1 1.00 BOUNDARY 1.01 Earth work in excavation of foundation trenches or drains. in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing. Spreading or stacking the spils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches. leveling. dressing and ramming the bottom. bailing out water as required complete 1.02 Depth of foundation upto 1500mm 5.11 %Cum Rupees Twelve Thousand & Forty Seven Earth work & filling in foundation trences or plinth with good earth in layers not exceeding 150 mm. including watering and raming etc. layer by layer complete.(payment to be made on basis of measurement of finished quantity of work) With earth obtained from excavation of foundation %Cum Rupees Seven Thousand Eight Hundred & Thirty One 1.05 Cement concrete with graded stone ballast ( 40 mm size excluding shuttering) In ground floor (a) 1:3:6 proportion 1.06 (A) Pakur variety Cum Rupees Five Thousand Eight Hundred & Twenty Three Controlled Cement concrete with well graded stone chips (20 mm nominal size ) excluding shuttering and reinforcement with complete design of concrete as per I : 456 and relevant special publications submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In ground floor and foundation. [using concrete mixture] M 25 Grade 1.08 With Pakur variety Ground Floor CUM Rupees Seven Thousand Three Hundred & Thirteen and Paise Forty Three Hire and labour charges for shuttering with centreing and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thckness with required bracing for concrete slabs, beams, m columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) 1.10 Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work 1.11 Ground Floor Sqm Rupees Four Hundred & Three 1.12 Reinforcement for reinforced concrete work in the all sorts of structures including distribution bars, stirrups, binders etc. including supply of rods, initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge balck annealed wire at every intersection, complte as per drawing and direction For works in foundation, basement and upto roof of ground floor/upto 4 m 1.13 tor steel/ Mild steel M.T Rupees Sixty Eight Thousand Five Hundred & Eight Brick work with 1st class bricks in cement mortar (1:6) 1.15 Ground Floor Cum Rupees Five Thousand Nine Hundred & Forty Three

2 mm thick brick work with 1st class bricks in cement mortar(1:4) in different floors. Ground Floor 1.17 Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand Plaster (to wall, floor, ceiling etc) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints or roughening of of concrete surface, including throating, nosing and drip course where necessary Sqm Rupees Seven Hundred & Eighty Three Sqm Rupees Three Hundred & Seventy Seven (ii) With 1:6 cement mortar mm thick plaster (External) 1.21 Ground floor SQM Rupees One Hundred & Eighty One Applying decorative cement based paint of approved quality after preparing the surface including scraping the same thoroughly (plastered or concrete surface) as per manufacturer's specification. Two Coat Ground floor Sqm Rupees Fifty Three CIVIL WORKS (MAIN BUILDING) 2.01 A: EARTHWORKS 2.02 Earth work in excavation of foundation trenches or drains. in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing. Spreading or stacking the spils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches. leveling. dressing and ramming the bottom. bailing out water as required complete 2.03 a) Depth of foundation upto 1500mm 2.77 %Cum Rupees Twelve Thousand & Forty Seven 2.04 b) Depth of foundation beyond 1500mm 0.12 %Cum Rupees Nineteen Thousand Four Hundred & Thirty Earth work & filling in foundation trences or plinth with good earth in layers not exceeding 150 mm. including watering and raming etc. layer by layer complete.(payment to be made on basis of measurement of finished quantity of work) With earth obtained from excavation of foundation %Cum Rupees Seven Thousand Eight Hundred & Thirty One 2.07 With carried earth arranged by contractor within a radius of 3km including cost of carried earth 1.00 %Cum Rupees Thirty Five Thousand Eight Hundred & Ninety Six Filling in foundation or plinth by silver sand in layers not by thorough saturation with water, ramming completeexceeding 150 mm as directed and consolidating the sameincluding the cost of supply of sand. (Payment to be madeon measurement of finished quantity) 2.19 %Cum Rupees Ninety Eight Thousand Five Hundred & Twenty Four B: PILING WORKS 2.10 Boring,providing and installing by DMC method bored cast insiture in forced cement concrete piles of grade M25 of 450 mm dia and 20.5 m shaft length below pile cap, to carry a safe working load not less than specified as per code excluding the cost of steel reinforcement but including the cost of boring, with bentonite soultion and temporary casing of approximate length for setting out and removal of the same and the length of the pile to beem bedded in the pilecap etc. all complete including removal of excavated earth with a lifts and leads (length of pile for payment shall be measured upto bottom of pilecap) With N.B.variety stone metal Metre Rupees Two Thousand One Hundred & Fifty Five and Paise Eighty Three

3 2.11 Vertical load test of pile inaccordance with IS2911 part iv including installation of loading platform and preparation of pile head or construction of test pile cap and dismantling of test pilecap after test and complete as per the direction of the engineer and specification Single pile 50 tn-100tn. Capacity 2.13 Initial Test between 100T to 150T 1.00 no.s Rupees Forty Seven Thousand Five Hundred Performing Lateral load test on two piles or two groups of piles by introducing a hydraulic jack with gauge between two piles or pile groups under test by applying horizontal loads in increments of about 20% of the estimated safe load at each stage and applying the next increment after the rate of displacement is nearer to 0.1 mm. per 30 minutes till the total displacement becomes, 12 mm at the cut-off level including the cost of arranging the entire set-up, hire charges of all implements including at least two dial gauges, preparing the pile head if necessary, and removal of all arrangement after completion etc. complete in all respect including cost of carriage of all materials and as per IS specification and direction of Engineer-in-charge C: ANTITERMITE MEASURES 2.16 PreConstructional Measures : 2.17 Treatment to the back filling of RCC foundation with chemical emulsion by admixing Chlorophyrofos emulsifiable concentrate (1% concentration) with water by 7.5 lts per sqm of the vertical xurface of the substructure of each side of the foundation Anti termite treatment to the top surface of the consolidated earth within plinth walls with chemical emulsion by admixing chloropyrofos emulsifiable concentrates ( 1% concentration) with water by weight at the rate of 5 Litres per sq. m. of the surface before sand bed or sub-grade is laid. Holes upto 50 mm. to 75 mm. deep at 150 mm. centre to centre both ways shall be made with 12 mm, diameter mild steel rod on the surface to facilitate saturation of the soil with the chemical emulsion. The work shall be carried out as per specification described in para 6.4 of code IS-6313 (part -II) (Mode of measurment will be per Sq.M of plan area of plinth treated.) 2.19 Post Constructional Measures : 1.00 nos Rupees Twenty Seven Thousand Four Hundred Sqm Rupees One Hundred & Thirty Eight Sq. m Rupees One Hundred & Eleven Anti-termite treatment to the outside of foundations with chemical emulsion by admixing chloropyrofos emulsifiable concentrates (1%concentration) with water by weight including cutting shallow channel by excavating soil along and close to the wall face ensuring uniform dispersal of the chemical emulsion to a depth of 300mm. from the ground level by rodding with 12mm. dia. M.S. rod at 150mm.interval in the channel litres of chemical emulsion per metre length shall be used and a balance quantity of 0.5 litres of the chemical emulsion per running metre shall then be used to treat the back fill earth by directing the spray of the imulsion towards the wall surface. The entire work is to be carried out as per specification laid down in para of code IS-6313 (Part-III) Mtr Rupees Seventy Three D: CONCRETE WORKS 2.22 Damp proof course

4 mm. thick damp proof course with cement concrete with stone chips (1:1.5:3) [with graded stone aggregate 10 mm nominal size] and admixture of water proofing compound as per manufacturer's specification followed by two coat of polymer based paint, (1st coat after 4 to 5 days of concrete laying and 2 nd coat just before brick masonry work) as directed (cost of water proofing compound & polymer based paint to be paid separately).( Chequering not required over concrete or painted surface). [Note: - Waterproofing as per item NO 60, polymer based paint as per item 59 (a) of Section (C) Extra rate for using water proofing and plasticising 0.2% by weight of cement (or at manufacturer's specified rate) for concrete of various grades Sq.m Rupees Two Hundred & Ten Kg Rupees One Hundred & Thirty Nine (a) Applying 2 coats of bonding agent with synthetic multi functional rubber emulsion having adhesive and water proofing properties by mixing with water in proportion (1 bonding agent : 4 water : 6 cement) as per Manufacturer's specification [Cement to be supplied by the Department] 2.26 Supplying and laying Polythene Sheet (150gm / Sq.M) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches Sq. M Rupees Ninety Seven Sqm Rupees Twenty Five Cement concrete with graded stone ballast ( 40 mm size excluding shuttering) In ground floor (a) 1:3:6 proportion 2.28 (A) [Pakur Variety] Cum Rupees Five Thousand Eight Hundred & Twenty Three Ordinary Cement concrete (mix1:2:4) with graded stonechips (20mm nominal size) excluding shuttering and reinforcement, if any 2.30 pakur valley 2.31 upto plinth Cum Rupees Six Thousand One Hundred & Eighty Six and Paise Eighty Nine 2.32 Ground Floor 1.00 Cum Rupees Six Thousand One Hundred & Eighty Six and Paise Eighty Nine st Floor 0.60 Cum Rupees Six Thousand Two Hundred & Eighty Two and Paise Eighty Nine 2.34 Above Roof Cum Rupees Six Thousand Three Hundred & Seventy Eight and Paise Eighty Nine Controlled Cement concrete with well graded stone chips (20 mm nominal size ) excluding shuttering and reinforcement with complete design of concrete as per I : 456 and relevant special publications submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In ground floor and foundation. [using concrete mixture] M 25 Grade 2.36 (i) Pakur Variety 2.37 upto plinth Cum Rupees Seven Thousand Four Hundred & Thirty Nine and Paise Nine

5 2.38 Ground Floor Cum Rupees Seven Thousand Four Hundred & Thirty Nine and Paise Nine st Floor Cum Rupees Seven Thousand Five Hundred & Thirty Five and Paise Nine 2.40 Above Roof Cum Rupees Seven Thousand Six Hundred & Thirty One and Paise Nine 2.41 Hire and labour charges for shuttering with centreing and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thckness with required bracing for concrete slabs, beams, m columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) ply shutttering 2.43 upto plinth Sqm Rupees Four Hundred & Three 2.44 Ground Floor Sqm Rupees Four Hundred & Three st Floor Sqm Rupees Four Hundred & Twenty One 2.46 Above Roof Sqm Rupees Four Hundred & Thirty Nine Reinforcement for reinforced concrete work in the all sorts of structures including distribution bars, stirrups, binders etc. including supply of rods, initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge balck annealed wire at every intersection, complte as per drawing and direction 2.48 tor steel/ Mild steel 2.49 upto plinth M.T Rupees Sixty Eight Thousand Five Hundred & Eight 2.50 Ground Floor M.T Rupees Sixty Eight Thousand Five Hundred & Eight st Floor M.T Rupees Sixty Eight Thousand Five Hundred & Fifty Six 2.52 Above Roof 2.59 M.T Rupees Sixty Eight Thousand Six Hundred & Four 2.53 D: BRICK WORKS 2.54 Brick work with 1st class bricks in cement mortar (1:6) 2.55 upto plinth Cum Rupees Five Thousand Seven Hundred & Nineteen 2.56 Ground Floor Cum Rupees Five Thousand Nine Hundred & Forty Three st Floor Cum Rupees Six Thousand & Fifty Five 2.58 Above Roof Cum Rupees Six Thousand One Hundred & Sixty Seven mm thick brick work with 1st class bricks in cement mortar (4:1) in different floors.

6 2.60 Ground Floor Sqm Rupees Seven Hundred & Eighty Three st Floor Sqm Rupees Seven Hundred & Ninety Five 2.62 Above Roof Sqm Rupees Eight Hundred & Seven 2.63 Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand Sqm Rupees Three Hundred & Seventy Seven E: PLASTERING 2.65 Plaster (to wall, floor, ceiling etc) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints or roughening of of concrete surface, including throating, nosing and drip course where necessary 2.66 a)20 mm thick plaster (External) 1; Ground floor Sqm Rupees Two Hundred & Six st floor Sqm Rupees Two Hundred & Ten 2.69 Mumty Sqm Rupees Two Hundred & Fourteen b) 15 mm thick plaster (Internal) 1: Ground floor Sqm Rupees One Hundred & Seventy Six st floor Sqm Rupees One Hundred & Eighty 2.73 Mumty Sqm Rupees One Hundred & Eighty Four 2.74 c)10 mm thick plaster (Ceiling) 1: Ground floor Sqm Rupees One Hundred & Forty st floor Sqm Rupees One Hundred & Forty Four 2.77 Mumty Sqm Rupees One Hundred & Forty Eight F: FLOORING mm to 22mm thick kota stone slab set in 20 mm thick(avg.) cement mortar (4:1) including levelling course with same mortar as required in floor including pointing in Cement slurry with admixture of pigment matching the stone shade, including grinding & polishing as per direction of Engineer-in-charge Sqm Rupees One Thousand One Hundred & Fifty One Neat cement punning about 1.5mm thick in wall,dado,window sill,floor etc. NOTE:Cement cu.m per100 sq.m Sqm Rupees Thirty Eight Supplying, fitting & fixing 1st quality ceramic tiles of any size having mat finish in floors with cement sand mortar (1:4) 20mm thk and cement slurry 2 mm thk. At back side of tiles using kg/sqm & Joint filling using white cement 0.20 Kg/Sqm (Coloured decorative) 2.82 Supplying, fitting & fixing 1st quality ceramic tiles of any size having mat finish in walls with cement sand mortar (1:4) 20mm thk and cement slurry 2 mm thk. At back side of tiles using kg/sqm & Joint filling using white cement 0.20 Kg/Sqm (Coloured decorative) Sqm Rupees Eight Hundred & Forty Four Sqm Rupees Eight Hundred & Fifty One G: PAINTING

7 2.84 Rendering the surface of walls and ceiling with plaster of paris (thickness not less than 1.5mm) Sqm Rupees Sixty Nine Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured(matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC In Ground Floor Two coats: Sqm Rupees Forty Eight and Paise Ninety Nine st floor Sqm Rupees Forty Nine and Paise Seventy One nd floor Sqm Rupees Fifty and Paise Forty Three Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as pedirection of EIC to be applied over acrylic primer as required. The rate includes cost omaterial, labour, scaffolding and all incidenta charges but excluding the cost of primer. a) Normal Acrylic Emulsion 2.90 In Ground Floor Two coats: Sqm Rupees Seventy Three st floor Sqm Rupees Seventy Three and Paise Seventy Two nd floor Sqm Rupees Seventy Four and Paise Forty Four Priming one coat on Timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc Sqm Rupees Forty One On steel or other metal surface: Sqm Rupees Thirty One Painrting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface if necessary iv) Two coats ( with any shade except white ) With super gloss ( hi-gloss) 2.96 Acrylic Distemper to interior wall, ceiling with a coat of solvent based interior grade acrylic primer (as per manufacturer's specification) including cleaning and smoothning of surface. Two Coats 2.97 G: DOOR/WINDOWS Sqm Rupees Eighty Nine Sqm Rupees Seventy Six Wood work in door frame fitted & fixed complete including a protective coat of painting at the contact surface of the frame excluding cost of conc. Iron butt hinges and MS clamp. f) Sisu, Gamar, Champ, Badam, Bhola, Mogra, Hallak Supplying solid flush type doors of commercial quality, the timber frame consisting of top and bottom rails an side styles of well seasoned timber 65 mm wide each and the entire frame fitted with 37.5mm wide battens placed both ways in order to makke the door of solid core and internal lipping with garjan or similar wood veneers using phnol formaldehyde as glue etc. complete including fitting, fixing shutters in positionbut excluding the cost of hinges and other fittings. 35 mm thick shutters ( single leaf) 2.20 Cum Rupees Eighty Seven Thousand Four Hundred Sqm Rupees Three Thousand One Hundred & Forty Two

8 3.00 Supplying, fitting and fixing fibre reinforced polymer (FRP) composit door frame as per approved section with glass fibre reinforced plastic moulded skin and a special sandwich core, so as to impart monolithic composit structure as per approved technology of Department of Science and Technology (DST) to satisfy IS : 4020 door testing performance criteria (i) 66 mm x 90 mm Mtr Rupees Five Hundred & Eighty Six 3.02 Supplying, Fitting & Fixing 30 mm thick both side prelaminated Sqm Rupees Two Thousand Eight Factory made solid Panel PVC Door Shutter consisting of outer Hundred & Sixty Eight frame made out of M.S. tubes of 19 gauge thickness and size 19 mmx19 mm for styles, top and bottom rails, M.S. frame shall have cost of steel primers of approved make and manufacture, M.S. frame covered with 5mm th. heat moulded PVC C channel of size 30 mm th, 70mm width out of which 50 mm shall be flat and 20mm shall be tapered in 45 degree angle on either sides forming styles; and 5 mm th. 95 mm wide PVC sheet out of which 75 mm shall be flat and 20 mm tapered in 45 degree on the inner side to form top & bottom rail and 115 mm wide PVC sheet out of which 75mm shall be flat and 20 mm shall be tapered on both sides to form lock rail. Top, bottom and lock rails shall be provided either side of the panel with 10 mm (5mmx2) th.,20 mm wide cross PVC sheet as gap insert for top rail and bottom rail sheet to be fitted in the M.S. frame welded/sealed to the styles &rails with 7 mm (5 mm+2 mm)th.x15 mm wide PVC sheet beading on inner side and joined together with solvent cement adhesive. An additional 5 mmth. PVC strip of 20 mm which is to be stuck on the interior side of the C channel using PVC solvent adhesive etc. complete excluding all necessary hardwares as per directionof Engineer-in- Charge. In ground floor Supplying profiles of required section made of Aluminium Alloy extrusions conforming to IS: & IS: ; Annodised (with required film thickness & specified colour/natural) matt finished conforming to IS: for fabrication of composite door, sliding & casement windows, partitions, formed of basic sections of any ISI embossed/certified make and brand with built- in locking arrangement, stainless steel sliding hinges, handles etc b) 3-TRACK Sliding window 3.05 i) Bottom Frame Rm Rupees Three Hundred & Sixty Six 3.06 ii) Top and Side frame Rm Rupees Three Hundred & Seventeen 3.07 d) Shutter i) Bottom and Top member ii) Style side member Rm Rm Rupees One Hundred & Thirty Eight Rupees One Hundred & Forty 3.10 iii) Interlock member Rm Rupees One Hundred & Seventy Six

9 3.11 Labour charge for fabrication and installation of composite door, window, partitions made from annodized extruded alloy aluminium sections for the following unit:- Glazed aluminium sliding windows made of extruded and annodized alloy aluminium sectios, fabrications, including cutting to proper shape and size, drilling and aligning of window shutter frame fitted with in built locking arrangements, sliding rollers and other necessary fittings, fixture, adhesives and joineries along with extruded neoprine or EPDM gasketing in between window frame and masonry work (walls, column, beam.lintels etc.) as well as between glass and shutter frame for fixing glass and Poly Shulphate sealant and in between shutter and window frame where necessary including cutting to requisite size and fixing glass as per drawing, specification and direction of EIC. The rate includes the hire charge of all tools and plants, including all incidental charges, adhesive, joineries such as screw, cleate angle etc. but excluded the cost of extruded aluminium sections, glass, neoprene / EPDM gasketing, locking arrangement and rollers /4 track sliding window Sq.M Rupees Nine Hundred & Fifty Supplying, fitting and fixing windows and ventilators with integrated grill conforming to IS and manufactured from rolled steel swection conforming to Openable Steel windiows 3.15 Ground floor 1.00 Sqm Rupees Two Thousand & Thirty One 3.16 FIRST floor 1.00 Sqm Rupees Two Thousand One Hundred & Thirty Nine Extra for M.S. Integrated Grill as per approved design kg Rupees Eighty Five Supplying & fixing the following hardware for doors: 3.19 Iron Butt hinges of approved quality fitted and fixed with steel screws with ISI marks (100mm x 58mm x 1.9mm ) Nos Rupees Fifty Two Anodised aluminium tower bolt full covered of approved manufactured from extruded section conforming to IS 204/74 fitted and fixed with cadmium plated screws: 3.21 vii) 225 mm long x 10mm dia bolt Nos Rupees Ninety Eight Supplying Godrej Mortice lock Chromium plated with Latch and keys four lever including fitting and fixing complete 3.23 M.S or W.I ornamental grill or approved design joints continiously welded with M.S, W.I flats and bars for windows, railing etc fitted and fixed with necessary screws and lugs (i)grill weighing above 10 Kg /sq.mtr and up to16 Kg./sq.mtr Nos Rupees One Thousand Two Hundred & Twenty Three Ground Floor 9.47 Qntl Rupees Nine Thousand & Fifty One 3.25 First Floor Qntl Rupees Nine Thousand One Hundred & Forty One and Paise Fifty One 3.26 Supplying bubble free float glass of approved make and brand conforming to IS: (i) 4 mm thick clear glass Sqm Rupees Four Hundred & Seventy Five 3.28 Wood work in upper rails of railing, hand rail of staircase etc including necessary fitted and fixed complete (for purpose of payment section will be measured in the square)

10 3.29 Hallak 0.14 Cum Rupees One Lakh One Thousand Four Hundred & Fifty Four 3.30 Collapsible Gate with 40x40x6 mm tee as top and bottom guide Sqm Rupees Four Thousand & rail 20x10x2 vertical chanells 100 mm apart in fully stretched Sixteen position with 38mm steel rollers incl. cutting holes, making good damages complete H: ROOF TREATEMENT 3.32 Applying 2 coats of Non-Toxic Acrylic Polymer modified Paint having adhesive & waterproofing properties by mixing in proportion (1 liquid: 4 cementitious material) or as per manufacturer's specification for water proofing layer in water tank etc. (No Departmental Cemnt is required) 4.00 CIVIL WORKS (WORKSHOP) 4.10 A: EARTHWORKS 4.20 Earth work in excavation of foundation trenches or drains. in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing. Spreading or stacking the spils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches. leveling. dressing and ramming the bottom. bailing out water as required complete Sq.m Rupees Two Hundred & Ninety Nine a) Depth of foundation upto 1500mm %Cum Rupees Twelve Thousand & Forty Seven 4.40 b) Depth of foundation beyond 1500mm 4.43 %Cum Rupees Nineteen Thousand Four Hundred & Thirty 4.50 Earth work & filling in foundation trences or plinth with good earth in layers not exceeding 150 mm. including watering and raming etc. layer by layer complete.(payment to be made on basis of measurement of finished quantity of work) With earth obtained from excavation of foundation %Cum Rupees Seven Thousand Eight Hundred & Thirty One 4.70 With carried earth arranged by contractor within a radius of 3km 1.00 %Cum Rupees Thirty Five Thousand including cost of carried earth Eight Hundred & Ninety Six 4.80 Filling in foundation or plinth by silver sand in layers not by thorough saturation with water, ramming completeexceeding 150 mm as directed and consolidating the sameincluding the cost of supply of sand. (Payment to be madeon measurement of finished quantity) 4.90 C: ANTITERMITE MEASURES 5.00 PreConstructional Measures : 5.10 Treatment to the back filling of RCC foundation with chemical emulsion by admixing Chlorophyrofos emulsifiable concentrate (1% concentration) with water by 7.5 lts per sqm of the vertical xurface of the substructure of each side of the foundation Anti termite treatment to the top surface of the consolidated earth within plinth walls with chemical emulsion by admixing chloropyrofos emulsifiable concentrates ( 1% concentration) with water by weight at the rate of 5 Litres per sq. m. of the surface before sand bed or sub-grade is laid. Holes upto 50 mm. to 75 mm. deep at 150 mm. centre to centre both ways shall be made with 12 mm, diameter mild steel rod on the surface to facilitate saturation of the soil with the chemical emulsion. The work shall be carried out as per specification described in para 6.4 of code IS-6313 (part -II) (Mode of measurment will be per Sq.M of plan area of plinth treated.) 3.80 %Cum Rupees Ninety Eight Thousand Five Hundred & Twenty Four Sqm Rupees One Hundred & Thirty Eight Sq. m Rupees One Hundred & Eleven Post Constructional Measures :

11 5.40 Anti-termite treatment to the outside of foundations with chemical emulsion by admixing chloropyrofos emulsifiable concentrates (1%concentration) with water by weight including cutting shallow channel by excavating soil along and close to the wall face ensuring uniform dispersal of the chemical emulsion to a depth of 300mm. from the ground level by rodding with 12mm. dia. M.S. rod at 150mm.interval in the channel litres of chemical emulsion per metre length shall be used and a balance quantity of 0.5 litres of the chemical emulsion per running metre shall then be used to treat the back fill earth by directing the spray of the imulsion towards the wall surface. The entire work is to be carried out as per specification laid down in para of code IS-6313 (Part-III) Mtr Rupees Seventy Three Damp proof course mm. thick damp proof course with cement concrete with stone chips (1:1.5:3) [with graded stone aggregate 10 mm nominal size] and admixture of water proofing compound as per manufacturer's specification followed by two coat of polymer based paint, (1st coat after 4 to 5 days of concrete laying and 2 nd coat just before brick masonry work) as directed (cost of water proofing compound & polymer based paint to be paid separately).( Chequering not required over concrete or painted surface). [Note: - Waterproofing as per item NO 60, polymer based paint as per item 59 (a) of Section (C) Extra rate for using water proofing and plasticising 0.2% by weight of cement (or at manufacturer's specified rate) for concrete of various grades Sq.m Rupees Two Hundred & Ten Kg Rupees One Hundred & Thirty Nine (a) Applying 2 coats of bonding agent with synthetic multi functional rubber emulsion having adhesive and water proofing properties by mixing with water in proportion (1 bonding agent : 4 water : 6 cement) as per Manufacturer's specification [Cement to be supplied by the Department] Sq. M Rupees Ninety Seven Supplying and laying Polythene Sheet (150gm / Sq.M) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches Sqm Rupees Twenty Five Cement concrete with graded stone ballast ( 40 mm size excluding shuttering) In ground floor (a) 1:3:6 proportion 6.10 (A) [Pakur Variety] Cum Rupees Five Thousand Eight Hundred & Twenty Three 6.20 Ordinary Cement concrete (mix1:2:4) with graded stonechips (20mm nominal size) excluding shuttering and reinforcement, if any pakur valley 6.40 upto plinth Cum Rupees Six Thousand One Hundred & Eighty Six and Paise Eighty Nine 6.50 Ground Floor 1.00 Cum Rupees Six Thousand One Hundred & Eighty Six and Paise Eighty Nine st Floor 1.00 Cum Rupees Six Thousand Two Hundred & Eighty Two and Paise Eighty Nine 6.70 Above Roof Cum Rupees Six Thousand Three Hundred & Seventy Eight and

12 6.80 Controlled Cement concrete with well graded stone chips (20 mm nominal size ) excluding shuttering and reinforcement with complete design of concrete as per I : 456 and relevant special publications submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In ground floor and foundation. [using concrete mixture] M 25 Grade 6.90 (i) Pakur Variety 7.00 upto plinth Cum Rupees Seven Thousand Four Hundred & Thirty Nine and Paise Nine 7.10 Ground Floor Cum Rupees Seven Thousand Four Hundred & Thirty Nine and Paise Nine st Floor Cum Rupees Seven Thousand Five Hundred & Thirty Five and Paise Nine 7.30 Above Roof Cum Rupees Seven Thousand Six Hundred & Thirty One and Paise Nine 7.40 Hire and labour charges for shuttering with centreing and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thckness with required bracing for concrete slabs, beams, m columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) ply shutttering 7.60 upto plinth Sqm Rupees Four Hundred & Three 7.70 Ground Floor Sqm Rupees Four Hundred & Three st Floor Sqm Rupees Four Hundred & Twenty One 7.90 Above Roof Sqm Rupees Four Hundred & Thirty Nine 8.00 Reinforcement for reinforced concrete work in the all sorts of structures including distribution bars, stirrups, binders etc. including supply of rods, initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge balck annealed wire at every intersection, complte as per drawing and direction 8.10 tor steel/ Mild steel 8.20 upto plinth M.T Rupees Sixty Eight Thousand Five Hundred & Eight 8.30 Ground Floor M.T Rupees Sixty Eight Thousand Five Hundred & Eight st Floor M.T Rupees Sixty Eight Thousand Five Hundred & Fifty Six 8.50 Above Roof 4.64 M.T Rupees Sixty Eight Thousand Six Hundred & Four D: BRICK WORKS 8.70 Brick work with 1st class bricks in cement mortar (1:6)

13 8.80 upto plinth Cum Rupees Five Thousand Seven Hundred & Nineteen 8.90 Ground Floor Cum Rupees Five Thousand Nine Hundred & Forty Three st Floor Cum Rupees Six Thousand & Fifty Five 9.10 Above Roof Cum Rupees Six Thousand One Hundred & Sixty Seven mm thick brick work with 1st class bricks in cement mortar (4:1) in different floors Ground Floor Sqm Rupees Seven Hundred & Eighty Three st Floor Sqm Rupees Seven Hundred & Ninety Five 9.50 Above Roof Sqm Rupees Eight Hundred & Seven 9.60 Single brick flat soling of picked jhama bricks including ramming Sqm Rupees Three Hundred & and dressing bed to proper level and filling joints with powdered Seventy Seven earth or local sand E: PLASTERING 9.80 Plaster (to wall, floor, ceiling etc) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints or roughening of of concrete surface, including throating, nosing and drip course where necessary 9.90 a)20 mm thick plaster (External) 1; Ground floor Sqm Rupees Two Hundred & Six st floor Sqm Rupees Two Hundred & Ten Mumty Sqm Rupees Two Hundred & Fourteen b) 15 mm thick plaster (Internal) 1: Ground floor Sqm Rupees One Hundred & Seventy Six st floor Sqm Rupees One Hundred & Eighty Mumty Sqm Rupees One Hundred & Eighty Four c)10 mm thick plaster (Ceiling) 1: Ground floor Sqm Rupees One Hundred & Forty st floor Sqm Rupees One Hundred & Forty Four Mumty Sqm Rupees One Hundred & Forty Eight F: FLOORING Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using 1.75 kg/sq.m all complete including all materials and labour/ 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement Ground floor Sqm Rupees Two Hundred & Sixty Five st floor Sqm Rupees Two Hundred & Sixty Eight and Paise Ninety Eight

14 nd floor Sqm Rupees Two Hundred & Seventy Two and Paise Ninety Six Neat cement punning about 1.5mm thick in wall,dado,window Sqm Rupees Thirty Eight sill,floor etc. NOTE:Cement cu.m per100 sq.m Supplying, fitting & fixing 1st quality ceramic tiles of any size having mat finish in floors with cement sand mortar (1:4) 20mm thk and cement slurry 2 mm thk. At back side of tiles using kg/sqm & Joint filling using white cement 0.20 Kg/Sqm (Coloured decorative) Supplying, fitting & fixing 1st quality ceramic tiles of any size having mat finish in walls with cement sand mortar (1:4) 20mm thk and cement slurry 2 mm thk. At back side of tiles using kg/sqm & Joint filling using white cement 0.20 Kg/Sqm (Coloured decorative) G: PAINTING Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured(matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC In Ground Floor Two coats: Sqm Rupees Eight Hundred & Forty Four Sqm Rupees Eight Hundred & Fifty One Sqm Rupees Forty Eight and Paise Ninety Nine st floor Sqm Rupees Forty Nine and Paise Seventy One nd floor Sqm Rupees Fifty and Paise Forty Three Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as pedirection of EIC to be applied over acrylic primer as required. The rate includes cost omaterial, labour, scaffolding and all incidenta charges but excluding the cost of primer. a) Normal Acrylic Emulsion In Ground Floor Two coats: Sqm Rupees Seventy Three st floor Sqm Rupees Seventy Three and Paise Seventy Two nd floor Sqm Rupees Seventy Four and Paise Forty Four Priming one coat on Timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc Sqm Rupees Forty One On steel or other metal surface: Sqm Rupees Thirty One Painrting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface if necessary iv) Two coats ( with any shade except white ) With super gloss ( hi-gloss) Sqm Rupees Eighty Nine Acrylic Distemper to interior wall, ceiling with a coat of solvent based interior grade acrylic primer (as per manufacturer's specification) including cleaning and smoothning of surface. Two Coats Sqm Rupees Seventy Six G: DOOR/WINDOWS

15 13.30 Wood work in door frame fitted & fixed complete including a protective coat of painting at the contact surface of the frame excluding cost of conc. Iron butt hinges and MS clamp. f) Sisu, Gamar, Champ, Badam, Bhola, Mogra, Hallak Supplying solid flush type doors of commercial quality, the timber frame consisting of top and bottom rails an side styles of well seasoned timber 65 mm wide each and the entire frame fitted with 37.5mm wide battens placed both ways in order to makke the door of solid core and internal lipping with garjan or similar wood veneers using phnol formaldehyde as glue etc. complete including fitting, fixing shutters in positionbut excluding the cost of hinges and other fittings. 35 mm thick shutters ( single leaf) Supplying, fitting and fixing fibre reinforced polymer (FRP) composit door frame as per approved section with glass fibre reinforced plastic moulded skin and a special sandwich core, so as to impart monolithic composit structure as per approved technology of Department of Science and Technology (DST) to satisfy IS : 4020 door testing performance criteria Cum Rupees Eighty Seven Thousand Four Hundred Sqm Rupees Three Thousand One Hundred & Forty Two (i) 66 mm x 90 mm Mtr Rupees Five Hundred & Eighty Six Supplying, Fitting & Fixing 30 mm thick both side prelaminated Sqm Rupees Two Thousand Eight Factory made solid Panel PVC Door Shutter consisting of outer Hundred & Sixty Eight frame made out of M.S. tubes of 19 gauge thickness and size 19 mmx19 mm for styles, top and bottom rails, M.S. frame shall have cost of steel primers of approved make and manufacture, M.S. frame covered with 5mm th. heat moulded PVC C channel of size 30 mm th, 70mm width out of which 50 mm shall be flat and 20mm shall be tapered in 45 degree angle on either sides forming styles; and 5 mm th. 95 mm wide PVC sheet out of which 75 mm shall be flat and 20 mm tapered in 45 degree on the inner side to form top & bottom rail and 115 mm wide PVC sheet out of which 75mm shall be flat and 20 mm shall be tapered on both sides to form lock rail. Top, bottom and lock rails shall be provided either side of the panel with 10 mm (5mmx2) th.,20 mm wide cross PVC sheet as gap insert for top rail and bottom rail sheet to be fitted in the M.S. frame welded/sealed to the styles &rails with 7 mm (5 mm+2 mm)th.x15 mm wide PVC sheet beading on inner side and joined together with solvent cement adhesive. An additional 5 mmth. PVC strip of 20 mm which is to be stuck on the interior side of the C channel using PVC solvent adhesive etc. complete excluding all necessary hardwares as per directionof Engineer-in- Charge.In ground floor Supplying, fitting and fixing windows and ventilators with integrated grill conforming to IS and manufactured from rolled steel swection conforming to Openable Steel windiows Ground floor Sqm Rupees Two Thousand & Thirty One FIRST floor (I) Sqm Rupees Two Thousand One Hundred & Thirty Nine FIRST floor (II) 4.86 Sqm Rupees Two Thousand Two Hundred & Forty Seven Extra for M.S. Integrated Grill as per approved design kg Rupees Eighty Five Supplying & fixing the following hardware for doors: Iron Butt hinges of approved quality fitted and fixed with steel screws with ISI marks (100mm x 58mm x 1.9mm ) Nos Rupees Fifty Two Anodised aluminium tower bolt full covered of approved manufactured from extruded section conforming to IS 204/74 fitted and fixed with cadmium plated screws: vii) 225 mm long x 10mm dia bolt Nos Rupees Ninety Eight Supplying Godrej Mortice lock Chromium plated with Latch and keys four lever including fitting and fixing complete Nos Rupees One Thousand Two Hundred & Twenty Three

16 14.90 Supplying bubble free float glass of approved make and brand conforming to IS: (i) 4 mm thick clear glass Sqm Rupees Four Hundred & Seventy Five Wood work in upper rails of railing, hand rail of staircase etc including necessary fitted and fixed complete (for purpose of payment section will be measured in the square) Hallak 0.20 Cum Rupees One Lakh One Thousand Four Hundred & Fifty Four Collapsible Gate with 40x40x6 mm tee as top and bottom guide rail 20x10x2 vertical chanells 100 mm apart in fully stretched position with 38mm steel rollers incl. cutting holes, making good damages complete (a) Supplying, fitting and fixing steel rolling shutter profile type with 18 B.G. of approved type steel latche section 75mm wide, fitted with coil wire spring to necessiate the fitting of required Nos. of C.I. Pulleys on heavy type solid drawn seamless steel tube complete with locking arrangements both inside and outside specially builtup side guide channels including providing a hood for the steel rolling shutter in the room, painting two coats of approved aluminium paint over a coat of red lead primer complete H: ROOF TREATEMENT Applying 2 coats of Non-Toxic Acrylic Polymer modified Paint having adhesive & waterproofing properties by mixing in proportion (1 liquid: 4 cementitious material) or as per manufacturer's specification for water proofing layer in water tank etc. (No Departmental Cemnt is required) 9.00 Sqm Rupees Four Thousand & Sixteen Sqm Rupees Three Thousand & Forty Four Sq.m Rupees Two Hundred & Ninety Nine CIVIL WORKS (GUARD ROOM) A: EARTHWORKS Earth work in excavation of foundation trenches or drains. in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing. Spreading or stacking the spils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches. leveling. dressing and ramming the bottom. bailing out water as required complete a) Depth of foundation upto 1500mm 0.41 %Cum Rupees Twelve Thousand & Forty Seven b) Depth of foundation beyond 1500mm 0.02 %Cum Rupees Nineteen Thousand Four Hundred & Thirty Earth work & filling in foundation trences or plinth with good earth in layers not exceeding 150 mm. including watering and raming etc. layer by layer complete.(payment to be made on basis of measurement of finished quantity of work) With earth obtained from excavation of foundation %Cum Rupees Seven Thousand Eight Hundred & Thirty One With carried earth arranged by contractor within a radius of 3km including cost of carried earth Filling in foundation or plinth by silver sand in layers not by thorough saturation with water, ramming completeexceeding 150 mm as directed and consolidating the sameincluding the cost of supply of sand. (Payment to be madeon measurement of finished quantity) C: ANTITERMITE MEASURES PreConstructional Measures : Treatment to the back filling of RCC foundation with chemical emulsion by admixing Chlorophyrofos emulsifiable concentrate (1% concentration) with water by 7.5 lts per sqm of the vertical xurface of the substructure of each side of the foundation %Cum %Cum Rupees Thirty Five Thousand Eight Hundred & Ninety Six Rupees Ninety Eight Thousand Five Hundred & Twenty Four Sqm Rupees One Hundred & Thirty Eight

17 16.90 Anti termite treatment to the top surface of the consolidated earth within plinth walls with chemical emulsion by admixing chloropyrofos emulsifiable concentrates ( 1% concentration) with water by weight at the rate of 5 Litres per sq. m. of the surface before sand bed or sub-grade is laid. Holes upto 50 mm. to 75 mm. deep at 150 mm. centre to centre both ways shall be made with 12 mm, diameter mild steel rod on the surface to facilitate saturation of the soil with the chemical emulsion. The work shall be carried out as per specification described in para 6.4 of code IS-6313 (part -II) (Mode of measurment will be per Sq.M of plan area of plinth treated.) Sq. m Rupees One Hundred & Eleven Post Constructional Measures : Anti-termite treatment to the outside of foundations with chemical emulsion by admixing chloropyrofos emulsifiable concentrates (1%concentration) with water by weight including cutting shallow channel by excavating soil along and close to the wall face ensuring uniform dispersal of the chemical emulsion to a depth of 300mm. from the ground level by rodding with 12mm. dia. M.S. rod at 150mm.interval in the channel litres of chemical emulsion per metre length shall be used and a balance quantity of 0.5 litres of the chemical emulsion per running metre shall then be used to treat the back fill earth by directing the spray of the imulsion towards the wall surface. The entire work is to be carried out as per specification laid down in para of code IS-6313 (Part-III) Mtr Rupees Seventy Three D: CONCRETE WORKS Damp proof course mm. thick damp proof course with cement concrete with stone chips (1:1.5:3) [with graded stone aggregate 10 mm nominal size] and admixture of water proofing compound as per manufacturer's specification followed by two coat of polymer based paint, (1st coat after 4 to 5 days of concrete laying and 2 nd coat just before brick masonry work) as directed (cost of water proofing compound & polymer based paint to be paid separately).( Chequering not required over concrete or painted surface). [Note: - Waterproofing as per item NO 60, polymer based paint as per item 59 (a) of Section (C) Extra rate for using water proofing and plasticising 0.2% by weight of cement (or at manufacturer's specified rate) for concrete of various grades Sq.m Rupees Two Hundred & Ten 9.73 Kg Rupees One Hundred & Thirty Nine (a) Applying 2 coats of bonding agent with synthetic multi functional rubber emulsion having adhesive and water proofing properties by mixing with water in proportion (1 bonding agent : 4 water : 6 cement) as per Manufacturer's specification [Cement to be supplied by the Department] Supplying and laying Polythene Sheet (150gm / Sq.M) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches Sq. M Rupees Ninety Seven Sqm Rupees Twenty Five Cement concrete with graded stone ballast ( 40 mm size excluding shuttering) In ground floor (a) 1:3:6 proportion (A) [Pakur Variety] 7.00 Cum Rupees Five Thousand Eight Hundred & Twenty Three Ordinary Cement concrete (mix1:2:4) with graded stonechips (20mm nominal size) excluding shuttering and reinforcement, if any pakur valley upto plinth 5.60 Cum Rupees Six Thousand One Hundred & Eighty Six and Paise Eighty Nine Ground Floor 3.70 Cum Rupees Six Thousand One Hundred & Eighty Six and Paise Eighty Nine

BILL OF QUANTITY FOR THE WORK OF "REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP"

BILL OF QUANTITY FOR THE WORK OF REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP BILL OF QUANTITY FOR THE WORK OF "REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP" Sl. 1 DISMANTLING WORK 1.1 Stripping off worn out plaster (outside and inside) and raking out joints

More information

PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE

PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE Sl.No. PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE Description of item Qty Unit Rate Amount 1 Demolishing tile work/cement concrete/( carefully taking out the closet and other

More information

Tender schedule. Rate in

Tender schedule. Rate in Name of work Maintanance work for hajj house at Karipur for the year 2012 Tender schedule Sl. No 1 1.00 Cubic Probable Quantity Description of work 2 8.00 Cubic 3 12.00 Cubic 4 7.00 Cubic Dismantling,

More information

CHAPTER NO. 27 QUANTITIES OF MATERIALS

CHAPTER NO. 27 QUANTITIES OF MATERIALS CHAPTER NO. 27 QUANTITIES OF MATERIALS Note :- One cement bag weighs 50 kg. and measures 0.03472 cum. Sr. No. Description Unit Quantities Fine aggregates Coarse aggregates 1 2 3 4 5 6 27.1 Cement concrete

More information

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE By H P Gupta & D K Gupta DIFFERENT TYPES OF DAMAGES 1.Minor cracks 0.5 to 5 mm wide in load or non-load bearing walls 2.Major

More information

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE 86 :: Certificate in Construction Supervision (CIVIL) 12 ROOF 12.1 INTRODUCTION The structure provided to cover the house surface (floor) is known as roof. For different situation and requirement, it is

More information

LAYING BLOCK AND BRICK

LAYING BLOCK AND BRICK LAYING BLOCK AND BRICK Products highlighted in this section: SAKRETE Type N Mortar Mix SAKRETE Type S Mortar Mix Brick And Block Laying Basics The first step in building a brick or block wall is to construct

More information

TYPICAL ESTIMATE OF A RAINWATER COLLECTION UNIT (110 mm / 150 mm dia PVC Pipelines)

TYPICAL ESTIMATE OF A RAINWATER COLLECTION UNIT (110 mm / 150 mm dia PVC Pipelines) TYPICAL ESTIMATE OF A RAINWATER COLLECTION UNIT (110 mm / 150 mm dia PVC Pipelines) A. 110 mm dia PVC Pipeline (to collect rainwater from roof) Laying and fitting of 110 mm PVC pipes of 6 metres length

More information

CONTRACT PRICE ADJUSTMENT PROVISIONS (CPAP)

CONTRACT PRICE ADJUSTMENT PROVISIONS (CPAP) CONTRACT PRICE ADJUSTMENT PROVISIONS (CPAP) Work Groups Composition and Weightings of Sub-indices CURRENT AS AT 1 JANUARY 2013 Issued by the CPAP Committee Distributed by the Association of South African

More information

BILL OF QUANTITIES FOR CIVIL WORKS FOR 8MW POWER PLANT

BILL OF QUANTITIES FOR CIVIL WORKS FOR 8MW POWER PLANT BILL OF QUANTITIES FOR CIVIL WORKS FOR 8MW POWER PLANT ITEM Description Unit Quantity (approx) [A] A-1 EARTH WORK Earthwork in excavation in all types of soil/rock but excluding hard rock requiring blasting

More information

If stepping is required, step at 180mm as seen in this picture.

If stepping is required, step at 180mm as seen in this picture. Cast Foundations to standard building regulations requirements. Foundations must be cast completely level, 600mm wide by 230mm deep for single storey, double storey is not allowed by NHBRC. If stepping

More information

BOQ SPECIFICATIONS. The Blind system consist of a coated aluminium tube of 38 mm diameter with provision of fabric clamping.

BOQ SPECIFICATIONS. The Blind system consist of a coated aluminium tube of 38 mm diameter with provision of fabric clamping. BOQ SPECIFICATIONS VERTICAL BLINDS Vertical Blinds made of glass fibre fabrics in width 5 (or 4 ). Minimum overlapping of ¾ in fabric. Top aluminium anodized rail of 1.4 mm thickness. 2 inch wide channel

More information

Chapter. Restoration of Damaged Structures

Chapter. Restoration of Damaged Structures 5 Chapter Restoration of Damaged Structures Bringing back a damaged structure to its pre-earthquake state and original strength is called restoration. This is the first step of building rehabilitation.

More information

PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY

PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY GENERAL SPECIFICATIONS These specifications are intended to cover the construction of the

More information

BOQ for Plumbing, Sanitary Works

BOQ for Plumbing, Sanitary Works BOQ for Plumbing, Sanitary Works Page 1 of 6 Sr.No Item Description Quantity Unit Rate Amount (Rs.) 1 SANITARY FIXTURES Providing & Fixing star white colour vitreous china wall mounted wc with 1a heavy

More information

HOUSE BUILDING DIGEST

HOUSE BUILDING DIGEST HOUSE BUILDING DIGEST (Construction Specifications-Foundations) Creating Enabling Environment for Affordable Housing for All This is an attempt by BMTPC to provide useful but often ignored information

More information

Project : CONSTRUCTION OF BUILDING(including electrical and plumbing works) FOR NATIONAL CENTRE FOR SUSTAINABLE COASTAL MANAGEMENT,CHENNAI

Project : CONSTRUCTION OF BUILDING(including electrical and plumbing works) FOR NATIONAL CENTRE FOR SUSTAINABLE COASTAL MANAGEMENT,CHENNAI Project : CONSTRUCTION OF BUILDING(including electrical and plumbing works) FOR NATIONAL CENTRE FOR SUSTAINABLE COASTAL MANAGEMENT,CHENNAI TENDER CLARIFICATIONS- no 3 dated 3rd Oct 13 issued in response

More information

Superform Products Ltd.

Superform Products Ltd. TYPICAL CORNER REINFORCING NOTE : SEE ENGINEERED REBAR SCHEDULES SUPPLIED BY THE MANUFACTURER STEEL REINFORCEMENT WALL CORNER 90 Copyright 2012 Sept. 2012 5.1.1 Rebar Spacing 6" 12" Max. Load LB./FT. 2000

More information

Revised Specifications & Scale of Amenities for General Pool Residential Accommodation (Type I to VI) Revised Amenities.doc

Revised Specifications & Scale of Amenities for General Pool Residential Accommodation (Type I to VI) Revised Amenities.doc Revised Specifications & Scale of Amenities for General Pool Residential Accommodation (Type I to VI) 1 Specifications for Residential Buildings S Type I, II, III & Servant Qrs. Type IV Type V and VI Existing

More information

SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT. RCC Framed Structure confirming with zone II seismic detailing. Reinforced Cement Concrete

SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT. RCC Framed Structure confirming with zone II seismic detailing. Reinforced Cement Concrete SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT 1. CONSTRUCTION: Foundation Super Structure Internal Walls External Walls Roof Retaining Walls RCC footing RCC Framed Structure confirming with zone II seismic

More information

- From the Makers of India s Finest Designer Homes

- From the Makers of India s Finest Designer Homes Quality isn't something that can be argued into a document or promised into it It must be put there on the structure If it isn't put there, even the finest sales ta lk in the world won't act as a substitute,

More information

How To Run A Test Lab In Rourkela

How To Run A Test Lab In Rourkela TESTING LABORATORY ROURKELA 1. Background: Keeping in view of the growing demand of quality of the products of the industries, Govt. has established Testing Laboratory, Rourkela, under the Directorate

More information

RESIDENTIAL MASONRY A BEST PRACTICES GUIDE

RESIDENTIAL MASONRY A BEST PRACTICES GUIDE RESIDENTIAL MASONRY A BEST PRACTICES GUIDE Build With Brick Build With Boral CONTENTS BRICK :01 MASONRY CEMENT :03 MASONRY SAND :04 WALL TIES :05 STEEL LINTELS :07 DRAINAGE WALL SYSTEM :09 FLASHING :11

More information

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057 Lecturer: Jim Cahill 29 th November 2011 TABLE OF CONTENTS SUMMARY 1 MAIN BODY SECTION

More information

Confort 26. Sliding Systems. Sapa Building System

Confort 26. Sliding Systems. Sapa Building System Confort 26 Sliding Systems Sapa Building System Confort 26 is Sapa s thermally insulated sliding system for windows and doors. Available as two- and three-rail solution. Among its features, there are

More information

TS 813 GROUNDING AND BONDING TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET GROUNDING

TS 813 GROUNDING AND BONDING TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET GROUNDING TORONTO TRANSPORTATION January 2012 TS 813 GROUNDING AND BONDING TABLE OF CONTENTS 1. DRAWINGS TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET

More information

GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS

GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS 13.1 13.2 2006 Edition SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS GENERAL

More information

STATE BANK OF INDIA.

STATE BANK OF INDIA. Page 1 of 5 B SANITARY, PLUMBING & DRAINAGE STATE BANK OF INDIA. PROPOSED RURAL SELF EMPLOYMENT TRAINING INSTITUTE AT RAIGARH IN C.G. DIRECTOR'S BUNGALOW SCHEDULE OF ITEMS-PLUMBING AND SANITARY WORK 1

More information

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1

More information

Profiles in stock Standard catalogue. Discover the possibilities with aluminium profiles from Sapa

Profiles in stock Standard catalogue. Discover the possibilities with aluminium profiles from Sapa Profiles in stock Standard catalogue Discover the possibilities with aluminium from Sapa You can create your own profile or you can choose from a wide selection of standard. Delivery: 1 2 weeks for standard

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

Vanishing Lid Trays Construction Methods with Tile or Masonry

Vanishing Lid Trays Construction Methods with Tile or Masonry 1-800-447-2838 Installation Instructions Vanishing Lid Trays Construction Methods with Tile or Masonry Table of Contents 1. Tools and Equipment...1 2. Vanishing Lid Trays...3 2.1 Materials for Finished

More information

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel What is GigaCrete GigaCrete is a family of products based on low carbon footprint Green ceramic binders

More information

How to build a Pizza Oven in 4 days

How to build a Pizza Oven in 4 days How to build a Pizza Oven in 4 days Preparation day (slab) 1. Foundation 1500 deep x 1300 wide x 75mm deep Required 20 bags cement pre mix. If you already have a concrete base, you save this prep day DAY

More information

TARIFF CODE and updates standard

TARIFF CODE and updates standard TARIFF CODE and updates standard No HS CODE AHTN CODE PRODUCT DESCRIPTION PRODUCT TYPE STANDARDS IDENTIFIED 7207 Semi finished products of iron or non alloy steel Containing by weight less than 0.25% of

More information

Schedule of Quantities

Schedule of Quantities CIVIL WORK (A) 1 Providing and fixing corrugated galvanised iron sheets of 20 B.W.G. for roofing with wind ties including fastening with galvanised iron screw and bolts and lead and bitumen washers as

More information

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................

More information

How to build raised beds page

How to build raised beds page This leaflet has information to help you if you want to build a raised bed yourself or if you need information to give to a professional contractor. This information should be read in conjunction with

More information

Shower Walls and Tub Surrounds

Shower Walls and Tub Surrounds Reverso en español TEC Skill Set How-To Project Guide Shower Walls and Tub Surrounds 3 Steps to a Beautiful Tile Surface! 1. Prepare the surface 2. Set the tile 3. Grout and caulk H.B. Fuller Construction

More information

How to secure your property after a disaster

How to secure your property after a disaster How to secure your property after a disaster The Red Guide to Recovery HOuse secured properly Board-Up of Windows, Doors and Roof Hole. Lot secured with Perimeter Fencing. Fires, floods, tornadoes, hurricanes,

More information

SUMMARY (PLUMBING WORKS)

SUMMARY (PLUMBING WORKS) PROPOSED OBCRSETI BUILIDNG AT JASSOWAL, DEHRADUN, UTTRAKHAND SUMMARY (PLUMBING WORKS) SL. DESCRIPTION OF ITEMS PAGE REFE. AMOUNT (RS.) I PLUMBING WORKS 1.0 SH: SANITARY FIXTURES BOQ (P ) - - 2.0 SH: SOIL,

More information

7. Installation. installation 7.1.1. CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME

7. Installation. installation 7.1.1. CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME 7. Installation Window involves the fixing of window frame at an earlier construction stage and subsequent of the window sashes. This is a highly workmanship dependent process. Only trained and approved

More information

ICRC WORK SPECIFICATIONS IRAQ WATER AND HABITAT

ICRC WORK SPECIFICATIONS IRAQ WATER AND HABITAT ICRC WORK SPECIFICATIONS IRAQ WATER AND HABITAT GOVERNORATE : DISTRICT : LOCATION : DOHUK SUMEL SUMEL GO code : IRAK GEN ASSENG0 TITLE : Sharia / PHCC / Rehabilitation SO n : SO 03 WPA n : KIR16 0015 Job

More information

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown

More information

Section 02702 SEWER PIPE INSTALLATION AND TESTING

Section 02702 SEWER PIPE INSTALLATION AND TESTING PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete

More information

PANELIZED HOME INSTALLATION GUIDELINE

PANELIZED HOME INSTALLATION GUIDELINE PANELIZED HOME INSTALLATION GUIDELINE A typical home package will be constructed of Snap-N-Lock Insulated Panels clad with steel skins. 4" panels will be used for the walls, and 6" panels for the roof.

More information

Plaisance 24. Sliding Systems. Sapa Building System

Plaisance 24. Sliding Systems. Sapa Building System Plaisance 24 Sliding Systems Sapa Building System Plaisance 24 is Sapa s noninsulated sliding system for windows and doors. Available as one-, two-, three- and fourrail solution. Among its features, there

More information

Sliding and Folding Door Fittings Sliding Door Accessories

Sliding and Folding Door Fittings Sliding Door Accessories Sliding door lock Toplock For 1- and 2-leaf sliding doors Suitable for toughened safty glass and laminated sheet glass Suitable for DIN left and DIN right Max. weight per door leaf 120 kg For glass thickness:

More information

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION General 7 www.meadowburke.com 877-518-7665 MB1109 CONCRETE FLOOR SLAB AND CASTING BED CONSTRUCTION Quality Construction Begins at Ground Level Everything

More information

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Introduction Wastewater of petrochemical industries and refineries contains high amounts of emulsified aliphatic or

More information

FORM DESIGN. easy to work with, and generally available.

FORM DESIGN. easy to work with, and generally available. Forms play a major role in concrete construction. They give the plastic concrete its shape and hold it until it hardens. Forms protect the concrete, assist in curing it, and support any reinforcing rods

More information

Extension. for. Pretend Customer 123 A Road HA7 9BP. at: 123 A Road HA7 9BP

Extension. for. Pretend Customer 123 A Road HA7 9BP. at: 123 A Road HA7 9BP for Pretend Customer at: Pretend Customer Site address: Monday, 23 November 2015 Dear Pretend Customer, Subject: Thank you for your valued enquiry and instructions to quote for the above project. We are

More information

Vitraflex Classic Modular Combination Shower and Changeroom Cubicles (c/w Telescopic Stainless Steel Leg Anchors)

Vitraflex Classic Modular Combination Shower and Changeroom Cubicles (c/w Telescopic Stainless Steel Leg Anchors) GENERAL PRODUCT SPECIFICATIONS Vitraflex Classic Modular Combination Shower and Changeroom Cubicles (c/w Telescopic Stainless Steel Leg Anchors) (Document Reference CC/GPS/CUBE/03 Rev. 1 April 2010) (E&OE

More information

CONSTRUCTION COSTS INDEX FOR RESIDENTIAL BUILDINGS, SLOVENIA

CONSTRUCTION COSTS INDEX FOR RESIDENTIAL BUILDINGS, SLOVENIA CONSTRUCTION COSTS INDEX FOR RESIDENTIAL BUILDINGS, SLOVENIA METHODOLOGICAL EXPLANATIONS PURPOSE OF THE STATISTICAL SURVEY LEGAL BASIS FOR THE SURVEY OBSERVATION UNITS COVERAGE SOURCES AND METHODS OF DATA

More information

Rooflight INSTALLATION INSTRUCTIONS

Rooflight INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS Rooflight These instructions should be used for: Installing Permanent Trickle Ventilation: Constructing & Waterproofing a Timber Upstand Curb: Installing & Waterproofing Proprietary

More information

DIY CABINET REFACING INSTALLATION GUIDE

DIY CABINET REFACING INSTALLATION GUIDE DIY CABINET REFACING INSTALLATION GUIDE CABINET REFACING INSTALLATION Are you ready to reface your outdated cabinets? This guide will show you how to install your new Facelifters Cabinet Refacing Products

More information

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General

More information

NRG 75 CRF NRG GREENBOARD WALL SYSTEM

NRG 75 CRF NRG GREENBOARD WALL SYSTEM NRG GREENBOARD WALL SYSTEM NRG Energy Efficient Building Systems is pleased to announce a revolution in lightweight cladding systems. NRG Building Systems is the first and only company to achieve CodeMark

More information

ELECTRIC PERISTALTIC MORTAR POINTING PUMP

ELECTRIC PERISTALTIC MORTAR POINTING PUMP ELECTRIC PERISTALTIC MORTAR POINTING PUMP pointing gun & control valve ACF405 PERISTALTIC PuMP hopper feed roller & tube pump for refurbishment & repair trades heritage & conservation bridge & underground

More information

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS 1. 2. 3. 3.0 Scope 1.1 This application standard shall be used where the authority having jurisdiction has adopted its use, and

More information

Installation Instructions

Installation Instructions Installation Instructions 1. Position the unit onto bridging packers. These keep the unit away from any water sitting inside the frame. 2. Centralise the unit within the frame and pack the edges with appropriate

More information

SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 08332 COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Counter Fire Doors. 1.2

More information

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification Number: 3503-11.2.610 Rev. 2 Rubber Lined Steel Pipe and Fittings Mechanically Coupled Plain End Type System Issued Revised Approved

More information

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows americancraftsmanwindows.com Project Requirements: Read

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised November 27, 2013 the Easton - R 12'x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.

More information

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing 1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize

More information

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035 Decra Plus Drawing no DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 Description Shown In Decra Brochure Most Commonly Used Detail t~êã=oççñ=b~îéë=aéí~áä=b~îéë=lîéêü~åö=táíü=fåëìä~íéç=c~ëåá~=~åç=pçññáí

More information

Installing Window and Door Mouldings

Installing Window and Door Mouldings Installing Window and Door Mouldings About Window and Door Mouldings The trim around windows and doors greatly influences the look and style of your interior. They also bridge the gaps and cover spaces

More information

118 One hundred Eighteen

118 One hundred Eighteen 1 2 3 4 5 6 7 8 9 10 ten 11 Eleven 12 Twelve 13 Thirteen 14 Fourteen 15 Fifteen 16 Sixteen 17 Seventeen 18 Eighteen 19 Nineteen 20 Twenty 21 Twenty 22 Twenty 23 Twenty 24 Twenty 25 Twenty 26 Twenty 27

More information

CHAPTER 2 QUANTITY TAKE-OFF

CHAPTER 2 QUANTITY TAKE-OFF CHAPTER 2 QUANTITY TAKEOFF The quantity takeoff is an important part of the cost estimate. It must be as accurate as possible and should be based on all available engineering and design data. Use of appropriate

More information

VOLUME AND SURFACE AREAS OF SOLIDS

VOLUME AND SURFACE AREAS OF SOLIDS VOLUME AND SURFACE AREAS OF SOLIDS Q.1. Find the total surface area and volume of a rectangular solid (cuboid) measuring 1 m by 50 cm by 0.5 m. 50 1 Ans. Length of cuboid l = 1 m, Breadth of cuboid, b

More information

Black Wolf POCKET BILLIARD TABLE INSTALLATION MANUAL. SERVICE DEPARTMENT P.O. BOX 68 BRISTOL, WI 53104

Black Wolf POCKET BILLIARD TABLE INSTALLATION MANUAL.  SERVICE DEPARTMENT P.O. BOX 68 BRISTOL, WI 53104 Black Wolf TM POCKET BILLIARD TABLE INSTALLATION MANUAL www.brunswickbilliards.com SERVICE DEPARTMENT P.O. BOX 68 BRISTOL, WI 53104 51-905710-000 SEPTEMBER 2010 NOTE: Please use the instructions in this

More information

Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses.

Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses. The Townhouses Park View Place A A Compass House A T T T Royal Wharf Gardens Endeavour House T A A Thameside House T Sienna House A A A A T Apartments Townhouses River Thames Compass House Compass House

More information

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS BSW HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS BSW is a fully reinforced Pre-Applied system membrane designed for horizontal and vertical external blind-side

More information

Cedar Cottage Doghouse Plans

Cedar Cottage Doghouse Plans Overlapping cedar shingles add an element of charm to this medium size doghouse. The walls, floor, and trim are constructed of solid cedar, making it naturally weather resistant and provides excellent

More information

1958-64 WINDOW CHANNEL, WEATHERSTRIP & WHISKER STRIP REPLACEMENT FOR 2-DOOR SEDANS

1958-64 WINDOW CHANNEL, WEATHERSTRIP & WHISKER STRIP REPLACEMENT FOR 2-DOOR SEDANS By Denny Williams Photos by Denny Williams 1958-64 WINDOW CHANNEL, WEATHERSTRIP & WHISKER STRIP REPLACEMENT FOR 2-DOOR SEDANS Denny Williams - Technical Writer Denny is first and foremost a dyed-in-thewool

More information

Security Shutters, Retractable Security Gates, SeceuroBar & Aluminium Folding Shutter

Security Shutters, Retractable Security Gates, SeceuroBar & Aluminium Folding Shutter Security Shutters, Retractable Security Gates, SeceuroBar & Aluminium Folding Shutter C38 Vision 38 showing in-line punching Continental Range Experience Syston Doors have been manufacturing & supplying

More information

Laying the First Course. 1. Excavate the site and construct the footing.

Laying the First Course. 1. Excavate the site and construct the footing. Use QUIKRETE Mortar Mix or Mason Mix lay up a concrete block wall as shown. QUIKRETE Mortar Mix or Mason Mix Concrete block Mason's line Line blocks 4' level brick trowel Jointer Mason's hammer Stiff brush

More information

CONTE NT DESIGN PROCESS. Appendix. 01 First Issue. 02 Revision A. 03 Revision B. 04 Co-ordination. 05 Panel Thicknesses. 06 Panel Surface Quality

CONTE NT DESIGN PROCESS. Appendix. 01 First Issue. 02 Revision A. 03 Revision B. 04 Co-ordination. 05 Panel Thicknesses. 06 Panel Surface Quality CONTE NT DESIGN PROCESS First Issue 02 Revision A 03 Revision B 04 Co-ordination 05 Panel Thicknesses 06 Panel Surface Quality 07 CNC Timber Processing 08 Panel Standard Sizes 09 Glulam Standard Sizes

More information

Brick Veneer Construction

Brick Veneer Construction Brick Veneer Construction Check list of suggested tools & support items Claw hammer Tape measure 3/4" [19 or 20] Wood chisel Wood or plastic shims Pry bar Utility knife Caulking and caulking gun Power

More information

Saint Gobain Gyproc India Ltd. (Formerly India Gypsum Ltd.)

Saint Gobain Gyproc India Ltd. (Formerly India Gypsum Ltd.) Saint Gobain Gyproc India Ltd. (Formerly India Gypsum Ltd.) Gyproc Plasters The cracks in cement sand plaster are an inherent feature which cannot be completely prevented but can only be controlled and

More information

INSTALLATION OF A BAY WINDOW

INSTALLATION OF A BAY WINDOW INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening

More information

COMMONLY USED RESIDENTIAL BUILDING CODES

COMMONLY USED RESIDENTIAL BUILDING CODES COMMONLY USED RESIDENTIAL BUILDING CODES INTERNATIONAL RESIDENTIAL CODE (2009) form revised 5/10 FOUNDATION 1. DESIGN OF FORMWORK. Section 1906.1 IBC 2009, Section R404.1.2.3.6 IRC 2009, ACI 318 Section

More information

Dock Hardware & Accessory Products Catalog

Dock Hardware & Accessory Products Catalog Dock Hardware & Accessory Products Catalog Product Page # Product Page # Angle Brackets/Clips 8 Back Up Plate 5 Backing Plate/Hurricane Stop 10 Carriage Bolt Sets 4 Chain Retainer 10 Connector Pin Set

More information

NATIONAL INSTITUTE OF BIOLOGICALS

NATIONAL INSTITUTE OF BIOLOGICALS Short Term Notice Inviting Quotations Quotations No. S.1-36/07/NIB/Engg. (Civil) Invitation to short term quotations for Repairing of damaged gypsum board false ceiling and painting with epoxy paint in

More information

Residential Garage Door Terminology

Residential Garage Door Terminology A Air Infiltration: The leakage or passage of air through a door system Anodize: A hard non-corrosive oxide film on the surface of aluminum Astragal: A compressible or deformable seal provided on the bottom

More information

Sun Windows General Information Sun New Construction Window Installation Instructions

Sun Windows General Information Sun New Construction Window Installation Instructions Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten

More information

Improving the flood resistance of your home. Advice sheet 4: Flood-resilient walls.

Improving the flood resistance of your home. Advice sheet 4: Flood-resilient walls. Improving the flood resistance of your home Advice sheet 4: Flood-resilient walls. This sheet provides guidance on identifying different types of wall, and reducing the flow of floodwater through them

More information

CERTIFICATE OF APPROVAL No CF 291 SCHOTT UK LIMITED

CERTIFICATE OF APPROVAL No CF 291 SCHOTT UK LIMITED CERTIFICATE OF APPROVAL No CF 291 This is to certify that, in accordance with TS General Requirements for Certification of Fire Protection Products The undermentioned products of Drummond Road, Stafford.

More information

Built to Last. Built for Beauty. Good. Solid. Logix. TM

Built to Last. Built for Beauty. Good. Solid. Logix. TM Built to Last. Built for Beauty. Good. Solid. Logix. TM Quality, Value and Service Introducing LOGIX Insulated Concrete Forms. Based on the simple concept of interlocking blocks, LOGIX ICF gives you a

More information

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing Substrate, structural panel, bonded waterproofing The universal substrate for tiles Perfect covering No matter whether you work with mosaics or large format tiles, an absolutely level substrate with straight

More information

It's large enough to handle most welding job shop projects, yet small enough to make it a worth while home-workshop tool

It's large enough to handle most welding job shop projects, yet small enough to make it a worth while home-workshop tool It's large enough to handle most welding job shop projects, yet small enough to make it a worth while home-workshop tool H Craft Print Project No. 272 ERE'S a metal bender that will enable you to bend

More information

INDEX. Sec. No. Items Page Nos.

INDEX. Sec. No. Items Page Nos. INDEX Sec. No. Items Page Nos. 1. Types of Pipe............... MSSP- 2 2. Concrete Pipe............... MSSP- 2 thru MSSP-3 3. ABS and PVC Truss Pipe............... MSSP- 3 4. ABS and PVC Solid Wall Pipe...............

More information

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11 K. D. FRAME ASSEMBLY FOR MASONRY WALLS...........................Ins 2 FRAME INSTALLATION DETAILS FOR MASONRY WALLS......................Ins 3 INSTALLING EXISTING MASONRY WALL ANCHORS IN FRAME..................Ins

More information

Linea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1

Linea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1 Top plate Stud Soffit lining 45mm min nog Fix scotia bead Building underlay/james Hardie rigid air barrier Soffit Detail Building underlay/james Hardie rigid air barrier Bottom plate 25mm wide cant strip.

More information

Seven. Easy Steps. Your Own Walkway, Without Mortar. or Concrete. to Installing. Driveway and Patio

Seven. Easy Steps. Your Own Walkway, Without Mortar. or Concrete. to Installing. Driveway and Patio Seven Easy Steps to Installing Your Own Walkway, Driveway and Patio Without Mortar or Concrete Brick is one of the world s oldest and most enduring building materials. Those same qualities also make it

More information

These instructions will show you how to install an internal door into a non-loadbearing partition wall. The instructions are split into three parts.

These instructions will show you how to install an internal door into a non-loadbearing partition wall. The instructions are split into three parts. No 8 in the series of 'How to' brochures produced by PlaceMakers, New Zealand How to Frame and Hang a Door These instructions will show you how to install an internal door into a non-loadbearing partition

More information

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...

More information