1 Phase One Environmental Site Assessment North Scugog Court and Regional Road 57 Clarington, ON Prepared for: Headgate Developments Inc. 85 Curlew Drive, Suite 107 Toronto, ON M3A 2P8 Prepared by: Pottinger Gaherty Environmental Consultants Ltd. 250 Water Street, Unit 102 Whitby, ON L1N 0G5 PGL File: December 1, 2014

2 Table of Contents 1.0 Executive Summary Introduction Phase One Property Information Scope of Investigation Records Review General Phase One Study Area Determination First Developed Use Determination Fire Insurance Plans Chain of Title Environmental Reports Environmental Source Information Business Directories EcoLog ERIS Data Freedom of Information Request Coal Gasification Plants Waste Disposal Site Inventory Physical Setting Sources Aerial Photographs Topography, Hydrology and Geology Fill Materials Water Bodies and Areas of Natural Significance Well Records Site Operating Records Interviews Site Reconnaissance General Requirements Specific Observations at Phase One Property Structures and Other Improvements Description of Below-Ground Structures Storage Tank Details Potable and Non-Potable Water Sources Underground Services... 17

3 6.2.6 Entry and Exit Points Heating and Cooling Systems Drains, Pits and Sumps Unidentified Substances Current and Former Wells Sewage Works Ground Surface Conditions Railway Lines or Spurs Areas of Staining Stressed Vegetation Fill and Debris Materials Potentially Contaminating Activity Enhanced Investigation Property Written Description of Investigation Review and Evaluation of Information Current and Past Land Uses Potentially Contaminating Activity Areas of Potential Environmental Concern Phase One Conceptual Site Model Conclusions Whether Phase Two ESA is Required Record of Site Condition Based on Phase One ESA Alone Standard Limitations Signatures... 26

4 LIST OF TABLES Table A: Site Identification Information... 4 Table B: Property Owner Information... 4 Table C: Summary of Environmental Reports... 7 Table D: Information from EcoLog Eris Database... 9 Table E: Aerial Photograph Summary Table F: Water Wells Table G: Site Photograph Descriptions Table H: Table of Current and Past Uses of the Phase One Property Table I: PCAs Identified from Phase One Investigation Table J: Table of Areas of Potential Environmental Concern LIST OF FIGURES Figure 1 Site Location Map Figure 2 Phase One Study Area Figure 3 Conceptual Site Model Figure 4 Areas of Potential Environmental Concern LIST OF APPENDICES Appendix 1 Legal Survey Appendix 2 Opta Report Appendix 3 Chain of Title Summary Appendix 4 Environmental Reports Appendix 5 Business Directories Review Appendix 6 EcoLog ERIS Report Appendix 7 Freedom of Information Records Appendix 8 Aerial Photographs Appendix 9 Topographic Map Appendix 10 Bowmanville Valley Conservation Area map Appendix 11 Water Wells Map Appendix 12 Site Photographs and Figure

5 List of Acronyms APEC - area of potential environmental concern BTEX - benzene, toluene, ethylbenzene, and xylenes COC - contaminant of concern ESA - Environmental Site Assessment MOECC - Ontario Ministry of the Environment and Climate Change O.Reg. - Ontario Regulation PAH - polycyclic aromatic hydrocarbons PCA - potentially contaminating activity PGL - Pottinger Gaherty Environmental Consultants Ltd. PHC - petroleum hydrocarbons VOC - volatile organic compounds

6 Phase One Environmental Site Assessment December 1, 2014 Headgate Developments Inc. Page 2 PGL File No: EXECUTIVE SUMMARY Pottinger Gaherty Environmental Consultants Ltd. (PGL) conducted a Phase One Environmental Site Assessment (ESA) for the property located near the southeast corner of North Scugog Court and Regional Road 57 in Clarington, Ontario (the Site; Figure 1). This Phase One ESA was conducted to assess the likelihood of environmental contamination originating on the Site as well as the potential for contamination originating from adjacent properties to migrate to the Site. The report describes the Site and area uses and history, discusses the environmental contamination risks, and presents our conclusions. The Phase One ESA complies with Ontario Regulation (O.Reg.) 153/04 Records of Site Condition Part XV.1 of the Act. The Site is an irregularly shaped, undeveloped, heavily vegetated, 3.69-hectare parcel of land on the southwest side of North Scugog Court, east of Regional Road 57, and north of Bowmanville Creek. It is located in a residential area with schools north and east of the Site. The local topography slopes moderately down to the south. Site topography is characterized by an intermittent creek which runs from the northeast edge of the Site, along North Scugog Court, and roughly south for about 150m until it flows into Bowmanville Creek. Site topography slopes down to this creek from the east and west sides of the Site. Portions of the Site are characterized by steep topography. Bowmanville Creek flows south to Lake Ontario which is about 5.5km southeast of the Site. PGL reviewed the Site for environmental issues normally assessed in a Phase One ESA. We discuss current and historical potentially contaminating activities (PCAs) at the Site and in the area of the Site. PGL assessed each PCA for its potential to cause contamination at the Site. Those with a risk of causing contamination at the Site resulted in areas of potential environmental concern (APECs) at the Site. Based on the Phase One ESA conducted, PGL identified five PCA locations within the Phase One Study Area. One PCA is located on the Site and four are offsite. The assessment of PCAs resulted in three APECs onsite. These are: APEC 1 potential for impacts to soil and groundwater resulting from imported fill containing construction debris and in some places exhibiting some staining and solvent odour. Historical information suggests the fill was placed onsite sometime in the late 1960s or early 1970s to create berms around constructed ponds. Contaminants of concern (COC) include metals, petroleum hydrocarbons (PHC), polycyclic aromatic hydrocarbons (PAH), and volatile organic compounds (VOC) parameters. APEC 2 potential for impacts to groundwater along the north Site boundary. The north-adjacent property is inferred to have had an automotive service shop since 2005 or earlier. Potential COCs include metals, benzene, toluene, ethylbenzene, and xylenes (BTEX), PHC, PAH and VOC parameters. APEC 3 potential for impacts to groundwater along the east and southeast Site boundaries. Historical orchards operated in these areas during the 1950s or earlier, until the early 1980s, possibly later. Potential COC is arsenic.

7 Phase One Environmental Site Assessment December 1, 2014 Headgate Developments Inc. Page 3 PGL File No: There is the potential for soil and groundwater quality onsite to have been impacted in the identified APECs, therefore a Phase Two Soil and Groundwater investigation is recommended. 2.0 INTRODUCTION PGL prepared this Phase One ESA for the property located near the southeast corner of North Scugog Court and Regional Road 57 in Clarington Ontario (the Site; Figure 1). This Phase One ESA was undertaken to assess the likelihood of environmental contamination originating on the Site as well as the potential for contamination originating from adjacent properties. The report describes the Site and Study Area uses and history, discusses environmental contamination risks, and presents our conclusions. This Phase One ESA complies with O.Reg.153/04. This Phase One ESA report will be provided to the Region of Durham in support of residential development of this undeveloped property. The Site is an irregularly shaped, heavily vegetated, 3.69-hectare parcel of land on the southwest side of North Scugog Court, east of Regional Road 57, and north of Bowmanville Creek. It is located in a residential area with schools north and east of the Site. The location of the Phase One Property is shown on Figure 1. The local topography slopes moderately down to the south. Site topography is characterized by an intermittent creek which runs from the northeast edge of the Site, along North Scugog Court, and roughly south for about 150m until it flows into Bowmanville Creek. Site topography slopes down to this creek from the east and west sides of the Site. Portions of the Site are characterized by steep topography. Bowmanville Creek flows south to Lake Ontario which is about 5.5km southeast of the Site. Surficial geology is characterized as glacial lake deposits of sand, gravelly sand and gravel. 1. Bedrock is a shale, interbedded siltstone and minor limestone 2, and is about 50m below surface. According to The Regional Municipality of Durham, the water supply system includes water from Lake Ontario as well as 28 groundwater supply wells. The area of Bowmanville appears to be part of the Lake Ontario Based Water Supply System 3. Domestic water wells dating as recently as 1985 are within the Phase One Study Area. 2.1 Phase One Property Information Site information is summarized in the two tables below. 1 Quaternary Geology of Ontario. Southern Sheet, Map 2556, Ministry of Northern Development and Mines Bedrock Geology of Ontario, Southern Sheet, Map 2544, Ministry of Northern Development and Mines, nc

8 Phase One Environmental Site Assessment December 1, 2014 Headgate Developments Inc. Page 4 PGL File No: Table A: Site Identification Information Municipal Address None Property Identifier Number Land Use Universal Transverse Mercator Coordinates Legal Description Site Area Agricultural or Other Zone 17 Easting Northing Pt Lt 14 Con 2 Darlington, Pts 1 & 2 Plan 40R23970; Clarington 3.69 hectares The boundary of the Phase One Site is shown on Figures 2 and 3 and a legal survey dated January 2013 is provided in Appendix 1. Table B: Property Owner Information Property Property Owner Contact Information Site Ontario Inc. in trust for Headgate Developments Inc. Andy Anderson 85 Curlew Drive, Suite 107 Toronto, Ontario M3A 2P For this report, PGL was retained by Headgate Developments Inc., the owner of the Site. 3.0 SCOPE OF INVESTIGATION This Phase One ESA was completed as specified in Schedule D Phase One Environmental Site Assessments of O.Reg. 153/04 and follows the mandatory reporting requirements for ESA reports stipulated in Table 1 of the Schedule. The Phase One assesses, based on archival review, interviews, and a visual inspection, risks that are likely to have contaminated the Site from previous use up to the present. It does not evaluate compliance of operations or the risk that an ongoing operation might contaminate the Site; these would be evaluated in an operations or compliance audit. The topics in the Phase One ESA are those specified in O.Reg. 153/04. We review those risks that are identified by our sources or that are visible and readily inspected. No destructive investigation or testing was conducted as part of this Phase One ESA. PGL is well qualified to conduct Phase One ESAs having conducted over 5,000 since 1991, for over 2,000 clients. We have also conducted over 1,000 Phase Two ESAs and so have the benefit of that experience. PGL has over 40 specialist professionals in engineering, geosciences, and soil science involved full-time in environmental Site investigations, Site audits, and business audits.

9 Phase One Environmental Site Assessment December 1, 2014 Headgate Developments Inc. Page 5 PGL File No: PGL involves senior staff on all projects to ensure a high level of service to our clients. All work is supervised by, and all reports are reviewed by, a senior project manager or a principal of the firm (and by a second such person if the main author was such a person). Supervision is conducted by a qualified person as required by O.Reg. 153/04. The Phase One Site visit was supervised by, and this report was prepared by, Kathleen Minehan, M.Sc., P.Geo., QP ESA Our Phase One ESA protocols and checklists are based on industry standards and address the requirements of the Ontario Ministry of Environment and Climate Change (MOECC) O.Reg. 153/04. PGL maintains professional errors and omissions insurance in accordance with O.Reg. 153/ RECORDS REVIEW This assessment was based on our review of the following records of the Site Area: 1. Historical aerial photographs; 2. Historical business directories; 3. An EcoLog ERIS search of numerous provincial, federal, and private databases; 4. MOECC records regarding the Site; and 5. Reports, various historical maps, and other information regarding the Site Area. Historical fire insurance maps were never prepared for the Site or area. A complete list of sources referenced for this Phase One Environmental Site Assessment is presented in the Bibliography. 4.1 General Phase One Study Area Determination PGL used the prescribed 250m distance from all Site boundaries as the determined Study Area, as required by O.Reg. 153/04. Based on our understanding of soil and groundwater conditions in the area of the Site and surrounding land uses, there was no reason to assess properties beyond the 250m limit. The boundaries of the Phase One Study Area are shown in Figures 2 and First Developed Use Determination Based on information from historical business directories, aerial photographs, and a Chain of Title, the Site has never been developed. A small portion of the Site, along North Scugog Court, may have been used for agricultural purposes until the 1980s, or possibly later. An artificial pond, stocked with fish, was created onsite during the late 1960s or early 1970s by constructing a berm to contain water flowing through the Site. The ponds were dismantled, and fish moved, under the supervision of conservation officers in about 2004.

10 Phase One Environmental Site Assessment December 1, 2014 Headgate Developments Inc. Page 6 PGL File No: Fire Insurance Plans PGL requested a search for fire insurance plan data from Opta Environmental Services in November Opta s research found no fire insurance plans for the Site or immediately surrounding area. The OPTA report is included as Appendix Chain of Title A chronological chain of title was completed back to September 29, 1871, the patent date of the property. The Site was owned by individuals until February 28, 1990 when it was purchased by Roker Park Developments Limited. The current owner, Ontario Inc., purchased the Site on September 17, The Chain of Title is provided in Appendix Environmental Reports Environmental reports previously completed for the Site and adjacent properties are listed below. Slope Stability Assessment Report, Proposed Residential Development, North Scugog Court and Bons Avenue, Municipality of Clarington, for Headgate Developments Inc., Soil Engineers Ltd. Consulting Engineers, September 10, 2014, Reference No S045. Geotechnical and Limited Environmental Investigation, Proposed Residential Development, Westside of Scugog Street, Between Mill Lane to Concession 3 Rd, Bowmanville, Ontario, for Headgate Developments Inc., Golder Associates Ltd, March 4, 2005, Reference Based on our review of these reports we have identified the following onsite PCA: PCA 30 Importation of Fill Material of Unknown Quality. A summary of the information contained within these reports is provided in Table C below. Copies of the reports are provided in Appendix 4.

11 Phase One Environmental Site Assessment December 1, 2014 Headgate Developments Inc. Page 7 PGL File No: Table C: Summary of Environmental Reports Report 2014 Slope Stability Report 2005 Geotechnical and Limited Environmental Investigation Summary Information Two boreholes were drilled and a slope inspection conducted. The boreholes were drilled to a maximum depth of 15.7m. The property is slated for residential development with 25 houses. There appear to be multiple ditches entering the Site from the north and which form two ponds near the centre of the Site. The ponds eventually flow into Bowmanville Creek, southwest of the Site. The area of concern was a slope along the west Site boundary. At the time of the inspection the slope was well vegetated with shrubs and trees. Deleterious materials including asphalt, glass, concrete, etc. were observed along the side of the slope. Topsoil fill and earth fill were observed overlaying native silty clay till and silty sand till interlayered with sand. The depth to groundwater ranged from 4.8m in BH1, in the west central portion of the Site, to 7.6m in BH2, near the southwest portion of the Site. Findings Relevant to the Phase One ESA Report Fill of unknown quality (PCA 30) is present on the Site. At the time of the investigation the Site was described as gently rolling undeveloped lands with two drained ponds, which were central to the Site. To the west of the smaller, southerly pond was a substantial incised ravine sloping sharply to the south and Bowmanville Creek. The Site was covered with tall grass and brush with densely treed areas. Elevations (referenced to an assumed local datum) ranged from 99.3m adjacent to North Scugog Court, to 92.5 in the southwest portion of the Site. Five boreholes and 20 probeholes were advanced. Shallow groundwater was encountered at about 1.6m. A sandy silt to clayey silt fill with zones of topsoil was encountered between 0.46 and 4.42m thick. Extraneous materials including brick, wood, and cinders were observed over much of the Site (9 of 25 locations). Black organic or brown-green organic staining was identified in the fill layer in six locations. A notable solvent-like odour was detected onsite along North Scugog Court between 1.5 and 2.1m depth. Samples of fill were collected for metals analysis and compared to the MOE Soil, Groundwater and Sediment Standards for Use Under Part XV.I of the Environmental Protection Act. No contamination was identified. As part of our review, PGL compared the metals concentrations to both MOECC Table 2 (generic, potable) and MOECC Table 1 (background) Site Condition Standards and identified no exceedances of Standards. We note that only three samples were analyzed. This number of samples is considered insufficient to characterize the fill. A recommendation was made by Golder to further investigate the area of solvent odour and test for volatile organic compounds and petroleum hydrocarbon compounds. Findings Relevant to the Phase One ESA Report Fill of unknown quality (PCA 30) is present on the Site.

12 Phase One Environmental Site Assessment December 1, 2014 Headgate Developments Inc. Page 8 PGL File No: Environmental Source Information Historical information regarding the Site and Study area was obtained from the following sources: Historical business directories; Ecolog ERIS search; A Freedom of Information Request to the MOECC; A search for coal gasification plants; and A search for open and closed waste disposal sites Business Directories Criss-cross and Might s Business directory records for properties located within the Phase One Study Area were reviewed for the years 1995 and 2000, the only years published for the Study Area. For the most part, properties located within the Phase One Study Area surrounding the Site were either undeveloped, residential, or institutional (schools). There are no listings for the Site. Business directory records note the following properties which were not residential, within the Phase One Study Area: The Knox Christian School is listed at 410 North Scugog Court in 1995 and 2000 and is still present. This property is immediately north of a portion of the Site; The Durham Christian School is listed at 340 West Scugog Lane in 1995 and 2000 and is still present. This property is immediately east of a portion of the Site; AAA Sunshine State Movers, Cdn is listed at 2510 Nash Road. The only developed properties in this area appear residential and are both on the opposite side of Bowmanville Creek from the Site. This property is not considered an environmental risk to the Site because it is downgradient of the Site and separated from the Site by the creek; and Ontario Hydro One Central Ontario Electric is listed at both 445 North Scugog Court and 2445 Concession Road 3. Both of these addresses refer to a property on the southeast corner of the intersection of North Scugog Court and Concession Road 3. Based on our aerial photograph review the Ontario Hydro One property has been in operation from as early as the late 1960s. This property consists of two buildings and a large storage yard which appears to be used to store vehicles and transformers. The southern end of this property is 150m north of the Site. We have identified PCA 55 Transformer Manufacturing, Processing and Use, for this Site. A summary of the business directory review is provided in Appendix EcoLog ERIS Data A summary of relevant EcoLog ERIS database search results for North Scugog Court, Clarington from November 12, 2014 is provided below and the full data is provided in Appendix 6. Figure 3 shows the location of the item noted in Table D below.

13 Phase One Environmental Site Assessment December 1, 2014 Headgate Developments Inc. Page 9 PGL File No: The EcoLog ERIS records not detailed below were not considered relevant to PCAs. The PCA and its relation to an APEC at the Site is discussed further in Section 7.2. Table D: Information from EcoLog Eris Database Type of Record O.Reg. 347 Waste Generators Summary Address and Company Type of Business Duration /Date Comments Bowmanville District Christian School Society 410 North Scugog Court, Bowmanville, Ontario Elementary and secondary schools. 2005, 2006 and 2009 Aliphatic solvents, petroleum distillates, waste oils and lubricants We have identified PCA 52 Storage, maintenance, fuelling, and repair of equipment, vehicles, and materials used to maintain transportation systems, for the school property immediately north of the Site. We infer there is a vehicle repair shop onsite Freedom of Information Request The MOECC Freedom of Information and Protection of Privacy Office was contacted and a search of the Investigations and Enforcement Branch, Environmental Monitoring and Reporting Branch, Sector Compliance Branch and Safe Drinking Water Branch was undertaken. The MOECC responded with a letter dated November 14, The letter indicates that files from the MOECC York-Durham District Office, Investigations and Enforcement Branch, Environmental Monitoring and Reporting Branch, Sector Compliance Branch, and Safe Drinking Water Branch were searched and no records we located pertaining to the Site. The Freedom of Information records are provided in Appendix Coal Gasification Plants The Inventory of Coal Gasification Plant Waste Sites in Ontario was searched as part of the EcoLog Eris report. No coal gasification plant waste sites were within the Phase One Study Area Waste Disposal Site Inventory The Waste Disposal Site Inventory, dated June 1991was reviewed to identify the presence of any active or closed waste disposal sites located within the Phase One Study area. The Study Area would fall in the Central Region, Durham County, of the inventory. No landfills were identified within the 250m Phase One Study Area and none outside the Study Area are considered a risk of contamination to the Site based on their distance from the Site. 4.3 Physical Setting Sources Aerial Photographs Aerial photographs of the Phase One Site and surrounding area were obtained for the years 1959, 1964, 1974, and 1981 from the National Air Photo Library, Natural Resources Canada. The 1959 aerial photograph was the earliest available air photo for the Site. No aerial photograph was available from the 1990s or more recent dates from this source. We also viewed aerial

14 Phase One Environmental Site Assessment December 1, 2014 Headgate Developments Inc. Page 10 PGL File No: photographic imagery available via Google Earth and the Municipality of Clarington for the period between 2005 and We consider aerial photographs from these dates sufficient to document changes in the Site and area given that the Site was never developed and the Study area is almost entirely residential, schools, or undeveloped. Observations from the aerial photographs are provided below. Table E: Aerial Photograph Summary Year Flight Line (Scale) 1959 A16867 #92 (1:30,000) 1964 A18587 #67 (1:20,000) 1974 A23664 #128 (1:25,000) Summary North Scugog Court and Concession Road 3 are present. The Site is undeveloped. The eastern portion of the Site along North Scugog Road appears agricultural. The remainder of the Site is heavily wooded but trails are apparent throughout the Site. There are no buildings onsite. Surrounding properties all appears residential, agricultural, or undeveloped. The property immediately east of the southeast portion of the Site appears to be an orchard. Bowmanville Creek is visible southwest of the Site. The Site and surrounding area appear largely the same as in There is a clearing along the southeast Site boundary with an access road from the southwest corner of the 374 North Scugog Court property. No equipment or suspect piles of materials are apparent in the photograph. A large L -shaped building has been constructed on the current school property at 410 North Scugog Court and a clearing southeast of this building looks like a possible building expansion. Highway 57 has now been constructed. The Site is still undeveloped. The small portion of the Site along North Scugog Court is vacant of vegetation and there are irregular linear clearings on the Site. The remainder of the Site is largely wooded with some cleared areas. There is a pond near the centre of the Site and there appears to be a bridge constructed of gravel over a culvert about halfway along the pond. The properties northwest and southeast of the Site, along North Scugog Road appear residential or agricultural, except for the large building at 410 North Scugog Court. There are five large circular structures at the south end of the building at 410 North Scugog Court. There are no indications of industrial uses on this property so no indication that these structures (possible tanks) are a risk to the Site. The property on the southeast corner of the intersection of North Scugog Court and Concession Road 3 is developed with two large buildings. This property corresponds to the current Ontario Hydro One yard. The east building is accessed off Concession Road 3 while the west building is accessed of North Scugog Court. Remaining properties surrounding the Site appear undeveloped or agricultural.

15 Phase One Environmental Site Assessment December 1, 2014 Headgate Developments Inc. Page 11 PGL File No: Year Flight Line (Scale) 1981 A25648 #126 (1:25,000) 2005 Google Satellite View 2007 Google Satellite View Municipality of Clarington Summary The Site is still undeveloped. The small portion of the Site along North Scugog Court appears to be used for agricultural purposes. The remainder of the Site is largely unchanged from The area at the east end of the bridge over the pond looks disturbed; there are no trees and what appears to be a mound of gravel. The properties northwest and southeast of the Site, along North Scugog Road appear residential except for large buildings at the two current school properties northwest (410 North Scugog Court) and southeast (340 West Scugog Lane). There are still orchards east of the Site. The five large circular structures at the south end of the building at 410 North Scugog Court are no longer present. The property on the southeast corner of the intersection of North Scugog Court and Concession Road 3 appears the same as in 1974 except that a paved access road and parking area is visible at the north end of the west building. Materials (indistinguishable) are stored along the northeast and southeast property boundaries. Remaining properties surrounding the Site appear undeveloped or agricultural. The Site appears largely the same as in 1981; however, the pond is not visible. The school property at 410 North Scugog Court is now fully developed. The original L shaped building is visible with the large addition at the southeast end. There are also two additions off the southwest wall of the original L shaped section. Orchards are no longer visible east and southeast of the Site. The property on the southeast corner of the intersection of North Scugog Court and Concession Road 3 is very clear. The western most building remains, with a small addition off the northeast corner, but the eastern building is no longer present. There is a new shed in the southeast corner of the property. The large gravel storage yard appears to contain cars, service trucks (cherry pickers) and possibly transformers. There are two square, lighter areas that may be concrete pads. One is outside the building and one is centrally located onsite. The Site looks very similar to The property on the southeast corner of the intersection of North Scugog Court and Concession Road 3 appears similar to 2005 but there is another shed, or addition, off the east side of the main building. A new residential area is being developed north of the Site. The area is cleared and new roads are being constructed. Some single family homes are visible. The Site and area appear the same as in There is more residential development north of the Site. 4

16 Phase One Environmental Site Assessment December 1, 2014 Headgate Developments Inc. Page 12 PGL File No: Year Flight Line (Scale) 2014 Google Satellite View Summary The Site appears the same as in the earlier 2000s but with more vegetation growth. The residential area north of the site is now fully developed. The quality of the photograph is poor but the property on the southeast corner of the intersection of North Scugog Court and Concession Road 3 appears similar to 2007 but the shed, or addition, visible in 2007 is no longer present. Based upon the review of the aerial photographs One new PCA was identified; PCA 40 Pesticides (including Herbicides, Fungicides, and Anti-Fouling Agents) Manufacturing, Processing, Bulk Storage and Large-Scale Applications. Aerial photographs are included in Appendix Topography, Hydrology and Geology The regional topography in the Phase One Study Area generally slopes gently toward the south and Lake Ontario, 5.5km south of the Site. Locally, topography slopes to the west toward Bowmanville Creek, about 30m south of the Site. Regionally, groundwater flows from the northnorthwest to the south-southeast. A topographic map of the Study Area is included in Appendix 9. Geological maps (Map 2544, Quaternary Geology of Ontario) indicate native soils on the Site are characterized by glaciolacustrine (glacial lake) deposits of sand, gravelly sand and gravel. 5. Slope stability work undertaken on the property in 2014 by Soil Engineers Ltd. indicates that native soils at the Site are predominantly silty sand till. Two boreholes were drilled. Silty clay till was found above the silty sand till on part of the Site and a silty clay layer was found at depth (15.7m) on part of the Site. Bedrock is a shale, interbedded siltstone and minor limestone 6. Based on water well records bedrock is expected to be about 50m below surface. Site storm water runoff is allowed to infiltrate the ground surface. The Bowmanville Valley Conservation Area appears to be immediately south of the Site. It follows Bowmanville Creek south for about 1.1km 7 (Google map provided in Appendix 10). 5 Quaternary Geology of Ontario. Southern Sheet, Map 2556, Ministry of Northern Development and Mines Bedrock Geology of Ontario, Southern Sheet, Map 2544, Ministry of Northern Development and Mines, ,16z/data=!4m2!3m1!1s0x89d506d706262c51:0x4cf59490e67541fa

17 Phase One Environmental Site Assessment December 1, 2014 Headgate Developments Inc. Page 13 PGL File No: The Bowmanville/Soper Creek Watershed Aquatic Resource Management Plan ( ) indicates the Site falls within the Bowmanville/Soper Creek Watershed. Near the Site, the Bowmanville Creek cuts through Iroquios Beach soils, at the limits of the former glacial lake. This area is an important groundwater recharge/discharge zone. According to The Regional Municipality of Durham, the water supply system includes water from Lake Ontario as well as 28 groundwater supply wells. The area of Bowmanville appears to be part of the Lake Ontario Based Water Supply System 9. Domestic water wells dating as recently as 1985 are within the Phase One Study Area Fill Materials The 2014 Slope Stability Assessment Report prepared by Soil Engineers Ltd. Consulting Engineers, identified up to 2.3m of topsoil fill and earth fill overlaying native till. Our review of aerial photographs from the 1970s and 1980s revealed what appeared to be a bridge constructed of gravel over a culvert, crossing a pond onsite. A disturbed surface at the east end of this structure indicates possible fill. No extraneous materials were noted in the two boreholes drilled but extraneous materials including asphalt glass and concrete were noted along the side of the steep slope at the west end of the Site. The 2005 Geotechnical and Limited Environmental Investigation identified a sandy silt to clayey silt fill with zones of topsoil between 0.46 and 4.42m thick. Extraneous materials including brick, wood, and cinders were observed within the fill over much of the Site. Black organic or browngreen organic staining was identified in the fill layer in six locations. A notable solvent-like odour was detected in fill along North Scugog Court between 1.5 and 2.1m depth. Three samples of fill were collected for metals analysis. No contamination has been identified in these samples. However, the number of samples is considered insufficient to characterize the fill. Additionally an area of solvent odour was not investigated for volatile organic compounds or petroleum hydrocarbon compounds. The source of the fill on Site is unknown and has been identified as a potentially contaminating activity (PCA 30) Water Bodies and Areas of Natural Significance Bowmanville Creek is about 30m south of the Site and flows south towards Lake Ontario. Lake Ontario is 5.5km south of the Site As reported above, the Site appears to be adjacent (north) to the Bowmanville Valley Conservation Area. The Bowmanville Valley Conservation Area has been identified as an environmentally significant area within the Phase One Study Area. 8 The Bowmanvile/Soper Creek Watershed Aquatic Resource Management Plan, September, 200. Prepared by Canada Fisheries and Oceans, Central Lake Ontario Conservation, and Ontario Ministry of Natural Resources 9 oter.inc

18 Phase One Environmental Site Assessment December 1, 2014 Headgate Developments Inc. Page 14 PGL File No: Well Records PGL searched the MOECC Water Well Records Database within a 250m radius of the Site. Fourteen wells were identified. The majority of these were for domestic water supply as shown in the following table. A map of well locations is provided in Appendix 11. Table F: Water Wells Well ID Well Depth (m) Date of Completion /14/ /28/ /09/ /30/ /25/ /15/ Not Available /18/ /05/ /20/ /02/ Not Available /29/ /09/1986 Stratigraphy Clay, water depth not indicated Clay and sand, water at 27.4m (90 ) Clay, bedrock at 47.8m (157 ), water at 36.5m (120 ) Clay, sand and gravel, water at 8.2m (27) Clay and gravel, water depth not indicated Clay and gravel, water at 5.7m (19 ) Sand, clay and gravel, water depth not indicted Gravel and clay, water at 21.3m (70 ) Clay, shale bedrock at 49.6m (163 ), water at 27.4m (90 ) Clay, limestone bedrock at 50.9m (167 ), water at 48.8(160 ) Sand, water depth not indicated Details Domestic water supply Public water supply Domestic water supply Domestic water supply Domestic water supply Domestic water supply Domestic water supply Public water supply Domestic water supply Domestic water supply Observation Wells 09/26/2006 No information Abandoned Clay, water depth not indicated Sand, gravel and clay, shale bedrock at 51.8m (170 ), water at 34.1m (112 ) Public Water Supply Commercial water supply

19 Phase One Environmental Site Assessment December 1, 2014 Headgate Developments Inc. Page 15 PGL File No: The water supply system for the Region of Durham includes water from Lake Ontario as well as groundwater supply wells. Because domestic water wells dating as recently as 1985 are within the Phase One Study Area we infer that potable water is sourced from the Phase One Study Area. 4.4 Site Operating Records The Site has never been developed. There are no Site operating records relating to environmental issues. 5.0 INTERVIEWS PGL interviewed Mr. Andy Anderson, the site owner representative, regarding historical Site activities and activities in the Study Area. We also attempted to interview Ms. Antonette Tavares, Real Estate Assistant, Hydro One Networks Inc., regarding the property at 2445 Concession Road 3. The interview with Mr. Anderson was conducted by telephone on November 21, Mr. Anderson was chosen for interview as the current property owner having knowledge of the Site for the past 23 or 24 years. Mr. Anderson confirmed that the Site had never been developed. To his knowledge there have never been any Site buildings or other aboveground or underground structures. He understands that the Site was historically at the back of a large agricultural area but was never fully developed for agricultural purposes due to steep topography and heavy vegetation. The west portion of the Site has been heavily treed for as long as Mr. Anderson has known the Site. Mr. Anderson stated that when Headgate Developments Inc. purchased the property there were two artificial ponds onsite. It appears the ponds were created by importing fill to form berms to contain an intermittent creek running through the Site. To Mr. Anderson s knowledge, there has been no filling of the Site since it has been owned by Headgate Developments Inc. About 10 years ago the ponds were drained by breaching the berms, after moving fish (carp) that had been stocked in the ponds. This work was done under the supervision of a conservation officer. Mr. Anderson indicated that the small creek which used to run through the Site no longer exists. Residential redevelopment and installation of storm sewers north of the Site has eliminated most surface water flowing onto the Site. At the completion of this report, Ms. Tavares had not yet responded to our repeated requests for information. We will continue to attempt to contact Hydro One and consider any information provided when developing our Phase Two investigation program.

20 Phase One Environmental Site Assessment December 1, 2014 Headgate Developments Inc. Page 16 PGL File No: SITE RECONNAISSANCE 6.1 General Requirements PGL inspected the Phase One Site and Study Area on November 17, 2014, between 3:30 and 4:30pm. The weather was snowing with a temperature -1 0 Celsius. The inspection was conducted by Stephan Marinovic, B.Sc. and supervised by Kathleen Minehan, M.Sc, P.Geo. who is a qualified person for Phase One work. The Site was vacant and overgrown with vegetation, and covered with a light layer of snow during our inspection. Our Site visit included: Inspecting the Site and improvements for indications of environmentally significant materials such as those listed in the following sections; Carrying out a reconnaissance of the neighbouring properties; and Reviewing physical factors that may affect Site contamination such as topography, groundwater, and soils. Portions of the Site were not accessible for inspection due to steep terrain, heavy vegetation growth, and snow cover. We were able to inspect the northeastern portion of the Site between the residence north of the Site, North Scugog Court, the school south of the Site, and the central low lying marshy area. We also visually inspected the Site from Highway 57, west of the Site, but there were no access points to the Site due to heavy vegetation. Photographs from the inspection are presented in Appendix 12. A description of each of the photographs is provided below in Table G and in Appendix 12. A figure showing site inspection observations is also provided in Appendix 12. Table G: Site Photograph Descriptions Photograph Description No. 1 View of the Site from the west end of Westover Drive, facing west. 2 View of newly developed properties east of the Site (Westover Drive), standing onsite facing east. 3 View of northeast portion of the Site, along North Scugog Court, facing west. 4 View of north portion of Site facing north. 5 View of the north central portion of the Site facing south. 6 View of soil pile observed in northeast portion of Site, overgrown with vegetation. 7 View of construction debris observed on east side of the Site. 8 View of the Hydro One property at 2445 Concession Road 3. Note the transformers on the left side of the photograph.

21 Phase One Environmental Site Assessment December 1, 2014 Headgate Developments Inc. Page 17 PGL File No: Specific Observations at Phase One Property Structures and Other Improvements The Site has never been developed so there have been no onsite structures or other improvements. At the time of the Site visit the Site was vacant Description of Below-Ground Structures No below ground structures were apparent on the Site at the time of the Site inspection Storage Tank Details No aboveground or underground storage tanks were apparent onsite at the time of the Site inspection Potable and Non-Potable Water Sources There is no evidence that the Site was ever serviced with a water supply Underground Services There is no evidence that there have ever been underground structures on the Site Entry and Exit Points There are no buildings currently located on the property; therefore, there are no entry or exit points to report. The Site was accessible via trails from North Scugog Court Heating and Cooling Systems There have been no buildings onsite and no heating or cooling systems present Drains, Pits and Sumps There were no drains, pits or sumps identified on the Site Unidentified Substances There were no unidentified substances at the Site Current and Former Wells Potable water in the area of the Site appears to be is supplied by a combination of the municipal system and private wells. No potable wells were observed at the Site. Potable wells were identified within the Phase One Study Area. Refer to Section Sewage Works There have been no buildings onsite so there are no sewer services to report.

22 Phase One Environmental Site Assessment December 1, 2014 Headgate Developments Inc. Page 18 PGL File No: Ground Surface Conditions At the time of the Site inspection the ground surface was snow covered gravel and soil with some areas of dense vegetation Railway Lines or Spurs There are no rail lines or spurs in the Phase One area Areas of Staining No surficial areas of stained soil, vegetation or pavement were observed during the Phase One Site visit Stressed Vegetation No areas of stressed vegetation were identified on the Site Fill and Debris Materials Fill and debris materials were observed on the Site at the time of the Site inspection. We observed a soil pile in the northeast corner of the Site, near North Scugog Court, and construction debris along a slope in the north central portion of the site (see map Appendix 12). As reported in Section prior investigations indicate that fill containing construction debris is present onsite Potentially Contaminating Activity There are 59 PCAs listed in Table 2 Potentially Contaminating Activities of Schedule D of O.Reg. 153/04. One PCA from Table 2 was confirmed on the Site at the time of the Site visit - PCA 30 Importation of Fill Material of Unknown Quality. No other PCAs were observed in the Phase One Study Area. No auto shop was visible at the schools north or southeast of the Site and no residential heating oil tanks were observed in the area. Based on the ages of the single-family homes and schools it is possible they have been heated by oil-fired furnaces. Heating-oil tanks may be associated with these buildings Enhanced Investigation Property The Site is not considered an Enhanced Investigation Property. There is no record that the Site has ever been used for an industrial purpose. 6.3 Written Description of Investigation This Phase One investigation involved a records review, review of physical setting sources, interviews with people knowledgeable about the historical uses of the Site, and a Site inspection to evaluate existing Site conditions.

23 Phase One Environmental Site Assessment December 1, 2014 Headgate Developments Inc. Page 19 PGL File No: The Site has never been developed. There have been no processing or manufacturing operations onsite. No hazardous materials are known to have been used or stored onsite and no by-products or wastes being generated. There were no drums, totes or bins. There were no oil/water separators, vehicle or equipment maintenance areas or waste storage areas located onsite. The Bowmanville Valley Conservation Area was identified in the Phase One Study Area, immediately south of the site. Drinking water wells have been identified in the Phase One Study Area. The Site inspection was completed by Stephan Marinovic on November 17, At the time of the Site visit, the Site was covered with snow and largely vegetated with dense vegetation. There were some cleared areas and a low lying wetland. There were no obvious areas of stained soil or stressed vegetation. Fill and debris materials were observed onsite. We observed a soil pile in the northeast corner of the Site, near North Scugog Court, and construction debris along a slope in the north central portion of the site (see map 12). As reported in Section prior investigations indicate that fill containing construction debris is present onsite. Adjacent properties were evaluated during the Site inspection. Immediately adjacent properties are residential, schools or undeveloped. Five PCAs were identified in the Study Area, one onsite and four offsite, as follows: Offsite PCA 28 Gasoline and Associated Products Storage in Fixed Tanks. Based on the ages of the single-family homes and schools it is possible they have been heated by oil-fired furnaces. Heating oil tanks may be associated with these buildings; Onsite PCA 30 Importation of Fill Material of Unknown Quality was identified onsite during the Site visit and from historical information reviewed. The fill appears to have been placed onsite to form berms to create two ponds. Construction debris is associated with the fill material; Offsite PCA 40 Pesticides (including Herbicides, Fungicides, and Anti-Fouling Agents) Manufacturing, Processing, Bulk Storage and Large-Scale Applications. This PCA is related to historical orchards east and south of the Site. In our experience orchards from this time period may have associated arsenic contamination; Offsite PCA 52 Storage, maintenance, fuelling, and repair of equipment, vehicles, and materials used to maintain transportation Systems. This PCA was identified from the ERIS search at the Knox Christian School immediately north of the Site. We infer there is a vehicle repair shop onsite that generates the listed wastes; aliphatic solvents, petroleum distillates, waste oils and lubricants; and Offsite PCA 55 Transformer Manufacturing, Processing and Use. This PCA, at a Hydro One property at 2445 Concession Road 3, was identified though review of business directories, aerial photographs and our Site inspection. We observed truck and transformer storage in the yard of this property.

24 Phase One Environmental Site Assessment December 1, 2014 Headgate Developments Inc. Page 20 PGL File No: REVIEW AND EVALUATION OF INFORMATION We have identified three onsite APECs arising from three of the five identified PCAs. 7.1 Current and Past Land Uses The Site has never been developed.

25 Phase One Environmental Site Assessment December 1, 2014 Headgate Developments Inc. Page 21 PGL File No: Table H: Table of Current and Past Uses of the Phase One Property Year Name of Owner Description of Property Use Property Use 1 Other Observations from Aerial Photographs, Fire Insurance Plans, etc. Pt Lt 14 Con 2 Darlington, Pts 1 & 2 Plan 40R23970; Clarington Prior to September November 1962 Crown Individuals Vegetated property with some cleared areas. Possible agricultural use on a small portion of the Site along North Scugog Court. 10 November June June February 1990 Dirk Brinkman and Alida Catherina Brinkman James Chow Vacant Agricultural or other use - An artificial pond was created onsite during the late 1960s or early 1970s by constructing a berm to contain water flowing through the Site. None. February September 2003 Roker Park Developments 17 September Ontario Inc. The ponds were dismantled, and fish moved, under the supervision of conservation officers in about Notes: 1 for each owner, specify one of the following types of property use (as defined in O. Reg. 153/04) that applies: Agriculture or other use Commercial use Community use Industrial use Institutional use Parkland use Residential use

26 Phase One Environmental Site Assessment December 1, 2014 Headgate Developments Inc. Page 22 PGL File No: Potentially Contaminating Activity PGL reviewed the Site for environmental issues normally assessed in a Phase One ESA. PCAs were identified onsite and within the Phase One Study area. These are summarized in Table I below and are shown on Figure 3. Table I includes an assessment of whether the PCA leads to an APEC onsite or not. Table I: PCAs Identified from Phase One Investigation PCA Company, Address Distance & Direction from Site Activity Source APEC (Y/N) 28 Various within Phase One Study Area Various to north and east within Phase One Study Area Heating-oil tanks may have been associated with single-family homes and schools in the Phase One Study Area Professional experience N 30 None, Onsite Onsite Importation of fill material containing construction debris, from an unknown source Historical Reports, Site Inspection Y 40 Orchards east and south of the Site Across North Scugog Court east of the Site and southeast of the Site along West Scugog Lane (340) Pesticides (including Herbicides, Fungicides, and Anti-Fouling Agents) Manufacturing, Processing, Bulk Storage and Large-Scale Applications. Aerial Photographs Y 52 Bowmanville District Christian School Society, 410 North Scugog Court, Bowmanville, Ontario Adjacent to the North Elementary and secondary schools, Aliphatic solvents, petroleum distillates, waste oils and lubricants, 2005, 2006 and 2009 ERIS; O.Reg. 347 Waste Generators Summary Y 55 Hydro One, 2445 Concession Road 3 About 200m north Works yard. We observed truck and transformer storage in the yard. This use may have been in operation from as early as the 1960s. Business Directories, Aerial Photographs, Site Inspection N The Hydro One property is 150m north of the Site. Given this distance, combined with the gentle topographic relief between this property and the Site, the stratigraphy, and the inferred nature of contaminants of potential concern in use on this property (hydrocarbons and possibly polychlorinated biphenyls) we do not consider this property to represent an Environmental Concern for the Site.

27 Phase One Environmental Site Assessment December 1, 2014 Headgate Developments Inc. Page 23 PGL File No: Areas of Potential Environmental Concern PGL identified five PCA locations within the Phase One study area. One PCA was identified on Site. Based on our assessment of contaminant migration and our conceptual Site model, we have concluded that the PCA located onsite and two of the four PCAs identified offsite give rise to APECs. The PCAs and resulting APECs are summarized as follows: APEC 1 The Site received imported fill (PCA 30) sometime in the late 1960s or early 1970s. The fill was used to construct berms to create two onsite ponds. The source of this fill is unknown and contains construction debris. Additionally a solvent odour was observed in fill at about 1.5m depth in the northeast portion of the Site and a soil pile was observed during our Site inspection. There is the potential for soil and groundwater underlying the Site in the area of the berms, in the northeast portion of the Site, and soil pile to be impacted with metals, PHCs, and possibly solvents. Historical document review indicated fill thicknesses of up to 4.4m. APEC 2 We infer that an auto service shop is present at the school immediately north of the Site. This would account for the generation of waste aliphatic solvents, petroleum distillates, oils, and lubricants. The school was constructed as early as the early 1960s; however, the wastes generated were only listed between 2005 and If these wastes were improperly managed there is the potential for groundwater on the northern portion of the Phase One Site to have been impacted by metals, BTEX, PHC, PAH, and VOC parameters from automotive service operations. APEC 3 Historical orchards operated east and south of the Site. In PGL s experience orchard properties can have associated arsenic contamination related to the application of pesticides and/or herbicides. The orchards operated from as prior to 1959, the earliest aerial photograph available, until the early 1980s, possibly later. The APECs discussed above are summarized in Table J.

28 Phase One Environmental Site Assessment December 1, 2014 Headgate Developments Inc. Page 24 PGL File No: Table J: Table of Areas of Potential Environmental Concern Area of Potential Environmental Concern 1 APEC 1 APEC 2 APEC 3 Location of Area of Potential Environmental Concern on Phase One Property In area of berms, in the northeast portion of the Site, and in soil piles. Along the north Site boundary Along east and southeast Site boundaries Potentially Contaminating Activity 2 PCA 30 - Importation of Fill Material of Unknown Quality PCA 52 Storage, maintenance, fuelling, and repair of equipment, vehicles, and materials used to maintain transportation Systems PCA 40 - Pesticides (including Herbicides, Fungicides, and Anti-Fouling Agents) Manufacturing, Processing, Bulk Storage and Large-Scale Applications. Aerial Photographs Y Location of PCA (onsite or offsite) Onsite Offsite north adjacent property Offsite - Orchards east and south of the Site. Across North Scugog Court east of the Site and southeast of the Site along West Scugog Lane. Contaminants of Potential Concern 3 Metals, and possibly PHC, PAH, and VOC Metals, BTEX, PHC, PAH and VOC Arsenic Media Potentially Impacted (Ground water, soil and/or sediment) Soil and Groundwater Groundwater Soil and Groundwater Notes: 1 area of potential environmental concern means the area on, in or under a phase one property where one or more contaminants are potentially present, as determined through the phase one environmental site assessment, including through, (a) identification of past or present uses on, in or under the phase one property, and (b) identification of potentially contaminating activity. 2 potentially contaminating activity means a use or activity set out in Column A of Table 2 of Schedule D that is occurring or has occurred in a phase one study area 3 when completing this column, identify all contaminants of potential concern using the Method Groups as identified in the "Protocol for in the Assessment of Properties under Part XV.1 of the Environmental Protection Act, March 9, 2004, amended as of July 1, 2011, as specified below: ABNs PCBs Metals Electrical Conductivity SAR CPs PAHs As, Sb, Se Cr (VI) 1,4-Dioxane THMs Na Hg Dioxins/Furans, PCDDs/PCDFs VOCs B-HWS Methyl Mercury OCs BTEX Cl - high ph PHCs Ca, Mg CN - low ph

29 Phase One Environmental Site Assessment December 1, 2014 Headgate Developments Inc. Page 25 PGL File No: Phase One Conceptual Site Model The Conceptual Site Model is based on the following figures and information. These have all been discussed in the previous report sections. Figure 1: Site Location; Figure 2: Phase One Study Area; Figure 3: Conceptual Site Model (illustrates PCAs and surface water locations); Figure 4: Areas of Potential Environmental Concern (illustrates expected impacted areas from offsite PCAs); Appendix 8: Aerial Photographs; Appendix 9: Topographic Map; Appendix 10: Bowmanville Valley Conservation Area; Appendix 11: Location of water wells; and Appendix 12: Site Photographs. The figures and photographs provided identify water bodies, drinking water well locations, roads, adjacent property uses, PCAs, and APECs within the Phase One Study area. Based on the Phase One conducted, PGL identified five PCA locations within the Phase One Study area. PGL assessed the PCAs for their risk of contamination to the Site. This assessment resulted in three APECs onsite. These are as follows: APEC 1 potential for impacts to soil and groundwater resulting from imported fill containing construction debris and in some places exhibiting some staining and solvent odour. Historical information suggests the fill was placed onsite sometime in the late 1960s or early 1970s to create berms around constructed ponds. Contaminants of concern include metals, PHC, PAH, and VOC parameters. APEC 2 potential for impacts to groundwater along the north Site boundary. The north-adjacent property is inferred to have had an automotive service shop since 2005 or earlier. Potential COCs include metals, BTEX, PHC, PAH and VOC. APEC 3 potential for impacts to soil and groundwater along the east and southeast Site boundaries. Historical orchards operated in these areas during the 1950s or earlier, until the early 1980s, possibly later. Potential COC is arsenic. The Site was never developed and there are no known onsite utility corridors. Underground utilities would not be expected to affect contaminant distribution and transport. PGL did not identify any gaps in information that would affect the validity of our model. Similarly there are no uncertainties that may affect our Conceptual Site Model.

30 Phase One Environmental Site Assessment December 1, 2014 Headgate Developments Inc. Page 26 PGL File No: CONCLUSIONS 8.1 Whether Phase Two ESA is Required This Phase One Site ESA identified the presence of PCAs located on the Site and within the Phase One Study area. There is the potential for three of these PCAs to have impacted soil and groundwater quality at the Site therefore, a Phase Two Soil and Groundwater investigation is recommended for the Site. 8.2 Record of Site Condition Based on Phase One ESA Alone Based on the results of this Phase One ESA, a Record of Site Condition, based on a Phase One ESA alone, cannot be filed. A Phase Two ESA is required to characterize soil and groundwater conditions on site. 9.0 STANDARD LIMITATIONS PGL prepared this report for our client, Headgate Developments Inc. and its agents exclusively. PGL accepts no responsibility for any damages that may be suffered by third parties as a result of decisions or actions based on this report. The purpose of this report is to provide an assessment of the potential for environmental contamination on the subject property. Our investigation identified reasonably foreseeable risks that can be detected by normal archival research and a single untimed Site visit with no sampling or testing. Our conclusions rely on their having been complete and accurate disclosure of conditions by the client and our sources. As with all environmental investigations, potential remains for unknown, unidentified, or unforeseen contamination. Environmental investigations are limited by both practical limitations in scope and inherent limitations in technique. The findings and conclusions are Site-specific and were developed in a manner consistent with that level of care and skill normally exercised by environmental professionals currently practicing under similar conditions in the area. Changing assessment techniques, regulations, and Site conditions means that environmental investigations and their conclusions can quickly become dated, so this report is for use now. The report should not be used after that without PGL review/approval. The project has been conducted according to our instructions and work program. Additional conditions and limitations on our liability are set forth in our work program/contract. This report is neither an endorsement nor a condemnation of the subject property. No warranty, expressed or implied, is made SIGNATURES We trust that this report meets your needs. The Site visit was performed by Stephan Marinovic, B.Sc., under the supervision of Kathleen Minehan, M.Sc.,, P.Geo. The report was prepared by Kathleen Minehan and reviewed by Shannon Hunt. Kathleen Minehan and Shannon Hunt are both Qualified Persons for Phase One ESAs and can confirm that the work was carried out in accordance with O.Reg. 153/04. If you have any questions or require clarification, please contact Kathleen Minehan, M.Sc., P.Geo.

31 Phase One Environmental Site Assessment December 1, 2014 Headgate Developments Inc. Page 27 PGL File No: POTTINGER GAHERTY ENVIRONMENTAL CONSULTANTS LTD. Per: Kathleen P. Minehan, M.Sc, P.Geo. Senior Geologist Shannon Hunt, P.Eng., PMP, QP ESA Environmental Engineer KPM/SH/slr r ph1-nov14-draft.doc

32 Bibliography Aerial Photographs: National Air Photo Library): 1959, 1964, 1974, and 1981 Google Earth aerial images: 2005, 2007, and 2014, and street view Municipality of Clarington aerial images, 2013 Business Directories: 1995, 2000 Maps: Quaternary Geology of Ontario, Southern Sheet, Map 2556, Ministry of Northern Development and Mines1991 Bedrock Geology of Ontario, Southern Sheet, Map 2544, Ministry of Northern Development and Mines, 1991 Topographic Map of Oshawa, Durham Regional Municipality, Ontario, Edition 8, 30M/15,, Scale 1:50,000, 1994 Databases: EcoLog Eris database report, February 28, 2013 Waste Disposal Sites Inventory, Ontario Waste Management Branch, June 1991, Published by the Waste Management Branch, Ontario Ministry of the Environment, ISBN Inventory of Coal Gasification Plant Waste Sites in Ontario, Prepared for Ontario Ministry of the Environment Waste Management Branch, prepared by Intera Technogologies Ltd., April 1987 Interviewed: Mr. Andy Anderson, Site Owner representative Reports: Slope Stability Assessment Report, Proposed Residential Development, North Scugog Court and Bons Avenue, Municipality of Clarington, for Headgate Developments Inc., by Soil Engineers Ltd. Consulting Engineers, September 10, 2014, Reference No S045. Geotechnical and Limited Environmental Investigation, Proposed Residential Development, Westside of Scugog Street, Between Mill Lane to Concession 3 Rd, Bowmanville, Ontario, for Headgate Developments Inc., by Golder Associates Ltd, March 4, 2005, Reference The Bowmanvile/Soper Creek Watershed Aquatic Resource Management Plan, September, 200. Prepared by Canada Fisheries and Oceans, Central Lake Ontario Conservation, and Ontario Ministry of Natural Resources

33 Internet Sites: Water Wells Ontario Municipality of Clarington Region of Durham Oshawa Maps

34 Figures

35 SITE 1:4,000 Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, MapmyIndia, OpenStreetMap contributors, and the GIS User Community m Site Boundary Image: GoogleEarthPro Km 1:75,000 Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, MapmyIndia, OpenStreetMap contributors, and the GIS User Community SITE LOCATION Sudds Court, North Scugog Court, Bowmanville, ON HEADGATE DEVELOPMENT File No.: Date: NOV 2014 Dwg No.: Drawn by: DPL FIGURE 1 Original in colour

36 250m Site Boundary Phase One Study Area 1:4, m 250m Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, MapmyIndia, OpenStreetMap contributors, and the GIS User Community Image: GoogleEarthPro PHASE ONE STUDY AREA Sudds Court, North Scugog Court, Bowmanville, ON HEADGATE DEVELOPMENT File No.: Date: NOV 2014 Dwg No.: Drawn by: DPL FIGURE 2 Original in colour

37 Industrial (Hydro One) m Residential Residential Institutional (School) 52 Residential Residential Institutional (School) Institutional (School) PCA Site Boundary Phase One Study Area PCA - 30 Water Body 30 - Importation of Fill Material of Unknown Quality 40 - Pesticides (including Herbicides, Fungicides, and Anti Fouling Agents), Manufacturing, Processing, Bulk Storage and Large Scale Applications 52 - Storage, maintenance, fuelling, and repair of equipment, vehicles, and materials used to maintain transporation systems 55 - Transformer Manufacturing, Processing and Use Residential Bowmanville Creek NOTE: Fuel oil storage tanks for residential heating (PCA 28 - gasoline and associated products storage in a fixed tank) may have been used in the area, but do not result in and APEC 1:4, m 250m Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, MapmyIndia, OpenStreetMap contributors, and the GIS User Community Image: GoogleEarthPro CONCEPTUAL SITE MODEL Sudds Court, North Scugog Court, Bowmanville, ON HEADGATE DEVELOPMENT File No.: Date: NOV 2014 Dwg No.: Drawn by: DPL FIGURE 3 Original in colour

38 APEC 2 APEC 1 Site Boundary APEC 1 - Imported Fill APEC 3 APEC 2 - Offiste Automotive Service Shop APEC 3 - Offsite Historical Orchard 1:1, m Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, MapmyIndia, OpenStreetMap contributors, and the GIS User Community Image: GoogleEarthPro AREAS OF POTENTIAL ENVIRONMENTAL CONCERN Sudds Court, North Scugog Court, Bowmanville, ON HEADGATE DEVELOPMENT File No.: Date: NOV 2014 Dwg No.: Drawn by: DPL FIGURE 4 Original in colour

39 Appendix 1 Legal Survey

40

41 Appendix 2 Opta Report

42 North Scugog Court Haydon ON Canada Sunita Kapoor Shannon Rogers Pottinger Gaherty Env. Cons. Ltd. 11/11/2014 9:18:34 AM

43 Page: 2 Project Name: Project #: ENVIROSCAN Report Search Area: North Scugog Court Haydon ON Canada Requested by: Shannon Rogers Date Completed: November 11, :18:34 OPTA INFORMATION INTELLIGENCE

MEMORANDUM. Further discussion regarding the Community s solid waste facility is described further in this memorandum.

MEMORANDUM. Further discussion regarding the Community s solid waste facility is described further in this memorandum. MEMORANDUM File: Sanikiluaq Improvement of the Existing Wastewater Treatment Facility To: Government of Nunavut Department of Community and Government Services Attention: Mr. Grigor Hope,, Project Officer

More information

Phase One Environmental Site Assessment 45 Bay Street and 55 Bay Street Toronto, Ontario

Phase One Environmental Site Assessment 45 Bay Street and 55 Bay Street Toronto, Ontario Phase One Environmental Site Assessment 45 Bay Street and 55 Bay Street Toronto, Ontario Prepared For: Ivanhoe Cambridge c/o Hines 1 Dundas Street West, Suite 2108 Toronto, ON M5G 1Z3 SPL Project No.:10000583-210A

More information

FINAL PLAN OF REMEDIAL ACTION

FINAL PLAN OF REMEDIAL ACTION FINAL PLAN OF REMEDIAL ACTION 1000 FRENCH STREET SITE Wilmington, Delaware DE 1115 June 1999 Department of Natural Resources and Environmental Control Division of Air and Waste Management Site Investigation

More information

patersongroup Phase I - Environmental Site Assessment Existing Commercial Property 175 St. Lawrence Street Gananoque, Ontario Prepared For

patersongroup Phase I - Environmental Site Assessment Existing Commercial Property 175 St. Lawrence Street Gananoque, Ontario Prepared For Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Phase I - Environmental Site Assessment Existing Commercial Property

More information

Soil and Materials Engineers, Inc. Mark J. Quimby Project Consultant

Soil and Materials Engineers, Inc. Mark J. Quimby Project Consultant Soil and Materials Engineers, Inc. Mark J. Quimby Project Consultant Michigan Indiana Ohio www.sme-usa.com consultants in the environment, geosciences and materials OVERVIEW Site Description and History

More information

SOIL-MAT ENGINEERS & CONSULTANTS LTD.

SOIL-MAT ENGINEERS & CONSULTANTS LTD. SOIL-MAT ENGINEERS & CONSULTANTS LTD. 130 LANCING DRIVE, HAMILTON, ONTARIO L8W 3A1 PHONE (905) 318-7440 FAX (905) 318-7455 E-MAIL: info@soil-mat.on.ca PROJECT NO.: SM 145464-E JANUARY 16, 2014 1371975

More information

Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan

Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan Scope: This Extraction Oil and Gas Waste Management Plan has been prepared to provide operations personnel at the

More information

PROTOCOL NO. 5: Petroleum Hydrocarbon Analytical Methods and Standards

PROTOCOL NO. 5: Petroleum Hydrocarbon Analytical Methods and Standards PROTOCOL FOR THE CONTAMINATED SITES REGULATION UNDER THE ENVIRONMENT ACT PROTOCOL NO. 5: Petroleum Hydrocarbon Analytical Methods and Standards Prepared pursuant to Part 6 Administration, Section 21, Contaminated

More information

BLUE ISLAND NORTHEAST MIXED-USE COMMERCIAL PARK 119TH STREET & VINCENNES AVENUE BLUE ISLAND, COOK COUNTY, ILLINOIS

BLUE ISLAND NORTHEAST MIXED-USE COMMERCIAL PARK 119TH STREET & VINCENNES AVENUE BLUE ISLAND, COOK COUNTY, ILLINOIS DRAFT ANALYSIS OF BROWNFIELDS CLEANUP ALTERNATIVES BLUE ISLAND NORTHEAST MIXED-USE COMMERCIAL PARK 119TH STREET & VINCENNES AVENUE BLUE ISLAND, COOK COUNTY, ILLINOIS PREPARED BY: Office of Sustainability

More information

MBJ Environmental Programmes

MBJ Environmental Programmes MBJ Airports Limited Environmental Policy The following is MBJ Airports Limited s (MBJ) Environmental Policy for Sangster International Airport (SIA): Integrate environmental management measures with planning,

More information

Guide to the Remediation Report & Fee Submission Form

Guide to the Remediation Report & Fee Submission Form Guide to the Remediation Report & Fee Submission Form May 1, 2012 TABLE OF CONTENTS 1 DEFINITIONS... 1 2 INTRODUCTION... 3 3 BACKGROUND... 3 3.1 EXISTING POLICY/GUIDELINES FRAMEWORK... 3 Domestic Fuel

More information

Ontario Ministry of the Environment - Record of Site Condition # 206831 Record of Site Condition Under Part XV.1 of the Environment Protection Act

Ontario Ministry of the Environment - Record of Site Condition # 206831 Record of Site Condition Under Part XV.1 of the Environment Protection Act Ontario Ministry of the Environment - Record of Site Condition # 206831 Record of Site Condition Under Part XV.1 of the Environment Protection Act Summary Record of Site Condition Number 206831 Date Filed

More information

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF

More information

Bowmanville Marsh Habitat Restoration and Public Access Project

Bowmanville Marsh Habitat Restoration and Public Access Project Bowmanville Marsh Habitat Restoration and Public Access Project Terms of Reference for Detailed and Conceptual Design Works December 2015 1.0 Background and Purpose The Bowmanville Marsh Habitat Restoration

More information

What Constitutes Environmental Due Diligence?

What Constitutes Environmental Due Diligence? What Constitutes Environmental Due Diligence? Different Levels of Due Diligence for Different Types of Acquisitions: Green Fields, Brownfields, Operating Terminals and Leases By Gail A. Corrigan, Corrigan

More information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific

More information

THE APPRAISAL OF REAL ESTATE 3 RD CANADIAN EDITION BUSI 330

THE APPRAISAL OF REAL ESTATE 3 RD CANADIAN EDITION BUSI 330 THE APPRAISAL OF REAL ESTATE 3 RD CANADIAN EDITION BUSI 330 REVIEW NOTES by CHUCK DUNN CHAPTER 10 Copyright 2010 by the Real Estate Division and Chuck Dunn. All rights reserved ARE 3 rd EDITION REVIEW

More information

Critical Regulations SUMMARY OF. Stormwater Management Regulations (National Pollutant Discharge Elimination System or "NPDES ) 40 CFR 122.

Critical Regulations SUMMARY OF. Stormwater Management Regulations (National Pollutant Discharge Elimination System or NPDES ) 40 CFR 122. SUMMARY OF Critical Regulations Stormwater Management Regulations (National Pollutant Discharge Elimination System or "NPDES ) 40 CFR 122.26 Spill Prevention, Control, and Countermeasures Rule (SPCC) 40

More information

Spill Plan Reviewer s Guidance

Spill Plan Reviewer s Guidance Spill Plan Reviewer s Guidance WSDOT Hazardous Materials Program May 2013 2 Overview Purpose: Spill prevention planning is a key element for protecting the environment during construction. The Spill Plan

More information

Gravel Pit Rehabilitation Near Shallow Municipal Wells Threat or Opportunity?

Gravel Pit Rehabilitation Near Shallow Municipal Wells Threat or Opportunity? Gravel Pit Rehabilitation Near Shallow Municipal Wells Threat or Opportunity? Tanya Kampherm Martin, Scott Lister & Wendy Kemp Regional Municipality of York, Newmarket, Ontario, Canada ABSTRACT When the

More information

Preliminary Assessment

Preliminary Assessment Preliminary Assessment Bonebrake Theological Seminary Site Dayton Unit III Dayton, Ohio Prepared by: U.S. Army Corps of Engineers Buffalo District 1776 Niagara Street Buffalo, NY 14207-3199 September 5,

More information

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN 3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards

More information

Rural Residential Buildable Lands Inventory

Rural Residential Buildable Lands Inventory The Dalles Periodic Review, May 2013 Rural Residential Lands Inventory Contents Introduction and Summary... 1 Concerns related to the 2007 Analysis... 2 Rural Residential Capacity Summary... 2 Methodology...

More information

4. Environmental Impacts Assessment and Remediation Targets

4. Environmental Impacts Assessment and Remediation Targets 4. Environmental Impacts Assessment and Remediation Targets 4.1 Environmental Impacts Significant additional development in the Alder Creek watershed is not anticipated at this time; however, there are

More information

ORDINANCE NO. 2013 -

ORDINANCE NO. 2013 - ORDINANCE NO. 2013 - AN ORDINANCE OF BREVARD COUNTY, FLORIDA AMENDING CHAPTER 62, LAND DEVELOPMENT REGULATIONS SECTION 62-2891, LOT DRAINAGE, AND CHAPTER 22 BUILDINGS AND BUILDING REGULATIONS, SECTION

More information

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter ENVIRONMENTAL STATEMENT: VOLUME 1 9.1 INTRODUCTION 9.1.1 This Chapter considers the effects of the Project on surface water and groundwater

More information

New York State Department of Environmental Conservation 625 Broadway, Albany, NY 12233 www.dec.ny.gov. Environmental Self Audit For Small Businesses

New York State Department of Environmental Conservation 625 Broadway, Albany, NY 12233 www.dec.ny.gov. Environmental Self Audit For Small Businesses New York State Department of Environmental Conservation 625 Broadway, Albany, NY 12233 www.dec.ny.gov Environmental Self Audit For Small Businesses Disclaimer The materials in this document are intended

More information

Q 4/17/13: Thank you for your quick response to our email dated April 10, 2013. In looking over your comments, we have a few clarifying remarks.

Q 4/17/13: Thank you for your quick response to our email dated April 10, 2013. In looking over your comments, we have a few clarifying remarks. Q & A Q 4/10/13: In anticipation of the DEM action plan implementation in the next few days, Citizens Advocating for a Safe Environment (CASE) would like to bring a few concerns to your attention. Some

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

Appendix A: Affordable Housing Site Inventory

Appendix A: Affordable Housing Site Inventory Appendix A: Affordable Housing Site Inventory Following is a brief summary of the various sites considered for the Affordable Housing Project. Each site is provided with a photo when available and a concise

More information

ENVIRONMENTAL REVIEW SCREENING QUESTIONS

ENVIRONMENTAL REVIEW SCREENING QUESTIONS ENVIRONMENTAL REVIEW SCREENING QUESTIONS All applications to WHEDA are required to meet the Department of Housing and Urban Development s environmental compliance standards listed in 24 CFR Part 58. Your

More information

VILLAS OF TRADITIONS AT GREY OAKS

VILLAS OF TRADITIONS AT GREY OAKS Report of Turnover Survey VILLAS OF TRADITIONS AT GREY OAKS Grey Oaks Development Naples, Collier County, Florida Forge Engineering Project Number 2907-001.01 March 2015 Richard P..Lundberg, P.E cn=richard

More information

NATURAL RESOURCES & NATURAL FEATURES

NATURAL RESOURCES & NATURAL FEATURES A3 NATURAL RESOURCES & NATURAL FEATURES INTRODUCTION This chapter will discuss the topography, geology, soils, and other natural features found in Casco Township. The identification of the natural features

More information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)

More information

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24 Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge

More information

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Harmony Creek subwatershed Harmony Creek subwatershed BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT April 2011 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices

Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices Purpose The purpose of this document is to provide guidance and recommendations for minimizing potential impacts to

More information

If you require assistance in obtaining access to the presentations or have questions regarding the. 6300 or Glenn Young at (916) 341 6696.

If you require assistance in obtaining access to the presentations or have questions regarding the. 6300 or Glenn Young at (916) 341 6696. These materials were developed by CalRecycle staff to address specific technical training areas and are posted as reference documents for the local l government and CalRecycle staff who work on closed,

More information

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 SUMMARY 2009-10 The Willochra Basin is situated in the southern Flinders Ranges in the Mid-North of South Australia, approximately 50 km east of Port Augusta

More information

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations SWPPP for Park Operations 2 Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations Bordered by Lake Washington & Lake Sammamish, the City of Bellevue has more than 60 miles of streams,

More information

SLOPE AND TOPOGRAPHY

SLOPE AND TOPOGRAPHY SLOPE AND TOPOGRAPHY What are Slope and Topography? Slope and topography describe the shape and relief of the land. Topography is a measurement of elevation, and slope is the percent change in that elevation

More information

APPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY

APPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY ALAMEDA POINT MASTER INFRASTRUCTURE PLAN March 31, 2014 APPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY Carlson, Barbee & Gibson, Inc. Backbone Infrastructure Engineer

More information

Taylor Wimpey UK Ltd. December 2007

Taylor Wimpey UK Ltd. December 2007 Taylor Wimpey UK Ltd December 2007 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft For Planning Date 3 August 2007 20 December 2007 Prepared by D Gooding P Barton Signature Checked

More information

On Site Sewage System Maintenance Inspections. March 2011. Building and Development Branch Ministry of Municipal Affairs and Housing

On Site Sewage System Maintenance Inspections. March 2011. Building and Development Branch Ministry of Municipal Affairs and Housing On Site Sewage System Maintenance Inspections March 2011 Building and Development Branch Ministry of Municipal Affairs and Housing Introduction The Building Code Act, 1992 and Building Code (Ontario Regulation

More information

Drainage Analysis for the McKownville Area

Drainage Analysis for the McKownville Area Drainage Analysis for the McKownville Area Town of Guilderland Albany County, New York Prepared by: DELAWARE ENGINEERING, P.C. 28 Madison Avenue Extension Albany, New York 12203 June 2010 Town of Guilderland

More information

Asbestos Storage Facility Plan Examples

Asbestos Storage Facility Plan Examples Asbestos Storage Facility Plan Examples The purpose of this document This document contains examples of what an operational plan, plans and specification, contingency plan and closure plan should look

More information

UNIVERSITY OF WISCONSIN MADISON

UNIVERSITY OF WISCONSIN MADISON UNIVERSITY OF WISCONSIN MADISON Contractor Spill Contingency Plan (while working on campus) Departments of: Environment, Health & Safety Physical Plant Table of Contents Spill Contingency Plan Most Common

More information

Contact Person Sarah Morris-Benavides Revision 1.1 Document Plan 10200.037 Effective Date 07/01/2014 Review Date 03/15/2017.

Contact Person Sarah Morris-Benavides Revision 1.1 Document Plan 10200.037 Effective Date 07/01/2014 Review Date 03/15/2017. Ames Laboratory Federal SPCC regulations (40 CFR Part 112) were created under the authority of the Clean Water Act. The stated purpose is " to prevent oil discharges from reaching navigable waters of the

More information

Storm Water Runoff. Managing. A Self-Assessment Guide for Wisconsin Businesses. Storm water runoff is coming. This guide provides businesses

Storm Water Runoff. Managing. A Self-Assessment Guide for Wisconsin Businesses. Storm water runoff is coming. This guide provides businesses Managing Storm Water Runoff A Self-Assessment Guide for Wisconsin Businesses Storm water runoff is coming under increasing scrutiny as both a source of pollutants to our lakes and streams, and as a cause

More information

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting

More information

G James Contractors Ltd.

G James Contractors Ltd. Proposed Self Storage Facility for Ivor DeLange 1579 Fanshawe Park Road West BY G James Contractors Ltd. Contents 1. Project description 2. Goals and Objectives 3. Site History 4. Design 5. Servicing 6.

More information

INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction

INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction ACE GLOBAL RISK ENGINEERING INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE Introduction The most common cause of flooding is due to established water storage areas (natural and man-made)

More information

Preventing Storm Water Pollution: What We Can Do

Preventing Storm Water Pollution: What We Can Do Preventing Storm Water Pollution: What We Can Do ~Employee Training Series~ Streets and Drainage Maintenance PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND U.S. ENVIRONMENTAL

More information

Stormwater Management Functional Servicing Report

Stormwater Management Functional Servicing Report Stormwater Management Functional Servicing Report Part of Lot 12, Concession 10 Township of Cavan Monaghan Ian Cameron Rural Subdivision Engage Project No. 14016 Engage Engineering Ltd. January 7, 2015

More information

BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY

BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY In the Matter of the Application of ) NO. SSDP 000748 ) Kevin Robinson ) FINDINGS, CONCLUSIONS ) AND DECISION For a Shoreline Substantial Development ) Permit

More information

ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN

ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN Best Management Practices (BMPs) will be implemented during construction of the Allegany Wind Power Project to prevent and contain spills.

More information

Hazardous Materials in Project Development

Hazardous Materials in Project Development Hazardous Materials in Project Development Environmental Documentation TxDOT Environmental Affairs Division Release Date: 2/2014 510.01.DS Version 1 Table of Contents Overview... 3 Assessment Type and/or

More information

CLIFTY CREEK PLANT MADISON, INDIANA

CLIFTY CREEK PLANT MADISON, INDIANA 2015 DAM AND DIKE INSPECTION REPORT GERS-15-018 CLIFTY CREEK PLANT MADISON, INDIANA PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION 1 RIVERSIDE PLAZA COLUMBUS, OHIO Annual Dam and Dike Inspection

More information

Civil Engineering Sector Labour-Management Health and Safety Committee

Civil Engineering Sector Labour-Management Health and Safety Committee PROCEDURE FOR THE STORAGE AND HANDLING OF FUEL ON CONSTRUCTION SITES Civil Engineering Sector Labour-Management Health and Safety Committee July 2008 PROCEDURE FOR THE STORAGE AND HANDLING OF FUEL ON CONSTRUCTION

More information

FIVE-YEAR REVIEW REPORT MASON COUNTY LANDFILL SUPERFUND SITE LUDINGTON, MICHIGAN FEBRUARY, 2001

FIVE-YEAR REVIEW REPORT MASON COUNTY LANDFILL SUPERFUND SITE LUDINGTON, MICHIGAN FEBRUARY, 2001 FIVE-YEAR REVIEW REPORT MASON COUNTY LANDFILL SUPERFUND SITE LUDINGTON, MICHIGAN FEBRUARY, 2001 I. INTRODUCTION Section 121(c) of the Comprehensive Environmental Response, Compensation and Liability Act

More information

SOIL AND GROUNDWATER MANAGEMENT PLAN For Site Located at 420 South Avenue Rochester, New York NYSDEC Spill No. 1000563 PREPARED FOR: PREPARED BY:

SOIL AND GROUNDWATER MANAGEMENT PLAN For Site Located at 420 South Avenue Rochester, New York NYSDEC Spill No. 1000563 PREPARED FOR: PREPARED BY: SOIL AND GROUNDWATER MANAGEMENT PLAN For Site Located at 420 South Avenue Rochester, New York NYSDEC Spill No. 1000563 PREPARED FOR: FLOWER CITY MANAGEMENT & DEVELOPMENT THE MEDICAL ARTS BUILDING (USGBC

More information

How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska

How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska APPENDIX B Geotechnical Engineering Report GEOTECHNICAL ENGINEERING REPORT Preliminary Geotechnical Study Upper Southeast Salt Creek Sanitary Trunk Sewer Lincoln Wastewater System Lincoln, Nebraska PREPARED

More information

WELCOME. Please sign in Representatives are available to answer questions Please complete a comment sheet

WELCOME. Please sign in Representatives are available to answer questions Please complete a comment sheet WELCOME Please sign in Representatives are available to answer questions Please complete a comment sheet Place it in the box or send it to the Consultant undertaking the study or to the Town of Wasaga

More information

TABLE OF CONTENTS. GENERAL PROJECT INFORMATION...3 Project Location... 3 Project Description... 3 STUDY OVERVIEW... 3 SITE EVALUATION TECHNIQUES...

TABLE OF CONTENTS. GENERAL PROJECT INFORMATION...3 Project Location... 3 Project Description... 3 STUDY OVERVIEW... 3 SITE EVALUATION TECHNIQUES... App. P-2 TABLE OF CONTENTS GENERAL PROJECT INFORMATION...3 Project Location... 3 Project Description... 3 STUDY OVERVIEW... 3 SITE EVALUATION TECHNIQUES...4 SITE CONDITIONS... 4 Land Use and Zoning...

More information

V. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials

V. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials E. HAZARDOUS MATERIALS An Environmental Site Assessment Phase I Update was performed on the subject properties by California Environmental Inc. in March 2000 1. This report is included in Appendix E of

More information

How Did These Ocean Features and Continental Margins Form?

How Did These Ocean Features and Continental Margins Form? 298 10.14 INVESTIGATION How Did These Ocean Features and Continental Margins Form? The terrain below contains various features on the seafloor, as well as parts of three continents. Some general observations

More information

Outdoor Storage of Raw Materials SC-33

Outdoor Storage of Raw Materials SC-33 Objectives Cover Contain Educate Reduce/Minimize Description Raw materials, by-products, finished products, containers, and material storage areas exposed to rain and/or runoff can pollute stormwater.

More information

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580

More information

6 Chemicals from human settlements

6 Chemicals from human settlements 6 Chemicals from human settlements 6.1 Introduction The world is becoming increasingly urban, particularly in developing countries. The transition of people from rural areas to cities represents a major,

More information

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY ORDER NO. R5-2011-XXXX INFORMATION SHEET Background Triangle Rock, Inc. (Discharger) submitted a Report of Waste Discharge (RWD) on 23 August 2010. The Discharger is expanding the mining operations at

More information

City of Shelbyville Site Inspection Checklist

City of Shelbyville Site Inspection Checklist City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather

More information

STAFF REPORT TO COMMITTEE OF THE WHOLE

STAFF REPORT TO COMMITTEE OF THE WHOLE STAFF REPORT TO COMMITTEE OF THE WHOLE DATE: November 7 2012 TO: FROM: SUBJECT: ATTACHMENT(S): COMMITTEE OF THE WHOLE GINA LAYTE-LISTON, SUPERVISOR, WASTEWATER Stormwater Management Funding Strategy None

More information

Solid Waste Treatment Facility Solid Waste Permit Application

Solid Waste Treatment Facility Solid Waste Permit Application Part One: Fees A check or money order for the appropriate fees must be submitted with the permit application. If the required fees are not included, the permit application will be returned to the applicant.

More information

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year Appendix C1 Surface Water Modelling 1 Overview 1.1 The Drain London modelling was designed to analyse the impact of heavy rainfall events across each London borough by assessing flow paths, velocities

More information

Florida Department of Environmental Protection

Florida Department of Environmental Protection Florida Department of Environmental Protection Background Mobile vehicle and equipment washing involves washing at a location where vehicles are based (such as a trucking company, warehouse, bus station,

More information

The Proposed Plan and Proposed Plan Fact Sheet are available in the NCBC Gulfport ERP Administrative Record File.

The Proposed Plan and Proposed Plan Fact Sheet are available in the NCBC Gulfport ERP Administrative Record File. The World War II Landfill (Site 2) Proposed Plan Public Meeting was held from 2-4 pm on December 2, 2014 at the Gulfport Public Library. The Public Meeting marked the opening of a 30-day Public Comment

More information

SPECIAL USE PERMIT 22-01. JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing

SPECIAL USE PERMIT 22-01. JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing SPECIAL USE PERMIT 22-01. JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing This report is prepared by the James City County Planning Division

More information

CITY OF NIAGARA FALLS. By-law No. 2007-41. A by-law to regulate the maintaining of land in a clean and clear condition.

CITY OF NIAGARA FALLS. By-law No. 2007-41. A by-law to regulate the maintaining of land in a clean and clear condition. CITY OF NIAGARA FALLS By-law No. 2007-41 A by-law to regulate the maintaining of land in a clean and clear condition. WHEREAS the Council of the Corporation of the City of Niagara Falls has determined

More information

Weed Survey and Mapping

Weed Survey and Mapping Weed Survey and Mapping The primary objective of weed surveying and mapping is to accurately identify and delineate land with populations of invasive plants or noxious weeds. These surveys allow land managers

More information

SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING

SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING 1 TABLE OF CONTENTS 1.0 Introduction and Purpose 3 2.0 Description of Work 3 3.0 Site Supervisor/Foremen Responsibilities 4 4.0 Equipment

More information

Annual Storm Water Pollution Prevention Plan and Spill Prevention, Control and Countermeasures Plan Compliance Inspection

Annual Storm Water Pollution Prevention Plan and Spill Prevention, Control and Countermeasures Plan Compliance Inspection Annual Storm Water Pollution Prevention Plan and Spill Prevention, Control and Countermeasures Plan Compliance Inspection September 22, 2014 Prepared By: Facilities Management Environmental Resources University

More information

PV SOLAR Developing Countries

PV SOLAR Developing Countries Date (Site Visit): Pictures taken/allowed: Weather: Project Location: Host Government: Project Name (Title assigned by client): GPS/Google Earth - Latitude: Longitude: Elevation: Feet: Meters: Survey Coordinates:

More information

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness 3 Chapter 3 of Concentration and Travel Time Time of Concentration and Travel Time Travel time ( T t ) is the time it takes water to travel from one location to another in a watershed. T t is a component

More information

THE CORPORATION OF THE CITY OF GUELPH. THEREFORE the council of the Corporation of the City of Guelph enacts as follows:

THE CORPORATION OF THE CITY OF GUELPH. THEREFORE the council of the Corporation of the City of Guelph enacts as follows: THE CORPORATION OF THE CITY OF GUELPH By-law (1993)-14515 A by-law respecting storm water disposal from private property in the City of Guelph, to amend By-law (1987)-12602 and to adopt Municipal Code

More information

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WLPS BUNCEFIELD REBUILD Flood Risk Assessment Green Lane Hemel Hempstead Hertfordshire HP2 7HZ September 2009 Prepared

More information

MOBILE HOME LAW. Revised November 2001

MOBILE HOME LAW. Revised November 2001 MOBILE HOME LAW Revised November 2001 TABLE OF CONTENTS: SECTION 1: SECTION 2: SECTION 3: SECTION 4: SECTION 5: SECTION 6: SECTION 7: SECTION 8: SECTION 9: SECTION 10: SECTION 11: SECTION 12: INTENT DEFINITIONS

More information

Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.

Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills. WQ-10 Best Management Practice (BMP) Water Quality Protection Guideline Secondary Containment Design Standards Fuel Storage on Construction Sites According to the EPA, the majority of water pollution in

More information

PREDICTIVE MODELLING AND MONITORING NATURAL ATTENUATION TO SAVE REMEDIAL COSTS

PREDICTIVE MODELLING AND MONITORING NATURAL ATTENUATION TO SAVE REMEDIAL COSTS PREDICTIVE MODELLING AND MONITORING NATURAL ATTENUATION TO SAVE REMEDIAL COSTS A.Aziz Shaikh, Brian Tsang, Greg Sutor and Thomas Dance Abstract This paper describes the multidisciplinary components of

More information

MITIGATION MONITORING PROGRAM (Accompanies the Van Nuys Fire Station 39 Initial Study/Mitigated Negative Declaration)

MITIGATION MONITORING PROGRAM (Accompanies the Van Nuys Fire Station 39 Initial Study/Mitigated Negative Declaration) MITIGATION MONITORING PROGRAM (Accompanies the Van Nuys Fire Station 39 Initial Study/Mitigated Negative Declaration) Van Nuys Fire Station 39 W.O. E170094B The California Environmental Quality Act (CEQA)

More information

A Developer s Guide: Watershed-Wise Development

A Developer s Guide: Watershed-Wise Development A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another

More information

JOHNSON STREET BRIDGE REPLACEMENT PROJECT

JOHNSON STREET BRIDGE REPLACEMENT PROJECT JOHNSON STREET BRIDGE REPLACEMENT Victoria, BC GEOTECHNICAL INVESTIGATION REPORT Prepared for: City Hall No. 1 Centennial Square Victoria, BC VW 1P Prepared by: Stantec 7 Dominion Street, Suite 5 Burnaby,

More information

Utah State General Records Retention Schedule SCHEDULE 1 GEOSPATIAL DATA SETS

Utah State General Records Retention Schedule SCHEDULE 1 GEOSPATIAL DATA SETS Utah State General Records Retention Schedule SCHEDULE 1 BIOTA RECORDS (Item 1-26) These are geospatial records that depict wildlife use areas in the state of Utah as determined by wildlife biologists

More information

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd ENVIRONMENTAL SITE DESIGN (ESD) REDEVELOPMENT EXAMPLES OCTOBER 2010 1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan,

More information

BALLANTRAE-MUSSELMAN LAKE SERVICING REPORT. Submitted to: The Town of Whitchurch-Stouffville. Submitted by:

BALLANTRAE-MUSSELMAN LAKE SERVICING REPORT. Submitted to: The Town of Whitchurch-Stouffville. Submitted by: BALLANTRAE-MUSSELMAN LAKE SERVICING REPORT Submitted to: The Town of Whitchurch-Stouffville Submitted by: AMEC Environment & Infrastructure 3215 North Service Road Burlington, ON L7N 3G2 Tel: 905-335-2353

More information

LEVEL I PRE-ACQUISITION ENVIRONMENTAL SITE ASSESSMENT GUIDANCE MANUAL

LEVEL I PRE-ACQUISITION ENVIRONMENTAL SITE ASSESSMENT GUIDANCE MANUAL LEVEL I PRE-ACQUISITION ENVIRONMENTAL SITE ASSESSMENT GUIDANCE MANUAL MARCH 1999 National Park Service Washington, DC 20013 SECTION TABLE OF CONTENTS PAGE 1.0 INTRODUCTION...1 1.1 Policy and Requirements...1

More information

Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can

Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources

More information

Scheduling Maintenance for Infiltration Basins and Trenches

Scheduling Maintenance for Infiltration Basins and Trenches Visual Inspection for Infiltration Practices Visual inspection is a rapid assessment procedure for qualitatively evaluating the functionality of a stormwater best management practice (BMP). Visual inspections

More information

Prattsville Berm Removal Project. 1.0 Project Location

Prattsville Berm Removal Project. 1.0 Project Location Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed

More information

MID-TOWN RE-DEVELOPMENT

MID-TOWN RE-DEVELOPMENT FOR SALE MID-TOWN RE-DEVELOPMENT 293 MACPHERSON AVENUE, TORONTO, ON Property Description > 21,135 square feet > 153.25 feet frontage, 89.63 feet depth > Site area: 13,735 SF > Zoning: ID2.5 Legal Description

More information

PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS

PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS Check here for Address or phone number change the fiscal year (July 1 June 30), and date(s) maintenance was performed. Under Inspection,

More information