1 Flooding Design Basis Reevaluation Challenges and Solutions Dave Schowalter, PhD Dan Gessler, PhD, PE, DWRE
2 Outline Introduction to Alden Flood Hazard Re-Evaluation Background Required Analysis Recommendations
3 Alden started as the hydraulics laboratory for Worcester Polytechnic Institute in Early projects focused on hydropower, but there were some other interesting applications
4 in the 21st Century, Alden is focused on fluid dynamics problems associated with the energy and environmental industries, and has been working on nuclear power plant applications since the 1960 s
5 Flood Hazard Re-Evaluation: Background March 11, 2011 Tohoku magnitude 9.0 earthquake June, 2011 Missouri River Flooding and Fort Calhoun March 12, 2012 NRC issued 50.54(f) letter The 50.54(f) transmittal defines a 10 step procedure (Attachment 1 to Recommendation 2.1: Flooding Enclosure 2) which "represent an acceptable approach to perform the reevaluation of the flood hazard and integrated assessment." This talk will focus on: Steps 1 through 6, which is what plants are doing now Details of Step 2
6 Required Analysis Step 1: Review information on current flooding hazard for which plant is designed. Design basis flood hazard Flood elevations and effects considered for all mechanisms Changes since licensing (drainage, watershed changes) New information (flood studies, PMP, dam operations) Flood protection mechanisms Pertinent features identified in the walkdown
7 Required Analysis Step 2: Reevaluate flood hazard based on present day regulatory guidance. "... the reevaluation apply present-day regulatory guidance and methodologies being used for Early Site Permits (ESP) and Combined license (COL) reviews..." NUREG/CR-7046 NUREG/CR-6966 (Tsunami hazard assessment) NUREG-0800 NUREG-0800 gives 10 flooding mechanisms to analyze
8 Required Analysis Step 3: Compare flood level for each causing mechanism to current design basis. Determine if current design basis flood bounds all reevaluated hazards If Yes: Proceed to Step 4 If No: Proceed to Step 6
9 Required Analysis Step 4: Submit report in accordance with Item 1 of 50.54(f) letter Step 5: Achieved when no further action is required Step 6: Submit a report in accordance with requested information item 1, Hazard Evaluation Report describing plans for further analysis. Step 7: Develop an Integrated Assessment showing whether existing protection mechanisms can mitigate the impacts of the re-evaluated hazard for the entire flood duration
10 10 Components of the Analysis (Step 2) Hydrologic Characterization Local Flooding Probable Maximum Flood Dam Failure Surge and Seiche Tsunami Ice Cooling Water Canals Channel Diversions Low Water Considerations
11 2.4.1 Hydrologic Characterization Develop a narrative characterization of the hydrosphere in which the plant exists. Characterize all nearby water features Characterize the source of cooling water Characterize how the plant affects the hydrosphere Characterization should include ground water Has likely not changed significantly since plant was permitted. Should require minimal effort.
12 2.4.2 Flooding Narrative of the historic flood events on all relevant water bodies. Local flooding due to Probable Maximum Precipitation Site drainage Historically and some COLA s use HEC-HMS and HEC-RAS Two dimensional runoff models may be better suited Precipitation data from NWS HMR Report 51 and 52 Required Modeling Data Topography Boundary conditions
13 HEC-HMS and HEC-RAS HEC-HMS (Hydrologic Modeling System) Designed to simulate the surface runoff, computing the streamflow hydrographs at desired locations in the river basin. HEC-RAS (River Analysis System) One-dimensional hydraulic model intended for calculating water surface profiles at cross-sections along a stream, for both steady and unsteady flow
14 2D runoff model Flooding Flow moves from cell to cell (elevation, slope, etc.) Accumulates in channels for routing. Consider as an alternative to HEC-HMS
15 2.4.3 PMF on Streams and Rivers Probable Maximum Flood (PMF) on rivers near the plant due to Probable Maximum Precipitation (PMP) in tributary basin. Typically involves HEC-HMS and HEC-RAS Reservoirs and Dams are handled separately Precipitation data from NWS HMR Report 51 and 52 Required Modeling Data Precipitation information Basin characteristics River and flood plain bathymetry HEC-HMS HEC-RAS 2D models
16 2.4.3 PMF on Streams and Rivers Important to consider debris and sediment Debris or sediment could overwhelm systems Could cause river diversion
17 2.4.4 Potential Dam Failures Two possible scenarios: Instantaneous and simultaneous failure of all upstream dams. Flood waves can be routed with HEC-RAS or other 1D model Domino failure starting at most upstream dam Storage in all upstream reservoirs is added to most downstream reservoir, and flood routed to plant Coincident with 2 year design wind and 500 year or ½ PMF per ANSI/ANS-2.8 Required Modeling Data River and flood plain bathymetry Impoundment characteristics HEC-RAS 2D models
18 2.4.4 Potential Dam Failures Consider debris, sedimentation, and scour, modes of failure Dam failure is also a source of debris
19 2.4.5 Surge and Seiche Flooding Flooding due to probable maximum hurricane (PMH) Most COLAs have been using SURGE by NOAA Met parameters from NOAA TR NWS 23 Required Modeling Data More sophisticated models exist Recent preference for ADCIRC Flooding due to probable maximum wind storm (PMWS) Use USACE Coastal Engineering Manual to compute run-up Flooding due to Seiche Atmospheric conditions that cause sloshing at the resonance frequency of the water body.
20 2.4.6 Tsunami Flooding Tsunami flood is a complex phenomena Identify tsunamigenic source mechanisms Atlantic and Gulf of Mexico Tsunami Hazard Assessment Group report Propagate the tsunami to near the coast Use 2D model such as MIKE21 to propagate the tsunami on shore accounting for local bathymetry
21 2.4.7 Ice Effects Consider how ice may affect any of the flooding predictions. Ice dams which fail Ice dams that cause a low water condition
22 2.4.8 Cooling Water Canals Some plants have cooling water canals that transfer water to the plant. Consider how the canal will be affected by: Flood Wind blow out Sedimentation Debris Cut off
23 2.4.9 Channel Diversions Channel diversion can occur at riverine plants. During a flood there is increased potential for a river to cutoff Plant becomes isolated from river. Very complex analysis, most plants won t require Analysis Geomorphic studies to understand historic meanders Sedimentation studies to understand erosion and lateral migration potential 1 and 2D modeling is likely required
24 2.4.9 Channel Diversions
25 Low Water Consideration Primarily consider downstream dam failures, causing loss of pond. Also consider Sedimentation that could obstruct intake Debris that could obstruct intake Requires multidimensional modeling Required Modeling Data 1 and 2D modeling may be required
26 Walkdowns With that described modeling effort in mind: What to look for during the walkdown: Hydrologic Characterization Local Flooding Probable Maximum Flood Dam Failure Surge and Seiche Tsunami Ice Cooling Water Canals Channel Diversions Low Water Considerations
27 Summary 10 analysis components cover potential scenarios Hydrologic Characterization Local Flooding Probable Maximum Flood Dam Failure Surge and Seiche Tsunami Ice Cooling Water Canals Channel Diversions Low Water Considerations Studies completed under 10 CFR Part 50 Appendix B Challenges you will face: Data Resources Schedule
28 Start soon Recommendations (Owners) 1 st year plants should be well underway 2 nd and 3 rd year plants are expect to have complex analysis Balance with finalization of guidance Obtain multiple proposals Clever engineering or modeling can affect cost Ensure the bidders have depth and expertise in all areas relevant to your plant. Tsunami experts are not the same as sedimentation experts Monitor schedules and progress Some plants may require field work that is best done during a 2 or 3 summer months per year.
29 Recommendations (Bidders) Assemble teams with true expertise in each area required. Schedules are tight for all plants, allocate sufficient resources. Monitor progress and schedules Anticipate field data needs some sites have very short field work windows.
Hydrologic Engineering Techniques for Regional Water Resources Planning
US Army Corps of Engineers Hydrologic Engineering Center Hydrologic Engineering Techniques for Regional Water Resources Planning October 1969 Approved for Public Release. Distribution Unlimited. TP-17
More informationMethods for Determination of Safe Yield and Compensation Water from Storage Reservoirs
US Army Corps of Engineers Hydrologic Engineering Center Methods for Determination of Safe Yield and Compensation Water from Storage Reservoirs October 1966 Approved for Public Release. Distribution Unlimited.
More informationEnvironmental Data Management Programs
Hydrologic Engineering Centre (HEC) Software CD Collection of programs, developed by the U.S. Army Corps of Engineers Environmental Data Management Programs Name: HEC-DSS Package Purpose: Data Storage
More informationURBAN DRAINAGE CRITERIA
URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities
More informationROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND
ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND The Rose Creek Watershed (RCW) consists of three planning
More informationUSSD Workshop on Dam Break Analysis Applied to Tailings Dams
USSD Workshop on Dam Break Analysis Applied to Tailings Dams Antecedents Newtonian / non-newtonian flows Available models that allow the simulation of non- Newtonian flows (tailings) Other models used
More informationPresented by: Michael DePue, PE, CFM Annual Georgia Association of Floodplain Management Conference Lake Lanier Islands, Georgia March 23, 2010
Flood Types and Characteristics Presented by: Michael DePue, PE, CFM Annual Georgia Association of Floodplain Management Conference Lake Lanier Islands, Georgia March 23, 2010 Agenda Why study flood types?
More informationFlash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes
Chapter 2 Flash Flood Science A flash flood is generally defined as a rapid onset flood of short duration with a relatively high peak discharge (World Meteorological Organization). The American Meteorological
More informationAZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA
AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA GÁBOR KEVE 1, GÉZA HAJNAL 2, KATALIN BENE 3, PÉTER TORMA 4 EXTRAPOLATING
More informationUNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001. June 26, 2014
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 26, 2014 Mr. Michael J. Pacilio Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)
More informationCITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.
More informationFederal Guidelines for Dam Safety
Federal Guidelines for Dam Safety Selecting and Accomodating Inflow Design Floods for Dams April 2004 FEDERAL GUIDELINES FOR DAM SAFETY: SELECTING AND ACCOMMODATING INFLOW DESIGN FLOODS FOR DAMS prepared
More informationFLOODPLAIN DELINEATION IN MUGLA-DALAMAN PLAIN USING GIS BASED RIVER ANALYSIS SYSTEM
FLOODPLAIN DELINEATION IN MUGLA-DALAMAN PLAIN USING GIS BASED RIVER ANALYSIS SYSTEM Dr. Murat Ali HATİPOĞLU Fatih KESKİN Kemal SEYREK State Hydraulics Works (DSI), Investigation and Planning Department
More informationNext Generation Flood Alert in Houston
Next Generation Flood Alert in Houston Philip B. Bedient Civil and Environmental Eng., Rice University Houston, TX Major Causes of Urban Flooding (Excess Water that Inundates) Highly Developed (urbanized)
More informationUSING DETAILED 2D URBAN FLOODPLAIN MODELLING TO INFORM DEVELOPMENT PLANNING IN MISSISSAUGA, ON
22nd Canadian Hydrotechnical Conference 22e Conférence canadienne d hydrotechnique Water for Sustainable Development : Coping with Climate and Environmental Changes L eau pour le développement durable:
More information2D Modeling of Urban Flood Vulnerable Areas
2D Modeling of Urban Flood Vulnerable Areas Sameer Dhalla, P.Eng. Dilnesaw Chekol, Ph.D. A.D. Latornell Conservation Symposium November 22, 2013 Outline 1. Toronto and Region 2. Evolution of Flood Management
More informationNew Brunswick s Flood Risk Reduction Strategy. Province of New Brunswick PO 6000, Fredericton NB E3B 5H1. www.gnb.ca
New Brunswick s Flood Risk Reduction Strategy i New Brunswick s Flood Risk Reduction Strategy Province of New Brunswick PO 6000, Fredericton NB E3B 5H1 2014 www.gnb.ca ISBN 978-1-4605-0533-5 (print edition)
More informationNational Dam Safety Program Technical Seminar #22. When is Flood Inundation Mapping Not Applicable for Forecasting
National Dam Safety Program Technical Seminar #22 Thursday February 19 th 2015 Emmittsburg, MD When is Flood Inundation Mapping Not Applicable for Forecasting Victor Hom Hydrologic Services Division National
More informationCity of London Climate Change Adaptation Strategy Dealing with Extreme Rainfall Events
City of London Climate Change Adaptation Strategy Dealing with Extreme Rainfall Events May 29, 2014 Presented by: Berta Krichker M.Eng., FEC, P.Eng. Manager of Stormwater Unit Environmental and Engineering
More informationEarth Science. River Systems and Landforms GEOGRAPHY 1710. The Hydrologic Cycle. Introduction. Running Water. Chapter 14.
Earth Science GEOGRAPHY 1710 River Systems and Landforms DAVID R. SALLEE Robert W. Christopherson Charlie Thomsen Chapter 14 Introduction Rivers and streams are dynamic systems that continually adjust
More informationEmergency Spillways (Sediment basins)
Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]
More informationAppendix J Online Questionnaire
Appendix J Online Questionnaire In accordance with the Paperwork Reduction Act, this questionnaire was approved by the Office of Management and Budget (OMB). The OMB control number and expiration date
More informationNew Coastal Study for Puerto Rico FIRMs. Paul Weberg, FEMA RII Mat Mampara, Dewberry Jeff Gangai, Dewberry Krista Collier, Baker
New Coastal Study for Puerto Rico FIRMs Paul Weberg, FEMA RII Mat Mampara, Dewberry Jeff Gangai, Dewberry Krista Collier, Baker September 2007 Project Team FEMA Region II Program Manager Collaboration
More informationHYDROLOGIC/HYDRAULIC MODELING OF WESTMINSTER WATERSHED ORANGE COUNTY, CALIFORNIA
HYDROLOGIC/HYDRAULIC MODELING OF WESTMINSTER WATERSHED ORANGE COUNTY, CALIFORNIA James Chieh, Ph.D., P.E., Senior Hydraulic Engineer, USACE, Los Angeles, California, Shih.H.Chieh@usace.army.mil; Jay Pak,
More informationStructural Damage Due to Floods
Structural Damage Due to Floods By Craig D. Rogers, P.E. The Federal Emergency Management Agency (FEMA) reports that each year approximately 90 percent of all disaster-related property damage results from
More informationHydrologic Aspects of Flood Warning Preparedness Programs
US Army Corps of Engineers Hydrologic Engineering Center Hydrologic Aspects of Flood Warning Preparedness Programs August 1990 Approved for Public Release. Distribution Unlimited. TP-131 REPORT DOCUMENTATION
More informationSIMPLIFIED INUNDATION MAPS FOR EMERGENCY ACTION PLANS. National Dam Safety Review Board Emergency Action Plan Workgroup
SIMPLIFIED INUNDATION MAPS FOR EMERGENCY ACTION PLANS National Dam Safety Review Board Emergency Action Plan Workgroup EXECUTIVE SUMMARY Development of Emergency Action Plans (EAPs) for all high and significant
More informationDANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT
DANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT By: Conor C. Shea Stream Habitat Assessment and Restoration Program U.S. Fish and Wildlife Service CBFO-S07-01 Prepared in
More informationHydrologic Modeling using HEC-HMS
Hydrologic Modeling using HEC-HMS Prepared by Venkatesh Merwade School of Civil Engineering, Purdue University vmerwade@purdue.edu April 2012 Introduction The intent of this exercise is to introduce you
More informationFlood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005
Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005 Speakers: Tom Chan, CEO, Global Risk Miyamoto Greg Bates, Principal, Global Risk Consultants Learning Objectives
More informationImpact of water harvesting dam on the Wadi s morphology using digital elevation model Study case: Wadi Al-kanger, Sudan
Impact of water harvesting dam on the Wadi s morphology using digital elevation model Study case: Wadi Al-kanger, Sudan H. S. M. Hilmi 1, M.Y. Mohamed 2, E. S. Ganawa 3 1 Faculty of agriculture, Alzaiem
More informationProtecting Floodplain. While Reducing Flood Losses
Protecting Floodplain Natural and Beneficial i Functions While Reducing Flood Losses Jon Kusler Association of State Wetland Managers 518 872 1804; jon.kusler@aswm.org Report available at: http://aswm.org/pdf_lib/nbf.pdf
More informationCLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY
US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC ANALYSES NOTES: 1) All elevations listed in this report are referenced
More informationFort Dodge Stormwater Master Planning. Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M.
Fort Dodge Stormwater Master Planning Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M. Project Location Project Background Flooding History Localized flooding and storm sewer
More informationLower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1
Strategy Name: Reduce Existing Potential for Flood Damages LRSW-S3C1. Develop and implement a program to: Minimize flood damages through the use of structural measures. Minimize flood damages through the
More informationCatchment Scale Processes and River Restoration. Dr Jenny Mant Jenny@therrc.co.uk. The River Restoration Centre therrc.co.uk
Catchment Scale Processes and River Restoration Dr Jenny Mant Jenny@therrc.co.uk The River Restoration Centre therrc.co.uk 3 Main Catchment Elements Hydrology Energy associated with the flow of water affects
More informationBLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT
Harmony Creek subwatershed Harmony Creek subwatershed BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT April 2011 TABLE OF CONTENTS 1.0 INTRODUCTION...
More informationEstimating Potential Reduction Flood Benefits of Restored Wetlands
Estimating Potential Reduction Flood Benefits of Restored Wetlands Kenneth W. Potter University of Wisconsin Introduction Throughout the summer of 1993 a recurring question was the impact of wetland drainage
More informationPrattsville Berm Removal Project. 1.0 Project Location
Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed
More informationThe Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin
The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin Dr.Phattaporn Mekpruksawong 1, Thana Suwattana 2 and Narong Meepayoong 3 1 Senior Civil Engineer, Office of Project Management,
More informationSmall Dam Hazard Assessment Inventory
Small Dam Hazard Assessment Inventory What would happen if your dam were to fail? This is a question that most dam owners hope they will never have to answer. However it is a question you, as a responsible
More informationQuality Assurance Reviews of Hydraulic Models Developed for the Central Valley Floodplain Evaluation and Delineation Program
Quality Assurance Reviews of Hydraulic Models Developed for the Central Valley Floodplain Evaluation and Delineation Program Techniques Applied and Lessons Learned Seth Ahrens, P.E., CFM Selena Forman,
More informationHCP Team Meeting. November 18, 2015. icfi.com
HCP Team Meeting November 18, 2015 icfi.com 1 Welcome and Introductions Where are we in the HCP process Hydrology modeling update Native fish survey Fish translocation Finalize covered activities Next
More informationLower Breton Sound Sediment Diversion Conceptual Engineering Design Presentation
EXPERT PANEL ON DIVERSION PLANNING AND IMPLEMENTATION Lower Breton Sound Sediment Diversion Conceptual Engineering Design Presentation February 12, 2015 Topics I. Introduction II. Geotechnical Study III.
More informationAppendix F Benefit-Cost Analysis of Flood Protection Measures
Appendix F Benefit-Cost Analysis of Flood Protection Measures Acronyms used in Appendix F: AA B AA C AA D BC BFE EAD FEMA NED O&M PV RED USACE Average Annual Benefits Average Annual Cost Average Annual
More informationSIMULATION OF SEDIMENT TRANSPORT AND CHANNEL MORPHOLOGY CHANGE IN LARGE RIVER SYSTEMS. Stephen H. Scott 1 and Yafei Jia 2
US-CHINA WORKSHOP ON ADVANCED COMPUTATIONAL MODELLING IN HYDROSCIENCE & ENGINEERING September 19-21, Oxford, Mississippi, USA SIMULATION OF SEDIMENT TRANSPORT AND CHANNEL MORPHOLOGY CHANGE IN LARGE RIVER
More informationComputing Stormwater Runoff Rates and Volumes
New Jersey Stormwater Best Management Practices Manual February 2004 C H A P T E R 5 Computing Stormwater Runoff Rates and Volumes This chapter discusses the fundamentals of computing stormwater runoff
More informationMIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING
1 MIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING This note is intended as a general guideline to setting up a standard MIKE 21 model for applications
More informationGeneral Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]
General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] Purpose These rules set forth the conditions under which a person may, without an individual removal-fill permit
More informationThe Next Generation Science Standards (NGSS) Correlation to. EarthComm, Second Edition. Project-Based Space and Earth System Science
The Next Generation Science Standards (NGSS) Achieve, Inc. on behalf of the twenty-six states and partners that collaborated on the NGSS Copyright 2013 Achieve, Inc. All rights reserved. Correlation to,
More informationInterim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.
Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank
More informationPerforming a Steady Flow Analysis
C H A P T E R 7 Performing a Steady Flow Analysis This chapter discusses how to calculate steady flow water surface profiles. The chapter is divided into two parts. The first part discusses how to enter
More informationThe Hydrologic Engineering Center Training Course on
The Hydrologic Engineering Center Training Course on SEDIMENT TRANSPORT ANALYSIS WITH HEC-RAS Davis, California Course Objectives This course is intended to prepare engineers to perform studies using various
More informationPERFORMANCE OF DAMS AND SPILLWAYS 2009 GEORGIA FLOOD. Randall P. Bass, P.E. 1, 2. James R. Crowder, P. Joseph S. Monroe, P.E.
PERFORMANCE OF DAMS AND SPILLWAYS 2009 GEORGIA FLOOD Randall P. Bass, P.E. 1, 2 James R. Crowder, P. Joseph S. Monroe, P.E. 3 ABSTRACT During the latter part of September 2009, the Atlanta metro area received
More informationc f'f:..-- Risk Identification Branch
Federal Emergency Management Agency Washington, D.C. 20472 AUG -1 3)05 MEMORANDUM FOR: FROM: c f'f:..-- Risk Identification Branch SUBJECT: Procedure Memorandum No. 37 Protocol for Atlantic and Gulf Coast
More informationWesterly Creek, A Poster Child for Understanding the Benefit of Stormwater Investment
Westerly Creek, A Poster Child for Understanding the Benefit of Stormwater Investment Presented at the ASFPM Annual Conference Atlanta, GA June 1 June 5 2015 Jon Villines, EIT, CFM Aurora Water Alan Turner,
More informationFLOOD PROTECTION BENEFITS
IV. (340 points) Flood Protection Benefits A. Existing and potential urban development in the floodplain (50) 1. Describe the existing and potential urban development at the site and the nature of the
More informationThe Hydrologic Cycle. precipitation evaporation condensation transpiration infiltration surface runoff transport groundwater water table.
The Hydrologic Cycle Page 1 of 1 Name Directions: The hydrologic cycle consists of the processes that change and move water through the earth s system. Use the terms below to label the hydrologic cycle.
More informationBasic Principles of Channel Design
United States Department of Agriculture Natural Resources Conservation Service Stream Restoration Design Chapter 7 Basic Principles of Channel Design Issued August 2007 Cover photo: Where modification
More informationStream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration
Stream Rehabilitation Concepts, Guidelines and Examples Pierre Y. Julien Wuhan 2005 Objectives Part I - Stream restoration and rehabilitation: 1. Present and discuss important concepts, laws, criteria
More informationEFFECTS OF ARUNDO DONAX ON RIVER HYDRAULICS, SEDIMENT TRANSPORT, AND GEOMORPHOLOGY, SANTA MARGARITA RIVER, CALIFORNIA
EFFECTS OF ARUNDO DONAX ON RIVER HYDRAULICS, SEDIMENT TRANSPORT, AND GEOMORPHOLOGY, SANTA MARGARITA RIVER, CALIFORNIA René Leclerc Geomorphologist Robert C. MacArthur, Ph.D., P.E. Principal Headwaters
More informationAn innovative approach to Floods and Fire Risk Assessment and Management: the FLIRE Project
8 th International Conference of EWRA Water Resources Management in an Interdisciplinary and Changing Context 26-29 June 2013, Porto, Portugal An innovative approach to Floods and Fire Risk Assessment
More information4. Environmental Impacts Assessment and Remediation Targets
4. Environmental Impacts Assessment and Remediation Targets 4.1 Environmental Impacts Significant additional development in the Alder Creek watershed is not anticipated at this time; however, there are
More informationLR 314 Working Group 5 Final Report
LR 314 Working Group 5 Final Report I. Nebraska Department of Natural Resources Table 1. NDNR and NATURAL RESOURCES COMMISSION WATER/INTEGRATED MANAGEMENT PLANNING RELATED RESEARCH, STUDIES AND RELATED
More informationDepartment of Energy and Water Supply
Department of Energy and Water Supply Guidelines on Acceptable Flood Capacity for Water Dams January 2013 State of Queensland, Department of Energy and Water Supply, 2012. The Queensland Government supports
More information06 - NATIONAL PLUVIAL FLOOD MAPPING FOR ALL IRELAND THE MODELLING APPROACH
06 - NATIONAL PLUVIAL FLOOD MAPPING FOR ALL IRELAND THE MODELLING APPROACH Richard Kellagher 1, Mike Panzeri 1, Julien L Homme 1, Yannick Cesses 1, Ben Gouldby 1 John Martin 2, Oliver Nicholson 2, Mark
More information7.0 OTHER STUDIES 8.0 LOCATION OF DATA
7.0 OTHER STUDIES Johnson Engineering prepared the Lee County Surface Water Management Plan for the Board of Lee County Commissioners in 1992. Johnson reviewed and modeled hydrology and hydraulics for
More informationSite Characterization and Adapted Monitoring of a Flood-Disturbed Reclamation Area
Durango, CO Cortez, CO Pagosa Springs, CO Santa Fe, NM Farmington, NM Site Characterization and Adapted Monitoring of a Flood-Disturbed Reclamation Area Swastika/Dillon Canyon Reclamation Project Raton,
More informationTravel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness
3 Chapter 3 of Concentration and Travel Time Time of Concentration and Travel Time Travel time ( T t ) is the time it takes water to travel from one location to another in a watershed. T t is a component
More informationCHICKASAW COUNTY, MISSISSIPPI, AND INCORPORATED AREAS
CHICKASAW COUNTY, MISSISSIPPI, AND INCORPORATED AREAS Chickasaw County Community Name Community Number CHICKASAW COUNTY 280269 (UNINCORPORATED AREAS) HOUSTON, CITY OF 280030 NEW HOULKA, TOWN OF 280067
More informationUsing Hydraflow Storm Sewers Extension with AutoCAD Civil 3D 2008: A Recommended Workflow
AutoCAD Civil 3D 2008 Using Hydraflow Storm Sewers Extension with AutoCAD Civil 3D 2008: A Recommended Workflow The ability to perform storm water hydrology and hydraulic (H&H) tasks is crucial to civil
More informationOverview. NRC Regulations for Seismic. Applied to San Onofre Nuclear Generating Station. NRC History. How we Regulate
Overview 1. NRC History and Overview NRC Regulations for Seismic Analysis and Design Applied to San Onofre Nuclear Generating Station Christie Hale Megan Williams 2. Regulations for Seismic Hazards 3.
More informationCoastal Drought and Water Supply in the Southeast
Coastal Drought and Water Supply in the Southeast Jessica C. Whitehead, PhD. S.C. Sea Grant Consortium/N.C. Sea Grant 2010 Land Grant and Sea Grant National Water Conference 22 February 2010 Outline Coastal
More information2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT
2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT Open channel flow is defined as flow in any channel where the liquid flows with a free surface. Open channel flow is not under pressure; gravity is the
More informationFLOOD HAZARD IN THE URBAN ENVIRONMENT: IMPLICATIONS FOR DEVELOPERS, DESIGNERS, AND ATTORNEYS
FLOOD HAZARD IN THE URBAN ENVIRONMENT: IMPLICATIONS FOR DEVELOPERS, DESIGNERS, AND ATTORNEYS PRESENTED BY: CHAD W. COX, P.E. DANIEL C. STAPLETON, P.E. BOSTON, MA JAN. 24, 2014 PRESENTATION Flood Vulnerability
More informationIUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure
IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure (December 2013) IUCN does not engage in projects which involve the design, construction or rehabilitation
More informationROLE OF THE MODELING, MAPPING, AND CONSEQUENCES PRODUCTION CENTER
ROLE OF THE MODELING, MAPPING, AND CONSEQUENCES PRODUCTION CENTER Russ Wyckoff, P.E., CFM, MMC Modeling Lead, Tulsa District, USACE, Tulsa, Oklahoma, russell.wyckoff@usace.army.mil ABSTRACT: The goal of
More informationFlood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún
Flood mitigation program for Gatun lake Programa de mitigación de inundaciones del lago Gatún Moffatt & Nichol Engineers 10 de febrero de 2005 Contrato No. 126161 Introducción y Recomendaciones 1 INTRODUCTION
More informationHow To Develop A Flood Risk Map
Recommended Procedures for Flood Velocity Data Development November 2012 Federal Emergency Management Agency Department of Homeland Security 500 C Street, SW Washington, DC 20472 This document was prepared
More informationA Flood Warning System for City of Findlay, Ohio
A Flood Warning System for City of Findlay, Ohio Matt Whitehead US Geological Survey, Ohio Water Science Center 6480 Doubletree Avenue Columbus, Ohio 43229 Abstract The U.S. Geological Survey (USGS) and
More informationTechnical Approach and Methodology
1 Dam Rehabilitation & Improvement Project (DRIP), India Technical Approach and Methodology relative to Section of Design Flood Review of TOR Making an integral part of Egis Eau Tender Technical Proposal
More informationStandard Operating Procedures for Flood Preparation and Response
Standard Operating Procedures for Flood Preparation and Response General Discussion Hurricanes, tropical storms and intense thunderstorms support a conclusion that more severe flooding conditions than
More informationNeversink River East Branch
Neversink River East Branch Management Unit 10 Summary of Post-Flood Recommendations Intervention Level Full restoration of the stream reach including the eroding bank site between Station 38380 and Station
More informationThe correct answers are given below. Some talking points have been added for the teachers use.
Natural Resources Canada 2011: Lesson Plan Grades 11 and 12 Landslide activity 5b: Landslides in Canada quiz Description: This is an independent study activity for grades 11 and 12. Students will read
More informationPost-Flood Assessment
Page 1 of 7 Post-Flood Assessment CHAPTER 4 AGENCY COORDINATION Agency coordination is an essential element for the operation of the flood management systems in the Central Valley. Due to the nature of
More informationRuissellement du Bassin Précipitation Abstractions Hydrogramme Flux de Base. Superposition Routage
HEC-1 Leçon 11 This lesson will focus on how WMS can be used to develop HEC-1 modeling parameters and not on the fundamental hydrologic principles simulated by HEC-1. 1 Vue D Emsemble Utilisés Couramment
More informationThe Basics of Chapter 105 Waterways and Wetlands Permitting in PA
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers
More informationDRAFT WATERSHED USA FLOOD RISK REPORT 1
DRAFT WATERSHED USA FLOOD RISK REPORT 1 Preface The Department of Homeland Security (DHS), Federal Emergency Management Agency s (FEMA) Risk Mapping, Assessment, and Planning (Risk MAP) program provides
More informationTHE UNIVERSITY OF TRINIDAD & TOBAGO
THE UNIVERSITY OF TRINIDAD & TOBAGO FINAL ASSESSMENT/EXAMINATIONS APRIL 2014 Course Code and Title: Programme: Date and Time: Duration: HYDRAULICS FLUD2006 BASc. Civil Engineering Wednesday 16 th April,
More informationArgonne National Laboratory
Argonne National Laboratory Using Climate Data to Inform Critical Infrastructure Resilience and Urban Sustainability Decisionmaking National Academy of Sciences Roundtable on Science and Technology for
More informationCHAPTER 2 HYDRAULICS OF SEWERS
CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination
More informationOrigins and causes of river basin sediment degradation and available remediation and mitigation options. Feedback from the Riskbase workshop
Origins and causes of river basin sediment degradation and available remediation and mitigation options Feedback from the Riskbase workshop Corinne Merly 1, Olivier Cerdan 1, Laurence Gourcy 1 Emmanuelle
More informationEvaluation of Open Channel Flow Equations. Introduction :
Evaluation of Open Channel Flow Equations Introduction : Most common hydraulic equations for open channels relate the section averaged mean velocity (V) to hydraulic radius (R) and hydraulic gradient (S).
More informationTENNESSEE GAS PIPELINE COMPANY, L.L.C.
TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC & HYDRAULIC CALCULATIONS FOR WATERBODIES CROSSED BY CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,
More informationTypes of flood risk. What is flash flooding? 3/16/2010. GG22A: GEOSPHERE & HYDROSPHERE Hydrology. Main types of climatically influenced flooding:
GG22A: GEOSPHERE & HYDROSPHERE Hydrology Types of flood risk Main types of climatically influenced flooding: 1. Flash (rapid-onset) 2. Lowland (slow-rise) 3. Coastal (not covered here) But! Causal factors
More information5.14 Floodplains and Drainage/Hydrology
I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important
More informationAligning Natural and Built Infrastructure for
Aligning Natural and Built Infrastructure for Houston Climate Resilience National Exercise Program (NEP) Houston Climate Change Preparedness & Resilience Workshop Edmond J. Russo, Jr., PhD, PE, D.CE, D.NE,
More informationImage source: www.rivers.gov. Visual Data Analytics, LLC
AWRA Spring Specialty AWRA Conference Spring Specialty on GIS Conference and Water on Resources GIS and Water VIII Resources May 13, 2014 Using a Temporal Information System for Visualization and Analysis
More informationA New Coastal Engineering Graduate Program
Paper ID #12157 A New Coastal Engineering Graduate Program Dr. Robert W. Whalin, Jackson State University Dr. Robert W. Whalin, Professor of Civil and Environmental Engineering, and Director, Coastal Hazards
More informationCHECKLIST FOR FILING AN APPLICATION FOR A GROUND AND/OR SURFACE WATER WITHDRAWAL PROJECT IN THE DELAWARE RIVER BASIN
CHECKLIST FOR FILING AN APPLICATION FOR A GROUND AND/OR SURFACE WATER WITHDRAWAL PROJECT IN THE DELAWARE RIVER BASIN PLEASE COMPLETE CHECKLIST AND ENCLOSE WITH THE APPLICATION. If you need assistance,
More information