1 Operating Instructions Determining Sample Composition Using Refractive Index (RI) Analysis Throughout this experiment, you will use a refractometer to determine compositions of water-eg mixtures. Concentration of ethylene glycol in a sample is determined by comparing the refractive index (RI) of the sample to the refractive indices of water and ethylene glycol using the following formula: volume (10) Preparation for Start-up Feed Preparation 1. Check that the feed valve on the 2 nd floor is closed. 2. Check that sufficient amount of feed is available in the supply tank on the third floor. 3. Check with the TA whether the feed needs to be mixed. If so, perform the following operations: a. Close valve V-a and open valves V-b, V-c, and V-d (see Figure 6). b. Plug in the mixing pump and mix the feed for about five minutes. c. Unplug the mixing pump. 4. Open valves V-a and V-b for flow leaving the supply tank and close the recycling valve V-c. 5. Take a feed sample from the supply tank and determine the feed composition using the RI analysis. Pump power supply V-a V-b V-d V-c Figure 6. Feed Tanks. 3 1

2 Emptying the Product Tanks NOTE: You need to empty the product tanks both before you start the experiment as well as during the experiment due to the limited tank capacity. 1. Close all air valves V20-23 and intake valves V11-V14 connected to the product tanks (see Figure 7). 2. Open vacuum valves V15-18 connected to the product tanks (see Figure 7). Steps 1 and 2 are necessary to prevent flow of liquid from the product tanks back into the system. 3. Open the air supply valve VA (see Figure 8). 4. Open the air valve (V20-23) connected to the product tank (see Figure 7). 5. Drain each product tank (one at a time) following these steps: (Wear safety goggles while draining product tanks!) a. Open the air valve on the product tank. Let the tank pressurize. b. Tilt the black receiving bucket toward the outlet tap to minimize splashing. c. Open the outlet valve at the bottom of the tank. Let all liquid drain into the bucket. d. Close the air valve and then the outlet valve for the product tank. e. Empty buckets in the appropriate waste bins. 6. Keep valve V19 open! Valve V19 Vacuum valve V15-18 (green line) Pressure Intake valve (V11-14) gauge Air valve V20-23 (white line) Outlet valve (V24-27) Figure 7. Product tank. Configurations of all product tanks are similar. Different numbers for each valve shown in this figure refer to similar valves on different tanks. 3 2

3 Supplying Water to the system There are several sets of water supply valves to be turned on: 1. Main water supply (Figure 8): Open the valves V2, V3 Water valves V2, V3 Keep this air valve closed at all times Air Valve (VA) Keep these water valves closed at all times Main steam valve (V8) Figure 8. Air, water, and steam valves. 2. Water Supply for the heat exchanger for cooling the bottom product (Figures 9, 10): Open the valve V4 3. Water supply for the condenser for the top product (Figures 9, 10): Open the valve V5. Use the needle valve to adjust the flow rate of the cooling water. Recommended setting: about 8 gpm. 4. Water supply for the steam injector (Figure 11): Open the main valve (V6) and the supply valve (V7). 3 3

4 Valve V4 Cooling water bottom product Valve V5 Needle valve Cooling water for top product Figure 10. Heat exchanger for cooling the bottom product. Figure 9. Water controls for the heat exchanger and the condenser Valve V6 Valve V7 Figure 11.Water valves for the steam injector 3 4

5 Supplying Steam and Evacuating the System Steam in this system is used for two purposes: (1) heat the evaporator walls and (2) create vacuum using the steam injector. 1. The first time steam is used, ask the lab assistant for assistance. 2. Open the main steam valve V8 (see Figure 8). Wear gloves! This line will be hot! 3. Supply steam to the heating jacket of the evaporator by opening the valves V9 on the steam line (see Figure 12). Close when sending steam to the system Keep these valves fully open Figure 12. Valves for steam supply to the evaporator Valves V9 Open to send steam to TFE 4. Supply steam to the injector by SLOWLY opening the valve V10 valve. This valve is located at the back of the apparatus (see Figure 13). Wear gloves! This line will be hot! Condenser for steam injector Steam pressure indicator Steam injector Steam valve V10 Figure 13. Steam injector setup. 3 5

6 The steam pressure gauge should read about psi. You can control pressure in the TFE chamber by adjusting the steam pressure in the injector. 5. Create vacuum in the product tanks by opening all vacuum valves (V15-18) on the product tanks and the condenser (see Figure 7). Evacuation vacuum pressure should be between 15 in Hg and 30 in Hg Start-up 1. Open the intake valves on the back of the product tanks. 2. Open feed valve VF (see Figure 14) to start flow of the feed solution to the evaporator from the third floor. Use the feed valve to adjust the feed flow rate. Recommended flow rate: below Important: the numbers on the feed rotameter do not correspond to the actual flow rate of the water-eg mixture. Therefore, it is necessary to calibrate the rotameter prior to starting the experiment. This can be done by the bucket and stopwatch method. 3. Turn on the motor driving the evaporator rotor blades with the motor switch (see Figure 14). If necessary, see lab manager for key to open the lockout switch. 4. Wait until temperature of the top product stream reaches 88 and temperature of the bottom product becomes larger than that of the top product. Motor switch Feed valve (VF) The thin film evaporator is now fully operational. Feed rotameter Figure 14. TFE feed valve and motor switch. 3 6

7 Switching between Product Tanks during the TFE Operation It is important that you do not perturb the continuous operation of the system when you switch between the tanks. Otherwise, you may not be able to reach a steady-state. 1. Simultaneously close the intake valves on the full tank and open the intake valves on the empty tank (see Figure 7). 2. Empty the full tank following the instructions for Emptying the Product Tanks given above. 3. Re-establish the vacuum on the emptied product tanks by opening the vacuum valves V20-23 while the air valves are closed. 4. Make sure the vacuum valves V15-18 are open and the condensed air valve is closed while the tanks under them are collecting the product. 5. After emptying the tank, obtain the mass of the product. Use this information to estimate the products flow rate. 6. Determine the product composition using the RI analysis Shutting Down 1. Turn off the motor for the rotor blades (see Figure 14). 2. Close the feed valve VF (see Figure 14). 3. Close the main steam valve V8 (see Figure 8). Wear gloves! This line will be hot! 4. Close the steam valves V9 to the evaporator (see Figure 12). Wear gloves! This line will be hot! 5. Close the steam valve V13 to the steam injector (see Figure 8). Wear gloves! This line will be hot! 6. Close water valves V2-7 (see Figures 8, 9, and 11). 7. Close valves V-a and V-b on the line leaving the bottom of the supply tank (see Figure 6). 8. Empty the product tanks (instructions for emptying the product tanks are given in the Startup procedure). 9. Close all valves (air, vacuum, intake, and outlet) on the product tanks. 10. Close the master air valve VA (see Figure 8). 11. Check the tanks for pressurization. If they are pressurized, open the outlet valve to relieve the pressure. 3 7

8 Data Collection and Analysis 1. Record experimental conditions for each experimental run, including: steam pressure, pressure in the TFE chamber, feed flow rate, and feed composition. 2. This system takes long time to reach a steady state. In order to ensure that the steady state has been reached, take samples periodically (15-20 minutes) during each experimental run and record results of your measurements in the following table: Measurement Time RI top RI bottom W top W bottom T top T bottom Here, W is the weight and T is the temperature. 4. Use the information collected in the above table to compute the compositions and flow rates of the product streams. 5. Due to long time required to reach a steady-state, you will not have enough time to repeat each experiment 3 times in order to estimate the experimental error. Instead, you can use the time-averaging, i.e. use the last 3 samples taken from each run to estimate the mean values and standard deviations of the measured quantities. Of course, you need to verify that the last 3 measurements correspond to a steady-state! 6. To verify reproducibility of your results, run at least one experiment under the same conditions on two different lab days. 3 8

UNIVERSITY OF MINNESOTA DULUTH DEPARTMENT OF CHEMICAL ENGINEERING ChE 3211-4211 ABSORPTION OF CARBON DIOXIDE INTO WATER

UNIVERSITY OF MINNESOTA DULUTH DEPARTMENT OF CHEMICAL ENGINEERING ChE 3211-4211 ABSORPTION OF CARBON DIOXIDE INTO WATER UNIVERSITY OF MINNESOTA DULUTH DEPARTMENT OF CHEMICAL ENGINEERING ChE 3211-4211 ABSORPTION OF CARBON DIOXIDE INTO WATER OBJECTIVE The objective of this experiment is to determine the equilibrium line,

More information

Draining and filling cooling system

Draining and filling cooling system Page 1 of 9 Draining and filling cooling system Special tools and workshop equipment required Adapter -V.A.G 1274/8- Pipe -V.A.G 1274/10- Drip tray -V.A.G 1306- or drip tray for workshop hoist -VAS 6208-

More information

(S&G 5th ed. Expt 27, 6th, 7th & 8th eds. Expt 26)

(S&G 5th ed. Expt 27, 6th, 7th & 8th eds. Expt 26) Chem 367-2/ Physical Adsorption 63 PHYSICAL ADSORPTION (S&G 5th ed. Expt 27, 6th, 7th & 8th eds. Expt 26) The sample used in this experiment needs to be conditioned for at least two hours before the experiment;

More information

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-217(I) Series 150S and 157S (Snap Switch, All Models except 157S-RB-P)

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-217(I) Series 150S and 157S (Snap Switch, All Models except 157S-RB-P) Series 150S and 157S (Snap Switch, All Models except 157S-RB-P) Low Water Cut-Off/Pump Controllers For Steam Boilers and Other Level Control Applications McDonnell & Miller Installation & Maintenance Instructions

More information

Indirect-Fired Storage Water Heater Models WH-30 through WH-80 INSTALLATION AND OPERATING INSTRUCTIONS

Indirect-Fired Storage Water Heater Models WH-30 through WH-80 INSTALLATION AND OPERATING INSTRUCTIONS Indirect-Fired Storage Water Heater Models WH-30 through WH-80 INSTALLATION AND OPERATING INSTRUCTIONS Contents Page Ratings and Specifications..................... 2 Installation Requirements......................

More information

PC1131 Electric Air Compressor

PC1131 Electric Air Compressor Senco Products Inc. 8485 Broadwell Road Cincinnati, Ohio 45244 PC1131 Electric Air Compressor Operating Instructions 2006 by Senco Products, Inc. Warnings for the safe use of this tool are included in

More information

Air Conditioner Water Heater - A Product of HotSpot Energy LLC

Air Conditioner Water Heater - A Product of HotSpot Energy LLC Air Conditioner Water Heater - A Product of HotSpot Energy LLC PLEASE READ THIS BEFORE YOU INSTALL THE UNIT 1. This air conditioner must be installed and/or repaired by a qualified technician. If you perform

More information

PC1130 Electric Air Compressor

PC1130 Electric Air Compressor Senco Products Inc. 8485 Broadwell Road Cincinnati, Ohio 45244 PC1130 Electric Air Compressor Operating Instructions 2006 by Senco Products, Inc. Warnings for the safe use of this tool are included in

More information

FLASH TANK ECONOMIZER PRODUCT GUIDE

FLASH TANK ECONOMIZER PRODUCT GUIDE FLASH TANK ECONOMIZER PRODUCT GUIDE Overview A flash tank is used to recover blowdown energy in the form of flash steam and blowdown. This can only be used with a deaerator or some other pressurized device.

More information

Oil and Coolant Circulating Heating System. Model - OCSM

Oil and Coolant Circulating Heating System. Model - OCSM Oil and Coolant Circulating Heating System Model - OCSM Installation & Operation Manual 216280-000 REV 2 Identifying Your System The HOTSTART heating system is designed to heat fluids for use in marine

More information

USER INSTRUCTIONS FOR 10 LITRE PORTABLE DEHUMIDIFIER MODEL NO. DHMD102

USER INSTRUCTIONS FOR 10 LITRE PORTABLE DEHUMIDIFIER MODEL NO. DHMD102 USER INSTRUCTIONS FOR 10 LITRE PORTABLE DEHUMIDIFIER MODEL NO. DHMD102 THANK YOU FOR CHOOSING YOUR NEW DEHUMIDIFIER. BEFORE USING THE UNIT READ THESE INSTRUCTIONS FULLY AND RETAIN THEM FOR FUTURE REFERENCE

More information

Steam Sterilization Cycles for Lab Applications

Steam Sterilization Cycles for Lab Applications Steam Sterilization Cycles for Lab Applications Presented by Gary Butler STERIS Life Sciences August 2009 Early Steam Sterilizers Koch Upright Sterilizer First Pressurized Sterilizer First built by Pasteur-Chamberlain

More information

Hot, Warm and Cold Mineral Water Cooler [Models Cool18, Cool25, Cool36, Cool50, Cool75, Cool100]

Hot, Warm and Cold Mineral Water Cooler [Models Cool18, Cool25, Cool36, Cool50, Cool75, Cool100] Hot, Warm and Cold Mineral Water Cooler [Models Cool18, Cool25, Cool36, Cool50, Cool75, Cool100] PLEASE READ BEFORE INSTALLATION TO PREVENT DAMAGE TO THE COOLER HOT WATER TANK STEAM EXAUST VENT (CAUTION!)

More information

CDS TROUBLESHOOTING SECTION I. VACUUM. 1.0. Weak vacuum at wand. Gauge reads normal (10hg to 14hg)

CDS TROUBLESHOOTING SECTION I. VACUUM. 1.0. Weak vacuum at wand. Gauge reads normal (10hg to 14hg) CDS TROUBLESHOOTING SECTION I. VACUUM 1.0. Weak vacuum at wand. Gauge reads normal (10hg to 14hg) 1.1. Clogged hoses or wand tube. Disconnect hoses and carefully check for an obstruction. 1.2. Excessive

More information

9. ENERGY PERFORMANCE ASSESSMENT OF HVAC SYSTEMS

9. ENERGY PERFORMANCE ASSESSMENT OF HVAC SYSTEMS 9. ENERGY PERFORMANCE ASSESSMENT OF HVAC SYSTEMS 9.1 Introduction Air conditioning and refrigeration consume significant amount of energy in buildings and in process industries. The energy consumed in

More information

ME 315 - Heat Transfer Laboratory. Experiment No. 7 ANALYSIS OF ENHANCED CONCENTRIC TUBE AND SHELL AND TUBE HEAT EXCHANGERS

ME 315 - Heat Transfer Laboratory. Experiment No. 7 ANALYSIS OF ENHANCED CONCENTRIC TUBE AND SHELL AND TUBE HEAT EXCHANGERS ME 315 - Heat Transfer Laboratory Nomenclature Experiment No. 7 ANALYSIS OF ENHANCED CONCENTRIC TUBE AND SHELL AND TUBE HEAT EXCHANGERS A heat exchange area, m 2 C max maximum specific heat rate, J/(s

More information

LABOKLAV. Autoclaves Made in Germany. www.shp-steriltechnik.de

LABOKLAV. Autoclaves Made in Germany. www.shp-steriltechnik.de LABOKLAV Autoclaves Made in Germany www.shp-steriltechnik.de 2 LABOKLAV STEAM STERILIZERS Steam sterilization is the sterilization method with the widest range of applications efficient, safe, reproducible

More information

Fact Sheet on Steam Sterilizers at Stanford University

Fact Sheet on Steam Sterilizers at Stanford University Fact Sheet on Steam Sterilizers at Stanford University By: Environmental Quality and Water Efficiency Group, Stanford University; December 2013 Jennifer Fitch, Marty Laporte, Julia Nussbaum, Adam Kern,

More information

2A.1 Features of Chiller Control Components... 104. 2A.3 Chilled-Water Supply Temperature Control... 107. 2A.4 Cooling-Water Supply Control...

2A.1 Features of Chiller Control Components... 104. 2A.3 Chilled-Water Supply Temperature Control... 107. 2A.4 Cooling-Water Supply Control... Appendix 2A: Chiller Control Principles... 104 2A.1 Features of Chiller Control Components... 104 2A.2 Start-up and Shutdown... 105 2A.2.1 Start-up...105 2A.2.2 Shutdown...106 2A.3 Chilled-Water Supply

More information

STEAM HEATING SYSTEM TROUBLESHOOTING GUIDE

STEAM HEATING SYSTEM TROUBLESHOOTING GUIDE Page 1 of 9 PURPOSE Steam is the most commonly used heating medium for maintaining process temperatures. Compared to other heating media, steam contains a significant amount of heat energy, and this heat

More information

USER INSTRUCTIONS FOR GET PORTABLE 12k BTU AIR CONDITIONER MODEL No. GPACU12HR

USER INSTRUCTIONS FOR GET PORTABLE 12k BTU AIR CONDITIONER MODEL No. GPACU12HR USER INSTRUCTIONS FOR GET PORTABLE 12k BTU AIR CONDITIONER MODEL No. GPACU12HR CONTENTS Introduction Safety Notes Identification of parts Installation instructions Operation instructions Maintenance Troubleshooting

More information

Injection Systems INSTALLATION AND OPERATING GUIDE HI FLO VERTICAL SYSTEMS

Injection Systems INSTALLATION AND OPERATING GUIDE HI FLO VERTICAL SYSTEMS 1 TM INSTALLATION AND OPERATING GUIDE HI FLO VERTICAL SYSTEMS When the HI-FLO Metering Head is attached to a tank, the tank will be pressurized to the same pressure as the irrigation system. Before attaching

More information

UNIVERSITY OF MINNESOTA DULUTH DEPARTMENT OF CHEMICAL ENGINEERING ChE 3211-4211 CONVECTIVE HEAT TRANSFER

UNIVERSITY OF MINNESOTA DULUTH DEPARTMENT OF CHEMICAL ENGINEERING ChE 3211-4211 CONVECTIVE HEAT TRANSFER UNIVERSITY OF MINNESOTA DULUTH DEPARTMENT OF CHEMICAL ENGINEERING ChE 3211-4211 CONVECTIVE HEAT TRANSFER OBJECTIVE The purpose is to measure heat transfer in cases where convection is a significant mechanism.

More information

Heat. Investigating the function of the expansion valve of the heat pump. LD Physics Leaflets P2.6.3.2. Thermodynamic cycle Heat pump

Heat. Investigating the function of the expansion valve of the heat pump. LD Physics Leaflets P2.6.3.2. Thermodynamic cycle Heat pump Heat Thermodynamic cycle Heat pump LD Physics Leaflets P2.6.3.2 Investigating the function of the expansion valve of the heat pump Objects of the experiment g To study the operational components of the

More information

Measurement of Specific Heat Capacity Using Differential Scanning Calorimeter

Measurement of Specific Heat Capacity Using Differential Scanning Calorimeter INL/EXT-08-15056 Measurement of Specific Heat Capacity Using Differential Scanning Calorimeter J. E. Daw November 2008 The INL is a U.S. Department of Energy National Laboratory operated by Battelle Energy

More information

Steam System Efficiency. Bill Lumsden Leidos Engineering

Steam System Efficiency. Bill Lumsden Leidos Engineering Steam System Efficiency Bill Lumsden Leidos Engineering Steam System Efficiency Steam System Efficiency Key Take-aways: Review of the properties of ice, water, and steam Learn the basics of steam trap

More information

TECHNICAL SERVICE DEPARTMENT Technical Service Bulletin 1-800-432-8373. 2 Inch PowerVent LED Indicator Explanations & Troubleshooting Table

TECHNICAL SERVICE DEPARTMENT Technical Service Bulletin 1-800-432-8373. 2 Inch PowerVent LED Indicator Explanations & Troubleshooting Table New Robertshaw control valve was introduced in May 2008 as a replacement part. See last page for troubleshooting this replacement part. All voltage inputs are 120V. All electrical connectors are Molex

More information

ELECTRIC/DIESEL FIRE PUMP CHECK LIST

ELECTRIC/DIESEL FIRE PUMP CHECK LIST BUILDING NAME: DESIGNER: SCO REPRESENTATIVE: PUMP MANUF.: LOCATION: INSTALLER: DATE: OWNER NAME: INSTALLATION Certificate for flushing and hydrostatic test furnished Piping been hydrostatically tested

More information

2 (. 3 4 5 . -,.. -,. 3. : 1 2 3 > 4, :!! 1,, 17 Lt MAX 2 3 4,, > 5.,,, 6 :, :1)! 2)! 7,, 1, :,. 2,, Bottom of steam generator 7 8 9 10 11 12 automatically and this phenomenon will continue for

More information

ENGINE COOLING SYSTEM

ENGINE COOLING SYSTEM ENGINE COOLING SYSTEM 1988 Toyota Celica 1987-88 TOYOTA Engine Cooling Systems Celica DESCRIPTION The basic liquid cooling system consists of a radiator, water pump, thermostat, cooling fan, pressure cap,

More information

with MERCURY FREE 1 HP Relays ! WARNING Before using this product read and understand instructions.

with MERCURY FREE 1 HP Relays ! WARNING Before using this product read and understand instructions. B Installation & Maintenance Instructions MM-414 Series 150E and 157E Low Water Cut-Off/Pump Controllers For Steam Boilers and Other Level Control Applications A Typical Applications: Primary or secondary

More information

Dealer Sales & Service Guide

Dealer Sales & Service Guide Analog Models w/thermostat or Timerstat Heat Siphon Not Starting 1 BREAKER TRIPPED - Check Breaker Box for correct size breaker Breakers: EX; Domestic model 2.25hp (20amp) 3.25hp (40amp) 5hp (50amp) check

More information

C. starting positive displacement pumps with the discharge valve closed.

C. starting positive displacement pumps with the discharge valve closed. KNOWLEDGE: K1.04 [3.4/3.6] P78 The possibility of water hammer in a liquid system is minimized by... A. maintaining temperature above the saturation temperature. B. starting centrifugal pumps with the

More information

Lockout - Tagout. Control of Hazardous Energy OSHA Standard 1910.147

Lockout - Tagout. Control of Hazardous Energy OSHA Standard 1910.147 Lockout - Tagout Control of Hazardous Energy OSHA Standard 1910.147 You will learn Purpose of Lockout-Tagout Requirements for LOTO Types of Hazardous Energy Procedures for LOTO Types of Energy Electrical

More information

ACCUMULATOR INSTALLATION

ACCUMULATOR INSTALLATION 7001-7 ACCUMULATOR INSTALLATION BRAKE ACCUMULATORS I 308L93 Rae 7-59710 Issued 6-93 Printed in U.S.A 7001-8 Removal ACCUMULATOR VALVE 1. Park the machine on a level surface and lower the. loader bucket

More information

Agitated Thin- Film Evaporator

Agitated Thin- Film Evaporator DOE-FIU SCIENCE & TECHNOLOGY WORKFORCE DEVELOPMENT PROGRAM STUDENT SUMMER INTERNSHIP TECHNICAL REPORT June 6, 2011 to August 12, 2011 Principal Investigators: Jose Matos (DOE Fellow) Florida International

More information

Physical Chemistry Laboratory I CHEM 445 Experiment 6 Vapor Pressure of a Pure Liquid (Revised, 01/09/06)

Physical Chemistry Laboratory I CHEM 445 Experiment 6 Vapor Pressure of a Pure Liquid (Revised, 01/09/06) 1 Physical Chemistry Laboratory I CHEM 445 Experiment 6 Vapor Pressure of a Pure Liquid (Revised, 01/09/06) The vapor pressure of a pure liquid is an intensive property of the compound. That is, the vapor

More information

Cooling system components, removing and installing

Cooling system components, removing and installing Volkswagen Touareg 3.2 - Cooling system components, removing and installing Page 1 / 24 19-1 Cooling system components, removing and installing Warning! Hot steam may escape when opening expansion tank.

More information

Customized Assessment Blueprint

Customized Assessment Blueprint Customized Assessment Blueprint HVAC Installer Basic - Test Codes: 7906 and 7796 Measuring What Matters Competencies and Skills Tested in this Assessment: HVAC Theory Heat Theory and Refrigeration HVAC

More information

THERMO KING TRUCK & TRAILER UNIT ALARM CODES THIS DOCUMENT SHOWS ALL CURRENT ALARM CODES FOR THERMO KING TRUCK AND TRAILER UNITS.

THERMO KING TRUCK & TRAILER UNIT ALARM CODES THIS DOCUMENT SHOWS ALL CURRENT ALARM CODES FOR THERMO KING TRUCK AND TRAILER UNITS. THERMO KING TRUCK & TRAILER UNIT ALARM CODES THIS DOCUMENT SHOWS ALL CURRENT ALARM CODES FOR THERMO KING TRUCK AND TRAILER UNITS. NOT ALL CODES ARE POSSIBLE ON ANY INDIVIDUAL UNIT. IF THE ALARM APPLIES

More information

Lecture 9 Solving Material Balances Problems Involving Non-Reactive Processes

Lecture 9 Solving Material Balances Problems Involving Non-Reactive Processes CHE 31. INTRODUCTION TO CHEMICAL ENGINEERING CALCULATIONS Lecture 9 Solving Material Balances Problems Involving Non-Reactive Processes Component and Overall Material Balances Consider a steady-state distillation

More information

Waters Corporation. Waters 2690/5 USER & TROUBLESHOOTING GUIDE

Waters Corporation. Waters 2690/5 USER & TROUBLESHOOTING GUIDE Waters Corporation Waters 2690/5 USER & TROUBLESHOOTING GUIDE Contents 2690/5 Theory Setup procedures. Troubleshooting the 2690/5 User maintenance of the 2690/5 Spare Parts 2 2690/5 Theory 2690/5 Solvent

More information

EJECTOR AIR REMOVAL SYSTEMS ENGINEERING DATA BULLETIN # PVS-80025201-ARS PAGE 1 OF 5

EJECTOR AIR REMOVAL SYSTEMS ENGINEERING DATA BULLETIN # PVS-80025201-ARS PAGE 1 OF 5 BULLETIN # PVS-80050-ARS PAGE OF 5 GENERAL Air Removal Systems generally consist of dual 00% (twin-element) ejecrs, single 00% surface-type inter- & aftercondensers, suction & discharge isolation valves

More information

Unit 8. Conversion Systems

Unit 8. Conversion Systems Unit 8. Conversion Systems Objectives: After completing this unit the students should be able to: 1. Describe the Basic conversion systems 2. Describe main conversion kit types. 3. Describe how the CNG

More information

FILLING AND PURGING THE SYSTEM

FILLING AND PURGING THE SYSTEM FILLING INSTRUCTIONS FOR WATER HEATER OR CONDENSING BOILER (City Water) Safety tip: Before beginning, turn off power to boiler and circulator. FILLING AND PURGING Step 1: Close Return Manifold Isolation

More information

A basic introduction to steam

A basic introduction to steam A basic introduction to steam FOR HOT, COLD, MOIST AND DRY, FOUR CHAMPIONS FIERCE. STRIVE HERE FOR MASTERY Milton 1666 Steam Wonderful Steam Very high heat content Recyclable Clean, non toxic Biodegradable

More information

Heating Water by Direct Steam Injection

Heating Water by Direct Steam Injection Heating Water by Direct Steam Injection Producing hot water by direct steam injection provides a solution where large volumes of hot water at precise temperatures are required, and where energy and space

More information

DERON Air/Water Swimming pool Heat Pump. CY/DY series for Heating/Cooling. Description

DERON Air/Water Swimming pool Heat Pump. CY/DY series for Heating/Cooling. Description Description Compact air/water heat pump for outside installation. With suction gas cooled rotary compressor. With extensive aluminium/cu lamellar tube evaporator and PVC Titanium condenser. Axial fan Refrigerant

More information

OUR PRODUCTS TRH-TRS-TRM-TRV. LIQUID RING VACUUM PUMPS AND COMPRESSORS Capacity up to 2100 ACFM Vacuum to 29 Hg. Our Other Products.

OUR PRODUCTS TRH-TRS-TRM-TRV. LIQUID RING VACUUM PUMPS AND COMPRESSORS Capacity up to 2100 ACFM Vacuum to 29 Hg. Our Other Products. Our Other Products OUR PRODUCTS Liquid Ring & Rotary Vane Vacuum Pumps and Systems Liquid Ring Vacuum Pumps: 3 CFM to,000 CFM Liquid Ring Compressors up to 1 psig Heat Transfer Pumps for hot thermal oils

More information

Stenner Pump Chlorinator Installation & Start Up Guide

Stenner Pump Chlorinator Installation & Start Up Guide Clean Water Made Easy www.cleanwaterstore.com Stenner Pump Chlorinator Installation & Start Up Guide Thank you for purchasing a Clean Water System! With proper installation and a little routine maintenance

More information

PERMITS REQUIRED & PERMIT EXEMPTIONS

PERMITS REQUIRED & PERMIT EXEMPTIONS PERMITS REQUIRED & PERMIT EXEMPTIONS This guideline is intended to assist the applicant in determining what types of construction work require a permit. The 1997 California Uniform Administrative Code,

More information

Specific Volume of Liquid (Column 7). The volume per unit of mass in cubic feet per pound.

Specific Volume of Liquid (Column 7). The volume per unit of mass in cubic feet per pound. Steam Tables What They Are How to Use Them The heat quantities and temperature/ pressure relationships referred to in this Handbook are taken from the Properties of Saturated Steam table. Definitions of

More information

HS-901(A) BASIC STEAM HEATING SYSTEMS

HS-901(A) BASIC STEAM HEATING SYSTEMS HS-901(A) BASIC HEATING SYSTEMS One-Pipe Two-Pipe Basic Steam Heating Systems One-pipe steam heating system EQUALIZER SAFETY FACTOR STATIC HEAD PRESSURE DROP 2" HEATING UNIT 15" DRIP CONNECTION In a one-pipe,

More information

Refrigerant Charging Unit ICOGD. 020AH1000 Operating Manual. FR.8.2.4-09 İ-COLD 12.03.2014 Rev. 00

Refrigerant Charging Unit ICOGD. 020AH1000 Operating Manual. FR.8.2.4-09 İ-COLD 12.03.2014 Rev. 00 E Refrigerant Charging Unit ICOGD 020AH1000 Operating Manual FR.8.2.4-09 İ-COLD 12.03.2014 Rev. 00 Contents Technical Specifications... 20 Safety... 21 A/C System... 22 Components... 23 Control Panel...

More information

Preventing Overheated Boiler Incidents

Preventing Overheated Boiler Incidents Preventing Overheated Boiler Incidents PSE&G Appliance Service October 2012 Runaway Boiler Explosion Review Items Hazard Background Past Incidents PSE&G Emergency Response Future Process Improvements What

More information

Water for Injection (WFI) and Pure Steam Production in a Lean Manufacturing Environment. Larry Zanko Project Manager STERIS Corporation

Water for Injection (WFI) and Pure Steam Production in a Lean Manufacturing Environment. Larry Zanko Project Manager STERIS Corporation Water for Injection (WFI) and Pure Steam Production in a Lean Manufacturing Environment Larry Zanko Project Manager STERIS Corporation Agenda Brief overview of multiple-effect water stills (MWS) Lean advancements

More information

How To Clean Water From An Ammonia Refrigeration System

How To Clean Water From An Ammonia Refrigeration System Water Contamination and Water Removal in Industrial Ammonia Refrigeration Systems By Ray Ficker, PE Effects of Water Contamination Water contamination in an industrial ammonia refrigeration system can

More information

STAINLESS STEEL TANK TABLE OF CONTENTS TROUBLESHOOTING... 1 TESTING WATER TEMPERATURE... 3 TANK & JACKET ASSEMBLY... 4.

STAINLESS STEEL TANK TABLE OF CONTENTS TROUBLESHOOTING... 1 TESTING WATER TEMPERATURE... 3 TANK & JACKET ASSEMBLY... 4. TABLE OF CONTENTS STAINLESS TROUBLESHOOTING... 1 TESTING WATER TEMPERATURE... 3 & JACKET ASSEMBLY... 4 SST Section 052506 1 Troubleshooting performed by untrained personnel could result in electrical

More information

Cooling system components, removing and installing

Cooling system components, removing and installing Page 1 of 34 19-1 Cooling system components, removing and installing WARNING! The cooling system is pressurized when the engine is warm. When opening the expansion tank, wear gloves and other appropriate

More information

Steam System Best Practices Condensate System Piping

Steam System Best Practices Condensate System Piping Steam System Best Practices Condensate System Piping Summary The best method for improving steam system energy efficiency, reducing chemical costs, and reducing make-up water costs is to return the maximum

More information

The Different Types of Air Conditioning Equipment for IT Environments

The Different Types of Air Conditioning Equipment for IT Environments The Different Types of Air Conditioning Equipment for IT Environments By Tony Evans White Paper #59 Executive Summary Cooling equipment for an IT environment can be implemented in 10 basic configurations.

More information

Support Cleaning Apparatus. Operation, Cleaning, & Safety Manual

Support Cleaning Apparatus. Operation, Cleaning, & Safety Manual Support Cleaning Apparatus Operation, Cleaning, & Safety Manual Revision 1.1 31 May 2014 WARNING: The instructions and precautionary statements contained herein are intended for the Support Cleaning Apparatus

More information

COMPETENCY ANALYSIS PROFILE Refrigeration and Air Conditioning Systems Mechanic - Branch 1 313A

COMPETENCY ANALYSIS PROFILE Refrigeration and Air Conditioning Systems Mechanic - Branch 1 313A COMPETENCY ANALYSIS PROFILE Refrigeration and Air Conditioning Systems Mechanic - Branch 1 313A (All unshaded skill sets must be demonstrated/completed) PROTECT SELF AND OTHERS Identify, interpret, and

More information

David O. Ahrens, Commercial Marine Manager Caterpillar Engine Products Division

David O. Ahrens, Commercial Marine Manager Caterpillar Engine Products Division Caterpillar Inc. Cat Marine Power Diesel fuel feature story 187-P-2-004-98 Special to Seaway Review HEADLINE: BYLINE: Fuel for Thought David O. Ahrens, Commercial Marine Manager Caterpillar Engine Products

More information

Why and How we Use Capacity Control

Why and How we Use Capacity Control Why and How we Use Capacity Control On refrigeration and air conditioning applications where the load may vary over a wide range, due to lighting, occupancy, product loading, ambient weather variations,

More information

Module 5: Combustion Technology. Lecture 34: Calculation of calorific value of fuels

Module 5: Combustion Technology. Lecture 34: Calculation of calorific value of fuels 1 P age Module 5: Combustion Technology Lecture 34: Calculation of calorific value of fuels 2 P age Keywords : Gross calorific value, Net calorific value, enthalpy change, bomb calorimeter 5.3 Calculation

More information

Quik Lining Systems Heater Owners Guide

Quik Lining Systems Heater Owners Guide Quik Lining Systems Heater Owners Guide Quik Lining Systems, Inc is pleased to present the Quik Heater, an innovative heater used to cure cured in place pipe for sewer laterals. The unit is the most cost

More information

Throttle Body Fuel Injection

Throttle Body Fuel Injection Throttle Body Fuel Injection Initial Calibration of the TBI Disclaimer The author of this presentation assumes NO responsibility for information provided causing the owner to modify or alter their motorhome

More information

Fault codes DM1. Industrial engines DC09, DC13, DC16. Marine engines DI09, DI13, DI16 INSTALLATION MANUAL. 03:10 Issue 5.0 en-gb 1

Fault codes DM1. Industrial engines DC09, DC13, DC16. Marine engines DI09, DI13, DI16 INSTALLATION MANUAL. 03:10 Issue 5.0 en-gb 1 Fault codes DM1 Industrial engines DC09, DC13, DC16 Marine engines DI09, DI13, DI16 03:10 Issue 5.0 en-gb 1 DM1...3 Abbreviations...3 Fault type identifier...3...4 03:10 Issue 5.0 en-gb 2 DM1 DM1 Fault

More information

FLUID FLOW Introduction General Description

FLUID FLOW Introduction General Description FLUID FLOW Introduction Fluid flow is an important part of many processes, including transporting materials from one point to another, mixing of materials, and chemical reactions. In this experiment, you

More information

This section gives you some helpful information and tips on running your home and the equipment in it.

This section gives you some helpful information and tips on running your home and the equipment in it. 67 This section gives you some helpful information and tips on running your home and the equipment in it. Electricity Fuse board (electrical consumer unit) Make sure you know where your fuse board is and

More information

Test Code: 8297 / Version 1

Test Code: 8297 / Version 1 Blueprint HVAC Maintenance Technology PA Test Code: 8297 / Version 1 Copyright 2014. All Rights Reserved. General Assessment Information HVAC Maintenance Technology PA Blueprint Contents General Assessment

More information

pdi PLASTIC DRUM INSTITUTE Plastic Drum Paneling Issues

pdi PLASTIC DRUM INSTITUTE Plastic Drum Paneling Issues pdi PLASTIC DRUM INSTITUTE Plastic Drum Paneling Issues PANELING BACKGROUND This report will explain the causes of paneling and suggest some possible ways to eliminate or minimize the paneling of plastic

More information

MEMBRANE VACUUM MINI PUMPS

MEMBRANE VACUUM MINI PUMPS MEMBRANE VACUUM MINI PUMPS The mini pumps described in this page are membrane-type. They can be used both as vacuum pumps and compressors. In the latter version they can supply compressed air 100% oil-free

More information

Factory owners must ensure the boiler is:

Factory owners must ensure the boiler is: Factory owners must ensure the boiler is: * Registered with the Boilers and Pressure Vessels Division, Labour Department * Examined by an appointed examiner and has a valid certificate of fitness * Supervised

More information

Any Service Technician Can Fix It A Good Service Technician Can Figure Out What s Wrong With It.

Any Service Technician Can Fix It A Good Service Technician Can Figure Out What s Wrong With It. I Dave s Statement If the thermostat calls for cooling, and the furnace fan is running properly, and the coil airflow is adequate, and the condenser fan is running properly, and the condenser airflow is

More information

Make sure oven is OFF. Never remove parts or touch the fan unless the oven is OFF.

Make sure oven is OFF. Never remove parts or touch the fan unless the oven is OFF. Morning Cleaning The following start-up procedures MUST be completed before using the oven. The procedures may be completed at night after the oven has completed the clean cycle, or in the morning BEFORE

More information

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook Trainee:... Training Provider:... Year:... Trainee Contact no:... Competency Based Skill Training Logbook Introduction

More information

Technical Information

Technical Information Date of last update: Oct-11 Ref: D7.8.4/1011/E Application Engineering Europe CORESENSE DIAGNOSTICS FOR STREAM REFRIGERATION COMPRESSORS CoreSense Diagnostics for Stream Refrigeration Compressors... 1

More information

ENERGY SAVING WORT BOILING SISTEM IN BREWING FACTORY

ENERGY SAVING WORT BOILING SISTEM IN BREWING FACTORY ENERGY SAVING WORT BOILING SISTEM IN BREWING FACTORY Mariana Geta TOMESCU (cas. Cismarescu) *, Carol CSATLOS** * Faculty of Food and Tourism, Transilvania University of Braşov, Braşov, Romania ** Faculty

More information

A Guide to Trouble-Free Cooling Towers

A Guide to Trouble-Free Cooling Towers A Guide to Trouble-Free Cooling Towers A basic understanding of cooling tower operation and maintenance will help keep a cooling water system running in top condition, year after year By David M. Suptic

More information

Deluxe Bottle Warmer

Deluxe Bottle Warmer Deluxe Bottle Warmer IMPORTANT SAFEGUARDS This product is for household use only. When using electrical appliances, basic safety precautions should always be followed including the following: Read all

More information

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION Fire Pump Plan Review 2009 International Fire Code and NFPA 20 Date of Review / / BLD201 - Project Address: Project Name: Contractor s Business

More information

Routine and Emergency Boiler Operation

Routine and Emergency Boiler Operation Routine and Emergency Boiler Operation Learning Outcome When you complete this module you will be able to: Describe the routine safe and efficient operation of a packaged boiler. Learning Objectives Here

More information

TRAINING BULLETIN Fire Apparatus Pump Test

TRAINING BULLETIN Fire Apparatus Pump Test TOPIC: TRAINING BULLETIN Fire Apparatus Pump Test EFFECTIVE DATE: 05/06 DOC NO: TB081 CROSS REF: INTRODUCTION District Fire Apparatus Pump Testing is completed on an annual basis. Currently, pump testing

More information

Cooling System, Draining and Filling. Special tools, testers and auxiliary items required. Adapter V.A.G 1274/8. Drip tray V.A.

Cooling System, Draining and Filling. Special tools, testers and auxiliary items required. Adapter V.A.G 1274/8. Drip tray V.A. Page 1 of 5 Volkswagen > GTI, Rabbit > 2006-2007 2.0 Liter 4-Cyl. 4V Turbo Engine Mechanical, Fuel Injection Ignition, Engine Code(s): BPY 19 - Cooling System Components. Cooling System, Draining and Filling

More information

Ultrasonic support removal tank

Ultrasonic support removal tank Ultrasonic support removal tank User guide and safety manual See inside for use and safety information. The Ultrasonic support removal tank automatically removes PLA support material from a printed ABS

More information

ORGANIC SAMPLE PREPARATION

ORGANIC SAMPLE PREPARATION ORGANIC SAMPLE PREPARATION W W W.LA BT E C H S R L.CO M WSPE MANUAL VACUUM MANIFOLD SPE Process control of the flow rate is critical to guarantee reproducible extractions. Differently then any other systems,

More information

Triple Point Experiment

Triple Point Experiment Equipment List Rotary vane vacuum pump 2-stage, 2 to 7 CFM. For example, Edwards 2M2 (2 CFM), Edwards RV5 (3.5 CFM), Edwards E2M8 (6.7 CFM) or equivalent. Bell jar Nalgene polycarbonate plastic, 5-5/8

More information

Master Advice From The Shower Experts

Master Advice From The Shower Experts Master dvice From The Shower Experts Creating a shower system will be made easier and more enjoyable with thorough planning prior to installation. y exploring all the options first, you can have a pleasant

More information

Audi > C5 Platform > 1998-2005 4.2 Liter V8 5V Engine Mechanical, Engine Code(s): ART, AWN, BBD 19 - Engine - Cooling system

Audi > C5 Platform > 1998-2005 4.2 Liter V8 5V Engine Mechanical, Engine Code(s): ART, AWN, BBD 19 - Engine - Cooling system Page 1 of 5 Audi > C5 Platform > 1998-2005 4.2 Liter V8 5V Engine Mechanical, Engine Code(s): ART, AWN, BBD 19 - Engine - Cooling system Cooling system, draining and filling To prevent frost and corrosion

More information

USER MANUAL. Bottom Loading Bottled Water Dispenser SAVE THIS MANUAL FOR FUTURE USE. Model # 900172

USER MANUAL. Bottom Loading Bottled Water Dispenser SAVE THIS MANUAL FOR FUTURE USE. Model # 900172 Model # 900172: Page 1 USER MANUAL Bottom Loading Bottled Water Dispenser Model # 900172 TO REDUCE THE RISK OF INJURY AND PROPERTY DAMAGE, USER MUST READ THIS MANUAL BEFORE ASSEMBLING, INSTALLING & OPERATING

More information

Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, 5415. Table of Contents

Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, 5415. Table of Contents Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, 5415 Table of Contents WORK COVERED... 2 WORK NOT COVERED...2 TITLES... 2 GRADE LEVELS... 2 HELPER AND INTERMEDIATE JOBS...

More information

Description of a Basic Vacuum System

Description of a Basic Vacuum System Description of a Basic Vacuum System Figure 1: Configuration of a basic vacuum system. The system, illustrated in Figure 1, contains the essential elements typically required to obtain high vacuum. The

More information

Engineering Recommendation on: Accumulators Revised 6-17-99 Issued January 10, 1979 Page 1 of 7

Engineering Recommendation on: Accumulators Revised 6-17-99 Issued January 10, 1979 Page 1 of 7 Issued January 10, 1979 Page 1 of 7 Accumulators have long been recognized by the industry as an effective means of maintaining good system balance by storing excess refrigerant as the condenser or evaporator

More information

Rules for Safe Operation

Rules for Safe Operation Rules for Safe Operation Important: Do not attempt to operate the CleanStation until you have read and understand all of the instructions in this manual. Failure to do so may result in injury. The machine

More information

INSTRUCTION MANUAL FOR RECREATIONAL REFRIGERATOR/FREEZER MODEL

INSTRUCTION MANUAL FOR RECREATIONAL REFRIGERATOR/FREEZER MODEL INSTRUCTION MANUAL FOR RECREATIONAL REFRIGERATOR/FREEZER MODEL 15-LITER, 20-LITER, 35-LITER, 45-LITER, 60-LITER & 100-LITER SECTION 1 Basic Operation SECTION 2 Cleaning and Storing SECTION 3 Basic Trouble

More information

Water Fired Chiller/Chiller-Heater. WFC-S Series: 10, 20 and 30 RT Cooling

Water Fired Chiller/Chiller-Heater. WFC-S Series: 10, 20 and 30 RT Cooling Water Fired Chiller/Chiller-Heater WFC-S Series: 1, 2 and 3 RT Cooling W E A R E F R I E N D L Y T O T H E E A R T H Water Fired SINGLE-EFFECT Chiller or Chiller-Heater Absorption Principle Cooling Cycle

More information

THERMOSTATIC MIXING VALVE TRIM K-T9493, K-T9494

THERMOSTATIC MIXING VALVE TRIM K-T9493, K-T9494 THERMOSTATIC MIXING VALVE TRIM K-T9493, K-T9494 1. BEFORE YOU BEGIN IMPORTANT INSTRUCTIONS READ AND SAVE FOR THE CONSUMER WARNING: Risk of scalding or other severe injury. Before completing installation,

More information

GAS HANDLING SYSTEMS VACUUM INSTRUMENT CORPORATION

GAS HANDLING SYSTEMS VACUUM INSTRUMENT CORPORATION GAS HANDLING SYSTEMS VACUUM INSTRUMENT CORPORATION 2099 Ninth Avenue Ronkonkoma, NY 11779 www.vacuuminst.com Smart Charge II An advanced gas backfill and evacuation system with built-in gross leak test.

More information