1 South Lanarkshire Leisure and Culture Business Plan 2016/17

2 Contents Introduction 3 Financial Resources 2016/17 4 Key Themes 5 The Golden Thread 10 Priorities 2016/17 11 Outcome Delivery Plan 2016/17 13 SDR/92 2

3 Providing opportunities to enrich people s lives. Introduction Welcome to South Lanarkshire Leisure and Culture s (SLLC) 2016/17 Business Plan. This plan has been designed to identify the actions and priorities for the coming year, with background and performance information relating to SLLC contained in a separate document titled Who we are and what we do. 2016/17 is another year of change and challenge. The continued requirement to operate with reducing funding has resulted in a review to identify changes in how and if services will be provided in the future while ensuring appropriate resources for the services we continue to provide. Meanwhile the Health and Social Care Partnership begins this year and we would hope to provide significant supporting activities in this core area of our business. Finally each section of the business has their key service priorities identified in the plan. All this is aimed at providing continuous improvement in all our dealings with customers, partners and stakeholders and ensuring that visitors and residents will have more opportunities to take part in cultural and leisure activities and consequently enjoy the benefits of a healthy lifestyle. Gerry Campbell, General Manager, South Lanarkshire Leisure and Culture South Lanarkshire Leisure and Culture Business Plan 2016/17 3

4 Financial Resources 2016/17 The level of grant support provided to local government by the Scottish Government remains a reducing one in real terms. In this challenging economic climate, local authorities anticipate further budget reductions over the next three financial years. The level of financial settlement for SLC has a direct impact on the service fee payable to SLLC for managing leisure and culture services on their behalf. The continued savings requirements have led to a 24% reduction in the SLC Service fee from 2013/14 to 2016/17, in addition income performance over that period has been impacted by significant reductions, especially from gym memberships. This has led to a requirement to restructure the budgets to properly represent the new spending profiles and the full details of each service and site can be found in our detailed budgets. The unrestricted fund budget is shown below: Budget 2016/ /17 000s Expenditure 36,430 Income 17,965 SLC Service Fee 18,465 In setting the budget for 2016/17 savings of 1.28m were implemented to bring the base Service Fee to m. In addition to these savings funding for Coalburn Leisure Centre has ceased and achieving some income targets will be difficult at a time of reducing attendances. Changes fall into the following broad categories: Targeted price increases generating increased income Staffing restructure Closure of under-utilised services Each has risks and in developing the SLLC priorities and Outcome Delivery Plan it has been recognised: That the base SLC Service Fee will be m That there will be fewer managers and staff to deliver the services In an environment of increasing competition and reducing attendances the 51% of our total income which comes from paying customers is volatile. Recent performance demonstrates that we must continue to develop and reorganise our business to ensure that we are able to provide the key services to the agreed standards over the coming years. The priorities for the year 2016/17 have been agreed and while we must retain flexibility to respond to the key themes highlighted, the priorities must remain our focus as demonstrated in the Outcome Delivery Plan. The Marketing Plan and associated action plan are also an essential element of our efforts to ensure we achieve our income targets. 4

5 Providing opportunities to enrich people s lives. Key Themes 2016/17 In developing the Service Priorities a number of key themes have been taken into account. Each of these themes has the capacity to alter resourcing plans to such an extent that other priorities may be affected and because of their importance they are highlighted: 1. Health 1.1 Health and Wellbeing SLLC delivers a range of health related services in conjunction with NHS Lanarkshire and also supports a number of consistent themes with NHS Lanarkshire, as noted in their Public Health Annual Report for 2014/15, in particular: The Health Inequalities Action Plan and themes SLLC is supporting this theme through the Fairhill Integration Pilot Lanarkshire s Cancer Plan SLLC is supporting the Lanarkshire Cancer Improvement plan through the McMillan Cancer project in Libraries Cardiac Rehabilitation SLLC referral programmes and Physical Activity Prescription pilot These services however have been part of an SLLC wide generic programme and have never been targeted to reflect the specific demographic or health inequalities and health needs of a local area. It is anticipated that SLLC will work closely with Health and Social Care partners and NHS Lanarkshire to review and develop health intervention programmes which reflect the health needs of the community. A recommendation of the recently produced SLLC Health Impact Assessment noted that NHS Lanarkshire and SLLC should focus on collecting data locally so that need can be identified and resources targeted appropriately. This would also enable any resulting change in physical activity levels to be recorded. It is well documented that the greatest health gains relating to physical activity are likely to be attained by people whose physical activity levels are below the recommended levels. Targeting inactive people is a challenge and this is something that NHS Lanarkshire and SLLC will continue to collaborate on. 1.2 Health and Social Care Partnership New Scottish legislation which integrates the delivery of health and social services in the community has the potential to significantly impact how and to whom we deliver many of our services. We will continue to have close contact with all parties and key priorities are to continue to contribute to the national and local health and wellbeing agenda and demonstrate our importance in delivering health and wellbeing outcomes within the community. South Lanarkshire Leisure and Culture Business Plan 2016/17 5

6 2. Integrated Delivery of Services Pilot - South Lanarkshire Lifestyle Fairhill Health Impact Assessment From April 2015 SLLC adopted a new framework of operational management for all SLLC services hosted at Fairhill. The primary focus of implementing this framework is to assist in moving beyond physical co-location to fully integrating services which will be achieved through increased partnership working (internal and external) whilst also raising awareness of the facility within the local community. It is also intended that this new framework will improve communication and co-ordination between partners; provide increased opportunities to access pooled knowledge and resources as well as the opportunity to be more service user focused. A manager has been appointed to oversee the daily operations of the facility and all associated services delivered by SLLC. Budgets which were previously allocated to the individual services are now operating under a pooled budget to ensure improved collaborative working between services. A data collation/scoping exercise will be carried out in 2016 for both South Lanarkshire and the Fairhill community, details of which will be shared with Integrated Health and Social Care partners to provide information which highlights the health inequalities across South Lanarkshire and specifically within the local area of Fairhill. It is anticipated that this information will enable SLLC to review health initiatives/projects currently delivered in the Fairhill area. This scoping exercise is an opportunity to ensure that our combined leisure and cultural provision and deployment of resources has the optimum impact in terms of health inequalities and encouraging more physical activity. It will also set out clear objectives for informing and shaping the future programming of SLLC health interventions within the Fairhill area. 3. Service Review SLC is conducting a full review of SLLC. The review has a savings outcome to achieve however the other aims of the review are to define the services to be delivered on SLC s behalf by SLLC and to ensure that SLLC s delivery of services is providing value for money to SLC. Investment to ensure successful delivery of the services will be considered. The review s objectives are to: Gain a detailed understanding of the nature, scope and scale of SLLC services provided Clarify priorities of delivery Identify areas in provision where savings can be achieved Realise savings through more efficient and effective delivery Examine the savings requirements identified by SLC In addition to this the key aims/outcomes from the Service Review are: Service/operational The review will consider and report on all SLLC services and identify potential changes to delivery models and arrangements, including any changes to strategy as required. A benchmarking exercise will also be undertaken to allow comparisons with alternative examples of delivery and the identification of good practice. 6

7 Providing opportunities to enrich people s lives. Employees Ensure the most effective operational structure as a result of the review recommendations. The aim is to ensure that employees are working in the right places, targeting the right people, and linking to the right services to deliver the most effective service. Outcomes will be developed during the review. 4. Review of Service Level Agreements (SLA s) SLC and SLLC are developing a Memorandum of Understanding which will provide the detail of the agreements between us. Within the Memorandum of Understanding will be the details of the Service Level Agreements with each of the different sections of the Council that we procure services from. As the Memorandum of Understanding is a legal agreement between the parties, each of the SLA s will require review. This will be achieved by developing the current SLA s with our partners in SLC. This will represent a significant time resource as many of the current SLA s are not defined to the level required for the Memorandum of Understanding. Strong links have been maintained with internal departments of SLC and SLLC will continue to make use of all existing resources and services. In addition to the SLA s we have with SLC there are a number of agreements that we currently have with NHS Lanarkshire which will be affected by the implementation of the Health and Social Care Partnership. 5. Requirements for Capital Investment Although significant investment has been made by the Council in the assets managed by SLLC, a number of the facilities with the largest attendances and greatest variety are in need of significant investment with failure to invest resulting in unintended closures. In carrying out the Service Review the Council will take account of the Asset Discussion papers produced by the Property Investment Group and an investment plan will be required over short, medium and long term. 6. Workforce Planning Workforce planning is a key priority for the coming year and we will develop our strategy and action plan addressing: Lean staffing and management structures, ensuring we are operating efficiently and effectively in an ever changing environment An empowered front-line workforce, equipped with skills and knowledge necessary to deliver a seamless service A workforce able to operate flexibly, both in terms of meeting customer demand and across a range of service areas Maximising the potential of information technology and working in a modern and flexible way, with the business acumen to respond to changing demands The skills management we will need to operate in a supportive environment of encouraging employee engagement and looking after employee wellbeing South Lanarkshire Leisure and Culture Business Plan 2016/17 7

8 Each specific area of our business will be supported to take stock of where they are now, where they need to get to and to set actions which will deliver the required change to the workforce. This will ensure our people are flexible and equipped to deliver now and in the future. 7. Information Governance In January 2016 the Information Commissioner gave a clear message that they expect all organisations to do more to protect the data they hold. At the end of 2015 we launched the Information Strategy and the Retention/Collection Transfer and Archiving Policies. It is imperative that the action plans are now implemented throughout SLLC. In addition the data cleansing which commenced during 2015 must continue and expand to ensure all data stored by SLLC is appropriate and secure. The table below outlines the internal structure of how SLLC will embed Information Governance into the culture of SLLC for all employees. Information Governance - Internal Structure Seeks approval from Internal and External Audits Where impinge on Information Strategy Group (ISG) Implements and monitors Strategies, Procedures and Improvement Plan Information Governance passed to Reports to for approval of developed policies Information Working Group (IWG) Represented on Each Service Area 8

9 Providing opportunities to enrich people s lives. 8. Social Media Advertising, promotion and customer engagement through social media continues to expand both in use and importance. The implementation of the Social Media Strategy requires staff resources but provides cost effective promotional tools in a forum customers are familiar and comfortable with. We will achieve this by: Identifying team representatives who hold the required expertise and enthusiasm for social media Cascading our Social Media Strategy to ensure everyone is aware of what we want to accomplish with social media Developing content strategy for each service including when we are introducing new technology pilots Providing and cascading monthly stats to ensure there is a continued awareness on social media Continuing to develop our strategy and content using analytics to guide us and ensure we continually adapt to the ever changing technologies and trends Engaging with our community, become part of their society, analyse response and develop content based on engagement External consultation with experts in social media South Lanarkshire Leisure and Culture Business Plan 2016/17 9

10 9. Competition The arrival of budget gyms in June 2014 has produced a new and unprecedented level of competition for a part of our income that previously represented 25% of the total income of SLLC. This income has seen a near 30% reduction, as highlighted previously, and the competition is set to increase further over the 2016/17 period. In tackling this competition the products, service and customer journey will all be reviewed and honed. Alternative income streams are also being developed, e.g. ACE products and new birthday party packages in tandem with methods of increasing income from other traditional streams, such as swimming lessons. The Golden Thread The Business Plan is a vital part of the golden thread which links, national, local, corporate and community objectives through to individual Performance Development Reviews (PDRs) so that each staff member knows how what they do contributes to achieving SLLC s objectives. Consequently, in representing the overall business objectives agreed between SLC and SLLC, this document outlines the priorities and actions required to achieve specific goals in line with South Lanarkshire s Single Outcome Agreement, the Community Plan Stronger Together and the Council Plan, Connect. THE Golden Thread - Measured The Outcome Delivery Plan outlined in this Business Plan highlights a number of actions and measures which contribute to SLLC s objectives and which link directly in to the Council s Community Plan, Council Plan (Connect), Community and Enterprise Resources Plan (CERP). These are as follows and are reported through IMPROVe on a quarterly basis. Achieve 3.1m attendances at those facilities managed by the Sport and Physical Activity section of SLLC Maintain number of attendances per 1,000 population for swimming pools Maintain number of attendances per 1,000 population for other indoor sports and leisure facilities, excluding pools in a combined complex Maintain number of attendances at outdoor recreation and country parks at 2.14m Achieve 0.87m under 16 attendances at facilities maintained by South Lanarkshire Leisure and Culture (includes halls, school lets, outdoor and indoor leisure) Increase the numbers of over 60 s registering with the Activage scheme Increase numbers of over 60 s using South Lanarkshire Leisure and Culture facilities Maintain 2015/16 level of visitors to SLLC cultural venues Achieve 3440 visits to libraries per 1,000 population Increase number of visits to/usages of council funded or part funded museums per 1,000 population Increase number of these visits that were in person per 1,000 population Target achieved for customer satisfaction of 95% Target achieved for customer satisfaction (results from Scottish Household Survey) 10

11 Providing opportunities to enrich people s lives. The following agreed priorities will be delivered over the period 1 April 2016 to 31 March These should be viewed within the context that both the financial position and the Key Themes have the capacity to affect our ability to deliver the Plan. Priorities 2016/17 These are priorities to be achieved during 2016/17 in order to best deliver our services to the community. All these priorities will be measured as part of the Outcome Delivery Plan. All Services Continue to develop and implement internal and external processes in order to maximise income and control expenditure Develop new and existing partnerships to support the development of arts and cultural, leisure and learning activities Implement recommendations from Service and Efficiencies Review Develop service integration and improved cross selling across services Develop service quality and delivery in line with best value Invest in our workforce through support and training Strengthen our partnership links to attract new opportunities for funding Cultural Services Continue to review community assets Extend the programming and audience development of halls and community letting of schools Develop and utilise existing customer database to increase sales and audience development Develop strong partnership working with internal and external departments to develop cultural opportunities and increase participation in arts and culture across South Lanarkshire Continue to work in partnership to develop a programme of arts and cultural opportunities/activities aimed at promoting and improving the health and wellbeing of our communities Libraries and Museum Develop digital access to the museum collections Deliver the Pits and Ponies exhibition and associated activities in Low Parks Museum Develop access to digital library services through Wi-Fi Develop partnerships to support the health and wellbeing agenda Develop and implement Every child an active library member project South Lanarkshire Leisure and Culture Business Plan 2016/17 11

12 Outdoor Recreation and Country Parks At least maintain the present use of outdoor environment and encourage improved use through formal and informal activity Develop outdoor activity programme and associated services through partnership working Sport and Physical Activity Work with strategic partners, in particular Health and Social Care Partnership to contribute to the health inequalities agenda through locality health plans Invest in our workforce through support and training to address competition from alternative service providers Develop physical activity provision, club engagement and partnership programmes aimed at engaging all members of the community Central Support Develop and implement governance processes and procedures Continue to develop employee engagement Develop customer consultation processes and procedures Continue to develop a consistent approach to procurement practices Develop and implement the use of IT, including social media, to improve efficiency and enhance external and internal communications, activities and processes 12

13 Providing opportunities to enrich people s lives. Outcome Delivery Plan Four strategic objectives provide the focus for SLLC s activities. This section provides an overview of these objectives and the main actions we will undertake in achieving them. It also lists the key themes within the Community Plan and the Council Plan to which each objective relates. The Outcome Delivery Plan will be used for monitoring and evaluation purposes. Each action shows what will be done in the achievement of SLLC s objectives, what each action aims to achieve in the longer term and who is responsible. In many instances there is more than one person responsible for the action and in these cases a lead officer is identified. The Outcome Delivery Plan is detailed, but given the range of activity across SLLC, it is not an exhaustive list of everything we undertake. More comprehensive action plans are contained in Our Focus and the Marketing Plan. These plans cascade to facility and section levels. The Outcome Delivery Plan will be monitored regularly and a Quarterly Performance Report presented to the SLLC Board, in addition regular performance reports are also submitted to SLC. An Annual Report is also produced which contains information on SLLC s performance for stakeholders and the general public. Outcome Delivery Plan 2016/17 Key BDM CS CSM GM HRM LGBF SOA Business Development Manager (includes responsibility for Admin and Marketing) Company Secretary (includes responsibility for Business Development ICT and Finance) Cultural Services Manager General Manager Human Resources Manager Libraries and Museum, Outdoor Recreation and Country Parks Manager Sport and Physical Activity Manager (includes responsibility for Health and Safety and Technical team) Senior Management Team (All of the above) Local Government Benchmarking Framework South Lanarkshire s Single Outcome Agreement South Lanarkshire Leisure and Culture Business Plan 2016/17 13

14 Community Plan Themes: Improving health and tackling inequalities; promoting sustainable and inclusive communities and opportunities for all throughout life. Council Plan Objectives: improve and maintain health and increase physical activity; increase involvement in lifelong learning; promote participation in cultural activities and provide quality facilities to support communities; improve services for older people; tackle disadvantage and deprivation SLLC Objective 1 To become an inclusive organisation providing quality leisure, cultural and learning opportunities for all residents and visitors to South Lanarkshire. LOCAL OUTCOME Increased opportunities for participation Local Outcome Ref No Actions to Achieve Objective Responsibility Measure/Output Increased opportunities for participation Maintain annual attendances across all services (Connect 13) Promote the Activage scheme (Connect 13.2) At least maintain 2015/16 attendance Increase the number of registered users of Activage Increase attendances by over 60 s 1.3 Provide indoor and outdoor use for Under 16 s clubs in accordance with SLC s use policy At least maintain the number of registered clubs At least maintain attendances by under 16 s clubs Increase the number of accredited clubs through Club SL 1.4 Develop a programme of activities which will support equitable access for all Uptake of concession scheme Usage of concession scheme % of people with a disability registering with our facilities/ services 1.5 Develop access to digital library services Increased use of digital services within libraries using Wi-Fi and Smart devices 1.6 Implement the Every Child an Active Library Member programme 10% increase in children s library membership 1.7 Develop Cameronians Website content At least maintain uptake of museum s digital offer 1.8 Refurbish Low Parks Museum gallery space At least maintain attendances at Low Parks Museum table continued over. 14

15 Providing opportunities to enrich people s lives. Local Outcome Ref No Actions to Achieve Objective Responsibility Measure/Output Increased opportunities for participation 1.9 Review the programming and audience development of halls and community letting of schools CSM At least maintain attendances and community lets in schools CSM Development teams to target Halls/schools as well as ICF s 1.10 Encourage increased and improved use of the outdoor environment through formal and informal activities At least maintain attendances at Outdoor Recreation At least maintain attendances at OLA activities At least maintain attendances at country parks Improvements in formal/ informal activities Increase opportunities/ attendances via Greenspace Officer Programmes 1.11 Improve participation in physical activity through the development of community hubs and sports clubs Increased participation at hubs Increased number of clubs using hubs 1.12 Monitor and report on service uptake by equality groups Number of Equality Impact Assessments (EIA s) carried out for all relevant policies, strategies and procedures Implement actions identified in the Equalities Outcome Plan Establish an annual suite of EO PI s 1.13 Ensure ongoing compliance with all current Health and Safety legislation Implement H&S audit programme Ensure robust Health and Safety Audits are carried out in accordance with audit programme Endeavour to reduce the number of reported accidents (pro rata) table continued over. South Lanarkshire Leisure and Culture Business Plan 2016/17 15

16 Local Outcome Ref No Actions to Achieve Objective Responsibility Measure/Output Increased opportunities for participation 1.14 Work with SLC in the provision of refurbished/new facilities Assist SLC in the continued development of community facilities Consult on the design/ operation of the new build St Patrick s Primary school and community hub Refurbishment of East Kilbride Ice Rink 1.15 Demonstrate continuous improvement and efficient and effective service delivery CSM Continue to review community assets Retain or improve external accreditations from Visitscotland, Investors in People, National Governing Bodies and Adventure and Activity Licensing, and BIAZA 16

17 Providing opportunities to enrich people s lives. Community Plan Themes: Promoting sustainable and inclusive communities and opportunities for all throughout life Council Plan Objectives: improve and maintain health and increase physical activity; increase involvement in lifelong learning; promote participation in cultural activities and provide quality facilities to support communities SLLC Objective 2. To continually improve the service to our customers by developing the effectiveness of our workforce and our working practices, as well as addressing service quality, variety and responding to changing needs, trends etc. LOCAL OUTCOME Improved service to our customers Local Outcome Ref No Actions to Achieve Objective Responsibility Measure/Output Improved service to our customers 2.1 Ensure staff both understand and are equipped to fulfill their individual roles within the organisation Ensure staff have the opportunity to complete PDR and associated training plans Implement actions arising from Our People Strategy /HRM Develop Learn on Line training and modules and continue the roll out of Learn on Line and Learning and Development activity HRM Develop the Workforce Planning Strategy HRM Further develop and implement functionality of People Connect, improved use of IT as a staff resource (e.g. People Connect, on line training) HRM Continue to review, develop and implement Best Practice procedures in HR CS Develop and implement Best Practice procedures in Finance table continued over. South Lanarkshire Leisure and Culture Business Plan 2016/17 17

18 Local Outcome Ref No Actions to Achieve Objective Responsibility Measure/Output Improved service to our customers 2.2 Develop employee engagement HRM Implement Our People Strategy Develop a Learn on Line module for Our Way of Working to allow further roll out Absence levels less than 4% 2.3 Develop the use of IT, including social media, to improve efficiency and enhance external and internal communications, activities and processes CS CS Develop the internet social media presence of SLLC Develop and produce an IT strategy Ensure the implementation of SLLC s projects within the Council s IT Service Plan Continue to develop digital access to the museum collection BDM Develop the use of our performance management systems to inform the development of the service 2.4 Develop service standards in direct response to customer feedback and through knowledge of competition and service trends to ensure that community and individual needs are met Carry out customer consultation at least once a year in each service area Develop customer consultation processes and procedures Achieve a 95% customer satisfaction rating Demonstrate improvements to the service implemented as a result of customer feedback BDM Develop a rolling programme of customer research 2.5 Continue to develop operational practices in line with continuous improvement Maintain membership of service specific benchmarking groups Sustain and improve LGBF results for SLLC table continued over. 18

19 Providing opportunities to enrich people s lives. Local Outcome Ref No Actions to Achieve Objective Responsibility Measure/Output Improved service to our customers 2.6 Implement the long term vision for the provision of leisure and cultural services in South Lanarkshire Will form part of formal Service Review Continue to work with SLC in the implementation of Sports Pitch Strategy GM Deliver SLLC s business plan and review suite of measures for coverage and relevance 2.7 Investigate and improve integrated programming across all service areas ACE, Birthday Parties, Dance programmes, Fairhill Community Plan Themes: Improving health and tackling inequalities; promoting sustainable and inclusive communities and opportunities for all throughout life; ensuring sustainable economic recovery and development Council Plan Objectives: strengthen partnership working, community leadership and engagement; improve and maintain health and increase physical activity; increase involvement in lifelong learning; promote participation in cultural activities and provide quality facilities to support communities; improve services for older people SLLC Objective 3. To work in partnership with local and national agencies to promote active participation in leisure, cultural and learning activities. LOCAL OUTCOME Improved partnership working Local Outcome Ref No Actions to Achieve Objective Responsibility Measure/Output Improved partnership working 3.1 Develop new and existing partnerships to support the development of arts and cultural, leisure and learning activities Demonstrate events/ initiatives implemented through partnership working Investigate integration of services into SLLC facilities via the Health & Social Care partnership (HSCP) and private sector organisations 3.2 Attract new external funding support Maximise income received from external funding bodies 3.3 Work with partners to specifically (but not exclusively) (1) Develop cultural opportunities (2) Contribute to the health inequalities agenda (3) Develop the outdoor activity programme (4) Support the health and wellbeing agenda CSM At least maintain opportunities Improved programmes (specific measures are shown in detail in each services Outcome Delivery Plan) Data collection monitoring & evaluation of all programmes South Lanarkshire Leisure and Culture Business Plan 2016/17 19

20 Community Plan Themes: Improving health and tackling inequalities; promoting sustainable and inclusive communities and opportunities for all throughout life Council Plan Objectives: embed governance and accountability; achieve efficient and effective use of resources SLLC Objective 4. To maximise resources and operational efficiencies taking into account environmental and sustainable issues. LOCAL OUTCOME Improved value for money organisation Local Outcome Ref No Actions to Achieve Objective Responsibility Measure/Output Improved value for money organisation 4.1 Develop internal and external processes in order to maximise income and control expenditure Implement recommendations arising from the Service Review Develop service integration and improved cross selling across all services Achieve efficiency savings as identified by SLC 4.2 Continue to develop procurement practices CS Develop and implement procurement practices to improve efficiency and effectiveness 4.3 Achieve financial targets Implement the Marketing Plan Maintain golf income targets 4.4 Review health and fitness provision and the structure of the service Maximise efficiency of fitness activities and minimise loss of income 4.5 Promote high standards of governance are being exercised CS Develop and implement governance processes and procedures CS Continue to develop risk management practices and procedures CS Maintain risk register CS Audit actions delivered by due dates 4.6 Monitor the ongoing costs of the delivery of SLLC LGBF indicators table continued over. 20

21 Providing opportunities to enrich people s lives. Local Outcome Ref No Actions to Achieve Objective Responsibility Measure/Output Improved value for money organisation 4.7 Ensure efficient and effective implementation of Freedom of Information Scotland Act procedures BDM Number of FOI requests responded to within timescales 4.8 Support environmental awareness Contribute to SLC s Carbon Management Plan and Energy Strategy Maximise and monitor the energy efficiency of the major operational properties Develop SLLC s Sustainability and Environmental Policy South Lanarkshire Leisure and Culture Business Plan 2016/17 21

22 Notes 22

23 Providing opportunities to enrich people s lives. South Lanarkshire Leisure and Culture Business Plan 2016/17 23

24 If you need this information in a different format or language, please contact us to discuss how we can best meet your needs. Telephone Text phone or customer.services@southlanarkshireleisure.co.uk Further copies of this report are available in PDF format by accessing our website:

Corporate Governance Service Business Plan 2011-2016. Modernising Services

Corporate Governance Service Business Plan 2011-2016. Modernising Services Corporate Governance Service Business Plan 2011-2016 Modernising Services Index 1. Executive Summary 3 2. Vision and Strategy 4 3. Service Overview 3.1 What Services do we and Will we Deliver? 5 3.2 How

More information

Wales Procurement Policy Statement

Wales Procurement Policy Statement Wales Procurement Policy Statement In December 2012 I launched the Wales Procurement Policy Statement (WPPS) setting out the principles by which I expect public sector procurement to be delivered in Wales.

More information

Consultation and Engagement Strategy

Consultation and Engagement Strategy Consultation and Engagement Strategy Contents: 1. Introduction 2 2. Purpose 3 3. Aims and Objectives 4 4. Key principles 5 5. Delivery of the Strategy 6 6. Action Plan 2011-12 7 Appendix 1 Understanding

More information

Sure Start children s centres statutory guidance. For local authorities, commissioners of local health services and Jobcentre Plus

Sure Start children s centres statutory guidance. For local authorities, commissioners of local health services and Jobcentre Plus Sure Start children s centres statutory guidance For local authorities, commissioners of local health services and Jobcentre Plus April 2013 Contents Summary 3 Sure Start children s centres statutory guidance

More information

Commissioning Strategy

Commissioning Strategy Commissioning Strategy This Commissioning Strategy sets out the mechanics of how Orkney Alcohol and Drugs Partnership (ADP) will implement its strategic aims as outlined in the ADP Strategy. Ensuring that

More information

Communications strategy refresh. January 2012. 1 c:\documents and settings\mhln.snh\objcache\objects\a654473.doc

Communications strategy refresh. January 2012. 1 c:\documents and settings\mhln.snh\objcache\objects\a654473.doc Communications strategy refresh January 2012 1 c:\documents and settings\mhln.snh\objcache\objects\a654473.doc Contents 1. Introduction p 3 a. SNH: corporate aims and objectives b. SNH and communications

More information

Communications Strategy

Communications Strategy Communications Communications July 2013 Version 1.1 1 Communications River Clyde Homes Vision Our vision is to provide quality, affordable homes, in neighbourhoods we can be proud of and to deliver excellent

More information

People Strategy 2013/17

People Strategy 2013/17 D a t a L a b e l : P U B L I C West Lothian Council People Strategy 2013/17 Contents 1 Overview 2 2 Council Priorities 8 3 Strategy Outcomes 10 1 Engaging and motivating our employees 13 2 Recognised

More information

Digital Inclusion Programme Started. BL2a

Digital Inclusion Programme Started. BL2a PROJECT BRIEF Project Name Digital Inclusion Programme Status: Started Release 18.05.2011 Reference Number: BL2a Purpose This document provides a firm foundation for a project and defines all major aspects

More information

The post holder will be guided by general polices and regulations, but will need to establish the way in which these should be interpreted.

The post holder will be guided by general polices and regulations, but will need to establish the way in which these should be interpreted. JOB DESCRIPTION Job Title: Membership and Events Manager Band: 7 Hours: 37.5 Location: Elms, Tatchbury Mount Accountable to: Head of Strategic Relationship Management 1. MAIN PURPOSE OF JOB The post holder

More information

Service and Improvement Plan 2015 18

Service and Improvement Plan 2015 18 Service and Improvement Plan 2015 18 Property and Risk 1. Introduction Property and Risk Service and Improvement Plan 2015 2018 1.1 The Property and Risk Service and Improvement Plan covers the period

More information

How To Manage The Council

How To Manage The Council Mole Valley District Council Corporate Communications Strategy 2002-2005 CONTENTS Content Section 1: Introduction Section 2: Stakeholders Section 3: Objectives Section 4: Targets Section 5: Principles

More information

City and County of Swansea. Human Resources & Workforce Strategy 2013-2017. Ambition is Critical 1

City and County of Swansea. Human Resources & Workforce Strategy 2013-2017. Ambition is Critical 1 City and County of Swansea Human Resources & Workforce Strategy 2013-2017 Ambition is Critical 1 Delivering quality services for a safer, greener, smarter, fairer, healthier, richer Swansea Executive Summary

More information

REPORT 4 FOR DECISION. This report will be considered in public

REPORT 4 FOR DECISION. This report will be considered in public REPORT 4 Subject: Safety Readiness for the Summer 2013 Events Programme Agenda item: Public Item 7 Report No: 4 Meeting date: 28 May 2013 Report to: Board Report of: Mark Camley, Interim Executive Director

More information

A Health and Wellbeing Strategy for Bexley Listening to you, working for you

A Health and Wellbeing Strategy for Bexley Listening to you, working for you A Health and Wellbeing Strategy for Bexley Listening to you, working for you www.bexley.gov.uk Introduction FOREWORD Health and wellbeing is everybody s business, and our joint aim is to improve the health

More information

Introduction. Page 2 of 11

Introduction. Page 2 of 11 Page 1 of 11 Introduction It has been a year since The Walton Centre brought its recruitment function in-house and it was critical that the organisation took this step. This is a specialist organisation

More information

Strategic Guidance for Community Planning Partnerships: Community Learning and Development

Strategic Guidance for Community Planning Partnerships: Community Learning and Development Strategic Guidance for Community Planning Partnerships: Community Learning and Development COMMUNITY LEARNING AND DEVELOPMENT: STRATEGIC GUIDANCE FOR COMMUNITY PLANNING PARTNERSHIPS EXECUTIVE SUMMARY This

More information

Communications Strategy 2015-16

Communications Strategy 2015-16 Communications Strategy 2015-16 Communication leads to community, that is, to understanding, intimacy and mutual valuing [Rollo May, 1909-1994, American Psychologist] Introduction The WWM CRC is a provider

More information

CORPORATE PLAN 2012-13 2013-14 2014-15

CORPORATE PLAN 2012-13 2013-14 2014-15 CORPORATE PLAN 2012-13 2013-14 2014-15 V0.3 170412 1 1. Introduction This Corporate Plan identifies the main strategic challenges facing the Agency over the next three years, and sets out its key performance

More information

JOB DESCRIPTION: DIRECTORATE MANAGER LEVEL 3. Job Description

JOB DESCRIPTION: DIRECTORATE MANAGER LEVEL 3. Job Description JOB DESCRIPTION: DIRECTORATE MANAGER LEVEL 3 Job Description Job Title: Directorate Manager Level 3 Band: Post Type: Location: Managerially Accountable to: Professionally Accountable to: 8C Permanent UHNS

More information

How To Manage Performance In North Ayrshire Council

How To Manage Performance In North Ayrshire Council North Ayrshire Council Performance Management Strategy February 2015 Contents 1. Foreword... 3 2. Introduction... 3 3. What is performance management?... 4 3.1 Why is it important to North Ayrshire Council?...

More information

Derbyshire County Council Performance and Improvement Framework. January 2012

Derbyshire County Council Performance and Improvement Framework. January 2012 Derbyshire County Council Performance and Improvement Framework January 2012 Contents 1. Introduction 3 2. About the framework 4 3. Planning 7 5. Monitoring Performance 8 6. Challenge and Review 11 7.

More information

Northern Ireland Environment Agency Corporate Social Responsibility

Northern Ireland Environment Agency Corporate Social Responsibility Northern Ireland Environment Agency Corporate Social Responsibility September 2011 Introduction This document has been prepared by the Northern Ireland Environment Agency (NIEA) in line with general NICS

More information

Pathways into Sport Active Schools in West Lothian

Pathways into Sport Active Schools in West Lothian PS49 Children and sport What level of sport and physical activity should be provided by primary and, separately, secondary schools? Early Primary school children should be introduced to Fundamentals and

More information

TRANSPORT FOR LONDON CORPORATE PANEL

TRANSPORT FOR LONDON CORPORATE PANEL AGENDA ITEM 4 TRANSPORT FOR LONDON CORPORATE PANEL SUBJECT: EMPLOYEE ENGAGEMENT DATE: 17 NOVEMBER 2009 1 PURPOSE AND DECISION REQUIRED 1.1 The purpose of this report is to advise the Panel on TfL s approach

More information

Working with you to make Highland the healthy place to be

Working with you to make Highland the healthy place to be Highland NHS Board 2 June 2009 Item 5.3 POLICY FRAMEWORK FOR LONG TERM CONDITIONS/ANTICIPATORY CARE Report by Alexa Pilch, LTC Programme Manager, on behalf of Dr Ian Bashford, Medical Director and Elaine

More information

COMMUNICATION AND ENGAGEMENT STRATEGY 2013-2015

COMMUNICATION AND ENGAGEMENT STRATEGY 2013-2015 COMMUNICATION AND ENGAGEMENT STRATEGY 2013-2015 NWAS Communication and Engagement Strategy 2013-2015 Page: 1 Of 16 Recommended by Executive Management Team Communities Committee Approved by Board of Directors

More information

INVESTING IN REFORM INVESTING IN STOCKPORT DRAFT BUSINESS CASE

INVESTING IN REFORM INVESTING IN STOCKPORT DRAFT BUSINESS CASE INVESTING IN STOCKPORT DRAFT BUSINESS CASE INVESTING IN REFORM IIS Programme/Project Name: Project Name: Portfolio: IIS Outcome: IIS Board SRO: IIS Project Lead: Public Realm and Solutions SK Communities

More information

People & Organisational Development Strategy

People & Organisational Development Strategy 2013-2018 People & Organisational Development Strategy Delivering excellent research Delivering an excellent student experience Enhancing global reach and reputation 1. Introduction Glasgow 2020: A global

More information

Stratford on Avon District Council. The Human Resources Strategy

Stratford on Avon District Council. The Human Resources Strategy Stratford on Avon District Council The Human Resources Strategy Page 1 1 Purpose of The Human Resources (HR) Strategy The purpose of this document is to review the role and effectiveness of human resource

More information

EVERYONE COUNTS STRATEGY

EVERYONE COUNTS STRATEGY EVERYONE COUNTS STRATEGY Introduction The aim of the Equality and Diversity Strategy is to ensure that Great Places Housing Group promotes equality, tackles discrimination, values diversity, and continues

More information

1.4. Ensuring people and communities know and understand these issues can help build trust and confidence in the Council and improve our reputation.

1.4. Ensuring people and communities know and understand these issues can help build trust and confidence in the Council and improve our reputation. Draft Communications Strategy -2018 1. Introduction and context 1.1. In the challenging and changing environment of local government, it s really important that regular, reliable and accurate information

More information

Health and wellbeing Principles and practice

Health and wellbeing Principles and practice Health and wellbeing Principles and practice Curriculum for Excellence has an important role to play in promoting the health and wellbeing of children and young people and of all of those in the educational

More information

Full of Life Strategy, Improving quality of life for residents over 50

Full of Life Strategy, Improving quality of life for residents over 50 Full of Life Strategy, Improving quality of life for residents over 50 Action Plan: 1 April 2011 to 31 March 2012 Priority Objective Tasks Measure Lead A safer cleaner, greener borough Gain a better understanding

More information

Below you will find information relevant to CCPS members which has been taken from the Single Outcome Agreement published in June 2009.

Below you will find information relevant to CCPS members which has been taken from the Single Outcome Agreement published in June 2009. East Ayrshire Below you will find information relevant to CCPS members which has been taken from the Single Outcome Agreement published in June 2009. Information is ordered in the following topic groups:

More information

AUDIT & PERFORMANCE REVIEW COMMITTEE ON 26 TH SEPTEMBER 2007

AUDIT & PERFORMANCE REVIEW COMMITTEE ON 26 TH SEPTEMBER 2007 PAGE: 1 REPORT TO: SUBJECT: BY: AUDIT & PERFORMANCE REVIEW COMMITTEE ON 26 TH SEPTEMBER 2007 ASSET MANAGEMENT CHIEF FINANCIAL OFFICER 1. REASON FOR REPORT 1.1 To provide the Audit and Performance Review

More information

EAST AYRSHIRE COUNCIL COUNCIL 12 MARCH 2015 EAST AYRSHIRE LEISURE TRUST BUSINESS PLAN UPDATE APRIL 2015

EAST AYRSHIRE COUNCIL COUNCIL 12 MARCH 2015 EAST AYRSHIRE LEISURE TRUST BUSINESS PLAN UPDATE APRIL 2015 EAST AYRSHIRE COUNCIL COUNCIL 12 MARCH 2015 EAST AYRSHIRE LEISURE TRUST BUSINESS PLAN UPDATE APRIL 2015 Report by the Acting Executive Director of Neighbourhood Services PURPOSE OF REPORT 1. The purpose

More information

EAST AYRSHIRE HEALTH AND SOCIAL CARE PARTNERSHIP SHADOW INTEGRATION BOARD 24 APRIL 2014

EAST AYRSHIRE HEALTH AND SOCIAL CARE PARTNERSHIP SHADOW INTEGRATION BOARD 24 APRIL 2014 EAST AYRSHIRE HEALTH AND SOCIAL CARE PARTNERSHIP SHADOW INTEGRATION BOARD 24 APRIL 2014 PROPOSALS FOR PARTNERSHIP MANAGEMENT AND GOVERNANCE ARRANGEMENTS PURPOSE Report by Director of Health and Social

More information

The Highland Council

The Highland Council The Highland Council Communities and Partnerships Committee 9 June 2016 Corporate Communications Strategy Update Report by Corporate Communications Manager Summary Agenda Item Report No 7 CP 13/16 A 2

More information

AGENDA ITEM 5 AYRSHIRE SHARED SERVICE JOINT COMMITTEE 1 MAY 2015 AYRSHIRE ROADS ALLIANCE CUSTOMER SERVICE STRATEGY

AGENDA ITEM 5 AYRSHIRE SHARED SERVICE JOINT COMMITTEE 1 MAY 2015 AYRSHIRE ROADS ALLIANCE CUSTOMER SERVICE STRATEGY AYRSHIRE SHARED SERVICE JOINT COMMITTEE 1 MAY 2015 AYRSHIRE ROADS ALLIANCE CUSTOMER SERVICE STRATEGY Report by the Head of Roads Ayrshire Roads Alliance PURPOSE OF REPORT 1. The purpose of this report

More information

Aberdeen City Council self evaluation 2010 Public Library Quality Improvement Matrix (PLQIM)

Aberdeen City Council self evaluation 2010 Public Library Quality Improvement Matrix (PLQIM) Scottish Library & Information Council Aberdeen City Council self evaluation 2010 Public Library Quality Improvement Matrix (PLQIM) Summary In March 2010 Aberdeen City Library and Information Service s

More information

Annual Plan Part C. SOCIAL CARE BUSINESS SUPPORT SERVICE PLAN 2011-2014 March 2011

Annual Plan Part C. SOCIAL CARE BUSINESS SUPPORT SERVICE PLAN 2011-2014 March 2011 Annual Plan Part C SOCIAL CARE BUSINESS SUPPORT SERVICE PLAN 2011-2014 March 2011 SECTION 1 STRATEGIC OVERVIEW OF SERVICE The Business Support Service delivers a range of technical and support services

More information

External Audit BV Performance Report: Delivering Change Management and Financial Sustainability

External Audit BV Performance Report: Delivering Change Management and Financial Sustainability CLACKMANNANSHIRE COUNCIL THIS PAPER RELATES TO ITEM 05 ON THE AGENDA Report to: Resources and Audit Committee Date of Meeting: 24 September 2015 Subject: External Audit BV Performance Report: Delivering

More information

Monitoring Highways England The monitoring framework

Monitoring Highways England The monitoring framework Monitoring Highways England The monitoring framework October 2015 Contents Executive summary 4 Roads reform 4 ORR s role in monitoring Highways England 5 What we will do next 10 1. Overview of this document

More information

Cabinet Member for Adult Social Care and Health ASCH04 (14/15)

Cabinet Member for Adult Social Care and Health ASCH04 (14/15) Cabinet Member for Adult Social Care and Health ASCH04 (14/15) Commissioning of Telecare as part of wider Assistive Technology Services for West Sussex July 2014 Report by Director of Public Health and

More information

Investors in People Assessment Report. Presented by Alli Gibbons Investors in People Specialist On behalf of Inspiring Business Performance Limited

Investors in People Assessment Report. Presented by Alli Gibbons Investors in People Specialist On behalf of Inspiring Business Performance Limited Investors in People Assessment Report for Bradstow School Presented by Alli Gibbons Investors in People Specialist On behalf of Inspiring Business Performance Limited 30 August 2013 Project Reference Number

More information

Glasgow s Tourism action PLAN to 2016

Glasgow s Tourism action PLAN to 2016 Glasgow s Tourism action PLAN to 2016 Image and Brand Strengthen and maximize the economic impact and value of Glasgow: Scotland with style by developing and implementing brand strategy GCMB & 1-5 years

More information

PEOPLE AND ORGANISATION DEVELOPMENT STRATEGIC FRAMEWORK FOR LOCAL GOVERNMENT IN NORTHERN IRELAND

PEOPLE AND ORGANISATION DEVELOPMENT STRATEGIC FRAMEWORK FOR LOCAL GOVERNMENT IN NORTHERN IRELAND PEOPLE AND ORGANISATION DEVELOPMENT STRATEGIC FRAMEWORK FOR LOCAL GOVERNMENT IN NORTHERN IRELAND DRAFT JULY 2011 PEOPLE AND ORGANISATION DEVELOPMENT STRATEGIC FRAMEWORK FOR LOCAL GOVERNMENT IN NORTHERN

More information

Appendix 4 - Statutory Officers Protocol

Appendix 4 - Statutory Officers Protocol Appendix 4 - Statutory Officers Protocol Accountability Protocol for role of Director of Children s Services within the London Borough of Barnet Introduction In September 2014, the Chief Executive of the

More information

CONCORDAT IMPLEMENTATION

CONCORDAT IMPLEMENTATION CONCORDAT IMPLEMENTATION UNIVERSITY OF ABERDEEN HR EXCELLENCE IN RESEARCH AWARD TWO YEAR INTERNAL REVIEW PROGRESS REPORT. The University of Aberdeen received the HR Excellence Award for Excellence in December

More information

Consultation Questionnaire. The case for change

Consultation Questionnaire. The case for change Annex G Consultation Questionnaire The case for change Question 1: Is the proposal to focus initially, after legislation is enacted, on improving outcomes for older people, and then to extend our focus

More information

The Institute Business Plan - Review

The Institute Business Plan - Review Guildford Institute Strategic Plan to 2020 Foreword The objects of the Institute are set out in its Memorandum of Association [Art3]. They may be summarised as follows: To promote and advance the education

More information

Inquiry into teenage pregnancy. Lanarkshire Sexual Health Strategy Group

Inquiry into teenage pregnancy. Lanarkshire Sexual Health Strategy Group Inquiry into teenage pregnancy Lanarkshire Sexual Health Strategy Group A. Do you have any views on the current policy direction being taken at the national level in Scotland to reduce rates of teenage

More information

HEALTH SYSTEM. Introduction. The. jurisdictions and we. Health Protection. Health Improvement. Health Services. Academic Public

HEALTH SYSTEM. Introduction. The. jurisdictions and we. Health Protection. Health Improvement. Health Services. Academic Public FUNCTIONS OF THE LOCAL PUBLIC HEALTH SYSTEM Introduction This document sets out the local PH function in England. It was originally drafted by a working group led by Maggie Rae, FPH Local Board Member

More information

Care service inspection report

Care service inspection report Care service inspection report Full inspection SSCN Social Care Housing Support Service Suite 3, Floor 2 ELS House 555 Gorgie Road Edinburgh Inspection completed on 03 May 2016 Service provided by: Support

More information

NORTH STRATHCLYDE COMMUNITY JUSTICE AUTHORITY

NORTH STRATHCLYDE COMMUNITY JUSTICE AUTHORITY NORTH STRATHCLYDE COMMUNITY JUSTICE AUTHORITY CRIMINAL JUSTICE SOCIAL WORK SERVICES TRAINING STRATEGY 2008-2011 1.00. Policy Context The North Strathclyde Community Justice Authority joint area plan for

More information

Delivering Local Health Care

Delivering Local Health Care Delivering Local Health Care Accelerating the pace of change Delivering Local Integrated Care Accelerating the Pace of Change WG 17711 Digital ISBN 978 1 0496 0 Crown copyright 2013 2 Contents Joint foreword

More information

The City of Edinburgh Council Business plan 2015 18. A thriving, sustainable capital city

The City of Edinburgh Council Business plan 2015 18. A thriving, sustainable capital city The City of Edinburgh Council Business plan 2015 18 A thriving, sustainable capital city Introduction This business plan sets out the strategic direction and priorities for the City of Edinburgh Council

More information

JOB DESCRIPTION. Head of Learning and Standards. Salary grade: Management Scale 2 + 1

JOB DESCRIPTION. Head of Learning and Standards. Salary grade: Management Scale 2 + 1 JOB DESCRIPTION Job Title: Responsible to: Head of Learning and Standards Director of Faculty Salary grade: Management Scale 2 + 1 Hours per week: 21.6 hours per week Main Purpose of the Role 1. To manage

More information

Integrated Care Value Case

Integrated Care Value Case Integrated Care Value Case Cumbria, England November 2013 This Value Case has been commissioned by the Local Government Association with support from the national partners on the integrated care and support

More information

JOB DESCRIPTION. Senior Intelligence Analyst (lead - in either crime, public health, economy, customer segmentation, demography)

JOB DESCRIPTION. Senior Intelligence Analyst (lead - in either crime, public health, economy, customer segmentation, demography) JOB DESCRIPTION TITLE: Senior Intelligence (lead - in either crime, public health, economy, customer segmentation, demography) POST NO: 4164 DEPARTMENT: DIVISION: RESPONSIBLE TO: GRADE: Chief Executive

More information

Corporate objectives. Communications strategy. Digital marketing and inclusion strategy

Corporate objectives. Communications strategy. Digital marketing and inclusion strategy marketing and inclusion strategy 2014-2019 (draft) Introduction Corporate objectives Communications strategy marketing and inclusion strategy This digital marketing and inclusion strategy is a supplementary

More information

University of Edinburgh Procurement Strategy 2012 16 updated May 2013

University of Edinburgh Procurement Strategy 2012 16 updated May 2013 University of Edinburgh Procurement Strategy 2012 16 updated May 2013 At the University of Edinburgh, we aim to meet our needs for goods, services and works in a way that achieves value for money on a

More information

Asset Management Strategy (2013-2017) Doing things Differently A New Approach for a sustainable future

Asset Management Strategy (2013-2017) Doing things Differently A New Approach for a sustainable future Asset Management Strategy (2013-2017) A New Approach for a sustainable future Contents Introduction... 2 The Asset Management Vision, Policy Statement & Strategic Themes... 5 Part B The Asset Management

More information

A NEW LOOK AT HALL 4 The Early Years Good Health for Every Child

A NEW LOOK AT HALL 4 The Early Years Good Health for Every Child A NEW LOOK AT HALL 4 The Early Years Good Health for Every Child A NEW LOOK AT HALL 4 The Early Years Good Health for Every Child The Scottish Government, Edinburgh, 2011 Crown copyright 2011 ISBN: 978-0-7559-9421-2

More information

TOOL D14 Monitoring and evaluation: a framework

TOOL D14 Monitoring and evaluation: a framework TOOL D14 Monitoring and evaluation: a framework 159 TOOL D14 Monitoring and evaluation: a framework TOOL D14 For: About: Purpose: Use: Resource: Commissioners in primary care trusts (PCTs) and local authorities

More information

Community Pharmacy in 2016/17 and beyond - proposals Stakeholder briefing sessions

Community Pharmacy in 2016/17 and beyond - proposals Stakeholder briefing sessions Community Pharmacy in 2016/17 and beyond - proposals Stakeholder briefing sessions 1 CONTENTS Contents This presentation describes our vision for community pharmacy, and outlines proposals for achieving

More information

Job description Customer Care Team Leader (Engagement)

Job description Customer Care Team Leader (Engagement) Job description Customer Care Team Leader (Engagement) Main purpose of job The Customer Care Team Leader will manage the day to day running of the internal Customer Care engagement team, ensuring it provides

More information

RAISING OUR GAME. The Strategic Plan for England Golf 2014-2017

RAISING OUR GAME. The Strategic Plan for England Golf 2014-2017 RAISING OUR GAME The Strategic Plan for England Golf 2014-2017 Contents 3 Foreword 4 Purpose, Vision and Ambitions 5-7 Why we need this strategy 8 Seven key themes 9-10 Delivering the strategy Appendices

More information

HR Enabling Strategy 2012-2017

HR Enabling Strategy 2012-2017 This document is yet to be put into corporate format but this interim version can be referred to for the time being. Should you have any queries, please refer to Sally Hartley, University Secretary, x

More information

Housing Association Regulatory Assessment

Housing Association Regulatory Assessment Welsh Government Housing Directorate - Regulation Housing Association Regulatory Assessment Melin Homes Limited Registration number: L110 Date of publication: 20 December 2013 Welsh Government Housing

More information

INVESTORS IN PEOPLE REVIEW REPORT

INVESTORS IN PEOPLE REVIEW REPORT INVESTORS IN PEOPLE REVIEW REPORT Lower Farm Primary School Page: 1 of 13 CONTENTS Key Information 3 Assessor Decision 3 Milestone Dates 3 Introduction 4 Assessment Objectives 4 Feedback Against the Assessment

More information

Business Plan for Financial Management and Business Effectiveness Unit - May 2011 to 30 September 2013

Business Plan for Financial Management and Business Effectiveness Unit - May 2011 to 30 September 2013 1 Business Plan for Financial Management and Business Effectiveness Unit - May 2011 to 30 September 2013 1. Introduction 1.1 The Service s key responsibilities are: o The achievement of proper and effective

More information

Gloucestershire Health and Wellbeing Board SIG

Gloucestershire Health and Wellbeing Board SIG Gloucestershire Health and Wellbeing Board SIG Report Title Item for decision or information? Sponsor Author Organisation Report from the Strategy Implementation Group (SIG) For information Dr Peter Brambleby

More information

Leicestershire Partnership Trust. Leadership Development Framework

Leicestershire Partnership Trust. Leadership Development Framework Leicestershire Partnership Trust Leadership Development Framework 1 Leadership Development Framework Introduction The NHS in England is facing a period of substantial change in light of the recent Government

More information

The Audit of Best Value and Community Planning The City of Edinburgh Council. Best Value audit 2016

The Audit of Best Value and Community Planning The City of Edinburgh Council. Best Value audit 2016 The Audit of Best Value and Community Planning The City of Edinburgh Council Best Value audit 2016 Report from the Controller of Audit February 2016 The Accounts Commission The Accounts Commission is the

More information

PERTH AND KINROSS COUNCIL. Strategic Policy and Resources Committee 14 September 2011 CORPORATE ENERGY MANAGEMENT AND CONSERVATION POLICY

PERTH AND KINROSS COUNCIL. Strategic Policy and Resources Committee 14 September 2011 CORPORATE ENERGY MANAGEMENT AND CONSERVATION POLICY PERTH AND KINROSS COUNCIL 10 11/465 Strategic Policy and Resources Committee 14 September 2011 CORPORATE ENERGY MANAGEMENT AND CONSERVATION POLICY Report by Depute Director (Environment) This report seeks

More information

Diversity is not about them and us. It s about. all of us.

Diversity is not about them and us. It s about. all of us. Tate for all Diversity is not about them and us. It s about If you require this booklet in an alternative format please email cheryl.richardson@tate.org.uk or call 0207 8878026. all of us. Tate for all

More information

STATEMENT OF STRATEGY 2015-2017 AN ROINN OIDEACHAIS AGUS SCILEANNA DEPARTMENT OF EDUCATION AND SKILLS DEPARTMENT OF EDUCATION AND SKILLS 2015-2017

STATEMENT OF STRATEGY 2015-2017 AN ROINN OIDEACHAIS AGUS SCILEANNA DEPARTMENT OF EDUCATION AND SKILLS DEPARTMENT OF EDUCATION AND SKILLS 2015-2017 STATEMENT OF STRATEGY 2015-2017 AN ROINN OIDEACHAIS AGUS SCILEANNA DEPARTMENT OF EDUCATION AND SKILLS Foreword by the Minister I welcome the publication of the Statement of Strategy which sets out the

More information

An Implementation Guide and Toolkit for Making Every Contact Count: Using every opportunity to achieve health and wellbeing

An Implementation Guide and Toolkit for Making Every Contact Count: Using every opportunity to achieve health and wellbeing An Implementation Guide and Toolkit for Making Every Contact Count: Using every opportunity to achieve health and wellbeing Maintain or improve mental and physical wellbeing Maintain or improve mental

More information

Head of Business & Social Sciences Job Description. Leadership Spine L1 8

Head of Business & Social Sciences Job Description. Leadership Spine L1 8 Head of Business & Social Sciences Job Description Leadership Spine L1 8 This job description forms part of the contract of employment of the successful applicant. The appointment is subject to the conditions

More information

Corporate Risk Management Policy

Corporate Risk Management Policy Corporate Risk Management Policy Managing the Risk and Realising the Opportunity www.reading.gov.uk Risk Management is Good Management Page 1 of 19 Contents 1. Our Risk Management Vision 3 2. Introduction

More information

Communications Strategy

Communications Strategy Communications Strategy 2014-2017 Classification: Internal/Stakeholder 1. Introduction Good communication is central to the perception of City Property (Glasgow) LLP and our credibility. It is at the core

More information

SR0001 Maintaining Business Continuity including the Council s response to major civil emergencies. (Interim Programme Lead)

SR0001 Maintaining Business Continuity including the Council s response to major civil emergencies. (Interim Programme Lead) STRATEGIC RISK REPORT QUARTER 1 APRIL TO JUNE 2007 APPENDIX A SR0001 Maintaining Business Continuity including the Council s response to major civil emergencies. (Interim Programme Lead) Over 75% of business

More information

Delivering our Vision 5 Year Programme A Performance Management Framework Tier 1: Strategic goals and objectives RIGHT CARE, RIGHT PLACE, RIGHT TIME

Delivering our Vision 5 Year Programme A Performance Management Framework Tier 1: Strategic goals and objectives RIGHT CARE, RIGHT PLACE, RIGHT TIME Delivering our Vision 5 Year Programme A Performance Management Framework Tier 1: Strategic goals and objectives RIGHT CARE, RIGHT PLACE, RIGHT TIME To lead in the provision of emergency care; offering

More information

Management. Level 3 Diploma in Management (QCF) 2014 Skills CFA Level 3 Diploma in Management (QCF) Page 1

Management. Level 3 Diploma in Management (QCF) 2014 Skills CFA Level 3 Diploma in Management (QCF) Page 1 Management Level 3 Diploma in Management (QCF) 2014 Skills CFA Level 3 Diploma in Management (QCF) Page 1 Level 3 Diploma in Management (combined qualification) Qualification Title Credit Value 55 Level

More information

Sports Physiotherapist

Sports Physiotherapist Job Title: Department: Hours: Status: Sports Physiotherapist Exeter Chiefs Rugby Academy Programme at Bicton College 1 FTE = 37 hours Permanent Salary: 22,971-25,854 Child/Vulnerable Adult Contact: Frequent

More information

PERTH AND KINROSS COUNCIL. Housing and Health Committee 14 March 2012 JOINT PHYSICAL DISABILITY STRATEGY PROGRESS REPORT

PERTH AND KINROSS COUNCIL. Housing and Health Committee 14 March 2012 JOINT PHYSICAL DISABILITY STRATEGY PROGRESS REPORT PERTH AND KINROSS COUNCIL 8 12/121 Housing and Health Committee 14 March 2012 JOINT PHYSICAL DISABILITY STRATEGY PROGRESS REPORT Report by Executive Director (Housing and Community Care) ABSTRACT The purpose

More information

Middlesbrough Manager Competency Framework. Behaviours Business Skills Middlesbrough Manager

Middlesbrough Manager Competency Framework. Behaviours Business Skills Middlesbrough Manager Middlesbrough Manager Competency Framework + = Behaviours Business Skills Middlesbrough Manager Middlesbrough Manager Competency Framework Background Middlesbrough Council is going through significant

More information

ARGYLL AND BUTE COUNCIL SUPPORT SERVICES REVIEW HR & PAYROLL EXECUTIVE SUMMARY- 2 NOVEMBER 2011

ARGYLL AND BUTE COUNCIL SUPPORT SERVICES REVIEW HR & PAYROLL EXECUTIVE SUMMARY- 2 NOVEMBER 2011 ARGYLL AND BUTE COUNCIL SUPPORT SERVICES REVIEW HR & PAYROLL EXECUTIVE SUMMARY- 2 NOVEMBER 2011 1 Introduction 1.1 The Heads of Customer & Support Services, Improvement & HR and the workstream leads for

More information

PERFORMANCE APPRAISAL AND DEVELOPMENT AND KSF ANNUAL REVIEW

PERFORMANCE APPRAISAL AND DEVELOPMENT AND KSF ANNUAL REVIEW SECTION: HUMAN RESOURCES POLICY AND PROCEDURE No: 10.16 NATURE AND SCOPE: SUBJECT: POLICY AND PROCEDURE TRUST WIDE PERFORMANCE APPRAISAL AND DEVELOPMENT AND KSF ANNUAL REVIEW This policy explains the Performance

More information

Rehabilitation Network Strategy 2014 2017. Final Version 30 th June 2014

Rehabilitation Network Strategy 2014 2017. Final Version 30 th June 2014 Rehabilitation Network Strategy 2014 2017 Final Version 30 th June 2014 Contents Foreword 3 Introduction Our Strategy 4 Overview of the Cheshire and Merseyside Rehabilitation Network 6 Analysis of our

More information

Involving Patients in Service Improvement at Nottingham University Hospitals NHS Trust

Involving Patients in Service Improvement at Nottingham University Hospitals NHS Trust Involving Patients in Service Improvement at Nottingham University Hospitals NHS Trust Report to the Joint City and County Health Scrutiny Committee 12 July 2011 Introduction This paper provides additional

More information

Children s Services Improvement and Business Support. Service Review 2013/14

Children s Services Improvement and Business Support. Service Review 2013/14 Children s Services Improvement and Business Support Service Review 2013/14 Service Name: Children s Services Improvement and Business Support Service Contact: Richard Williams Date of review: 2013/14

More information

SCHOOL DISTRICT #81 FORT NELSON. District Literacy Plan June 2013

SCHOOL DISTRICT #81 FORT NELSON. District Literacy Plan June 2013 SCHOOL DISTRICT #81 FORT NELSON District Literacy Plan June 2013 1 District Literacy Plan June 2013 Introduction The Fort Nelson Board of Education recognizes the importance of improving access to literacy

More information

Ayrshire and Arran Tourism Partnership Plan Reviewed April 2007

Ayrshire and Arran Tourism Partnership Plan Reviewed April 2007 Ayrshire and Arran Tourism Partnership Plan Reviewed April 2007 1 AYRSHIRE & ARRAN TOURISM PARTNERSHIP PLAN AND THE TOURISM FRAMEWORK FOR CHANGE 2006-2009 Introduction In March 2004 the Minister for Culture,

More information

Moray Council. Adoption Plan

Moray Council. Adoption Plan APPENDIX 1 Moray Council Adoption Plan Review: - November 2013 Next Review: - September 2016 Adoption Plan 18.12 2013 Page 1 of 15 Introduction The Moray Council believes that children should be brought

More information

Performance Detailed Report. May 2008. Review of Performance Management. Norwich City Council. Audit 2007/08

Performance Detailed Report. May 2008. Review of Performance Management. Norwich City Council. Audit 2007/08 Performance Detailed Report May 2008 Review of Performance Management Audit 2007/08 External audit is an essential element in the process of accountability for public money and makes an important contribution

More information

DERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY

DERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY DERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY VERSION 1.0 ISSUED JULY 2015 CONTENTS Page CONTENTS VERSION CONTROL FOREWORD i ii iii POLICY 1 Scope 1 Aim and Objectives 1 Methods and Standards 1

More information

Principal Job Description

Principal Job Description Anfield School Anfield International Kindergarten Anfield International Kindergarten & Nursery Principal Job Description RESPONSIBLE TO: The School Board INTRODUCTION: This job description is based on

More information