive

Hyperlinks are Inactive Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)

More information

MEDIUM VOLTAGE SUBSTATION PRACTICES Medium Voltage (MV) is defined as: 1000V< MV 44kV

MEDIUM VOLTAGE SUBSTATION PRACTICES Medium Voltage (MV) is defined as: 1000V< MV 44kV MEDIUM VOLTAGE SUBSTATION PRACTICES MEDIUM VOLTAGE SUBSTATION PRACTICES Medium Voltage (MV) is defined as: 1000V< MV 44kV MEDIUM VOLTAGE SUBSTATION PRACTICES This presentation covers some safety aspects

More information

Earth Fault Detection Basics in Theory

Earth Fault Detection Basics in Theory Earth Fault Detection Basics in Theory Author: Dipl.-Ing. Ingo Kühnen Woodward Power Solutions Krefelder Weg 47 47906 Kempen, Germany Kempen, 16.04.2010 Earth_Fault_Detection_20100416.doc page 1 1. Star

More information

Electrical Fault Level Calculations Using the MVA Method

Electrical Fault Level Calculations Using the MVA Method J.M. PNG & SH PT LTD Chapter lectrical ault Level Calculations Using the Method 5 With modern day personal computers, hand calculations for electrical fault level are becoming a thing of the past. The

More information

EDS 02-0027 11KV TRIPLEX CABLE

EDS 02-0027 11KV TRIPLEX CABLE THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Document Number: EDS 02-0027 ENGINEERING DESIGN STANDARD EDS 02-0027 11KV TRIPLEX CABLE Network(s): EPN, LPN, SPN Summary:

More information

Design of Electrical Power Supply System in an Oil and Gas refinery. Master of Science Thesis in Electric Power Engineering

Design of Electrical Power Supply System in an Oil and Gas refinery. Master of Science Thesis in Electric Power Engineering Design of Electrical Power Supply System in an Oil and Gas refinery Master of Science Thesis in Electric Power Engineering Reza Vafamehr Department of Energy and Environment Division of Electric Power

More information

The electrical energy produced at the gen

The electrical energy produced at the gen 300 300 Principles of Power System CHAPTER CHAPTER 12 Distribution Systems General 12.1 Distribution System 12.2 Classification of Distribution Systems 12.3 A.C. Distribution 12.4 D.C. Distribution 12.5

More information

7. Reactive energy compensation

7. Reactive energy compensation 593 7. Reactive energy compensation 594 7. REACTIVE ENERGY COMPENSATION Reactive energy compensation is an important element for reducing the electricity bill and improving the quality of the electrical

More information

Cables, Cable Laying & Accessories Manual

Cables, Cable Laying & Accessories Manual Distribution Business Cables, Cable Laying & Accessories Manual Database ref: File Ref: Title Page & Revision Log For Cables & Access v4 - Nov 2003.doc Manual Name: Cables & Accessories Manual Version

More information

Part 1 System Modeling & Studies for Existing Systems

Part 1 System Modeling & Studies for Existing Systems Part 1 System Modeling & Studies for Existing Systems Operation Technology, Inc. Copyright 2009 Result of rapid release of energy due to an arcing fault between two conductors. Bus voltages > 208V Temperatures

More information

F.C. Chan General Manager, CLP Engineering Ltd., Hong Kong SAR, China

F.C. Chan General Manager, CLP Engineering Ltd., Hong Kong SAR, China ELECTRIC POWER DISTRIBUTION SYSTEMS F.C. Chan General Manager, CLP Engineering Ltd., Hong Kong SAR, China Keywords: Distribution system planning, Load characteristics, Subtransmission Lines, Distribution

More information

13. Electrical network design methodology and application example

13. Electrical network design methodology and application example 873 13. Electrical network design methodology and application example 874 13. ELECTRICAL NETWORK DESIGN METHODOLOGY AND APPLICATION EXAMPLE The profitability of an industrial installation is directly linked

More information

Power transformers. Special transformers Railway

Power transformers. Special transformers Railway Power transformers Special transformers Railway A leader in railway systems Our compact and low-weight transformers fully comply with the customer s specifications. The products are developed together

More information

HIGH VOLTAGE SHORE CONNECTION

HIGH VOLTAGE SHORE CONNECTION Guide for High Voltage Shore Connection GUIDE FOR HIGH VOLTAGE SHORE CONNECTION NOVEMBER 2011 American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 Copyright 2011

More information

Overcurrent Protection for the IEEE 34 Node Radial Test Feeder

Overcurrent Protection for the IEEE 34 Node Radial Test Feeder Power System Automation Lab 1 Overcurrent Protection for the IEEE 34 Node Radial Test Feeder Hamed B. Funmilayo, James A. Silva and Dr. Karen L. Butler-Purry Texas A&M University Electrical and Computer

More information

Modeling of Transmission Lines

Modeling of Transmission Lines Modeling of Transmission Lines Electric Power Transmission The electric energy produced at generating stations is transported over high-voltage transmission lines to utilization points. The trend toward

More information

Comparative study for cables and busbars

Comparative study for cables and busbars Comparative study for cables and busbars Preliminary considerations To compare the prices of two categories of product as different as traditional cables and busbars, it is necessary to make some preliminary

More information

VOLTAGE CONTROL IN DISTRIBUTION SYSTEMS AS A LIMITATION OF THE HOSTING CAPACITY FOR DISTRIBUTED ENERGY RESOURCES

VOLTAGE CONTROL IN DISTRIBUTION SYSTEMS AS A LIMITATION OF THE HOSTING CAPACITY FOR DISTRIBUTED ENERGY RESOURCES VOLTAGE CONTROL IN DISTRIBUTION SYSTEMS AS A LIMITATION OF THE HOSTING CAPACITY FOR DISTRIBUTED ENERGY RESOURCES C. Schwaegerl*, M.H.J. Bollen, K. Karoui #, A. Yagmur + *Siemens AG, # Tractebel STRI AB

More information

Instrument Transformers Application Guide

Instrument Transformers Application Guide Instrument Transformers Application Guide Edited by ABB AB High Voltage Products Department: Marketing & Sales Text: Knut Sjövall, ABB Layout, 3D and images: Mats Findell, ABB SE-771 80 LUDVIKA, Sweden

More information

Guideline for Energy Efficient Electrical systems for building. Presentation by TERI

Guideline for Energy Efficient Electrical systems for building. Presentation by TERI Guideline for Energy Efficient Electrical systems for building Presentation by TERI Objective of study The study highlights how BBMP can implement energy efficiency measures in building in co-ordination

More information

Engineering innovation

Engineering innovation Eaton's Electrical Engineering Services & Systems Solutions Focus Seamless Solutions for Reliable, Efficient and Safe Power Systems Engineering innovation Progressive solutions for today s power systems

More information

Digital Energy ITI. Instrument Transformer Basic Technical Information and Application

Digital Energy ITI. Instrument Transformer Basic Technical Information and Application g Digital Energy ITI Instrument Transformer Basic Technical Information and Application Table of Contents DEFINITIONS AND FUNCTIONS CONSTRUCTION FEATURES MAGNETIC CIRCUITS RATING AND RATIO CURRENT TRANSFORMER

More information

Electrical Shore Connections / Cold Ironing

Electrical Shore Connections / Cold Ironing STANDARD FOR CERTIFICATION No. 2.25 Electrical Shore Connections / Cold Ironing JULY 2014 The electronic pdf version of this document found through http://www.dnv.com is the officially binding version

More information

6. Synchronous machine dynamics

6. Synchronous machine dynamics 1 6. Synchronous machine dynamics In the middle of eighties, the present Type 59 synchronous machine model program was implemented and put into practical use in EMTP. In the first half of nineties, also

More information

TYPE TEST CERTIFICATE OF SHORT-CIRCUIT PERFORMANCE. A three-phase outdoor oil-immersed distribution transformer

TYPE TEST CERTIFICATE OF SHORT-CIRCUIT PERFORMANCE. A three-phase outdoor oil-immersed distribution transformer 168-08 TYPE TEST CERTIFICATE OF SHORT-CIRCUIT PERFORMANCE APPARATUS A three-phase outdoor oil-immersed distribution transformer DESIGNATION 1000 kva SERIAL No. 1-08-112-01-0001 Rated power Rated voltage

More information

SHORT CIRCUIT CURRENT CALCULATION AND PREVENTION IN HIGH VOLTAGE POWER NETS

SHORT CIRCUIT CURRENT CALCULATION AND PREVENTION IN HIGH VOLTAGE POWER NETS Bachelor's Thesis Electrical Engineering June 2014 SHORT CIRCUIT CURRENT CALCULATION AND PREVENTION IN HIGH VOLTAGE POWER NETS MD FARUQUL ALAM SALMAN SAIF HAMID ALI School of Engineering Blekinge Tekniska

More information

Cahier technique no. 158

Cahier technique no. 158 Collection Technique... Cahier technique no. 158 Calculation of short-circuit currents B. de Metz-Noblat F. Dumas C. Poulain Building a New Electric World "Cahiers Techniques" is a collection of documents

More information

3 Calculation of Short-Circuit Currents in Three-Phase Systems

3 Calculation of Short-Circuit Currents in Three-Phase Systems 3 ABB_11_E_03 13.08.2007 8:19 Uhr Seite 69 3 Calculation of Short-Circuit Currents in Three-Phase Systems 3.1 Terms and definitions 3.1.1 Terms as per IEC 60909 Short circuit: the accidental or deliberate

More information

AUTOMATIC TRANSFER SWITCH. Changeover Type from 250A to 2500A

AUTOMATIC TRANSFER SWITCH. Changeover Type from 250A to 2500A AUTOMATIC TRANSFER SWITCH Changeover Type from 250A to 2500A Table of Contents Preamble 1.1 Theoretical base 1.2 Selection the size of automatic transfer switch 1.3 Automatic transfer switch components

More information

ES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1

ES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1 ES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1 Design and Planning Specification for New Low Voltage Installations for Housing Developments 1. SCOPE This appendix to ENA

More information

Power Voltage Transformers for Air Insulated Substations. THE PROVEN POWER.

Power Voltage Transformers for Air Insulated Substations. THE PROVEN POWER. Power Voltage Transformers for Air Insulated Substations THE PROVEN POWER. Introduction Trench Power Voltage Transformers (Power VTs) combine the attributes of an inductive voltage transformer with the

More information

Electrical network protection. Protection guide. Guide

Electrical network protection. Protection guide. Guide Electrical network protection Protection guide Guide A new path for achieving your electrical installations A comprehensive offer The Protection Guide completes the perfectly coordinated offer of products

More information

SURVEY OF HARMONIC DISTORTION IN LV AND MV NETWORKS: RESULTS AND CORRECTIVE STRATEGIES

SURVEY OF HARMONIC DISTORTION IN LV AND MV NETWORKS: RESULTS AND CORRECTIVE STRATEGIES SURVEY OF HARMONIC DISTORTION IN LV AND MV NETWORKS: RESULTS AND CORRECTIVE STRATEGIES E Bompard*, E Carpaneto*, R Napoli*, P Ribaldone**, C Vercellino** * Dipartimento di Ingegneria Elettrica Industriale,

More information

Earthing Guidance Notes

Earthing Guidance Notes Central Networks Earthing Manual Section E2 Earthing Guidance Notes Version: 2 Date of Issue: September 2007 Author: Nigel Johnson Job Title: Earthing Specialist Approver: John Simpson Job Title: Head

More information

Open Phase Conditions in Transformers Analysis and Protection Algorithm

Open Phase Conditions in Transformers Analysis and Protection Algorithm Open Phase Conditions in Transformers Analysis and Protection Algorithm Amir Norouzi GE Digital Energy Markham, ON amir.norouzi@ge.com Abstract This paper first provides an in-depth analysis of open phase

More information

Electrical network protection. Protection guide. Guide 2003 51G 51G 51G 51G 51G. network protection solutions

Electrical network protection. Protection guide. Guide 2003 51G 51G 51G 51G 51G. network protection solutions Electrical network protection Protection guide Guide 2003 5 A H G G 4 D3 D2 D1 G G G 3 network protection solutions Protection guide Contents 0 Presentation 2 Power-system architecture Selection criteria

More information

FAQs-Main switchboard design criteria

FAQs-Main switchboard design criteria FAQs-Main switchboard design criteria Q: What is the Australian standard for main switchboards? Current Australian standard is AS/NZS 3439.1: 2002 originating from IEC 60439. The new series of standard

More information

Grounding of Electrical Systems NEW CODE: Grounding and Bonding

Grounding of Electrical Systems NEW CODE: Grounding and Bonding Grounding of Electrical Systems NEW CODE: Grounding and Bonding Presented By Scott Peele PE Grounding of Electrical Systems Outline Defining the Terms Why should I Ground? Types of Grounding Systems Separately

More information

Three phase circuits

Three phase circuits Three phase circuits THREE PHASE CIRCUITS THREE-PHASE ADVANTAGES 1. The horsepower rating of three-phase motors and the kva rating of three-phase transformers are 150% greater than single-phase motors

More information

Advantages of Fixed Circuit Breaker Switchgear

Advantages of Fixed Circuit Breaker Switchgear Advantages of Fixed Circuit Breaker Switchgear by Lionel Mackay, EDF Energy, and Mike Adams, Schneider Electric Ltd Introduction The purpose of this paper is to review the advantages of fixed circuit breaker

More information

THE PER-UNIT SYSTEM. (2) The per-unit values for various components lie within a narrow range regardless of the equipment rating.

THE PER-UNIT SYSTEM. (2) The per-unit values for various components lie within a narrow range regardless of the equipment rating. THE PER-UNIT SYSTEM An interconnected power system typically consists of many different voltage levels given a system containing several transformers and/or rotating machines. The per-unit system simplifies

More information

Relion. Power system protection and automation reference Extending substation life cycle with IEC 61850

Relion. Power system protection and automation reference Extending substation life cycle with IEC 61850 Relion Power system protection and automation reference Extending substation life cycle with IEC 61850 Extending substation life cycle with IEC 61850 A step-by-step power system retrofit approach for optimizing

More information

Secondary Unit Substations

Secondary Unit Substations 14 SWITCHGEAR Secondary Unit Substations Overview Siemens offers a wide variety of unit substation designs to meet customer requirements. A unit substation consists of one or more transformers mechanically

More information

Application-oriented testing of line differential protection end to end in the field using the corresponding RelaySimTest template

Application-oriented testing of line differential protection end to end in the field using the corresponding RelaySimTest template Application Note Application-oriented testing of line differential protection end to end in the field using the corresponding RelaySimTest template Author Jens Baumeister jens.baumeister@omicron.at Date

More information

Physical Address: City: State: Zip Code:

Physical Address: City: State: Zip Code: Application for Small Generator Facility Interconnection Tier 2, Tier 3 or Tier 4 Interconnection (For Small Generator Facilities with Electric Nameplate Capacities of 10 MW and less) Applicant Contact

More information

Submit shop drawings for equipment provided under this section Shop drawings shall indicate:

Submit shop drawings for equipment provided under this section Shop drawings shall indicate: Section 16435 - SWITCHBOARDS Introduction Part 1 - General Reference The work under this section is subject to requirements of the Contract Documents including the General Conditions, Supplementary Conditions,

More information

Discussion on Class I & II Terminology. IEEE PES Transformers Committee Fall Meeting 2011 Boston, MA

Discussion on Class I & II Terminology. IEEE PES Transformers Committee Fall Meeting 2011 Boston, MA Discussion on Class I & II Terminology IEEE PES Transformers Committee Fall Meeting 2011 Boston, MA What is Class I & II? C57.12.00 2010 is the only document we have that defined these terms. 5.10 Insulation

More information

CT Analyzer: Coming to the Rescue. Introduction. Equivalent Circuit. Construction. Classification of a CT. Tony Porrelli, OMICRON, UK

CT Analyzer: Coming to the Rescue. Introduction. Equivalent Circuit. Construction. Classification of a CT. Tony Porrelli, OMICRON, UK Presentation 09.1 CT Analyzer: Coming to the Rescue Tony Porrelli, OMICRON, UK Introduction The Current Transformer (CT) may exist for many applications but for this paper we can think about them being

More information

EARTHING SYSTEM CALCULATION

EARTHING SYSTEM CALCULATION BAZIAN STEAL FACTORY S/S 132/11kV, 1x30/40MVA EARTHING SYSTEM CALCULATION Kurdistan Region Sulaimani May 2011 Bazian Steal Factory S/S 132/11kV, 1x30/40 MVA Contents: 1. Introduction... 3 2. List of references

More information

FIT TIER 2 Application

FIT TIER 2 Application FIT TIER 2 Application Application Information The below information Auto-Fills from your registration information: Building Permit Application Date: Project Completion Date: Name: Address: City: State:

More information

PI144K - Winding 311 APPROVED DOCUMENT. Technical Data Sheet. Generator Solutions AS

PI144K - Winding 311 APPROVED DOCUMENT. Technical Data Sheet. Generator Solutions AS PI144K - Winding 311 Technical Data Sheet PI144K SPECIFICATIONS & OPTIONS STANDARDS TERMINALS & TERMINAL BOX Stamford industrial generators meet the requirements of BS EN 60034 and the relevant section

More information

DESCRIPTION DWG DESCRIPTION DWG

DESCRIPTION DWG DESCRIPTION DWG DESCRIPTION DWG DESCRIPTION DWG Ferroresonance 3451/1 3451/2 3451/3 Electro-magnetic Fields (EMF) 3462/1 HV & LV Insulators (Links) 3463/1 A ORIGINAL ISSUE B 14.07.09 APPROVED DATE J. Brooks 25.02.03 INDEX

More information

PI044E - Winding 311 APPROVED DOCUMENT. Technical Data Sheet

PI044E - Winding 311 APPROVED DOCUMENT. Technical Data Sheet PI044E - Winding 311 Technical Data Sheet PI044E SPECIFICATIONS & OPTIONS STANDARDS Stamford industrial generators meet the requirements of BS EN 60034 and the relevant section of other international standards

More information

Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components

Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components Course No: E02-010 Credit: 2 PDH Boris Shvartsberg, Ph.D., P.E., P.M.P. Continuing Education

More information

1 Introduction. 2 The Symmetrical Component Transformation. J.L. Kirtley Jr.

1 Introduction. 2 The Symmetrical Component Transformation. J.L. Kirtley Jr. Massachusetts Institute of Technology Department of Electrical Engineering and Computer Science 6.06 Introduction to Power Systems Class Notes Chapter 4 Introduction To Symmetrical Components J.L. Kirtley

More information

Relion. Power system protection and automation reference Fast substation busbar protection with IEC 61850 and GOOSE

Relion. Power system protection and automation reference Fast substation busbar protection with IEC 61850 and GOOSE Relion Power system protection and automation reference Fast substation busbar protection with IEC 61850 and GOOSE Fast substation busbar protection with IEC 61850 and GOOSE Falu Elnät AB applies new power

More information

Product Data Bulletin

Product Data Bulletin Product Data Bulletin Power System Harmonics Causes and Effects of Variable Frequency Drives Relative to the IEEE 519-1992 Standard Raleigh, NC, U.S.A. INTRODUCTION This document describes power system

More information

System Grounding and Ground-Fault Protection Methods for UPS-Supplied Power Systems

System Grounding and Ground-Fault Protection Methods for UPS-Supplied Power Systems System Grounding and Ground-Fault Protection Methods for -Supplied Power Systems Bill Brown, P.E., Square D Critical Power Competency Center 1. INTRODUCTION The use of solid grounding for -supplied power

More information

Management Systems 10 Electrical Safety Audit 14 PPE 20 Arc Mitigation 22 Hazard Assessment 26

Management Systems 10 Electrical Safety Audit 14 PPE 20 Arc Mitigation 22 Hazard Assessment 26 Management Systems 10 Electrical Safety Audit 14 PPE 20 Arc Mitigation 22 Hazard Assessment 26 Assessing The Hazards Of High and Low Voltage Single-Phase Arc-Flash By Albert Marroquin One common question

More information

DC TRANSMISSION BASED ON VOLTAGE SOURCE CONVERTERS

DC TRANSMISSION BASED ON VOLTAGE SOURCE CONVERTERS DC TRANSMISSION BASED ON VOLTAGE SOURCE CONVERTERS by Gunnar Asplund, Kjell Eriksson, Hongbo Jiang, Johan Lindberg, Rolf Pålsson, Kjell Svensson ABB Power Systems AB Sweden SUMMARY Voltage Source Converters

More information

GPS Interfacing of Banediya Feeder (M.P) Using MI Power Software

GPS Interfacing of Banediya Feeder (M.P) Using MI Power Software GPS Interfacing of Banediya Feeder (M.P) Using MI Power Software Swati Paliwal 1, V.K Tayal 2, H.P Singh 3 Assistant professor, Department of Electrical & Electronics Engineering, Northern India Engineering

More information

STANDARDS. Site-Specific Loss Adjustments PUBLIC

STANDARDS. Site-Specific Loss Adjustments PUBLIC STANDARDS PUBLIC MDP_STD_0005 Site-Specific Loss Adjustments Requirements for Adjustment of Meter Readings for Site-Specific Losses in the IESO-Administered Market Issue 4.0 This standard provides the

More information

Technical Information Requirement for MV transformers and transformer for internal power supplies for SUNNY CENTRAL

Technical Information Requirement for MV transformers and transformer for internal power supplies for SUNNY CENTRAL Technical Information Requirement for MV transformers and transformer for internal power supplies for SUNNY CENTRAL SC_Trafo-TI-en-62 Version 6.2 ENGLISH Table of Contents SMA Solar Technology Table of

More information

SAMPLE OF THE STUDY MATERIAL PART OF CHAPTER 3. Symmetrical Components & Faults Calculations

SAMPLE OF THE STUDY MATERIAL PART OF CHAPTER 3. Symmetrical Components & Faults Calculations SAMPLE OF THE STUDY MATERIAL PART OF CHAPTER 3 3.0 Introduction Fortescue's work proves that an unbalanced system of 'n' related phasors can be resolved into 'n' systems of balanced phasors called the

More information

Assessment of the Technical Issues relating to Significant Amounts of EHV Underground Cable in the All-island Electricity Transmission System

Assessment of the Technical Issues relating to Significant Amounts of EHV Underground Cable in the All-island Electricity Transmission System Assessment of the Technical Issues relating to Significant Amounts of EHV Underground Cable in the All-island Electricity Transmission System Summary Report November 2009 Technical Report on using EHV

More information

Circulating Current Relay. Type IRXm

Circulating Current Relay. Type IRXm Circulating Current Relay Type IRXm ABB a global technology leader ABB is a global leader in Power and Automation technologies that enable utility and industry customers to improve performance while lowering

More information

Power System Analysis

Power System Analysis PDHonline Course E194 (15 PDH) Power System Analysis Instructor: Timothy L. O'Hearn, PE 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org

More information

Residual Current Circuit Breaker

Residual Current Circuit Breaker Introduction Residual Current Circuit Breaker / ELCB The Fault current overloads and short circuits can be detected by circuit breakers like MCB s MCCB s & HRC Fuses etc. But, Circuit breakers don t detect

More information

2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV 16346-1. 2a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std.

2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV 16346-1. 2a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std. 2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV 16346-1 2a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std. Relays) Part 1 General 1.1 CONDITIONS AND REQUIREMENTS: A. Refer to

More information

Chapter G Sizing and protection of conductors

Chapter G Sizing and protection of conductors Chapter G Sizing and protection of conductors 1 2 3 4 5 6 7 8 Contents General 1.1 Methodology and definition G2 1.2 Overcurrent protection principles G4 1.3 Practical values for a protective scheme G4

More information

ALTERNATIVE METHODS FOR INTERNAL ARC TESTS ON 12 KV AND 24 KV METAL-ENCLOSED SWITCHGEARS WITH COMPACT RMU

ALTERNATIVE METHODS FOR INTERNAL ARC TESTS ON 12 KV AND 24 KV METAL-ENCLOSED SWITCHGEARS WITH COMPACT RMU ALTERNATIVE METHODS FOR INTERNAL ARC TESTS ON 12 KV AND 24 KV METAL-ENCLOSED SWITCHGEARS WITH COMPACT RMU George CURCANU, Constantin ILINCA, Ilie SBORA ICMET Craiova, Romania, Calea Bucuresti 144, phone:

More information

Measurement, Modeling and Simulation of Capacitor Bank Switching Transients

Measurement, Modeling and Simulation of Capacitor Bank Switching Transients Measurement, Modeling and Simulation of Capacitor Bank Switching Transients Mirza Softić*, Amir Tokić**, Ivo Uglešić*** *Kreka - Dubrave e, Dubrave, Bosnia and Herzegovina (e-mail: softic_mirza@yahoo.com).

More information