Design for X Quality Function Deployment Failure Mode and Effect Analysis
|
|
- Roxanne Garrison
- 7 years ago
- Views:
Transcription
1 MECH152-L17(1.0) - 1 Design for X Quality Function Deployment Failure Mode and Effect Analysis What is Design for X MECH152-L17(1.0) - 2 Design for X is a term evolved after sustained interests in developing design methodology to cover various aspects, such as Design for Assembly, Design for Manufacturing, Design for Quality, etc. In general, this is being adopted by the product design community to cover a wide range of issues. It is important NOT to over emphasis its usage and focus on a few key items. 1
2 MECH152-L17(1.0) - 3 Example for DFX Design for assembly Design for disassembly Design for ease of use Design for maintenance Design for manufacture Design for quality Design for reliability Design for reuse Design for cost Design for environment Key Topics in DFX MECH152-L17(1.0) - 4 Key topics Design for Assembly and Disassembly Design for Manufacture Design for Recycling/Disposal Design for Life Cycle Other useful topics: Quality Function Deployment (QFD) Failure Mode and Effect Analysis (FMEA) 2
3 Design for Life Cycle MECH152-L17(1.0) - 5 Design considerations related to total product life cycle: Testability/Inspectability Maintainability/Serviceability Design for the Environment Upgradeability Installability Safety and Product Liability Human Factors lifecycle.html Paradigm Shift MECH152-L17(1.0) - 6 3
4 MECH152-L17(1.0) - 7 Quality Function Deployment A method to translate the customers demands (Voice of Customers) of the products to specific plans to produce products to meet those needs. Market survey 3D Matrix of customer requirements, design considerations and design alternatives with assign weighted scores based on market research information collected Cross functional teams participate in the process MECH152-L17(1.0) - 8 Typical QPD Matrix Auxiliary Power Unit Product Planning Matrix 4
5 QFD Key Steps MECH152-L17(1.0) Define product requirements from customer needs (Product Planning Matrix). 2. Develop product concepts to satisfy these requirements. 3. Evaluate product concepts to select most optimum (Concept Selection Matrix). 4. System Decomposition and define functional requirements or technical characteristics for the subsystems. 5. Derive detail product requirements (assembly or part characteristics) and specifications from subsystem requirements (Assembly/Part Deployment Matrix). 6. For critical assemblies or parts, generate process planning from detail product requirements (assembly or part characteristics). 7. Determine manufacturing process steps to meet these assembly or part characteristics. 8. Based in these process steps, determine set-up requirements, process controls and quality controls MECH152-L17(1.0) - 10 Customer Needs 5
6 Customer Needs (VOC) -1 VOC Collection Plan MECH152-L17(1.0) - 11 Customer requirement documents, requests for proposals, requests for quotations, contracts, customer specification documents, customer meetings/interviews, focus groups/clinics, user groups, surveys, observation, suggestions, and feedback from the field. Include both current and potential customers Special attention to lead customers as future trend setter Plan human resources support for data collection Schedule activities such as meeting, focus groups and surveys. MECH152-L17(1.0) - 12 Customer Needs (VOC) - 2 VOC Data Collection Preparation Identify required information Prepare Questionnaires, Meeting agendas, Survey forms, Presentation for users group/focus group Consolidation of needs Grouping and consolidation to define functional needs using tools like affinity diagram Ranking of VOC Ranking of customer priorities (typically 1 to 5) 6
7 Product Planning (1) Categorize the customer needs in groups Define customer priorities (1 to 5 rating) MECH152-L17(1.0) - 13 Check on standards, regulatory, and industry requirements (normally 3) Critical requirements (5) Competitive analysis of product Get feedback from customers and potential customers on product competitiveness (surveys, meeting, focus group) Rank company and competitor s product on a 1 to 5 scale. MECH152-L17(1.0) - 14 Competitive analysis 7
8 Product Planning (2) MECH152-L17(1.0) - 15 Based on Competitive Analysis, set the improvement goal Improvement No planned improvement: Improvement factor 1 Planned improvement from a rating of 2 to 4: Improvement factor of 1.2 Warranty, service, reliability & compliant reduction are potential areas of improvement Sales points to emphasize Major sales points weighting factor 1.3 Minor sales points weighting factor 1.1 Maximum: 3 major sales point or 2 major sales point and 2 minor sales points Product Planning (3) MECH152-L17(1.0) - 16 Product Strategy Brief Value proposition behind the product. To focus development resources on areas of greatest value to customer and to gain management support Sales point emphases Competitive strengths Market differentiation Market positioning relative to other products 8
9 MECH152-L17(1.0) - 17 Product requirements and direction Product Planning (4) MECH152-L17(1.0) - 18 Establish and classify product requirements in response to customer needs. Classification: functional or sub-systems Classification should be generic to allow room for alternative solutions consideration Identify the direction of the objective for each requirement (target value or range, maximize or minimize) 9
10 MECH152-L17(1.0) - 19 Product requirements vs customer needs Technical evaluation Product Planning (5) MECH152-L17(1.0) - 20 Relate customer needs to product requirements: satisfying customer needs Evaluate against the goal for the requirement Use the weighting factors (strong, medium, weak) Perform technical evaluation of the product against competitive products Source: websites, industry publications, customer interviews, published specifications, catalogs and brochures, trade shows, purchasing information, patents, technical publications, trade benchmarks, 3 rd party organizations, former employees, testing reports Warranty, service repair occurrences and costs 10
11 MECH152-L17(1.0) - 21 Initial target values Requirements interaction Product Planning (6) Define initial target values for product requirements MECH152-L17(1.0) - 22 Use technical evaluation data Set appropriate target values and not be over-aggressive on non-focused areas Determine potential interactions between product requirements Strong positive, moderate positive, moderate negative and strong negative Overly positive bias means redundancy in requirements Focus on negatives: negative means potentially conflicting requirements 11
12 MECH152-L17(1.0) - 23 Importance ratings Difficulty ratings Product Planning (7) Calculate the importance ratings MECH152-L17(1.0) - 24 products of customer priority rating and requirement weighting factor. Improvement factors and sales point factors Sum of the product under the requirement column Define the difficulty ratings 1 to 5 point scale (5, very difficult and risky) Consider technology maturity, personnel technical capability, resources availability, technical risk, manufacturing capability, supply chain capability, and schedule Generate composite rating by classification 12
13 Product plan Product Planning (8) Analyze the matrix and finalize the product plan. Determine required actions and areas of focus Finalize target values Based on: Product strategy objectives Importance of various product requirements Conflict resolutions of the interaction matrix Technical difficulty ratings Technology solution and maturity Maintain the matrix as customer needs or conditions changes MECH152-L17(1.0) - 25 MECH152-L17(1.0) - 26 FMEA 13
14 MECH152-L17(1.0) - 27 Failure Mode and Effect Analysis FMEA is a method which is used to find and judge potential sources of error in products or manufacturing processes. FMEA includes a judgment of how serious the consequences of a presumed error would be. FMEA also estimates the failure in terms of the frequency of the occurrence, the severity, and its detection. Action to eliminate or reduce risk forms the outcome of the analysis. Typical FMEA Chart MECH152-L17(1.0)
15 MECH152-L17(1.0) - 29 Failure Modes Possible Failure Mode: potential failures of parts in the system Effects of failure on system: failure of the part leading to adverse effect on the system Cause of Failure (Failure Mode): underlying mechanism leading to failure Case Study MECH152-L17(1.0) - 30 Product: Component Name: Component Number: Issue Nunber: Automatic Transmission Shaft & Lever Assembly Q Engineer Sheet Issue Number 1 of 1 1 Last Updated: Part, Process or System Name/Number Function Possible Failure Mode Effects of Failure on System Cause of Failure (Failure Mode) O S D R Action to eliminate or reduce risk Manual level assembly Transmit manual selector motion from external linkage to manual valve and park linkage Plastic level breaks No drive, Locked in park Overload on lever when disengaging park on grade, Brittle when cold, Damaged in handling Redesign lever- Thicker material and strengthening ribs to carry 100% overload. In progress Wear at hole in lever Loose fit at shaft and lever serration Excessive free-play in manual linkage Excessive free-play in manual linkage Lever slides off serration Cannot select drive position High unit loading at rod, Inferior material Thermal set of plastic. Inadequate press-fit interference Assemble with lubricant Install load sensor on assembly press to detect light press fit. Status open. Mis-orient lever to shaft flat in assembly Improper linkage geometry, Cannot select low, Cannot select park 15
16 FMEA Procedure MECH152-L17(1.0) - 31 The FMEA analysis is built on a table with a number of columns: Product/Process name Product/Process function Possible failure mode Effects of failure on system Cause of failure (failure mode) O Occurrence S Severity D Detection R Risk priority number = O x S x D Action to eliminate or reduce risk 16
CHAPTER 6 QUALITY ASSURANCE MODELING FOR COMPONENT BASED SOFTWARE USING QFD
81 CHAPTER 6 QUALITY ASSURANCE MODELING FOR COMPONENT BASED SOFTWARE USING QFD 6.1 INTRODUCTION Software quality is becoming increasingly important. Software is now used in many demanding application and
More informationMechanical Design/Product Design Process
Mechanical Design/Product Design Process Several Major Steps: Define project and its planning Identify customers (users) and their needs Evaluate existing similar products (benchmarking) Generate engineering
More informationDesign for Six Sigma +Lean Toolset
Stephan Lunau (Ed.) Christian Staudter Jens-Peter Mollenhauer Renata Meran Olin Roenpage Clemens von Hugo Alexis Hamalides Design for Six Sigma +Lean Toolset Implementing Innovations Successfully 4y Springer
More informationBE 2015 A BUSINESS EXCELLENCE INITIATIVE EXCELLENCE IN CUSTOMER MANAGEMENT SELF ASSESSMENT QUESTIONNAIRE
BE 2015 A BUSINESS EXCELLENCE INITIATIVE 2015 CUSTOMER MANAGEMENT SELF ASSESSMENT QUESTIONNAIRE BE 2015 Self Assessment Guidelines l l l l l l The Criterion contains questions on the Processes and Results.
More informationEnsuring Reliability in Lean New Product Development. John J. Paschkewitz, P.E., CRE
Ensuring Reliability in Lean New Product Development John J. Paschkewitz, P.E., CRE Overview Introduction and Definitions Part 1: Lean Product Development Lean vs. Traditional Product Development Key Elements
More informationFINDING THE RISK IN RISK ASSESSMENTS NYSICA JULY 26, 2012. Presented by: Ken Shulman Internal Audit Director, New York State Insurance Fund
FINDING THE RISK IN RISK ASSESSMENTS NYSICA JULY 26, 2012 Presented by: Ken Shulman Internal Audit Director, New York State Insurance Fund There are different risk assessments prepared: Annual risk assessment
More informationSupplier Quality Requirements
Key Elements Procedures # 2 Supplier Quality Requirements Section List of content Page 1.0 Foreword 2 2.0 Definitions and acronyms 2 3.0 Basic Quality Requirements 3 4.0 Part Specific Quality Requirements
More informationQUALITY FUNCTION DEPLOYMENT (QFD) FOR SERVICES HANDBOOK MBA Luis Bernal Dr. Utz Dornberger MBA Alfredo Suvelza MBA Trevor Byrnes
International SEPT Program QUALITY FUNCTION DEPLOYMENT (QFD) FOR SERVICES HANDBOOK MBA Luis Bernal Dr. Utz Dornberger MBA Alfredo Suvelza MBA Trevor Byrnes SEPT Program March 09 Contents DEFINITION...
More informationThermodynamic efficiency of an actuator that provides the mechanical movement for the driven equipments:
1. Introduction 1.1. Industry Automation Industry automation is the term that describes a vital development programme of a production community where the project engineers build up automated manufacturing
More informationPhase 2 Systems Analysis. Dr. Feng-Jen Yang
Phase 2 Systems Analysis Dr. Feng-Jen Yang Phase Description Systems analysis is the 2nd phase in the systems development life cycle (SDLC) Use requirements modeling, data and process modeling, and object
More informationDMAIC PHASE REVIEW CHECKLIST
Project Name Project Lead Champion Kick-Off Date: _mm / dd / yyyy Project CTQ & Target D-M-A-I-C: DEFINE Project Identification: Big Y linkage identified Customer(s) & Customer type identified Voice of
More informationRETTEW Associates, Inc. RISK MANAGEMENT PLAN. for. (client project/rfp number) (date of proposal submission)
RISK MANAGEMENT PLAN for (client project/rfp number) (date of proposal submission) This proposal includes data that shall not be disclosed outside the government and shall not be duplicated, used, or disclosed
More informationThe Billion Dollar Lost Laptop Problem Benchmark study of U.S. organizations
The Billion Dollar Lost Laptop Problem Benchmark study of U.S. organizations Independently conducted by Ponemon Institute LLC Publication Date: 30 September 2010 Ponemon Institute Research Report Part
More informationDesign Verification The Case for Verification, Not Validation
Overview: The FDA requires medical device companies to verify that all the design outputs meet the design inputs. The FDA also requires that the final medical device must be validated to the user needs.
More informationLean Six Sigma Black Belt Body of Knowledge
General Lean Six Sigma Defined UN Describe Nature and purpose of Lean Six Sigma Integration of Lean and Six Sigma UN Compare and contrast focus and approaches (Process Velocity and Quality) Y=f(X) Input
More informationBrown Hills College of Engineering & Technology Machine Design - 1. UNIT 1 D e s i g n P h i l o s o p h y
UNIT 1 D e s i g n P h i l o s o p h y Problem Identification- Problem Statement, Specifications, Constraints, Feasibility Study-Technical Feasibility, Economic & Financial Feasibility, Social & Environmental
More informationCase Study: How Cognition Cockpit Improves Development Processes at Cummins, Inc.
How Cognition Cockpit Improves Development Processes at Cummins, Inc. Cummins Inc. (www.cummins.com) is a $10B company that is in business to design, manufacture, distribute and service engines and related
More informationProduct Design. Chapter 5. Product and Service Design. Service Design. An Effective Design Process. Stages In The Design Process
Chapter 5 Product and Service Design Product Design Specifies materials Determines dimensions & tolerances Defines appearance Sets performance standards Service Design Specifies what the customer is to
More informationI E 361. Jennifer Tapke Allyson Muller Greg Johnson Josh Sieck. House of Quality. Steps in Understanding the House of Quality
I E 361 Jennifer Tapke Allyson Muller Greg Johnson Josh Sieck House of Quality Steps in Understanding the House of Quality House of Quality Steps in Understanding the House of Quality Introduction Every
More informationObjective Oriented Planning Module 1. Stakeholder Analysis
III. Stakeholder Analysis Stakeholders are people, groups, or institutions, which are likely to be affected by a proposed project (either negatively or positively), or those which can affect the outcome
More informationEffective Root Cause Analysis For Corrective and Preventive Action
Effective Root Cause Analysis For Corrective and Preventive Action Manuel Marco Understanding Key Principles Requirement need or expectation that is stated, generally implied, or obligatory Generally implied
More informationORGANIZATION-WIDE RISK ASSESSMENT
ORGANIZATION-WIDE RISK ASSESSMENT Prepared By: Craig Hametner, CPA, CIA, CMA, CFE City Auditor Randall Mahaffey, CIA, CGAP Senior Audit Analyst INTERNAL AUDIT DEPARTMENT January 10, 2008 Report 0806 Table
More informationRisk Management and Internal Audit Specialized Training Course Audit Risk Assessment Methodology
Risk Management and Internal Audit Specialized Training Course Audit Risk Assessment Methodology May 20, 2015 Internal FR 2 Risk and Risk Assessment Defined Risk Institute of Internal Auditors (IIA) The
More informationInternal Audit Quality Assessment. Presented To: World Intellectual Property Organization
Internal Audit Quality Assessment Presented To: World Intellectual Property Organization April 2014 Table of Contents List of Acronyms 3 Page Executive Summary Opinion as to Conformance to the Standards,
More informationA Guide To The Project Management Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition
A Guide To The Project Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition Major Changes The adoption of the verb-noun format for process names Amplification as to Enterprise
More informationSession 4. System Engineering Management. Session Speaker : Dr. Govind R. Kadambi. M S Ramaiah School of Advanced Studies 1
Session 4 System Engineering Management Session Speaker : Dr. Govind R. Kadambi M S Ramaiah School of Advanced Studies 1 Session Objectives To learn and understand the tasks involved in system engineering
More informationRisk Management Primer
Risk Management Primer Purpose: To obtain strong project outcomes by implementing an appropriate risk management process Audience: Project managers, project sponsors, team members and other key stakeholders
More informationRisk Management Strategy and Policy. The policy provides the framework for the management and control of risk within the GOC
Annex 1 TITLE VERSION Version 2 Risk Management Strategy and Policy SUMMARY The policy provides the framework for the management and control of risk within the GOC DATE CREATED January 2013 REVIEW DATE
More informationConsulting Performance, Rewards & Talent. Measuring the Business Impact of Employee Selection Systems
Consulting Performance, Rewards & Talent Measuring the Business Impact of Employee Selection Systems Measuring the Business Impact of Employee Selection Systems Many, if not all, business leaders readily
More informationRequirements Analysis Concepts & Principles. Instructor: Dr. Jerry Gao
Requirements Analysis Concepts & Principles Instructor: Dr. Jerry Gao Requirements Analysis Concepts and Principles - Requirements Analysis - Communication Techniques - Initiating the Process - Facilitated
More informationPROJECT MANAGEMENT PLAN CHECKLIST
PROJECT MANAGEMENT PLAN CHECKLIST The project management plan is a comprehensive document that defines each area of your project. The final document will contain all the required plans you need to manage,
More informationBusiness Process Outsourcing on the rise in wealth management. Patrick Laurent Partner Technology & Enterprise Application Deloitte
Business Process Outsourcing on the rise in wealth management Pascal Martino Partner Strategy, Regulatory & Corporate Finance Deloitte Patrick Laurent Partner Technology & Enterprise Application Deloitte
More informationCertified Software Quality Assurance Professional VS-1085
Certified Software Quality Assurance Professional VS-1085 Certified Software Quality Assurance Professional Certified Software Quality Assurance Professional Certification Code VS-1085 Vskills certification
More informationPhase A Aleutian Islands Risk Assessment. Options and Recommended Risk Matrix Approach. April 27, 2010
Phase A Aleutian Islands Risk Assessment Options and Recommended Risk Matrix Approach April 27, 2010 Agenda for Risk Matrix Discussion Introductions Where we are in AIRA Phase A Risk Matrix Background
More informationAnnual Risk Assessment and Audit Plan Fiscal Year 2015/2016
Annual Risk Assessment and Audit Plan Fiscal Year 2015/2016 Office of the Internal Auditor May 2015 Table of Contents Introduction... 3 Risk Assessment Process... 3 Interpreting Risk Assessment Results...
More informationBusiness Intelligence and Analytics: Leveraging Information for Value Creation and Competitive Advantage
PRACTICES REPORT BEST PRACTICES SURVEY: AGGREGATE FINDINGS REPORT Business Intelligence and Analytics: Leveraging Information for Value Creation and Competitive Advantage April 2007 Table of Contents Program
More informationDesign Failure Modes and Effects Analysis DFMEA with Suppliers
Design Failure Modes and Effects Analysis DFMEA with Suppliers Copyright 2003-2007 Raytheon Company. All rights reserved. R6σ is a Raytheon trademark registered in the United States and Europe. Raytheon
More informationBODY OF KNOWLEDGE CERTIFIED SIX SIGMA YELLOW BELT
BODY OF KNOWLEDGE CERTIFIED SIX SIGMA YELLOW BELT The topics in this Body of Knowledge include additional detail in the form of subtext explanations and the cognitive level at which test questions will
More informationWORKSHOP #4 CUSTOMER TARGETING (MARKETING) STRATEGY
WORKSHOP #4 CUSTOMER TARGETING (MARKETING) STRATEGY THE FUNDAMENTAL ELEMENTS OF THE DEFINITION OF A CUSTOMER TARGETING (MARKETING) STRATEGY Corporate Strategy Mission of the firm Strategic thrusts and
More informationTraining Pack. Kaizen PDCA ( Plan / Do / Check / Act )
Training Pack Kaizen PDCA ( Plan / Do / Check / Act ) Introductions Name Department Current knowledge of Plan Do Check Act Aims & Objectives Target Audience : All! Purpose of Module : To train the delegates
More informationRisk/Issue Management Plan
Risk/Issue Management Plan Centralized Revenue Opportunity System November 2014 Version 2.0 This page intentionally left blank Table of Contents 1. Overview... 3 1.1 Purpose... 3 1.2 Scope... 3 2. Roles
More informationAn Introduction to Design for Six Sigma concepts
An Introduction to Design for Six Sigma concepts Dr Jane Marshall Product Excellence using 6 Sigma Module PEUSS 2012/2013 Design for Six Sigma Page 1 Objectives of the session History of Six Sigma Describe
More informationBusiness Insurance Preparation - A Practical Application
PRODUCTS LIABILITY INSURANCE QUESTIONNAIRE YOU ARE TO DISCLOSE IN THIS FORM FULLY AND FAITHFULLY ALL FACTS WHICH YOU KNOW OR OUGHT TO KNOW, OTHERWISE YOU MAY RECEIVE NOTHING FROM THIS INSURANCE CONTRACT
More informationOracle Banking Digital Experience
Oracle Banking Digital Experience Dashboard Widgets Personal Finance Management User Manual Release 15.1.0.0.0 Part No. E66313-01 October 2015 Dashboard Widgets Personal Finance Management User Manual
More informationCareer Tracks Project
Career Tracks Project 1. What is Career Tracks? Career Tracks is a systemwide job classification structure. Job titles are organized into occupation-specific groupings called families (i.e., Information
More informationCHAPTER 14 ORDINAL MEASURES OF CORRELATION: SPEARMAN'S RHO AND GAMMA
CHAPTER 14 ORDINAL MEASURES OF CORRELATION: SPEARMAN'S RHO AND GAMMA Chapter 13 introduced the concept of correlation statistics and explained the use of Pearson's Correlation Coefficient when working
More informationUsing the PRECEDE- PROCEED Planning Model PRECEDE-PROCEED P R E C E D E. Model for health promotion programming Best known among health scientists
Using the PRECEDE- PROCEED Planning Model Dr. McKinley Thomas Associate Professor Department of Community Medicine Mercer University PRECEDE-PROCEED Model for health promotion programming Best known among
More informationQUALITY FUNCTION DEPLOYMENT AS A STRATEGIC PLANNING TOOL
QUALITY FUNCTION DEPLOYMENT AS A STRATEGIC PLANNING TOOL Burcu DEVRİM İÇTENBAŞ Atılım University Department of Industrial Engineering E-mail: bdevrim@atilim.edu.tr Hande ERYILMAZ Atılım University Department
More informationRelationship Manager (Banking) Assessment Plan
Relationship Manager (Banking) Assessment Plan ST0184/AP03 1. Introduction and Overview The Relationship Manager (Banking) is an apprenticeship that takes 3-4 years to complete and is at a Level 6. It
More informationStrategic HR Partner Assessment (SHRPA) Feedback Results
Strategic HR Partner Assessment (SHRPA) Feedback Results January 04 Copyright 997-04 Assessment Plus, Inc. Introduction This report is divided into four sections: Part I, The SHRPA TM Model, explains how
More informationThe Ohio Resident Educator Program Standards Planning Tool. 1 9-1-11 Final
The Ohio Resident Educator Program Standards Planning Tool 1 The Resident Educator Program Standards Planning Tool The Resident Educator Program Standards Planning Tool is intended to assist district/schools
More informationCERTIFIED QUALITY ENGINEER (CQE) BODY OF KNOWLEDGE
CERTIFIED QUALITY ENGINEER (CQE) BODY OF KNOWLEDGE The topics in this Body of Knowledge include subtext explanations and the cognitive level at which the questions will be written. This information will
More informationCAPA - the importance of data analysis
CAPA - the importance of data analysis Presented by: Sue Jacobs QMS Consulting, Inc. 1 847 359 4456 sue@qmsconsultant.com QMS Consulting, Inc. 2007 1 Topics Regulatory Requirements Design Controls and
More informationArizona Association of Student Councils
1. Communication 1.1 Student communicates effectively in large and small groupings 1.1.a Student develops content and ideas into organized presentations. 1.1b Student learn to monitor and adjust based
More informationINTERNAL CONTROL MATRIX FOR AUDIT OF ESTIMATING SYSTEM CONTROLS Version No. 3.2 June 2006. 31-d Page 1 of 7
INTERNAL CONTROL MATRIX FOR AUDIT OF ESTIMATING SYSTEM CONTROLS Version No. 3.2 June 2006 Control Objectives Example Control Activities Audit Procedures 1. INTERNAL AUDITS Management should periodically
More informationEssential Power System Requirements for Next Generation Data Centers
Essential Power System Requirements for Next Generation Data Centers White Paper #4 Revision 4 Executive Summary Effective mission critical installations must address the known problems and challenges
More informationAdjustable Stiffening Device for Alpine Snow Ski
Adjustable Stiffening Device for Alpine Snow Ski Design Team Ryan Conroy, Michael Dores, Michael Grant, Scott Kelley, Lara Taylor Design Advisor Prof. Mohammad Taslim Abstract The purpose of this project
More informationCHROME FRONT BRAKE MASTER CYLINDER KIT
-J075 REV. 009-0-0 CHROME FRONT BRAKE MASTER CYLINDER KIT GENERAL Kit Number 5-99D, 5-99D Models These Chrome Master Cylinder Kits are designed to replace the original equipment front brake master cylinder
More informationCalculation of Risk Factor Using the Excel spreadsheet Calculation of Risk Factor.xls
Calculation of Risk Factor Using the Excel spreadsheet Calculation of Risk Factor.xls Events, Impact and Software Validation Table of Contents Many software products in complex computer systems like LIS
More informationC I O T A S K F O R C E U P D A T E. July 13, 2012
July 13, 2012 Task force scope Management review and assessment of circumstances surrounding CIO losses Assisted by outside counsel Comprehensive fact-gathering effort Conducted numerous interviews with
More informationModule J Trade Study Process
Module J Trade Study Process CC04264140.ppt Trade Study Objectives Support the decision needs of the system engineering process Evaluate alternatives (requirements, functions, configurations) Integrate
More informationProcess Failure Modes and Effects Analysis PFMEA for Suppliers
Process Failure Modes and Effects Analysis PFMEA for Suppliers Copyright 2003-2007 Raytheon Company. All rights reserved. R6σ is a Raytheon trademark registered in the United States and Europe. Raytheon
More informationIntroduction to Asset Management. Presented by: John J. Jackman, P.E. Associate - Asset Management Specialist
Introduction to Asset Management Presented by: John J. Jackman, P.E. Associate - Asset Management Specialist Agenda Infrastructure Management Inventory Condition Assessment Maintenance Life Cycle Costs
More informationClassification Description
Classification Description Job Title: Financial Aid Communications Coordinator Job Code: 3623 Pay Grade: 23 FLSA Status: Exempt Job Purpose This is responsible, professional work in support of the development
More informationAlignment of the Career and Life Role Common Curriculum Goals with Career-Related Learning Standards Oregon Department of Education October 2002
Alignment of the Career and Life Role with Oregon Department of Education October 2002 (available on the ODE website at www.ode.state.or.us/cimcam) The Oregon Department of Education hereby gives permission
More informationAssessing Banks: Delivering a Triple Bottom Line in the Real Economy. Overview
Assessing Banks: Delivering a Triple Bottom Line in the Real Economy Overview Global Alliance for Banking on Values The Global Alliance for Banking on Values, established in 2009, is an independent network
More informationService Manual Trucks
Service Manual Trucks Group 36 Vehicle Electronic Control Unit (MID 144), Diagnostic Trouble Code (DTC), Guide From build date 1.2007 PV776-88951780 Foreword The descriptions and service procedures contained
More informationU & D COAL LIMITED A.C.N. 165 894 806 BOARD CHARTER
U & D COAL LIMITED A.C.N. 165 894 806 BOARD CHARTER As at 31 March 2014 BOARD CHARTER Contents 1. Role of the Board... 4 2. Responsibilities of the Board... 4 2.1 Board responsibilities... 4 2.2 Executive
More informationROADMAP TO SAP SECURITY
ROADMAP TO SAP SECURITY The NORM Definition whitepaper Version 1.1 July 2010 2010 axl & trax 1. Background 1 2. Roadmap to compliance 1 2.1. risk management 2 2.2. solving risks 3 2.3. monitoring compliance
More informationRequest for Proposals Sanitary Sewer System Condition Assessment (PILOT PROJECT)
Request for Proposals Sanitary Sewer System Condition Assessment (PILOT PROJECT) Utilizing CCTV equipment, equipment use training, NASSCO PACP defect coding, and infrastructure program management software
More informationThis is the civilian transfer case with the cooling loop only found in the driven gear half of the front case.
INTRODUCTION The Transfer case used in the AMG Hummer is a New Venture Gear, model 242. This case has been in use for the H-1/Hummer since the early 1990 s. There have been modifications to the internal
More informationTHE SIX SIGMA YELLOW BELT SOLUTIONS TEXT
THE SIX SIGMA YELLOW BELT SOLUTIONS TEXT 2014 by Bill Wortman - All rights reserved SECTION II SIX SIGMA FUNDAMENTALS - SAMPLE QUESTIONS 2.1. The DPMO for a process is 860. What is the approximate six
More information2016 Edenred-Ipsos Barometer Understand and improve Wellbeing At Work. May 2016
2016 Edenred-Ipsos Barometer Understand and improve Wellbeing At Work May 2016 INSIGHTS Wellbeing at work is a growing challenge for companies struggling with an unpredictable economic environment and
More informationEconomic impact of privacy on online behavioral advertising
Benchmark study of Internet marketers and advertisers Independently Conducted by Ponemon Institute LLC April 30, 2010 Ponemon Institute Research Report Economic impact of privacy on online behavioral advertising
More informationFor Optimal Sales Force Performance, Pay Is Not Enough
For Optimal Sales Force Performance, Pay Is Not Enough Three must-have elements for optimal sales performance How to develop sustainable engagement of sales professionals How sales managers make a significant
More informationMaster Document Audit Program. Version 7.4, dated November 2006 B-1 Planning Considerations. Purpose and Scope
Activity Code 24010 B-1 Planning Considerations Estimating System Survey (ICR) Purpose and Scope The major objectives of this audit are to: Evaluate the adequacy of and the contractor s compliance with
More informationModel Risk, A company perspective Peter K. Reilly, FSA Valuation Actuary & Head of Actuarial Strategic Initiatives Aetna, Inc
Model Risk, A company perspective Peter K. Reilly, FSA Valuation Actuary & Head of Actuarial Strategic Initiatives Aetna, Inc 1 Agenda Thoughts/Observations on Model Risk Practical Considerations Aetna
More informationPosition Classification Standard for Management and Program Clerical and Assistance Series, GS-0344
Position Classification Standard for Management and Program Clerical and Assistance Series, GS-0344 Table of Contents SERIES DEFINITION... 2 EXCLUSIONS... 2 OCCUPATIONAL INFORMATION... 3 TITLES... 6 EVALUATING
More informationProduct Design (Part 4)
Product Design (Part 4) Engineering Drawing Chapter 16 Drawing Standards Line conventions and lettering- ANSI/ASME Y14.2M-1992 Multiview and sectional view drawings- ANSI/ASME Y14.3M-1994 Pictorial drawing-ansi/asme
More informationRating Methodology. Alternative Investment Funds Open-Ended Real Estate Funds. June 2016. Contact
Alternative Investment Funds Open-Ended Real Estate Funds June 2016 Contact Sonja Knorr Director +49 (0)30 27891-141 s.knorr@scopeanalysis.com Purpose of Document This document explains the methodology
More informationOverview of: A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition
Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Overview of: A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition 1 Topics for Discussion
More informationBody of Knowledge for Six Sigma Lean Sensei
Body of Knowledge for Six Sigma Lean Sensei What to Prepare For: The following is the Lean Six Sigma Certification Body of Knowledge that the exam will cover. We strongly encourage you to study and prepare
More informationOverview of EAM Services. A Fully Integrated Global EAM Service Provider
A Fully Integrated Global EAM Service Provider Table of Contents Strategy & Process Services Overview... p. 3 Asset Reliability Services Overview... p. 4 Systems & Technology Services Overview... p. 7
More informationThe Whole Product An Integrated Approach to Evaluating & Selecting a Clinical Trial Management System
The Whole Product An Integrated Approach to Evaluating & Selecting a Clinical Trial Management System Summary For institutions, deriving real value from investments in clinical research management systems
More informationThe Second National HIPAA Summit
HIPAA Security Regulations: Documentation and Procedures The Second National HIPAA Summit Healthcare Computing Strategies, Inc. John Parmigiani Practice Director, Compliance Programs Tom Walsh, CISSP Practice
More informationGoldman Sachs Presentation to Deutsche Bank Global Financial Services Investor Conference Comments by Gary Cohn, President and Chief Operating Officer
Goldman Sachs Presentation to Deutsche Bank Global Financial Services Investor Conference Comments by Gary Cohn, President and Chief Operating Officer Slide 3: Thanks, Matt. Today I d like to give a brief
More informationLeadingAge Maryland. QAPI: Quality Assurance Performance Improvement
LeadingAge Maryland QAPI: Quality Assurance Performance Improvement NOT ALL CHANGE IS IMPROVEMENT, BUT ALL IMPROVEMENT IS CHANGE Donald Berwick, MD Former CMS Administrator 2 WHAT IS QAPI? Mandated as
More informationAUTOMATIC TRANSMISSION
23-1 AUTOMATIC TRANSMISSION CONTENTS 23109000347 SERVICE SPECIFICATIONS... 2 LUBRICANTS... 2 SPECIAL TOOLS... 2 TROUBLESHOOTI... 4 ON-VEHICLE SERVICE... 46 Essential Service... 46 A/T Control Component
More informationDecision and uncertainty management for human and human/agent teams. Dr. David Ullman President Robust Decisions, Inc. www.robustdecisions.
Decision and uncertainty management for human and human/agent teams Dr. David Ullman President Robust Decisions, Inc. www.robustdecisions.com Topics What is Decision Management and why is it important?
More informationAligning Quality Management Processes to Compliance Goals
Aligning Quality Management Processes to Compliance Goals MetricStream.com Smart Consulting Group Joint Webinar February 23 rd 2012 Nigel J. Smart, Ph.D. Smart Consulting Group 20 E. Market Street West
More informationNRCS Business Process Management Suite Analysis NRCS s Approach to IT Application Delivery Transformation
NRCS Business Process Management Suite Analysis NRCS s Approach to IT Application Delivery Transformation Christine Calvosa, CTO NRCS OCIO April 10, 2013 Purpose and Agenda NRCS Conservation Delivery Streamlining
More informationAUDITOR GUIDELINES. Responsibilities Supporting Inputs. Receive AAA, Sign and return to IMS with audit report. Document Review required?
1 Overview of Audit Process The flow chart below shows the overall process for auditors carrying out audits for IMS International. Stages within this process are detailed further in this document. Scheme
More informationPROJECT RISK MANAGEMENT
PROJECT RISK MANAGEMENT DEFINITION OF A RISK OR RISK EVENT: A discrete occurrence that may affect the project for good or bad. DEFINITION OF A PROBLEM OR UNCERTAINTY: An uncommon state of nature, characterized
More informationApplication Technique. Safety Function: Magnetic Door Switch Monitoring
Application Technique Safety Function: Magnetic Door Switch Monitoring Products: MC1 Magnetically-coded Door Switch, Guardmaster Dual-input Safety Relay Safety Rating: CAT. 3, PLd to EN ISO 13849-1: 2008
More informationAudit Report. Effectiveness of IT Controls at the Global Fund Follow-up report. GF-OIG-15-20b 26 November 2015 Geneva, Switzerland
Audit Report Effectiveness of IT Controls at the Global Fund Follow-up report GF-OIG-15-20b Geneva, Switzerland Table of Contents I. Background and scope... 3 II. Executive Summary... 4 III. Status of
More informationAN ILLUSTRATION OF COMPARATIVE QUANTITATIVE RESULTS USING ALTERNATIVE ANALYTICAL TECHNIQUES
CHAPTER 8. AN ILLUSTRATION OF COMPARATIVE QUANTITATIVE RESULTS USING ALTERNATIVE ANALYTICAL TECHNIQUES Based on TCRP B-11 Field Test Results CTA CHICAGO, ILLINOIS RED LINE SERVICE: 8A. CTA Red Line - Computation
More informationA Case Study in Software Enhancements as Six Sigma Process Improvements: Simulating Productivity Savings
A Case Study in Software Enhancements as Six Sigma Process Improvements: Simulating Productivity Savings Dan Houston, Ph.D. Automation and Control Solutions Honeywell, Inc. dxhouston@ieee.org Abstract
More informationAlignment, Depth of Knowledge, & Change Norman L. Webb Wisconsin Center for Education Research http://facstaff.wcer.wisc.
Alignment, Depth of Knowledge, & Change Norman L. Webb Wisconsin Center for Education Research http://facstaff.wcer.wisc.edu/normw/ Florida Educational Research Association 50 th Annual Meeting Miami,
More informationKnowledge-Based Sustainable Decision-making Framework for the Implementation of Innovative Technologies in the Malaysian Construction Industry
Knowledge-Based Sustainable Decision-making Framework for the Implementation of Innovative Technologies in the Malaysian Construction Industry ROHANA MAHBUB Faculty of Architecture Planning and Surveying
More informationQuality Function Deployment
PRODUCT BRIEF DEVELOPMENT TOOLS Quality Function Deployment In a few words: The voice of the customer translated into the voice of the engineer. To design a product well, a design teams needs to know what
More information