1 TERMS OF REFERENCE FOR ELECTRICITY COST OF SERVICE STUDY AND DETERMINATION OF ECONOMIC COST BASED TARIFFS MARCH 2016
2 1.0 BACKGROUND 1.1 In 2006, the Energy Regulation Board (ERB) conducted a Cost of Service Study, which was intended to determine the cost ZESCO Limited (ZESCO) incurred in generating, transmitting, distributing and supplying power to its various customers as well as to provide the basis of gradual adjustment of electricity prices towards cost reflective levels. 1.2 The 2006 study focused primarily on ZESCO who was at that time the producer and supplier of about 96% of the electricity consumed in the country. However, since then, significant changes have taken place in the Electricity Sector in Zambia. There have been new entrants into the sector, such as Independent Power Producers (IPPs), who have invested in power generation; much higher cost generation sources are being developed by ZESCO and others. Since the lowest cost resources have already been developed; significant new investments have been made to reinforce and expand the transmission and distribution infrastructure to improve and expand supply to existing and new areas of the country. As a result, the cost of electricity production and supply has risen significantly. Further, in order to diversify the generation mix, there is also growing emphasis on developing the renewable energy resources of the country. However, current electricity prices are well below both economic and financial costs. It has, therefore, become imperative that a new electricity cost of service study be undertaken, not only to capture developments since the last study was undertaken, but also to be forward looking in consideration of the forecast electricity demand in Zambia over the longterm, and the future expansion of the power supply infrastructure to meet the forecast future demand in the least-cost manner. The ERB, therefore, wishes to engage the services of an experienced international consulting firm to undertake the cost of-service study and the design of economic cost reflective tariffs. 2.0 OBJECTIVES OF THE STUDY 2.1 The objectives of the study are threefold: firstly, to set electricity tariffs to promote economic efficiency of production and consumption and ensure financial viability of the electricity sector, while taking into account social and equity considerations; secondly to review the current ERB model used for tariff determination and develop a new in-house model for use by ERB during future regulatory review of tariff proposals and tariff determination; and, thirdly, to provide a basis of strategy formulation for the gradual transition from existing financial-cost based tariffs to economic cost -based tariffs, setting of targeted life-line tariffs and associated support mechanism while at the same time maintaining the household consumer category level economic-cost based tariff. 2
3 2.2 To achieve the above objectives, the study should: a) Determine the long-term least cost generation, transmission, distribution and supply 1 programs to meet the forecasted electricity demand in Zambia over the medium to longterm; b) Estimate the long-run marginal cost ( LRMC) of generation, the average incremental cost (AIC) of transmission, and AIC of distribution and supply; c) Determine the economic cost of supply by voltage level, from generation through to the supply level; d) Design economic cost-based tariffs for structure and levels that reflect economic cost of service by consumer category; e) Determine the appropriate tariff structures, and the level of the social life-line tariff; f) propose a comprehensive strategy for transition from financial to economic based tariffs; and g) Prepare a roll out plan for communicating the results of the study, and the proposed strategy of implementation to all stakeholders. 3.0 SCOPE OF THE STUDY 3.1 The scope of the study comprises the following Tasks: 3.2 TASK 1 FIRST FIELD VISIT FOR STUDY LAUNCH AND DATA COLLECTION About 2 weeks after contract signature, the Consultant shall undertake a field mission to Zambia for a stay of about 14 days for the launching of the study, and data gathering. During this period, ERB will introduce the Consultant to the key stakeholders, and the various agencies from whom data and information gathering will be done by the Consultant. The Consultant shall meet with the key stakeholders as advised by ERB to present to them its general approach to carrying out the study as per the Contract. The Study Management Team (SMT), established for the purpose, shall assist and facilitate the data gathering by the Consultant. One month after the field visit, the Consultant shall submit an Inception Report to the ERB. Two weeks after submitting the Inception Report to ERB, the Consultant shall undertake a second visit to Zambia for a stay of about 4 days to present the Inception Report, and to collect any additional information that is required for completeness of the information. 1 Distribution and Supply means down to 220 Volts 3
4 3.3 TASK 2 REVIEW OF STRUCTURE AND CONDUCT OF THE POWER SECTOR INCLUDING THE LEGAL AND REGULATORY FRAMEWORK Undertake a detailed review of the structure and conduct of the power sector including the existing legal and regulatory framework. The review of the legal and regulatory framework should focus on identifying inconsistencies, including the institutional arrangements and weaknesses thereof that pose constraints to the determination and of setting electricity tariffs in accordance with the Zambia Energy Policy Document, and to provide recommendations for addressing the inconsistencies. Prepare a detailed report on the findings from the review and the recommendations. 3.4 TASK 3 - ELECTRICITY DEMAND FORECASTS Review the current electricity demand forecasts under the three scenarios high, medium, and low, prepared by ZESCO, and prepare revised demand forecasts under the three scenarios for the next 20 years up to 2037 for both maximum demand, and energy (all customer categories). The consultant shall prepare a detailed Load Forecast Report stating the findings from the review of the existing load forecasts, the underlying assumptions of the revised forecasts and the methodological approaches utilized for the forecasts. 3.5 TASK 4 - DETERMINATION OF MEDIUM TO LONG-TERM DEVELOPMENT PROGRAMS Based on the Base-case scenario electricity demand forecast from Task 3, determine the long-term least-cost expansion programs for generation, transmission, distribution and supply to meet the projected maximum demand over the next 20 years up to A dynamic optimization computer programming technique should be applied for the determination of the least-cost generation expansion program. Since the Zambian power system is integrated into the Southern African Power Pool, the generation expansion analysis should take into account potential generation developments in the pool over the planning horizon that could impact on the supply situation in Zambia, as well as the integration of renewable energy options in determining the least-cost expansion program for Zambia. In formulating the transmission development program, account should be taken of developments that would enable potential economic bilateral imports from the Pool. The Consultant shall prepare three separate detailed reports as follows: a) The long-term least-cost generation expansion program; b) The transmission expansion program; and c) The distribution and supply expansion program For each of the reports, the input data used and the explanatory notes, and the methodological approach underlying the analysis should be provided. 4
5 3.6 TASK 5 DETERMINATION OF ECONOMIC COST OF SUPPLY AND STRUCTURE AND LEVELS OF TARIFFS From outputs of Task 4, determine: a) the LRMC of generation, the AIC of transmission, and the AIC of distribution and supply of unit of capacity addition to the power system at the peak period by main voltage levels; b) the SRMC (energy and other variable O&M) at generation, transmission, and at distribution and supply ; and c) the economic cost of supply, expressed as (a) capacity cost ( cost/kw/year)or /and fixed charge per month, (b) energy and other variable O&M cost (cost/kwh), and (c) as a composite of (a) and (b) cost/kwh at generation, at transmission, at distribution and supply From the foregoing, determine for each main class of consumer category, using the applicable characteristics, the appropriate structure and level of tariff for each consumer category/class reflecting the economic cost of supply to the category. Should information on consumer characteristics not be available from ZESCO the Consultant is required, using a desk review, to draw from experience in other countries with fairly similar power system as that of Zambia, and with similar consumer classification and patterns of consumption. The Consultant shall prepare and issue a detailed report on Economic Cost of Supply and Consumer Tariff Structures and Levels. The report must provide details of assumptions, analysis, and the methodological approaches used. 3.7 TASK 6 - LIFE-LINE TARIFF MECHANISM, ANALYSIS OF EXISTING TARIFFS, AND ADJUSTMENT TO ECONOMIC BASED TARIFFS Based on the output of Task 5, and utilizing available information in Zambia on poor household uses of electricity for basic needs from consumer household surveys, and/or drawing on international experience, determine the level of electricity requirement for poor households in Zambia for basic needs, clearly defining what the basic needs are, the linkage between household incomes, and expenditures on electricity consumption, and propose a tariff level for poor household consumers, including the appropriate quantity of electricity usage for basic needs. Determine the economic cost differential of the proposed life-line tariff and the economic cost of supply to the household consumer category, and provide recommendations on alternative options by which the life-line tariff subsidy could be administered, and the preferred option Review the current tariffs of ZESCO by consumer category in terms of structure and levels in relation to the proposed economic cost-based tariffs derived under Task 5. Propose 5
6 modifications to the existing structures to reflect the structures of economic cost-based tariffs. Considering the differentials with the economic cost-based tariffs, the Consultant shall propose a trajectory of gradual increases to reach the levels of economic-cost based tariffs within a realistic time frame. The Consultant shall issue a Task 6 report. 3.8 TASK 7 -REVIEW OF FINANCIAL PERFORMANCE OF ZESCO AND PREPARATION OF PROJECTIONS Carry out a detailed review of ZESCO s cost structure benchmarking with cost structure of efficient utilities of similar technical structure as ZESCO, indicating areas of improvements to accepted efficient utility performance standards, and recommend a realistic time frame for reaching the performance standards. Taking into consideration the recommended efficiency improvements and the regulatory requirements of ERB, define a basis of financial viability for ZESCO. Provide a forecast of financial performance of ZESCO over the specified time-frame of the tariff adjustments to demonstrate the impacts of the adjustments on the financial performance of ZESCO. The forecast should take into consideration the proposed expansion programs of the supply infrastructure of ZESCO over the period of the forecast, as well as the regulatory requirements of ERB. The Consultant shall issue a Task 7 report. 3.9 TASK 8- TRANSMISSION WHEELING CHARGES Based on the transmission-level cost of service derived under Task 5, provide a methodology for the determination of transmission wheeling charges, taking into account timeof-day use of the access, and clearly stating the underlying principles, definition of the elements of applicable formulae, and the assumptions. Provide examples drawn from international experience and best practices in situations of third party transmission access, and how issues of congestion and of discriminatory access have been addressed. Further, the Consultant shall provide recommendations to foster efficient utilization of the network TASK 9 ASSESSMENT OF ERB APPROACH TO REVIEW OF TARIFF APPLICATIONS Currently, tariff application to ERB is based on revenue requirement. The Consultant shall undertake a review of this approach in relation to alternative best practice approaches to regulatory review of tariff proposals and tariff determination. The review should focus, among other things, on the following: a) how targeted operational improvements should be considered; b) the incentive structure to promote compliance with regulatory requirements; c) the composition of the regulatory asset-base and its appropriateness based on accepted utility practices; 6
7 d) the current mandated return on the regulatory asset-base, and its implications for the financial viability of ZESCO; and e) Develop an in-house model for use by ERB during regulatory review of tariff proposals and tariff determination (Cost and Income model and Pricing Model) TASK 10 TARIFF ADJUSTMENT ROLL-OUT STRATEGIES The Consultant shall provide a comprehensive roll-out plan that outlines alternative strategies for gradual adjustments (migration path) in existing tariffs ultimately to the economic cost of service of each consumer category. Under this task the Consultant should comment on the applicability of a multi-year tariff regime, as well as automatic cost pass through mechanism. Further, a separate recommendation should be provided on the relative adjustment of the social life-line tariff and the administration of the subsidy in this regard. The recommendations should cover strategies and enforcement mechanisms such as the introduction of a system of penalties to prevent abuse of the life-line by consumers outside the targeted group of households, and a draft of required provision in the Regulatory Act should be provided, as well as the responsibility for the administration of the penalties TASK 11 TRAINING The Consultant shall design and implement a five-day training program to provide training for a select group of technical staff of ERB, ZESCO and the Department of Energy on load forecasting, the generation system expansion model and its application, preparation of leastcost transmission and distribution expansion plans, and the use of computerized models for the estimation of LRMC of generation and AIC of transmission and distribution, SRMC, and tariff design, including the use of consumer characteristics The training shall be conducted in Zambia. It is expected that the close collaboration between the consultant s experts and the local counterpart staff in the various professional disciplines shall target to enhance transfer of knowhow to the local counterpart staff. The Consultant shall design a training program for the purpose TASK 12 -WORKSHOPS The Consultant shall deliver 4 Workshops at critical stages of the assignment as follows: Workshop 1 - presentation of the Inception Report on the findings and recommendations from the first field visit, and setting the stage and tone for the conduct of the assignment. Workshop 2 to present and discuss the reports of Tasks 2 to 6. 7
8 Workshop 3 to present and discuss the reports of Tasks 7 to 10 with special focus on the design and use of the developed tariff determination models (Cost & Income and Pricing Models). Workshop 4- to present and discuss the final Draft Report to the Steering Committee The purpose of the workshops is to solicit comments from the key stakeholders on the results at the various stages of the study as accomplished. It is also to facilitate the dissemination of the final outcome of the assignment to the cross-section of stakeholders and interested parties at the later stage DRAFT REPORT AND FINAL WORKSHOP: The Consultant shall issue the Draft Report consolidating the reports issued at the various stages of the study, and incorporating the comments received from the earlier two workshops. The Report should include an Executive Summary of not more than 10 pages, highlighting the main recommendations and conclusions of the study; the Main Text of detailed analyses, presentation of results, and recommendations ; and Annexes comprising data inputs and sources, underlying assumptions used, details of analyses and computations, and various applied methodologies, and results The draft report will serve as basis of the final Workshop in Lusaka. The Consultant shall make presentations to the Study Steering Committee (SST) following the stakeholder Workshop. A Draft Final Report, incorporating the comments of the Stakeholders from the Workshop and the SST, shall be submitted to ERB. Following review and acceptance of the Draft Final Report, the Final Report shall be issued to bring the assignment to conclusion. 4.0 DELIVERABLES 4.1 All reports by the Consultant shall be submitted to ERB, and, in the form and number of copies as designated. ERB, as the responsible party for the supervision of the implementation of the study, shall coordinate comments from the various stakeholders, and submit comments to the Consultant no later than 2 weeks after the submission of a report to ERB by the Consultant. Each report, as per task order, shall be issued in 5 hard copies and, one electronic copy The following are the specific deliverables: a) An Inception Report; b) A report on the Review of Structure and Conduct of the Power Sector, including the Legal and Regulatory Framework (Task 2); c) A report on long-term Electricity Demand Forecast Report (Task 3); d) A report on Medium-Long-term Least-cost Generation, Transmission, and Distribution and Supply Expansion Programs ( Task 4); 8
9 e) A report on Economic Cost of Supply and Structure and Levels of Tariffs ( Task 5) f) A report on Life-line Tariff Mechanism, Existing Tariffs and Economic Cost-based Tariffs (Task 6); g) A Report on ZESCO financial performance, and Medium -term Outlook of financial performance ( Task 7); h) A report on Transmission Wheeling Charges ( Task 8) i) A report on ERB Tariff Application Review Approach ( Task 9) and Tariff Roll-out Strategies ( Task 10); j) A report on Training and Workshops; k) Draft Report on Electricity Cost of Service and Economic Cost-based Tariffs; l) An excel based tariff determination model and Cost and Income Model together with accompanying instruction manuals; and m) Final Report Consultant shall propose a time-table of the deliverables taking into account the indicated allowed review period of the reports by ERB and the stakeholders, and the completion of the assignment within the stipulated duration of no longer than 12 calendar months (365 days). 5.0 DURATION OF ASSIGNMENT AND LEVEL OF EFFORT 5.1 The duration of the assignment shall not exceed 12 calendar months, and with a level of effort of 28.5 person-months (570 person-days) 6.0 CONTRACT TYPE 6.1 The Contract for the assignment will be a Lump-sum type contract. The Lump-sum will cover: a) professional fees of consultant personnel, and home office support; b) round-trip international travel, including associated incidental expenses; ; c) hotel accommodation and subsistence during travel for assignment; d) hotel accommodation and subsistence in Zambia; e) In-country transportation and communication; and f) Reporting and other secretarial services. 6.2 The Lump-sum excludes all Zambian local taxes applicable to such consultancy services. The Consultant is advised to familiarised itself with the prevailing applicable local taxes for discussion with ERB as to tax responsibility during contract negotiations. 7.0 REMUNERATION 7.1 Payments to the consultant will be linked to the deliverables as follows, subject to acceptance by ERB of each designated deliverable: 9
10 a) 10 % of Lump-sum for the Inception Report; b) 10 % of lump-sum for Task 3 report; c) 20% of lump-sum for Tasks 4 and 5 reports; d) 10% of lump-sum for Task 6 report; e) 15% of lump-sum for Tasks 7,8, 9 and 10 reports f) 10% for completion of training and training report g) 15% of lump-sum for Draft report h) 10% of lump-sum for Final Report 8.0 ORGANIZATION AND MANAGEMENT OF THE STUDY 8.1 ERB will have the overall responsibility for the management and supervision of the study. ERB will provide office space with basic office furniture for the Consultant, and will be responsible for organization of the workshops, provision of conference room and facilities for the workshops, including the catering facilities at the workshop, and the invitations to participants. ERB will set up a Study Management Team (SMT) of about 5 persons, comprising staff of ERB in the key professional streams as that of the key consultant personnel. The SMT will work on day-to-day basis with the Consultant, be the link between the Consultant and the other stakeholders to facilitate the gathering of information and data for the study. It will also be responsible for the consolidation of the comments of stakeholders on the various reports issued by the Consultant, and submission of same to the Consultant. The SMT will be headed by a Study Manager at the level of a Section Manager in ERB. 8.2 A Study Technical Committee (STC), comprising members of the SMT, staff of ZESCO, CEC and staff of Department of Energy will be set up to work with the consultant s key personnel on load forecasting, preparation of generation, transmission, distribution and supply expansion programs, determination of economic cost of supply and the design of economic costbased tariffs, including the use of the computer-based programs under the training program for transfer of know-how. A member of the STC will be nominated to head the STC. Members will assist in soliciting comments on reports submitted by the Consultant from their respective entities. 8.3 A Study Steering Committee (SST) will be set up to be informed and monitor the progress of the study. It will comprise the Permanent Secretaries of the Ministry of Finance and Ministry of Energy and Water, Chairperson of the ERB, Managing Director for ZESCO, the Industrial Development Corporation (IDC), a representative of the Consumers Association, and a representative of the Federation of Zambia Industries. The purpose of the SST is to bring awareness of the study results to the key stakeholders at an early stage and at various key stages of the study with the view to creating understanding of the study outputs to facilitate dissemination of the recommendations and implementation of the study recommendations. The Executive Director of ERB will report to the SST. The Consultant shall make a presentation to the SST of the overall study results on the basis of the Draft Report as described above. 10
11 9.0 QUALIFICATIONS AND EXPERIENCE OF THE CONSULTANT (FIRM) 9.1 The consulting firm should have: a) minimum of 15 years of experience in the power industry, and at least 10 years of experience in power system planning, electricity cost of service studies, tariff analysis, determination and design, and electricity pricing; b) demonstrated experience of having carried out 2 successfully completed similar assignments in the last 5 years; c) demonstrated experience relevant to all aspects of the assignment; and d) demonstrated success in building consensus among stakeholders and in achieving acceptance and recognition of the benefits of cost-effective pricing of electricity 9.2 The consultant s (the Firm s) core team of experts should comprise at least the following, each with the requisite academic qualifications of at least a Master s Degree in the professional field, and a minimum of 15 years of experience for the Team Leader and 10 years of experience for the rest of the core team members in the power sector, and at least 6 years of experience in the various aspects relevant to the study. a) Team Leader b) Power Economist and Electricity Pricing Specialist c) Power System Planning Specialist d) Power Engineer Generation e) Transmission and Distribution Engineer f) Financial Analyst g) Utility Accountant h) Power System Planning Data and Modelling Analyst i) Regulatory Lawyer j) Secretarial Support 11
How To Help The Republic Of The Maldives
Technical Assistance Report Project Number: 47150 Capacity Development Technical Assistance (CDTA) December 2013 Republic of the Maldives: Enhancing Tax Administration Capacity (Financed by the Japan Fund
More informationSTRATEGIC REVIEW OF HUMAN RESOURCE MANAGEMENT IN UNICEF. Terms of Reference July 20 2005
1. Background STRATEGIC REVIEW OF HUMAN RESOURCE MANAGEMENT IN UNICEF Terms of Reference July 20 2005 UNICEF has decided to undertake a Strategic Review of its approach to and performance in Human Resource
More information(Article 131(2) of the Financial Rules of the Innovative Medicines Initiative Joint Undertaking)
Annual report of the Executive Director to the Discharge on measures taken in the light of the Discharge s recommendations of 2012 in respect of the implementation of the budget of 2010 (Article 131(2)
More informationPeople s Republic of China: Strategy and Transport Policy Study on Promoting Logistics Development in Rural Areas
Technical Assistance Report Project Number: 48022 Policy and Advisory Technical Assistance (PATA) August 2014 People s Republic of China: Strategy and Transport Policy Study on Promoting Logistics Development
More informationMinistry of Finance, Planning and Economic Development. The Second Financial Management and Accountability Programme (FINMAPII) Terms of Reference:
Ministry of Finance, Planning and Economic Development The Second Financial Management and Accountability Programme (FINMAPII) Terms of Reference: TO REVIEW EFFECTIVENESS OF THE MEDIUM TERM EXPENDITURE
More informationOverview of Local Unit Power Supply Bidding Practices
Overview of Local Unit Power Supply Bidding Practices Once deciding to public bid power supply (as opposed to using the BGS-FP tariff) it is a major effort to design and implement a bidding process that
More informationVACANCY ANNOUNCEMENT
INTERNATIONAL LABOUR ORGANIZATION DECENT WORK FOR ALL The ILO is a Specialised Agency of the United Nations devoted to the promotion of social justice and human rights in the world of work. The primary
More informationCODE: E.003 Financial Services BUDGET AND BUSINESS PLANNING POLICY. 1.2 The essential activities covered by this policy include:
BUDGET AND BUSINESS PLANNING POLICY CONTENTS 1.1 Budget and business planning is undertaken to support strategic planning and decision-making and to serve accountability by enabling administration to plan
More informationInformation Requirements: Business Plan. Trinidad & Tobago Electricity Commission
Information Requirements: Business Plan June 01, 2011 May 31, 2016 Trinidad & Tobago Electricity Commission November 2010 This document is one of a series of discussion papers exploring a specific aspect
More informationTerms of Reference. Preparing Safety and Technical Management Programme for Electricity Licensees
Terms of Reference Preparing Safety and Technical Management Programme for Electricity Licensees Introduction Public Utilities Commission of Sri Lanka (PUCSL) has started regulating the electricity industry
More informationATTACHED TECHNICAL ASSISTANCE
Strengthening Economic Management Program II (RRP BHU 46371-002) ATTACHED TECHNICAL ASSISTANCE A. Introduction 1. The Ministry of Finance (MOF) of the Government of Bhutan requested capacity development
More informationPROJECT MANAGEMENT PLAN CHECKLIST
PROJECT MANAGEMENT PLAN CHECKLIST The project management plan is a comprehensive document that defines each area of your project. The final document will contain all the required plans you need to manage,
More informationData Communications Company (DCC) price control guidance: process and procedures
Guidance document Contact: Tricia Quinn, Senior Economist Publication date: 27 July 2015 Team: Smarter Metering Email: tricia.quinn@ofgem.gov.uk Overview: The Data and Communications Company (DCC) is required
More informationUpdated SCER Demand Side Participation Program December 2013
Updated SCER Demand Side Participation Program December 2013 The Standing Council on Energy and Resources (SCER) has adopted this framework to guide its demand side participation (DSP) work. The framework
More informationTerms of Reference: Baseline Survey for Global Multi-tier Measurement for Access to Energy
Background Terms of Reference: Baseline Survey for Global Multi-tier Measurement for Access to Energy In order to realize the vision of the Government of Bangladesh (GOB) for universal access to electricity
More informationThe South African Council for the Project and Construction Management Professions. Guideline Scope of Services and Tariff of Fees
The South African Council for the Project and Construction Management Professions Guideline Scope of Services and Tariff of Fees For Persons Registered in terms of the Project and Construction Management
More informationGuidance Note on Developing Terms of Reference (ToR) for Evaluations
Evaluation Guidance Note Series UNIFEM Evaluation Unit October 2009 Guidance Note on Developing Terms of Reference (ToR) for Evaluations Terms of Reference (ToR) What? Why? And How? These guidelines aim
More informationKERALA STATE ELECTRICITY REGULATORY COMMISSION
KERALA STATE ELECTRICITY REGULATORY COMMISSION Notification No. 2096/KSERC/CT/2014 Dated, Thiruvananthapuram 10 th June 2014. In exercise of the powers conferred under sections 66, 86 (1) (e) and 181 of
More informationTerms of Reference for LEAP II Final Evaluation Consultant
UNESCO Office Kabul, Afghanistan November 2015 Terms of Reference for LEAP II Final Evaluation Consultant Post Title: Final Evaluation Specialist Organization: UNESCO Office Kabul Location: Kabul, Afghanistan
More informationR&D Fund Reference Document. Supporting market-led innovation in manufacturing and internationally traded services companies.
R&D Fund Reference Document Supporting market-led innovation in manufacturing and internationally traded services companies. Revision date: 28th April 2016 http://www.enterprise-ireland.com/randd 1 Reference
More informationA Guide to the. BC Hydro Last Updated: July, 2012
A Guide to the Large General Service Conservation Rate BC Hydro Last Updated: July, 2012 Executive summary Large General Service (LGS) accounts pay for electricity according to the LGS Conservation Rate
More informationSTEPS IN THEATRE PROJECT PLANNING
Janis A. Barlow & Associates Research, Planning and Management Consultants Specializing in Theatre since 1981 STEPS IN THEATRE PROJECT PLANNING Janis A. Barlow & Associates www.barlowandassociates.com
More informationTHE FERC STANDARD MARKET DESIGN GIGANOPR: RESEARCH NEEDS
THE FERC STANDARD MARKET DESIGN GIGANOPR: RESEARCH NEEDS Presentation by George Gross University of Illinois at Urbana-Champaign Modernizing the National Electric Power Grid NSF Workshop November 18-19,
More informationNCBS DATA ANALYST EXPERT COACH TERMS OF REFERENCE. National Capacity Building Secretariat
NCBS DATA ANALYST EXPERT COACH TERMS OF REFERENCE Position Type Organization Partner organization Duration Type of contract Data Analyst Expert Coach Consultancy contract National Capacity Building Secretariat
More informationEXECUTIVE COMMITTEE OF THE HIGH COMMISSIONER S PROGRAMME UPDATE ON THE CHANGE MANAGEMENT PROCESS
EXECUTIVE COMMITTEE OF THE HIGH COMMISSIONER S PROGRAMME Dist. RESTRICTED EC/49/SC/CRP.19 4 June 1999 STANDING COMMITTEE 15th meeting Original: ENGLISH UPDATE ON THE CHANGE MANAGEMENT PROCESS 1. At its
More informationAnnex II: Terms of Reference for Management and Implementation Support Consultant (Firm)
Annex II: Terms of Reference for Management and Implementation Support Consultant (Firm) a. Background: 1. The GoB in accordance with its Public Financial Management (PFM) Strategy & Vision and Medium
More informationSAMPLE TERMS OF REFERENCE FOR ELECTRICITY SECTOR PRIVATIZATION TRANSACTION ADVISORY SERVICES
SAMPLE TERMS OF REFERENCE FOR ELECTRICITY SECTOR PRIVATIZATION TRANSACTION ADVISORY SERVICES Table of Contents 1st. INTRODUCTION... 3 2nd. ELECTRICITY SECTOR BACKGROUND. 4 3rd. SCOPE OF WORK. 6 PHASE :
More informationThe key strength of UNDP-GEF is its three-tier system of quality control which relies on:
UNDP APRC TERMS OF REFERENCE Title: iphone/android optimized web-application Developer Type of Contract: Individual Contractor Duration: April 203 May 203 with maximum of 30 working days Duty Station:
More informationFormative Evaluation of the Midwifery Education Programme. Terms of Reference
Formative Evaluation of the Midwifery Education Programme Terms of Reference 1.0 BACKGROUND Investment in midwifery is crucial for national development and is of international interest. It has strong links
More informationRequest for Proposal Name of Organization Title of work project
Request for Proposal Name of Organization Title of work project Introduction Insert brief introduction here. Background Insert background information here. Scope of Work Work Elements (those elements listed
More informationThe PNC Financial Services Group, Inc. Business Continuity Program
The PNC Financial Services Group, Inc. Business Continuity Program 1 Content Overview A. Introduction Page 3 B. Governance Model Page 4 C. Program Components Page 4 Business Impact Analysis (BIA) Page
More informationThe Levy Control Framework
Report by the Comptroller and Auditor General Department of Energy & Climate Change The Levy Control Framework HC 815 SESSION 2013-14 27 NOVEMBER 2013 4 Key facts The Levy Control Framework Key facts 2bn
More informationNorth American Development Bank. Model Bidding Document: Consultant Services
North American Development Bank Model Bidding Document: Consultant Services MODEL DOCUMENTS Sample letter of invitation Outline for typical Terms of Reference Supplementary information for consultants
More informationCENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION. No. L-1/(3)/2009-CERC Dated the 7 th August 2009
CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION No. L-1/(3)/2009-CERC Dated the 7 th August 2009 In exercise of powers conferred by section 178 of the Electricity Act, 2003 and all other
More informationStrategic Plan 2013-2018
Strategic Plan 2013-2018 TABLE OF CONTENTS 1. LIST OF ACRONYMS 2. MESSAGE FROM THE AUDITOR GENERAL 3. OVERVIEW OF SAIB STRATEGIC PLAN 2013 2018 4. MISSION 5. VISION 6. VALUES 7. SAIB STRATEGIC THRUSTS
More informationChanges in regulated electricity prices from 1 July 2012
Independent Pricing and Regulatory Tribunal FACT SHEET Changes in regulated electricity prices from 1 July 2012 Based on Final Determination, 13 June 2012 The Independent Pricing and Regulatory Tribunal
More informationIslamic Republic of Afghanistan: Supporting the Inter-Ministerial Commission for Energy
Technical Assistance Report Project Number: 46347 Policy and Advisory Technical Assistance (PATA) February 2013 Islamic Republic of Afghanistan: Supporting the Inter-Ministerial Commission for Energy (Financed
More informationOverview of the framework
Overview of the framework Need for a framework Economic growth and trade expansion in recent years have enhanced the relevance of port sector as a critical element in globalisation of the Indian economy.
More informationDevelop Project Charter. Develop Project Management Plan
Develop Charter Develop Charter is the process of developing documentation that formally authorizes a project or a phase. The documentation includes initial requirements that satisfy stakeholder needs
More informationNetwork Code on Harmonised Transmission Tariff Structures for Gas
Network Code on Harmonised Transmission Tariff Structures for Gas ENTSOG s Network Code for Re-Submission to ACER ENTSOG AISBL; Av. de Cortenbergh 100, 1000-Brussels; Tel: +32 2 894 5100; Fax: +32 2 894
More informationOrganizational Design Toolkit
Organizational Design Toolkit We provide below highlights of the approach to developing/confirming the preferred service delivery model and organizational structure for an organization. The key steps are:
More informationTERMS OF REFERENCE. Assessing and Strengthening Legal Awareness Raising Initiatives with Youth Bhutan National Legal Institute (BNLI)
TERMS OF REFERENCE Assessing and Strengthening Legal Awareness Raising Initiatives with Youth Bhutan National Legal Institute (BNLI) 1 Contracting Agency: Coordinating Agency: Place: United Nations Development
More informationAustralian National Audit Office. Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO
Australian National Audit Office Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO Commonwealth of Australia 2002 ISBN 0 642 80678 0 10 December 2002 Dear Mr
More informationICT Project Management
THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE PUBLIC SERVICE MANAGEMENT ICT Project Management A Step-by-step Guidebook for Managing ICT Projects and Risks Version 1.0 Date Release 04 Jan 2010 Contact
More informationEBA FINAL draft Regulatory Technical Standards
EBA/RTS/2015/03 03 July 2015 EBA FINAL draft Regulatory Technical Standards on resolution colleges under Article 88(7) of Directive 2014/59/EU Contents 1. Executive summary 3 2. Background and rationale
More informationThe New Programming Period 2007-2013. Working Document No.1
EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL POLICY Thematic development, impact, evaluation and innovative actions Evaluation and additionality The New Programming Period 2007-2013 INDICATIVE GUIDELINES
More informationInformation Paper. Investigation into prices for electricity and water services in the ACT
Information Paper Investigation into prices for electricity and water services in the ACT DECEMBER 2002 INDEPENDENT COMPETITION AND REGULATORY COMMISSION INFORMATION PAPER INVESTIGATION INTO PRICES FOR
More informationpg. 1 1. Summary Title Purpose
1. Summary Title Purpose Expected fee Location Duration Start Date Reporting to Budget Code/PBA No Project and activity codes Education Management Information System (EMIS) consultant Support the Libyan
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS Project Title: The development of a business plan for (TYPE OF BUSINESS) in (COMMUNITY), NU Statement of Request: XXXX with the support of (Kakivak, KPID or KIA), is inviting qualified
More informationJAGUAR MINING INC. CORPORATE GOVERNANCE GUIDELINES
JAGUAR MINING INC. CORPORATE GOVERNANCE GUIDELINES The Board of Directors (the "Board") of Jaguar Mining Inc. (the "Corporation") places great importance on the maintenance of an accountable and effective
More informationRoad map for establishing Technology & Innovation Support Centers (TISC)
Road map for establishing Technology & Innovation Support Centers (TISC) I. Background 1. Why: a. To allow users to benefit effectively from increased accessibility offered by internet searches (including
More informationGAAR 2013-2017. Submission Assurance Plan. Version number: Version 1.0. Date published: June 2011
GAAR 2013-2017 Submission Assurance Plan Version number: Version 1.0 Status: Author: Final Date published: June 2011 File name: GAAR 2013-2017 Submission Assurance Plan 1.1 1 Authorised by: Signature:
More informationDRAFT * Statewide Strategic Plan for Science * DRAFT DRAFT * For Board of Regents Discussion * DRAFT. Mission
Preamble The Statewide Strategic Plan for Science serves as a planning and implementation guide to support newly adopted P-12 science learning standards. The strategic plan begins with mission and vision
More informationProcess Management: Creating Supply Chain Value
Process Management: Creating Supply Chain Value Carol L. Marks, C.P.M., Director of Purchasing and Business Management Systems Industrial Distribution Group, Southern Division 704/398-5666; carol.l.marks@idg-corp.com
More informationBusiness Policy of CEZ Group and ČEZ, a. s.
Business Policy of CEZ Group and ČEZ, a. s. Contents: Introduction 1. CEZ Group mission and vision 2. Scope of business of CEZ Group 3. Business concept Guiding principles Trade Generation Electricity
More informationMETHODOLOGY FOR SETTING TARIFFS FOR ELECTRICITY SUPPLY WITHIN PUBLIC SERVICE IN BRČKO DISTRICT OF BOSNIA AND HERZEGOVINA
Promulgated in the Official Gazette of BiH, No. 90/14 of November 18, 2014 This translation is unofficial; it is for information purposes only Pursuant to Articles 4.2 and 4.8 of the Law on Transmission,
More informationNational Disability Authority Resource Allocation Feasibility Study Final Report January 2013
National Disability Authority Resource Allocation Feasibility Study January 2013 The National Disability Authority (NDA) has commissioned and funded this evaluation. Responsibility for the evaluation (including
More informationLUKHANJI MUNICIPALITY PERFORMANCE MANAGEMENT FRAMEWORK
LUKHANJI MUNICIPALITY PERFORMANCE MANAGEMENT FRAMEWORK INTRODUCTION The Municipal Systems Act, 2000, which requires a municipality to establish a performance management system that is: Commensurate with
More informationREQUEST FOR EXPRESSION OF INTEREST FOR HIRING THREE(3) EXPERT COACHES NO. 010/NCBS-BTC/S/2015-2016
REPUBLIC OF RWANDA NATIONAL CAPACITY BUILDING SECRETARIAT- NCBS P. O. Box 7367 Kigali Rwanda Email: info@ncbs.gov.rw Web site: www.ncbs.gov.rw REQUEST FOR EXPRESSION OF INTEREST FOR HIRING THREE(3) EXPERT
More informationOUTSOURCING. The Original Agreement provided for an optional 3-year extension to the original 10-year term.
Filed: -- EB--0 Exhibit C Tab Page of OUTSOURCING.0 BACKGROUND Hydro One Networks Inc. ( Networks ) entered into a -year master services agreement with Inergi LP ( Inergi ) on December, 0 for services
More informationGUIDE FOR APPLICANTS GRANTS PROGRAMME 2016/2017 TRAINING IN CONFERENCE INTERPRETING
GUIDE FOR APPLICANTS GRANTS PROGRAMME 2016/2017 TRAINING IN CONFERENCE INTERPRETING The aim of this guide is to give a summary of the main points of the administrative and financial processes governing
More informationTerms of Reference for consulting services financed under a World Bank executed Trust Fund
Terms of Reference for consulting services financed under a World Bank executed Trust Fund Design and Procurement of long-term pilot contracts for the Performance-based Management and Maintenance of Roads
More informationCustomer Relationship Team reporting to Product Manager
Position Description Employee: Position title: Location: Grade: Organisation: Head Office: 60-68 Moorabool Street, Geelong. Technical Specialist Customer Relationship Team reporting to Product Manager
More informationComputing Services Network Project Methodology
Computing Services Network Project Prepared By: Todd Brindley, CSN Project Version # 1.0 Updated on 09/15/2008 Version 1.0 Page 1 MANAGEMENT PLANNING Project : Version Control Version Date Author Change
More informationTHE SOUTH AFRICAN HERITAGE RESOURCES AGENCY MANAGEMENT OF PERFORMANCE INFORMATION POLICY AND PROCEDURES DOCUMENT
THE SOUTH AFRICAN HERITAGE RESOURCES AGENCY MANAGEMENT OF PERFORMANCE INFORMATION POLICY AND PROCEDURES DOCUMENT ACCOUNTABLE SIGNATURE AUTHORISED for implementation SIGNATURE On behalf of Chief Executive
More informationPOLICY AND PROCEDURES FOR MEASUREMENT OF RESEARCH OUTPUT OF PUBLIC HIGHER EDUCATION INSTITUTIONS MINISTRY OF EDUCATION
POLICY AND PROCEDURES FOR MEASUREMENT OF RESEARCH OUTPUT OF PUBLIC HIGHER EDUCATION INSTITUTIONS MINISTRY OF EDUCATION June 2003 TABLE OF CONTENTS 1. Introduction...3 2. Policy Framework...3 3. Recognised
More informationMongolia: Strengthening the Health Insurance System
Technical Assistance Report Project Number: 47007 Capacity Development Technical Assistance (CDTA) September 2013 Mongolia: Strengthening the System (Financed by the Japan Fund for Poverty Reduction) The
More informationHRM. Human Resource Management Rapid Assessment Tool. A Guide for Strengthening HRM Systems. for Health Organizations. 3rd edition
HRM Human Resource Management Rapid Assessment Tool for Health Organizations A Guide for Strengthening HRM Systems 3rd edition . Human Resource Management Rapid Assessment Tool Copyright 2005, renewed
More informationHow To Plan A University Budget
Annual Budget Plan Guidelines & Instructions 9/1/2010 Table of Contents INTRODUCTION...3 INTRODUCTION:...4 THE GOALS OF THE BUDGET PROCESS:...4 PRINCIPLES OF EFFECTIVE BUDGETING:...4 GUIDELINES FOR RESOURCE
More informationPeace operations 2010 reform strategy (excerpts from the report of the Secretary-General)
Peace operations 2010 reform strategy (excerpts from the report of the Secretary-General) Reporting to the General Assembly on 24 February 2006 on the financing of the United Nations peacekeeping operations
More informationPROGRAM EXPENDITURE AND FINANCING ASSESSMENT
Electricity Grid Strengthening Sumatra Program (RRP INO 49080) PROGRAM EXPENDITURE AND FINANCING ASSESSMENT 1. The program expenditure and financing assessment reviews the extent to which the Electricity
More informationTerms of Reference (revised version 24 Augustus 2012 correction on description of deliverables)
Open call for tender 9 July 2012 Terms of Reference (revised version 24 Augustus 2012 correction on description of deliverables) Communication Best Practices for Renewable Energies (RE COMMUNICATE) Scoping
More informationLONG-TERM FINANCIAL PLAN POLICY. Budgets FINANCE DEPARTMENT. City of Cape Town
ANNEXURE 14 LONG-TERM FINANCIAL PLAN POLICY Budgets FINANCE DEPARTMENT City of Cape Town 1 TABLE OF CONTENTS 1. DEFINITIONS AND ABBREVIATIONS... 3 2. INTRODUCTION... 4 3. PROBLEM STATEMENT... 4 4. PURPOSE...
More informationSCHEDULE A JOB DESCRIPTION
SCHEDULE A JOB DESCRIPTION Job Title: Work Unit: Responsible To: Responsible For: Position Purpose: Financial Delegated Authority: Pay Range: Assets & Business Efficiency Coordinator Corporate and Governance
More informationChecklist for a Coordination Agreement for Coordinated Calls (Option 2)
Checklist for a Coordination Agreement for Coordinated Calls (Option 2) 01/04/08 Note There are two different types of coordinated calls: one where the result is a joint project, i.e. the third country
More informationAdvertisement on Behalf of Ministry of Industry. Terms of Reference. Development of Industry Information System (IIS)
Advertisement on Behalf of Ministry of Industry Terms of Reference Development of Industry Information System GENERAL INFORMATION Services/Work Description: Development of Industry Information System (IIS)
More informationPROJECT AUDIENCE REQUEST FOR PROPOSAL: Business Plan
CONTENTS Introduction Proposal Submission deadline Background Summary of Goals Project Details o Business Plan Participants Financial Planning o Business structure/leadership model Framework Board governance/structure
More informationPart E: Contract management
Overview Part A: Strategic assessment Part B1: Business case developing the business case Part B2: Business case procurement options Part B3: Business case funding and financing options Part C: Project
More informationMethodology for Merit Order Dispatch. Version 1.0
Methodology for Merit Order Dispatch Version 1.0 25 th April 2011 TABLE OF CONTENTS 1. OBJECTIVES... 1 2. ROADMAP FOR IMPLEMENTATION... 1 3. DEFINITIONS... 3 4. OPERATIONS PLANNING... 3 4.1. General Considerations...
More information4.1 Identify what is working well and what needs adjustment. 4.1.1 Outline broad strategies that will help to effect these adjustments.
(Overview) Step 1 Prepare 1.1 Identify specific issues or choices that the planning process should address. 1.2 Develop an organizational profile. 1.3 Identify any information that must be collected to
More informationInvestment manager research
Page 1 of 10 Investment manager research Due diligence and selection process Table of contents 2 Introduction 2 Disciplined search criteria 3 Comprehensive evaluation process 4 Firm and product 5 Investment
More informationRule change request. 18 September 2013
Reform of the distribution network pricing arrangements under the National Electricity Rules to provide better guidance for setting, and consulting on, cost-reflective distribution network pricing structures
More informationProcurement Performance Measurement System
Public Procurement and Disposal of Public Assets Authority Procurement Performance Measurement System User's Guide August 2008 Public Procurement and Disposal of Public Assets Authority Procurement Performance
More informationDeveloping a Public-Private Partnership Framework: Policies and PPP Units
Note 4 May 2012 Developing a Public-Private Partnership Framework: Policies and PPP Units This note is the fourth in a series of notes on developing a comprehensive policy, legal, and institution framework
More informationA new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM)
A new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM) Non-technical summary High level design Draft Decision Paper SEM -14-047 June 2014 1 INTRODUCTION
More informationAER Issues Paper Tariff Structure Statement Proposals Victorian Electricity Distribution Network Service Providers
20 January 2016 Australian Energy Regulator GPO Box 520 Melbourne VIC 3001 Via email: AERInquiry@aer.gov.au AER Issues Paper Tariff Structure Statement Proposals Victorian Electricity Distribution Network
More informationCHAPTER 5 FINANCIAL BENEFIT-COST ANALYSIS
CHAPTER 5 FINANCIAL BENEFIT-COST ANALYSIS 122 HANDBOOK FOR THE ECONOMIC ANALYSIS OF WATER SUPPLY PROJECTS CONTENTS 5.1 Introduction...123 5.2 Financial Revenues...124 5.3 Project Costs...126 5.3.1 Investments...127
More informationReport on: Strategic and operational planning 2016/17 to 2020/21
To: The Board For meeting on: 25 February 2016 Agenda item: 7 Report by: Bob Alexander Report on: Strategic and operational planning 2016/17 to 2020/21 Purpose 1. The purpose of this paper is to invite
More informationThe South African Council for the Project and Construction Management Professions (SACPCMP)
The South African Council for the Project and Construction Management Professions (SACPCMP) Registration Rules for Professional Construction Mentors in terms of Section 18(1) (c) of the Act, 2000 (Act
More informationNational Electricity Policy 03-Feb-2005
National Electricity Policy 03-Feb-2005 Under the provisions of section 3(1) of the Electricity Act, 2003, the Central Government is required to prepare the National Electricity Policy for development
More informationTerms of Reference for Consultant to Support Development of Country Level Land Policy Issues Papers
Terms of Reference for Consultant to Support Development of Country Level Land Policy Issues Papers 1. Background The Australian Government is supporting the Organization of Eastern Caribbean States (OECS)
More information2.0 OBJECTIVES OF THE CONSULTANCY SERVICE
TERMS OF REFERENCE FOR AN INDEPENDENT DATA BASE MANAGEMENT AND IT CONSULTANT TO PROVIDE PREPARATION AND IMPLEMENTATION SUPPORT FOR THE NEITI INDUSTRY AUDIT DATA MANAGEMENT SYSTEM (NIADMS) 1.0 BACKGROUND
More informationPeople s Republic of China: Design of the National Sulfur Dioxide Emission Trading System
Technical Assistance Report Project Number: 42056 Capacity Development Technical Assistance (CDTA) December 2008 People s Republic of China: Design of the National Sulfur Dioxide Emission Trading System
More informationTHE OPTIONS CLEARING CORPORATION BOARD OF DIRECTORS CORPORATE GOVERNANCE PRINCIPLES
THE OPTIONS CLEARING CORPORATION BOARD OF DIRECTORS CORPORATE GOVERNANCE PRINCIPLES The following Corporate Governance Principles have been adopted by the Board of Directors (the Board ) of The Options
More informationTARIFF AND GOVERNANCE ASSESSMENT
Power System Expansion and Efficiency Improvement Investment Program (RRP BAN 42378) A. Tariff Assessment 1. Introduction TARIFF AND GOVERNANCE ASSESSMENT 1. Electricity tariffs in Bangladesh are unbundled
More informationSubmissions to the Reserve Bank of Australia. Reform of Debit Card Systems in Australia
Submissions to the Reserve Bank of Australia Reform of Debit Card Systems in Australia 1. Introduction On 29 th December 2005 the Reserve Bank of Australia (RBA) gazetted a draft Access Regime for the
More informationPapua New Guinea: Supporting Public Financial Management, Phase 2
Technical Assistance Report Project Number: 44379 012 Capacity Development Technical Assistance (CDTA) November 2012 Papua New Guinea: Supporting Public Financial Management, Phase 2 The views expressed
More informationPRESIDENCY JOINT MANAGING AUTHORITY OF THE 2007-2013 ENPI CBC MEDITERRANEAN SEA BASIN PROGRAMME Operational Management Unit
PRESIDENCY JOINT MANAGING AUTHORITY OF THE 2007-2013 ENPI CBC MEDITERRANEAN SEA BASIN PROGRAMME Operational Management Unit PUBLIC NOTICE for the selection of a group of experts in charge of the definition
More informationPACIFIC ISLANDS FORUM SECRETARIAT FEMM BIENNIAL STOCKTAKE 2012
PACIFIC ISLANDS FORUM SECRETARIAT PIFS(12)FEMK.05 FORUM ECONOMIC MINISTERS MEETING Tarawa, Kiribati 2-4 July 2012 SESSION 2 FEMM BIENNIAL STOCKTAKE 2012 The attached paper, prepared by the Forum Secretariat,
More informationINVITATION OF PROPOSAL
INVITATION OF PROPOSAL for Study on Status and Opportunities for Indian Consulting Industry CONSULTANCY DEVELOPMENT CENTRE (Autonomous Institution of DSIR, Ministry of Science & Technology) 2 nd Floor,
More information