1 Disclaimer This training presentation is provided as a reference for preparing for the PJM Certification Exam. Note that the following information may not reflect current PJM rules and operating procedures. For current training material, please visit: PJM 2014

2 Reserves Scheduling, Reporting and Loading RE Module Interconnection Training Program PJM State & Member Training Dept. 1

3 Agenda Basics Reserve Categories/Terminology IRC Reporting Loading of Reserves Shared Reserve Agreements Appendix 2

4 Basics MW MW Capacity Requirement Operating Reserve Requirement External Bilateral Sales Reserve Generation committed by PJM Pool Scheduled and Committed Energy Requirement PJM OI Load Forecast Self-Scheduled External Bilateral Purchases Requirement 3 Generation Supply

5 Scheduling Reserves On a daily basis, PJM must schedule enough capacity to cover the forecast load plus expected sales of energy off the system and operating reserves RFC Day-ahead Scheduling Reserve VACAR Day-ahead Scheduling Reserve 4

6 Purpose of Reserve Generation Reserve requirements are values of reserve which enable the system to operate reliably and economically while providing protection against load variations, forecast error and equipment failure. Enables control area to restore tie lines to pre-contingency state within 10 minutes of a contingency that causes an imbalance between load and generation 5

7 Agenda Basics Reserve Categories/Terminology IRC Reporting Loading of Reserves Shared Reserve Agreements Appendix 6

8 Reserve Terminology Synchronous Reserve (a.k.a. Spinning Reserve) Increase in output energy level of a synchronized generator which can be attained in 10 min. Or decrease in a Load Response Resource Max energy output achieved in 10 min by a unit operating as a synchronous condenser Quick-start Reserve Not synchronized to system Includes maximum energy output level of a unit that can be attained in 10 min. from the PJM request Generally run-of-river hydro, pumped hydro, combustion turbines, combined cycle and diesel type units 7

9 Reserve Terminology Contingency Reserve (a.k.a. Primary Reserve) Synchronous Reserve - Spinning (Generation) - Customer Demand Response - Quick-Start Reserve All MW available within 10 minutes 8

10 Reserve Terminology Supplemental Reserve (a.k.a. Secondary Reserve) The reserve capability that can be fully converted into energy in >10 to 30 minute interval following a request by PJM Equipment does not need to be synchronized to the system Secondary reserve is tracked and reported in real-time for the entire PJM footprint via Instantaneous Reserve Checks, or IRC s 9

11 Reserve Terminology Operating Reserve Generation available from either offline or online units within 30 minutes Scheduled to meet Operating Reserve requirements in Day- Ahead Market Contingency Reserve + Supplemental Reserve Calculated on an annual basis involving variables that adversely impact system reliability: - Load Forecast Error - Generator Forced Outage Rates Day Ahead Scheduling Reserves = Load Forecast Error + Generator Forced Outage Rates 10

12 Reserve Terminology Load Forecast Error: - Based on a 3-year average of underforecasted load forecast error - Underforecasted LFE can result in capacity deficiencies - Underforecasted LFE is based on the 80 th percentile of the rolling 3-year average - Effective January 1, 2011, the LFE component of the Day- Ahead Scheduling Reserve will be 1.87% 11

13 Reserve Terminology Forced Outage Rate: - Based on a rolling 3-year average of forced outages that occur on the scheduling day (18:00) through the operating day (20:00) - PJM dispatch has the ability to schedule additional reserves during Hot and Cold Weather Alerts - Effective January 1, 2010, the Forced Outage Rate component for the Day-Ahead Scheduling Reserve is 5.23% 12

14 Reserve Terminology Day-Ahead Scheduling Reserve Requirement: - PJM performs the calculations annually during November - Calculations cover a 3-year window from November 1 (year 3) through October 31 (current year) - Reserve calculations are implemented annually on January 1 - Effective January 1, 2011, the Day-Ahead Scheduling Reserve is 7.11% 13

15 Reserve Terminology 0 to 10 Minutes Operating Reserves Contingency Reserve Synchronized Reserves Quick-Start Reserves 10 to 30 Minutes Supplemental Reserve 14

16 Reserve Requirements RRO Control Zone Day-Ahead Schedule Contingency (Primary) Synchronized Reserve Regulation (Operating) RFC Annual % 150% Largest Unit Largest Unit 1% Peak Mid- Atlantic Annual % 1700 MW Largest Unit 1% Peak SERC Dominion VACAR VACAR VACAR 1% Peak ARS % ARS % ARS % 15

17 Dominion Reserve Requirement VACAR Requirements VACAR Contingency Reserve (15 min) Largest Unit in VACAR 1.5 DVP Contingency Reserve (15 min) 422 MW for 2011 VACAR Operating Reserve Peak Load Share (VACAR) DVP Synchronized Reserve (10 Minute) DVP Contingency Reserve (15 min) DVP 15 minute Non-Synchronized Resources 16

18 Agenda Basics Reserve Categories/Terminology IRC Reporting Loading of Reserves Shared Reserve Agreements Appendix 17

19 Instantaneous Reserve Check Instantaneous Reserve Check (IRC) is used to verify reserve situation ALL generators must report their reserve information to PJM when requested Request for IRC data submittal given via PJM All-Call Data submittal for IRC through edart application IRC results used to initiate some emergency procedures IRCs performed at least 3 times per day 18

20 Instantaneous Reserve Check Instantaneous Reserve Check (IRC) reporting will be by PJM Region MidAtlantic Traditional PJM zones Western Region AP, AEP, DPL, ComEd, DLCO Southern Region DVP 19

21 Instantaneous Reserve Check Data Entry Form All regulating and non-regulating reserve values are replaced by the Synchronized Reserve Value Synchronized Reserve is equal to the lesser of: (Synchronized Ramp Rate x 10) Or (Synchronized Maximum Limit Current Output) The Reserve > 30 row will now be hidden East Synchronous Reserve and Load values will not be displayed under Pool Totals For Ancillary Service Markets with only one Control Zone, the Control Zone will be hidden 20

22 Instantaneous Reserve Check Report 21

23 edata Instantaneous Reserve Check Report 22

24 Agenda Basics Reserve Categories/Terminology IRC Reporting Loading of Reserves Shared Reserve Agreements Appendix 23

25 100% Synchronized Reserve Definition Implement 100% Synchronized Reserves and/or Contingency Reserves if the unit loss is equal to or greater than 80% of the largest unit contingency and there is insufficient regulation and economic generation to recover the Area Control Error within the Disturbance Control Standard of NERC 24

26 100% Synchronized Reserve Purpose PJM orders to recover the ACE so that tie line schedules are maintained following disturbance conditions (i.e., loss of generation and/or steam lag) NERC Standards: Control Performance Standard 1 & BAAL Disturbance Control Standard OR To return the reactive transfers or other thermal limitations to within the appropriate limits 25

27 100% Synchronized Reserve Implementation: Request made via the PJM ALL-CALL, Procedures allow for calling of a percentage (25, 50, 75, 100%) of Synchronized Reserve May limit loading of synchronous to certain geographic areas (Eastern PJM, spinning reserve zones) If quick start is required, will also direct its loading 26

28 100% Synchronized Reserve Member Actions: Without regard to price and as quickly as possible, load the requested percentage of Synchronized Reserve (and Quick-Start if specifically requested). PJM Members continue to load generation until directed by the PJM OI dispatcher to discontinue. If regulating units are increased above regulation bands, they MUST be returned to regulation when regulation signal starts to lower from full raise 27

29 Agenda Basics Reserve Categories/Terminology IRC Reporting Loading of Reserves Shared Reserve Agreements Appendix 28

30 Shared Reserves Purpose To assist a neighboring system in recovering from a large sudden loss of generation or energy purchase. To achieve recovery from such a loss faster than otherwise achieved, thereby improving the reliability of the interconnected system 29

31 Shared Reserves PJM Mid-Atlantic Region Manual Reference for Shared Reserve: M-12, Dispatching Operations Manual Section 4 IESO MARITIMES Participants PJM Mid-Atlantic Region ISO New England New York ISO Independent Electricity System Operator (IESO, formerly Ontario Hydro) Maritimes NY-ISO PJM-ISO ISO-NE 30

32 Shared Reserves PJM Mid-Atlantic Region Highlights of the agreement NYISO is plan coordinator Shared reserves involves the use of unloaded on-line capacity (spinning reserves) Can be requested when lost generation is equal to or greater than 500 MW in any amount up to 50% of the loss (300 MW for the Maritimes) Is expected to be delivered within 10 minutes of request; termination is within 10 minutes but no longer than 30 minutes Payback of reserve energy is currently not required 31

33 Synchronized Reserve Markets The current Synchronized Reserve Market has two Synchronized Reserve Zones and one sub-zone RTO Synchronized Reserve Zone Mid-Atlantic Sub-Zone Southern Synchronized Reserve Zone (existing) The limiting factor between the RTO market and Mid-Atlantic Sub-Zone is the AP-South Reactive Transfer Interface This functions the same way the Eastern Sub-Zone did previously but includes the entire Mid-Atlantic region The limits and flows on these will be summed to provide west-to-east transfer capability No changes to the Regulation Market 32

34 RTO Synchronized Reserve Zone DLCO Synchronized Reserve Market Areas ComEd AEP AP Mid Atlantic Synchronized Reserve Sub-zone DAY Control Zone Ancillary Service Region DOM Southern Synchronized Reserve Zone 33

35 Synchronized Reserve Requirements The RTO (except DOM) will have a single requirement DVP will remain separate and will keep the same requirement as today When AP-South transfers are near the limit: Mid-Atlantic Sub-Zone will have a locational requirement Will result in a higher clearing price in the Mid-Atlantic, similar to the old Eastern sub-zone 34

36 Requirements RTO Synchronized Reserve Zone (excluding Dominion) Requirement is the greater of: Calculated RFC minimum requirement OR Largest contingency in RTO Synchronized Reserve Zone Expected to be about 1350 MW (RFC) Mid-Atlantic sub-zone requirement is equal to: Largest contingency in Mid-Atlantic region Normally 1300 MW 35

37 Shared Reserves PJM Southern Region VACAR Reserve Sharing Dominion, Duke, South Carolina Electric and Gas, Progress Carolinas, South Carolina Public Service Authority Telephone request for reserve energy Up to 12 hours PJM schedules delivery between PJM and CPL Dominion Virginia Power Performs billing and provide compensation for energy deliveries 36

38 Operational Considerations Request for Synchronized Reserve in Eastern Reserve subzone is no longer an option If limited on the AP-South Interface, call for Synchronized Reserve in Mid-Atlantic subzone only Be aware of possible over-response as more units will be providing spinning reserve when the RTO Synchronized Reserve zone is called PJM discussing with Operating Committee the use of less than 100% synchronized reserve if this continues to be an issue 37

39 Operational Considerations For loss of unit in Dominion, call for Synchronized Reserve in Southern Synchronized Reserve Zone only If needed, request VACAR reserve sharing Same as existing procedure For loss of a unit in any area other than Dominion, call for Synchronized Reserve in RTO Synchronized Reserve Zone Call only Mid-Atlantic sub-zone if limited on transfer interfaces Initiate the NPCC reserve sharing, if needed For low ACE, call for Synchronized Reserve in Spinning Reserve zone with largest negative ACE Southern Synchronized Reserve Zone OR RTO Synchronized Reserve Region Entire RTO may be requested if needed 38

40 Shared Reserves Summary RTO - Triggers Dominion, RFC, and Mid-Atlantic Sub-Zone RFC - Triggers RFC and Mid-Atlantic Sub-Zone PJM Mid-Atlantic Region Reserve sharing with NYISO, NEISO, IMO, Maritimes PJM Southern Region Reserve sharing with other VACAR members 39

41 Questions? 40

42 Disclaimer: PJM has made all efforts possible to accurately document all information in this presentation. The information seen here does not supersede the PJM Operating Agreement or the PJM Tariff both of which can be found by accessing: For additional detailed information on any of the topics discussed, please refer to the appropriate PJM manual which can be found by accessing: 41

Pre-Scheduling Operations

Pre-Scheduling Operations PJM Manual 10: Pre-Scheduling Operations Revision: 33 Effective Date: December 22, 2015 Prepared by Operations Support Division Generation Department PJM 2015 i Table of Contents PJM Manual 10: Pre-Scheduling

More information

PJM Overview of Markets. Georgian Delegation PUCO Office April 11, 2013

PJM Overview of Markets. Georgian Delegation PUCO Office April 11, 2013 PJM Overview of Markets Georgian Delegation PUCO Office April 11, 2013 1 Agenda Introduction Energy Markets Locational Marginal Pricing - LMP Two Settlement - Day Ahead / Real time Ancillary Services Capacity

More information

PJM Electric Market. PJM Electric Market: Overview and Focal Points. Federal Energy Regulatory Commission Market Oversight www.ferc.

PJM Electric Market. PJM Electric Market: Overview and Focal Points. Federal Energy Regulatory Commission Market Oversight www.ferc. PJM Electric Market: Overview and Focal Points Page 1 of 14 PJM Electric Market Source: Velocity Suite Intelligent Map Updated August 23, 21 145 PJM Electric Market: Overview and Focal Points Page 2 of

More information

PJM LMP Market Overview

PJM LMP Market Overview PJM LMP Market Overview Andrew Ott Senior Vice President, Markets June 10, 2010 PJM as Part of the Eastern Interconnection 6,038 substations KEY STATISTICS PJM member companies 600+ millions of people

More information

Ancillary Services: Technical and Commercial Insights

Ancillary Services: Technical and Commercial Insights Ancillary Services: Technical and Commercial Insights July 2007 Brendan Kirby Prepared For CONTENTS 1. INTRODUCTION...1 2. ENERGY AND CAPACITY: NECESSARY BUT INSUFFICIENT... 2 2.1 ENERGY...3 2.2 CAPACITY...3

More information

Governance. What s a Governance?

Governance. What s a Governance? Governance What s a Governance? Governance FERC - Federal Energy Regulatory Commission NERC - North American Electric Reliability Council. NPCC - Northeast Power Coordinating Council NYSRC - New York State

More information

Presentation for The National Commission for Energy State Regulation of Ukraine

Presentation for The National Commission for Energy State Regulation of Ukraine Presentation for The National Commission for Energy State Regulation of Ukraine Todd Keech Laura Walter PJM Interconnection June 17, 2014 What is PJM? 1 What is PJM? ISO RTO Map Part of Eastern Interconnection

More information

Section 4: Scheduling Philosophy & Tools

Section 4: Scheduling Philosophy & Tools Welcome to the Scheduling Philosophy & Tools section of the PJM Manual for Scheduling Operations. In this section you will find the following information: A description of the PJM OI s scheduling philosophy

More information

Chapter 7 System Operations and Physical Markets

Chapter 7 System Operations and Physical Markets MDP_RUL_0002_07 Market Rules Chapter 7 System Operations and Physical Markets Public Issue Date: June 3, 2015 Library Record No. MDP_RUL_0002_07 Document Name Market Rules for the Ontario Electricity Market

More information

Closing the Gap Between Wholesale and Retail

Closing the Gap Between Wholesale and Retail Closing the Gap Between Wholesale and Retail Transactive Energy Workshop March 28-29 Robert B. Burke GWAC MEMBER & PRINCIPAL ANALYST ISO NEW ENGLAND INC. Disclaimer This presentation represents the thoughts

More information

Consistency of Energy-Related Opportunity Cost Calculations

Consistency of Energy-Related Opportunity Cost Calculations Consistency of Energy-Related Opportunity Cost Calculations Bhavana Keshavamurthy Market Implementation Committee 03/14/2012 PJM 2012 www.pjm.com 1 P a g e This page is intentionally left blank. PJM 2012

More information

FRCC Standards Handbook. FRCC Automatic Underfrequency Load Shedding Program. Revision Date: July 2003

FRCC Standards Handbook. FRCC Automatic Underfrequency Load Shedding Program. Revision Date: July 2003 F R C C FRCC Standards Handbook FRCC Automatic Underfrequency Load Shedding Program Revision Date: July 2003 FRCC Underfrequency Load Shedding Program Modification and Approval Process Requests to modify

More information

Project Report: A Survey of Operating Reserve Markets in U.S. ISO/RTO-managed Electric Energy Regions

Project Report: A Survey of Operating Reserve Markets in U.S. ISO/RTO-managed Electric Energy Regions SANDIA REPORT SAND2012-1000 Unlimited Release Printed September 2012 Project Report: A Survey of Operating Reserve Markets in U.S. ISO/RTO-managed Electric Energy Regions James F. Ellison, Leigh S. Tesfatsion,

More information

ICAP/UCAP Overview. Aaron Westcott Awestcott@nyiso.com 518 356 7657. If possible, Please mute your phones Please do not use the hold button.

ICAP/UCAP Overview. Aaron Westcott Awestcott@nyiso.com 518 356 7657. If possible, Please mute your phones Please do not use the hold button. ICAP/UCAP Overview Aaron Westcott Awestcott@nyiso.com 518 356 7657 If possible, Please mute your phones Please do not use the hold button. Agenda What is ICAP/UCAP? How are ICAP and UCAP calculated? How

More information

Overview of the IESO-Administered Markets. IESO Training. Updated: January, 2014. Public

Overview of the IESO-Administered Markets. IESO Training. Updated: January, 2014. Public Overview of the IESO-Administered Markets IESO Training Updated: January, 2014 Public Overview of the IESO-Administered Markets AN IESO TRAINING PUBLICATION This guide has been prepared to assist in the

More information

Is It Possible to Charge Market-Based Pricing for Ancillary Services in a Non-ISO Market?

Is It Possible to Charge Market-Based Pricing for Ancillary Services in a Non-ISO Market? Is It Possible to Charge Market-Based Pricing for Ancillary Services in a Non-ISO Market? Regulation and Operating Reserves 33 rd Eastern Conference Center for Research in Regulated Industry Romkaew P.

More information

Transmission Pricing. Donald Hertzmark July 2008

Transmission Pricing. Donald Hertzmark July 2008 Transmission Pricing Donald Hertzmark July 2008 Topics 1. Key Issues in Transmission Pricing 2. Experiences in Other Systems 3. Pricing Alternatives 4. Electricity Market Structure and Transmission Services

More information

Two Settlement - Virtual Bidding and Transactions

Two Settlement - Virtual Bidding and Transactions Two Settlement - Virtual Bidding and Transactions (Fall 2009) PJM 2009 2009 PJM 1 Agenda Two-Settlement Overview Two-Settlement Features & System Two-Settlement Business Rules Two-Settlement Data Requirements

More information

PJM Overview and Wholesale Power Markets. John Gdowik PJM Member Relations

PJM Overview and Wholesale Power Markets. John Gdowik PJM Member Relations PJM Overview and Wholesale Power Markets John Gdowik PJM Member Relations PJM s Role Ensures the reliability of the high-voltage electric power system Coordinates and directs the operation of the region

More information

Market Operation s Report

Market Operation s Report Market Operation s Report Business Issues Committee Meeting December 14, 2011 Agenda #3 Report Items Market Performance Highlights Market Performance Highlights for November 2011 PRELIMINARY DATA (Most

More information

Operating Reserves and Variable Generation

Operating Reserves and Variable Generation Operating Reserves and Variable Generation A comprehensive review of current strategies, studies, and fundamental research on the impact that increased penetration of variable renewable generation has

More information

Workshop B. 11:15 a.m. to 12:30 p.m.

Workshop B. 11:15 a.m. to 12:30 p.m. Workshop B Advanced Energy Management Tools: Benefitting from the Competitive Electricity Marketplace Beyond the Fixed Rate & Key Issues to Understand when Comparing Electricity Quotes 11:15 a.m. to 12:30

More information

Accounting and Billing Manual

Accounting and Billing Manual MANUAL 14 Accounting and Billing Manual December 2014 Version: 3.3 Effective Date: 12/29/2014 Committee Acceptance: BIC 12/10/2014 This document was prepared by: NYISO Customer Settlements New York Independent

More information

Technical Bulletin 2011-04-01. Bid Cost Recovery and Accounting for Delivered Minimum Load Energy Market Revenues. Market Issue

Technical Bulletin 2011-04-01. Bid Cost Recovery and Accounting for Delivered Minimum Load Energy Market Revenues. Market Issue Technical Bulletin 2011-04-01 Bid Cost Recovery and Accounting for Delivered Minimum Load Energy Market Revenues Market Issue April 5, 2011 Technical Bulletin 2011-04-01 Bid Cost Recovery and Accounting

More information

PJM Interconnection LLC Regional Transmission Organization (RTO)

PJM Interconnection LLC Regional Transmission Organization (RTO) PJM Interconnection LLC Regional Transmission Organization (RTO) ComEd Generator Interconnection Meeting October 2015 William Patzin PJM Infrastructure Coordination October 2015 PJM 2013 Nine Major North

More information

Grid of the Future. Integration of Renewables Energy Storage Smart Grid. Presentation by David Hawkins Lead Renewables Power Engineer Grid Operations

Grid of the Future. Integration of Renewables Energy Storage Smart Grid. Presentation by David Hawkins Lead Renewables Power Engineer Grid Operations Grid of the Future Integration of Renewables Energy Storage Smart Grid Presentation by David Hawkins Lead Renewables Power Engineer Grid Operations Grid of the Future Current Power System Gen. Trans. Dist.Cust.

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION CHAPTER 1 INTRODUCTION Power systems form the largest man made complex system. It basically consists of generating sources, transmission network and distribution centers. Secure and economic operation

More information

ERCOT Monthly Operational Overview (March 2014) ERCOT Public April 15, 2014

ERCOT Monthly Operational Overview (March 2014) ERCOT Public April 15, 2014 ERCOT Monthly Operational Overview (March 2014) ERCOT Public April 15, 2014 Grid Operations & Planning Summary March 2014 Operations The peak demand of 54,549 MW on March 3 rd was greater than the mid-term

More information

CURTAILABLE RATE PROGRAM FOR INDIVIDUAL CUSTOMER LOADS

CURTAILABLE RATE PROGRAM FOR INDIVIDUAL CUSTOMER LOADS Page 1 of 16 CURTAILABLE RATE PROGRAM FOR INDIVIDUAL CUSTOMER LOADS PROPOSED TERMS AND CONDITIONS January 2015 Page 2 of 16 TABLE OF CONTENTS 1. Definitions... 3 2. Curtailable Load Options... 6 3. Nomination

More information

Resource Monitoring and Deliverability Tool Paper

Resource Monitoring and Deliverability Tool Paper Resource Monitoring and Deliverability Tool Paper NWPP MC Phase 3 Operations Integration Work Group 11/30/2014 Page 1 of 16 Table of Contents Executive Summary... 3 1. Purpose... 5 2. Existent Methods

More information

Energy Imbalance Market

Energy Imbalance Market Energy Imbalance Market Tariff Framework September 10, 2013 CAIS[Type text] [Type text] [Type text] Table of Contents 1. Introduction... 1 2. Guiding Objectives for the Tariff Framework... 2 3. Tariff

More information

Alternative Approaches for Incentivizing the Frequency Responsive Reserve Ancillary Service

Alternative Approaches for Incentivizing the Frequency Responsive Reserve Ancillary Service Alternative Approaches for Incentivizing the Frequency Responsive Reserve Ancillary Service E. Ela, M. Milligan, and B. Kirby National Renewable Energy Laboratory A. Tuohy and D. Brooks Electric Power

More information

Enabling 24/7 Automated Demand Response and the Smart Grid using Dynamic Forward Price Offers

Enabling 24/7 Automated Demand Response and the Smart Grid using Dynamic Forward Price Offers Enabling 24/7 Automated Demand Response and the Smart Grid using Dynamic Forward Price Offers Presented to ISO/RTO Council by Edward G. Cazalet, PhD The Cazalet Group ed@cazalet.com www.cazalet.com 650-949-0560

More information

Ancillary Services and Flexible Generation

Ancillary Services and Flexible Generation Ancillary Services and Flexible Generation Contents Ancillary Services Overview Types of Ancillary Services Market Impact Benefits of Medium Speed Solution Contact Information What are Ancillary Services?

More information

NV Energy ISO Energy Imbalance Market Economic Assessment

NV Energy ISO Energy Imbalance Market Economic Assessment March 25, 2014 NV Energy ISO Energy Imbalance Market Economic Assessment NV Energy ISO Energy Imbalance Market Economic Assessment 2014 Copyright. All Rights Reserved. Energy and Environmental Economics,

More information

Rules on Southern Companies Energy Auction Participation

Rules on Southern Companies Energy Auction Participation Southern Company Services, Inc. First Revised Sheet No. 20B Superseding Original Sheet No. 20B Rules on Southern Companies Energy Auction Participation 1.0 Participation; Definitions 1.1 Southern Companies

More information

Operator Initiated Commitments in RTO and ISO Markets

Operator Initiated Commitments in RTO and ISO Markets Price Formation in Organized Wholesale Electricity Markets Docket No. AD14-14-000 Staff Analysis of Operator Initiated Commitments in RTO and ISO Markets December 2014 For further information, please contact:

More information

Performance Metrics. For Independent System Operators And Regional Transmission Organizations

Performance Metrics. For Independent System Operators And Regional Transmission Organizations Performance Metrics For Independent System Operators And Regional Transmission Organizations A Report to Congress In Response to Recommendations of the United States Government Accountability Office April

More information

Transmission Function Employees Job Titles and Descriptions 18 C.F.R 358.7(f)(1)

Transmission Function Employees Job Titles and Descriptions 18 C.F.R 358.7(f)(1) Date of Last Change to the Provided Information August 27 th, 2015 Director, Transmission Operations The employee in this position is responsible for effectively managing the operation of FirstEnergy Utilities

More information

Reclamation Manual Directives and Standards

Reclamation Manual Directives and Standards Subject: Purpose: Ancillary Generation Services Establishes standards for ancillary generation services. Authority: The Reclamation Act of 1902 (Act of June 17, 1902, 32 Stat. 388), the Town Sites and

More information

Wind Power and Electricity Markets

Wind Power and Electricity Markets PO Box 2787 Reston, VA 20195 Phone: 703-860-5160 Fax: 703-860-3089 E-mail: info@uwig.org Web: www.uwig.org Wind Power and Electricity Markets A living summary of markets and market rules for wind energy

More information

2014 STATE OF THE MARKET REPORT FOR THE NEW YORK ISO MARKETS

2014 STATE OF THE MARKET REPORT FOR THE NEW YORK ISO MARKETS 2014 STATE OF THE MARKET REPORT FOR THE NEW YORK ISO MARKETS By: David B. Patton, Ph.D. Pallas LeeVanSchaick, Ph.D. Jie Chen, Ph.D. Market Monitoring Unit for the New York ISO May 2015 2014 State of the

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) Coordination Between Natural Gas ) Docket No. AD12-12-000 And Electricity Markets ) ) COMMENTS OF DOMINION RESOURCES SERVICES,

More information

Multi-Faceted Solution for Managing Flexibility with High Penetration of Renewable Resources

Multi-Faceted Solution for Managing Flexibility with High Penetration of Renewable Resources Multi-Faceted Solution for Managing Flexibility with High Penetration of Renewable Resources FERC Technical Conference Increasing RT & DA Market Efficiency Through Improved Software June 24 26, 2013 Nivad

More information

Master/Local Control Center Procedure No. 13 (M/LCC 13) Communications Between the ISO and Local Control Centers

Master/Local Control Center Procedure No. 13 (M/LCC 13) Communications Between the ISO and Local Control Centers Master/LCC Procedure No. 13 - Communications Master/Local Control Center Procedure No. 13 (M/LCC 13) Communications 1. References... 2 2. Background... 3 3. Responsibilities... 3 4. Procedure... 4 4.1

More information

The Materials Contained Are Property of GP Renewables & Trading, LLC and are considered proprietary. This is not for distribution.

The Materials Contained Are Property of GP Renewables & Trading, LLC and are considered proprietary. This is not for distribution. The Materials Contained Are Property of GP Renewables & Trading, LLC and are considered proprietary. This is not for distribution. 1 Wholesale Power 101 Maximizing Asset Value & Minimizing Risk 2 Facts

More information

New York State of the Market System - NYISO Success Project

New York State of the Market System - NYISO Success Project Auxiliary Market Products Additional Capacity Zones The NYISO and stakeholders are developing the rationale in 2010 for creating additional capacity zones, identified as a recommendation in the 2009 State

More information

SCHEDULE 1. Scheduling, System Control and Dispatch Service

SCHEDULE 1. Scheduling, System Control and Dispatch Service Seventh Revised Volume No. 5 (MT) Original Sheet No. 71 SCHEDULE 1 Scheduling, System Control and Dispatch Service This service is required to schedule the movement of power through, out of, within, or

More information

Impact of Coal Plant Retirements on the Capacity and Energy Market in PJM

Impact of Coal Plant Retirements on the Capacity and Energy Market in PJM Impact of Coal Plant Retirements on the Capacity and Energy Market in PJM by Neil Copeland Debashis Bose Black & Veatch INTRODUCTION It has recently been observed that U.S. electricity providers are announcing

More information

Duke Energy Progress Standards of Conduct Transmission Function Employee Job Titles and Job Descriptions 9/1/13

Duke Energy Progress Standards of Conduct Transmission Function Employee Job Titles and Job Descriptions 9/1/13 Duke Energy Progress Standards of Conduct Transmission Function Employee Job Titles and Job Descriptions 9/1/13 Transmission Operations & Planning Carolinas Power System Operations Director Power System

More information

ANCILLARY SERVICES. A Paper for PPC. Establishment Organisation and Pilot Operation of the HTSO. 21 September 2000

ANCILLARY SERVICES. A Paper for PPC. Establishment Organisation and Pilot Operation of the HTSO. 21 September 2000 ANCILLARY SERVICES A Paper for PPC Establishment Organisation and Pilot Operation of the HTSO 21 September 2000 TABLE OF CONTENTS 1. INTRODUCTION 1 2. SYSTEM TRADING ARRANGEMENTS 2 3. OPTIONS FOR PROCUREMENT

More information

Convergence Bidding Stakeholder Conference Call

Convergence Bidding Stakeholder Conference Call Convergence Bidding Stakeholder Conference Call Margaret Miller Senior Market Design & Policy Specialist Convergence Bidding Stakeholder Conference Call August 13, 2009 Agenda 1:00 1:15 - Plan for Stakeholder

More information

Market Solutions to Loop Flow

Market Solutions to Loop Flow Market Solutions to Loop Flow Robert Pike Director, Market Design New York Independent System Operator Business Issues Committee September 9, 2009 1 Agenda Background Recommendation Next Steps Solution

More information

The South African Grid Code

The South African Grid Code The South African Grid Code The Scheduling and Dispatch Rules Draft Revision 7.15T Comments to this document can be forwarded to: Attention: Mr. Nhlanhla Lucky Ngidi National Energy Regulator of South

More information

INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO)

INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO) INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO) Paul L. Joskow September 28, 2007 ALTERNATIVE SYSTEM OPERATOR MODELS System operator (SO) is vertically integrated utility (G+T) Functional

More information

Day- Ahead Congestion and Real-Time Commodity Markets in East York

Day- Ahead Congestion and Real-Time Commodity Markets in East York 2013 STATE OF THE MARKET REPORT FOR THE NEW YORK ISO MARKETS By: David B. Patton, Ph.D. Pallas LeeVanSchaick, Ph.D. Jie Chen, Ph.D. Market Monitoring Unit for the New York ISO May 2014 2013 State of the

More information

NYISO Demand Response Programs: Enrollment

NYISO Demand Response Programs: Enrollment NYISO Demand Response Programs: Enrollment Donna Pratt Demand Response Market Product Specialist New York Independent System Operator DR-Expo Chicago, Illinois October 16-17, 2007 New York Independent

More information

Chapter 5. System security and ancillary services

Chapter 5. System security and ancillary services Chapter 5. System security and ancillary services 1 Introduction Markets for electrical energy can function only if they are supported by the infrastructure of a power system. System should continue to

More information

Responsible for pipeline engineering and plant operations for DTI and Cove Point.

Responsible for pipeline engineering and plant operations for DTI and Cove Point. GAS TRANSMISSION DTI - Pipeline Vice President, Pipeline Responsible for pipeline operations for DTI and Cove Point. Vice President, Pipeline Engineering & Plant Managing Director, Pipeline Director, Gas

More information

SOP-RTMKTS.0060.0005 - Test and Approve Operations Software Applications. Contents

SOP-RTMKTS.0060.0005 - Test and Approve Operations Software Applications. Contents SOP-RTMKTS.0060.0005 - Test and Approve Operations Software Applications Contents 1. Objective... 2 2. Background... 2 3. Responsibilities... 3 4. Controls... 4 5. Instructions... 5 5.1 Document Operations

More information

IEA Workshop: Demand Response. 3 July, 2014

IEA Workshop: Demand Response. 3 July, 2014 IEA Workshop: Demand Response 3 July, 2014 EnerNOC 24 27GW of Peak Load under management ~9GW of Dispatchable Demand Response (DR) 10 Countries with DR operations 100+ Utilities / System Operator relationships

More information

Operating Hydroelectric and Pumped Storage Units In A Competitive Environment

Operating Hydroelectric and Pumped Storage Units In A Competitive Environment Operating electric and Pumped Storage Units In A Competitive Environment By Rajat Deb, PhD 1 LCG Consulting In recent years as restructuring has gained momentum, both new generation investment and efficient

More information

Introduction to Ontario's Physical Markets

Introduction to Ontario's Physical Markets Introduction to Ontario's Physical Markets Introduction to Ontario s Physical Markets AN IESO MARKETPLACE TRAINING PUBLICATION This document has been prepared to assist in the IESO training of market

More information

Update on Northeast Seams Issues. January 9, 2008 NYISO Management Committee Meeting

Update on Northeast Seams Issues. January 9, 2008 NYISO Management Committee Meeting Update on Northeast Seams Issues January 9, 2008 NYISO Management Committee Meeting Status of Seams Projects Current Deliverables Project 1. Intra-Hour Transaction Scheduling NYISO and ISO-NE have documented

More information

UNIT COMMITMENT AND ECONOMIC DISPATCH SOFTWARE TO OPTIMISE THE SHORT-TERM SCHEDULING OF ELECTRICAL POWER GENERATION

UNIT COMMITMENT AND ECONOMIC DISPATCH SOFTWARE TO OPTIMISE THE SHORT-TERM SCHEDULING OF ELECTRICAL POWER GENERATION UNIT COMMITMENT AND ECONOMIC DISPATCH SOFTWARE TO OPTIMISE THE SHORT-TERM SCHEDULING OF ELECTRICAL POWER GENERATION INTRODUCTION Electricity generating companies and power systems have the problem of deciding

More information

Methodology for Merit Order Dispatch. Version 1.0

Methodology for Merit Order Dispatch. Version 1.0 Methodology for Merit Order Dispatch Version 1.0 25 th April 2011 TABLE OF CONTENTS 1. OBJECTIVES... 1 2. ROADMAP FOR IMPLEMENTATION... 1 3. DEFINITIONS... 3 4. OPERATIONS PLANNING... 3 4.1. General Considerations...

More information

sink asset load power pool ISO pool participant bids operating constraints ancillary service declarations

sink asset load power pool ISO pool participant bids operating constraints ancillary service declarations G1 DEFINITIONS In the ISO rules: acceptable operational reason means with respect to a source asset, any one or more of the following: i) a circumstance related to the operation of the generating asset

More information

Table of Contents. Real-Time Reliability Must Run Unit Commitment and Dispatch (Formerly G-203) Operating Procedure

Table of Contents. Real-Time Reliability Must Run Unit Commitment and Dispatch (Formerly G-203) Operating Procedure No. 2310 Table of Contents Purpose... 2 1. Responsibilities... 2 2. Scope/Applicability... 2 2.1 Background... 2 2.2 Scope / Applicability... 2 3. Detail... 3 3.1 Energy Dispatching... 3 3.1.2 Real-Time

More information

Emissions Comparison for a 20 MW Flywheel-based Frequency Regulation Power Plant

Emissions Comparison for a 20 MW Flywheel-based Frequency Regulation Power Plant Emissions Comparison for a 20 MW Flywheel-based Frequency Regulation Power Plant Beacon Power Corporation KEMA Project: BPCC.0003.001 May 18, 2007 Final Report with Updated Data Emissions Comparison for

More information

Transmission Grid Reliability And Performance Monitoring

Transmission Grid Reliability And Performance Monitoring Transmission Grid Reliability And Performance Monitoring NARUC s Summer Committee Meetings July 29, 2002 Portland, Oregon by Vikram S. Budhraja President, Electric Power Group, LLC Chair, Consortium for

More information

A Locational Analysis of Generation Benefits on Long Island, New York

A Locational Analysis of Generation Benefits on Long Island, New York LBNL-57506 ERNEST ORLANDO LAWRENCE BERKELEY NATIONAL LABORATORY A Locational Analysis of Generation Benefits on Long Island, New York Juan Wang, Jesse Cohen, Jennifer Edwards, and Chris Marnay Environmental

More information

Generation and Transmission Interconnection Process

Generation and Transmission Interconnection Process PJM Manual 14A Generation and Transmission Interconnection Process Revision: 18 Effective Date: January 28, 2016 Prepared by Planning Division Generation Interconnection Department PJM 2016 Table of Contents

More information

Convergence Bidding Tutorial & Panel Discussion

Convergence Bidding Tutorial & Panel Discussion Convergence Bidding Tutorial & Panel Discussion CAISO June 13, 2006 Joe Bowring PJM Market Monitor www.pjm.com Convergence Basics Day-Ahead Market basics Day-Ahead and Real-Time Market interactions Increment

More information

153 FERC 61,221 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER DIRECTING REPORTS. (Issued November 20, 2015) TABLE OF CONTENTS

153 FERC 61,221 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER DIRECTING REPORTS. (Issued November 20, 2015) TABLE OF CONTENTS 153 FERC 61,221 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Norman C. Bay, Chairman; Cheryl A. LaFleur, Tony Clark, and Colette D. Honorable. Price Formation in

More information

Operations Performance Metrics Monthly Report

Operations Performance Metrics Monthly Report Operations Performance Metrics Monthly Report June 2013 Report Operations & Reliability Department New York Independent System Operator Prepared by NYISO Operations Analysis and Services, based on settlements

More information

International Review of Demand Response Mechanisms

International Review of Demand Response Mechanisms International Review of Demand Response Mechanisms PREPARED FOR Australian Energy Market Commission PREPARED BY Toby Brown Samuel A. Newell David Luke Oates Kathleen Spees October 2015 This report was

More information

Load Dispatcher (Class Code 5223) Task List

Load Dispatcher (Class Code 5223) Task List A. Load Dispatching, General Load Dispatcher (Class Code 5223) Task List 1. Prior to work shift speaks to Load Dispatcher(s), reviews hardcopy and computer logs, and looks at the dispatcher's diagram board

More information

Load Participation in Ancillary Services

Load Participation in Ancillary Services Load Participation in Ancillary Services DOE Framing Workshop October 25-26, 2011 EnerNOC Inc. Proposed Agenda EnerNOC Overview Who, Where, How and What we do Demand Response for Ancillary Services Wholesale

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Price Formation in Energy and ) Docket No. AD14-14-000 Ancillary Services Markets Operated ) By Regional Transmission Organizations

More information

An Overview of the Midwest ISO Market Design. Michael Robinson 31 March 2009

An Overview of the Midwest ISO Market Design. Michael Robinson 31 March 2009 An Overview of the Midwest ISO Market Design Michael Robinson 31 March 2009 The Role of RTOs Monitor flow of power over the grid Schedule transmission service Perform transmission security analysis for

More information

Real-time Security-Constrained Economic Dispatch and Commitment in the PJM : Experiences and Challenges

Real-time Security-Constrained Economic Dispatch and Commitment in the PJM : Experiences and Challenges Real-time Security-Constrained Economic Dispatch and Commitment in the PJM : Experiences and Challenges Simon Tam Manager, Markets Coordination PJM Interconnection June 29, 2011 1 Real Time and Day Ahead

More information

Demand Response Market Overview. Glossary of Demand Response Services

Demand Response Market Overview. Glossary of Demand Response Services Demand Response Market Overview Glossary of Demand Response Services Open Energi has partnered with Tarmac to provide Demand Response What s inside... Market Overview Balancing Electricity Supply and Demand

More information

152 FERC 61,218 DEPARTMENT OF ENERGY FEDERAL ENERGY REGULATORY COMMISSION. 18 CFR Part 35. [Docket No. RM15-24-000]

152 FERC 61,218 DEPARTMENT OF ENERGY FEDERAL ENERGY REGULATORY COMMISSION. 18 CFR Part 35. [Docket No. RM15-24-000] 152 FERC 61,218 DEPARTMENT OF ENERGY FEDERAL ENERGY REGULATORY COMMISSION 18 CFR Part 35 [Docket No. RM15-24-000] Settlement Intervals and Shortage Pricing in Markets Operated by Regional Transmission

More information

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Reliability Technical Conference Docket No. AD16-15-000 Prepared Statement of Mark Rothleder on behalf of the California Independent System

More information

Concepts and Experiences with Capacity Mechanisms

Concepts and Experiences with Capacity Mechanisms Concepts and Experiences with Capacity Mechanisms Manuel Baritaud, International Energy Agency Conference Capacity Mechanisms: Experiences in Various European Countries Bundesministerium fur Wirtschaft

More information

INTRODUCTION TO SYNCHRONIZING AUTOMATIC SYNCHRONIZING CONSIDERATIONS AND APPLICATIONS

INTRODUCTION TO SYNCHRONIZING AUTOMATIC SYNCHRONIZING CONSIDERATIONS AND APPLICATIONS INTRODUCTION TO SYNCHRONIZING AUTOMATIC SYNCHRONIZING CONSIDERATIONS AND APPLICATIONS INTRODUCTION It is the intention of this presentation to provide an explanation of the automatic synchronizing process,

More information

Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid

Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid Pakistan Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid Final Report: Executive Summary - November 2015 for USAID Energy Policy

More information

USBR PLEXOS Demo November 8, 2012

USBR PLEXOS Demo November 8, 2012 PLEXOS for Power Systems Electricity Market Simulation USBR PLEXOS Demo November 8, 2012 Who We Are PLEXOS Solutions is founded in 2005 Acquired by Energy Exemplar in 2011 Goal People To solve the challenge

More information

New Brunswick Electricity Business Rules

New Brunswick Electricity Business Rules New Brunswick Electricity Business Rules Table of Contents Chapter 1 Chapter 2 Chapter 3 Chapter 4 Administration and Participation Transmission Planning and Connections Reliable Operations Billing and

More information

Outage Scheduling Manual

Outage Scheduling Manual MANUAL 29 Outage Scheduling Manual July 2015 Version: 4.3.1 Effective Date: 07/29/2015 Committee Acceptance: 6/11/2015 OC This document was prepared by: NYISO Energy Market Operations New York Independent

More information

ISO-NE Transmission Markets and Services Tariff Cross Sound Cable Business Practices. Version 10.0 April 17, 2013

ISO-NE Transmission Markets and Services Tariff Cross Sound Cable Business Practices. Version 10.0 April 17, 2013 ISO-NE Transmission Markets and Services Tariff Cross Sound Cable Business Practices Version 10.0 April 17, 2013 ISO-NE Transmission, Markets and Services Tariff Cross Sound Cable Business Practices Version

More information

MAINTAINING SYSTEM BLACKSTART IN COMPETITIVE BULK-POWER MARKETS

MAINTAINING SYSTEM BLACKSTART IN COMPETITIVE BULK-POWER MARKETS MAINTAINING SYSTEM BLACKSTART IN COMPETITIVE BULK-POWER MARKETS BRENDAN KIRBY and ERIC HIRST Consulting in Electric-Industry Restructuring Oak Ridge, Tennessee Restructuring the electric-power industry

More information

Natural Gas Pipeline Penalty Recovery Issue Paper

Natural Gas Pipeline Penalty Recovery Issue Paper Natural Gas Pipeline Penalty Recovery Issue Paper September 16, 2014 Table of Contents I. Introduction and Background... 3 II. Scope of Initiative and Plan for Stakeholder Engagement... 4 III. The Approved

More information

REVIEW OF APRIL 17, 2006 EMERGENCY ELECTRIC CURTAILMENT EVENT ERCOT COMPLIANCE JULY 21, 2006

REVIEW OF APRIL 17, 2006 EMERGENCY ELECTRIC CURTAILMENT EVENT ERCOT COMPLIANCE JULY 21, 2006 REVIEW OF APRIL 17, 2006 EMERGENCY ELECTRIC CURTAILMENT EVENT ERCOT COMPLIANCE JULY 21, 2006 1 Review of April 17, 2006 EECP Event EXECUTIVE SUMMARY:... 3 EVENT DESCRIPTION AND TIMELINE:... 3 EVENT ANALYSIS

More information

Customer Services and the Changing Needs of the CA Electricity Grid. Stanford University May 5, 2015

Customer Services and the Changing Needs of the CA Electricity Grid. Stanford University May 5, 2015 Customer Services and the Changing Needs of the CA Electricity Grid Stanford University May 5, 2015 Agenda Overview of DR CA Energy Policy DR in CA Other Markets System Needs Regional Resource Sharing?

More information

The Locational Based Marginal Prices ( LBMPs or prices ) for Suppliers and Loads in

The Locational Based Marginal Prices ( LBMPs or prices ) for Suppliers and Loads in 17.1 LBMP Calculation Method The Locational Based Marginal Prices ( LBMPs or prices ) for Suppliers and Loads in the Real-Time Market will be based on the system marginal costs produced by either the Real-

More information

PROCEDURE. Part 4.3: Real-Time Scheduling of the Physical Markets PUBLIC. Market Manual 4: Market Operations. Issue 44.

PROCEDURE. Part 4.3: Real-Time Scheduling of the Physical Markets PUBLIC. Market Manual 4: Market Operations. Issue 44. PUBLIC IMP_PRO_0034 PROCEDURE Market Manual 4: Market Operations Part 4.3: Real-Time Scheduling of the Physical Markets Issue 44.0 This procedure provides guidance to Market Participants on the Real-time

More information

Energy Ventures Analysis 1901 N. Moore St. Arlington, VA 22209 (703) 276 8900

Energy Ventures Analysis 1901 N. Moore St. Arlington, VA 22209 (703) 276 8900 T H E I M P A C T O F E A R L Y C O A L R E T I R E M E N T S O N K E Y P O W E R M A R K E T S ISO = 46.6% Prepared for: National Mining Association Washington, DC Northwest = 41.3% MISO = 36.8% NYISO

More information

Enabling End Users to see Real Time Price Signals and Manage their Own Electricity Costs via the PJM Demand Side Response Program Delaware DNREC

Enabling End Users to see Real Time Price Signals and Manage their Own Electricity Costs via the PJM Demand Side Response Program Delaware DNREC Enabling End Users to see Real Time Price Signals and Manage their Own Electricity Costs via the PJM Demand Side Response Program Delaware DNREC Joe Polidoro, Sr. Engineer PJM Interconnection, LLC 610-666-4693

More information

Overview and Comparison of Demand Response Programs in North American Electricity Markets

Overview and Comparison of Demand Response Programs in North American Electricity Markets , pp.22-29 http://dx.doi.org/10.14257/astl.205.97.04 Overview and Comparison of Demand Response Programs in North American Electricity Markets Pedro Faria 1, Zita Vale 1 1 GECAD Knowledge Engineering and

More information