What Utilities Should Consider when rolling out Smart Meter Projects Phumzile Lawrence Juku Head of Sales Landis+Gyr (Pty) Ltd South Africa
|
|
- Adelia Sparks
- 7 years ago
- Views:
Transcription
1 What Utilities Should Consider when rolling out Smart Meter Projects Phumzile Lawrence Juku Head of Sales Landis+Gyr (Pty) Ltd South Africa Place your company logo here NB: Your company s logo is only permitted on the first slide!
2 CONTENT INTRODUCTION PLANNING PHASE FOCUS AREAS BID MANAGEMENT ROLL-OUT BRAINSTORM SESSIONS PLANNING PROCESS PROJECT MAMAGEMENT JIGSWAW PUZZLE CUSTOMER CENTRIC APPROACH GE0-SPATIAL SITE MANAGEMENT TOOLS CONCLUSION
3 The famous Africa at night picture This image represents different things to different people. So why is it here!!!!!!!!!! To me as Head of Sales - $$$$$$$ Smart meter roll-out opportunities
4 PLANNING PHASE
5 Utility focus Areas for Smart Meter Roll-Out 1. Internal Preparation 2. Anticipate Future Requirements Security 3. Technical Decision Drivers 4. Customer Engagement 5 Landis+Gyr Smart Grid 5/27/2016
6 Smart Meter Bid Management Business Case Steering Committee Utility Technical Solution Team Prepare specs and also review utility processes to support the smart meter roll-out Bid Process Management Solution Consultant (if required) Customer Services Dept. Project Management Post Solution and Service Management IT/Legal and Risk Mgmnt Commercial Dept. 6
7 BRAINSTORM SESSIONS POINTERS (Use Case definition) Do we know what we want What model and solution structure (Utility funding, vendor funding etc) Project management approach (Turnkey or Utility managed) Clarity of technology adoption model, roadmap and governance arrangements Country legislation, Energy Regulator, Consumer Laws etc Customer communication and marketing strategies Alignment of the smart meter solution to the entire business structure/model. Business rules and processes 7
8 The planning process must address some of the following key considerations Build Business Case The review should include all costs elements to include aspects like customer marketing and communications, process integration, systems integration and all the relevant Use Cases for a successful smart meter rollout. Key KPI to enable tracking of business benefits should also be clearly articulated to provide a baseline against which the programme s success can be tracked Project Staffing Issues Project resource assignment needs to be addressed. The current model of staff part-time/secondments is not adequate. The normal staff get involved in multiple initiatives and they need to be fully dedicated to the smart meter project to enable focus and ensure success Integrate smart metering into utility business model Address integration gaps between Smart meter project processes with Distribution, Customer Services and Engineering as these are resulting in a potential risk for continuity and sustainability of the smart meter roll-out. Employ effective Change Management and Leadership alignment interventions to harmonise the sometimes conflicting requirements from the diverse stakeholders Customer Focus Place emphasis on customer customers communication on smart meter roll-out Employ innovative marketing techniques
9 PROJECT MANAGEMENT PHASE
10 JIGSAW PUZZLE APPROACH Don t start a project without having figured out your puzzle Project Management Business Integration Skills and Installers training Customer Education
11 . Project Steercom committee Project reporting structure Best practise investigations and possible interface with other industry experts Governance Stakeholder structures & procedures Strategic alignment Stakeholder Management Quality & Financial Management Budgetary & timeline controls & processes Data integrity of project schedules & reporting Customer Focused Where required develop new policies to support smart metering roll out initiatives Alignment to approved standards Policies & Procedures Project Management Clear roles & responsibilities Document management Resource management Communication management Change control procedures 11
12 High Level Roles and Responsibilities Provides overall guidance and final decision making authority Approves funding & resources requirements Provides overall programme governance and oversight Executive Sponsor Chairs Smart Metering Project Steering Committee Ensures executive sponsorship & leadership alignment with project strategy Project Manager Responsible for overall project execution Project organizational structure including roles and responsibilities Project plan Project status reports Issue management plan and log System change control process and log Risk management plan Project Communication plan Deployment strategy SLA Framework linked to solution contract structure Post Project - Business Line Manager Systems & process integration within the utility Responsible for value realization of the project benefits as outlined in the business case Develop a method and approach to track and measure actual benefits achieved
13 GEO-SPATIAL SITE MAMAGEMENT TOOLS
14
15 Site and Data Management Scheduling and dispatching of installation teams Ability to track and monitor installations increased efficiency Create automated workflows and forms to ensure data accuracy Ensure that all installations are on the map and can be interfaced to other GIS solutions/platform within utility
16 Conclusion
Location of the job: CFO Revenue Assurance
JOB PROFILE Title of position: Manager: Revenue Assurance Operations Number of subordinates: 5-10 Location of the job: CFO Revenue Assurance Level: 3 Position Code: Time span: 2-3 years Key Performance
More informationWhy are PMO s are Needed on Large Projects?
Why are PMO s are Needed on Large Projects? Keeps Project Manager focused on: Priority risks Priority issues Stakeholder alignment Technical challenges Ensures administrative tasks are completed: Projects
More informationChange or Die Effective Utility Business Readiness Through Change Management
Change or Die Effective Utility Business Readiness Through Change Management By Marisol Garza, Principal Consultant, Black & Veatch Published in Electric Energy T&D, March 2011 Change Management is not
More informationObjectives. Project Management Overview. Successful Project Fundamentals. Additional Training Resources
Project Management for Small Business Moderator: Maria Mancha Frontline Systems, Inc. Objectives Project Management Overview Successful Project Fundamentals Additional Training Resources Project Management
More informationGIS DESIGN AND IMPLEMENTATION SERVICES
22-1 21 24 23 22 30 32 25 33 29 34 28 35 28 GIS DESIGN AND IMPLEMENTATION SERVICES Croswell-Schulte provides a full range of services for GIS design and implementation support. We are active in GIS industry
More informationApproaches to Legacy System Modernization. April 2016
Approaches to Legacy System Modernization April 2016 Approaches to Legacy System Modernization Today s Topics Why Legacy Modernization Projects are Complex Components of a Successful Project Best Practices
More informationIESO Information & Technology Services Group Roles, Responsibilities, and Project Management. Doug Thomas: VP- I&TS and CIO May 28, 2015
IESO Information & Technology Services Group Roles, Responsibilities, and Project Management Doug Thomas: VP- I&TS and CIO May 28, 2015 IESO I&TS: Presentation Agenda Group Overview Roles and responsibilities
More informationAnalytics Strategy Information Architecture Data Management Analytics Value and Governance Realization
1/22 As a part of Qlik Consulting, works with Customers to assist in shaping strategic elements related to analytics to ensure adoption and success throughout their analytics journey. Qlik Advisory 2/22
More informationSales & Operations Planning Process Excellence Program
Chemical Sector We make it happen. Better. Sales & Operations Planning Process Excellence Program Engagement Summary November 2014 S&OP Excellence Robust discussions creating valuable ideas Engagement
More informationThe role of IT in business-led Data Governance. by First San Francisco Partners
The role of IT in business-led Data Governance by First San Francisco Partners 2 It s been said the first step in solving any problem is recognizing there is one. Fortunately today, more and more companies
More informationOrganization. Project Name. Project Overview Plan Version # Date
Project Overview Plan Template Organization Project Name Project Overview Plan Version # Date REVISION HISTORY VERSION # REVISION DATE COMMENT 1 APPROVALS: Authorized Signature DATE 2 Table of Contents
More informationProject Management Office Charter
Old Dominion University Office of Computing and Communication Services Project Management Office Charter Version: 1.0 Last Update: February 18, 2010 Created By: Anthony Fox, PMP OCCS Project Management
More informationPosition Description
Position Description Job title Group Section Responsible to Responsibility for staff Project Coordinator Natural Resource Operations Rotorua Lakes Protection & Restoration Programme Rotorua Lakes Business
More informationLeading Practices in Business Transformation
Leading Practices in Business Transformation Stick To The Game Plan Business Transformation Conference October 2013 While the typical risks and challenges seem intuitive, why do business transformation
More informationUniversal Service Administrative Company (USAC) Request for Information (RFI) for Data Governance Software, Training and Support
RFI Number: USAC-IT-2016-03-009-RFI Universal Service Administrative Company (USAC) Request for Information (RFI) for Data Governance Software, Training and Support Title: Data Governance Software, Training
More informationJob Description Head of CRM
Date 10/15 Job Title Head of CRM Solutions Job Grade Management Location London/Solihull Department Client Services Reports to job title Managing Director Job purpose (A concise statement of why the job
More information2007 Follow-Up Report on the Audit of Information Technology January 2005
2007 Follow-Up Report on the Audit of Information Technology January 2005 Natural Sciences & Engineering Research Council of Canada & Social Sciences & Humanities Research Council of Canada October 2007
More informationU.S. Nuclear Regulatory Commission. Plan of Action Strategic Workforce Planning
U.S. Nuclear Regulatory Commission Plan of Action Strategic Workforce Planning January 19, 2001 Strategic Workforce Planning Plan of Action January 19, 2001 Content Overview This plan of action outlines
More informationProject Governance A N T I C I P A T I N G A N A U D I T
Project Governance A N T I C I P A T I N G A N A U D I T Public sector Project Management characteristics Multi-million rand projects Often National interest projects Subject to intense scrutiny Uncertainty
More informationFor Utility Operations
For Utility Operations Provided For: SCAMPS 2014 Annual Meeting Presented By: Michael E. Jenkins, PE What Are We Talking About? Simply, Preparing A Clear Picture Of Where And How The Utility Is Headed
More informationBuilding Your EDI Modernization Roadmap
Simplify and Accelerate e-business Integration Building Your EDI Modernization Roadmap Background EDI Modernization Drivers Lost revenue due to missing capabilities or poor scorecard ratings High error
More informationQuality Assurance for SAP Implementations
Quality Assurance for SAP Implementations Combining the power of SAP Quality Assurance Services with the depth and breadth of experience and knowledge of the SAP corporate ecosystem to drive your end-to-end
More information5 Reasons Learning and Adoption Programs Fail And What To Do About Them
5 Reasons Learning and Adoption Programs Fail And What To Do About Them Product Lifecycle Management (PLM) solutions deliver extensive business advantages. These include lower time-to-manufacture, greater
More informationRevealing the Big Picture Using Business Process Management
Revealing the Big Picture Using Business Process Management Page 1 of 20 Page 2 of 20 Introduction In today s business environment, change is inevitable. Changes in technology, organizational structure,
More informationProcess Improvement Program Project Process
Process Improvement Program Project Process 1 P a g e 12/3/2014 The Process Improvement Program is part of the City of Fort Lauderdale s FL 2 STAT Approach to Exponential Improvement. Its objective is
More informationA New Framework for Administrative Applications Governance
A New Framework for Administrative Applications Governance IT Task Force September 26, 2008 Michael Krugman, Interim VP IST Rafael Reisz, RAFINCO Why are we here? Describe the origin of ERGO framework
More informationOvercoming Common Challenges of Change Management
Speaker: Beena Patel Company: Halcon & Crane Management Consulting Website: Overcoming Common Challenges of Change Management HalconAndCrane.com Welcome to the PMI Houston Conference & Expo and Annual
More informationDeveloping an Analytics Strategy that Drives Healthcare Transformation
Developing an Analytics Strategy that Drives Healthcare Transformation Trevor Strome, MSc, PMP Analytics Lead, Winnipeg Regional Health Authority Emergency Program Assistant Professor, Dept. of Emergency
More informationXavier University: IT Portfolio Management and the Project Request Process
A guideline and process document to establish the governance framework for technology related project requests laying the groundwork for strategic portfolio management Xavier University: IT Portfolio Management
More informationUnlocking value from your ERP service organization*
Consulting Application Managed Services Technology Unlocking value from your ERP service organization* Application Support Effectiveness Assessment can help you identify and dismantle the roadblocks that
More informationPresented By: Leah R. Smith, PMP. Ju ly, 2 011
Presented By: Leah R. Smith, PMP Ju ly, 2 011 Business Intelligence is commonly defined as "the process of analyzing large amounts of corporate data, usually stored in large scale databases (such as a
More informationCentral Agency for Information Technology
Central Agency for Information Technology Development of a National IT Governance Framework Project Management Agenda 1 What is project management? Why it is important? 2 Leading practices 3 Project management
More informationWhy Smart Water Networks Boost Efficiency
Why Smart Water Networks Boost Efficiency by Jeff M. Miller and Mark Leinmiller Executive summary The Smart Water Network (SWAN) is the water utility industry s equivalent to the energy industry s Smart
More informationBSBMKG609 Develop a marketing plan
BSBMKG609 Develop a marketing plan Release: 1 BSBMKG609 Develop a marketing plan Modification History Release Release 1 Comments This version first released with BSB Business Services Training Package
More informationITIL V3 for Small and Medium Business. Michael O Mara IBM Service Management Executive Tivoli Asia Pacific
ITIL V3 for Small and Medium Business Michael O Mara IBM Service Management Executive Tivoli Asia Pacific The current situation at an SMB client in the ASEAN region There is no integrated process framework
More informationGlobal Software Update Rollout: Global Learning Management System
Journal of IT and Economic Development 5(2), 18-31, October 2014 18 Global Software Update Rollout: Global Learning Management System Heather Budriss, Tamikia Life, Denise Sarpong, Cham Williams College
More informationNaperville Smart Grid Initiative
Naperville Smart Grid Initiative Business Case Fundamentals Updated on 9/7/2010 Summary The NGSI program delivers an excellent ROI by increasing network reliability, operational efficiencies, reducing
More informationOverview of Business Process Management
Overview of Business Process Management A DevelopIntelligence Publication Written By: Jay A. Miller Overview of Business Process Management Version 1.2 Publication date: Feb 29, 2008 This material is licensed
More informationCompany Overview. Financial Snapshot. Leading Global ERP Provider Global Midmarket Divisions / Subsidiaries of Global 1000
Today s Agenda!! $ " # # % & Epicor at a Glance Company Overview Global presence in over 50 countries Leading Global ERP Provider Global Midmarket Divisions / Subsidiaries of Global 1000 Founded in 1972.
More informationChange Management. Tools and Techniques for Change Management Success
Change Management Tools and Techniques for Change Management Success Insert Title Here INTRODUCTION ScottMadden has long recognized the managerial challenges caused by change. Our clients consider our
More informationA Privacy Officer s Guide to Providing Enterprise De-Identification Services. Phase I
IT Management Advisory A Privacy Officer s Guide to Providing Enterprise De-Identification Services Ki Consulting has helped several large healthcare organizations to establish de-identification services
More informationSound Transit Internal Audit Report - No. 2014-3
Sound Transit Internal Audit Report - No. 2014-3 IT Project Management Report Date: Dec. 26, 2014 Table of Contents Page Background 2 Audit Approach and Methodology 2 Summary of Results 4 Findings & Management
More informationFacilities Portfolio Management Tool
2016 Facilities Portfolio Management Tool Project Charter Budget- Facilities Oversight Office of Financial Management 4/10/2016 CONTENTS Overview... 2 Purpose Statement... 2 Background... 2 Goals & Objectives...
More informationProject Management Framework
Information Services Project Management Framework October 2003 Document ID No. Page 1 of 1 Contents 1. Introduction Page 3 2. Use of Framework Page 3 3. Project Register and Monitoring Page 4 4. Project
More informationW H I T E P A P E R H o w P r o j e c t a n d P o r t f o l i o Management Solutions Are Delivering Value to Organizations
W H I T E P A P E R H o w P r o j e c t a n d P o r t f o l i o Management Solutions Are Delivering Value to Organizations Sponsored by: CA Randy Perry September 2008 Eric Hatcher EXECUTIVE SUMMARY Global
More informationIT Sourcing. White Paper IT Advisory
IT Sourcing Sourcing of IT capabilities can result in significant benefits. Besides getting access to market competence and development, BearingPoint s experience is that the actual cost savings typically
More informationIntroductory Certificate The APM Project Fundamentals Qualification
Introductory Certificate The APM Project Fundamentals Qualification Syllabus, learning outcomes and assessment criteria aligned to the APM Body of Knowledge 6th edition The syllabus provides a summary
More informationDELIVERY CONTROLLED CONSTRUCTION MANAGEMENT. Control your Delivery with a 360 View of Your Project Data, Financials and Operations
DELIVERY CONTROLLED CONSTRUCTION MANAGEMENT Control your Delivery with a 360 View of Your Project Data, Financials and Operations CONTENT 1 For convenience, use the links below Complete Enterprise Platform
More informationInternal Financial Controls
Internal Financial Controls Who All Are Responsible? 3 What is Internal Financial Control (IFC)? 5 What is Internal financial controls over financial reporting (ICFR)? Internal Controls Global Perspective
More information3 Fundamental Strategies to Convince the CFO to Fund Your BI Solution. e-book
3 Fundamental Strategies to Convince the CFO to Fund Your BI Solution e-book Table of Contents Do You and Your CFO See Eye to Eye on BI? Find Common Ground Do Your Homework Establish Yourself as a Trusted
More informationUpdate on NHSCB Key features of (proposed) NHSCB operating model for primary care
Aim to cover Update on NHSCB Key features of (proposed) NHSCB operating model for primary care NHSCB dental commissioning strategy all dental services Concept and context of local professional networks
More informationDeveloping an analytics strategy & roadmap
Developing an analytics strategy & roadmap Paula Edwards, PhD pedwards@himformatics.com Nov 15, 2012 Topics Why develop a strategic plan? Key components of an analytics strategic plan Typical planning
More informationReal world experiences for CMDB Success
Real world experiences for CMDB Success Gaurav Dutt Uniyal Infosys Technologies Limited The CMDB and CMS - the Powerhouse of Service Management 8 th July 2008 Agenda The present state CMDB implementation
More informationDraft Document STATE OF MICHIGAN. SACWIS Planning Department of Human Services Strategic Implementation Plan: Project Staffing
STATE OF MICHIGAN SACWIS Planning Department of Human Services Strategic Implementation Plan: Project Staffing Executive Summary The State of Michigan has dedicated integrated team of resources for the
More informationOUR STRATEGIC PLANNING JOURNEY
OUR STRATEGIC PLANNING JOURNEY The Department of Medicine Strategic Plan Our roadmap for the future It will shape and guide what the Department of Medicine does, why we do it, and our priorities, with
More informationOngoing N/A TBC. Baseline
Position Title: Executive General Manager, Core Services Systems Operations Classification: SES Band 2 Position Number: 1018 Position Status (ongoing/nonongoing): Ongoing Division: Core Services Systems
More informationAttachment 16.1 SA Power Networks: Customer Data Quality Plan 2015-2020 September 2014
Attachment 16.1 SA Power Networks: Customer Data Quality Plan 2015-2020 September 2014 Customer Data Quality Plan 2015-2020 V1.1 Executive Summary The commencement of Full Retail Contestability in 2004
More informationISO 20000-1:2005 Requirements Summary
Contents 3. Requirements for a Management System... 3 3.1 Management Responsibility... 3 3.2 Documentation Requirements... 3 3.3 Competence, Awareness, and Training... 4 4. Planning and Implementing Service
More informationMajor Project Governance Assessment Toolkit
Major Project Governance Assessment Toolkit Mark Ritchie, University of Edinburgh Pauline Woods-Wilson, Lancaster University Project and Change Management Group Project and Change Management Group Established
More information2012 National BDPA Technology Conference. Defining Project and PMO Metrics
2012 National BDPA Technology Conference Defining Project and PMO Metrics Betty Hutchins, MBA, PMP August 1 4, 2012 Baltimore, MD Presentation Objectives Project Performance Determine the Process Defining
More informationFINANCE TRANSFORMATION CHALLENGES
FINANCE TRANSFORMATION CHALLENGES Fred Hargrove Managing Director IN THIS WHITE PAPER Challenges of Finance Transformation... 3 PEOPLE/ORGANIZATION CHALLENGES... 3 Competing priorities/limited resources
More informationPINK ELEPHANT THOUGHT LEADERSHIP WHITE PAPER DEVELOPING AN IT SERVICE MANAGEMENT TRAINING STRATEGY & PLAN
PINK ELEPHANT THOUGHT LEADERSHIP WHITE PAPER DEVELOPING AN IT SERVICE MANAGEMENT TRAINING STRATEGY & PLAN Executive Summary Developing and implementing an overall IT Service Management (ITSM) training
More informationAttachment 1. PGW IS expects to use the Demand Management and Project Prioritization tools and methodologies to:
Attachment 1 1. Introduction 1.1 Overview Philadelphia Gas Works (PGW) has used Microsoft Project and Project Server to manage Information Services (IS) Projects since 2006. In 2014, PGW upgraded its Project
More informationPreparation for ISO 45001 OH&S Management Systems
Preparation for ISO 45001 OH&S Management Systems HEALTH & SAFETY MANAGEMENT QUALITY MANAGEMENT ACCESSIBILITY ENVIRONMENTAL MANAGEMENT ENERGY MANAGEMENT ISO 45001 TIMELINE ISO project committee ISO PC
More informationUNOPS International Public Sector Accounting Standards (IPSAS) Implementation Programme
UNOPS International Public Sector Accounting Standards (IPSAS) Implementation Programme This IPSAS briefing document provides an overview of why IPSAS is being implemented at UNOPS, how this process is
More informationCHARTER. Interagency Information Systems Working Group. Timber Regulation and Forest Restoration Program June 23, 2015
Mission and Background CHARTER Interagency Information Systems Working Group Timber Regulation and Forest Restoration Program June 23, 2015 The Mission of the Interagency Information Systems (IIS) Working
More informationEnterprise Release Management
Enterprise Release Management Plutora helps organizations manage complex IT Feature Pipeline, IT Releases and IT Test Environments in a simple and transparent manner. Enterprise Releases Transparency and
More informationIntelligent Buildings and Big Data CABA Intelligent & Integrated Buildings Council (IIBC) Landmark Research 2014
Intelligent Buildings and Big Data CABA Intelligent & Integrated Buildings Council (IIBC) Landmark Research 2014 1. BACKGROUND The Continental Automated Buildings Association (CABA) is an industry association
More informationProject Management. On-Site Training and Facilitation Services. www.performanceweb.org. For more information, visit
Project Management On-Site Training and Facilitation Services For more information, visit www.performanceweb.org Benefits of On-Site Training The Performance Institute s proven consulting methodology is
More informationHuman Performance & the Role of Human Resources
DEFENSE LOGISTICS AGENCY AMERICA S COMBAT LOGISTICS SUPPORT AGENCY Human Performance & the Role of Human Resources Ms. Cheryl Steptoe-Simon July 20, 2016 Human Performance Functions Human Performance Components
More informationUsing Your PMO to Drive Successful Organizational Change Management
Using Your PMO to Drive Successful Organizational Change Management Joe Saliunas, Booz Allen Hamilton 11 November 2012 1 Agenda Organizational change management overview Case studies PMBOK Guide processes
More informationT31: Before, During and After Outsourcing David Fong, BlackRock
T31: Before, During and After Outsourcing David Fong, BlackRock Before, During and After Outsourcing David Fong, CISA, CPA Objective o Explore reasons why some organizations choose to outsource o Understanding
More informationwww.pwc.com/in PwC Approach to Benefits Management
www.pwc.com/in Approach to Benefits Management Benefits management is a process of translating business challenges into successful strategic, process, and technology initiatives by identifying, managing,
More informationProject Management Office Best Practices
Project Management Office Best Practices Agenda Maturity Models (Industry & PMO) PMO Areas of Expertise (Scale & Scope) Project Management Office Process Model Project Management Framework PMO Implementation
More informationBalanced Scorecard: & Challenges. 23rd July 2007. Organized by: SMR
Balanced Scorecard: Implementation & Challenges 23rd July 2007 Organized by: SMR 1 Program Schedule» 9.00 am 10.30am» 2.00pm 3.30pm > Introduction PMS > BSC Terminology & Principles > Understanding BSC
More informationAppeals Case Management System Project. Scope Management Plan. November 20, 2014
Appeals Case Management System Project Version 1.0 Health and Human Services Agency, Office of Systems Integration Template Revision History REVISION HISTORY REVISION # DATE OF RELEASE OWNER SUMMARY OF
More informationPREMIER SERVICES MAXIMIZE PERFORMANCE AND REDUCE RISK
MAXIMIZE PERFORMANCE AND REDUCE RISK 1 BROCHURE COMPLEXITIES IN MISSION CRITICAL SYSTEMS CONTINUE TO INCREASE Mission critical communications systems have become increasingly complex as more features and
More informationTHE NEXT GENERATION CMDB - ALIGNING IT TO BUSINESS
WWW.WIPRO.COM WIPRO CONSULTING SERVICES THE NEXT GENERATION CMDB - ALIGNING IT TO BUSINESS SERVICE MODELING IS CRITICAL ACROSS INDUSTRIES TO DELIVER SERVICE CENTRIC VIEW TO THE IT. DO BUSINESS BETTER Today,
More informationVendor Management. Minimizing Value Leakage. Deloitte Consulting LLP. November 19, 2013
Vendor Management Minimizing Value Leakage Deloitte Consulting LLP November 19, 2013 Vendor Management is a rapidly emerging business practice in the outsourcing industry Define sourcing strategy Assess
More informationDESIGN BUILD TEST TRAIN/DEPLOY MAINTENANCE
SOLUTION PLAN REQUIREMENTS ANALYSIS DESIGN BUILD TEST TRAIN/DEPLOY MAINTENANCE Executive Summary The project will document campus requirements for IAM functionality and select and procure one or more technology
More informationFrom Vision to Implementation: Integrated Strategic Planning
A three-page excerpt from our 18-page Best Practice Guidebook: From Vision to Implementation: Integrated Strategic Planning 1 Best Practice Guidebook From Vision to Implementation: Integrated Strategic
More informationSingle Sourcing as Enabler for SAP Clients
Single Sourcing as Enabler for SAP Clients Gert Keuschnigg IBM Business Consulting Services Vienna, April 2005 Table Of Contents Initial Situations at Clients and Goals of Single Sourcing Approaches of
More informationZimbabwe Women s Economic Empowerment Study Terms of Reference
Zimbabwe Women s Economic Empowerment Study Terms of Reference Background Women s economic empowerment appears to be an elusive goal in Zimbabwe despite the recognition of its importance by the government,
More informationData Governance Primer. A PPDM Workshop. March 2015
Data Governance Primer A PPDM Workshop March 2015 Agenda - SETTING THE STAGE - DATA GOVERNANCE BASICS - METHODOLOGY - KEYS TO SUCCESS Copyright 2015 Noah Consulting LLC. All Rights Reserved. Industry Drivers
More informationConstructive Leadership in a Strong Nuclear Safety Culture
Constructive Leadership in a Strong Nuclear Safety Culture The Role of Leadership Development and Succession Planning Strategies Presented By: Jesse L. Brooks, III MSOD President, J.L. Brooks & Associates,
More informationInformation Pack for Applicants to the MIDLANDS CONNECT PROJECT TEAM
Information Pack for Applicants to the MIDLANDS CONNECT PROJECT TEAM I. Midlands Connect: Strategic Context and progress to date The Midlands Connect (MC) Partnership started in 2014 and brings together
More informationEnterprise Architecture 101. (Includes numerous samples/ templates produced using TOGAF methodology) Shail Sood
Enterprise Architecture 101 (Includes numerous samples/ templates produced using TOGAF methodology) Enterprise Architecture Key Question What is Enterprise Architecture? Why Enterprise Architecture? What
More informationSuccessful Change Management Practices in the Public Sector. How governmental agencies implement organizational change management
Successful Change Management Practices in the Public Sector How governmental agencies implement organizational change management Table of Contents Introduction 1 Key Findings Identifying change drivers
More informationAn Introduction to the Information Security Program Model (ISPM)
SECURELY ENABLING BUSINESS An Introduction to the Information Security Program Model (ISPM) Presented by: Nick Puetz VP of Strategic Services, FishNet Security David Robinson CIO, Lockton Companies AGENDA
More informationHow To Implement An Enterprise Resource Planning Program
ERP Implementation Program Key phases of ERP implementation: Analysis of the company existing or designing new business process descriptions Inventory of the company s existing formal workflows or designing
More information5/12/2014. ANALYTICS GOVERNANCE May 16, 2014. What is Enterprise Analytics? Dr. Tamira Harris, PhD, MBA, MSN, CPHQ, CCM
ANALYTICS GOVERNANCE May 16, 2014 Dr. Tamira Harris, PhD, MBA, MSN, CPHQ, CCM What is Enterprise? The core of enterprise analytics is to create a technological and management infrastructure to get an enterprise-wide,
More informationBenefits Realization from IS & IT, and Change Management of roles and the working practices of individuals and teams.
: Delivering Value from IS & IT Investments John Ward and Elizabeth Daniel John Wiley & Son Ltd ISBN: 9780470094631, 399 pages Theme of the Book This book explores a process and practical tools and frameworks
More informationInformation Governance Workshop. David Zanotta, Ph.D. Vice President, Global Data Management & Governance - PMO
Information Governance Workshop David Zanotta, Ph.D. Vice President, Global Data Management & Governance - PMO Recognition of Information Governance in Industry Research firms have begun to recognize the
More informationAvanade Point of View. Getting it right with a project and portfolio management solution
Avanade Point of View Getting it right with a project and portfolio management solution Better control, higher value Orchestrating a portfolio of projects, and the resources for execution, challenges leaders
More informationCybersecurity and the Connected Home CABA Connected Home Council (CHC) Landmark Research 2015
TERMS OF REFERENCE/PROSPECTUS Cybersecurity and the Connected Home CABA Connected Home Council (CHC) Landmark Research 2015 1. BACKGROUND The Continental Automated Buildings Association (CABA) is an industry
More informationIntelligent Buildings and Cybersecurity CABA Intelligent & Integrated Buildings Council (IIBC) Landmark Research 2015
TERMS OF REFERENCE/PROSPECTUS Intelligent Buildings and Cybersecurity CABA Intelligent & Integrated Buildings Council (IIBC) Landmark Research 2015 1. BACKGROUND The Continental Automated Buildings Association
More informationIS&T Project Management: Project Management 101. June, 2006
IS&T Project Management: Project Management 101 June, 2006 Session Objectives Review basics management Discuss obstacles to effective management Share practices that work for you Empower you to try some
More informationThe Department for Business, Innovation and Skills IMA Action Plan PRIORITY RECOMMENDATIONS
PRIORITY RECOMMENDATIONS R1 BIS to elevate the profile of information risk in support of KIM strategy aims for the protection, management and exploitation of information. This would be supported by: Establishing
More informationITIL Intermediate Lifecycle Stream:
ITIL Intermediate Lifecycle Stream: SERVICE DESIGN CERTIFICATE Sample Paper 2, version 6.1 Gradient Style, Complex Multiple Choice SCENARIO BOOKLET This booklet contains the scenarios upon which the eight
More information