1 Eric Strecker, PE Geosyntec Consultants Portland, OR USA 1 estrecker@geosyntec.com

2 New Development and Re-Development Most larger Cities have requirements for new and redevelopment SUDs. US Terms: BMPs = Best Management Practices LID = Low Impact Development Retrofitting Most retrofitting has been completed due to specific watershed requirements ( distributed CSO control, Lake Tahoe, etc.) Very little separated stormwater system applications (usually grant projects) Regional vs. localized SUDs Retrofits 2 2

3 3

4 4

5 5 About $1,000,000 for one block 98% runoff reduction Mostly infiltration losses Natural groundwater recharge level?

6 Before After 6

7 7 About $30,000 per block Less effective per block But how many blocks?

8 8

9 9

10 10

11 11

12 Orange San Diego Creek Watershed Boundary Tustin Irvine Peters Canyon Wash Santa Ana/Santa Fe Channel Upper Newport Bay San Creek Diego San Diego Creek Peters Canyon Wash near Edinger Avenue. Lake Forest Newport Beach N Miles 12

13 N San Diego Creek Watershed Boundary Upper Newport Bay San 45 Newport Beach Miles Tustin A Creek Diego Orange Peters Canyon Wash Irvine San 7 9 Diego Creek Lake Forest 25 Type 1- Offline Water Quality Wetlands Type 2 - Inline Water Quality Wetlands Type 3 - Water Quality Wetlands within Existing or Proposed Detention Basin Sites excluded from selected NTS Plan More than 70 sites considered Many sites modified or eliminated for: feasibility or political constraints wildlife or habitat impacts flood control impacts 31 NTS facilities in current Plan Plan has mechanism for adding or deleting sites

14 City of Orange After Before 14 14

15 CSO Control Primary Driver TMDLs Total Maximum Daily Loads Driver in some locations NPDES Permit Requirements Typically no specific requirements

16 CSO Control has resulted in extensive analysis of retrofitting (Portland Example) Separated areas, much fewer examples: SBPAT Heal the Bay, City/County of LA Available from City Lake Tahoe BMP Retrofit Tool US Army Corps Under development Sustain EPA In limited beta testing not available

17 Specific Objectives of Methodology and Tool To maximize water quality benefits of constructed controls in watersheds (based on best available information). To use methodical and disciplined, science-based analyses to break-down large areas, and then prioritize and build-up suites of targeted activities in manageable sizes which results in measureable progress to achieving water quality goals. To understand and quantify potential benefits with suites of BMP activities. 17

18 18 Develop water quality goals for each watershed to be evaluated based upon: TMDLs 303D listings Typical Urban Pollutants of Concern Hydromodification Issues (wet and dry weather)

19 Catchment Prioritization Index (CPI) Determination Begin Area Screening (GIS) Step 1 Catchment Prioritization Account for downstream impairments (303d listed or completed TMDLs) Compute Normal CPI Scores es2 Compute Nodal CPI Scores Compile GIS Themes Result: Set of High CPI Score Catchments Estimate Pollutant Loads or Concentrations Step 2 Project Area Screening 19 Normalize Pollutant Loads (LCPI) or Concentrations (CCPI)

20 Project Area Screening for BMPs Regional/Subregional BMPs Distributed BMPs Step 2 Project Area Screening Overlay BMP Opportunities with High CPI Catchments From STEP 1 Compile GIS Themes Result: Set of High CPI Score Catchments with BMP Opportunity Catchments Identified Regional BMP Opportunity Identification Distributed BMP Opportunity Identification Begin BMP Screening 20 Compute Regional and Distributed BMP Scores and Prepare BMP Opportunity Maps Step 3 General BMP Screening

21 Effectiveness Other Benefits es3 Ease of Implementation Cost 21

22 Critical Step in process A. GIS- Level B. Desktop- Level C. Field- Level Step 4 Site Specific BMP Evaluation Compile GIS Themes GIS-Level Screening Desktop-Level Screening Fill in GIS-Screening Section of Fatal Flaw Matrix Completed BMP Fatal Flaw Matrix Complete Field Summary Table and Recommended Projects List Complete BMP Comparison Matrices (update values entered in Step 3) Field-Level Screening Fill in Desktop-Screening Section of Fatal Flaw Matrix Result: Set of Priority Catchments with Ranked BMP Options (Fatally Flawed BMPs Eliminated) Select Highest Priority Projects for Further Evaluation (END) Fill in Field Data Sheet & Field-Screening Section of Fatal Flaw Matrix 22

23 23

24 User Input Source Controls Hydrologic Simulation Pollutant Load Generation Storm Water Treatment Pollutant Load 24

25 Unit processes and BMP Performance Based International BMP Database + Tahoe BMP information Unit Processes based modeling of hydrology/hydraulics and particle settling 25

26 26

27 Gaining popularity as a method to address runoff where infiltration is difficult or not wise Challenge is being able to use the water to recover storage before next storm arrives In areas where storms tend to be back-to-back and colder climates, use for irrigation is limited Must look at toilet flushing or other consumptive uses Density of toilet flushers to impervious area ratio (TFIA) needs to be higher to make re-use feasible as a viable approach (or other uses besides normal irrigation) 27

28 Importance of water balance: Runoff, evapotranspiration (ET), deeper infiltration Much of LID focuses on surface hydrology (runoff) and could potentially impact water balance Pre-development ET is a significant component of water balance. In dense urban areas very hard to match predevelopment ET Therefore, one may over-infiltrate to achieve surface hydrology goals Over-infiltration can be a problem (or not) Pay attention to unit processes 28

29 Ready, Aim, Aim, Aim or (Planning to death) Ready, Fire, Aim or (Forget Planning just implement) Or Ready, Aim, Fire? (Just right)

6 Use of Low Impact Development Techniques in an Urbanized Watershed Infill and Retrofit Applications

6 Use of Low Impact Development Techniques in an Urbanized Watershed Infill and Retrofit Applications 6 Use of Low Impact Development Techniques in an Urbanized Watershed Infill and Retrofit Applications David Pohl, Ph.D., P.E. Weston Solutions, Inc. Presentation Outline Storm Water Regulatory Overview

More information

CWSRF Project Descriptions and Examples for Green Project Reserve

CWSRF Project Descriptions and Examples for Green Project Reserve CWSRF Project Descriptions and Examples for Green Project Reserve I. Water Efficiency a. Water efficiency is the use of improved technologies and practices to deliver equal or better services with less

More information

10/4/2012. 40 slide sample of Presentation. Key Principles to Current Stormwater Management

10/4/2012. 40 slide sample of Presentation. Key Principles to Current Stormwater Management 40 slide sample of Presentation Please contact mhoalton@pacewater.com if you would like the complete presentation Key Principles to Current Stormwater Management Distributed Control Measures Integrated

More information

City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions

City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions City of Atlanta Department of Watershed Management Post-Development Stormwater Management Ordinance Summary of Revisions Cory Rayburn, CPESC Environmental Program Manager crayburn@atlantaga.gov Stormwater

More information

ATTACHMENT 7. CWSRF Project Descriptions and Examples for Green Project Reserve

ATTACHMENT 7. CWSRF Project Descriptions and Examples for Green Project Reserve Attachments 7 and 8 are from the American Recovery and Reinvestment Act Guidance, produced March 2, 2009 by the U.S. EPA Office of Water. Attachments 7 and 8 specifically address the 20% Green Project

More information

URBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT

URBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT URBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT Contacts: Barry Chilibeck (666-3765) or Megan Sterling (666-2322) Revision 4

More information

Presented by Dani Wise Johnson Vanasse Hangen Brustlin, Inc.

Presented by Dani Wise Johnson Vanasse Hangen Brustlin, Inc. Incorporating LID Stormwater Management Practices and Ecological Restoration on Redevelopment Properties Presented to LID Conference Philadelphia, Sept 2011 Presented by Dani Wise Johnson Vanasse Hangen

More information

Costs for Green Infrastructure and Stormwater Retention Practices

Costs for Green Infrastructure and Stormwater Retention Practices Costs for Green Infrastructure and Stormwater Retention Practices Bob Newport U.S. EPA December 9, 2014 Topics to be Covered EPA data collection and cost analysis focused on postconstruction stormwater

More information

Peters Canyon Channel (OCFCD Facility No. F06) from Confluence with San Diego Creek Channel (F05) to downstream Barranca Parkway

Peters Canyon Channel (OCFCD Facility No. F06) from Confluence with San Diego Creek Channel (F05) to downstream Barranca Parkway Peters Canyon Channel (OCFCD Facility. F06) from Lead Agency: Agency: Project Director: Address: Orange County, Public Works, Infrastructure Programs, Capital Programs Sam Ali 300 N. Flower Street Santa

More information

Greater Los Angeles County Region

Greater Los Angeles County Region Attachment 6 Greater Los Angeles County Region IRWM Implementation Grant Proposal Monitoring, Assessment, and Attachment 6 consists of the following items: Monitoring, Assessment, and. The purpose of this

More information

Costs for Green Infrastructure and Stormwater Controls

Costs for Green Infrastructure and Stormwater Controls Costs for Green Infrastructure and Stormwater Controls August 5, 2015 Bob Newport U.S. EPA Region 5 (Chicago Office) Topics to be Covered EPA data collection and cost analysis focused on postconstruction

More information

Triple Bottom Line Analysis for Green Infrastructure A Case Study 2012 ARCADIS

Triple Bottom Line Analysis for Green Infrastructure A Case Study 2012 ARCADIS Triple Bottom Line Analysis for Green Infrastructure A Case Study Imagine 1 25 June the 2013 result Learning Objectives Explain Green Infrastructure (GI) as a strategy for stormwater management Describe

More information

ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND

ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND The Rose Creek Watershed (RCW) consists of three planning

More information

Stormwater management around the world Lessons from Novatech 2010 Dennis Corbett and Marion Urrutiaguer

Stormwater management around the world Lessons from Novatech 2010 Dennis Corbett and Marion Urrutiaguer Stormwater management around the world Lessons from Novatech 2010 Dennis Corbett and Marion Urrutiaguer Novatech 2010, the 7th international conference on sustainable techniques and strategies in urban

More information

A San Antonio Case Study on the Water Quantity and Quality Benefits of LID Development

A San Antonio Case Study on the Water Quantity and Quality Benefits of LID Development A San Antonio Case Study on the Water Quantity and Quality Benefits of LID Development Chad Richards PE, CFM, CPSWQ Brett Sachtleben PE, CFM Agenda Purpose Water Quality Processes LID Components and their

More information

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?

More information

modeling Stormwater Retention

modeling Stormwater Retention Appendix 5.8-1 Model Orange County Stormwater Retention Credit Framework for Regional LID Implementation and Retrofitting CONCEPT PROPOSAL APPLICATION A. Program selection & General FAAST Information 1.

More information

Making San Francisco A Water Sensitive City Urban Watershed Management Program October 25, 2011

Making San Francisco A Water Sensitive City Urban Watershed Management Program October 25, 2011 Making San Francisco A Water Sensitive City Urban Watershed Management Program October 25, 2011 Outline San Francisco Context Drivers of Change Emerging Paradigm LID Program Goals Mechanisms for Change

More information

A Developer s Guide: Watershed-Wise Development

A Developer s Guide: Watershed-Wise Development A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another

More information

CITY OF PACIFIC GROVE PUBLIC WORKS DEPARTMENT

CITY OF PACIFIC GROVE PUBLIC WORKS DEPARTMENT CITY OF PACIFIC GROVE PUBLIC WORKS DEPARTMENT REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES Stormwater LID Infrastructure Plan PROPOSAL SUBMITTAL DEADLINE DATE: March 22, 2016 TIME: 4:00 pm LOCATION:

More information

Introduction to the Envision Sustainability Rating System

Introduction to the Envision Sustainability Rating System THE ENVISION RATING SYSTEM Introduction to the Envision Sustainability Rating System Russell Moore, PE, ENV SP Richard Gomez, PE, MSEM, ENV SP test APWA Public Works Conference Richmond, CA November 2015

More information

Post Construction Stormwater Management Checklist Program

Post Construction Stormwater Management Checklist Program Post Construction Stormwater Management Checklist Program Anahid Damerau, CPESC, CPSWQ Christopher Smith, P.E. Department of Environmental Protection Stormwater Section Watershed Management Program The

More information

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1 COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES April 20, 2010 EXHIBIT 1 ELEMENT 4 WATER RESOURCES TABLE OF CONTENTS 4.1 INTRODUCTION 4.2 GOALS AND POLICIES 4.2.A General Goals and Policies 1 4.2.B

More information

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN 3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards

More information

7.0 Stream Restoration

7.0 Stream Restoration 7.0 Stream Restoration 7.1 Issue Statements One of the primary concerns of residents in the Bassett Creek watershed is the maintenance of the natural beauty of the creek in residential and recreational

More information

Watershed-Wide Modeling for TMDL/MS4 Permit Compliance. Greg Wilson, Barr Engineering

Watershed-Wide Modeling for TMDL/MS4 Permit Compliance. Greg Wilson, Barr Engineering Watershed-Wide Modeling for TMDL/MS4 Permit Compliance Greg Wilson, Barr Engineering Acknowledge City of Golden Valley Eric Eckman Heather Hegi Laura Jester and BCWMC Technical Advisory Committee members

More information

How To Manage Runoff In Southern California

How To Manage Runoff In Southern California 100 YEARS OF RUNOFF MANAGEMENT IN SOUTHERN CALIFORNIA By John Hogan, P.E. Past-President LA Section and Member 2013 Centennial Committee Civil Engineers help build a better world. The work we do directly

More information

Presentation Program Outline

Presentation Program Outline Presentation Program Outline IRWM Program Background San Diego IRWM Planning 2013 IRWM Update Integrated Flood Management Flood Management Planning Study IRWM Program Background What is IRWM? Collaborative

More information

Use of Regional Detention Basins for Stormwater Quality Management

Use of Regional Detention Basins for Stormwater Quality Management Use of Regional Detention Basins for Stormwater Quality Management Las Vegas Valley Municipal Separate Storm Sewer System (MS4) Permit Andrew Trelease, PE, CFM Clark County Regional Flood Control District

More information

Conveyance means a mechanism for transporting water from one point to another, including pipes, ditches, and channels.

Conveyance means a mechanism for transporting water from one point to another, including pipes, ditches, and channels. Glossary of Common Stormwater Terms Baffle means a device to check, deflect, or regulate flow. Beneficial Uses means uses of waters of the states which include but are not limited to - use for domestic,

More information

Stormwater Design Guidelines Frequently Asked Questions:

Stormwater Design Guidelines Frequently Asked Questions: 525 Golden Gate, 11th Floor San Francisco, CA 94102 T 415.551.4694 F 415.934.5728 TTY 415.554.3488 Stormwater Design Guidelines Frequently Asked Questions: A. GENERAL INQUIRIES... 2 1. What projects are

More information

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities This document summarizes and provides explanation for the purpose and intent of major recommended

More information

Using Green Infrastructure to Manage Combined Sewer Overflows and Flooding

Using Green Infrastructure to Manage Combined Sewer Overflows and Flooding New York State Water Resources Institute Using Green Infrastructure to Manage Combined Sewer Overflows and Flooding Emily Vail Hudson River Estuary Program NYS Department of Environmental Conservation

More information

Exhibit A-7.III. Water Quality Management Plan (WQMP) Checklist

Exhibit A-7.III. Water Quality Management Plan (WQMP) Checklist Exhibit A-7.III Water Quality Management Plan (WQMP) Checklist Water Quality Management Plan Checklist The purpose of this checklist is to provide a format for uniform, comprehensive, and welldocumented

More information

The International Stormwater BMP Database Part 1: Summary of Database

The International Stormwater BMP Database Part 1: Summary of Database Land Development Brief: February 2013 The Pennsylvania Housing Research Center The International Stormwater BMP Database Part 1: Summary of Database Katherine L. Blansett, Ph.D., P.E. INTRODUCTION This

More information

OWOW Proposition 84, Round 2 Master Project List

OWOW Proposition 84, Round 2 Master Project List OWOW Proposition 84, Round 2 Master List Name s Recommended for Prop 84 Round 2 Funding 1 2071 Inland Empire Utilities Agency 2 2068 USDA Forest Service San Bernardino National Forest Wineville Regional

More information

Lessons Learned from the Expert BMP Panel Process That May Apply to MTDs. Tom Schueler Chesapeake Stormwater Network

Lessons Learned from the Expert BMP Panel Process That May Apply to MTDs. Tom Schueler Chesapeake Stormwater Network Lessons Learned from the Expert BMP Panel Process That May Apply to MTDs Tom Schueler Chesapeake Stormwater Network Recent Expert Panels 1. Stormwater Retrofit Practices 2. New State Performance Standards

More information

Computing Stormwater Runoff Rates and Volumes

Computing Stormwater Runoff Rates and Volumes New Jersey Stormwater Best Management Practices Manual February 2004 C H A P T E R 5 Computing Stormwater Runoff Rates and Volumes This chapter discusses the fundamentals of computing stormwater runoff

More information

Use of Green Roofs to Meet New Development Runoff Requirements. Greg Davis Nov. 8, 2007

Use of Green Roofs to Meet New Development Runoff Requirements. Greg Davis Nov. 8, 2007 Use of Green Roofs to Meet New Development Runoff Requirements Greg Davis Nov. 8, 2007 Why green roof? Absorption of precipitation Increased insulation Reduced urban heat island effect Pollutant removal

More information

4. Environmental Impacts Assessment and Remediation Targets

4. Environmental Impacts Assessment and Remediation Targets 4. Environmental Impacts Assessment and Remediation Targets 4.1 Environmental Impacts Significant additional development in the Alder Creek watershed is not anticipated at this time; however, there are

More information

WATER QUALITY MODELING TO SUPPORT THE ROUGE RIVER RESTORATION

WATER QUALITY MODELING TO SUPPORT THE ROUGE RIVER RESTORATION WATER QUALITY MODELING TO SUPPORT THE ROUGE RIVER RESTORATION Edward H. Kluitenberg, P.E., Applied Science, Inc. Gary W. Mercer, P.E., Camp, Dresser and McKee Vyto Kaunelis, Wayne County Department of

More information

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Harmony Creek subwatershed Harmony Creek subwatershed BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT April 2011 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

San Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits

San Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits Attachment 9 San Diego Integrated Regional Water Management Economic Analysis Flood Damage Reduction Costs and Benefits Attachment 9 consists of the following items: Flood Damage Reduction Costs and Benefits.

More information

4.7 Hydrology/Water Quality

4.7 Hydrology/Water Quality 4.0 Environmental Impact Analysis 4.7 Hydrology/Water Quality 4.7 Hydrology/Water Quality This section addresses the flow and quality of surface and ground water within the City. The following hydrology

More information

TITLE: [Name of municipality] Storm Water Abatement Feasibility Study

TITLE: [Name of municipality] Storm Water Abatement Feasibility Study TITLE: [Name of municipality] Storm Water Abatement Feasibility Study PROBLEM/NEED: [Name of watershed] is an area of [##] acres, surrounding [name of waterbody]. [Name of waterbody] has been assessed

More information

CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers

CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers United States Environmental Protection Agency CASE STUDY City of Grand Rapids Stormwater Asset Management Program Overview With increasing pressure to meet water quality targets, address population growth,

More information

SPA Annual Report for 2002 September, 2003 Montgomery County Department of Environmental Protection Page 125. Evaluation and Recommendations

SPA Annual Report for 2002 September, 2003 Montgomery County Department of Environmental Protection Page 125. Evaluation and Recommendations Montgomery County Department of Environmental Protection Page 125 Evaluation and Recommendations Monitoring efforts in the Special Protection Areas continue to provide the kind of information needed to

More information

Toronto s Wet Weather Flow Master Plan

Toronto s Wet Weather Flow Master Plan Toronto s Wet Weather Flow Master Plan 1. The Master Plan 2. The Don And Waterfront Study 3. What the Individual Can Do Wet Weather Flow Management Master Plan 2000 Storm Presentation to Don Mouth Naturalization...

More information

Stormwater Design Guidelines 2015 Proposed Regulatory Update Urban Watershed Management Program WWE October 2015

Stormwater Design Guidelines 2015 Proposed Regulatory Update Urban Watershed Management Program WWE October 2015 Stormwater Design Guidelines 2015 Proposed Regulatory Update Urban Watershed Management Program WWE October 2015 PRESENTATION OUTLINE 1. Urban Watershed Management Program 2. Stormwater Management Ordinance:

More information

ELMER AVENUE. Water Augmentation Study NEIGHBORHOOD RETROFIT DEMONSTRATION PROJECT

ELMER AVENUE. Water Augmentation Study NEIGHBORHOOD RETROFIT DEMONSTRATION PROJECT ELMER AVENUE Water Augmentation Study NEIGHBORHOOD RETROFIT DEMONSTRATION PROJECT STAGG STREET ELMER AVENUE KESWICK STREET PASEO NOTE: Photo taken before retrofit WHAT IS THE NEIGHBORHOOD RETROFIT PROJECT?

More information

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater) Applicability: Required for projects that create and/or replace 5,000 square feet or greater of impervious surface (i.e. asphalt roads, concrete structures, building area, sidewalks, etc.). Impervious

More information

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Whitby CLOCA Whitby CLOCA LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT June 2008 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 STUDY AREA AND SCOPE... 4 3.0 METHODOLOGY...

More information

City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405

City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405 City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405 REGULATORY CONSIDERATIONS FOR WET WEATHER COLLECTION SYSTEM BACKUPS FINAL DRAFT August 2009 2700 YGNACIO

More information

C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures

C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures Jill Bicknell, P.E., EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention Program Presentation Overview

More information

HYDROLOGIC/HYDRAULIC MODELING OF WESTMINSTER WATERSHED ORANGE COUNTY, CALIFORNIA

HYDROLOGIC/HYDRAULIC MODELING OF WESTMINSTER WATERSHED ORANGE COUNTY, CALIFORNIA HYDROLOGIC/HYDRAULIC MODELING OF WESTMINSTER WATERSHED ORANGE COUNTY, CALIFORNIA James Chieh, Ph.D., P.E., Senior Hydraulic Engineer, USACE, Los Angeles, California, Shih.H.Chieh@usace.army.mil; Jay Pak,

More information

Official OPP Overall Penn State Stormwater Program Latest Revision/Review: 5/28/2015

Official OPP Overall Penn State Stormwater Program Latest Revision/Review: 5/28/2015 Official OPP Latest Revision/Review: 5/28/2015 Link to Penn State s Stormwater homepage: http://www.opp.psu.edu/services/stormwater ARTICLE 1 - GENERAL 1.1 Intent Since the passage of the Clean Water Act,

More information

Joel Tillery, P.E., CH2M HILL. SESWA 2010 Annual Conference October 7, 2010

Joel Tillery, P.E., CH2M HILL. SESWA 2010 Annual Conference October 7, 2010 Joel Tillery, P.E., CH2M HILL SESWA 2010 Annual Conference October 7, 2010 The need for water quality improvement is a reason to play the game. Local governments dealt a variety of federal, state, and

More information

STORMWATER AND URBAN DESIGN

STORMWATER AND URBAN DESIGN STORMWATER AND URBAN DESIGN Atlanta BeltLine Fall 2012 DESIGN + RESEARCH Urban Design Strategies for Four Sites on the Atlanta BeltLine Maddox Park, Boone Blvd and Proctor Creek Ansley Mall and the Clear

More information

Innovative Site Design to Protect Water Quality (Density CAN be Green) Community Design + Architecture Nelson\Nygaard

Innovative Site Design to Protect Water Quality (Density CAN be Green) Community Design + Architecture Nelson\Nygaard Innovative Site Design to Protect Water Quality (Density CAN be Green) Community Design + Architecture Nelson\Nygaard Alameda Countywide Clean Water Program. 2007 New Development Workshop, February 13,

More information

Henry Van Offelen Natural Resource Scientist MN Center for Environmental Advocacy hvanoffelen@mncenter.org

Henry Van Offelen Natural Resource Scientist MN Center for Environmental Advocacy hvanoffelen@mncenter.org Henry Van Offelen Natural Resource Scientist MN Center for Environmental Advocacy hvanoffelen@mncenter.org Wetland study slide Water Quality NRE goals in watershed plans Protect habitat that remains.

More information

Permeable Pavers. calstone.com. Permeable Interlocking Concrete Pavements (PICP s)

Permeable Pavers. calstone.com. Permeable Interlocking Concrete Pavements (PICP s) Permeable Pavers Permeable Interlocking Concrete Pavements (PICP s) CBC Title 24/ADA Compliant LEED Functional Optimum balance of surface infiltration and joint interlock Available in a 6 x 9 Quarry Stone

More information

Implementing Green Infrastructure in Atlanta

Implementing Green Infrastructure in Atlanta City of Atlanta Mayor Kasim Reed Department of Watershed Management Implementing Green Infrastructure in Atlanta SESWA Southeast Regional Stormwater Seminar April 9, 2014 Jo Ann J. Macrina, P.E. Commissioner

More information

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply Pervious Pavers By: Rich Lahren Hebron Brick & Block Supply Stormwater Management and Control Issues Past emphasis was on flood control Today s emphasis is also on pollution More impermeable areas are

More information

Total Criteria Score Out of a possible 6

Total Criteria Score Out of a possible 6 Toronto, Ontario, Canada A Case Study of How Green Infrastructure is Helping Manage Urban Stormwater Challenges Types of green infrastructure used: Green roofs, blue roofs, rain barrels/cisterns, permeable

More information

Retention/Irrigation. Design Considerations. Soil for Infiltration Area Required Slope Environmental Side-effects

Retention/Irrigation. Design Considerations. Soil for Infiltration Area Required Slope Environmental Side-effects Description Retention/irrigation refers to the capture of stormwater runoff in a holding pond and subsequent use of the captured volume for irrigation of landscape of natural pervious areas. This technology

More information

Environment Virginia Conference April 6, 2011. Integrating Stormwater, Urban Design, and Growth Policies

Environment Virginia Conference April 6, 2011. Integrating Stormwater, Urban Design, and Growth Policies Environment Virginia Conference April 6, 2011 Integrating Stormwater, Urban Design, and Growth Policies Integrating Stormwater, Urban Design, and Growth Policies Sara Hollberg, AICP, Valley Conservation

More information

Final Report of the Town Owned Lands Improvement Project for the Town of Brentwood, NH

Final Report of the Town Owned Lands Improvement Project for the Town of Brentwood, NH Final Report of the Town Owned Lands Improvement Project for the Town of Brentwood, NH Project Background In November of 2013 the Green Infrastructure for Sustainable Coastal Communities (GISCC) project

More information

DRAFT. White Paper. Green Solutions for the. City of Omaha. City of Omaha Department of Public Works

DRAFT. White Paper. Green Solutions for the. City of Omaha. City of Omaha Department of Public Works DRAFT White Paper Green Solutions for the City of Omaha City of Omaha Department of Public Works August 2007 DRAFT Green Solutions for the City of Omaha Background The purposes of this White Paper is to

More information

Kansas City s Overflow Control Program

Kansas City s Overflow Control Program Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater

More information

Baltimore City Phase II Watershed Implementation Plan (WIP) July 2, 2012

Baltimore City Phase II Watershed Implementation Plan (WIP) July 2, 2012 Baltimore City Phase II Watershed Implementation Plan (WIP) July 2, 2012 1. Overview of the Local Team s process The WIP Team is compiled of three teams with varying levels of contribution: Core Team,

More information

89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto

89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto 89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto Prepared By: R.J. Burnside & Associates Limited 6990 Creditview Road, Unit

More information

Please click on the tutorial most fitting of your expertise in order to learn about the features of the visualization tool.

Please click on the tutorial most fitting of your expertise in order to learn about the features of the visualization tool. Introduction Welcome to the Indian Creek Conservation Reserve Program (CRP) visualization tool. This tool was developed by the University of Iowa - Institute for Hydroscience and Research (IIHR) as part

More information

Table 2: State Agency Recommendations Agency of Agriculture, Food and Markets

Table 2: State Agency Recommendations Agency of Agriculture, Food and Markets SUPPORTING INFORMATION ASSOCIATED WITH THE ALLOCATION PRIORITIES FOR CLEAN WATER FUND BOARD Table 2: State Agency Recommendations Agency of Agriculture, Food and Markets 1 Agriculture AAFM On-Farm Implementation

More information

Miquon Creek STREAM RESTORATION PROJECT WHO WE ARE

Miquon Creek STREAM RESTORATION PROJECT WHO WE ARE Miquon Creek STREAM RESTORATION PROJECT WHO WE ARE Introductions Brett Long, PE Project Permitting & Construction Oversight Chris Streb, PE Project Designer & Construction Oversight Assistance WHO WE ARE

More information

San Francisco s Urban Watershed Framework: A Decision Making Process to Support Multi-Benefit Wastewater and Stormwater Projects September 26, 2011

San Francisco s Urban Watershed Framework: A Decision Making Process to Support Multi-Benefit Wastewater and Stormwater Projects September 26, 2011 San Francisco s Urban Watershed Framework: A Decision Making Process to Support Multi-Benefit Wastewater and Stormwater Projects September 26, 2011 Karen Kubick, P.E., SSIP Program Director, SFPUC Randy

More information

Draft Photo Documentation Update for Proposition 13 Grant Agreement No. San Diego Region McClellan-Palomar Airport Water Quality Treatment Facility

Draft Photo Documentation Update for Proposition 13 Grant Agreement No. San Diego Region McClellan-Palomar Airport Water Quality Treatment Facility Draft Photo Documentation Update for Proposition 13 Grant Agreement No. San Diego Region McClellan-Palomar Airport Water Quality Treatment Facility Prepared For: County of San Diego DPW 555 South Overland

More information

Greater Lake Ballinger/McAleer Creek Watershed Study STRATEGIC ACTION PLAN. Project #31325

Greater Lake Ballinger/McAleer Creek Watershed Study STRATEGIC ACTION PLAN. Project #31325 Greater Lake Ballinger/McAleer Creek Watershed Study STRATEGIC ACTION PLAN Project #31325 By Otak, Inc. Golder Associates, Inc. Clear Creek Solutions, Inc. EnviroIssues July 10, 2009 Preface The Lake Ballinger/McAleer

More information

Introduction to sustainable drainage. www.ciria.org/suds

Introduction to sustainable drainage. www.ciria.org/suds Introduction to sustainable drainage Outline of presentation Challenges of existing drainage Drivers for SuDS SuDS philosophy and principles Benefits of SuDS Examples of SuDS Challenges of SuDS Summary

More information

Integrated Water Management in Maryland. Anwer Hasan, Senior Vice President

Integrated Water Management in Maryland. Anwer Hasan, Senior Vice President Integrated Water Management in Maryland Anwer Hasan, Senior Vice President Discussion Topics State initiatives for water management o Stormwater management o Agriculture runoff o Enhanced Nutrient Removal

More information

*AKA: Green Infrastructure (GI) and other aliases

*AKA: Green Infrastructure (GI) and other aliases *AKA: Green Infrastructure (GI) and other aliases Paul Wagner, USACE IWR Lisa Hair, USEPA, Office of Water Roger Lindsey, Nashville Metro Water Services Tom Palko, Nashville Metro Water Services Dan Medina,

More information

Innovative Stormwater Solutions in Coastal Areas 2015 APWA Stormwater Conference

Innovative Stormwater Solutions in Coastal Areas 2015 APWA Stormwater Conference Innovative Stormwater Solutions in Coastal Areas 2015 APWA Stormwater Conference September 15, 2015 Barrier Island Hydrology 2015 APWA Stormwater Conference September 15, 2015 2 Barrier Island Hydrology

More information

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT UPPER MINNESOTA RIVER WATERSHED DISTRICT Lists of Accomplishments and Project Costs 10 Year Plan Update UMRWD 10 Year Plan Update Page A 1 UMRWD LIST OF ACCOMPLISHMENTS Since its inception in 1967, the

More information

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd ENVIRONMENTAL SITE DESIGN (ESD) REDEVELOPMENT EXAMPLES OCTOBER 2010 1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan,

More information

Green Infrastructure In New Jersey The Current State of Implementation. Prepared for Sustainable Jersey by the Natural Resources Defense Council

Green Infrastructure In New Jersey The Current State of Implementation. Prepared for Sustainable Jersey by the Natural Resources Defense Council Green Infrastructure In New Jersey The Current State of Implementation Prepared for Sustainable Jersey by the Natural Resources Defense Council The State of New Jersey was in many respects an early adopter

More information

Triple Bottom Line Discussion. Scott Struck, Ph.D. Senior Professional Geosyntec Consultants

Triple Bottom Line Discussion. Scott Struck, Ph.D. Senior Professional Geosyntec Consultants Triple Bottom Line Discussion Scott Struck, Ph.D. Senior Professional Geosyntec Consultants http://water.epa.gov/action/importanceofwater/upload /Importance-of-Water-Synthesis-Report.pdf EPA Report Says

More information

Post-Construction Storm Water Management Program: Planning, Design, Construction, and Operation. Presenters:

Post-Construction Storm Water Management Program: Planning, Design, Construction, and Operation. Presenters: Post-Construction Storm Water Management Program: Planning, Design, Construction, and Operation Presenters: Environment, Health & Safety (EH&S) Kimberly O Connell, UC San Diego April 2014 (draft) Charlotte

More information

Settlements Must Be Integrated with Nature

Settlements Must Be Integrated with Nature Settlements Must Be Integrated with Nature Why it Matters Besides reducing the impact of new development on land and vegetation, BC communities must also become more integrated with the natural world.

More information

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1 Strategy Name: Reduce Existing Potential for Flood Damages LRSW-S3C1. Develop and implement a program to: Minimize flood damages through the use of structural measures. Minimize flood damages through the

More information

Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District,

Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District, Bibliography Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District, California and Maps. US Army Corps of Engineers July 1973 pg. 24 Aqua Hedionda Lagoon Foundation Framework

More information

Restoration Planning and Development of a Restoration Bank

Restoration Planning and Development of a Restoration Bank Restoration Planning and Development of a Restoration Bank Black Creek Pioneer Village, South Theatre 8:30 a.m. to 3:30 p.m. Habitat Restoration and Environmental Monitoring Projects Section Restoration

More information

Risk and vulnerability assessment of the build environment in a dynamic changing society

Risk and vulnerability assessment of the build environment in a dynamic changing society Risk and vulnerability assessment of the build environment in a dynamic changing society Limnei Nie SINTEF Building and infrastructure, P.O.Box 124 Blindern, NO-0314 Oslo, Norway. linmei.nie@sintef.no

More information

Asset Management Stormwater Management Facilities and Wetlands

Asset Management Stormwater Management Facilities and Wetlands Maryland Department of Transportation State Highway Administration Asset Management Stormwater Management Facilities and Wetlands Sonal Sanghavi, P.E. Acting Director, Office of Environmental Design July

More information

Sustainable Drainage Systems (SUDS) A guide for developers

Sustainable Drainage Systems (SUDS) A guide for developers Sustainable Drainage Systems (SUDS) A guide for developers We are the Environment Agency. It s our job to look after your environment and make it a better place for you, and for future generations. Your

More information

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans APPENDIX IV Version: February 2, 2015 Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans Please fill in all blanks and please reference the plan sheets/pages where the information may

More information

Why Watersheds? An introduction to the whys and hows of water resource protection. Center for Watershed Protection

Why Watersheds? An introduction to the whys and hows of water resource protection. Center for Watershed Protection Why Watersheds? An introduction to the whys and hows of water resource protection In This Presentation Why Watersheds Matter What Is a Watershed Impacts of Impervious Cover What Your Community Can Do What

More information

APPROVAL AMENDMENT HISTORY

APPROVAL AMENDMENT HISTORY Prepared by: Aurecon South Africa (Pty) Ltd STORMWATER MANAGEMENT PLAN TOKAI ESTATE (DRAFT 1) Submission date: 11 January 2013 Contact Person: Francois du Toit T: +27 21 526 6950 F: +27 21 526 9500 E:

More information

Peter J. Strazdas Associate Vice President, Facilities Management Western Michigan University peter.strazdas@wmich.edu

Peter J. Strazdas Associate Vice President, Facilities Management Western Michigan University peter.strazdas@wmich.edu Peter J. Strazdas Associate Vice President, Facilities Management Western Michigan University peter.strazdas@wmich.edu Mark S. Kieser Principal, Senior Scientist Kieser & Associates, LLC mkieser@kieser-associates.com

More information

New York City, facing one of the nation s largest sewage overflow

New York City, facing one of the nation s largest sewage overflow New York, New York A Case Study of How Green Infrastructure is Helping Manage Urban Stormwater Challenges Types of green infrastructure used: Green roofs, blue roofs, rain barrels/cisterns, permeable pavement,

More information

Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report

Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. A. Introduction A Stormwater Report must be submitted with the Notice of Intent

More information

Recommendations for future developments

Recommendations for future developments C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site