STUCCO PATCHING AND REPAIR. B. Stucco Crack Repair

Size: px
Start display at page:

Download "STUCCO PATCHING AND REPAIR. B. Stucco Crack Repair"

Transcription

1 STUCCO PATCHING AND REPAIR Existing system: 2-coat stucco system with a polymer-based system finish coat. The base system is a product similar to a LaHabra Fastwall 100 with an El Rey Stucco PermaFlex finish coat. Repairs & patches to use a compatible stucco system. A. General Repair 1. Preparation of the repair area Straight line or saw cuts must be made irregular by chipping away the edge. Remove any loose material and expose approximately 2" of the existing lath at all edges of the repair area. 2. Installing the water resistive barrier A minimum 6 vertical and 2 horizontal weatherboard/shingle lap is necessary, lap the top and sides under the existing and allow the bottom to lap over the existing paper. 3. Installing the lath Cut lath to fit and lap the existing over/on top of the new. The simple rule of thumb to remember is "paper over paper and wire over wire". Note: When using wire lath, metal lath butterflies (6 x 12 strips of metal lath) are recommended at the corners of openings such as doors and windows normally installed before the field area. 4. Installing the base coat Follow manufacturer s instructions regarding not bonding the scratch coat to the edge of the repair area, cure times, etc. Match adjacent stucco thicknesses. Install acrylic bonding agent per manufacturer s instructions. 5. Applying the finish; Apply the finish using the same type and color of product that exists on the wall, matching the existing finish and texture to the best of your ability. Taper the new finish in to the existing finish. B. Stucco Crack Repair 1. Cracks 1/16-inch wide and smaller (hairline cracks) Clean existing surface & coat wall surface with elastomeric coating in accordance with written product instructions. 2. Cracks not wider than 1/16-inch Remove finish along crack, clean crack of loose material & seal crack with a crack filler per manufacturer s instructions. Tool and apply new finish to the area per manufacturer s directions. Match adjacent texture. 3. Repair of Cracks 1/16-inch to 1/8 inch wide Remove finish along crack, clean crack and install crack filler per manufacturer s instructions. Install mesh and skim coat material and tool per manufacturer s instructions. Allow to cure and install finish per manufacturer s instructions matching adjacent texture.

2 C. Surface Defect Repair 1. Localized finish repair Remove affected finish, Clean exposed brown coat surface to remove all dust, dirt, and other bond-inhibiting materials per manufacturer s instructions. Install new base and or finish coat per manufacturer s instructions. Match surrounding stucco texture and color. 2. Replacement of damaged or corroded lath: a. Remove damaged lath minimum 1-inch in all directions beyond area of concern. b. Repair water-resistive barrier system as necessary to correct any damage that is either existing or caused by stucco and lath removal actions. c. Cut replacement lath to provide minimum 1/2-inch overlap on all sides. Wire tie new lath to existing lath at maximum spacing of 8-inches. Provide minimum 4 wire ties for small lath replacements. d. Install stucco base and finish coat per manufacturer s instructions. 3. Remedial accessory installation a. Remove stucco a sufficient distance from accessory to permit removal of the existing accessory and wire-tie connection of new accessory. b. Cut damaged section of existing accessory and remove from wall. c. Repair water-resistive barrier system if damage is present or occurs as a result of the accessory removal. d. Wire tie new accessory to existing lath at maximum spacing of 8-inches Provide minimum 4 wire ties for small lengths of replacement. e. Align new sections of corner and casing beads carefully to match adjacent accessories. Set both ends of all accessory replacements pieces in wet sealant. f. Install new stucco base coat (s) and cure per manufacturer s instructions. Install new finish per manufacturer s instructions. 4. Stucco Delamination from Concrete Substrates a. Define repair area based on sounding and remove stucco to sound substrate. Extend repairs laterally to adjacent well-bonded material. Scarify or chip concrete substrates to provide a surface profile sufficient for bonding of new stucco application. Clean prepared surface to remove all dust, dirt, laitance, oils and other potentially bond inhibiting materials. b. Check ability of surface to receive directly bonded stucco by checking for absorption of water into the concrete. If water does not readily absorb into concrete, provide additional surface preparation or mechanical anchorage for stucco. c. Install stucco in accordance with product instructions. d. Install new finish coat over entire surface to nearest architectural break (joint or corner.) e.

3 EXTERIOR PAINTING PART 1 - GENERAL 1.1 SECTION INCLUDES A. Exterior painting of various unpainted and previously painted concrete, metal and plastic surfaces including pipe, conduit, metal doors, windows, and railings. 1.2 SUBMITTALS A. Product Data: For each type of product. Include preparation requirements and application instructions. B. Samples for Verification: For each type of paint system and each color. 1. Submit Samples on rigid backing, 8 inches square minimum. 2. Step coats on Samples to show each coat required for system. 3. Label each Sample for location and application area. C. Product List: For each product indicated, include the following: 1. Cross-reference to paint system and locations of application areas. 2. Printout of current "MPI Approved Products List" for each product category specified 3. VOC content. 1.3 QUALITY ASSURANCE A. Mockups: Apply mockups of each paint system indicated and each color and finish selected to verify preliminary selections made under Sample submittals. 1. UCCS Project Manager will select one surface to represent surfaces and conditions for application of each paint system specified. 2. Final approval of color selections will be based on mockups. a. If first color selections are not approved, apply additional mockups of additional colors selected by UCCS Project Manager at no added cost to Owner. b. Mockup may remain as part of the work. 1.4 FIELD CONDITIONS A. Apply paints only when temperature of surfaces to be painted and ambient air temperatures are between 50 and 95 deg F (10 and 35 deg C). Do not apply paints in rain, fog, or on wet surfaces. PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Manufacturers: Subject to compliance with requirements, provide products by one of the following : 1. Benjamin Moore & Co. 2. Diamond Vogel Paints. 3. ICI Paints. 4. Kwal Paint. 5. PPG Inc. 6. Sherwin-Williams Company (The).

4 2.2 PAINT, GENERAL A. MPI Standards: Provide products that comply with MPI standards indicated and that are listed in its "MPI Approved Products List." PART 3 - EXECUTION 3.1 EXAMINATION A. Prior to beginning painting, Applicator shall examine substrates and conditions and certify that surfaces and conditions including moisture content and other conditions affecting performance of the Work are suitable to allowing work to begin. B. Maximum Moisture Content of Substrates: When measured with an electronic moisture meter as follows: 1. Concrete: 12 percent. 2. Gypsum Board: 12 percent. 3. Exterior Gypsum Board Substrates: Verify that finishing compound is sanded smooth. C. Verify suitability of substrates, including surface conditions and compatibility with existing finishes and primers. D. Proceed with coating application only after unsatisfactory conditions have been corrected. 1. Application of coating indicates acceptance of surfaces and conditions. E. Colors: As noted on color schedule. 3.2 PREPARATION A. Comply with manufacturer's written instructions and recommendations in "MPI Manual" applicable to substrates and paint systems indicated. B. Remove hardware, covers, plates, and similar items already in place that are removable and are not to be painted. If removal is impractical or impossible because of size or weight of item, provide surface-applied protection before surface preparation and painting. 1. After completing painting operations, use workers skilled in the trades involved to reinstall items that were removed. Remove surface-applied protection. C. Clean substrates of substances that could impair bond of paints, including dust, dirt, oil, grease, and incompatible paints and encapsulants. 1. Remove incompatible primers and reprime substrate with compatible primers or apply tie coat as required to produce paint systems indicated. D. Steel Substrates: Remove rust, loose mill scale, previously poorly applied paint to smooth surface. Clean using methods recommended in writing by paint manufacturer but not less than the following: 1. SSPC-SP 3, "Power Tool Cleaning."

5 3.3 APPLICATION A. Apply paints according to manufacturer's written instructions and recommendations in "MPI Manual." 1. Use applicators and techniques suited for paint and substrate indicated. 2. Paint surfaces behind movable items same as similar exposed surfaces. Before final installation, paint surfaces behind permanently fixed items with prime coat only. 3. Paint both sides and edges of exterior doors and entire exposed surface of exterior door frames. 4. Do not paint over labels of independent testing agencies or equipment name, identification, performance rating, or nomenclature plates. 5. Primers specified in painting schedules may be omitted on items that are factory primed or factory finished if acceptable to topcoat manufacturers. B. If undercoats or other conditions show through topcoat, apply additional coats until cured film has a uniform paint finish, color, and appearance. C. Apply paints to produce surface films without cloudiness, spotting, holidays, laps, brush marks, roller tracking, runs, sags, ropiness, or other surface imperfections. Cut in sharp lines and color breaks. D. Painting Fire Suppression, Plumbing, HVAC, Electrical, Communication, and Electronic Safety and Security Work: 1. Paint the following work where exposed to view: a. Equipment, including panelboards and switch gear. b. Uninsulated metal piping. c. Uninsulated plastic piping. d. Pipe hangers and supports. e. Metal conduit. f. Plastic conduit. g. Tanks that do not have factory-applied final finishes. E. Provide 1 gallon each type of paint for each substrate for Owner s future maintenance. 3.4 CLEANING AND PROTECTION A. At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from Project site. B. After completing paint application, clean spattered surfaces. Remove spattered paints by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces. C. Protect work of other trades against damage from paint application. Correct damage to work of other trades by cleaning, repairing, replacing, and refinishing, as approved by UCCS Project Manager, and leave in an undamaged condition. D. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces.

6 3.5 EXTERIOR PAINTING SCHEDULE A. Concrete Substrates, Non-traffic Surfaces: 1. Latex System: MPI EXT 3.1K a. Prime Coat: Primer, alkali resistant, water based, MPI #3. b. Intermediate Coat: Latex, exterior, matching topcoat. c. Topcoat: Latex, exterior semi-gloss (Gloss Level 5), MPI #11. B. Steel Substrates: 1. Alkyd System: MPI EXT 5.1D a. Prime Coat: Primer, alkyd, anticorrosive for metal, MPI #79. b. Intermediate Coat: Exterior alkyd enamel matching topcoat. c. Topcoat: Alkyd, exterior, semi-gloss (Gloss Level 5), MPI #94. C. Exterior Gypsum Board Substrates: 1. Latex System: a. Prime Coat: Latex, exterior, matching topcoat. b. Intermediate Coat: Latex, exterior, matching topcoat. c. Topcoat: Latex, exterior semi-gloss (Gloss Level 5), MPI #11.

DIVISION 9 FINISHES 09900-1 PAINTING

DIVISION 9 FINISHES 09900-1 PAINTING DIVISION 9 FINISHES 09900-1 DESIGN STANDARDS 1. GENERAL: This section includes cleaning and touch-up painting of structural steel connections and miscellaneous metals, painting, and finishing of interior

More information

SECTION 010100 SUMMARY OF WORK

SECTION 010100 SUMMARY OF WORK SECTION 010100 SUMMARY OF WORK PART 1: GENERAL 1-1 DESCRIPTION: A. This contract consists of painting the Park Headquarters Building, Park Residence, Costume Shop and Pearson Headquarters Building at Fort

More information

SCENIC VIEW SV 10 SECTION 08 87 13 SOLAR CONTROL FILMS

SCENIC VIEW SV 10 SECTION 08 87 13 SOLAR CONTROL FILMS PART 1 GENERAL SCENIC VIEW SV 10 SECTION 08 87 13 SOLAR CONTROL FILMS 1.1 SUMMARY A. Optically clear dual reflective, neutral sputtered and aluminum metallized polyester film for solar control. 1.2 RELATED

More information

The Minnesota Lath and Plaster Bureau Repairing Cracks in Stucco

The Minnesota Lath and Plaster Bureau Repairing Cracks in Stucco The Minnesota Lath and Plaster Bureau Repairing Cracks in Stucco Disclaimer: This guide contains general information on stucco installation and related materials. It is provided as a guide only and is

More information

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials SECTION 03 92 50 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings,

More information

INSTRUCTIONS FOR COORDINATION SECTION 06651 SOLID SURFACE FABRICATIONS

INSTRUCTIONS FOR COORDINATION SECTION 06651 SOLID SURFACE FABRICATIONS INSTRUCTIONS FOR COORDINATION SECTION 06651 SOLID SURFACE FABRICATIONS 1. Paragraph 1.02 Provide solid surface countertops at sinks locations. Provide solid surface window sills at drywall framing walls.

More information

SECTION 03 35 43 POLISHED CONCRETE FINISHING

SECTION 03 35 43 POLISHED CONCRETE FINISHING SECTION 03 35 43 POLISHED CONCRETE FINISHING PART 1 - GENERAL 1.01 SUMMARY A. Provide polished concrete finishing system where indicated on drawings, complete. This section includes the following: 1. Concrete

More information

GigaCrete Specification PlasterMax

GigaCrete Specification PlasterMax GigaCrete Inc. 6775 Speedway Blvd. Suite M105 Las Vegas, NV 89115 Ph (702) 643-6363 Fax (702) 643 1453 www.gigacrete.com GigaCrete Specification PlasterMax PlasterMax : Fire Rated Plaster for Direct Application

More information

SECTION 0990 PAINTING PART GENERAL 1.01 SCOPE OF WORK:

SECTION 0990 PAINTING PART GENERAL 1.01 SCOPE OF WORK: SECTION 0990 PAINTING PART 1.00 - GENERAL 1.01 SCOPE OF WORK: A. WORK INCLUDED: The Contractor shall furnish all necessary labor, materials, equipment and services to complete all field painting work indicated

More information

A. This Section includes rubberized asphalt sheet membrane waterproofing systems.

A. This Section includes rubberized asphalt sheet membrane waterproofing systems. SECTION 07110 SHEET MEMBRANE WATERPROOFING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION 07 61 13 STANDING SEAM METAL ROOFING

SECTION 07 61 13 STANDING SEAM METAL ROOFING SECTION 07 61 13 STANDING SEAM METAL ROOFING PART 1 GENERAL 1.01 SCOPE OF WORK A. The Work shall include all labor, materials, equipment and supervision required to complete the work of the above referenced

More information

RAMAPO COLLEGE OF NEW JERSEY PHASE I HOUSING REHABILITATION C 2012

RAMAPO COLLEGE OF NEW JERSEY PHASE I HOUSING REHABILITATION C 2012 SECTION 04235 - BRICK PANEL SYSTEMS PART 1 - PRODUCT & DESCRIPTION Structural Support Panel System for Thin Brick shale be Tabs II, manufactured by Tabs Wall System, LLC, Grandville, MI 49468, (616) 261-5656.or

More information

Stuccoing Systems. Three-Coat Stuccoing

Stuccoing Systems. Three-Coat Stuccoing Stucco is an attractive and durable cement-based coating frequently applied to masonry and properly prepared wooden, gypsum wallboard, and expanded polystyrene insulation board surfaces. Stucco is usually

More information

BLACK JACK ALL WEATHER ROOF COATING

BLACK JACK ALL WEATHER ROOF COATING PAGE: 1 of 6 PRINT DATE: 16/09/2004 BLACK JACK ALL WEATHER ROOF COATING DESCRIPTION BLACK JACK ALL WEATHER ROOF COATING is a solvent based, full bodied black brushable compound with added fibres for reinforcement.

More information

SECTION 09680 - CARPET

SECTION 09680 - CARPET SECTION 09680 - CARPET PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply

More information

SECTION STANDING SEAM METAL ROOFING

SECTION STANDING SEAM METAL ROOFING PART 1 - GENERAL 1.1 DESCRIPTION SECTION 07 41 13 SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Use for roofing sloped 1 in 4 (3 in/ft) or greater. 3. Delete between // // if not applicable

More information

SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 08332 COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Counter Fire Doors. 1.2

More information

Specifications. PermaTone, Inc. Manufacturer s Long Form Specifications Interior Finish Coatings PF-405

Specifications. PermaTone, Inc. Manufacturer s Long Form Specifications Interior Finish Coatings PF-405 PermaTone, Inc. Manufacturer s Long Form PF-405 PART I GENERAL 1.01 SUMMARY This document provides requirements for the proper specification, design, use and installations of PermaTone specialty interior

More information

FIRESTOPPING & SMOKE SEALS

FIRESTOPPING & SMOKE SEALS SPECIFICATION SECTION 07 84 00 FIRESTOPPING & SMOKE SEALS 1 GENERAL 1.1 SECTION INCLUDES 1.1.1 Comply with Division 1, General Requirements and Documents referred to therein. 1.1.2 It is the intent of

More information

Minor Cracks in Horizontal Surfaces

Minor Cracks in Horizontal Surfaces Cracks, chips and broken or flaking areas in concrete are not only unsightly, they can lead to further deterioration of the surface. The result is a costly replacement project as opposed to a simple repair.

More information

SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word

More information

UFGS-09 96 00 (July 2007) UNIFIED FACILITIES GUIDE SPECIFICATIONS

UFGS-09 96 00 (July 2007) UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-09 96 00 (November 2014) ----------------------------- Preparing Activity: NASA Superseding UFGS-09 96 00 (July 2007) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

SECTION 15420 WATER STORAGE TANK PAINTING

SECTION 15420 WATER STORAGE TANK PAINTING SECTION 15420 WATER STORAGE TANK PAINTING PART 1 GENERAL.01 SCOPE A. Section Includes Surface preparation, shop priming, and field coating for interior wet, interior dry, and exterior surfaces of steel

More information

Selection and Use of Coatings, Water Repellents, and Sealants to Control Moisture Intrusion in Above-Ground Concrete and Masonry Walls

Selection and Use of Coatings, Water Repellents, and Sealants to Control Moisture Intrusion in Above-Ground Concrete and Masonry Walls Selection and Use of Coatings, Water Repellents, and Sealants to Control Moisture Intrusion in Above-Ground Concrete and Masonry Walls Kenneth A. Trimber KTA-Tator, Inc. Coating, Water Repellent, Sealant

More information

1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system.

1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system. SECTION 075416 - PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system. 1.2 PERFORMANCE REQUIREMENTS A. Solar Reflectance

More information

K2 STONE NATURAL VENEER

K2 STONE NATURAL VENEER INTRODUCTION WHAT IS K2 NATURAL THINSTONE VENEER? Natural K2 Stone veneer is real stone, cut 1 inch thick, making it light enough to be installed as a veneer. Sometimes referred to as thin veneer, thin

More information

SECTION POLISHED CONCRETE FINISHING SYSTEM

SECTION POLISHED CONCRETE FINISHING SYSTEM SECTION 03350 POLISHED CONCRETE FINISHING SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Section Includes: This Section specifies dyed and polished concrete. B. Related Sections: 1.02 REFERENCES 1. Section 03300

More information

Aspect Metal Peel & Stick Tile Installation Guide

Aspect Metal Peel & Stick Tile Installation Guide Aspect Metal Peel & Stick Tile Installation Guide Proper surface preparation is essential for a successful project Failure to follow recommended surface preparation instructions may void the warranty Read

More information

SECTION 09900 PAINTS AND COATINGS. Display hidden notes to specifier by using "Tools"/"Options"/"View"/"Hidden Text".

SECTION 09900 PAINTS AND COATINGS. Display hidden notes to specifier by using Tools/Options/View/Hidden Text. A PPG Brand SECTION 09900 PAINTS AND COATINGS Display hidden notes to specifier by using "Tools"/"Options"/"View"/"Hidden Text". PART 1 GENERAL 1.1 SECTION INCLUDES A. Surface preparation and field painting

More information

Application Instructions for Keystone Kool Deck on Existing Concrete

Application Instructions for Keystone Kool Deck on Existing Concrete Application Instructions for Keystone Kool Deck on Existing Concrete REQUIRED MATERIALS Keystone Kool Deck PTA Bonding Agent Water 20 Mesh Marble Sand White Portland Cement OPTIONAL TOOLS Mortex Ad-Tex

More information

Note: Delete any section below not relevant to this project; add others as required.

Note: Delete any section below not relevant to this project; add others as required. Part 1 General 1.1 section includes A. Interior/Exterior Window Film B. Decorative Window Film C. Privacy Window Film 1.2 related sections Note: Delete any section below not relevant to this project; add

More information

THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150

THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150 THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150 SECTION ONE A. Objective The objective of this guide is to provide Owners and General Contractors/Construction

More information

THERMOTEK SELF ADHESIVE MEMBRANE OVER METAL SYSTEM DESCRIPTION SELF ADHESIVE SYSTEM METAL (10 YR) AP-SABS-SACS

THERMOTEK SELF ADHESIVE MEMBRANE OVER METAL SYSTEM DESCRIPTION SELF ADHESIVE SYSTEM METAL (10 YR) AP-SABS-SACS THERMOTEK SELF ADHESIVE MEMBRANE OVER METAL SYSTEM DESCRIPTION SELF ADHESIVE SYSTEM METAL (10 YR) AP-SABS-SACS 1 0 No 0. SUBSTRATE 1. ASPHALT PRIMER. THERMOTEK SELF ADHESIVE 1.5 FV SMOOTH. THERMOTEK SELF

More information

PART 1 GENERAL 1.1 SECTION INCLUDES

PART 1 GENERAL 1.1 SECTION INCLUDES J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including

More information

07 21 19 Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

07 21 19 Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM 07 21 19 STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM 7819 Broadview Road Cleveland, OH 44131 800-522-4522 February, 2011 SPEC NOTE: This guide specification is intended for use when specifying

More information

RECOATING AND RENEWING SPF ROOFING SYSTEMS

RECOATING AND RENEWING SPF ROOFING SYSTEMS RECOATING AND RENEWING SPF ROOFING SYSTEMS Procedures, Regional Differences and type of coating systems Bruce Schenke Premium Spray Products REASONS TO RECOAT/RENEW Add a new coating layer to renew the

More information

GUIDE SPECIFICATION COMBINATION SURFACE SYSTEM FOR NEW HOT MIX ASPHALT TENNIS COURTS I. PART 1 - GENERAL

GUIDE SPECIFICATION COMBINATION SURFACE SYSTEM FOR NEW HOT MIX ASPHALT TENNIS COURTS I. PART 1 - GENERAL COMBINATION SURFACE SYSTEM FOR NEW HOT MIX ASPHALT TENNIS COURTS I. PART 1 - GENERAL 1.1 SUMMARY A. This section is a part of the entire set of Contract Documents and shall be coordinated with the applicable

More information

Backstop NT. Backstop NT Application Instructions DS181. A High Performance, Polymer-Based, Noncementitious Water-Resistive Membrane and Air Barrier

Backstop NT. Backstop NT Application Instructions DS181. A High Performance, Polymer-Based, Noncementitious Water-Resistive Membrane and Air Barrier Backstop NT A High Performance, Polymer-Based, Noncementitious Water-Resistive Membrane and Air Barrier Backstop NT Application Instructions CHECKLIST PRIOR TO THE INSTALLATION OF BACKSTOP NT TEXTURE,

More information

Marblene Wall Panel Installation

Marblene Wall Panel Installation 1560 Quarry Rd. NW Corydon, IN 47112 812-738-1367 Marblene Wall Panel Installation Although we supply cultured wall panels in even rectangles, walls are usually not exactly square. Normally it will be

More information

BESSEY Training BESSEY Tools North America Alvin Products

BESSEY Training BESSEY Tools North America Alvin Products BESSEY Training BESSEY Tools North America Alvin Products Page 1-1 Lab Metal A ready to use, aluminum filled metal repair, filler and patching compound. Easy to use Ready to use straight out of the can.

More information

T R A N S F E R A B L E F U L LY

T R A N S F E R A B L E F U L LY HSTOPS A WALL OF WATER 22 FT. HIG! F U L LY T R A N S F E R A B L E RESISTS10 PSI ! 1 F U L LY T R A N S F E R A B L E HSTOPS A WALL OF WATER 22 FT. HIG RESISTS10 PSI Guaranteed To Stop Water Even Under

More information

Tractor Painting Tips

Tractor Painting Tips Keeping your tractor or equipment well kept & free from rust & corrosion will extend the life of your investment & help retain its value for a longer period of time. It can be difficult, in many cases,

More information

application instructions

application instructions application instructions FOUNDATIONS 76 & 120 SERIES PRIMED PANEL SIDING ARCHITECTURAL COLLECTION REVERSE BOARD & BATTEN AND STUCCO PANEL SIDING General At the time of manufacture, siding meets or exceeds

More information

WATERPROOFING OF WET ROOMS

WATERPROOFING OF WET ROOMS WATERPROOFING OF WET ROOMS Waterproofing under tiles For longterm enjoyment of a wetroom area a complete and resistant waterproofing system is an important precondition. Most tiles are by themselves waterproof

More information

OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. GeneralShale.com

OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. GeneralShale.com OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide GeneralShale.com OLD BRICK ORIGINALS THIN BRICK VENEER Page 2 INTRODUCTION Check local building codes for proper installation guidelines

More information

INSTALLATION INSPECTION GUIDE FOR 3RD PARTY INSPECTORS FOR PAREX USA EXTERIOR INSULATION AND FINISH SYSTEMS

INSTALLATION INSPECTION GUIDE FOR 3RD PARTY INSPECTORS FOR PAREX USA EXTERIOR INSULATION AND FINISH SYSTEMS INSTALLATION INSPECTION GUIDE FOR 3RD PARTY INSPECTORS FOR PAREX USA EXTERIOR INSULATION AND FINISH SYSTEMS Introduction This inspection guide is organized to follow the EIF System's Installation Guide.

More information

A. Work on this project shall consist of, but is not limited to, the following:

A. Work on this project shall consist of, but is not limited to, the following: PART 1 - GENERAL CLEANING AND RESTORATION OF SECTION 05900-1 1.1 SUMMARY A. Work on this project shall consist of, but is not limited to, the following: 1. Clean and treat all exposed anodized architectural

More information

application instructions

application instructions application instructions ARCHITECTURAL COLLECTION CEDAR SHAKE 76 SERIES LAP SIDING General At the time of manufacture, siding meets or exceeds the performance standards set forth in Composite Panel Association

More information

Product Information/Specifications

Product Information/Specifications BARN & FENCE PAINT NO. 25 BARN RED Smooth or rough sawn exterior vertical wood surfaces such as plywood, fences, shingles, shakes, siding. laminates, masonry and stucco surfaces. AVAILABLE IN: Gallon Only

More information

INSTALLATION OF ECOWORX MODULAR CARPET

INSTALLATION OF ECOWORX MODULAR CARPET INSTALLATION OF ECOWORX MODULAR CARPET INSTALLATION GUIDELINES THE FOLLOWING INSTRUCTIONS SHOULD BE REVIEWED PRIOR TO INSTALLATION AS WELL AS MEETING THE REQUIREMENTS OF AS2455.1:2007 & AS2455.2:2007 (WHERE

More information

SECTION 02824 EXPANDED METAL MESH FENCE

SECTION 02824 EXPANDED METAL MESH FENCE SECTION 02824 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for expanded metal mesh fence on the right-of-way. 1.02 REFERENCE STANDARDS A. ASTM International (ASTM): 1.03 SUBMITTALS

More information

SECTION 03 35 43 - POLISHED CONCRETE FINISHING. InovaCrete Polished Concrete Floor Finish (GUIDE SPEC)

SECTION 03 35 43 - POLISHED CONCRETE FINISHING. InovaCrete Polished Concrete Floor Finish (GUIDE SPEC) SECTION 03 35 43 - POLISHED CONCRETE FINISHING InovaCrete Polished Concrete Floor Finish (GUIDE SPEC) PART 1 GENERAL 1.01 SUMMARY This Section includes information about: A. Polished concrete finish in

More information

09990 MOLD REMEDIATION, LEAD-BASED PAINT ABATEMENT AND ENCASEMENT OF ASBESTOS

09990 MOLD REMEDIATION, LEAD-BASED PAINT ABATEMENT AND ENCASEMENT OF ASBESTOS 09990 MOLD REMEDIATION, LEAD-BASED PAINT ABATEMENT AND ENCASEMENT OF ASBESTOS PDS SE-160 01-2006 1. PRODUCT NAME SE-160 Clear Surface Coating (water-based copolymer) Specialty Elastomeric Topcoat 2. MANUFACTURER

More information

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,

More information

Graham & Brown Wallpaper FAQ

Graham & Brown Wallpaper FAQ Graham & Brown Wallpaper FAQ Buying Guide What are the advantages to using wallpaper over paint? There are many advantages to using wallpaper over paint to decorate your space. For instance, wallpaper

More information

HOUSING QUALITY STANDARDS (HQS)

HOUSING QUALITY STANDARDS (HQS) HOUSING QUALITY STANDARDS (HQS) Series 3 LEAD-BASED PAINT AND INSPECTIONS 3.1LBP Rev. 5-5-06 Finding of Lead-Based Paint 3.2LBP Defective paint found in units built before 1978 where children under six

More information

SECTION CHALKBOARDS AND MARKERBOARDS

SECTION CHALKBOARDS AND MARKERBOARDS PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 10 11 13 CHALKBOARDS AND MARKERBOARDS SPEC WRITER NOTE: Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable

More information

Tested to BS 6375: Part 1: 1989 and achieved a weathertightness classification of 2000 Pa (Special)

Tested to BS 6375: Part 1: 1989 and achieved a weathertightness classification of 2000 Pa (Special) THE B6 GLAZING SYSTEM GLAZING SYSTEMS FOR SEPTEMBER 2013 THE B6 HEEL BEAD SEAL SECURITY GLAZING SYSTEM Page 1 DESCRIPTION The B6 Heel Bead Seal Security Glazing System is suitable for installing all types

More information

SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront PART 1 GENERAL 1.01 Work Included SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS System 402 Flush-Glazed Screw Spline Storefront A. Furnish and install aluminum architectural storefront system

More information

Section 03 35 43 Polished Concrete Finishing. Vexcon

Section 03 35 43 Polished Concrete Finishing. Vexcon SS 120 1-13 Section 03 35 43 Polished Concrete Finishing Specifier Note: This product guide specification is written according to the Construction Specifications Institute (CSI) 3-part format. This section

More information

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

Graph Wall Cladding System. A. Scope: Section includes, but is not limited to, architectural wall cladding system. B.

Graph Wall Cladding System. A. Scope: Section includes, but is not limited to, architectural wall cladding system. B. September, 2009 Section 09 77 00 Graph Wall Cladding System PART 1 - GENERAL 1.1 SUMMARY A. Scope: Section includes, but is not limited to, architectural wall cladding system including trims, terminations,

More information

PAINTING OF UNPAINTED SURFACES

PAINTING OF UNPAINTED SURFACES SECTION 09900 PAINTING OF UNPAINTED SURFACES PART 1 GENERAL 1.01 SUMMARY: A. Section Includes: 1. Section 09902 - "PAINT, PUTTY, AND CAULKING MATERIALS FORM", pages 1 through 11, attached to and a part

More information

SECTION 05 7360 ALUMINUM HANDRAIL AND RAILING SYSTEMS WITH DECORATIVE METAL PANEL INFILLS

SECTION 05 7360 ALUMINUM HANDRAIL AND RAILING SYSTEMS WITH DECORATIVE METAL PANEL INFILLS 1 SECTION 05 7360 ALUMINUM HANDRAIL AND RAILING SYSTEMS WITH DECORATIVE METAL PANEL INFILLS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and

More information

Waterproofing Showers and Bathrooms Guide

Waterproofing Showers and Bathrooms Guide August 2016 1 Waterproofing Showers and Bathrooms Guide The purpose of this guide is to provide guidance on how a shower area or wet room can be successfully waterproofed and tiled with the products available

More information

sound absorbing wall units

sound absorbing wall units 10271 Berea Road Cleveland, OH 44102 Phone: 800-886-6678 Phone: 216-251-7888 Fax: 216-251-9933 E-mail: info@essiacoustical.com Website: www.essiacoustical.com This ManuSpec utilizes the Construction Specifications

More information

GENERAL RUBBER LINING PRINCIPLES

GENERAL RUBBER LINING PRINCIPLES GENERAL RUBBER LINING PRINCIPLES I. METAL PREREQUISITES Metal to be lined should meet the requirements as stated in section 8 Metal Fabrication and section 12 Blasting and Cementing Procedures. The surface

More information

ST. PETERSBURG NATIONAL GUARD SECTION 11132

ST. PETERSBURG NATIONAL GUARD SECTION 11132 PART 1 GENERAL 1.01 SUMMARY A. Section Includes: This Section specifies electrically operated front projection screens and ac cessories. 1.02 RELATED SECTIONS A. Div 16 Electrical Common Work Results for

More information

Triarch Products Over Various Interior Substrates

Triarch Products Over Various Interior Substrates Triarch products work well over a variety of substrates, both for interior and exterior settings. This document will only discuss interior substrates and is not intended to be a technical discussion of

More information

WATERPROOFING FOR CONCRETE STRUCTURES

WATERPROOFING FOR CONCRETE STRUCTURES MANUAL OF CONTRACT DOCUMENTS FOR ROAD WORKS VOLUME 1 SPECIFICATION FOR ROAD WORKS SERIES 2000 WATERPROOFING FOR CONCRETE STRUCTURES Contents Clause Title Page 2001 General 2 2002 Protection of Bridge Deck

More information

ITEM 599.06060008 THERMOPLASTIC MEMBRANE ROOFING

ITEM 599.06060008 THERMOPLASTIC MEMBRANE ROOFING DESCRIPTION Construct adhered membrane roofing system, roof insulation, and vapor retarder in accordance with these specifications. MATERIALS: General: Provide installed roofing membrane and base flashings

More information

LAYING BLOCK AND BRICK

LAYING BLOCK AND BRICK LAYING BLOCK AND BRICK Products highlighted in this section: SAKRETE Type N Mortar Mix SAKRETE Type S Mortar Mix Brick And Block Laying Basics The first step in building a brick or block wall is to construct

More information

Successful Painting Jobs Start Here.

Successful Painting Jobs Start Here. Successful Painting Jobs Start Here. The Right Primer Makes All the Difference. Selecting the right primer for the job is a critical part of improving paint coverage and achieving the highest quality finish

More information

Full Bed Depth Natural Veneer Stone Product Guide Specifications Page 1

Full Bed Depth Natural Veneer Stone Product Guide Specifications Page 1 Contact: Mike Mayzak 405/343-7879 mmayzak@minickmaterials.com 326 N. Council Road Oklahoma City, OK 73127 minickmaterials.com Full Bed Depth Natural Veneer Stone Product Guide Specifications Specifier

More information

M50 RUBBER/ PLASTICS/ CORK/ LINO/ CARPET TILING/ SHEETING To be read with Preliminaries/ General conditions.

M50 RUBBER/ PLASTICS/ CORK/ LINO/ CARPET TILING/ SHEETING To be read with Preliminaries/ General conditions. 2870 Helipad Guithie Ground Floor Works King s College Hospital Revision: 19th October 2015 M50 RUBBER/ PLASTICS/ CORK/ LINO/ CARPET TILING/ SHEETING To be read with Preliminaries/ General conditions.

More information

BILL OF QUANTITY FOR THE WORK OF "REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP"

BILL OF QUANTITY FOR THE WORK OF REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP BILL OF QUANTITY FOR THE WORK OF "REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP" Sl. 1 DISMANTLING WORK 1.1 Stripping off worn out plaster (outside and inside) and raking out joints

More information

SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING

SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING PART ONE GENERAL DESCRIPTION This section includes pre-formed standing seam metal roofing and related flashings, closures, trim and accessories including,

More information

Colorado State University. Durrell Center Roof Repair

Colorado State University. Durrell Center Roof Repair Colorado State University Durrell Center Roof Repair SPECIFICATION: POLYURETHANE FOAM ROOFING l.0 GENERAL REQUIREMENTS The successful application of a polyurethane foam roofing system is dependent upon

More information

MONOBASE RU/ SIDER-PLAST FINISH THE ULTIMATE HARD-COAT/ACRYLIC FINISH SYSTEM

MONOBASE RU/ SIDER-PLAST FINISH THE ULTIMATE HARD-COAT/ACRYLIC FINISH SYSTEM SIDER-CRETE, INC. 153 Regur Road Hawkinsville, GA 31036 USA Ph: 478.892.9800 www.sider-crete.com MONOBASE RU/ SIDER-PLAST FINISH THE ULTIMATE HARD-COAT/ACRYLIC FINISH SYSTEM 1.0 DESCRIPTION 1.1 General

More information

SKYLIGHT RESTORATION - SCOPE OF WORK- BASE BID 1

SKYLIGHT RESTORATION - SCOPE OF WORK- BASE BID 1 CITY OF SANTA ROSA CITY HALL WINGS 6-10 1.0 GENERAL SKYLIGHT RESTORATION - - BASE BID 1 A. Summary of work: 1. Information herein is provided as a general overview of the project scope, and as such, does

More information

Autobody/Collision and Repair Technology/Technician CIP 47.0603 Task Grid

Autobody/Collision and Repair Technology/Technician CIP 47.0603 Task Grid 1 Secondary Task List 100 ORIENTATION 101 Identify opportunities in the auto body field. 102 Identify basic auto body construction. 103 Identify program rules and policies. 104 Identify government agencies

More information

City of San Diego, CWP Guidelines

City of San Diego, CWP Guidelines PART 1 -- GENERAL SECTION 08520-1.1 WORK OF THIS SECTION City of San Diego, CWP Guidelines A. The WORK of this Section includes providing aluminum windows with frames, bracing, glazing attachments, screens,

More information

Mold Preventing I nterior System

Mold Preventing I nterior System interior insulation and renovation boards A system of components that have been designed to work perfectly together to repair damage caused by mold. The system consists of boards, insulation wedges, reveal

More information

Shower Walls and Tub Surrounds

Shower Walls and Tub Surrounds Reverso en español TEC Skill Set How-To Project Guide Shower Walls and Tub Surrounds 3 Steps to a Beautiful Tile Surface! 1. Prepare the surface 2. Set the tile 3. Grout and caulk H.B. Fuller Construction

More information

Approved Products MPI Standards

Approved Products MPI Standards Approved Products MPI Standards 1 Aluminum Paint Insl-x Corotech Alkyd Gloss Aluminum Enamel V200-78 2 Aluminum Paint, Heat Resistant (Up to 427 C - 800 F) Insl-x Corotech High Heat Aluminum V264-78 3

More information

STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS

STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for cleaning and lining existing cast iron and ductile iron water mains

More information

SECTION 08810 GLASS AND GLAZING

SECTION 08810 GLASS AND GLAZING SECTION 08810 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work under this Section shall include all materials and installation necessary to provide Glass and Glazing as shown and detailed on the Drawings

More information

Display hidden notes to specifier. (Don't know how? Click Here) A. Advanced Upcoiling Security Grilles, power operated.

Display hidden notes to specifier. (Don't know how? Click Here) A. Advanced Upcoiling Security Grilles, power operated. SECTION 08333 ADVANCED UPCOILING SECURITY GRILLE MODEL 600 ADV Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Advanced Upcoiling Security Grilles,

More information

WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM

WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM SPECIFICATION NO. SMAA-2P-8xE UPGRADE SMOOTH SURFACE / CAP SHEET / SINGLE PLY 2 PLY POLYESTER REINFORCED ACRYLIC

More information

A. Shop Drawing submittals shall include, but not be limited to, the following:

A. Shop Drawing submittals shall include, but not be limited to, the following: SECTION 26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Divisions 0 and 1 and Section 26 00 01, Electrical

More information

Barewood Octagon and Elongated Windows Installation Instructions

Barewood Octagon and Elongated Windows Installation Instructions Step-by-step instructions to a beautiful window. Measuring and Installation of your new window from Century Specialty Windows couldn't be easier with our step-by-step instructions. Quality, function and

More information

Wecryl Waterproofing System under surfacing supplied by others

Wecryl Waterproofing System under surfacing supplied by others Brief description The Wecryl waterproofing system allows a high-quality, seamless and crack-bridging waterproofing layer to be installed under loose-laid or bonded surfacing supplied by others (stone slabs,

More information

SECTION 07560 FLUID APPLIED ROOFING (LIGHT TRAFFIC DECKS OVER CONCRETE)

SECTION 07560 FLUID APPLIED ROOFING (LIGHT TRAFFIC DECKS OVER CONCRETE) SECTION 07560 FLUID APPLIED ROOFING (LIGHT TRAFFIC DECKS OVER CONCRETE) PART 1 GENERAL 1.1 DESCRIPTION 1. Fluid applied flexible acrylic waterproofing system over concrete. This work shall include the

More information

Guide Specification SECTION 09 68 13 TILE CARPETING PART 1 - GENERAL 1.1 SUMMARY. A. This Section includes carpet tile. 1.

Guide Specification SECTION 09 68 13 TILE CARPETING PART 1 - GENERAL 1.1 SUMMARY. A. This Section includes carpet tile. 1. SECTION 09 68 13 TILE CARPETING PART 1 - GENERAL 1.1 SUMMARY A. This Section includes carpet tile. 1.2 STANDARDS A. Except as modified by governing codes and by the Contract Documents, comply with the

More information

METHOD STATEMENT 006 TORCH APPLIED MEMBRANE TO BASEMENT WALLS

METHOD STATEMENT 006 TORCH APPLIED MEMBRANE TO BASEMENT WALLS This Document is designed to cover best practice installation procedures for a one layer torch applied sheet membrane system to basement walls. PRELIMINARY WORK Ensure that all surface preparation work,

More information

Manufactured Stone Veneer Installation Instructions

Manufactured Stone Veneer Installation Instructions Manufactured Stone Veneer Installation Instructions Published: 8/14/2008 Revised: 6/25/2010 Table of Contents PART 1 -- INTRODUCTION PART 2 -- MATERIAL REQUIREMENTS PART 3 EXECUTION REQUIREMENTS PART 4

More information

Chapter. Restoration of Damaged Structures

Chapter. Restoration of Damaged Structures 5 Chapter Restoration of Damaged Structures Bringing back a damaged structure to its pre-earthquake state and original strength is called restoration. This is the first step of building rehabilitation.

More information

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS AN ERGONARMOR COMPANY TECHNICAL INFORMATION SPECIFICATION FOR INSTALLATION 07/11 SUPERSEDES 04/00 PAGE 1 OF 6 CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS 1. SCOPE 1.1 This specification

More information

ALPHA 15-Year Permathane II FR w/granules

ALPHA 15-Year Permathane II FR w/granules ALPHA 15-Year Permathane II FR w/granules Section 07 57 13 Sprayed Polyurethane Foam Roofing Guide Specification PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Furnish all labor, materials, tools and

More information