2 PAGE 1 of 4 Chevron Pipe Line Company Protocol for Management of Hydrocarbon Contaminated Soil Encountered During Construction 1. Introduction: There is the potential to encounter petroleum-contaminated soil during pipeline construction projects. This Hydrocarbon Contaminated Soil Management Plan describes the procedures which must be followed upon encountering contaminated soil during pipeline construction. It is the intent of this plan to ensure the safe handling of contaminated soils to prevent impacts to human health and the environment. Since the potential exists to encounter contaminated soil on property that CPL does not own in fee it may be necessary to engage landowers to determine the responsible partyfor proper soil disposal. CPL will take prudent measures to identify the party responsible after the soil have been excavated per this management plan. The intent of this plan is to control handling of contaminted soil during construction to minimize construction delays. 2. Identification of Petroleum-Contaminated Soil: Petroleum-contaminated soil can be identified by the visual presence of oil or oil staining and/or a petroleum odor. Contaminated soil is defined as soil having an organic content exceeding 50 ppmw (based on laboratory analysis) or which registers greater than 50 ppmv when measured 3-inches from the soil surface with an organic vapor analyzer ( OVA ). A Phase I environmental assessment will be conducted on the right-of-way where the pipeline will be installed. The Phase I will include a file search of known data bases that contain information about potential environmental contamination. If the Phase I indicates a potential for contaminated soil to exist, then a Phase II soil investigation may be necessary to identify potential impacted soil prior to construction. 3. Contacts: CPL HES Environmental Specialist (Name and Phone Number) CPL HES Remediation Specialist (Name and Phone Number) CPL Construction Manager (Name and Phone number) 4. Definitions: Important definitions for the purposes of this guidance: Contaminated Soil Storage Pile Soil which has an organic content exceeding 50 ppmw (based on laboratory analysis) or which registers greater than 50 ppmv when measured with an OVA. A pile of excavated contaminated soil located above the existing grade level.

3 PAGE 2 of 4 Active Storage Pile Backfill Emergency Excavation An above grade storage pile to which contaminated soil is currently being added to or removed from. Activity must have occurred within one (1) hour to be considered current/active. Replacement of contaminated soil to an excavated pit below existing grade. (Note that in some cases, contaminated soil may, with regulatory agency approval, be placed back into the original excavation or other approved location). Excavation of contaminated soil carried out pursuant to state or local government agency order. 5. Exclusions: The following scenarios are excluded from this guidance: Soil with an organic content 50 ppmw or 50 ppmv Excavation of contaminated soil 1 cubic yard Soil contaminated by accidental spillage of 5 gallons of liquid organic compounds. 6. Notification: Project personnel must notify the HES Environmental Specialist immediately upon discovery of suspected soil contamination. The following information will be required: Name of person responsible for excavation (Company representative coordinating work) Location of excavation Date of excavation Estimated quantity of soil to be excavated, if possible Estimated average organic content of soil Purpose of excavation (i.e. pipeline installation, over excavation for foundations, etc.) Precautionary storage measures (stored in covered bins, covered with tarp in place, etc.) The CPL HES Environmental Specialist will determine and make the necessary notifications to property owners and regulatory agencies. 7. Requirements for Handling Contaminated Soil : During excavation: Contaminated soil that is excavated during construction shall be placed on continuous heavy duty plastic sheeting. The covering must be in good condition, joined at the seams (overlapped inches and held down with sand bags or other weights), and securely anchored to minimize headspace where vapors may accumulate. Additionally, the excavated soil shall be covered with continuous heavy duty plastic sheeting. Special care should be given to minimize the generation of dust and to mininize the handling or movement of the soil. Active storage piles of contaminated soil will have a maximum of 6000 square feet uncovered surface area with all additional surface area covered with a continuous heavy-duty plastic sheeting.

4 PAGE 3 of 4 8. Characterization Sampling: Inactive storage piles of contaminated soil must be covered with a continuous heavy-duty plastic sheeting during periods of inactivity longer than one hour. Within 30 days of any excavation of contaminated soil, one of the following must occur: all contaminated soil must be disposed of at an approved waste disposal facility, or: all contaminated soil must be backfilled and covered with at least 6 inches of uncontaminated soil (with prior CPL HES approval only, or: other site specific arrangements may be made through the CPL HES Remediation Specialist Soil deemed to have a beneficial reuse as backfill material: Soil that is placed back in the excavation and has exposed surfaces shall becovered with a continuous heavyduty plastic sheeting. Also, during periods of inactivity longer than 12 hours, backfilled contaminated soil must be covered with at least 6 inches of uncontaminated soil or covered with continuous heavy duty plastic sheeting Organic concentration of soil should be confirmed using an OVA before samples are collected for lab analysis. (OVA must comply with EPA Method 21). The soil surface may be disturbed to expose soil approximately 6 inches below the surface to obtain a measurement. A. Soil Disposal Sampling: Composite samples are to be taken and analyzed when necessary tocharacterize the soil to determine the appropropriate dispositon for the soil.. A site-specific compostie sampling plan will be developed and it shall include a sampling frequency of at least two composite samples for every 100 cubic yards or other suitable ratio. Each pile requiring sampling must be divided into equal sectors. One sample must be taken from the center of each sector using: a driven-tube sampler, capped and sealed with inert materials, extruded in the laboratory; or a clean brass tube (12-inches long min.), driven into the soil. The ends must be covered with aluminum foil, then plastic end caps and tape. Samples should be placed on ice for transport. B. For purposes of waste characterization, contaminant content of soil must be determined using: EPA Methods 8015B and 8021B. Title 17 TTLC (Total Threshold Limit Concentration Metals). Consult the CPL HES representative to confirm characterization requirements of the chosen waste facility.

5 PAGE 4 of 4 9. Confirmation Sampling: Discrete soil samples shall be taken and analyzed when necessary for confirmation of excavation boundaries. Samples should be taken from the bottom and sides of the excavation at a frequency appropriate with the size of the excavation to adequately verify that all potential contaminated soil has been removed. For confirmation of clean excavation boundaries, organic content of soil must be determined using: EPA Methods 8015B and 8021B. 10. Reporting: Based on information provided by project personnel, the HES Environmental Specialist will notify authorities as required. Written verification should follow no later than 30 working days after excavation and disposition of soil is complete. 10. Recordkeeping: The HES Environmental Specialist must keep records and the soil excavation reports andcorrespondence that is submitted to regulatory agencies.

UNDERGROUND STORAGE TANK SYSTEM CLOSURE REPORT FORM

UNDERGROUND STORAGE TANK SYSTEM CLOSURE REPORT FORM APPENDIX D COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF ENVIRONMENTAL CLEANUP AND BROWNFIELDS UNDERGROUND STORAGE TANK SYSTEM CLOSURE REPORT FORM - Facility I.D. Facility

More information

SOIL AND GROUNDWATER MANAGEMENT PLAN For Site Located at 420 South Avenue Rochester, New York NYSDEC Spill No. 1000563 PREPARED FOR: PREPARED BY:

SOIL AND GROUNDWATER MANAGEMENT PLAN For Site Located at 420 South Avenue Rochester, New York NYSDEC Spill No. 1000563 PREPARED FOR: PREPARED BY: SOIL AND GROUNDWATER MANAGEMENT PLAN For Site Located at 420 South Avenue Rochester, New York NYSDEC Spill No. 1000563 PREPARED FOR: FLOWER CITY MANAGEMENT & DEVELOPMENT THE MEDICAL ARTS BUILDING (USGBC

More information

ASBESTOS MANAGEMENT PROGRAM

ASBESTOS MANAGEMENT PROGRAM ASBESTOS MANAGEMENT PROGRAM September 2015 Asbestos Management Program Table of Contents I. Purpose II. III. IV. Definitions Identification of Asbestos Asbestos Sampling V. Notification and Labeling VI.

More information

1. Page 1, Incoming Soil Materials, Testing Frequency :

1. Page 1, Incoming Soil Materials, Testing Frequency : March 31, 2014 Ms. Wendy Henderson Director of Public Health Town of Dartmouth Board of Health Town Hall, Room 119 400 Slocum Road Dartmouth, MA 02747 Dear Ms. Henderson: I understand that the Dartmouth

More information

San Mateo County Environmental Health Characterization and Reuse of Petroleum Hydrocarbon Impacted Soil

San Mateo County Environmental Health Characterization and Reuse of Petroleum Hydrocarbon Impacted Soil INTRODUCTION San Mateo County Environmental Health Characterization and Reuse of Petroleum Hydrocarbon Impacted Soil This guidance relates to the on-site reuse of non-hazardous petroleum hydrocarbon impacted

More information

When Completed - Fax to (410) 704-2993

When Completed - Fax to (410) 704-2993 Revised 2/12 Date: / / Hazardous Chemical Waste Disposal Request Page of Requestor: Phone #: Email: Department: Building & Room #: Item # Description of Waste Chemicals Quantity Container Size & Type Comments

More information

Incident Reporting Requirements

Incident Reporting Requirements Incident Reporting Requirements Directive PNG014 February 2016 Revision 1.0 Governing Legislation: Acts: The Oil and Gas Conservation Act The Pipelines Act, 1998 Regulations: The Oil and Gas Conservation

More information

Appendix N Framework Spill Prevention, Containment, and Countermeasures Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702

Appendix N Framework Spill Prevention, Containment, and Countermeasures Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702 Appendix N Framework Spill Prevention, Containment, and Countermeasures Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702 November 2011 TABLE OF CONTENTS 1.0 PURPOSE... 1 2.0 RESPONSIBILITY

More information

Colorado Department of Public Health And Environment Hazardous Materials and Waste Management Division

Colorado Department of Public Health And Environment Hazardous Materials and Waste Management Division Brian Long Solid Waste Compliance Assurance Unit brian.long@state.co.us Richard Mruz Hazardous Waste Corrective Action Unit richard.mruz@state.co.us Colorado Department of Public Health And Environment

More information

State of Rhode Island Department of Environmental Management Division of Site Remediation. Policy Memo 95-01

State of Rhode Island Department of Environmental Management Division of Site Remediation. Policy Memo 95-01 State of Rhode Island Department of Environmental Management Division of Site Remediation Policy Memo 95-01 Guidelines for the Management of Investigation Derived Wastes 1.0 Purpose The purpose of this

More information

PCB Cleanups. Kurt Limesand EPA Region 7 Waste Remediation and Permitting. 5/1/13 U.S. Environmental Protection Agency 1

PCB Cleanups. Kurt Limesand EPA Region 7 Waste Remediation and Permitting. 5/1/13 U.S. Environmental Protection Agency 1 PCB Cleanups Kurt Limesand EPA Region 7 Waste Remediation and Permitting 5/1/13 U.S. Environmental Protection Agency 1 40 CFR Part 761 Polychlorinated Biphenyls (PCBs) Subpart D: Storage and disposal 761.61

More information

MITIGATION MONITORING PROGRAM (Accompanies the Van Nuys Fire Station 39 Initial Study/Mitigated Negative Declaration)

MITIGATION MONITORING PROGRAM (Accompanies the Van Nuys Fire Station 39 Initial Study/Mitigated Negative Declaration) MITIGATION MONITORING PROGRAM (Accompanies the Van Nuys Fire Station 39 Initial Study/Mitigated Negative Declaration) Van Nuys Fire Station 39 W.O. E170094B The California Environmental Quality Act (CEQA)

More information

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE FORM A PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE The following suggested specifications are written as a guide to assist the specifier in writing his own specifications. Specific circumstances

More information

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations SWPPP for Park Operations 2 Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations Bordered by Lake Washington & Lake Sammamish, the City of Bellevue has more than 60 miles of streams,

More information

SECTION 02200 SUPPORT OF EXCAVATION

SECTION 02200 SUPPORT OF EXCAVATION SECTION 02200 PART 1 GENERAL 1.01 DESCRIPTION A. Section including specifications for design and installation of excavation support. B. Section also includes specifications for excavation support systems

More information

V. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials

V. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials E. HAZARDOUS MATERIALS An Environmental Site Assessment Phase I Update was performed on the subject properties by California Environmental Inc. in March 2000 1. This report is included in Appendix E of

More information

STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS

STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for cleaning and lining existing cast iron and ductile iron water mains

More information

ATTACHMENT F ONSHORE PIPELINES DECOMMISSIONING GUIDELINE 1. INTRODUCTION

ATTACHMENT F ONSHORE PIPELINES DECOMMISSIONING GUIDELINE 1. INTRODUCTION ATTACHMENT F ONSHORE PIPELINES DECOMMISSIONING GUIDELINE 1. INTRODUCTION After concession is expired or at the end of its economic life, pipeline network and all associated structures are due for decommissioning

More information

SECTION 202. REMOVAL Of ROADWAYS AND BUILDINGS

SECTION 202. REMOVAL Of ROADWAYS AND BUILDINGS SECTION 202 REMOVAL Of ROADWAYS AND BUILDINGS 202.1 Description. This work shall consist of the removal and disposal of all existing improvements from the right of way and within the limits of any construction

More information

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY Page 1 of 7 ISSUED: 5/00 REVISED: 08/06 1. Potential Releases of Radioactive Materials to Unrestricted Areas The Environmental Health and Safety Department (EHRS) must be notified immediately if an emergency

More information

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition. Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer

More information

Asbestos Abatement Work Plan for the Carter Carburetor Superfund Site

Asbestos Abatement Work Plan for the Carter Carburetor Superfund Site for the Prepared for: ACF Industries LLC 101 Clark Street St. Charles, Missouri 63301 Prepared by: AMEC Environment & Infrastructure, Inc. 15933 Clayton Road, Suite 215 Ballwin, Missouri 63011 Project

More information

Risk-Based Decision Making for Site Cleanup

Risk-Based Decision Making for Site Cleanup July 2013 Risk-Based Decision Making for Site Cleanup The Oklahoma Department of Environmental Quality (DEQ) has adopted a risk based decision making process to provide a framework for determining cleanup

More information

MOLD REMEDIATION PROCEDURES

MOLD REMEDIATION PROCEDURES Page: 1 of 5 1.0 PROGRAM OBJECTIVE The purpose of this procedure is to define the responsibilities, methods, procedures and training required to safely and effectively remove or clean mold-contaminated

More information

C. Section 014510 TESTING LABORATORY SERVICE.

C. Section 014510 TESTING LABORATORY SERVICE. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,

More information

How To Safely Handle A Spill

How To Safely Handle A Spill WD DWGB 22 6 2010 Best Management Practices for Fueling and Maintenance of Excavation and Earthmoving Equipment Env Wq 401, Best Management Practices for Groundwater Protection, applies to a variety of

More information

File: Spill Response Plan for Hazard Chemicals and Mercury Spills. Orig. Date: 12/01/2005 Review Date: January Review Date: March 2010

File: Spill Response Plan for Hazard Chemicals and Mercury Spills. Orig. Date: 12/01/2005 Review Date: January Review Date: March 2010 File: Spill Response Plan for Hazard Chemicals and Mercury Spills Orig. Date: 12/01/2005 Review Date: January Review Date: March 2010 OSHA: 1910.120 EPA: 40CFR 112.7 Messiah College Spill Response Policy

More information

A GROUNDWATER PROTECTION PLAN FOR HOME HEATING OIL TANKS

A GROUNDWATER PROTECTION PLAN FOR HOME HEATING OIL TANKS A GROUNDWATER PROTECTION PLAN FOR HOME HEATING OIL TANKS What is a groundwater protection plan? A groundwater protection plan identifies the activities being conducted that can pollute groundwater and

More information

IAC 7/2/08 Agriculture and Land Stewardship[21] Ch 44, p.1

IAC 7/2/08 Agriculture and Land Stewardship[21] Ch 44, p.1 IAC 7/2/08 Agriculture and Land Stewardship[21] Ch 44, p.1 CHAPTER 44 ON-SITE CONTAINMENT OF PESTICIDES, FERTILIZERS AND SOIL CONDITIONERS [Prior to 7/27/88, see 21 Ch 9] PESTICIDES 21 44.1(206) Definitions.

More information

Sample Collection Procedures for Insulating Fluid Samples

Sample Collection Procedures for Insulating Fluid Samples Sample Collection Procedures for Insulating Fluid Samples GENERAL Sampling electrical insulating oil for laboratory analysis requires care to ensure that the sample is representative of the product being

More information

UI Procedures for Asbestos Management

UI Procedures for Asbestos Management UI Procedures for Asbestos Management The University of Iowa Rev.12/12/2012 These procedures apply to employees and contractors involving the identification, work on, removal, or repair of asbestos-containing

More information

CHAPTER 62-713 SOIL TREATMENT FACILITIES

CHAPTER 62-713 SOIL TREATMENT FACILITIES CHAPTER 62-713 SOIL TREATMENT FACILITIES 62-713.100 Intent. 62-713.200 Definitions. 62-713.210 Documents Incorporated by Reference. 62-713.220 Approval of Alternate Procedures and Requirements. 62-713.300

More information

Underground Storage Tanks

Underground Storage Tanks Underground Storage Tanks An Informational and Guidance Document for the University Community. Please contact Yale Environmental Health and Safety for latest Regulatory Requirements. A typical UST installation

More information

DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY

DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY FREQUENTLY ASKED QUESTIONS (FAQ) Question: Do fuel tanks fall under the requirements of Directive 055? No. For storage of fuels (e.g.,

More information

This page left intentionally blank

This page left intentionally blank 1 This page left intentionally blank 2 STATE OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF UNDERGROUND STORAGE TANKS TECHNICAL CHAPTER 4.2 SPILL AND OVERFILL PREVENTION EFFECTIVE

More information

SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING

SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING 1 TABLE OF CONTENTS 1.0 Introduction and Purpose 3 2.0 Description of Work 3 3.0 Site Supervisor/Foremen Responsibilities 4 4.0 Equipment

More information

Colorado Regulation No. 8, Part B, Asbestos 100 Questions http://www.cdphe.state.co.us/ap/asbeshom.asp

Colorado Regulation No. 8, Part B, Asbestos 100 Questions http://www.cdphe.state.co.us/ap/asbeshom.asp List of Questions Click on a question and you will be redirected to the answer. Page 1. On a non-friable project, can any poly used be disposed of as non-friable waste material?...2 2. What s the ruling

More information

CHAPTER 62-740 PETROLEUM CONTACT WATER

CHAPTER 62-740 PETROLEUM CONTACT WATER CHAPTER 62-740 PETROLEUM CONTACT WATER 62-740.010 Declaration of Intent (Repealed) 62-740.020 Applicability 62-740.030 Definitions 62-740.040 General 62-740.100 Management Practices for Producers of PCW

More information

THE COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT S REVISED ASBESTOS-IN-SOILS REGULATIONS AND THE COLORADO BROWNFIELDS TAX CREDIT

THE COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT S REVISED ASBESTOS-IN-SOILS REGULATIONS AND THE COLORADO BROWNFIELDS TAX CREDIT THE COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT S REVISED ASBESTOS-IN-SOILS REGULATIONS AND THE COLORADO BROWNFIELDS TAX CREDIT Presented by Polly Jessen Kaplan Kirsch & Rockwell LLP January 22,

More information

UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES

UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES February 2014 The plan contained in the following pages was developed in part from UDOT Construction Division s Safety and Health Manual,

More information

The Pipelines Regulations, 2000

The Pipelines Regulations, 2000 PIPELINES, 2000 P-12.1 REG 1 1 The Pipelines Regulations, 2000 being Chapter P-12.1 Reg 1 (effective April 1, 2000) as amended by the Statutes of Saskatchewan, 2014, c.21. NOTE: This consolidation is not

More information

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,

More information

NCCER 13614 Progress Blvd., Alachua, FL 32615 Tel: (888) 622-3720 E-mail: info@nccer.org. Task Number Item Date(s) Recorded By

NCCER 13614 Progress Blvd., Alachua, FL 32615 Tel: (888) 622-3720 E-mail: info@nccer.org. Task Number Item Date(s) Recorded By NCCER 13614 Progress Blvd., Alachua, FL 32615 Tel: (888) 622-3720 E-mail: info@nccer.org PIPELINE MAINTENANCE On-the-Job Training Level One MODULE 66101-02 INTRODUCTION TO THE PIPELINE INDUSTRY This is

More information

LEAD MANAGEMENT PROGRAM

LEAD MANAGEMENT PROGRAM Page: 1 of 7 1.0 Purpose and Applicability 1.1 It is the policy of the University of Pennsylvania in coordination with the Office of Environmental Health and Radiation Safety to provide the University

More information

Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.

Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills. WQ-10 Best Management Practice (BMP) Water Quality Protection Guideline Secondary Containment Design Standards Fuel Storage on Construction Sites According to the EPA, the majority of water pollution in

More information

Oil and Gas Exploration and Production Oil and gas exploration and production... 22a-472-1

Oil and Gas Exploration and Production Oil and gas exploration and production... 22a-472-1 Department of Environmental Protection Sec. 22a-472 page 1 (4-97) TABLE OF CONTENTS Oil and Gas Exploration and Production Oil and gas exploration and production... 22a-472-1 Department of Environmental

More information

APPENDIX 7-B. Hazardous Materials Management Plan

APPENDIX 7-B. Hazardous Materials Management Plan S TAR-ORION S OUTH D IAMOND P ROJECT E NVIRONMENTAL I MPACT A SSESSMENT APPENDIX 7-B Hazardous Materials Management Plan SX03733 Section 6.0 1.1.1 Hazardous Materials Management Plan 1.1.1.1 Introduction

More information

District of Columbia Municipal Regulations UNDERGROUND STORAGE TANKS: GENERAL PROVISIONS 5500 COMPLIANCE WITH OTHER DISTRICT LAWS

District of Columbia Municipal Regulations UNDERGROUND STORAGE TANKS: GENERAL PROVISIONS 5500 COMPLIANCE WITH OTHER DISTRICT LAWS CHAPTER 55 UNDERGROUND STORAGE TANKS: GENERAL PROVISIONS Section 5500 Compliance with Other District Laws 5501 Applicability of UST Regulations 5502 Partial Applicability of UST Regulations to Particular

More information

SECTION 02100 SITE PREPARATION

SECTION 02100 SITE PREPARATION SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division

More information

Environmental Protection Information Sheet: 2. Advice on Asbestos

Environmental Protection Information Sheet: 2. Advice on Asbestos Environmental Protection Information Sheet: 2 Advice on Asbestos A s b e s t o s Asbestos is a natural mineral, which has been widely used in construction materials and in articles within the home for

More information

Spill Plan Reviewer s Guidance

Spill Plan Reviewer s Guidance Spill Plan Reviewer s Guidance WSDOT Hazardous Materials Program May 2013 2 Overview Purpose: Spill prevention planning is a key element for protecting the environment during construction. The Spill Plan

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

In-situ Density Determination by Sand Replacement Method

In-situ Density Determination by Sand Replacement Method University of Texas at Arlington Geotechnical Engineering Laboratory Test Procedure In-situ Density Determination by Sand Replacement Method Lecture Note 7 (Thursday 03-04-04) 1 Definitions, Objectives

More information

Draft ABCA : USEPA 2015 Brownfields Cleanup Grant Application for Former Hudepohl Brewery Site by Port of Greater Cincinnati Development Authority

Draft ABCA : USEPA 2015 Brownfields Cleanup Grant Application for Former Hudepohl Brewery Site by Port of Greater Cincinnati Development Authority Analysis of Brownfield Cleanup Alternatives (ABCA) for Hudepohl Brewery Site Introduction & History The Port of Greater Cincinnati Development Authority (Port Authority) has developed a draft proposal

More information

Risk Management Procedure For The Derivation and Use Of Soil Exposure Point Concentrations For Unrestricted Use Determinations

Risk Management Procedure For The Derivation and Use Of Soil Exposure Point Concentrations For Unrestricted Use Determinations Risk Management Procedure For The Derivation and Use Of Soil Exposure Point Concentrations For Unrestricted Use Determinations Hazardous Materials and Waste Management Division (303) 692-3300 First Edition

More information

University of Pittsburgh Safety Manual. EH&S Guideline Number: 01-007 ASBESTOS

University of Pittsburgh Safety Manual. EH&S Guideline Number: 01-007 ASBESTOS Page 1 of 5 The inhalation of asbestos fibers in excess amounts can lead to chronic lung disease. Our knowledge of these health effects comes from studies of workers exposed routinely to high concentrations

More information

Site Cleanup in Connecticut

Site Cleanup in Connecticut Site Cleanup in Connecticut Taking the Mystery Out of Dealing with Contaminated Property in Connecticut: Information for Property Owners, Buyers, Sellers, Attorneys, Bankers, Insurance Representatives

More information

Proposed Changes to Utah Underground Storage Tank Rules, R311 5/31/2016

Proposed Changes to Utah Underground Storage Tank Rules, R311 5/31/2016 R311. Environmental Quality, Environmental Response and Remediation. R311-200. Underground Storage Tanks: Definitions. R311-200-1. Definitions. (a) Refer to Section 19-6-402 for definitions not found in

More information

Sanitary Sewer Overflow Response Plan Working Committee SANITARY SEWER OVERFLOW RESPONSE PLAN

Sanitary Sewer Overflow Response Plan Working Committee SANITARY SEWER OVERFLOW RESPONSE PLAN Sanitary Sewer Overflow Response Plan Working Committee SANITARY SEWER OVERFLOW RESPONSE PLAN I. PURPOSE The Municipality / Authority has structured this Sanitary Sewer Overflow Response Plan to satisfy

More information

SECTION 33 11 00.19 ABANDONMENT OF WATER MAINS. A. Conform to requirements of Section 01 33 00 - Submittals.

SECTION 33 11 00.19 ABANDONMENT OF WATER MAINS. A. Conform to requirements of Section 01 33 00 - Submittals. SECTION 33 11 00.19 ABANDONMENT OF WATER MAINS PART 1: GENERAL 1.01 SCOPE A. Abandonment in place, by cutting and capping, of existing water mains, hydrants, service lines, and valves. B. Abandonment in

More information

FUELING AND FUEL STORAGE

FUELING AND FUEL STORAGE FUELING AND FUEL STORAGE BENCHMARK Implement spill prevention measures whenever fuel is handled or stored. Report, minimize, contain and clean up spills that do occur. FUELING BMPS Spills of diesel, oil,

More information

UNIVERSITY OF RICHMOND REGULATED MEDICAL WASTE MANAGEMENT GUIDELINES

UNIVERSITY OF RICHMOND REGULATED MEDICAL WASTE MANAGEMENT GUIDELINES UNIVERSITY OF RICHMOND REGULATED MEDICAL WASTE MANAGEMENT GUIDELINES November 2003 Table of Contents Section Page I. Introduction.... 1 II. Characteristics of Regulated Medical Waste 1-2 III. Exclusions...2-3

More information

Rutgers Environmental Health and Safety

Rutgers Environmental Health and Safety Rutgers Environmental Health and Safety PCB Self-Audit (TSCA Program) Facility Name: Rutgers University, Facility Address: Facility EPA Identification Number: Date of Self-Audit Inspection: Campus/Farm/Field

More information

FLORIDA HAZARDOUS WASTE MANAGEMENT REGULATIONS THAT DIFFER FROM FEDERAL REQUIREMENTS

FLORIDA HAZARDOUS WASTE MANAGEMENT REGULATIONS THAT DIFFER FROM FEDERAL REQUIREMENTS FLORIDA HAZARDOUS WASTE MANAGEMENT REGULATIONS THAT DIFFER FROM FEDERAL REQUIREMENTS Chapter 1: Introduction General Notes Lead Agency: Florida Department of Environmental Protection (DEP) Division of

More information

Asbestos Inspection Project Procedure

Asbestos Inspection Project Procedure EOSMS 402 Date: 01/13/2014 Page 1 of 6 1) Purpose This document is intended to specify the scope of services required of Asbestos Contractor in asbestos inspection projects at Kennesaw State University

More information

Division of Public Health Administrative Manual

Division of Public Health Administrative Manual PURPOSE To establish a protocol for the development of a written Division of Public Health Hazard Communications Program at each applicable office or laboratory workplace and to assure that employees are

More information

Site Description and History

Site Description and History 3130 Southwest 17 th Street Pembroke Park, Florida County: Broward District: Southeast Site Lead: EPA Placed on National Priorities List: July 22, 1987 HWC # 023 Site Description and History The Petroleum

More information

Well Site Spill Protection: Impacts, Trends and Technologies for Preventing Releases to Water Sources

Well Site Spill Protection: Impacts, Trends and Technologies for Preventing Releases to Water Sources Well Site Spill Protection: Impacts, Trends and Technologies for Preventing Releases to Water Sources Presented by: Tekla Taylor, R.G. and Archie Filshill, Ph.D. InterGEO Services, now a part of Golder

More information

Contingency Plan. Facility Name

Contingency Plan. Facility Name Contingency Plan Facility Name This plan is reviewed annually and amended whenever changes occur that will significantly affect the ability of this facility to respond to an emergency situation. This includes

More information

EMERGENCY ACTION PLAN FLOOD AND FOOD OPERATIONS

EMERGENCY ACTION PLAN FLOOD AND FOOD OPERATIONS NEW HAMPSHIRE DEPARTMENT OF HEALTH AND HUMAN SERVICES DIVISION OF PUBLIC HEALTH SERVICES FOOD PROTECTION SECTION EMERGENCY ACTION PLAN FLOOD AND FOOD OPERATIONS For single events affecting an individual

More information

Asbestos Storage Facility Plan Examples

Asbestos Storage Facility Plan Examples Asbestos Storage Facility Plan Examples The purpose of this document This document contains examples of what an operational plan, plans and specification, contingency plan and closure plan should look

More information

Compliance Guidance for Motor Vehicle Waste Disposal Wells in Oregon September 2015

Compliance Guidance for Motor Vehicle Waste Disposal Wells in Oregon September 2015 Compliance Guidance for Motor Vehicle Waste Disposal Wells in Oregon September 2015 Underground Injection Control Program 700 NE Multnomah Street Suite 600 Portland, OR 97232 Phone: 503-229-6371 800-452-4011

More information

Soil Treatment Facility Guidance

Soil Treatment Facility Guidance State of Alaska DEPARTMENT OF ENVIRONMENTAL CONSERVATION DIVISION OF SPILL PREVENTION AND RESPONSE CONTAMINATED SITES PROGRAM Soil Treatment Facility Guidance November 7, 2002 TABLE OF CONTENTS PURPOSE...1

More information

ENVIRONMENTAL HEALTH & SAFETY/RISK MANAGEMENT Contractor Management (including Sub-Contractors)

ENVIRONMENTAL HEALTH & SAFETY/RISK MANAGEMENT Contractor Management (including Sub-Contractors) ENVIRONMENTAL HEALTH & SAFETY/RISK MANAGEMENT Contractor Management (including Sub-Contractors) Contractors have the responsibility to ensure the health and safety of their workers and that their work

More information

New York State Department of Environmental Conservation 625 Broadway, Albany, NY 12233 www.dec.ny.gov. Environmental Self Audit For Small Businesses

New York State Department of Environmental Conservation 625 Broadway, Albany, NY 12233 www.dec.ny.gov. Environmental Self Audit For Small Businesses New York State Department of Environmental Conservation 625 Broadway, Albany, NY 12233 www.dec.ny.gov Environmental Self Audit For Small Businesses Disclaimer The materials in this document are intended

More information

SPILL CONTAINMENT AND CONTROL PLAN

SPILL CONTAINMENT AND CONTROL PLAN SPILL CONTAINMENT AND CONTROL PLAN PUD NO. 1 TREATMENT PLANT 1257 GLASS ROAD PORT ANGELES, WASHINGTON PUD No. 1 Treatment Plant 2431 East Highway 101 P.O. Box 1090 Port Angeles, WA 98362 Facility Description:

More information

Checklist for plans to Construct, Alter or Repair An Individual Subsurface Sewage Disposal System

Checklist for plans to Construct, Alter or Repair An Individual Subsurface Sewage Disposal System Checklist for plans to Construct, Alter or Repair An Individual Subsurface Sewage Disposal System An application for the construction or alteration of an individual subsurface sewage disposal system shall

More information

Monitoring an Underground Storage Tank Facility

Monitoring an Underground Storage Tank Facility DEVELOPMENT SERVICES DEPARTMENT HAZARDOUS MATERIALS PERMIT APPLICATION / MATERIALS MANAGEMENT PLAN PART I: GENERAL INFORMATION ON UNDERGROUND STORAGE TANK (UST) LOCATION (Please print) UST Location Name:

More information

Arctic King Fuel Tanks meet the Environment Canada TECHNICAL REQUIREMENTS FOR COLLAPSIBLE FABRIC STORAGE TANKS (BLADDERS) - December 17, 2009

Arctic King Fuel Tanks meet the Environment Canada TECHNICAL REQUIREMENTS FOR COLLAPSIBLE FABRIC STORAGE TANKS (BLADDERS) - December 17, 2009 Arctic King Fuel Tanks meet the Environment Canada TECHNICAL REQUIREMENTS FOR COLLAPSIBLE FABRIC STORAGE TANKS (BLADDERS) - December 17, 2009 1. Fuel Bladders a. The fuel bladder should be manufactured

More information

CHEMICAL SPILL RESPONSE GUIDE

CHEMICAL SPILL RESPONSE GUIDE HEMIAL SPILL RESPONSE GUIDE Revised 2000 TABLE OF ONTENTS Emergency Phone Numbers Introduction - hemical Spill Response Spill Response Procedures - Major Spill Spill Response Procedures - Minor Spill Spills

More information

Application for the Construction or Installation of Aboveground Storage Tank (AST) Systems or Associated Underground or Over-water Piping Systems

Application for the Construction or Installation of Aboveground Storage Tank (AST) Systems or Associated Underground or Over-water Piping Systems Page 1 of 5 Application for the Construction or Installation of Aboveground Storage Tank (AST) Systems or Associated Underground or Over-water Piping Systems New Hampshire Department of Environmental Services

More information

HAZARDOUS WASTE SATELLITE ACCUMULATION MANAGER RESPONSIBILITIES

HAZARDOUS WASTE SATELLITE ACCUMULATION MANAGER RESPONSIBILITIES INTRODUCTION This program applies to Eastern Washington University (EWU) personnel who work with chemicals and generate chemical waste in performance of their job duties. Chemicals may pose a threat to

More information

This guidance was prepared to parallel the Low Hazard Exemption process guidance prepared by the Waste and Materials Management Program.

This guidance was prepared to parallel the Low Hazard Exemption process guidance prepared by the Waste and Materials Management Program. RR-999 Management of Contaminated Soils and Other Waste Materials Under s. NR 718 Wis. Adm. Code Wisconsin Department of Natural Resources (November, 2014) The attached document, Management of Contaminated

More information

Newport News Shipbuilding Contractor Environmental, Health and Safety Resource Manual Waste Management

Newport News Shipbuilding Contractor Environmental, Health and Safety Resource Manual Waste Management Newport News Shipbuilding Contractor Environmental, Health and Safety Resource Manual Waste Management Newport News Shipbuilding Page 1 WASTE MANAGEMENT 1. Purpose and Scope a. The purpose of this section

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS L. UTILITIES AND SERVICE SYSTEMS 3. SOLID WASTE AND DISPOSAL

IV. ENVIRONMENTAL IMPACT ANALYSIS L. UTILITIES AND SERVICE SYSTEMS 3. SOLID WASTE AND DISPOSAL IV. ENVIRONMENTAL IMPACT ANALYSIS L. UTILITIES AND SERVICE SYSTEMS 3. SOLID WASTE AND DISPOSAL ENVIRONMENTAL SETTING Within the City, solid waste management, including collection and disposal services

More information

SECTION 1 GENERAL REQUIREMENTS

SECTION 1 GENERAL REQUIREMENTS Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,

More information

Asbestos Work Permit Procedures

Asbestos Work Permit Procedures These procedures are to be followed by all persons required to perform the following work: Handling, installation or removal of non-friable manufactured products known to contain asbestos provided no sanding,

More information

UNDERGROUND OIL STORAGE TANKS

UNDERGROUND OIL STORAGE TANKS L E S P E R A N C E M E N D E S L A W Y E R S UNDERGROUND OIL STORAGE TANKS A Property Owner s Guide Robert J Lesperance and Naomi R Rozenberg If your home, townhouse or condominium was built before 1970,

More information

ASBESTOS MANAGEMENT PROGRAM

ASBESTOS MANAGEMENT PROGRAM ASBESTOS MANAGEMENT PROGRAM Prepared By: Triumvirate Environmental Program Approval Developed: August 2011 Updated: June 2015 Associate Vice President of Public Safety & Administrative Services Date Associate

More information

Pollution Prevention And Best Management Practices For Dry Cleaners Operating In Broward County

Pollution Prevention And Best Management Practices For Dry Cleaners Operating In Broward County FORWARD In 1991, the Broward County Environmental Protection and Growth Management Department, who was then known as the Department of Natural Resource Protection (DNRP), initiated the development of Pollution

More information

Maryland Containment System Testing Protocol. The individual performing the inspection and testing as outlined in this protocol must be either:

Maryland Containment System Testing Protocol. The individual performing the inspection and testing as outlined in this protocol must be either: MARYLAND DEPARTMENT OF THE ENVIRONMENT Oil Control Program, Suite 620, 1800 Washington Blvd., Baltimore MD 21230-1719 4 410-537-3442 410-537-3092 (fax) 1-800-633-6101 http://www.mde.state.md.us Maryland

More information

SPILLS & SPILL KITS. Spills -General Guidelines:

SPILLS & SPILL KITS. Spills -General Guidelines: Spills -General Guidelines: If handled properly, a spill may be nothing more than a nuisance. If handled improperly, a spill can seriously disrupt your activities and the work of your colleagues. At worst,

More information

METHOD OF TEST FOR SAMPLING AND TESTING CRUMB RUBBER MODIFIER

METHOD OF TEST FOR SAMPLING AND TESTING CRUMB RUBBER MODIFIER STATE OF CALIFORNIA BUSINESS, TRANSPORTATION AND HOUSING AGENCY DEPARTMENT OF TRANSPORTATION DIVISION OF ENGINEERING SERVICES Transportation Laboratory 5900 Folsom Boulevard Sacramento, California 95819-4612

More information

DECISION MEMORANDUM FOR ENVIRONMENTAL RESPONSE ACTIONS

DECISION MEMORANDUM FOR ENVIRONMENTAL RESPONSE ACTIONS DECISION MEMORANDUM FOR ENVIRONMENTAL RESPONSE ACTIONS Small Business Liability Relief and Brownfields Revitalization Act United States Environmental Protection Agency CERCLA Section 128(a) State Response

More information

MOLD REMEDIATION KEY STEPS

MOLD REMEDIATION KEY STEPS MOLD REMEDIATION KEY STEPS The EPA has developed the following guidelines for mold remediation managers. These guidelines are generally helpful, but we believe an expert in the industry should be consulted

More information

Autoclave Safety. Autoclaves are sterilizers using high pressure and high temperature steam. The potential safety risks for the operators are:

Autoclave Safety. Autoclaves are sterilizers using high pressure and high temperature steam. The potential safety risks for the operators are: Autoclave Safety Purpose: Sterilization refers to the complete killing of all living organisms, including spores. Common sterilization techniques include the application of wet heat, dry heat, chemicals,

More information

Hazardous Waste Determination and Management Plan

Hazardous Waste Determination and Management Plan Hazardous Waste Determination and Management Plan Prepared By: Triumvirate Environmental Developed: November 2014 Updated: Program Approval Associate Vice President of Public Safety & Administrative Services

More information

Improper storage of potential pollutants will increase the risk of water pollution that may occur because of spills.

Improper storage of potential pollutants will increase the risk of water pollution that may occur because of spills. WQ-3 Best Management Practice (BMP) Water Quality Protection Guideline Secondary Containment Design and Operation Standards Section 1. Introduction According to the EPA, the majority of water pollution

More information

ROXUL Board Insulation Section 07 21 13 Master Guide Specification (CAVITYROCK ) Page 1 April 2016

ROXUL Board Insulation Section 07 21 13 Master Guide Specification (CAVITYROCK ) Page 1 April 2016 Master Guide Specification (CAVITYROCK ) Page 1 Click on the pilcrow in the MS Word Toolbar to toggle ROXUL GUIDE NOTES on and off. Delete this text before incorporating the section into a Project Manual.

More information

RELEASE TRACKING NUMBER 4-19466 December 2010. Prepared For: New England Gas Company P.O. Box 911 Fall River, Massachusetts 02722.

RELEASE TRACKING NUMBER 4-19466 December 2010. Prepared For: New England Gas Company P.O. Box 911 Fall River, Massachusetts 02722. RELEASE ABATEMENT MEASURE COMPLETION REPORT REGULATOR DECOMMISSIONING AND WATER SERVICE LINE REPAIR 120 CHARLES STREET FALL RIVER, MASSACHUSETTS RELEASE TRACKING NUMBER 4-19466 December 2010 Prepared For:

More information