1 BIM Contract Language Penn State Office of Physical Plant

2 CONTRACT DOCUMENTS Professional Agreement CM Agreement BIM Addendum BIM Standards and Guidelines BIM Planning Template (BIM Execution Plan) Asset Attribute List BIM Process Maps LOD Matrix

3 What is in the Agreement? Building Information Modeling (Article in 1-P): Outline BIM Objectives Reference BIM Addendum (if qualifying project): This addendum applies to all projects exceeding a Total Project Cost of $5 million new construction, substantial renovation, or as directed by the OPP Project Manager Ensure price for OPP s BIM needs are in the base contract price Ownership and Use of Documents (Article 7 in 1-P) All preliminary studies, Construction Documents, as-built documents, record drawings, special requirements, cost estimates, and all other data compiled by the Professional under this Agreement shall become the property of the Owner and may be used for any purpose desired by the Owner except to use for the construction of an identical facility not covered by this Agreement. The Professional shall not be liable for any reuse of these documents by the Owner.

4 Goal of BIM Contract Addendum Professional BIM Requirements Contractor BIM Requirements BIM Requirement Overlap Coordinate to minimize as a Team through BIM Project Execution Planning

5 BIM Responsibility Overlap Examples 1. Conflict resolution analysis during design Professional is required to facilitate conflict resolution Contractor is required to assist in conflict resolution 2. Record model development Professional is required to develop the record model and Contractor must provide as-built changes

6 BIM Contract Addendum Introduction / Definition of Terms Article 1: Project BIM Requirements Article 2: BIM Project Execution Planning Article 3: Project Deliverable Requirements Article 4: Ownership, Rights and Liabilities Article 5: BIM Schedule of Values

7 Article 1: Project BIM Requirements Purpose: Specify detailed conditions that must be met as a minimum for successful implementation of BIM that aligns with PSU objectives including: Mandatory BIM Uses per phase (customized by project) Modeling Standards Facility Data Integration Method for Submitting BIM Deliverables (Article 3) Quality Control Procedures prior to submitting to PSU Modeling Commissioning (PSU Team)

8 Article 2: BIM Project Execution Planning Purpose: Detail the means and methods for developing an BIM Project Execution Plan in a timely manor including: Development of an initial BIM plan (payment held until approved) Overview of the submission process to PSU for approval Re-Develop Plan once CM is onboard (payment held until approved) Mandatory Review of the Plan during major project milestones

9 Article 3: Project Deliverable Requirements Purpose: Detail the specific deliverables (as a minimum) required for submission to PSU at each major milestone including: Design Intent Model (Geometry and Database) Means and Methods Model (Geometry and Database) Construction Submittal Schedule As-Built Model (Geometry and Database) Record Model (Geometry and Database) 2D Documents per agreement from model QC Report ensuring quality of information

10 Article 4: Ownership, Rights and Liabilities Purpose: Revisit the ownership language from the agreements to ensure that the teams are able to share the modeled information from one party to the next: BIM must be available for all team members BIM must be reliable and free of major defects Professional is responsible for design intent model Contractor is responsible for means and methods model

11 Article 5: BIM Schedule of Values Purpose: Determine the detailed cost for providing BIM services on each project (if any) including: Project BIM Requirements (Article 1): Owner Requirements QC Procedures Mandatory BIM Uses BIM Plan Development (Article 2) BIM Deliverable Development (Article 3) Model Sharing and Liabilities (Article 4) Must be reviewed and complete prior to contract approval

12 Record Model Development Design Construction [Contractor] uses Design Intent Model to develop Means and Methods Model Turn-over [Professional] creates coordinated Design Intent Model [Contractor] Updates Means and Methods Model with all design & construction revisions [Contractor ]develops As-Built Model using Means and Methods Model and Sub Models [Professional] updates Design Intent Model with all construction revisions [Professional] revises Design Intent Model with As-Built conditions to form Record Model

Mandatory Addendum to the Owner/Architect Contract For Projects Funded in Whole or in Part with State Capital Outlay Funds

Mandatory Addendum to the Owner/Architect Contract For Projects Funded in Whole or in Part with State Capital Outlay Funds Page 1 of 5 Mandatory Addendum to the Owner/Architect Contract For Projects Funded in Whole or in Part with State Capital Outlay Funds The Owner may use any form of agreement mutually agreed upon by the

More information

School Building Authority of West Virginia BUILDING INFORMATION MODELING (BIM) EXECUTION PLAN SBA FORM 191

School Building Authority of West Virginia BUILDING INFORMATION MODELING (BIM) EXECUTION PLAN SBA FORM 191 School Building Authority of West Virginia BUILDING INFORMATION MODELING (BIM) EXECUTION PLAN SBA FORM 191 Section 1: General 1.0 Alignment with Organizational Vision In the space provided below, read

More information

C.A.S.H. WORKSHOP Back to Basics Series Part 1: Planning Your Building Program

C.A.S.H. WORKSHOP Back to Basics Series Part 1: Planning Your Building Program C.A.S.H. WORKSHOP Back to Basics Series Part 1: Planning Your Building Program Friday, April 29, 2011 9:00 a.m. to 3:00 p.m. Ontario Airport Radisson 2200 East Holt Boulevard Ontario, California Design

More information

State of Utah Version of Document E203 2013

State of Utah Version of Document E203 2013 State of Utah Version of Document E203 2013 Building Information Modeling and Digital Data Exhibit VBS Project Edition This version of AIA Document E203 2013 is modified by the State of Utah. Publication

More information

Tel: (617) 727-4050 Fax: (617) 727-5363. OWNER S PROJECT MANAGER GUIDELINES M.G.L. c. 149, 44A1/2

Tel: (617) 727-4050 Fax: (617) 727-5363. OWNER S PROJECT MANAGER GUIDELINES M.G.L. c. 149, 44A1/2 The Commonwealth of Massachusetts Executive Office for Administration and Finance Division of Capital Asset Management One Ashburton Place Boston, Massachusetts 02108 Tel: (617) 727-4050 Fax: (617) 727-5363

More information

Project Charter Supporting Documents

Project Charter Supporting Documents 2011 CVR/IT Consulting LLC All Rights Reserved 1 www.cvr-it.com info@cvr-it.com Overview Project Charter Supporting Documents CVR/IT Consulting LLC 2011 CVR/IT Consulting LLC All Rights Reserved 2 Introduction

More information

Request of Qualification Proposal for Construction Management Services

Request of Qualification Proposal for Construction Management Services Request of Qualification Proposal for Construction Management Services Dated June 10, 2014 Table of Contents Overview 3 Introduction 4 Scope of Construction Managers Services 4 Submission of Qualifications

More information

Construction Management Services Delmar School District RFP No. DSD16001-CONSTR_MAN

Construction Management Services Delmar School District RFP No. DSD16001-CONSTR_MAN Construction Management Services Delmar School District RFP No. DSD16001-CONSTR_MAN The Delmar School District (DSD) is seeking the professional services of a Construction Management (CM) firm for the

More information

SECTION 3: ANNEX J UNC CHARLOTTE ILM IMPLEMENTATION PLAN (New Section)

SECTION 3: ANNEX J UNC CHARLOTTE ILM IMPLEMENTATION PLAN (New Section) University of North Carolina at Charlotte Design and Construction Manual Section 3, Annex J UNC Charlotte ILM Implementation Plan SECTION 3: ANNEX J UNC CHARLOTTE ILM IMPLEMENTATION PLAN (New Section)

More information

Request for Qualifications 2015-162

Request for Qualifications 2015-162 Kitsap County Human Services Department Request for Qualifications 2015-162 Architectural and Project Management Services - Kitsap County Work Release Facility Remodel Response Deadline: November 17, 2015

More information

BIM Implementation Strategies

BIM Implementation Strategies BIM Implementation Strategies Howard Ashcraft Senior Partner Hanson Bridgett Dennis R. Shelden, Ph.D. Chief Technology Officer Gehry Technologies Who we are Dennis R. Shelden, Ph.D., Chief Technology Officer

More information

Design Build Institute of America (DBIA)

Design Build Institute of America (DBIA) Design Build Institute of America (DBIA) 1 D E S I G N B U I L D L E S S O N S L E A R N E D J O S É D. N U Ñ E Z, L E E D A P V I C E C H A N C E L L O R F A C I L I T I E S P L A N N I N G, M A I N T

More information

RIBA Plan of Work 2013 Overview

RIBA Plan of Work 2013 Overview RIBA Plan of Work 2013 Overview Foreword First developed in 1963, for half a century the RIBA Plan of Work has been the definitive UK model for the building design and construction process, also exercising

More information

RFP Milestones, Instructions, and Information

RFP Milestones, Instructions, and Information This Request for Proposal is being issued by the Lower Colorado River Authority (LCRA). LCRA is a conservation and reclamation district of the State of Texas created pursuant to Article XVI, Section 59,

More information

CONSENSUSDOCS 300 STANDARD FORM OF TRI-PARTY AGREEMENT FOR COLLABORATIVE PROJECT DELIVERY

CONSENSUSDOCS 300 STANDARD FORM OF TRI-PARTY AGREEMENT FOR COLLABORATIVE PROJECT DELIVERY CONSENSUSDOCS 300 STANDARD FORM OF TRI-PARTY AGREEMENT FOR COLLABORATIVE PROJECT DELIVERY This document was developed through a collaborative effort of entities representing a wide cross-section of the

More information

Procurement Guidelines for Non-Profit Housing

Procurement Guidelines for Non-Profit Housing Procurement Guidelines for Non-Profit Housing July 2013 Table of Contents PART 1 INTRODUCTION... 1 1.1 Objectives... 1 1.2 How to Use... 1 PART 2 WORKING WITH BC HOUSING... 3 2.1 Key Stakeholders... 3

More information

Design Consultant Project Management Requirements

Design Consultant Project Management Requirements Design Consultant Project Management Requirements Version 2 April 25, 2013 AWTP Program Design Consultant Contents 1.0 Introduction... 1 2.0 General Management... 1 3.0 Project Management Plan... 1 4.0

More information

The Town of Londonderry, New Hampshire Community Development Department seeks proposals for:

The Town of Londonderry, New Hampshire Community Development Department seeks proposals for: Town of Londonderry, New Hampshire REQUEST FOR PROPOSALS The Town of Londonderry, New Hampshire Community Development Department seeks proposals for: Department Project Tracking Database Offered by: Cynthia

More information

Integrated Testing Solution Using SAP Solution Manager, HP-QC/QTP and SAP TAO

Integrated Testing Solution Using SAP Solution Manager, HP-QC/QTP and SAP TAO Integrated Testing Solution Using SAP Solution Manager, HP-QC/QTP and SAP TAO Applies to: SAP Test Acceleration and Optimization, HP Quality Center, HP Quick Test Professional, SAP Solution Manager. For

More information

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES Big Rapids Public Schools Building Program 2005 OWNER Big Rapids Public Schools 21034 15-Mile Road Big Rapids, Michigan 49307 PHONE: (231) 796-2627

More information

4.3 Project Construction

4.3 Project Construction 4.3 Project Construction 4.3.1 Contract Management Contract management practices may vary depending on the type of construction delivery method (e.g. Design-Bid-Build, Stipulated Sum, Construction Management).

More information

Phased Building Information Management (BIM) and Modeling Implementation Plan. David J. Gutierrez, AIA September, 2014

Phased Building Information Management (BIM) and Modeling Implementation Plan. David J. Gutierrez, AIA September, 2014 Phased Building Information Management (BIM) and Modeling Implementation Plan David J. Gutierrez, AIA September, 2014 1 Current State: Design and construction data is not shared, maintained, or updated

More information

Commissioning of Fire Protection and Life Safety Systems. Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA

Commissioning of Fire Protection and Life Safety Systems. Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA Fire Protection Engineering s role in sustainability through Commissioning

More information

North European Functional Airspace Block Avinor, Norway EANS, Estonia Finavia, Finland LGS, Latvia. NEFAB Project CHANGE MANAGEMENT MANUAL

North European Functional Airspace Block Avinor, Norway EANS, Estonia Finavia, Finland LGS, Latvia. NEFAB Project CHANGE MANAGEMENT MANUAL NEFAB Project CHANGE MANAGEMENT MANUAL Version 0.5 Page 1 of 38 Revision history Version Date Description Approved 0.5 14/12/2011 Page 2 of 38 Table of Contents 1. Introduction... 4 1.1. The Scope of this

More information

2012 BIM Guidelines and Standards (Rev. 00) University at Albany

2012 BIM Guidelines and Standards (Rev. 00) University at Albany A. Building Information Modeling (BIM) Guidelines: The Office of AECM will require the submission of BIM modeling files as part of an electronic file submission to the AECM project manager as requested

More information

KMS Implementation Roadmap

KMS Implementation Roadmap KMS Implementation Roadmap Sample Excerpt Prepared by: The Knowledge Compass, Inc. TABLE OF CONTENTS 1. EXECUTIVE SUMMARY 5 1.1 Overview 5 1.2 Project Goals & Objectives 5 1.3 Implementation Approach 5

More information

Work Type Definition and Submittal Requirements Work Type: Construction Contract Administration & Management

Work Type Definition and Submittal Requirements Work Type: Construction Contract Administration & Management The first section, Work Type Definition, provides a detailed explanation of the work type. The second section, Work Type Submittal Requirements, identifies the requirements a firm must meet to become pre-qualified

More information

Manage Deliverables - Construction Step 6. July 12, 2012

Manage Deliverables - Construction Step 6. July 12, 2012 Manage Deliverables - Construction Step 6 July 12, 2012 Project Management Concept Step 1: Needs Development Step 2: Scope Development Step 3: Procurement of Design Team Step 4: Design Step 5: Bid/Procurement

More information

PMP Examination Tasks Puzzle game

PMP Examination Tasks Puzzle game PMP Examination Tasks Puzzle game Here is a great game to play to test your knowledge of the tasks you will be tested on in the actual examination. What we have done is take each of the domain tasks in

More information

Procedure. Work Health and Safety Contractor Management. Document number: PRO-00808. Rev no. Description Process Owner Approved for issue

Procedure. Work Health and Safety Contractor Management. Document number: PRO-00808. Rev no. Description Process Owner Approved for issue Procedure Work Health and Safety Contractor Management Document number: PRO-00808 This document is the property of Seqwater. It must not be copied or reproduced in any way whatsoever without the authority

More information

Indiana University Agreement Between Owner and Architect for a Small Project

Indiana University Agreement Between Owner and Architect for a Small Project Indiana University Agreement Between Owner and Architect for a Small Project This AGREEMENT is made: (Date) BETWEEN the Owner: The Trustees of Indiana University 1800 N. Range Road Bloomington, IN 47408

More information

Wits Vendor Onboarding Suppliers Tutorial Table of Contents

Wits Vendor Onboarding Suppliers Tutorial Table of Contents Table of Contents Introduction... 2 Link to website... 2 Compatibility View... 2 Compatibility View Settings... 3 Screenshot 1: Suppliers Home Screen... 3 Screenshot 2: Mandatory Documents Upload Screen...

More information

LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL

LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL August 2008 TABLE OF CONTENTS Section 1 - Introduction... 3 1.1 Defining Plan Quality...

More information

Mary J. Thee, Human Resources Director/Asst. County Administrator

Mary J. Thee, Human Resources Director/Asst. County Administrator HUMAN RESOURCES DEPARTMENT 600 West Fourth Street Davenport, Iowa 52801-1030 Ph: (563) 326-8767 Fax: (563) 328-3285 www.scottcountyiowa.com Date: December 14, 2012 To: From: Subject: Board of Supervisors

More information

Volume II- Project Development Processes

Volume II- Project Development Processes Volume II- Project Development Processes This section outlines the procedures that are expected of capital projects at The University of Chicago. These requirements supplement the planning procedures required

More information

CITY OF POWAY REQUEST FOR PROPOSALS (RFP) FOR GEOGRAPHIC INFORMATION SYSTEM (GIS) WATER / WASTEWATER SYSTEM DATA CONVERSION PROJECT ADDENDUM SIX

CITY OF POWAY REQUEST FOR PROPOSALS (RFP) FOR GEOGRAPHIC INFORMATION SYSTEM (GIS) WATER / WASTEWATER SYSTEM DATA CONVERSION PROJECT ADDENDUM SIX CITY OF POWAY REQUEST FOR PROPOSALS (RFP) FOR GEOGRAPHIC INFORMATION SYSTEM (GIS) WATER / WASTEWATER SYSTEM DATA CONVERSION PROJECT ADDENDUM SIX In reference to the Request for Proposals for Geographic

More information

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT SERVICES

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT SERVICES ISSUED BY: INGLEWOOD UNIFIED SCHOOL DISTRICT Issued: November 20, 2015 Due: December 18, 2015 SCHEDULE OF EVENTS INGLEWOOD UNIFIED SCHOOL

More information

Process Plant Construction: A Handbook for Quality Management

Process Plant Construction: A Handbook for Quality Management Process Plant Construction: A Handbook for Quality Management Process Plant Construction: A Handbook for Quality Management Patrick Noble ISBN: 978-1-4051-8725-1 Hardcover 232 pages January 2009, Wiley-Blackwell

More information

State of Rhode Island Department of Administration / Division of Purchases ADDENDUM # 4 RFP # 7479367

State of Rhode Island Department of Administration / Division of Purchases ADDENDUM # 4 RFP # 7479367 State of Rhode Island Department of Administration / Division of Purchases One Capitol Hill, Providence, Rhode Island 02908-5855 Tel: (401) 574-8100 Fax: (401) 574-8387 Solicitation Information July 23,

More information

Template K Implementation Requirements Instructions for RFP Response RFP #

Template K Implementation Requirements Instructions for RFP Response RFP # Template K Implementation Requirements Instructions for RFP Response Table of Contents 1.0 Project Management Approach... 3 1.1 Program and Project Management... 3 1.2 Change Management Plan... 3 1.3 Relationship

More information

California Department of Mental Health Information Technology Attention: MHSA-IT 1600 9 th Street, Room 141 Sacramento, CA 95814

California Department of Mental Health Information Technology Attention: MHSA-IT 1600 9 th Street, Room 141 Sacramento, CA 95814 IT Project Status Report For an MHSA-Funded IT Project Please send the Signed Original to the following address: California Department of Mental Health Information Technology Attention: MHSA-IT 1600 9

More information

REQUEST FOR QUALIFICATIONS: Professional Engineering Services For Water Treatment Plant Filter Replacement or Rehab

REQUEST FOR QUALIFICATIONS: Professional Engineering Services For Water Treatment Plant Filter Replacement or Rehab Department of Utilities 504 N. Queen Street Palestine, Texas 75801 (903)731-8423 Fax (903)723-2953 REQUEST FOR QUALIFICATIONS: Professional Engineering Services For Water Treatment Plant Filter Replacement

More information

Covance Construction Management Staffing Plan Chandler, Arizona

Covance Construction Management Staffing Plan Chandler, Arizona INTRODUCTION: This Construction Management (CM) Staffing Plan has been prepared for Covance to identify the critical organizational structure necessary to successfully complete the Chandler project according

More information

MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT

MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT SERVICES RFQ #3028 Submissions Due by 2:00 p.m. PST, August 20, 2015 Mt. San Antonio Community College

More information

To verify the quality of completed Ministry of Health infrastructure projects and make recommendations for contract payments.

To verify the quality of completed Ministry of Health infrastructure projects and make recommendations for contract payments. Malawi Health Sector Strategic Plan (MHSP) Technical Assistance Component Draft Terms of Reference Supervision and Verification of MOH Infrastructure Programme Purpose To verify the quality of completed

More information

Liability and LEED. Wednesday, March 10, 2010

Liability and LEED. Wednesday, March 10, 2010 Liability and LEED Wednesday, March 10, 2010 Liability & LEED Project Team Contract Stylings LEED Considerations Contract Considerations Coverage Considerations 1 1 The Project Team LEED project accreditation

More information

THIS FORM HAS IMPORTANT LEGAL CONSEQUENCES AND THE PARTIES SHOULD CONSULT LEGAL AND TAX OR OTHER COUNSEL BEFORE SIGNING. SHORT SALE ADDENDUM

THIS FORM HAS IMPORTANT LEGAL CONSEQUENCES AND THE PARTIES SHOULD CONSULT LEGAL AND TAX OR OTHER COUNSEL BEFORE SIGNING. SHORT SALE ADDENDUM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 The printed portions of this form, except differentiated additions,

More information

Project Transition Plan

Project Transition Plan Put your logo here Put your organization name here Project Transition Plan Template Rev. 1.2 November, 2011 Project Transition Plan Project Name: Prepared by: Date (MM/DD/YYYY): Version History (insert

More information

NORTH COLONIE CENTRAL SCHOOL DISTRICT 91 FIDDLERS LANE LATHAM, NEW YORK 12110-5349 INVITATION FOR CONSTRUCTION MANAGEMENT PROPOSALS

NORTH COLONIE CENTRAL SCHOOL DISTRICT 91 FIDDLERS LANE LATHAM, NEW YORK 12110-5349 INVITATION FOR CONSTRUCTION MANAGEMENT PROPOSALS NORTH COLONIE CENTRAL SCHOOL DISTRICT 91 FIDDLERS LANE LATHAM, NEW YORK 12110-5349 INVITATION FOR CONSTRUCTION MANAGEMENT PROPOSALS The North Colonie Central School District invites your firm to submit

More information

Vermont Energy Investment Corporation (VEIC), a nonprofit organization, requests proposals for Website Content Strategy for Efficiency Vermont.

Vermont Energy Investment Corporation (VEIC), a nonprofit organization, requests proposals for Website Content Strategy for Efficiency Vermont. Notice Type: Request for Proposal Short Title: Website Content Strategy for Efficiency Vermont Posted date: 7/18/ 2014 E-mail response date: 7/28/2014 Decision: 7/30/2014 Introduction Vermont Energy Investment

More information

BIM Strategy for NHSScotland

BIM Strategy for NHSScotland BIM Strategy for NHSScotland Professor Bimal Kumar and Graham Hayne GCU BIM Partnership School of Engineering and Built Environment Glasgow Caledonian University Agenda Introduction to BIM GCU BIM Partnership

More information

Architectural Planning Services At Foothill College RFP #1082

Architectural Planning Services At Foothill College RFP #1082 Foothill-De Anza Community College District LOS ALTOS HILLS, CALIFORNIA Architectural Planning Services At Foothill College RFP #1082 Submit sealed proposals by 2:00 p.m. January 19, 2007 to: Foothill-De

More information

CITY COLLEGE OF SAN FRANCISCO (CCSF) Building Information Modeling (BIM) Standards for Design-Bid Build Projects. CCSFBIMS Version 1.

CITY COLLEGE OF SAN FRANCISCO (CCSF) Building Information Modeling (BIM) Standards for Design-Bid Build Projects. CCSFBIMS Version 1. CITY COLLEGE OF SAN FRANCISCO (CCSF) Building Information Modeling (BIM) Standards for Design-Bid Build Projects CCSFBIMS Version 1.0 Prepared by: CCSF Facilities Planning & Construction (FPC) Department

More information

ANTELOPE VALLEY COMMUNITY COLLEGE DISTRICT NOTICE INVITING PROPOSALS NOTICE IS HEREBY GIVEN THAT ANTELOPE VALLEY COMMUNITY COLLEGE DISTRICT, 3041

ANTELOPE VALLEY COMMUNITY COLLEGE DISTRICT NOTICE INVITING PROPOSALS NOTICE IS HEREBY GIVEN THAT ANTELOPE VALLEY COMMUNITY COLLEGE DISTRICT, 3041 NOTICE INVITING PROPOSALS NOTICE IS HEREBY GIVEN THAT ANTELOPE VALLEY COMMUNITY COLLEGE DISTRICT, 3041 WEST AVENUE K, LANCASTER, LOS ANGELES COUNTY, CALIFORNIA 93536-5426, ACTING BY AND THROUGH ITS GOVERNING

More information

TfNSW Standard Requirements TSR T Technical Management

TfNSW Standard Requirements TSR T Technical Management Template Applicable to: Transport Projects Quality Management System Status: Division: Approved Transport Projects Version: 5.0 Desksite No.: 3455797_1 Date of issue: 1 July 2014 Effective date: 1 July

More information

Risk Management in Interior Design

Risk Management in Interior Design Risk Management in Interior Design Presented by: Stephen Polozola Decker Jones P.C 801 Cherry Street, Suite 2000 Fort Worth, Texas 76102 817.336.2400 Cannot hold out as Registered Interior Designer if

More information

MDB Harmonised Particular Conditions

MDB Harmonised Particular Conditions FIDIC Plant and Design-Build Contract MDB Harmonised Particular Conditions 1. Introduction There is a need for FIDIC to provide sample Particular Conditions that render the General Conditions of the 1st

More information

FORM A FLORIDA DEPARTMENT OF TRANSPORTATION I-4 ULTIMATE PROJECT INSTRUCTIONS TO PROPOSERS PROPOSAL LETTER

FORM A FLORIDA DEPARTMENT OF TRANSPORTATION I-4 ULTIMATE PROJECT INSTRUCTIONS TO PROPOSERS PROPOSAL LETTER FORM A PROPOSER: I-4 Mobility Partners Proposal Date: February 12, 2014 FLORIDA DEPARTMENT OF TRANSPORTATION I-4 ULTIMATE PROJECT INSTRUCTIONS TO PROPOSERS PROPOSAL LETTER FLORIDA DEPARTMENT OF TRANSPORTATION

More information

Program Lifecycle Methodology Version 1.7

Program Lifecycle Methodology Version 1.7 Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated

More information

BIM Essential Guide. For BIM Adoption in an Organization

BIM Essential Guide. For BIM Adoption in an Organization BIM Essential Guide For BIM Adoption in an Organization BCA acknowledges the leadership provided by the BIM Steering Committee in support of the production of the BIM Essential Guides The BIM Essential

More information

Geometrisch Raakvlakkenbeheer op de Velsertunnel

Geometrisch Raakvlakkenbeheer op de Velsertunnel Geometrisch Raakvlakkenbeheer op de Velsertunnel 3 de Praktijkdag BIM Hasselt Johannes Anrijs - BESIX BESIX Group Biggest Belgian Contractor BESIX Group Why BIM? // BIM-department Why BIM? Increase EFFICIENCY

More information

What s a BA Lead and Who Needs One? by: Alessandra Zardo Marie-Chantal Côté Sonia Ruffolo

What s a BA Lead and Who Needs One? by: Alessandra Zardo Marie-Chantal Côté Sonia Ruffolo What s a BA Lead and Who Needs One? by: Alessandra Zardo Marie-Chantal Côté Sonia Ruffolo 1 Agenda Who we are? Why talk about this? Points of discussion IMPORTANT NOTE: We are aiming to present our thoughts

More information

6. Q: A: No, however it is anticipated that the PM firm will need to understand FEMA and HUD CDBG compliance as part of the scope of services. 7.

6. Q: A: No, however it is anticipated that the PM firm will need to understand FEMA and HUD CDBG compliance as part of the scope of services. 7. HHC Program Manager Request for Proposals (RFP) for Consulting Services Project # 6161 Questions & Answers Date: October 1, 2015 1. Q: In CR#2017007 would schedule outsourcing be considered as an appropriate

More information

BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No... 2011

BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No... 2011 BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT Notice No.... 2011 NOTICE IN TERMS OF THE COUNCIL FOR THE BUILT ENVIRONMENT ACT, 2000 (ACT NO. 43 OF 2000) The Council for the Built Environment has under

More information

FORM FRAMEWORX. SharePoint 2013 App

FORM FRAMEWORX. SharePoint 2013 App FORM FRAMEWORX SharePoint 2013 App Contents 1. To Create New Form Step By Step Guide:... 2 2. To Create New Form using existing Template Step By Step Guide:... 7 3. To Fill a Form Step by Step Guide:...

More information

RESOURCE GUIDE. A guide for implementing Building Information Modeling in State of Maryland and Washington DC public school construction projects

RESOURCE GUIDE. A guide for implementing Building Information Modeling in State of Maryland and Washington DC public school construction projects BIM RESOURCE GUIDE A guide for implementing Building Information Modeling in State of Maryland and Washington DC public school construction projects First Draft May 213 ASBO MD/DC BIM COMMITTEE MEMBERS

More information

EXHIBIT A. NPS Dispute & Claim Consultant Scope of Work

EXHIBIT A. NPS Dispute & Claim Consultant Scope of Work EXHIBIT A NPS Dispute & Claim Consultant Scope of Work Scope Date Region HQ Project No Location Sub Account The Contract Administrator for this Contract will be: Jeff Wassenaar Project Development Branch

More information

PRIME CONSULTANT SERVICES

PRIME CONSULTANT SERVICES GUIDELINES FOR Professional Engineers providing PRIME CONSULTANT SERVICES 1.0 INTRODUCTION 1.1 PURPOSE OF GUIDELINES The "Guidelines for Professional Engineers providing Prime Consultant Services" have

More information

The procedure which the City of Hays will follow for the selection of an Architectural firm is as follows:

The procedure which the City of Hays will follow for the selection of an Architectural firm is as follows: October 5, 2007 (firm) Address Dear (name), The City of Hays is interested in selecting a firm to provide architectural services for the proposed improvements of an existing facility to accommodate the

More information

Responses to Inquiries RFP 14-15 Software Quality Assurance Managed Services

Responses to Inquiries RFP 14-15 Software Quality Assurance Managed Services Responses to Inquiries RFP 14-15 Software Quality Assurance Managed Services 1. Questions with specific reference to documentation in the RFP Question/ Clarification What else does the application environment

More information

Employer s Information Requirements Version 07 28.02.13. Core Content and Guidance Notes

Employer s Information Requirements Version 07 28.02.13. Core Content and Guidance Notes Employer s Information Requirements Version 07 28.02.13 Core Content and Guidance Notes Employer s Information Requirements - Guidance notes version 07: 28.02.13 Contents 1.0 Employer s Information Requirements

More information

Input, Output and Tools of all Processes

Input, Output and Tools of all Processes 1 CIS12-3 IT Project Management Input, Output and Tools of all Processes Marc Conrad D104 (Park Square Building) Marc.Conrad@luton.ac.uk 26/02/2013 18:22:06 Marc Conrad - University of Luton 1 2 Mgmt /

More information

This request for qualifications seeks the following type of service providers:

This request for qualifications seeks the following type of service providers: ANNOUNCEMENT REQUEST FOR STATEMENT OF QUALIFICATIONS NOTICE SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES DESIGN AND CONSTRUCTION ARCHITECTURAL SERVICES The San Francisco Unified School District Facilities,

More information

ConsensusDocs 301 BUILDING INFORMATION MODELING (BIM) ADDENDUM

ConsensusDocs 301 BUILDING INFORMATION MODELING (BIM) ADDENDUM ConsensusDocs 301 BUILDING INFORMATION MODELING (BIM) ADDENDUM This page is solely for the information and convenience of ConsensusDocs users, and is not a part of the contract. Gray boxes indicate where

More information

BOD/2015/10 DOC 06-Decision Meeting of the Board of Directors October 16, 2015

BOD/2015/10 DOC 06-Decision Meeting of the Board of Directors October 16, 2015 BOD/2015/10 DOC 06-Decision Meeting of the Board of Directors October 16, 2015 Approved Decisions and Secretariat Actions Based on Recommendations set out in BOD/2015/10 DOC 06 - Proposal for a More Effective

More information

Request for Proposal Permitting Software

Request for Proposal Permitting Software Request for Proposal Permitting Software Date Issued: October 7, 2015 Proposals Due no later than: 2:00pm EST on November 10, 2015 Page 1 of 10 Revised 10/5/2015 TABLE OF CONTENTS Section I Introduction

More information

Capital Works Management Framework Guidance Note. Planning and Control of Capital Costs GN 2.2

Capital Works Management Framework Guidance Note. Planning and Control of Capital Costs GN 2.2 Capital Works Management Framework Guidance Note Planning and Control of Capital Costs GN 2.2 Planning and Control of Capital Costs Document Reference GN 2.2. V.1.1 29 September 2011 2011 Department of

More information

maguilar\h:\agenda Items\2012\12-0917 CH Plumbing RFQ.doc\1-7

maguilar\h:\agenda Items\2012\12-0917 CH Plumbing RFQ.doc\1-7 maguilar\h:\agenda Items\2012\12-0917 CH Plumbing RFQ.doc\1-7 maguilar\h:\agenda Items\2012\12-0917 CH Plumbing RFQ.doc\2-7 maguilar\h:\agenda Items\2012\12-0917 CH Plumbing RFQ.doc\3-7 maguilar\h:\agenda

More information

The Project Management Plan will be used to guide, communicate and coordinate project efforts.

The Project Management Plan will be used to guide, communicate and coordinate project efforts. F.1 General Implementation Contractor Deliverables include critical system planning and development components. Sufficient deliverables have been identified at key steps in the project to guide the project

More information

Eanes Independent School District

Eanes Independent School District EANES INDEPENDENT SCHOOL DISTRICT 601 Camp Craft Road Austin, Texas 78746 Request for Qualifications Construction Manager at Risk Services Eanes Independent School District Construct a District Operations

More information

Design Responsibility: What Difference Does It Make? A CostE NW Inaugural Lecture 23 January 2013 Paul Tracey

Design Responsibility: What Difference Does It Make? A CostE NW Inaugural Lecture 23 January 2013 Paul Tracey Design Responsibility: What Difference Does It Make? A CostE NW Inaugural Lecture 23 January 2013 Paul Tracey What Is Design? Depends upon the context within which the term is used. Communication of a

More information

MIS 424 COURSE OUTLINE

MIS 424 COURSE OUTLINE UNIVERSITY OF ALBERTA School of Business DEPARTMENT OF ACCOUNTING & MIS MIS 424 COURSE OUTLINE Course website: http://courses.bus.ualberta.ca/mis424-mullaly/ Instructor: Mark Mullaly Term II, 2004/2005

More information

BIM GUIDE. Developed for

BIM GUIDE. Developed for BIM GUIDE Developed for BIM GUIDE Protocols and Project Execution Plan 1 Table of Contents.. Objective... P. 4.. Roles & Responsibilities... P. 5.. Contract Strategies... P. 8.. Level of Development...

More information

System Engineering Plan

System Engineering Plan Project Documentation Document SPEC-0064 Revision A System Engineering Plan Rob Hubbard, Jeremy Wagner, Larry Daggert, Larry Stepp, Christoph Keller Systems Engineering / Project Management 5 October 2006

More information

Construction Management Standards of Practice

Construction Management Standards of Practice Construction Management Standards of Practice 2010 Edition Advancing Professional Construction/ Program Management Worldwide. 7926 Jones Branch Drive, Suite 800 McLean, VA 22102-3303 USA 703.356.2622 703.356.6388

More information

STATE OF MINNESOTA. BIM GUIDELINE State of Minnesota s Facilities Administration Data Capture Plan

STATE OF MINNESOTA. BIM GUIDELINE State of Minnesota s Facilities Administration Data Capture Plan STATE OF MINNESOTA BIM GUIDELINE State of Minnesota s Facilities Administration Data Capture Plan January 2014 TABLE OF CONTENTS GENERAL INFORMATION BUILDING INFORMATION MODELING (BIM)... 1 PURPOSE OF

More information

Facility Services PROJECT MANAGEMENT METHODOLOGY FRAMEWORK

Facility Services PROJECT MANAGEMENT METHODOLOGY FRAMEWORK Facility Services PROJECT MANAGEMENT METHODOLOGY FRAMEWORK Facility Services Project Management Methodology Framework 1 - Executive Summary The purpose of this document is to introduce the University community

More information

GORDON COUNTY BOARD OF COMMISSIONERS REQUEST FOR QUALIFICATIONS FOR AN ARCHITECT FAMILIAR WITH COMMUNITY DEVELOPMENT BLOCK GRANT APPLICATIONS

GORDON COUNTY BOARD OF COMMISSIONERS REQUEST FOR QUALIFICATIONS FOR AN ARCHITECT FAMILIAR WITH COMMUNITY DEVELOPMENT BLOCK GRANT APPLICATIONS GORDON COUNTY BOARD OF COMMISSIONERS REQUEST FOR QUALIFICATIONS FOR AN ARCHITECT FAMILIAR WITH COMMUNITY DEVELOPMENT BLOCK GRANT APPLICATIONS DATE RFQ RELEASED July 13, 2013 1 PURPOSE OF THIS REQUEST FOR

More information

California Department of Transportation. Construction Management System (CMS) Requirements Use Case Report. Version 2.1

California Department of Transportation. Construction Management System (CMS) Requirements Use Case Report. Version 2.1 California Department of Transportation Construction Management System (CMS) Requirements Use Case Report Version 2.1 Prepared by M Corp Edited by the Office of Construction Systems July 16, 2007 Version

More information

GUIDELINES FOR THE ENGAGEMENT OF EXTERNAL CONSULTANTS/PROFESSIONAL SERVICES AT MEMORIAL UNIVERSITY

GUIDELINES FOR THE ENGAGEMENT OF EXTERNAL CONSULTANTS/PROFESSIONAL SERVICES AT MEMORIAL UNIVERSITY GUIDELINES FOR THE ENGAGEMENT OF EXTERNAL CONSULTANTS/PROFESSIONAL SERVICES AT MEMORIAL UNIVERSITY INTENT: 1. To ensure due diligence and consistency is followed in the solicitation, selection, contract

More information

HULLEY & KIRKWOOD CONSULTING ENGINEERS LIMITED BIM PROJECT EXECUTION PLAN FOR [PROJECT TITLE] Date

HULLEY & KIRKWOOD CONSULTING ENGINEERS LIMITED BIM PROJECT EXECUTION PLAN FOR [PROJECT TITLE] Date HULLEY & KIRKWOOD CONSULTING ENGINEERS LIMITED BIM PROJECT EXECUTION PLAN FOR [PROJECT TITLE] Head Office Watermark Business Park 305 Govan Road Glasgow G51 2SE (t): 0141 332 5466 (f): 0870 928 1028 (e):

More information

Application Deadline: 5:00pm, September 16, 2014

Application Deadline: 5:00pm, September 16, 2014 QUALITY RATING AND IMPROVEMENT SYSTEM LOCAL EVALUATION REQUEST FOR QUALIFICATIONS Application Deadline: 5:00pm, September 16, 2014 APPLICATION INFORMATION: 1. All sections of the application must be completed.

More information

320 HEALTH INSURER FEE

320 HEALTH INSURER FEE 320 HEALTH INSURER FEE EFFECTIVE DATE: 01/01/14, 10/01/15 REVISION DATE: 11/06/14, 07/30/15 STAFF RESPONSIBLE FOR POLICY: DHCM FINANCE I. PURPOSE This Policy applies to Acute Care, ADHS/DBHS, ALTCS/EPD,

More information

Project Management Office (PMO)

Project Management Office (PMO) Contents I. Overview of Project Management...4 1. Project Management Guide (PMG)...4 1.1 Introduction...4 1.2 Scope...6 1.3 Project Types...6 2. Document Overview, Tailoring, and Guidance...7 3. The Project

More information

City of Mercer Island

City of Mercer Island City of Mercer Island MOBILE ASSET DATA COLLECTION: Pavement Condition Index Deflection Testing Sign Inventory Sign Retroreflectivity Contact Information: Leah Llamas, GIS Coordinator The City of Mercer

More information

Project Type Guide. Project Planning and Management (PPM) V2.0. Custom Development Version 1.1 January 2014. PPM Project Type Custom Development

Project Type Guide. Project Planning and Management (PPM) V2.0. Custom Development Version 1.1 January 2014. PPM Project Type Custom Development Project Planning and Management (PPM) V2.0 Project Type Guide Custom Development Version 1.1 January 2014 Last Revision: 1/22/2014 Page 1 Project Type Guide Summary: Custom Development Custom software

More information

Evolution of Information Management & Strategies for Tomorrow

Evolution of Information Management & Strategies for Tomorrow Houston, 2 June 2010 Evolution of Information Management & Strategies for Tomorrow Stephen Airey MBA in Project Management (Cranfield), Chartered Engineer Today s Agenda Information Management What is

More information

School Construction Projects

School Construction Projects The process of educating young people seems to be continually developing. New insights regarding how students most effectively receive retain and gain understanding of information and principles affect

More information