Designing a Lean Value Stream

Size: px
Start display at page:

Download "Designing a Lean Value Stream"

Transcription

1 Designing a Lean Value Stream Overview The steps that you will take to create a lean value stream are 1. Select a product family (done earlier) 2. Identify the value stream owner (done earlier) 3. Map the current value stream (done earlier) 4. Determine the rate of production required to meet customer demand, takt time 5. Develop continuous flow wherever possible 6. Use Supermarkets and kanbans to control production where continuous flow does not extend upstream 7. Send the customer schedule to only one production process, the pacemaker process 8. Level the production mix 9. Level the production volume 10. Develop the ability to make every part every day (or faster) upstream of the pacemaker process. Continuous Flow The goal of lean is to develop a value stream where value flows continuously to customers with no waste. This means no waiting, no inventory, no defects, no unnecessary motion; none of the 7 types of waste discussed in earlier lessons. Ideally a customer would say I want 10 widgets delivered at 10AM each day of the workweek and that would trigger the value stream to create 10 units from scratch and deliver them at 10AM every day. I.e., the needed supplies would be delivered to each process in the value stream at exactly the right time to be worked on, the work would be done perfectly, and the widget would be moved a minimal distance until it was finally delivered to the customer. Henry Ford s assembly line is an example of a value stream that could have been an ideal lean value stream. (It wasn t because cars were identical and made to long-term forecasts, but that s another story.) What if every Model T that came off of the assembly line was driven away by a customer who had ordered the car? If the production line value stream was triggered by the customer s order, we would have something very close to the ideal of continuous flow. Continuous flow is possible when product can be produced and moved to the next process one-unit-at-a-time, without delay and without errors or scrap. When it is possible to do this many benefits result, such as lower costs, instant signals of quality problems, lower costs, no work-in-process inventory, etc. When flow is not continuous it will create the opposite results. In other words, discontinuous flow will result in higher costs, delayed signals of quality problems, work-in-process inventory accumulations, etc.. 1

2 Reasons for Discontinuous Flow Discontinuous flow has many possible causes. Batch production or work scheduling separate processes using long-term forecasts is a primary cause. Other causes include Long physical distances between processes and process steps. Quality problems due to either sporadic special causes or chronic problems caused by process or product design flaws. Poor machine or equipment maintenance. Unpredictable customer demand. Acts of God causing unpredictable interruptions to supplies. Long changeover times. Long setup times. Supplier issues: unreliable deliveries, long lead times, business failures, multiple suppliers for the same item, quality problems, etc. Some of these causes can be addressed immediately by the design of the value stream. This will involve making the value stream as close as possible to continuous flow at the outset. The remaining causes are addressed long term by kaizen events, which are shortduration projects that use the DMAIC framework to make quick improvements. Lean Six Sigma is used to tackle especially stubborn problems identified by leadership or during kaizen events. The importance of an organizational culture that promotes the ideal of zero waste cannot be overemphasized. Steps toward continuous flow Takt Time To achieve our ideal of continuous flow we need to know how many items our customers want and when they want them. This demand rate is known as takt time. We begin by calculating this value using the equation available time per day takt time= (1.1) customer demand per day This value is used to synchronize the entire value stream. For example, if a disability claims office works from 9am-5pm with 1 hour for lunch and two 10 minute breaks then it has 400 minutes of time available to work each day. If it receives an average of 50 claims per day then the takt time is 400/50=8 minutes per claim, i.e., the office should complete one claim every 8 minutes. If it completes more claims than this then it is probably overstaffed (wasted resources.) If it completes fewer then customers will have to wait too long to learn the disposition of their claims (wait time waste.) If a factory produced widgets in the same 9-to-5 schedule with the same 1 hour lunch and two 10 minute breaks, then it would need to know the average customer demand for widgets. If the demand was 50 widgets per day, then the factory should complete one widget every 8 minutes. Faster production would result in accumulated finished goods 2

3 inventory. Slower production would mean customers would not get the widgets they need when they need them. Takt time is shown in data boxes for processes in the future state value stream map. Supermarkets and Kanbans When continuous flow is not possible (and it usually is not possible to get perfect continuous flow,) you will use supermarkets and kanbans. You may recall that in Lean Six Sigma the term supermarkets refers to small, controlled amounts of inventory that are used to schedule production at upstream processes. Kanbans are cards (or other devices, but we ll use the term cards for all kanbans) used to control production and movement of materials and parts. There are several types of Kanbans as shown in Table 1. Table 1-Types of Kanbans Symbol Type of Kanban Comment Withdrawal kanban. Production kanban Kanban that instructs the material handler to get parts from the supermarket to the process that needs them. Kanbans that tells a process how many of an item to produce and gives it permission to do so. Batched kanbans A group of kanbans to be picked up at one time Signal kanban Kanban post Signals when a reorder point is reached and another batch needs to be produced. Used when the supplying process produces in batches and requires a changeover to produce the required item. The place where kanban cards are collected for pickup 3

4 Pacemaker Process Takt time is used to schedule the pacemaker process in the value stream. This process is used to trigger production by other processes in the value stream. Because of its importance, care should be taken when selecting the pacemaker process. The pacemaker process should be the continuous flow process that is the furthest downstream in the value stream. Since we want pacemaker processes to schedule the entire value stream, there should not be any supermarkets downstream from the pacemaker process. Figure 1 shows a simple example of a pacemaker process for a typical value stream. Figure 1-Pacemaker Process If value streams are producing customized, made-to-order items, then the pacemaker process may need to be further upstream. However, the no supermarkets downstream rule still applies. Figure 2 Shows an example of this situation. Figure 2-Pacemaker Placement for Custom Production Production Mix The production mix is set at the pacemaker process. The basic idea is to produce a mix of products that, over a relatively short time interval, matches the mix of products demanded by customers. The ideal flow process is single-item flow, so the ideal product mix would 4

5 be build-to-order. However, for a variety of reasons, this ideal is seldom possible. 1 The primary purpose of creating an even production mix is to eliminate the need for batching. When the pacemaker process produces in batches, the resources it consumes are also used in batches. This creates batching in all upstream processes that feed the pacemaker process, and upstream inventories tend to grow larger as you move further upstream. A level production mix also makes it easier to respond to different customer requirements with a short lead time and little inventory. The downside is that at assembly there will be a larger number of changeovers and the need to keep components for different assemblies near at hand. The icon for leveling is shown in Figure 3. On the value stream map the icon is shown in the information flow, see Figure 4. Figure 3-Load Leveling Symbol Figure 4-Example of Using Load Leveling Icon Production Volume After leveling the production mix, the next step is to level the production volume. This is achieved at the pacemaker process by releasing and withdrawing small and consistent amounts of product in pace with takt time. By doing this we keep the entire value stream responsive to the demands of the customer. Batch-and-queue systems, in contrast, produce according to schedules at each separate process in the value stream, causing all 1 Services are an exception. Produce-to-order is relatively common in the services sector. It would be pointless to treat an emergency patient before they experience the emergency! 5

6 of the problems discussed earlier. In addition to the chronic problems, the situation is even worse when customer demand changes suddenly and the company is left with large inventories and no demand for them. This has lead to catastrophe that has spelled the end of more than one company. Consistent, level production rates are a primary goal of Lean Six Sigma. It is only possible when quality is high because poor quality disrupts production flow and is usually compensated for by maintaining large stocks of "just in case" inventory. When small amounts of production are released, say an hour s worth or less, poor quality will bring things to a halt. This is actually a good thing because it is likely that the cause of the quality problem is still identifiable. The time delay created by inventories is a huge barrier to quality improvement because the cause of quality problems has long since vanished, only to reappear again and again. With this arrangement the causes of quality problems are merely items of historical interest rather than something that can be realistically addressed. Of course, production is removed from the pacemaker process at the same rate that production orders are issued. This paced withdrawal keeps the pacemaker process free from inventory buildup. The consistent increment of work is referred to as the pitch. The pitch increment is calculated by considering both takt time and the quantity held by a container (pack size.) The formula used is pitch = takt time pack size = time it takes to produce a full container (1.2) For example, if your takt time is 1 minute and the container size is 10 units then pitch = 10 minutes (1 minute x 10 units = 10 minutes.) This is called the takt image. In practice we would, every 10 minutes, tell the pacemaker process to make 10 units and take away one finished pitch quantity from the process. The pitch quantity is the unit by which the production is scheduled for a given product family. Just as we don t batch parts, with Lean we also don t batch production schedules. The pitch time is the time frame used to monitor value stream performance. This is in stark contrast to the usual management time frame, which is often days, weeks, or even months. Just as the delay created by inventories makes it almost impossible to solve quality problems, the delay created by long management time frames does the same with production problems. Load-leveling Box (heijunka box) One mechanism used to accomplish load leveling is the load-leveling box, Figure 5. Think of a load-leveling box as a data table where each row in the table represents one product in the product family, each column represents a pitch time period, and each cell in the table is a place where kanbans are stored, see Table 2. The bins in the box each hold one or more kanbans. By staggering the kanbans in the load-leveling box at the pitch interval we automatically create a consistently level production mix. 6

7 Figure 5-Load-Leveling Box (Heijunka Box) 2 Table 2-Table Explaining Heijunka Box Pitch Time Product 9:00 9:10 9:20 9:30 9:40 9:50 A Kanban Kanban B Kanban Kanban C Kanban Kanban There is no separate icon for leveling the production pace, we use the same symbol as for leveling the production mix. Actually, it is not only the icon that is the same, leveling the mix and the pace of production are one and the same since we must level both simultaneously to have lean production. Every Part Every Day If items (parts, services, transactions, etc.) are produced repeatedly, we d like to have a system where upstream processes could create the quantity of each item needed by customers immediately. As a step towards this goal we begin with a target of producing every item needed, in the quantity needed, at least every day. Once this is accomplished we can begin the continuous improvement journey and reduce the EPE interval from a day to an hour or eventually a pitch interval. The primary factor that determines the ability of an upstream fabrication process to produce multiple items is the time it takes to changeover from one item to another. As 2 In this illustration, each time period builds an A and two Bs along with a mix of Cs, Ds and Es. What is clear from the box, from the simple repeating patterns of kanbans in each row, is that the production is smooth of each of these products. 7

8 this time decreases, the number of parts that can be produced in a day increases. In fact, changeover time can be used to determine batch sizes. Calculate the number of hours you have available in a workday, then subtract the number of hours required to produce the daily requirement. The time left over is the time available for changeovers. 3 Future State Value Stream Map The principles presented above serve as guidelines for creating a lean value stream. The tools and icons will be used to draw a picture of the new value stream you plan to build. In Lean Six Sigma we are usually not asked to create a brand-new value stream from scratch. Instead we start with the current value stream and apply lean principles to evaluate and improve it. Figure 6 shows a current state value stream map from an earlier lesson. 4 We'll use this example to illustrate the process of creating a future state value stream map. Figure 6-Current State Value Stream Map 3 Actually, this is also done for batch-and-queue processes. But before Lean Six Sigma has been applied the changeover times are frequently so long that huge batch sizes are required to amortize the changeover costs. 4 You may wish to review the lesson 'Establish Baseline 11' 8

9 Takt Time Obviously, the current state is a far cry from continuous flow, so there's lots of room for improvement. According to the principles presented above, the first step toward improvement is to calculate takt time. 5 The customer demand is uprights per month and the company works one shift per day, so takt time is calculated as follows: Available work time (minutes): =430 minutes/day=25800 seconds/day Customer demand: 16740/20=837 uprights per day Takt time: 25800/837=30.8 seconds/upright In other words, Peerless needs to produce one upright every 31 seconds to meet customer demand within its available work time. This does not allow for equipment breakdowns, quality problems, changeovers, or any other events that might occur. Peerless might decide to produce at a faster rate than takt, but takt is determined by customer demand and can't be changed by Peerless. Takt time is shown in data boxes on the future state value stream map. Where should finished uprights go? We've started with the customer's rate of demand, now we will work our way upstream. The next question we address is whether the finished uprights should be sent directly to customers each day, or whether we need supermarkets. The ideal of continuous flow would favor direct shipping, but the case study in the appendix includes the note Customer orders are erratic, suggesting that demand varies quite a bit. Thus, in this case, we ll need supermarkets to help us smooth the impact of varying demand on the value stream. Peerless will use the customer s monthly forecast to determine the production capacity they ll need in the upcoming period (one day, in this case) and they will adjust staffing accordingly. Actual production will be scheduled based on kanbans coming upstream from the finished goods supermarket. The future state value stream map shows the configuration in Figure 7. 5 Detailed information for this value stream is given in the appendix. 9

10 Figure 7-Build To Supermarket If the decision had been to build directly to shipping, the value stream map would look like Figure 8. Figure 8-Build to Ship Uprights, both short and long, are packed 6 to a box. We will use this quantity as the kanban size. In other words, each box of 6 uprights in the staging area has one production kanban on it. 6 is called the kanban size. As the shipping department loads the truck it removes the kanbans from the boxes and sends them back to the paint department. This tells the paint department that the uprights have been removed from the supermarket and need to be replenished. Continuous Flow The operator balance chart for this value stream is shown in Figure 9. The times are shown for a single operator at each process. Stamping and painting cycle faster than takt. Stamping produces an upright s worth of side plates in 20 seconds and it takes 15 seconds to paint an upright. A single weld station with one welder takes 45 seconds per upright, longer than takt. It also takes 45 seconds for one inspector to inspect an upright. Thus the weld and inspection stations currently use two operators each, for a total of four workers. We can make an immediate improvement by combining the jobs of welder and inspector. If we add the cycle times of welding and inspection we see that the combined time is 90 seconds, precisely three times takt. Thus we could hypothetically utilize three 10

11 operators rather than four. 6 However, downtime and changeover time mean that we ll still need four operators for the time being. For now, however, we ll draw our future state map to show continuous flow between welding and inspection. In a later lesson we ll discuss the design of a work cell to accommodate this. Figure 9-Takt Time versus Cycle Time Stamp Weld Inspect Paint Cycle Time Takt Time With the current layout it isn t feasible to implement continuous flow that includes the paint department, which is housed in a physically separate facility. It doesn t make sense to run a single part to another building. Figure 10 shows our progress so far. 6 This will require cross-training so that the three workers are skilled in both welding and inspection. 11

12 Figure 10-First View of Lean Value Stream Realizing the other potential gains will require that a number of improvements be made, including: Improve the combined welding/inspection operations by improving reliability, reducing changeover time and reducing cycle times. The initial target is to be able to produce to takt time with only three operators. Eliminate the defects that make inspection necessary. We could then eliminate the inspection activity. This would be a dual savings because not only would it save labor, it would eliminate scrap and rework. We could then get by with two welders, eventually maybe just one welder. Kaizen and Lean Six Sigma and other continuous improvement methods can be used to accomplish the above. We discuss how this is shown on the future state value stream map below. Placement of Other Pull Systems Our value stream needs another pull system. The stamping press can t be used solely for the production of plates for the uprights. While this is less than the continuous flow ideal, it can t be helped (at least, not yet.) Until we can figure out how to create the ideal, we need to create a supermarket between the stamping press and the downstream process that uses its output. Then we can use withdrawals from that supermarket to control the stamping press s production of short and long upright parts. Scenario A As with the full value stream, we will use customer information to design the supermarket pull system for the press. The customer for the press is the weld/inspect work cell. The cell requires enough parts to build 81 short and 756 long uprights per day. The parts for these uprights should be placed in containers that make it easy for the 12

13 welders to remove and assemble. Since each upright has two side plates and two end plates, perhaps each layer of the container will have these four components arranged in the best order for placement on the welding jig. Or maybe the containers will drop into feeders that automatically offer the parts one by one to the welders in the correct order. The containers need to be small so that Peerless can keep both long and short upright stampings in the work cell at all times. A target size for the containers might be one hour s total production, say 10 uprights. An hour s production would require 1 container of short and 9 containers of long upright parts. Each container will have a withdrawal kanban on it. When a welder/inspector begins taking parts from a container its withdrawal kanban will be given to the material handler, who will then go to the stamping press supermarket and withdraw another container of these parts. The withdrawal kanban is used to initiate movement of parts. The production kanban initiates production of new parts. Peerless will attach a production kanban to each container of 10 uprights in the supermarket. When the material handler removes a container from the supermarket a kanban will be sent to the stamping press. This tells the press operator to produce the needed short or long upright components, place them in a container, and move it to a specific place in the stamping supermarket. The location is known as the market address. Stamping now gets its schedule from the next process in the value stream, not from a central scheduling authority. A problem with this particular pull system is that the press takes 1-hour to changeover from short to long uprights. If we schedule runs of an hour s demand of upright components, then we are spending 1-hour setting up the press for a run of only 3 ⅓ minutes (short uprights) or 10 minutes (long uprights.) Changeover time is something that needs to be improved in the long term, but for now we need to design a system that makes sense for the current changeover time. Scenario B Obviously we need to produce greater quantities at the stamping press between changeovers. In keeping with the lean philosophy of every part every day, we will set the stamping press s target batch size to one day s demand: 81 short and 756 long uprights. To allow some buffer for quality problems and downtime we will keep 1.5 days of parts in the stamping press supermarket. We do this grudgingly and we will use Lean Six Sigma, Kaizen, and other methods to improve this situation. For now, it s the best we can do. Peerless needs to use a signal kanban to schedule the stamping press. The signal kanban is a triangle which lets the press know that it should changeover and produce another day s worth of short or long upright plates. The triangle is taken from the supermarket to the press whenever the number of bins remaining drop below a certain point. The stamping press is still scheduled by their customer rather than by central scheduling. We now have the value stream shown in Figure

14 Figure 11-Value Stream Map with Signal Kanban Upright Blanks Although the supplier of the blanks used by the stamping press isn t a lean manufacturer (yet,) Peerless will still use kanbans and supermarkets to control production and inventory at receiving. Withdrawal kanbans will be attached to the containers of blanks. As the containers are used the kanbans will be sent to production control, who will use them to order blanks based on the usage of blanks. Production control can order blanks on a daily basis and place the kanban cards in the kanban slots in the receiving area for the day that the blanks are supposed to arrive. When the shipment comes in the kanbans will be attached to the containers of blanks in the shipment. If the expected arrival date comes and goes and the kanban are still there, it provides a visual alert that the supplier is having problems. Peerless is currently sending the supplier faxed orders weekly. If possible deliveries should be scheduled to arrive daily. Since there are 5 days in a week, this would reduce inventory by 4, or 80%. We ll keep 1.5 days in the stamping. Figure 12 shows where 5 we are now. 14

15 Figure 12-Value Stream Map Including Flow to Supplier This value stream is far from the continuous flow ideal, but it is a definite improvement over the original batch-and-queue value stream. This system is much closer to achieving what Taichi Ohno calls autonomation, or automation with a human touch. Autonomation is a type of automation where production automatically responds to the external environment and to internal problems. With this value stream production is based on short-term customer demand. Parts move quickly from one process to the next (in the case of welding and inspection it moves immediately.) Thus, quality problems will be detected by the customer process soon after they were produced by the upstream process. The causes of these problems are much more likely to be discovered than if they went undetected for a week or so, as they would with the original value stream. Also, if there is a production problem at, say, welding, then downstream production will not receive product from them and will not overproduce. Of course, upstream processes will be starved for kanbans and will quickly stop. Lean welcomes the pain signals as an incentive to find and eliminate the causes of problems. Batch-and-queue uses inventory as an anesthetic to dull the pain while failing to treat the disease that is causing it. Scheduling and Load-Leveling Next we must decide which downstream process to schedule as the pacemaker process. Since there mustn t be any downstream supermarkets from the pacemaker process, the only real choice for the Peerless uprights product family is to send the schedule to shipping. In a typical day 81 short uprights and 756 long uprights are shipped in packages of six, commonly called 6-packs. However, it wouldn t do to simply have all trucks loaded with the day s forecast of 13 or 14 6-packs of short and packs of long 15

16 uprights and all of the kanbans pulled and sent in a batch to the paint department. This would be a batch-and-queue operation that would not provide any kind of takt image to the upstream processes. In fact, if the different processes received the entire day s worth of kanbans, chances are they would sort them into short and long piles and batch produce to reduce changeover time. This would, of course, cause the usual set of problems that are caused by batch-and-queue production. What we need is a system for pulling the kanbans that will result in a mix of short and long uprights being produced. At Peerless we will accomplish this by having Production Control use a heijunka box as a load-leveling device. The heijunka box will be placed in the staging area and it will show a mix of long and short uprights in the sequence. If we use the 6-pack as our container size the pitch interval is 6 x 31 seconds 3 minutes, but this is too short a time to use for our increment for releasing work. As it turns out, the pack size of six is used because uprights are quite heavy and cumbersome and this is the largest pack size that one or two people can lift without special equipment. In the finished goods area uprights are loaded on pallets of 10. We ll use this pack size to determine our pitch interval, which gives a pitch of 30 minutes. What this means is that every 30 minutes Peerless will release one batch of kanbans of work. Each column in the heijunka box represents a 30 minute pitch increment. The two rows are designated for short and long kanbans. Every half-hour the material handler brings the next kanban batch to the paint department, and moves the newly painted uprights to the finished goods area from the paint process supermarket. Table 3 illustrates the heijunka box arrangement. For example, at 8:00AM the material handler will move kanbans to the paint department telling them to paint 8x6=48 long uprights and 1x6=6 short uprights. The paint department will remove the needed unpainted uprights from their upstream supermarket and paint them. Table 3-Heijunka Box Kanban Counts The fact that the value stream includes processes in separate buildings presents a problem. The distance between the buildings also makes it impractical to deliver the kanbans physically to the weld+inspect process. The temptation will be for the material handlers to send the kanbans to the weld+inspect process on a daily basis, since that s how often the welded assemblies are delivered to the paint process. Of course, this will completely destroy the takt image. Peerless will need to use some means other than physically carrying kanbans to the weld+inspect work cell, such as a computer or fax machine. This should be done at the pitch increment so the takt image will be transmitted to the upstream process. From the lean perspective it would be best if the entire value stream were located in the same facility, as close to one another as possible. This objective should be studied by Peerless. We now have our complete future state value stream map, see Figure

17 Figure 13-Complete Future State Value Stream Map This value stream shows substantial improvement compared to the original batch-andqueue value stream. The lead time has been cut from 36 days to 5 days, and value added time has been reduced from 105 seconds to 63 seconds. Of course, there is still room for improvement. Here are some candidates for improvement: Improve uptime at stamping Reduce changeover time at stamping Reduce total work time at weld+inspect to 84 seconds or less Improve uptime at weld+inspect Reduce changeover time at weld+inspect Reduce changeover time at the paint process Relocate the value stream so that painting is in the same building These are all candidates for Kaizen bursts. This is shown on the future state value stream map, see Figure

18 Figure 14-Future State Map with Kaizen Bursts 18

19 Appendix Data for Current State Process Peerless Shelving Data Set Peerless Shelving Company produces a full line of shelving for grocery and department stores. This case concerns one product family, the shelving uprights, which the company calls uprights. The uprights come in two lengths, regular and short, and in four different colors. The components are shipped to contractors who install the shelving. Production Processes Peerless s processes for this product family involves stamping the side plates and the front and rear plates. After stamping, the plates are welded together to form the upright assembly. Assemblies are then moved by truck to the paint shop where they are painted. Parts are warehoused until needed on an order, then they are shipped to customers. Switching the presses from one length to another requires a 1 hour changeover. Steel blanks are supplied by Omaha Steel Company each Monday morning. Customer Requirements Customer orders are erratic. The monthly averages are: uprights per month o 1620 short o long There are two common order sizes. Small stores: 54 short, 108 long. Large stores: 198 long. Shipments leave the warehouse daily, 8am-5pm, Monday-Friday. An average of 3 large store shipments/day, 1½ small store shipments/day. Work Time 20 days/month One shift in all production departments Eight hour shift. Overtime if needed Two 10-minute breaks/shift; manual processes stop during breaks Unpaid lunch Peerless Production Control Receives marketing s 90/60/30 day forecasts and enters them into MRP system Issues Peerless 6-week forecast to Omaha Steel via MRP Obtains steel blanks by weekly faxed orders to Omaha Steel Receives daily delivery orders from sales department Generates MRP-based weekly department schedule based on customer orders, WIP and finished goods inventory, quality reports, downtime reports Issues daily expedite lists to area supervisors Issues weekly build schedules to stamping, welding, and painting processes Issues daily shipping schedule to shipping department Process Information All processing occurs in the following order. All pieces go through all processes. 1. Stamping. The presses are used to producing upright side plates and end plates and other parts. o One 50-ton press, manually loaded & unloaded. (another press is available.) o Cycle: 5-seconds (12 plates/minute) o Each upright short or long uses two side plates and two end plates. Thus, it takes 20 seconds to produce the plates for one upright. o Changeover time: one hour o Machine reliability 90% o Observed inventory 4000 short and 3000 long blanks before stamping 2000 long side plates after stamping 2000 long end plates after stamping 800 short side plates after stamping 400 short end plates after stamping 2. Weld Station 1 (dedicated) o Manual process with 1 operator 19

20 o Cycle time 45 seconds o Changeover (jig change) 15 minutes o Reliability 95% o Observed inventory 500 short 800 long 2. Weld Station 2 (available) o Manual process with 1 operator o Cycle time 45 seconds o Changeover (jig change) 15 minutes o Reliability 90% o Observed inventory 600 short 300 long 2. Weld Station 3 (available) o Manual process with 1 operator o Cycle time 45 seconds o Changeover (jig change) 15 minutes o Reliability 90% o Observed inventory 400 short 400 long o Cycle time 15 seconds (rate at which finished parts exit the paint process) o Changeover (color change): 30 minutes o Reliability 98% o Observed inventory awaiting paint o 100 short o 400 long Shipping Department Orders are shipped to contractors who install the systems on a daily basis. Number of trucks vary. Weld Inspection All welded assemblies are inspected before being added to inventory to be sent to the paint shop. o Visual, dye penetrant, magnetic particle inspection Manual process Cycle time 45 seconds o Observed inventory (backlog) 1200 short 800 long Deliver to Paint Shop There are daily deliveries to the painting facility by truck. Each load delivers the number of uprights needed for the following day s scheduled paint run. The paint shop is located 3 miles from the fabrication shop. o Observed inventory o 405 short o 7560 long Paint Line o Automated process with one person to load parts and another to unload parts. 20

Appendix Lean Glossary Page 1

Appendix Lean Glossary Page 1 Appendix Lean Glossary Page 1 Andon Board A visual control device in a work area giving the current status on performance to expectations and alerting team members to emerging issues. Batch-and- Queue

More information

VALUE STREAM MAPPING ICONS

VALUE STREAM MAPPING ICONS Material Material ASSEMBLY Process I 300 Pieces 1 Day Inventory MRP Control Center "Go-See" Scheduling XYZ Corporation Outside Source Takt = 50 sec. C/T = 45 sec. C/O = 30 min. Uptime = 95% Scrap = 2%

More information

Connecting Assembly with Batch Processes Via Basic Pull Systems

Connecting Assembly with Batch Processes Via Basic Pull Systems Connecting Assembly with Batch Processes Via Basic Pull Systems By Art Smalley Pull systems are an integral part of lean manufacturing yet they are frequently misunderstood and considered hard to implement.

More information

VALUE STREAM MAPPING KITS

VALUE STREAM MAPPING KITS Our Value Stream Mapping Icons are made of self-sticking notes (sticky notes) for an easy mapping experience. Each Icon is characterized by a symbol as well as its name, so that participants who are new

More information

THE BEGINNER S GUIDE TO LEAN

THE BEGINNER S GUIDE TO LEAN THE BEGINNER S GUIDE TO LEAN Professor Daniel T Jones Lean Enterprise Academy Who am I? Writer Machine and Lean Thinking books Researcher on how to do lean everywhere! Founder of the non-profit Lean Enterprise

More information

Value Stream Mapping

Value Stream Mapping Value Stream Mapping 1 Value Stream Mapping Definition Value Stream Mapping (VSM): Special type of flow chart that uses symbols known as "the language of Lean" to depict and improve the flow of inventory

More information

APPLICATION OF KANBAN SYSTEM FOR MANAGING INVENTORY

APPLICATION OF KANBAN SYSTEM FOR MANAGING INVENTORY Bulletin of the Transilvania University of Braşov Vol. 3 (52) - 2010 Series I: Engineering Sciences APPLICATION OF KANBAN SYSTEM FOR MANAGING INVENTORY M. APREUTESEI 1 I.R. ARVINTE 1 E. SUCIU 2 D. MUNTEANU

More information

Toyota Production System. Lecturer: Stanley B. Gershwin

Toyota Production System. Lecturer: Stanley B. Gershwin Toyota Production System Lecturer: Stanley B. Gershwin Primary source: Toyota Production System by Yasuhiro Monden See also: Decoding the DNA of the Toyota Production System by Steven Spear and H. Kent

More information

Lean Manufacturing and Six Sigma

Lean Manufacturing and Six Sigma Lean Manufacturing and Six Sigma Research Questions What have we done in the past? What must we do in the future? How do we know these are the correct actions? 1 Lean Definitions Key concepts of lean:

More information

The Tools of Lean - Value Stream Mapping

The Tools of Lean - Value Stream Mapping ASQ Section 1302 Summer 2004 Series Mahoney State Park The Tools of Lean - Value Stream Mapping Stan Gidley Managing Director Institute of Business Excellence July 15, 2004 Outline Two Stories 1 English,

More information

Work Cells and Cellular Manufacturing

Work Cells and Cellular Manufacturing Work Cells and Cellular Manufacturing Improving the fitness of the factory 1 Cellular Manufacturing Concept of performing all of the necessary operations to make a component, subassembly, or finished product

More information

VALUE STREAM MAPPING FOR SOFTWARE DEVELOPMENT PROCESS. Ganesh S Thummala. A Research Paper. Submitted in Partial Fulfillment of the

VALUE STREAM MAPPING FOR SOFTWARE DEVELOPMENT PROCESS. Ganesh S Thummala. A Research Paper. Submitted in Partial Fulfillment of the VALUE STREAM MAPPING FOR SOFTWARE DEVELOPMENT PROCESS by Ganesh S Thummala A Research Paper Submitted in Partial Fulfillment of the Requirements for the Master of Science Degree In Management Technology

More information

times, lower costs, improved quality, and increased customer satisfaction. ABSTRACT

times, lower costs, improved quality, and increased customer satisfaction. ABSTRACT Simulation of Lean Assembly Line for High Volume Manufacturing Hank Czarnecki and Nicholas Loyd Center for Automation and Robotics University of Alabama in Huntsville Huntsville, Alabama 35899 (256) 520-5326;

More information

Lean Principles by Jerry Kilpatrick

Lean Principles by Jerry Kilpatrick Lean Principles by Jerry Kilpatrick Introduction Lean operating principles began in manufacturing environments and are known by a variety of synonyms; Lean Manufacturing, Lean Production, Toyota Production

More information

Lean enterprise Boeing 737 manufacturing Lean Production System

Lean enterprise Boeing 737 manufacturing Lean Production System Student Self-administered case study Lean enterprise Boeing 737 manufacturing Lean Production System Case duration (Min): 45-60 Operations Management (OPs) Lean enterprise Worldwide Case summary: Assembling

More information

Lean Kitting: A Case Study

Lean Kitting: A Case Study Lean Kitting: A Case Study Ranko Vujosevic, Ph.D. Optimal Electronics Corporation Jose A. Ramirez, Larry Hausman-Cohen, and Srinivasan Venkataraman The University of Texas at Austin Department of Mechanical

More information

Map the Value Stream

Map the Value Stream 1 Map the Value Stream Objectives Create and format a value stream map Add data to a value stream map Compare a current-state value stream map and future-state value stream map 1-1 Contents Contents Examples

More information

Lean Manufacturing Essential Principles

Lean Manufacturing Essential Principles Mini-Lessons from Juran Global The Source for Breakthrough Juran.com Series Lean Manufacturing Essential Principles Juran Global Our expertise has been developed over more than six decades of real-world

More information

Achieving Basic Stability By Art Smalley

Achieving Basic Stability By Art Smalley Achieving Basic Stability By Art Smalley Introduction Lean production has dramatically lifted the competitiveness of many manufacturing companies and the value they deliver to customers. What s more, encouraging

More information

What is Lean Manufacturing?

What is Lean Manufacturing? What is Lean Manufacturing? Levantar March 2012 www.levantar.co.uk info@levantar.co.uk Lean Guides for other sectors are available on our website www.levantar.co.uk e.g. Lean Office, Lean Legal, Lean Engineering

More information

Getting Started with Lean Process Management

Getting Started with Lean Process Management Getting Started with Lean Process Management Hi-Tec Exchange Conference San Francisco July 25, 2011 Missions To team with Organizational Leaders, Managers, & Employees to focus on customers & improve competitiveness,

More information

Chapter 11. MRP and JIT

Chapter 11. MRP and JIT Chapter 11 MRP and JIT (Material Resources Planning and Just In Time) 11.1. MRP Even if MRP can be applied among several production environments, it has been chosen here as a preferential tool for the

More information

Chapter 11. Lean synchronization

Chapter 11. Lean synchronization Chapter 11 Lean synchronization Slack et al s model of operations management Direct Design Operations Management Deliver Develop Supply network management Capacity management Inventory management Planning

More information

Lean Management Standards: Manufacturing

Lean Management Standards: Manufacturing Leader Standard Work. Do leaders have standard work? Do they follow it? Do you carry it with you as a routine? Do you have it with you now?. Is leader standard work regularly reviewed for updating? Has

More information

"Kanban Do It Now but Do It Right" Workshop Illustrates the Importance of Kanban as a Tool in Lean Production

Kanban Do It Now but Do It Right Workshop Illustrates the Importance of Kanban as a Tool in Lean Production "Kanban Do It Now but Do It Right" Workshop Illustrates the Importance of Kanban as a Tool in Lean Production Helping to empower and motivate employees. Jeff Schaller, Ph.D. Just-In-Time (JIT) production

More information

Four Strategies for Smarter Inventory Control

Four Strategies for Smarter Inventory Control Whitepaper April 2016 Four Strategies for Smarter Inventory Control Section 01 Synopsis This paper is provided for companies that carry inventory (manufacturers, distributors, retailers and service providers)

More information

Lean manufacturing and ERP: How to leverage ERP to get lean

Lean manufacturing and ERP: How to leverage ERP to get lean E-Book Lean manufacturing and ERP: How to leverage ERP to get lean A manufacturing firm adopting the principles of lean manufacturing can effectively leverage the company s ERP system during its transition

More information

IMPACT OF PROCESS VARIABILITY ON LEAN MANUFACTURING SYSTEMS

IMPACT OF PROCESS VARIABILITY ON LEAN MANUFACTURING SYSTEMS IMPACT OF PROCESS VARIABILITY ON LEAN MANUFACTURING SYSTEMS Mel Adams and Bernard J. Schroer Center for Automation & Robotics University of Alabama in Huntsville Huntsville, AL 35899 adamsm@email.uah.edu

More information

Hessel Visser NCOI Les 6 A P 373. Operations Management, 7E: Chapter 14 en15

Hessel Visser NCOI Les 6 A P 373. Operations Management, 7E: Chapter 14 en15 1 Lecture Planning and Control 14 Enterprise Resource Planning (ERP) 15 Lean synchronization 16 Project Management (zie andere sheets) 17 Quality Management (zie andere sheets) Hessel Visser NCOI Les 6

More information

Does enterprise resource planning software support lean? ERP goes 44 TARGET AME.ORG/TARGET

Does enterprise resource planning software support lean? ERP goes 44 TARGET AME.ORG/TARGET Does enterprise resource planning software support lean? ERP goes 44 TARGET AME.ORG/TARGET BY HARRY F. LANDSBURG AND SHELDON NEEDLE lean WINTER 2014 TARGET 45 Many articles have been written about how

More information

Understanding Manufacturing Execution Systems (MES)

Understanding Manufacturing Execution Systems (MES) Understanding Manufacturing Execution Systems (MES) Presented by: Shirley Schmidt Freedom Technologies 10370 Citation Dr., Suite 200 Brighton, MI 48116 Phone: 810-227-3737 www.freedomcorp.com What is a

More information

AN INDUSTRIAL APPLICATION OF THE SMED METHODOLOGY AND OTHER LEAN PRODUCTION TOOLS

AN INDUSTRIAL APPLICATION OF THE SMED METHODOLOGY AND OTHER LEAN PRODUCTION TOOLS Integrity, Reliability and Failure of Mechanical Systems Paper Ref: 3927 AN INDUSTRIAL APPLICATION OF THE SMED METHODOLOGY AND OTHER LEAN PRODUCTION TOOLS Eric Costa 1(*), Rui Sousa 1, Sara Bragança 1,

More information

Warning: This document may be duplicated for instructional use within the institution purchasing the case. Other duplication is prohibited.

Warning: This document may be duplicated for instructional use within the institution purchasing the case. Other duplication is prohibited. Title: Case Study: Automobile Final Assembly Plant Date approved for distribution: October 5, 1997 Authors: and Mikell P. Groover Professor of Industrial and Manufacturing Systems Engineering Michael G.

More information

BSCM Sample TEST. CPIM(Certified In Production & Inventory Management) - 1 -

BSCM Sample TEST. CPIM(Certified In Production & Inventory Management) - 1 - BSCM Sample TEST. 1. Which of the following demand fulfillment approaches typically provides the longest delivery time? A) Engineer-to-order. B) Make-to-order. C) Assemble-to-order. D) Make-to-stock. 2.

More information

Lean Silver Certification Blueprint

Lean Silver Certification Blueprint The Lean Certification Blueprint provides additional useful information beyond the Body of Knowledge. The Body of Knowledge specifies the competencies, topics, and subtopics required by different types

More information

The problem with waiting time

The problem with waiting time The problem with waiting time Why the only way to real optimization of any process requires discrete event simulation Bill Nordgren, MS CIM, FlexSim Software Products Over the years there have been many

More information

This can be done by simply counting pieces in the line or subtracting total number of pieces loaded to total number of pieces unloaded from the line.

This can be done by simply counting pieces in the line or subtracting total number of pieces loaded to total number of pieces unloaded from the line. Garment industry over the years has adopted various key performance measures from different industries and invented some of their own. In the 2nd of the three article series, Mausmi Ambastha, a budding

More information

Lean Six Sigma Lean 201 Introduction. TECH 50800 QUALITY and PRODUCTIVITY in INDUSTRY and TECHNOLOGY

Lean Six Sigma Lean 201 Introduction. TECH 50800 QUALITY and PRODUCTIVITY in INDUSTRY and TECHNOLOGY TECH 50800 QUALITY and PRODUCTIVITY in INDUSTRY and TECHNOLOGY Before we begin: Turn on the sound on your computer. There is audio to accompany this presentation. Audio will accompany most of the online

More information

Analyze Mix for Opportunities. Create Full Current State Value Stream Map. Create Full Future State Value Stream Map

Analyze Mix for Opportunities. Create Full Current State Value Stream Map. Create Full Future State Value Stream Map Method: Analyze Mix for Opportunities Gather Data Family Analysis Pareto Order- out Lead Time Create Full Current State Value Stream Map Demand Proportionate Boxes Product Variety Funnel Create Full Future

More information

Smarter Inventory Management

Smarter Inventory Management 10 Real-World Tips for Smarter Inventory Management Inventory is a prime indicator of how well a business is being managed. At the plant and warehouse level too much inventory or obsolete inventory is

More information

VISUAL management techniques for optimum INVENTORY form, fit and function

VISUAL management techniques for optimum INVENTORY form, fit and function You won t GET LEAN... until you GET VISUAL! VISUAL management techniques for optimum INVENTORY form, fit and function Raw materials, work-in-process, finished goods, location and product flow Kanban Min/max

More information

Five Tips to Achieve a Lean Manufacturing Business

Five Tips to Achieve a Lean Manufacturing Business Five Tips to Achieve a Lean Manufacturing Business Executive Overview Introduction The more successful manufacturers today are those with the ability to meet customer delivery schedules while maintaining

More information

LEAN 101 CRASH COURSE. Presented by Jacob McKenna and Seaver Woolfok

LEAN 101 CRASH COURSE. Presented by Jacob McKenna and Seaver Woolfok LEAN 101 CRASH COURSE Presented by Jacob McKenna and Seaver Woolfok Introductions Name Company Position Expectations Favorite Movie Instructors Background: Jacob McKenna has been involved with Lean manufacturing

More information

Business Challenges. Customer retention and new customer acquisition (customer relationship management)

Business Challenges. Customer retention and new customer acquisition (customer relationship management) Align and Optimize Workflows with Lean Dan Marino Marino Associates, LLC Strategic and tactical planning Information systems integration Customer retention and new customer acquisition (customer relationship

More information

Push and Pull Production Systems

Push and Pull Production Systems Push and Pull Production Systems You say yes. I say no. You say stop. and I say go, go, go! The Beatles 1 The Key Difference Between Push and Pull Push Systems: schedule work releases based on demand.

More information

Chapter 6. Inventory Control Models

Chapter 6. Inventory Control Models Chapter 6 Inventory Control Models Learning Objectives After completing this chapter, students will be able to: 1. Understand the importance of inventory control and ABC analysis. 2. Use the economic order

More information

Using the Lean Model for Performance Improvement

Using the Lean Model for Performance Improvement Using the Lean Model for Performance Improvement Presented by Content Expert: Cindy Mand Director, Lean Enterprise BloodCenter of Wisconsin, Milwaukee, WI Learning Objectives 1. History of Lean and it

More information

Ten Steps to Lean Electrical Controls. a White Paper by J.E. Boyer Company, Inc.

Ten Steps to Lean Electrical Controls. a White Paper by J.E. Boyer Company, Inc. a White Paper by J.E. Boyer Company, Inc. Executive Summary Globalization is forcing companies to constantly become more efficient. To drive efficiencies, many companies are implementing Lean Manufacturing

More information

Product Documentation SAP Business ByDesign 1302. Supply Chain Setup Management

Product Documentation SAP Business ByDesign 1302. Supply Chain Setup Management Product Documentation PUBLIC Supply Chain Setup Management Table Of Contents 1 Supply Chain Setup Management.... 6 2 Supply Chain Design Master Data... 7 2.1 Business Background... 7 Locations and Location

More information

Atlas. Automatic Storage & Retrieval Systems

Atlas. Automatic Storage & Retrieval Systems Atlas Automatic Storage & Retrieval Systems PITCH - Servo belt driven LIFT Servo rack & pinion Overview Atlas Automatic Storage and Retrieval Systems (AS/RS) are the perfect solution for many stamping

More information

Smart Inventory Management: A Solution for Ensuring a Steady Supply of Custom Parts

Smart Inventory Management: A Solution for Ensuring a Steady Supply of Custom Parts Smart Inventory Management: A Solution for Ensuring a Steady Supply of Custom Parts By Richard Puglielli Co- written and edited by Sharon Scaramella 1 In trying to comply with the concepts of lean manufacturing,

More information

Lean Implementation in a Low Volume Manufacturing Environment: a Case Study

Lean Implementation in a Low Volume Manufacturing Environment: a Case Study Proceedings of the 2010 Industrial Engineering Research Conference A. Johnson and J. Miller, eds. Lean Implementation in a Low Volume Manufacturing Environment: a Case Study Lucas Simmons, Robbie Holt,

More information

Interpreting the Numbers: From Data to Design. William Elenbark, Consultant Gross & Associates 732-636-2666; belenbark@grossassociates.

Interpreting the Numbers: From Data to Design. William Elenbark, Consultant Gross & Associates 732-636-2666; belenbark@grossassociates. Interpreting the Numbers: From Data to Design William Elenbark, Consultant Gross & Associates 732-636-2666; belenbark@grossassociates.com Robert Muller, Industrial Engineer Gross & Associates 732-636-2666;

More information

NEXT GENERATION MOBILITY IN MANUFACTURING

NEXT GENERATION MOBILITY IN MANUFACTURING NEXT GENERATION MOBILITY IN MANUFACTURING NEXT GENERATION MOBILITY IN MANUFACTURING KEEPING PACE WITH DEMANDS The manufacturing sector is a demanding business. Globalisation has increased competition exponentially.

More information

Seradex White Paper. Using Project Management Software for Production Scheduling. Software Selection Spectrum

Seradex White Paper. Using Project Management Software for Production Scheduling. Software Selection Spectrum Seradex White Paper A Discussion of Issues in the Manufacturing OrderStream Using Project Management Software for Production Scheduling Frequently, we encounter organizations considering the use of project

More information

The Thinking Approach LEAN CONCEPTS. 2012-2013, IL Holdings, LLC All rights reserved 1

The Thinking Approach LEAN CONCEPTS. 2012-2013, IL Holdings, LLC All rights reserved 1 The Thinking Approach LEAN CONCEPTS All rights reserved 1 Basic Thinking to Manage the Journey MANAGEMENT TACTICS OF A LEAN TRANSFORMATION All rights reserved 2 LEAN MANAGEMENT Two key questions What is

More information

At the end of this module, you should be able to:

At the end of this module, you should be able to: A3 Thinking Learning Objectives At the end of this module, you should be able to: Recognize that A3 is a way of thinking and not just a tool Use the A3 chart as a standard tool for implementing lean projects

More information

Rules to Consider. All work shall be highly specified as to content, timing, sequence, and outcome.

Rules to Consider. All work shall be highly specified as to content, timing, sequence, and outcome. Lean Manufacturing An operational system that maximizes Value Added, reduces Essential Support and eliminates Waste in all processes throughout the Value Stream. What is Value-added? What is Essential

More information

APICS acknowledges the Basics of Supply Chain Management Committee for its contributions in the development of this resource.

APICS acknowledges the Basics of Supply Chain Management Committee for its contributions in the development of this resource. APICS acknowledges the Basics of Supply Chain Management Committee for its contributions in the development of this resource. Jim Caruso, CPIM, CSCP (chair) Carol Bulfer, CPIM James F. Cox, Ph.D., CFPIM,

More information

A Review of Assembly Line Changes for Lean Manufacturing

A Review of Assembly Line Changes for Lean Manufacturing IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) ISSN: 2278-1684, PP: 01-05 www.iosrjournals.org A Review of Assembly Line Changes for Lean Manufacturing Awasare Anant Dattatray 1, M.V.Kavade

More information

TOYOTA PRODUCTION SYSTEM BASIC HANDBOOK

TOYOTA PRODUCTION SYSTEM BASIC HANDBOOK TOYOTA PRODUCTION SYSTEM BASIC HANDBOOK TABLE OF CONTENTS Introduction & History of the Toyota Production System... 3 Goals of the Toyota Production System... 4 TPS Model Overview...5-6 Respect for People...

More information

HUMANIZING TAKT TIME AND PRODUCTIVITY IN THE LABOR- INTENSIVE MANUFACTURING SYSTEMS

HUMANIZING TAKT TIME AND PRODUCTIVITY IN THE LABOR- INTENSIVE MANUFACTURING SYSTEMS HUMANIZING TAKT TIME AND PRODUCTIVITY IN THE LABOR- INTENSIVE MANUFACTURING SYSTEMS Milan Fekete Comenius University in Bratislava, Slovak Republic milan.fekete@fm.uniba.sk Jaroslav Hulvej Comenius University

More information

QAD Enterprise Applications Standard and Enterprise Edition. Training Guide Lean Manufacturing

QAD Enterprise Applications Standard and Enterprise Edition. Training Guide Lean Manufacturing QAD Enterprise Applications Standard and Enterprise Edition Training Guide Lean Manufacturing 70-3217-2012.1SE_EE QAD 2012.1 Enterprise Edition and 2012 Standard Edition September 2012 This document contains

More information

Increased Productivity of Tyre Manufacturing Process using Lean Methodology

Increased Productivity of Tyre Manufacturing Process using Lean Methodology INSTITUTE OF TECHNOLOGY, NIRMA UNIVERSITY, AHMEDABAD 382 481, 08-10 DECEMBER, 2011 1 Increased Productivity of Tyre Manufacturing Process using Lean Methodology Ajit Chavda, Prof. M.Y.Patil Abstract--The

More information

Top reasons why ekanban should be a key element of your lean manufacturing plan

Top reasons why ekanban should be a key element of your lean manufacturing plan Infor ERP Top reasons why ekanban should be a key element of your lean manufacturing plan Table of contents Executive summary... 3 Reactive manufacturing model... 4 Move over manual Kanban... 6 Electronic

More information

Leading Continuous Improvement in Established Agile Organizations

Leading Continuous Improvement in Established Agile Organizations Leading Continuous Improvement in Established Agile Organizations Level Set What s the state of agile methods in your organization? Level Set What s the state of agile methods in your organization? Do

More information

PARADIGMS THAT DRIVE COSTS IN MANUFACTURING. The whole purpose of a business enterprise is pretty simple to make a profit by selling

PARADIGMS THAT DRIVE COSTS IN MANUFACTURING. The whole purpose of a business enterprise is pretty simple to make a profit by selling PARADIGMS THAT DRIVE COSTS IN MANUFACTURING The whole purpose of a business enterprise is pretty simple to make a profit by selling products or services to persons who desire those particular goods or

More information

TRAINING SESSION SUMMARIES FOR MANUFACTURING

TRAINING SESSION SUMMARIES FOR MANUFACTURING TRAINING SESSION SUMMARIES FOR MANUFACTURING Central to the lean philosophy is the mandate to educate everyone in an organization. Productivity s lean training has been called the best in the business,

More information

Louisiana Tech University Lean Manufacturing Courses

Louisiana Tech University Lean Manufacturing Courses Lean Course Objectives: Your Employees will be able to: Louisiana Tech University Lean Manufacturing Courses Understand the tools, terms, terminology, and most importantly the benefits of Lean Manufacturing.

More information

Automated Receiving. Saving Money at the Dock Door. Page 8

Automated Receiving. Saving Money at the Dock Door. Page 8 Automated Receiving Saving Money at the Dock Door Page 8 Today s warehouse management and automated sortation systems are far easier to integrate than in the past. As a result, distribution centers are

More information

Going Lean the ERP Way

Going Lean the ERP Way Going Lean the ERP Way Somnath Majumdar Abstract: Lean concepts and techniques are widely used all over the world today to eliminate waste in all processes. These are applicable for all organizations,

More information

Seradex White Paper A newsletter for manufacturing organizations April, 2004

Seradex White Paper A newsletter for manufacturing organizations April, 2004 Seradex White Paper A newsletter for manufacturing organizations April, 2004 Using Project Management Software for Production Scheduling Frequently, we encounter organizations considering the use of project

More information

Lean Training Ideas for TECOM. The Marine Corps needs more training time. Industry best practices can improve our training pipeline.

Lean Training Ideas for TECOM. The Marine Corps needs more training time. Industry best practices can improve our training pipeline. Lean Training Ideas for TECOM The Marine Corps needs more training time. Industry best practices can improve our training pipeline. LtCol B. B. McBreen, 1st RTBn, 2007 1 What is Lean? At MIT in 1988, Dr.

More information

The Theory of Constraints & Lean Manufacturing

The Theory of Constraints & Lean Manufacturing The Theory of Constraints & Lean Manufacturing Don Guild Synchronous Management, Milford, CT P: 3-877-1287 E: synchronous@att.net Reproduction or use of these materials, in whole or in part, is prohibited

More information

Small Lot Production. Chapter 5

Small Lot Production. Chapter 5 Small Lot Production Chapter 5 1 Lot Size Basics Intuition leads many to believe we should manufacture products in large lots. - Save on setup time - Save on production costs Costs associated with Lots

More information

VALUE STREAM ANALYSIS ON A PRINTED CIRCUIT BOARD (PCB) PRODUCTION LINE

VALUE STREAM ANALYSIS ON A PRINTED CIRCUIT BOARD (PCB) PRODUCTION LINE VALUE STREAM ANALYSIS ON A PRINTED CIRCUIT BOARD (PCB) PRODUCTION LINE Arvind S, Syari S Nair, Department of Industrial Engineering & Management, M.G University, Kerala Email: aravinds@gmail.com, syarinair@gmail.com

More information

L E A N M A N U F A C T U R I N G

L E A N M A N U F A C T U R I N G Executive Summary... 3 What is Lean Manufacturing?... 4 The Principles of Lean Manufacturing... 4 The Benefits of Lean... 6 Operational Improvements... 6 Administrative Improvements... 6 Strategic Improvements...

More information

Data Collection for Manufacturing

Data Collection for Manufacturing for Manufacturing G.S.D. Associates offers data collection expertise in the key applications that help our customers operate more efficiently and at lower cost: Work-In-Process (WIP) Tracking, Inventory

More information

Datasheet Electronic Kanban Ultriva vs. ERP ekanban Modules By Narayan Laksham

Datasheet Electronic Kanban Ultriva vs. ERP ekanban Modules By Narayan Laksham Datasheet Electronic Kanban Ultriva vs. ERP ekanban Modules By Narayan Laksham Summary: Several ERP vendors offer rudimentary Kanban modules to compliment their MRP systems. However, these Kanban modules

More information

Operations Management Part 12 Purchasing and supplier management PROF. NAKO STEFANOV, DR. HABIL.

Operations Management Part 12 Purchasing and supplier management PROF. NAKO STEFANOV, DR. HABIL. Operations Management Part 12 Purchasing and supplier management PROF. NAKO STEFANOV, DR. HABIL. Introduction basic terms Supply management describes the methods and processes of modern corporate or institutional

More information

A Book Review: Lean Thinking by Womack and Jones

A Book Review: Lean Thinking by Womack and Jones A : Lean Thinking by Womack and Jones Assignment for ESD.83: Research Seminar in Engineering Systems Prepared by Annalisa L. Weigel November 2000 We can lick gravity, but sometimes the paperwork is overwhelming.

More information

A better way to calculate equipment ROI

A better way to calculate equipment ROI page 1 A better way to calculate equipment ROI a West Monroe Partners white paper by Aaron Lininger Copyright 2012 by CSCMP s Supply Chain Quarterly (www.supplychainquarterly.com), a division of Supply

More information

TPM at the heart of Lean - March 2005 Art Smalley

TPM at the heart of Lean - March 2005 Art Smalley TPM at the heart of Lean - March 2005 Art Smalley Total Productive Maintenance (TPM) has been a very important tool for equipment intensive manufacturing sectors. It is a key means for increasing machine

More information

Lean Manufacturing: Part 1. Charles Theisen, CPIM, CIRM. Lean Manufacturing Part 1

Lean Manufacturing: Part 1. Charles Theisen, CPIM, CIRM. Lean Manufacturing Part 1 Lean Manufacturing Part 1 2013 ProcessPro, the ProcessPro logos, and the ProcessPro product and service names mentioned herein are registered trademarks or trademarks of Blaschko Computers, Inc. d.b.a.

More information

LEAN CERTIFICATION BODY OF KNOWLEDGE RUBRIC VERSION 3.0

LEAN CERTIFICATION BODY OF KNOWLEDGE RUBRIC VERSION 3.0 MODULE 1 LEAN CERTIFICATION BODY OF KNOWLEDGE RUBRIC VERSION 3.0 1. Cultural Enablers 15% 20% 25% 1.1. Principles of Cultural Enablers 3% 4% 5% 1.1.1. Respect for the individual 1.1.2. Humility 1.2. Processes

More information

Note: The teacher will need to construct one sample automobile using the parts above to show to the students.

Note: The teacher will need to construct one sample automobile using the parts above to show to the students. Preview of Main Idea The development of the assembly line was critical to the success of Henry Ford s Model T vehicle and to the development of Detroit as the Motor City. The efficiencies of the assembly

More information

How Small Businesses Can Use a Cycle-Count Program to Control Inventory

How Small Businesses Can Use a Cycle-Count Program to Control Inventory A-02 Janet Steiner Soukup, CPIM How Small Businesses Can Use a Cycle-Count Program to Control Inventory INTRODUCTION In today s economic environment, it is more critical than ever that small businesses

More information

Scrum vs. Kanban vs. Scrumban

Scrum vs. Kanban vs. Scrumban Scrum vs. Kanban vs. Scrumban Prelude As Agile methodologies are becoming more popular, more companies try to adapt them. The most popular of them are Scrum and Kanban while Scrumban is mixed guideline

More information

Capacity, Inventory, Variability and. Manufacturing Strategy

Capacity, Inventory, Variability and. Manufacturing Strategy . 3916 Wyandotte Kansas City MO 64111 USA 816-931-1414 Capacity, Inventory, Variability and.......... Manufacturing Strategy The Barriers to High Factory Utilization and Why Utilization May Not Even Matter

More information

/ Department of Mechanical Engineering. Manufacturing Networks. Warehouse storage: cases or layers? J.J.P. van Heur. Where innovation starts

/ Department of Mechanical Engineering. Manufacturing Networks. Warehouse storage: cases or layers? J.J.P. van Heur. Where innovation starts / Department of Mechanical Engineering Manufacturing Networks Warehouse storage: cases or layers? J.J.P. van Heur Where innovation starts Systems Engineering Group Department of Mechanical Engineering

More information

I. INTRODUCTION A. There are two aspects to an effective operating system: 1. Design 2. Control.

I. INTRODUCTION A. There are two aspects to an effective operating system: 1. Design 2. Control. Operations Control Chapter 8 CHAPTER OUTLINE I. INTRODUCTION A. There are two aspects to an effective operating system: 1. Design 2. Control. B. Effective operations control is attained by applying the

More information

Inventory Management, Just-in-Time, and Backflush Costing

Inventory Management, Just-in-Time, and Backflush Costing Inventory Management, Just-in-Time, and Backflush Costing Inventory Management in Retail Organizations Inventory Management is planning coordinating controlling activities related to the flow of inventory

More information

Implementing Automation after Making Lean Improvements

Implementing Automation after Making Lean Improvements Implementing Automation after Making Lean Improvements Frank C. Garcia, P.E., Director Business Solutions & Engineering Services Tom Lawton, President Advent Design Corporation Bristol, PA, USA December

More information

EVERYTHING YOU NEED TO KNOW ABOUT INVENTORY

EVERYTHING YOU NEED TO KNOW ABOUT INVENTORY EVERYTHING YOU NEED TO KNOW ABOUT INVENTORY Introduction Inventory is considered the necessary evil of the supply chain. In fact, there has been a whole movement; lean manufacturing that has tried to reduce

More information

SC21 Manufacturing Excellence. Process Overview

SC21 Manufacturing Excellence. Process Overview SC21 Manufacturing Excellence Process Overview Prepared by:- The SC21 Performance, Development and Quality (PDQ) Special Interest Group (SIG) Acknowledgement The scoring methodology used in the Management

More information

REDUCTION OF WORK IN PROCESS INVENTORY AND PRODUCTION LEAD TIME IN A BEARING INDUSTRY USING VALUE STREAM MAPPING TOOL

REDUCTION OF WORK IN PROCESS INVENTORY AND PRODUCTION LEAD TIME IN A BEARING INDUSTRY USING VALUE STREAM MAPPING TOOL REDUCTION OF WORK IN PROCESS INVENTORY AND PRODUCTION LEAD TIME IN A BEARING INDUSTRY USING VALUE STREAM MAPPING TOOL Praveen Saraswat 1, Deepak Kumar 2 and Manoj Kumar Sain 3 1 Senior Lecturer, 2,3 Associate

More information

Introduction to Software Kanban

Introduction to Software Kanban Introduction to Software Kanban Darian Rashid Agile Trainer & Coach darian@agileethos.com 1 Topics Push vs. Pull Systems Introduction to Lean/Kanban Traditional Wastes in Lean Standard Development Taskboard

More information

How to Configure and Use MRP

How to Configure and Use MRP SAP Business One How-To Guide PUBLIC How to Configure and Use MRP Applicable Release: SAP Business One 8.8 All Countries English October 2009 Table of Contents Purpose... 3 The MRP Process in SAP Business

More information

International Product and Service Management MASTER THESIS. Tutor Prof. Dr. Matthias Konle. Second Tutor Prof. Dr. Michael Müller

International Product and Service Management MASTER THESIS. Tutor Prof. Dr. Matthias Konle. Second Tutor Prof. Dr. Michael Müller International Product and Service Management MASTER THESIS Integration of Knowledge Management and Change Management to Implement Lean Manufacturing Tutor Prof. Dr. Matthias Konle Second Tutor Prof. Dr.

More information