1 AESO 2017 Business Plan and Budget Review Process Stakeholder Consultation Summary Presentation October 13, 2016

2 2017 Budget Review Process Amended process for 2017 Own Costs and Capital budgets Preparation and approval by December 2016 of 6-month budget for January to June 2017 Allows for additional time for more details on the government s policy initiatives to become available Followed by efficient stakeholder consultation in near term incorporating any AESO impacts Consultation will begin in March 2017 for a detailed 18-month budget for the period from July 2017 to December 2018 AESO Board approval by June 2017 Standard process for 2017 Transmission Operating Cost forecasts Preparation and approval by December 2016 of a 12-month forecast for

3 2017 and 2018 Budget Review Process Summary Stakeholder Consultation Process Business Plan and Budget Proposal Business Initiatives Transmission Operating Costs Own Costs and Capital Q Consultation Written process given limited new information Abbreviated document Continuation of existing initiatives Prepare and approval for 12- month forecast for 2017 Jan to Jun 2017 budget based on 2016 approved budget Q1/Q Consultation Consistent with prior years process for full stakeholder engagement and technical meetings Comprehensive document Detailed review and consultation with stakeholders Prepare and approval for 12- month forecast for 2018 Detailed review and consultation with stakeholders for the period from Jul 2017 to Dec

4 Presentation of 2017 Information Additional information to the following PowerPoint presentation is provided in the Word document titled Supplementary 2017 Forecast and Budget Information In the absence of in-person stakeholder meetings, this information provides the details that would have otherwise been disclosed through verbal discussion The Word document has been cross-referenced to the slide numbers in this presentation for ease of reading 4

5 2017 Business Initiatives

6 Business Initiatives Summary Presentation of the major strategies and initiatives (i.e. AESO s business priorities) For the period from January to June 2017, these are the carryforward initiatives presented to stakeholders in prior consultation processes Additional information on 2016 achievements and 2017 plans is provided in the following slides 6

7 Business Initiatives Supporting Strategic Objective 1 Framework Business Initiative Expected Achievement 2016 Plans 2017 Market Evolution Ongoing assessment of market design, structural elements and implementation of related changes Design, Consult, Implementation Design, Consult (rules development), Implementation Climate Change Program Renewable Electricity Program (REP) Government of Alberta (GoA) endorsed; AESO positioned to open first competition in Q4 or in line with revised GoA timelines; Commencement (first stage) of first competition Framework monitoring, assessment of proposed changes and related recommendations Implement first REP competition (Round 1) and identify winning bidders Framework monitoring, assessment of proposed changes and related recommendations Market Initiatives Consult, Design and Implement Determine the integration plan for new products and/or technologies (e.g. operating reserve amendments, technical standards and tariff provisions); Implement plan - Storage, Mothballing and Intertie Restoration inflight Implementation Tariff provisions for storage to be filed as part of the next General Tariff Application (GTA) in 2017 Other new products/technologies to continue Market Systems Replacement - Replacement and/or reengineering of market systems determined to have reached endof-life Implementation Implementation (future sustainment iterations) Market Systems Replacement and Reengineering (MSR) Complete MSR System reliability components (short-term sustainment) Continuation of future sustainment initiative 7

8 Business Initiatives Supporting Strategic Objective 1 continued Business Initiative Expected Achievement 2016 Plans 2017 Tariff and Technical Standards Enhancements Consult and Design Implementation 2017 General Tariff Application (GTA) Technical Standards and Rules Major components include how energy storage will be managed in the tariff, Section 8 (customer contributions) changes and cost/causation study Consult, Design and Implement Prioritization and Advancement of Loss Factor rule; Alberta Reliability Standards (80 new standards and revisions required); and Technical Rules (Customer Connection, Substation, Transmission Line and Metering Rules) File GTA with AUC Consult, Design and Implement Continue to advance Loss Factor rule, Alberta Reliability Standards and Technical Rules Major Projects Design, development and deployment activities for projects having notable industry impact Advancement of the Fort McMurray West (FMW) Project Design, Implementation Implementation (Formerly referred to as CP Integration) AESO regulatory proceedings involvement where applicable; Continued Project integration; Preparation for Debt Funding Competition (DFC) Develop programs to manage the FMW Project post energization; Implementation of DFC 8

9 Business Initiatives Supporting Strategic Objective 2 Value Business Initiative Expected Achievement 2016 Plans 2017 Reliability Program Facility, process and technology enhancements to improve grid reliability Implementation Implementation Energy Management System (EMS) Upgrade System Control Centre (SCC) Facility Expansion Replacement infrastructure procurement and configuration; Factory Acceptance Testing complete Implementation Complete definition phase including all preliminary approvals; Subject to Board approval, commence implementation phase and develop schedule Production implementation by July 2017 Implementation Continue implementation phase RFP, permit applications, other as required Security Critical Infrastructure Protection (CIP), Information Technology (IT) and cyber security enhancements Implementation Implementation Alberta Reliability Standards CIP Implementation IT and Cyber Security Advancements Develop internal CIP process and procedure requirements; Establish compliance approach for monitoring market participants and guidance on preparing compliance evidence Implementation IT and Cyber Security advanced in accordance with AESO business plan Complete internal compliance requirements and related audits; Set up market participant compliance program Implementation Continue to advance IT and Cyber Security program 9

10 Business Initiatives Supporting Strategic Objective 3 People Business Initiative Expected Achievement 2016 Plans 2017 Advance maturity level of our Human Resources processes Design, Implementation Design, Implementation Workforce capabilities - expanded Increase workforce capabilities by broadening knowledge (AESO and industry) across the organization; Program development of cross functional practice and learning opportunities realized; Enhance learning and development programs to meet future needs as identified in strategic plan; Establish broader exposure and a comprehensive understanding of corporate skills and competencies required in the future ( HR strategy and roadmap roll out) continued from

11 2017 Transmission Operating Cost Forecast

12 AESO Disclaimer The information contained in this document is published in accordance with the AESO s legislative obligations and is for information purposes only. As such, the AESO makes no warranties or representations as to the accuracy, completeness or fitness for any particular purpose with respect to the information contained herein, whether expressed or implied. While the AESO has made every attempt to ensure the information contained herein is timely and represents a reasonable forecast, the AESO is not responsible for any errors or omissions. Consequently, any reliance placed on the information contained herein is at the reader s sole risk. 12

13 Operating Cost Forecast Summary ($ millions) 2017 Forecast 2016 Projected 2016 Forecast 2015 Actual Wires Costs 1, , , ,596.0 Ancillary Services Transmission Line Losses Other Industry Costs* TOTAL 2, , , ,865.7 Pool Price (per MWh) $32 $21 $41 $33 * Includes transmission and energy market costs Forecast current estimate of future costs Projected current estimate of current year costs based on actual costs as of August 2016 combined with a forecast for the remaining four months of the year 13

14 2017 Pool Price Forecast

15 Price Forecast for 2017 Hourly pool price forecast is an integral input into calculating the forecast costs for ancillary services and transmission line losses AESO in-house generated hourly pool price forecasts from 2013 to 2016 for BRP forecasting purposes For 2017 BRP, the 2017 hourly pool price forecast is obtained from the EDC Associates Q Update Report Decision to use the EDC forecast was due to competing AESO priorities for staff resources EDC hourly pool prices were used in 2012 and prior BRP forecasts; they are considered as a reliable industry information source 15

16 Price Forecast for 2017 (continued) The EDC Associates Q Update Report pool price forecast includes the following: A trend for more generators to run closer to variable cost No impact to 2017 from the accelerated coal retirement plan Carbon price increases As of September 29, 2016, the 2017 forward market price* aligns to the EDC forecast at $32/MWh EDC Forecast 2017 Forward Market * 2017 Projected 2016 Average Hourly Pool Price (per MWh) $31.82 $31.50 $20.82 AECO-C Natural Gas Price (per GJ) $2.73 $2.71 $1.92 * Source: NGX (Sept 29, 2016) 16

17 Actual and Forecast Prices and Heat Rate $ Heat Rate, Gas Price $43.93 $3.84 $62.99 $54.59 $6.30 $6.19 $70.36 $8.27 $80.79 $66.95 $6.17 $6.10 $7.73 $80.19 $76.22 $64.32 $47.81 $50.88 $49.42 $3.76 $3.79 $4.25 $3.44 $2.27 $3.01 $33.34 $31.82 $20.82 $2.56 $1.92 $ Pool Price E 2017E Market Heat Rate (GJ/MWh) Gas Price ($/GJ) Pool Price ($/MWh) 0 17

18 Price Duration Curve Year-to-Date September 2016 $60 $17.02 as of 30 Sep 2016 $16.42 excluding highest 10 days This graph indicates the impact of high daily pool prices on the annual average. In past years, a few days of high prices had a material impact on the annual average pool price. This is not the case for 2016, which has not had any high pool price days. 20 Daily Price ($/MWh) $45 $30 $ Average Price ($/MWh) $ Day of Year Daily Price ($/MWh) Annual Average Price ($/MWh) 18

19 2017 Load Forecast

20 Load Forecast Assumptions The 2017 load forecast was prepared by the AESO for the purpose of the BRP and has considered: Alberta GDP, population and labor predictions from the Conference Board of Canada Outlook (June 2016) Historic weather patterns (40-year average temperatures) 2017 load is forecast to increase by 2% from 2016 projected values, which would be consistent with 2015 volumes 20

21 Load Forecast 2016: i) Lower actual volumes in May and June 2016 are associated with the Fort McMurray fires; ii) decreases in other months when comparing 2016 to 2015 relate to economic impacts and temperature variances. 2017: Based on the outlook for 2017 for Alberta s GDP and key indicators from the Conference Board of Canada, it is expected that load volumes will return to the 2015 levels during

22 2017 Wires Cost Forecast

23 Wires Costs Summary ($ millions) 2017 Forecast 2016 Projected 2016 Forecast 2015 Actual 2015 Forecast Wires 1, , , , ,367.7 Invitation to Bid on Credit (IBOC) Location Based Credit Standing Offer (LBC SO) TOTAL 1, , , , ,373.7 Wires costs are the amounts paid to TFOs in accordance with their AUCapproved tariffs and are not controllable costs of the AESO IBOC and LBC SO programs are long-term contracts that were initiated in 2001 and 2002 as incentives for generation to locate closer to major load centres IBOC costs are forecast to increase in 2016 and 2017 relative to previous years due to anticipated facility operating operating conditions LBC SO costs are forecast to be lower than 2015 due to reduced dispatches 23

24 2017 Ancillary Services Cost Forecast

25 Ancillary Services Costs Summary Refer to the Word document for additional details ($ millions) 2017 Forecast 2016 Projected 2016 Forecast 2015 Actual 2015 Forecast Operating Reserve (OR) Load Shed Service for Imports (LSSi) Contracted Transmission Must-run 2.8 n/a n/a n/a n/a (TMR) Conscripted Services (OR and TMR) Reliability Service Poplar Hill Blackstart Transmission Constraint Rebalancing (TCR) n/a TOTAL Pool Price (per MWh) $31.82 $20.82 $40.99 $33.34 $41.49 Gas Price (per GJ) $2.73 $1.92 $3.29 $2.56 $

26 Forecast Methodology Operating Reserves (OR) Forecast OR costs is the sum of forecast hourly volumes multiplied by the hourly OR price, Volumes: set by Alberta Reliability Standard requirements and dependent on forecast generation OR Price: hourly price of operating reserves determined for each product type There are no changes to the methodology in preparing the 2017 forecast 26

27 2017 Transmission Line Losses Cost Forecast

28 Transmission Line Loss Costs Summary 2017 Forecast 2016 Projected 2016 Forecast 2015 Actual 2014 Actual Cost ($ million) $74.1 $44.4 $111.9 $75.8 $119.5 Volume (GWh) 2,291 2,235 2,577 2,325 2,472 Pool Price ($/MWh) $31.82 $20.82 $40.99 $33.34 $

29 Forecast Methodology Line Losses Forecast transmission line losses costs is the sum of hourly volumes multiplied by hourly pool prices Volumes: 5-year historical actual losses volumes as a percentage of demand and forecast load volumes Pool Price: hourly pool price provided by EDC There are no changes to the methodology in preparing the 2017 forecast 29

30 2017 Other Industry Forecast

31 Other Industry Costs Summary ($ millions) 2017 Forecast 2016 Projected 2016 Budget 2015 Actual 2015 Budget AUC Fees Transmission AUC Fees Energy Market Regulatory Process Costs WECC/NWPP* Costs TOTAL * Western Electricity Coordinating Council / Northwest Power Pool 31

32 2017 Own Costs

33 Jan to June 2017 Own Cost Budget Amended process for 2017 Own Cost budgets Preparation of January to June 2017 for approval by December 2016 Allows for additional time for more details on the government s policy initiatives to become available Followed by efficient stakeholder consultation in near term incorporating any AESO impacts Subsequent BRP for the remaining 6 months of 2017 For simplicity, 6-month budget proposed equal to half of 2016 approved G&A, interest and amortization budgets This approach will allow for continued focus on current initiatives with no material changes to occur prior to subsequent budget approval for July 2017 onward 33

34 Own Costs Summary ($ millions) 2017 Budget (6 months) 2016 Projected YTD August Budget 2015 Actual 2015 Budget General & Administration Interest Amortization TOTAL

35 2017 Capital Budget

36 Jan to June 2017 Capital Budget Proposed budget for 6 months of $15.4 million Current assessment for the full year of 2017 would be a capital budget requirement of $31.5 million, however 6-month funding will be requested with further assessment to occur during the July 2017 to December 2018 BRP No major projects that have not previously been discussed with stakeholders have been included Jan to Jun 2017 funding will enable continued progression on the inflight projects and maintenance of base load initiatives Proposed budget is based on an allocation model applied to the current assessment for the full year of

37 Capital Budget Summary * Budget Budget Projected Budget Actual (6 months) (Estimate) Key Capital Initiatives Other Capital Initiatives Life Cycle Funding Sub total Special - MSR Special - EMS Special - SCC Sub total General capital costs in 2016 projected to be $4.2 million lower than budget mainly due to an Oracle environment refresh that was deferred Total *Aug 31, 2016 Definitions: Key Capital Initiatives Most critical projects that the AESO believes must be completed within the timeframe identified Other Capital Initiatives Other projects that have more flexibility in planning or delivery so timing is not as critical Life Cycle Funding Hardware replacements (end of useful life) and recurring software upgrades and leasehold improvements 37

38 2017 Capital Budget Estimate Capital Expenditures ($ million) Estimate Projected 1 Budget Actual Key Capital Initiatives 1. Reliability (EMS 2 elements) Reliability (other - non EMS elements) Critical Infrastructure Protection IT & Cyber Security MSR 3 - Sustainment Market Evolution Intertie Framework Cost Accountability Technology Review (website refresh) Facilities Total Key Capital Initiatives Other Capital Initiatives Life Cycle Funding SubTotal Capital Major - EMS Major - MSR Major - SCC Total Capital Differences are due to rounding 1 August 31, Spent plus estimate to complete for current year. 3 Market System Replacement & Reegineering (sustainment activities only) 2 Energy Management System 4 System Coordination Centre Expansion 38

39 2017 Energy Market Trading Charge

40 Proposed Energy Market Trading Charge Proposing to continue with the current AESO portion of the energy market trading charge until July 1, 2017 January 1, 2017 trading charge may change due to the Market Surveillance Administrator (MSA) component which will be communicated to the AESO in the latter part of 2016; there was no MSA charge (or refund) in 2016 Trading Charge Components ( per MWh) Jan to Jun 2017 Proposed 2016 Actual AESO Costs Energy Market Deficit / (Surplus) - - AESO Component AUC s Portion of Energy Market Administration Fee Total

Memo. AESO Board. Should you have any questions or additional information requirements please let me know. Yours truly, Todd Fior

Memo. AESO Board. Should you have any questions or additional information requirements please let me know. Yours truly, Todd Fior Memo To: AESO Board From: Vice-President, Finance Date: October 29, 2015 Subject: AESO 2016 Busines Plan Enclosed is the AESO 2016 Business Plan (Business Plan). This document was prepared by AESO Management

More information

AESO 2014 Business Plan and Budget Proposal

AESO 2014 Business Plan and Budget Proposal AESO 2014 Business Plan and Budget Proposal November 1, 2013 Table of Contents Section 1 Section 2 Section 3 Board Decision Items Executive Summary Stakeholder Presentations to the AESO Board Stakeholder

More information

Energy Management System (EMS) 3.0 Implementation Overview for BRP Consultation. July 2015

Energy Management System (EMS) 3.0 Implementation Overview for BRP Consultation. July 2015 Energy Management System (EMS) 3.0 Implementation Overview for BRP Consultation July 2015 Background Energy Management System EMS - Used by System Controllers to monitor, control and optimize the performance

More information

To learn more about Berkshire Hathaway Energy s commitment, please visit their website.

To learn more about Berkshire Hathaway Energy s commitment, please visit their website. A new look with a new owner On Monday, December 1, 2014 Berkshire Hathaway Energy completed the purchase of AltaLink. The sale received the provincial approval from the Alberta Utilities Commission (AUC)

More information

The Corporation of the City of London Quarterly Report on Internal Audit Results

The Corporation of the City of London Quarterly Report on Internal Audit Results www.pwc.com/ca The Corporation of the City of London Quarterly Report on Internal Audit Results - Corporate Services - IT: Project Management and System Prioritization February 13, 2014 Agenda Rating Scale

More information

Three Months Ended Nine Months Ended September 30 September 30

Three Months Ended Nine Months Ended September 30 September 30 HIGHLIGHTS Three Months Ended Nine Months Ended September 30 September 30 (millions of Canadian dollars, unless otherwise noted) 2011 2010 2011 2010 Total revenues 788.2 552.0 2,251.1 1,748.2 Operating

More information

Business Requirements Specification

Business Requirements Specification Business s Specification Capacity Procurement Mechanism Replacement Doc ID: GNFDMDEHU6BB-46-53 Page 1 of 18 Disclaimer All information contained in this draft Business s Specification (BRS) as provided

More information

NUVISTA ENERGY LTD. Consolidated Statements of Financial Position (unaudited)

NUVISTA ENERGY LTD. Consolidated Statements of Financial Position (unaudited) NUVISTA ENERGY LTD. Consolidated Statements of Financial Position (unaudited) ($Cdn thousands) Assets Current assets Cash and cash equivalents $ - $ - Accounts receivable and prepaids 42,980 30,317 Assets

More information

2017 Budget and Grid Management Charge Initial Stakeholder Meeting

2017 Budget and Grid Management Charge Initial Stakeholder Meeting 2017 Budget and Grid Management Charge Initial Stakeholder Meeting June 16, 2016 Page 1 Agenda Topic 2017 Budget Process & GMC Rate Outlook Managing Employee Compensation Presenter(s) Ryan Seghesio & April

More information

RIIO-T1 business plan submission London Tuesday 6 September 2011

RIIO-T1 business plan submission London Tuesday 6 September 2011 RIIO-T1 business plan submission London Tuesday 6 September 2011 Cautionary statement This presentation contains certain statements that are neither reported financial results nor other historical information.

More information

NUVISTA ENERGY LTD. Consolidated Statements of Financial Position (unaudited)

NUVISTA ENERGY LTD. Consolidated Statements of Financial Position (unaudited) NUVISTA ENERGY LTD. Consolidated Statements of Financial Position (unaudited) ($Cdn thousands) Assets Current assets Cash and cash equivalents $ - $ - Accounts receivable and prepaids 35,443 30,317 Assets

More information

Electricity Supply. Monthly Energy Output by Fuel Type (MWh)

Electricity Supply. Monthly Energy Output by Fuel Type (MWh) Ontario Energy Report Q4 Electricity October December Electricity Supply Electricity production was lower in Q4 than in previous years, with milder than normal weather in October and December resulting

More information

From: Steve Berberich, Vice President of Technology and Corporate Services and Chief Financial Officer

From: Steve Berberich, Vice President of Technology and Corporate Services and Chief Financial Officer California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Steve Berberich, Vice President of Technology and Corporate Services and Chief Financial Officer Date: September

More information

Industries Association. ERCOT Successes and Challenges

Industries Association. ERCOT Successes and Challenges Texas Renewable Energy Industries Association ERCOT Successes and Challenges Laura Doll Board Chair Electric Reliability Council of Texas November 7, 2011 ERCOT Overview The ERCOT market covers roughly

More information

1. No objection - although Edmonton meetings are always appreciated.

1. No objection - although Edmonton meetings are always appreciated. Stakeholder Comment and AESO Replies Matrix AESO Consultation 2013 Budget Review Process: Meeting September 14, 2012 - AESO s Draft Business Initiatives for 2013 The AESO is asking market participants

More information

ERCOT Monthly Operational Overview (March 2014) ERCOT Public April 15, 2014

ERCOT Monthly Operational Overview (March 2014) ERCOT Public April 15, 2014 ERCOT Monthly Operational Overview (March 2014) ERCOT Public April 15, 2014 Grid Operations & Planning Summary March 2014 Operations The peak demand of 54,549 MW on March 3 rd was greater than the mid-term

More information

MANAGEMENT S DISCUSSION AND ANALYSIS

MANAGEMENT S DISCUSSION AND ANALYSIS MANAGEMENT S DISCUSSION AND ANALYSIS FOR THE THREE MONTHS ENDED MARCH 31, 2013 MANAGEMENT S DISCUSSION AND ANALYSIS This MD&A should be read in conjunction with the Corporation s unaudited interim consolidated

More information

BUSINESS PLAN: 2012 2013 to 2014 2015

BUSINESS PLAN: 2012 2013 to 2014 2015 BUSINESS PLAN: 2012 2013 to 2014 2015 ALBERTA UTILITIES COMMISSION The Alberta Utilities Commission (AUC) is an independent, quasi-judicial agency of the Government of Alberta. While the Minister of Energy

More information

Utah Associated Municipal Power Systems. Kaysville City May 6, 2014

Utah Associated Municipal Power Systems. Kaysville City May 6, 2014 Utah Associated Municipal Power Systems Kaysville City May 6, 2014 UAMPS Overview An energy services interlocal that provides electric services on a non-profit basis to its members. Organized to develop,

More information

EE and Reliability: SCE s LCR RFO and Preferred Resources Pilot. ACEEE Energy Efficiency as a Resource National Conference Mohammed Aliuddin

EE and Reliability: SCE s LCR RFO and Preferred Resources Pilot. ACEEE Energy Efficiency as a Resource National Conference Mohammed Aliuddin EE and Reliability: SCE s LCR RFO and Preferred Resources Pilot ACEEE Energy Efficiency as a Resource National Conference Mohammed Aliuddin 1 Several major drivers have led to initiatives that are changing

More information

City of Palo Alto (ID # 1521) Finance Committee Staff Report

City of Palo Alto (ID # 1521) Finance Committee Staff Report City of Palo Alto Finance Committee Staff Report Report Type: Meeting Date: 4/19/2011 Summary Title: SAP Enterprise Resource Planning Assessment Title: Post-Implementation SAP Enterprise Resource Planning

More information

Which Way Now: Does your organisation have an Oracle ERP roadmap? Dave Baines, ERP Specialist, Version 1

Which Way Now: Does your organisation have an Oracle ERP roadmap? Dave Baines, ERP Specialist, Version 1 Which Way Now: Does your organisation have an Oracle ERP roadmap? Dave Baines, ERP Specialist, Version 1 Oracle ERP Webinar Series 1 2 Digitally Transform Oracle ERP 24th February 12:30pm Download Slides

More information

Scotiabank Financials Summit September 4, 2014

Scotiabank Financials Summit September 4, 2014 Scotiabank Financials Summit September 4, 2014 Customers Capital Bank ~7,000 customers, high level of recurring revenue 2 Forward-Looking Statements This presentation contains certain statements that constitute

More information

Levelized Cost of New Electricity Generating Technologies

Levelized Cost of New Electricity Generating Technologies Levelized Cost of New Electricity Generating Technologies The Energy Information Administration (EIA) produces forecasts of energy supply and demand for the next 20 years using the National Energy Modeling

More information

Alberta Wholesale Market A description of basic structural features undertaken as part of the 2012 State of the Market Report

Alberta Wholesale Market A description of basic structural features undertaken as part of the 2012 State of the Market Report Alberta Wholesale Market A description of basic structural features undertaken as part of the 2012 State of the Market Report August 30, 2012 Market Surveillance Administrator 403.705.3181 #500, 400 5th

More information

Sample. Alberta Company. Your electricity bill. Bill date March 18, 2012. Your use this month. Your use this year. Important. You owe 121.

Sample. Alberta Company. Your electricity bill. Bill date March 18, 2012. Your use this month. Your use this year. Important. You owe 121. Page 1 of 4 Customer Service 780 123 4567 Toll-free 1-800 123 4567 Emergency 780 123 3333 Website www.company.ca Your electricity bill Bill date March 18, 2012 You owe 121.18 Pay by March 28, 2012 Your

More information

A Virtual Power Plant to balance wind energy - A Canadian Smart Grid Project. Number of customers

A Virtual Power Plant to balance wind energy - A Canadian Smart Grid Project. Number of customers PowerShift Atlantic will demonstrate one of the world s first virtual power plants designed to allow for more effective integration and balancing of wind power onto the power grid. The project is a collaborative

More information

Inter Pipeline Fund Announces Strong Third Quarter 2009 Results

Inter Pipeline Fund Announces Strong Third Quarter 2009 Results News Release Inter Pipeline Fund Announces Strong Third Quarter 2009 Results CALGARY, ALBERTA, NOVEMBER 5, 2009: Inter Pipeline Fund ( Inter Pipeline ) (TSX: IPL.UN) announced today its financial and operating

More information

2015 Half-Year Results

2015 Half-Year Results 2015 Half-Year Results 26 August 2015 Copyright Copyright 2015 2015 APR Energy. APR Energy. All Rights All Rights Reserved. Reserved. APR Energy, APR Energy, its logo, its logo, and Powering and Powering

More information

Resource Planning Update. June 16, 2016 Board Meeting Presentation

Resource Planning Update. June 16, 2016 Board Meeting Presentation Resource Planning Update June 16, 2016 Board Meeting Presentation Strategic Directives SD-9 Resource Planning: The Board of Directors recognizes that the District will have to adapt to the rapidly changing

More information

September 21, 2015 Investor Conference Call. Bi-Monthly Credit Review

September 21, 2015 Investor Conference Call. Bi-Monthly Credit Review September 21, 2015 Investor Conference Call Bi-Monthly Credit Review Disclaimer This presentation has been prepared by the Commonwealth of Massachusetts to provide summary information relative to the general

More information

ELECTRICITY FINAL BUDGET AND FEES: 2015-16

ELECTRICITY FINAL BUDGET AND FEES: 2015-16 ELECTRICITY FINAL BUDGET AND FEES: 2015-16 PUBLISHED MAY 2015 CONTENTS EXECUTIVE SUMMARY 4 Introduction 4 2015-16 fees 4 Contacts 5 Energy consumption 6 National Electricity Market (NEM) 6 Revenue requirement

More information

2006 & 2007 Earnings Guidance Conference Call and Webcast December 14, 2006

2006 & 2007 Earnings Guidance Conference Call and Webcast December 14, 2006 2006 & 2007 Earnings Guidance Conference Call and Webcast December 14, 2006 Forward-Looking Statements Statements contained or incorporated by reference in these slides regarding future events and developments

More information

Innovative Funding Options for Energy Efficiency Initiatives

Innovative Funding Options for Energy Efficiency Initiatives Innovative Funding Options for Energy Efficiency Initiatives A Constellation Whitepaper January 2013 Innovative Funding Options For Energy Efficiency Initiatives Greg Fox, Director of Business Development

More information

2017 19 TasNetworks Regulatory Proposal Expenditure Forecasting Methodology

2017 19 TasNetworks Regulatory Proposal Expenditure Forecasting Methodology 2017 19 TasNetworks Regulatory Proposal Expenditure Forecasting Methodology Version Number 1 26 June 2015 Tasmanian Networks Pty Ltd (ACN 167 357 299) Table of contents 1 Introduction... 1 2 Meeting our

More information

Canadian Life Insurance Industry

Canadian Life Insurance Industry A.M. Best Company s 9 th Annual Insurance Market Briefing Canada Canadian Life Insurance Industry Edward Kohlberg, CPA, FLMI Senior Financial Analyst Richard McMillan Senior Financial Analyst September

More information

LeSueur, Jeff. Marketing Automation: Practical Steps to More Effective Direct Marketing. Copyright 2007, SAS Institute Inc., Cary, North Carolina,

LeSueur, Jeff. Marketing Automation: Practical Steps to More Effective Direct Marketing. Copyright 2007, SAS Institute Inc., Cary, North Carolina, Preface. Overview. PART 1: Marketing Financials. Chapter 1 Profit and Loss Fundamentals. Chapter 2 Profit and Loss Component Details. Chapter 3 Managing the P&L. Chapter 4 Measuring Marketing Effectiveness.

More information

B O A R D M E E T I N G N a s h v i l l e, T e n n e s s e e November 6, 2014

B O A R D M E E T I N G N a s h v i l l e, T e n n e s s e e November 6, 2014 B O A R D M E E T I N G Nashville, Tennessee November 6, 2014 PRESIDENT S REPORT B i l l J o h n s o n President & CEO Energy Environment Economic Development FY 2014 Overall Performance Safety Record

More information

CANADIAN RENEWABLE ENERGY POLICIES. Matthew H. Brown InterEnergy Solutions 2007

CANADIAN RENEWABLE ENERGY POLICIES. Matthew H. Brown InterEnergy Solutions 2007 CANADIAN RENEWABLE ENERGY POLICIES Matthew H. Brown InterEnergy Solutions 2007 The following offers an overview of Canadian federal and provincial policies that promote renewable energy. It is excerpted

More information

Pennsylvania Act 129 Phase I Economic Impact Assessment Report

Pennsylvania Act 129 Phase I Economic Impact Assessment Report Pennsylvania Act 129 Phase I Economic Impact Assessment Report Bureau of Technical Utility Services PA Public Utility Commission August 2014 Statement of Intent On February 25, 2014 Commissioner Cawley

More information

Methodology for Merit Order Dispatch. Version 1.0

Methodology for Merit Order Dispatch. Version 1.0 Methodology for Merit Order Dispatch Version 1.0 25 th April 2011 TABLE OF CONTENTS 1. OBJECTIVES... 1 2. ROADMAP FOR IMPLEMENTATION... 1 3. DEFINITIONS... 3 4. OPERATIONS PLANNING... 3 4.1. General Considerations...

More information

ELECTRICITY FINAL BUDGET AND FEES: 2016-17

ELECTRICITY FINAL BUDGET AND FEES: 2016-17 ELECTRICITY FINAL BUDGET AND FEES: 2016-17 Published: May 2016 CONTENTS EXECUTIVE SUMMARY 4 1.1 Introduction 4 1.2 Key messages 4 1.3 2016-17 fees 5 1.4 Budget contacts 5 NATIONAL ELECTRICITY MARKET 6

More information

Technical Bulletin 2011-04-01. Bid Cost Recovery and Accounting for Delivered Minimum Load Energy Market Revenues. Market Issue

Technical Bulletin 2011-04-01. Bid Cost Recovery and Accounting for Delivered Minimum Load Energy Market Revenues. Market Issue Technical Bulletin 2011-04-01 Bid Cost Recovery and Accounting for Delivered Minimum Load Energy Market Revenues Market Issue April 5, 2011 Technical Bulletin 2011-04-01 Bid Cost Recovery and Accounting

More information

Ontario Energy Board. 2013-2016 Business Plan Package

Ontario Energy Board. 2013-2016 Business Plan Package Ontario Energy Board 2013-2016 Business Plan Package Table of Contents Business Plan... 1 Appendix A Mandate Appendix B Factors that may affect achievement Appendix C Performance Assessment Budget...2

More information

The Town of Fort Frances

The Town of Fort Frances The Town of Fort Frances Long-Term Capital Financial Plan POLICY Resolution Number: 391 (Consent) 12/09 SECTION ADMINISTRATION AND FINANCE NEW: December 2009 REVISED: Supercedes Resolution No. Policy Number:

More information

2016 ASSESSMENT RATES

2016 ASSESSMENT RATES 2016 ASSESSMENT RATES FOREWORD WorkSafeNB determines employers assessment rates annually. Several factors influence rates, such as WorkSafeNB s current financial obligations, the prevailing economic environment,

More information

Natural Gas Wholesale Prices at PG&E Citygate as of November 7, 2006

Natural Gas Wholesale Prices at PG&E Citygate as of November 7, 2006 QUARTERLY GAS ISSUES UPDATE December 26 I. Supply Issues Wholesale Natural Gas Prices Above normal temperatures and a lack of hurricane activity caused market prices to decrease in October. By November,

More information

Developing Power Projects in Southern Africa. Cape Town Presentation 8 th February 2016

Developing Power Projects in Southern Africa. Cape Town Presentation 8 th February 2016 Developing Power Projects in Southern Africa Cape Town Presentation 8 th February 2016 Company Highlights AFR now participating in the development of three large-scale power projects in Botswana Completion

More information

Department of Management and Budget

Department of Management and Budget Director Debt Deputy Director and Budget FOCUS Business Support Group Budget Development & Production Revenue & Tax Analysis Customer & Information Technology Core Financial Processing Capital Projects/CIP

More information

Integrated Financial Plan FY2012

Integrated Financial Plan FY2012 Integrated Financial FY Delivering The new reality The fiscal year Integrated Financial (IFP) has an Operating with a projected Operating Loss of $3.0 billion, versus a loss of $2.2 billion in, despite

More information

Instructions for use:

Instructions for use: TRANSMISSION MONTHLY PROJECT PROGRESS REPORT INSTRUCTIONS FOR COMPLETION TEMPLATE Instructions for use: PURPOSE OF FORM: The Transmission monthly Project Progress Report form is to be used by the Transmission

More information

Board Update. Performance Management Activities

Board Update. Performance Management Activities Board Update Performance Management Activities May 2007 Purpose of Today s Meeting Update Board Members Share Scope, Plans & Results» Benchmarking & Performance Improvement» Compliance Activities 1 Chugach

More information

Lockheed Martin Corporation

Lockheed Martin Corporation Lockheed Martin Corporation 3 rd Quarter 2015 Financial Results Conference Call 11:00 am EDT Webcast login at www.lockheedmartin.com/investor Webcast replay & podcast available by 2:00 p.m. EDT at www.lockheedmartin.com/investor.

More information

CODE: E.003 Financial Services BUDGET AND BUSINESS PLANNING POLICY. 1.2 The essential activities covered by this policy include:

CODE: E.003 Financial Services BUDGET AND BUSINESS PLANNING POLICY. 1.2 The essential activities covered by this policy include: BUDGET AND BUSINESS PLANNING POLICY CONTENTS 1.1 Budget and business planning is undertaken to support strategic planning and decision-making and to serve accountability by enabling administration to plan

More information

Price to Compare (PTC) Sample Calculation DISCLAIMER

Price to Compare (PTC) Sample Calculation DISCLAIMER Price to Compare (PTC) Sample Calculation DISCLAIMER Disclaimer This document does not include factors/adders such as surcharges and sales taxes applicable to PECO distribution service. The PTC contained

More information

Agenda Report. April 8, 2013. Honorable Mayor and City Council TO: THROUGH: Finance Committee (April 8, 2013) FROM: Water and Power Department

Agenda Report. April 8, 2013. Honorable Mayor and City Council TO: THROUGH: Finance Committee (April 8, 2013) FROM: Water and Power Department Agenda Report April 8, 2013 TO: Honorable Mayor and City Council THROUGH: Finance Committee (April 8, 2013) FROM: SUBJECT: Water and Power Department AUTHORIZATION TO ENTER INTO CONTRACTS WITH DESIGNATED

More information

Toscana Resource Corporation Condensed Consolidated Interim Financial Statements

Toscana Resource Corporation Condensed Consolidated Interim Financial Statements TOSCANA RESOURCE CORPORATION Toscana Resource Corporation Condensed Consolidated Interim Financial Statements March 31, 2012 and 2011 Condensed Consolidated Interim Statements of Financial Position As

More information

OPERATING FUND. PRELIMINARY & UNAUDITED FINANCIAL HIGHLIGHTS September 30, 2015 RENDELL L. JONES CHIEF FINANCIAL OFFICER

OPERATING FUND. PRELIMINARY & UNAUDITED FINANCIAL HIGHLIGHTS September 30, 2015 RENDELL L. JONES CHIEF FINANCIAL OFFICER PRELIMINARY & UNAUDITED FINANCIAL HIGHLIGHTS September 30, 2015 RENDELL L. JONES CHIEF FINANCIAL OFFICER MANAGEMENT OVERVIEW September 30, 2015 Balance Sheet Cash and cash equivalents had a month-end balance

More information

Wrestling With a Tough Economic Equation: 2016 Impacts on Human Capital

Wrestling With a Tough Economic Equation: 2016 Impacts on Human Capital Wrestling With a Tough Economic Equation: 2016 Impacts on Human Capital June 2016 Prepared by: The Wynford Group The information presented in this report is a short sampling of results and interpretation

More information

TARIFF AND GOVERNANCE ASSESSMENT

TARIFF AND GOVERNANCE ASSESSMENT Power System Expansion and Efficiency Improvement Investment Program (RRP BAN 42378) A. Tariff Assessment 1. Introduction TARIFF AND GOVERNANCE ASSESSMENT 1. Electricity tariffs in Bangladesh are unbundled

More information

Natural Gas Diversification Strategy for PREPA GOVERNMENT DEVELOPMENT BANK FOR PUERTO RICO

Natural Gas Diversification Strategy for PREPA GOVERNMENT DEVELOPMENT BANK FOR PUERTO RICO Natural Gas Diversification Strategy for PREPA GOVERNMENT DEVELOPMENT BANK FOR PUERTO RICO Agenda 1 Importance of Diversifying to Natural Gas 2 Natural Gas Diversification Strategy 2 Currently, Puerto

More information

Item 8.1: Third Quarter 2013KPIs Update

Item 8.1: Third Quarter 2013KPIs Update Item 8.1: Third Quarter 2013KPIs Update Paula Feuerbacher Strategic Projects Senior Advisor Human Resources and Governance Committee ERCOT Public November 18, 2013 2013 3rd Quarter Reporting Period YTD

More information

2015 ASSESSMENT RATES

2015 ASSESSMENT RATES 2015 ASSESSMENT RATES FOREWORD WorkSafeNB determines employers assessment rates annually. Several factors influence rates, such as WorkSafeNB s current financial obligations, the prevailing economic environment,

More information

SunGard Announces Third Quarter 2006 Results

SunGard Announces Third Quarter 2006 Results For more information, contact: Michael Ruane Eric Erickson Kris Block Tel: 484-582-5405 Tel: 484-582-5480 Tel: 484-582-5505 michael.ruane@sungard.com eric.erickson@sungard.com kris.block@sungard.com SunGard

More information

Developing Power Projects in Southern Africa. Annual General Meeting Presentation 20 th November 2015

Developing Power Projects in Southern Africa. Annual General Meeting Presentation 20 th November 2015 Developing Power Projects in Southern Africa Annual General Meeting Presentation 20 th November 2015 2015 Company Highlights AFR now participating in the development of three large-scale power projects

More information

Financial Summary 3rd quarter of FY2012. January 29, 2013 Tohoku Electric Power Co., Inc.

Financial Summary 3rd quarter of FY2012. January 29, 2013 Tohoku Electric Power Co., Inc. Financial Summary FY2012 January 29, 2013 Tohoku Electric Power Co., Inc. Contents 1. Summary of the FY2012 Results 2. Electricity Sales 3. Large Industry Sector 4. Electricity Generated and Purchased,

More information

Panel Session #4 Smart Grid Workforce Training and Education: Identifying the Industry Perspective

Panel Session #4 Smart Grid Workforce Training and Education: Identifying the Industry Perspective Panel Session #4 Smart Grid Workforce Training and Education: Identifying the Industry Perspective J.W. (Jim) Wheeler A Workshop on Building Research Collaborations: Electricity Systems MRGN Building Room

More information

Annual Financial Results Presentation for year ended 30 June 2014 2 October 2014

Annual Financial Results Presentation for year ended 30 June 2014 2 October 2014 Annual Financial Results Presentation for year ended 30 June 2014 2 October 2014 Disclaimer The information contained in this presentation ( Presentation ) has been prepared by Firestone Diamonds plc (the

More information

1. Key Dates for Pool Settlement 1. 2. Where to find the Pool Statements 2. 3. On-going Reporting to Pool Participants 2

1. Key Dates for Pool Settlement 1. 2. Where to find the Pool Statements 2. 3. On-going Reporting to Pool Participants 2 Settlement Process Your Guide to the wholesale electricity market January 2010 Table of Contents 1. Key Dates for Pool Settlement 1 2. Where to find the Pool Statements 2 3. On-going Reporting to Pool

More information

Meridian Energy broker presentation

Meridian Energy broker presentation Meridian Energy broker presentation 4 June, 2014 Meridian Energy will this week give a series of presentations to brokers and their clients on its business. The presentation is attached. For media queries,

More information

LONG-TERM FINANCIAL PLAN POLICY. Budgets FINANCE DEPARTMENT. City of Cape Town

LONG-TERM FINANCIAL PLAN POLICY. Budgets FINANCE DEPARTMENT. City of Cape Town ANNEXURE 14 LONG-TERM FINANCIAL PLAN POLICY Budgets FINANCE DEPARTMENT City of Cape Town 1 TABLE OF CONTENTS 1. DEFINITIONS AND ABBREVIATIONS... 3 2. INTRODUCTION... 4 3. PROBLEM STATEMENT... 4 4. PURPOSE...

More information

RESULTS OF OPERATIONS

RESULTS OF OPERATIONS Management s Discussion and Analysis of Financial Conditions and Results of Operations («MD & A») should be read in conjunction with the unaudited interim consolidated financial statements for the six

More information

Updated SCER Demand Side Participation Program December 2013

Updated SCER Demand Side Participation Program December 2013 Updated SCER Demand Side Participation Program December 2013 The Standing Council on Energy and Resources (SCER) has adopted this framework to guide its demand side participation (DSP) work. The framework

More information

ISO 14001: 2015. White Paper on the Changes to the ISO Standard on Environmental Management Systems JULY 2015

ISO 14001: 2015. White Paper on the Changes to the ISO Standard on Environmental Management Systems JULY 2015 ISO 14001: 2015 White Paper on the Changes to the ISO Standard on Environmental Management Systems JULY 2015 4115, Sherbrooke St. West, Suite 310, Westmount QC H3Z 1K9 T 514.481.3401 / F 514.481.4679 eem.ca

More information

CABINET. 24 March 2015

CABINET. 24 March 2015 CABINET 24 March 2015 Title: Procurement of Electricity and Gas Supplies Report of the Cabinet Member for Finance Open Report with Exempt Appendix 4 Wards Affected: All Report Author: Andrew Sivess Group

More information

CONSERVATION AND DEMAND MANAGEMENT REQUIREMENT GUIDELINES FOR ELECTRICITY DISTRIBUTORS

CONSERVATION AND DEMAND MANAGEMENT REQUIREMENT GUIDELINES FOR ELECTRICITY DISTRIBUTORS Ontario Energy Board Commission de l énergie de l Ontario CONSERVATION AND DEMAND MANAGEMENT REQUIREMENT GUIDELINES FOR ELECTRICITY DISTRIBUTORS December 19, 2014 TABLE OF CONTENTS 1. BACKGROUND AND OVERVIEW...

More information

COST OF CAPITAL, COST OF EQUITY, DEBT FINANCING AND DIVIDEND POLICY

COST OF CAPITAL, COST OF EQUITY, DEBT FINANCING AND DIVIDEND POLICY Page of 4 5 6 7 8 9 0 COST OF CAPITAL, COST OF EQUITY, DEBT FINANCING AND DIVIDEND POLICY Overview PowerStream has followed the Report of the Board on Cost of Capital for Ontario s Regulated Utilities,

More information

Upgrade Business Intelligence Software

Upgrade Business Intelligence Software A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES Upgrade Business Intelligence Software Hydro Place April 2012 SUMMARY Hydro uses several tools to provide a Business Intelligence software solution.

More information

NV Energy ISO Energy Imbalance Market Economic Assessment

NV Energy ISO Energy Imbalance Market Economic Assessment March 25, 2014 NV Energy ISO Energy Imbalance Market Economic Assessment NV Energy ISO Energy Imbalance Market Economic Assessment 2014 Copyright. All Rights Reserved. Energy and Environmental Economics,

More information

Appendix D: Electricity Price Forecast Preliminary Draft

Appendix D: Electricity Price Forecast Preliminary Draft Preliminary Draft Introduction... 1 Findings... 2 Approach and Assumptions... 5 Demand Growth... 5 Firm Capacity Standards... 6 Planning Reserve Margin Targets... 6 Firm Capacity Credit... 7 Existing Resources...

More information

P3 Value for Money Assessment and Project Report. Evan Thomas Water and Wastewater Treatment Facility Project

P3 Value for Money Assessment and Project Report. Evan Thomas Water and Wastewater Treatment Facility Project P3 Value for Money Assessment and Project Report Evan Thomas Water and Wastewater Treatment Facility Project July 2013 Table of Contents 1. Summary: Using a P3 for a Water Treatment Plant - did it work?

More information

Electric Field Operations Organization

Electric Field Operations Organization NSTAR Electric Transmission Function Job Summaries Electric Field Operations Organization Vice President, Electric Field Operations (Transmission) This position has primary responsibility for the planning,

More information

Most household services provide you with a fixed monthly bill: Broadband Internet service

Most household services provide you with a fixed monthly bill: Broadband Internet service Predict-a-Bill Natural Gas Most household services provide you with a fixed monthly bill: Cell phone service Broadband Internet service And now... your natural gas supply! Predict-a-Bill advantage: Developed

More information

TomTom Q4 2012 results. Harold Goddijn CEO Marina Wyatt CFO 12 February 2013

TomTom Q4 2012 results. Harold Goddijn CEO Marina Wyatt CFO 12 February 2013 TomTom Q4 2012 results Harold Goddijn CEO Marina Wyatt CFO 12 February 2013 Summary of results Revenue of 1,057 million and adjusted EPS of 0.40 PND market performed as expected Automotive affected by

More information

Request for Expressions of Interest 3805EOI Consulting Services - Microsoft Productivity Specialist

Request for Expressions of Interest 3805EOI Consulting Services - Microsoft Productivity Specialist Request for Expressions of Interest 3805EOI Consulting Services - Microsoft Productivity Specialist 1. Introduction 1.1. The City of Richmond invites Expressions of Interest ( EOI ) from interested parties

More information

Mission, Vision and Values

Mission, Vision and Values Mission, Vision and Values The City of Greater Sudbury is a growing, world-class community bringing talent, technology and a great northern lifestyle together. We are committed to providing excellent access

More information

CALIFORNIA ISO. Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market

CALIFORNIA ISO. Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market CALIFORNIA ISO Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market Prepared by the Department of Market Analysis California Independent System Operator September 1999 Table of Contents Executive

More information

Date: 30 January 2014 Public

Date: 30 January 2014 Public Committee: Housing Management and Almshouses Sub Committee Subject: Detailed Options Appraisal Boiler Replacement Programme 2013-14 and 2014-15 Report of: Director of Community and Children s Services.

More information

The Alberta Electricity Market Frequently Asked Questions

The Alberta Electricity Market Frequently Asked Questions The Alberta Electricity Market Frequently Asked Questions NOTE: Responses have been gathered from the official websites and public materials of the Government of Alberta, Alberta Utilities Commission,

More information

Management Discussion and Analysis For The 9 Months Ended, June 30 2015

Management Discussion and Analysis For The 9 Months Ended, June 30 2015 Management Discussion and Analysis For The 9 Months Ended, June 30 2015 The following discussion and analysis as of August 31, 2015 should be read in conjunction with the consolidated financial statements

More information

Naperville Smart Grid Initiative

Naperville Smart Grid Initiative Naperville Smart Grid Initiative Business Case Fundamentals Updated on 9/7/2010 Summary The NGSI program delivers an excellent ROI by increasing network reliability, operational efficiencies, reducing

More information

Energy Management. Electric Procurement Strategies. August 27, 2007

Energy Management. Electric Procurement Strategies. August 27, 2007 Energy Management Electric Procurement Strategies August 27, 2007 1 Presentation Outline Purpose Background City of Dallas procurement goals Procurement term Environmental goals Energy products Energy

More information

Financial Operating Procedure: Budget Monitoring

Financial Operating Procedure: Budget Monitoring Financial Operating Procedure: Budget Monitoring Original Created: Jan 2010 Last Updated: Jan 2010 1 Index 1 Scope of Procedure...3 2 Aim of Procedure...3 3 Roles & Responsibilities...3 Appendix A Timetable...7

More information

EXPLANATORY MEMORANDUM TO THE CONTRACTS FOR DIFFERENCE (ELECTRICITY SUPPLIER OBLIGATIONS) REGULATIONS 2014. 2014 No. [XXXX]

EXPLANATORY MEMORANDUM TO THE CONTRACTS FOR DIFFERENCE (ELECTRICITY SUPPLIER OBLIGATIONS) REGULATIONS 2014. 2014 No. [XXXX] EXPLANATORY MEMORANDUM TO THE CONTRACTS FOR DIFFERENCE (ELECTRICITY SUPPLIER OBLIGATIONS) REGULATIONS 2014 2014 No. [XXXX] 1. This explanatory memorandum has been prepared by the Department for Energy

More information

Mecklenburg County, North Carolina Debt Policy

Mecklenburg County, North Carolina Debt Policy Mecklenburg County, North Carolina Debt Policy Introduction Mecklenburg County recognizes that one of the keys to sound financial management is a debt policy. These benefits are recognized by bond rating

More information

TG 47-01. TRANSITIONAL GUIDELINES FOR ISO/IEC 17021-1:2015, ISO 9001:2015 and ISO 14001:2015 CERTIFICATION BODIES

TG 47-01. TRANSITIONAL GUIDELINES FOR ISO/IEC 17021-1:2015, ISO 9001:2015 and ISO 14001:2015 CERTIFICATION BODIES TRANSITIONAL GUIDELINES FOR ISO/IEC 17021-1:2015, ISO 9001:2015 and ISO 14001:2015 CERTIFICATION BODIES Approved By: Senior Manager: Mpho Phaloane Created By: Field Manager: John Ndalamo Date of Approval:

More information

Main variations of business models for Flexible Industrial Demand combined with Variable Renewable Energy

Main variations of business models for Flexible Industrial Demand combined with Variable Renewable Energy Innovative Business Models for Market Uptake of Renewable Electricity unlocking the potential for flexibility in the Industrial Electricity Use Main variations of business models for Flexible Industrial

More information

Appendix G: Organizational Change Management Plan. DRAFT (Pending approval) April 2007

Appendix G: Organizational Change Management Plan. DRAFT (Pending approval) April 2007 Appendix G: Organizational Change Management Plan DRAFT (Pending approval) April 2007 Table of Contents TABLE OF CONTENTS... 1 INTRODUCTION:... 2 ABT ORGANIZATIONAL CHANGE MANAGEMENT SCOPE... 2 PEOPLESOFT

More information

COMMENTS OF THE SOLAR ALLIANCE NEW JERSEY INTERCONNECTION RULES APRIL 29 TH, 2011

COMMENTS OF THE SOLAR ALLIANCE NEW JERSEY INTERCONNECTION RULES APRIL 29 TH, 2011 COMMENTS OF THE SOLAR ALLIANCE NEW JERSEY INTERCONNECTION RULES APRIL 29 TH, 2011 I. Background The Solar Alliance is a group of approximately 30 of the largest photovoltaic (PV) solar development and

More information

Condensed Interim Consolidated Financial Statements

Condensed Interim Consolidated Financial Statements Condensed Interim Consolidated Financial Statements Unaudited (Expressed in Canadian dollars) NOTICE TO READER: These condensed interim consolidated financial statements have not been reviewed by the Company's

More information