1 PRODUCT MODELING OF BRIDGES RING ROAD III UPGRADE Minna Salonsaari, Development Engineer (BIM)

2 Content A-Insinöörit Oy Ring Road III Upgrade Lentoasemantie contract Lahdenväylä Porvoonväylä contract Conclusions

3 A-Insinöörit Oy

4 ,8 28,0 33,7 36,5 40,0 Turnover, EUR million A respected and versatile expert in information modelling Personnel Structural engineering A-INSINÖÖRIT Construction management Founded 1959 Branches Infrastructure design From our customers standpoint, we have a comprehensive service supply, strong professional expertise, and the ability to manage project entities. Our service is personalized to meet each customer s specific needs.

5 Tampere Finland

6 Corporate structure A-Insinöörit Oy CEO Jyrki Keinänen Structural engineering Business Area Director Seppo Raiski Espoo Tampere Turku Pori Construction management Business Area Director Antti Varpe Espoo Tampere Turku Pori Infrastructure design Business Area Director Vesa Järvinen ( ) Espoo Tampere

7 BIM&VDC Unit and ICT support BIM & VDC Softwares, Design Process and Technology 12 persons ICT Workstations, Servers, Phones, Network 5 persons

8 Wide-ranging international experience

9 Ring Road III Upgrade

10 RING ROAD III Ring Road III is part of the national E18 highway.

11 RING ROAD III UPGRADE

12 vehicles each working day Estimated to grow by 50% in M 50 M RING ROAD III UPGRADE

13 Modeling in projects Decision together with the customer Pilot projects Accuracy of models is exact Goal was: No drawings produced IFC and native model delivered to site Additional orders have been made for drawings 1 bridge to be constructed spring 2015 No drawings?

14 Softwares >350 softwares Structural design Tekla Structures, AutoCAD, AutoCAD LT BIMSight, Solibri Archicad Infrastructure design Tekla Civil (roads&streets) Tekla Structures (bridges) Novapoint (traffic) Infraworks (VDC) Autocad, Autocad LT (general) (Microstation &Terrasolid) FEM-softwares RFEM (concrete and wood) Staad.Pro (steel) Lusas (bridges) Ansys, Comsol Etc.

15 Lentoasemantie

16 17 New Bridges 3 Retaining Walls

17 Modelled structures Steel truss bridge Staircases Ramps 2 Retaining walls Rail decoration

18 STEEL TRUSS BRIDGE, KARHUMÄKI OVERPASS

19 STEEL TRUSS BRIDGE, KARHUMÄKI OVERPASS

20 STEEL TRUSS BRIDGE, KARHUMÄKI OVERPASS

21 STEEL TRUSS BRIDGE, KARHUMÄKI OVERPASS

22 STEEL TRUSS BRIDGE, KARHUMÄKI OVERPASS

23 STEEL TRUSS BRIDGE, KARHUMÄKI OVERPASS

24 STEEL TRUSS BRIDGE, KARHUMÄKI OVERPASS

25 RETAINING WALLS

26 RETAINING WALLS

27 RETAINING WALLS

28 RAIL DECORATION

29 RAIL DECORATION

30

31 Lahdenväylä - Porvoonväylä

32 12 New Bridges 5 Bridge Repair 2 Retainig Walls 2 km Noise Barriers Geotechnical Structures 26 Pile Slabs

33 Modelled structures 2 Bridges Västersundom Interchange A Västersundom Interchange B Retaining Wall 4 Pile Slabs

34 LAHDENVÄYLÄ - PORVOONVÄYLÄ

35 LAHDENVÄYLÄ - PORVOONVÄYLÄ

36 PILE SLABS

37 PILE SLABS

38 VÄSTERSUNDOM INTERCHANGE B

39 VÄSTERSUNDOM INTERCHANGE B

40 VÄSTERSUNDOM INTERCHANGE A

41 VÄSTERSUNDOM INTERCHANGE A

42 VÄSTERSUNDOM INTERCHANGE A

43 VÄSTERSUNDOM INTERCHANGE A

44 VÄSTERSUNDOM INTERCHANGE A

45 VÄSTERSUNDOM INTERCHANGE A

46 VÄSTERSUNDOM INTERCHANGE A

47 VÄSTERSUNDOM INTERCHANGE A

48 Conclusions

49 Challenges Modeling of concrete No curved shapes available for deck Cut edges harder to handle Modeling of reinforcment Different shapes Shape catalog Quantity take-off Steel structures 2 shapes: final and manufactured shape Models in use at site Framework?

50 Benefits Integration of all structures Existing structures Road structures / surfaces Bed-rock top surface Geometry Structure is the same for everyone Geometry of tendor easy to see Quantity take-off Concrete Reinforcement Etc. Site requirements

51 Future Västersundom interchange B to be constructed using only model Spring 2015 Västersundom interchange A was only practice No more perfect drawings Models to be used in sites Surveying Framework Softwares / Applications Customers will demand models Also during construction

52 Thank you A-Insinöörit solves the customer s most challenging problems with 500 skilled professionals

BIM-based falling prevention planning

BIM-based falling prevention planning BIM-based falling prevention planning BIM Safety research project, Pilot 1 Kristiina Sulankivi & Markku Kiviniemi VTT Technical Research Centre of Finland 2 Guardrail components for Pilot 1 (modelling

More information

SKANSKA S NEW HEADQUARTER IN HELSINKI, FINLAND. Tiina Koppinen Skanska Finland

SKANSKA S NEW HEADQUARTER IN HELSINKI, FINLAND. Tiina Koppinen Skanska Finland openbim building project: SKANSKA S NEW HEADQUARTER IN HELSINKI, FINLAND Skanska Finland 1 Contents t Skanska k Who are we? BIM Implementation in Skanska Globally openbim in Finland Example Skanska House,

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

Foreword. Version 1.0 27.03.2012 Parties to the COBIM project

Foreword. Version 1.0 27.03.2012 Parties to the COBIM project Series 12 author Insinööritoimisto Olof Granlund Oy: Markku Jokela, Tuomas Laine, Reijo Hänninen Foreword The publication series Common BIM 2012 is the result of a broadbased development project entitled

More information

Interoperability with Structural Disciplines

Interoperability with Structural Disciplines Interoperability with Structural Disciplines GRAPHISOFT Visit the GRAPHISOFT website at http://www.graphisoft.com for local distributor and product availability information. Interoperability with Structural

More information

SOLUTIONS FROM VIANOVA SYSTEMS

SOLUTIONS FROM VIANOVA SYSTEMS NovapointDCM & QuadriDCM Sydhavna, Oslo - Statens vegvesen/vianova SOLUTIONS FROM VIANOVA SYSTEMS The transport infrastructure industry worldwide is restructuring to meet increasing demands for shorter

More information

Inframodel 3 (4-5) InfraFINBIM / buildingsmart Infra Seminar 19 November 2013. Juha Hyvärinen, Senior Scientist

Inframodel 3 (4-5) InfraFINBIM / buildingsmart Infra Seminar 19 November 2013. Juha Hyvärinen, Senior Scientist InfraFINBIM / buildingsmart Infra Seminar 19 November 2013 Inframodel 3 (4-5) Juha Hyvärinen, Senior Scientist VTT Technical Research Centre of Finland 2 The Finnish Inframodel To improve information exchange

More information

InfraBIM Tiina Perttula 19.11.2013

InfraBIM Tiina Perttula 19.11.2013 InfraBIM Tiina Perttula 19.11.2013 The Finnish Transport Agency FTA Is a multidisciplinary expert organisation specialising in transport Responsible for the Finnish transport infrastructure and the overall

More information

BRIDGES ARE relatively expensive but often are

BRIDGES ARE relatively expensive but often are Chapter 10 Bridges Chapter 10 Bridges Bridg Bridges -- usually the best, but most expensive drainage crossing structure. Protect bridges against scour. BRIDGES ARE relatively expensive but often are the

More information

REHABILITATION OF NOVOARBATSKY BRIDGE IN MOSCOW

REHABILITATION OF NOVOARBATSKY BRIDGE IN MOSCOW 2005 New York City Bridge Conference September 12-13, 2005 REHABILITATION OF NOVOARBATSKY BRIDGE IN MOSCOW The Novoarbatsky Bridge across the Moskva River had been built in 1957 Plan of the bridge Steel

More information

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02. L_All_Vocatinal_Ed_Construction Sector: Construction Sr. No Specialisation Page No 1 Construction and Building Technology 02 1 P a g e 2 P a g e VOCATIONAL EDUCATIONAL QUALIFICATION FRAMEWORK (Sector -

More information

Trimble, TILOS & The Future

Trimble, TILOS & The Future Trimble, TILOS & The Future Alan Sharp Business Area Director Civil Engineering & Construction Division Trimble Navigation Ltd 16.10.2015 Marriott Hotel - Warszawa Wizualizacja projektów: BIM i planowanie

More information

Autodesk Revit LEARNING PATH BUILDING DESIGN SUITE

Autodesk Revit LEARNING PATH BUILDING DESIGN SUITE Autodesk Revit LEARNING PATH FUNDAMENTALS Duration: 3 days Cost: R5 500 (excl VAT) Revit MEP Duration: 3 days Cost: R5 500 (excl VAT) Revit Structure Duration: 3 days Cost: R5 500 (excl VAT) REVIT ADVANCED

More information

RoadBIM Seminar 11.09.2013 Tallinn

RoadBIM Seminar 11.09.2013 Tallinn RoadBIM Seminar 11.09.2013 Tallinn Ongoing Finnish InfraBIM Activities and the Finnish Inframodel Juha Hyvärinen, Senior Scientist VTT Technical Research Centre of Finland 3 Background Building Information

More information

BIM BUILDING INFORMATION MODELLING. Understanding its functions in the future of the Architectural profession.

BIM BUILDING INFORMATION MODELLING. Understanding its functions in the future of the Architectural profession. BIM BUILDING INFORMATION MODELLING. Understanding its functions in the future of the Architectural profession. Ar Chan Seong Aun 7 November 2015 SYNOPSIS Recently there have been many discussions both

More information

Building Information Modelling (BIM); How it Improves Building Performance. R.P. Kumanayake Lecturer, Department of Civil Engineering

Building Information Modelling (BIM); How it Improves Building Performance. R.P. Kumanayake Lecturer, Department of Civil Engineering Building Information Modelling (BIM); How it Improves Building Performance R.P. Kumanayake Lecturer, Department of Civil Engineering R.M.P.S. Bandara Lecturer, Department of Mechanical Engineering Faculty

More information

Olilo's AEC Design Services. SrinSoft Inc, Partners of

Olilo's AEC Design Services. SrinSoft Inc, Partners of Olilo's AEC Design Services SrinSoft Inc, Partners of Olilo provides design services that include design and analysis, cost estimation, 3D modeling, 2D drafting, conversion from 2D to 2D, quantity take-off,

More information

The Real Service Life and Repair Costs for Bridge Edge Beams

The Real Service Life and Repair Costs for Bridge Edge Beams The Real Service Life and Repair Costs for Bridge Edge Beams Hans-Åke MATTSSON*, Håkan SUNDQUIST ** *) MSc, PhD Student, Department of Civil and Architectural Engineering, Division of Structural Design

More information

SUPPLEMENTAL SPECIFICATIONS CROSS SLOPE VERIFICATION:

SUPPLEMENTAL SPECIFICATIONS CROSS SLOPE VERIFICATION: September 22, 2009 Updated November 16, 2009 SUPPLEMENTAL SPECIFICATIONS CROSS SLOPE VERIFICATION: 1. DESCRIPTION: The cross slopes of the roadway are to be constructed as detailed in the plans and within

More information

Lecturers: Per Kortegaard, Associate Professor, Arkitekt MAA Søren Sti Andersen, Arkitekt MAA, Aarhus Arkitekterne

Lecturers: Per Kortegaard, Associate Professor, Arkitekt MAA Søren Sti Andersen, Arkitekt MAA, Aarhus Arkitekterne Lecturers: Per Kortegaard, Associate Professor, Arkitekt MAA Søren Sti Andersen, Arkitekt MAA, Aarhus Arkitekterne What 3D? Building Information Modeling in 3D So what is BIM? And why? This is BIM The

More information

5 ALTERNATIVE SOLUTIONS AND EVALUATION

5 ALTERNATIVE SOLUTIONS AND EVALUATION Page 23 5 ALTERNATIVE SOLUTIONS AND EVALUATION The process used for the assessment and evaluation of the alternatives follows the procedures of the Municipal Class EA, as described below: Identify a reasonable

More information

BIM ACROSS THE DESIGN-BUILD-OPERATE LIFECYCLE

BIM ACROSS THE DESIGN-BUILD-OPERATE LIFECYCLE Division BIM ACROSS THE DESIGN-BUILD-OPERATE LIFECYCLE Mark Sawyer General Manager, Division Trimble Navigation Limited, Inc. Lifecycle Strategy PROJECT TEAM s Engineers General Contractor Subcontractors

More information

Turner Innovation Series BIM Conference Istanbul May 2012. Brian Krause, Dan Gramer, Turner Construction Company

Turner Innovation Series BIM Conference Istanbul May 2012. Brian Krause, Dan Gramer, Turner Construction Company 1 Why BIM? Excessive Re-Work and Waste TURNER INNOVATION SERIES May 2012 BIM for Design, Preconstruction, & Construction Brian Krause Manager, Integrated Building Solutions bkrause@tcco.com Value Value

More information

Common InfraBIM requirements YIV2015

Common InfraBIM requirements YIV2015 Common InfraBIM requirements YIV2015 Vol 1.0 MANAGING MODEL BASED PROJECT Quality control Interaction and collaboration Supervision and coordination Infra modeling Coordination of disciplines Gathering

More information

WORLD S TALLEST TIMBER BUILDING, BERGEN

WORLD S TALLEST TIMBER BUILDING, BERGEN WORLD S TALLEST TIMBER BUILDING, BERGEN Trondheim, Norway. 2014-09-26 M. Sc. Rune B Abrahamsen, Sweco, Lillehammer, Norway Bergen- og omegn boligbyggelag (BOB) is a Norwegian housing association. They

More information

Roadway Cost Per Centerline Mile Revised June 2014

Roadway Cost Per Centerline Mile Revised June 2014 Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743

More information

WORK SCOPE. Domains in which we work:

WORK SCOPE. Domains in which we work: WORK SCOPE Engineering consulting, technical office, assistance and supervision in industrial works. We specialize in structures, civil works and industrial equipment. Domains in which we work: Industrial

More information

USE OF MICROPILES IN TEXAS BRIDGES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch

USE OF MICROPILES IN TEXAS BRIDGES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch USE OF MICROPILES IN TEXAS BRIDGES by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch DEFINITION OF A MICROPILE A micropile is a small diameter (typically less than 12 in.), drilled and

More information

Construction automation and productivity - Industry perspective

Construction automation and productivity - Industry perspective Construction automation and productivity - Industry perspective Vice President R&D, Ilkka Romo Skanska Oy 22.1.2013 1 22.1.2013 Ilkka Romo Skanska in short One of the world s leading companies in construction

More information

C9 - BIM implementation on Stockholm Bypass Project Using PowerCivil. Trafikplats Akalla och Häggvik, ÅF-URS.

C9 - BIM implementation on Stockholm Bypass Project Using PowerCivil. Trafikplats Akalla och Häggvik, ÅF-URS. C9 - BIM implementation on Stockholm Bypass Project Using PowerCivil. Trafikplats Akalla och Häggvik, ÅF-URS. Track: Civil Presenter: Mateusz Nettmann AGENDA 1. Introduction: A. URS Company B. People involved

More information

BIM SOFTWARE EVALUATION MODEL FOR GENERAL CONTRACTORS

BIM SOFTWARE EVALUATION MODEL FOR GENERAL CONTRACTORS BIM SOFTWARE EVALUATION MODEL FOR GENERAL CONTRACTORS By JOSE MAURICIO RUIZ A THESIS PRESENTED TO THE GRADUATE SCHOOL OF THE UNIVERSITY OF FLORIDA IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE

More information

COBIM. Series 1. General part. Common BIM Requirements 2012. v 1.0

COBIM. Series 1. General part. Common BIM Requirements 2012. v 1.0 COBIM v 1.0 Common BIM Requirements 2012 Series 1 General part Foreword The publication series Common BIM Requirements 2012 is the result of a broad-based development project entitled COBIM. The need for

More information

Model based quality assurance process in a infra construction. Case Riippa-Eskola RU2 double rail project

Model based quality assurance process in a infra construction. Case Riippa-Eskola RU2 double rail project Model based quality assurance process in a infra construction project Case Riippa-Eskola RU2 double rail project M. Jaakkola a and P. Toppi a a Destia Ltd, Development of Infra construction, Finland E-mail:

More information

The unit costs are based on the trend line of the 3 low bids for the average quantity.

The unit costs are based on the trend line of the 3 low bids for the average quantity. Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally

More information

Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam

Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam Design of Bridges Introduction 3 rd to 4 th July 2012 1 FUNCTION OF A BRIDGE To connect two communities which are separated by streams, river, valley, or gorge, etc. 2 EVOLUTION OF BRIDGES 1. Log Bridge

More information

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E.

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E. Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir Presented By: Doug Stachler, P.E. Project Organization Owner Delaware County Engineers Office Design Consultant CH2M HILL Contractor Double

More information

Technical Analysis and High-End Structural Design

Technical Analysis and High-End Structural Design Capability Statement (Infrastructure & Buildings) Services ABES provides design and sub-consulting services in Australia and internationally. We are able to provide our services in a wide range of applications

More information

Elevated Roads for Sri Lanka

Elevated Roads for Sri Lanka Elevated Roads for Sri Lanka M.T.R. Jayasinghe (Senior Professor, Structural Engineering, University of Moratuwa) Senior Professor M.T.R. Jayasinghe is a Professor of Structural Engineering, University

More information

Tietomallintamisen läpimurto infra-alalla - tietomallintamisella automaatioon

Tietomallintamisen läpimurto infra-alalla - tietomallintamisella automaatioon PRE-ohjelman tulosseminaari, Dipoli, Otaniemi 18.11.2013 Tietomallintamisen läpimurto infra-alalla - tietomallintamisella automaatioon Rauno Heikkilä Oulun yliopisto Development of Infra Construction Technologies

More information

Building Information Modeling (BIM) Requirements for PT Projects Today s Capabilities for a BIM based Design

Building Information Modeling (BIM) Requirements for PT Projects Today s Capabilities for a BIM based Design Building Information Modeling (BIM) Requirements for PT Projects Today s Capabilities for a BIM based Design Florian Aalami CEO ADAPT Corporation florian@adaptsoft.com What is BIM? The ability to model

More information

Ch a p t e r 5. Bridges Decks and Boardwalks

Ch a p t e r 5. Bridges Decks and Boardwalks 05 Ch a p t e r 5 Park Structures Bridges Decks and Boardwalks Intentionally Blank Br i d g e s Chapter 5: Park Structures Pu r p o s e Bridges shall facilitate safe access across bodies of water, unstable

More information

ESI Consultants, Ltd. PROJECT EXPERIENCE

ESI Consultants, Ltd. PROJECT EXPERIENCE CRAWFORD COUNTY, ILLINOIS NBIS Program Manager and Bridge Inspection services provided for 123 structures throughout Crawford County. Routine Maintenance/Safety Inspection of existing bridges was performed

More information

Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding

Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding C Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding These guidelines are intended to provide assistance in selecting OFF-SYSTEM

More information

BIM in Finland today. TOMI HENTTINEN M.Sc. (Archit.) SAFA Gravicon Oy, CEO buildingsmart Finland, Chair FINLAND

BIM in Finland today. TOMI HENTTINEN M.Sc. (Archit.) SAFA Gravicon Oy, CEO buildingsmart Finland, Chair FINLAND BIM in Finland today TOMI HENTTINEN M.Sc. (Archit.) SAFA Gravicon Oy, CEO buildingsmart Finland, Chair GRAVICON BIM SERVICES BIM Manager Specifications and Supervision for BIM projects BIMwise WEB-Based

More information

CITY OF TRAIL MEMORANDUM

CITY OF TRAIL MEMORANDUM 0 C CITY OF TRAIL MEMORANDUM DATE: TO: FROM: SUBJECT: March 24, 2011 FILE NO. 5400-02 DAVID PEREHJJDOFF, CHIEF ADM1NTSTRATIVE OFFICER WARREN PROULX, ENGINEERING TECHMCIAN OLD TRAIL BRIDGE With the interest

More information

1,045 m length of the Deh Cho Bridge

1,045 m length of the Deh Cho Bridge Innovative Design Features: Lightweight truss: The principles of lightweight design led to a saving of 25% in the use of structural steel. State of the art deck system: Designed as a four-way slab, it

More information

- White Paper - Structural design with ArchiCAD, and its integration with structural software

- White Paper - Structural design with ArchiCAD, and its integration with structural software - White Paper - Structural design with ArchiCAD, and its integration with structural software - Great buildings need great structure - The Role of Structure in Architectural Design A building s architectural

More information

TABLE OF CONTENTS. INTRODUCTION... 5 Advance Concrete... 5 Where to find information?... 6 INSTALLATION... 7 STARTING ADVANCE CONCRETE...

TABLE OF CONTENTS. INTRODUCTION... 5 Advance Concrete... 5 Where to find information?... 6 INSTALLATION... 7 STARTING ADVANCE CONCRETE... Starting Guide TABLE OF CONTENTS INTRODUCTION... 5 Advance Concrete... 5 Where to find information?... 6 INSTALLATION... 7 STARTING ADVANCE CONCRETE... 7 ADVANCE CONCRETE USER INTERFACE... 7 Other important

More information

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 JRHill@HaywardBaker.com

More information

How To Write An Analysis System For Bridge Test

How To Write An Analysis System For Bridge Test Study of Analysis System for Bridge Test Chen Ke, Lu Jian-Ming, Research Institute of Highway, 100088, Beijing, China (chenkezi@163.com, lujianming@263.net) Summary Analysis System for Bridge Test (Chinese

More information

MASTER CLASS INTEGRATED PROJECT MANAGEMENT SOFTWARE REPORT 2009. Timo Hartmann t.hartmann@ctw.utwente.nl

MASTER CLASS INTEGRATED PROJECT MANAGEMENT SOFTWARE REPORT 2009. Timo Hartmann t.hartmann@ctw.utwente.nl Technical Paper #5 MASTER CLASS INTEGRATED PROJECT MANAGEMENT SOFTWARE REPORT 2009 Timo Hartmann t.hartmann@ctw.utwente.nl COPYRIGHT 2009 VISICO Center, University of Twente visico@utwente.nl Integrated

More information

Ross River Suspension Bridge Ross River, Yukon. Life Cycle Cost Analysis

Ross River Suspension Bridge Ross River, Yukon. Life Cycle Cost Analysis DNA project managers planners architects engineers David Nairne + Associates Ltd Suite 250 171 W Esplanade North Vancouver British Columbia Canada V7M 3J9 T 604 984 3503 F 604 984 0627 E dna@ davidnairne.com

More information

Advancements in GPR for a Sustainable Tomorrow

Advancements in GPR for a Sustainable Tomorrow Advancements in GPR for a Sustainable Tomorrow Shawn Lapain, BSc. E., EIT Pavement Specialist Applied Research Associates Inc. 5401 Eglinton Avenue West, Suite 105, Toronto, ON, Canada, M9C 5K6 Tel: 416-621-9555,

More information

Collaborative Engineering with IFC: common practice in the Netherlands

Collaborative Engineering with IFC: common practice in the Netherlands Collaborative Engineering with IFC: common practice in the Netherlands Léon van Berlo, leon.vanberlo@tno.nl Netherlands organisation for applied scientific research TNO, Delft, The Netherlands Gijs Derks,

More information

Numerical modelling of shear connection between concrete slab and sheeting deck

Numerical modelling of shear connection between concrete slab and sheeting deck 7th fib International PhD Symposium in Civil Engineering 2008 September 10-13, Universität Stuttgart, Germany Numerical modelling of shear connection between concrete slab and sheeting deck Noémi Seres

More information

NETLIPSE NETWORK MEETING 27-28.5.2013 Seppo Mäkinen Finnish Transport Agency 27.5.2013

NETLIPSE NETWORK MEETING 27-28.5.2013 Seppo Mäkinen Finnish Transport Agency 27.5.2013 NETLIPSE NETWORK MEETING 27-28.5.2013 Seppo Mäkinen Finnish Transport Agency 27.5.2013 Mainroad 4 Järvenpää Lahti PPP Project 1997 2012 FINLAND 27.5.2013 27.5.2013 Seppo Mäkinen Mainroad 4 Järvenpää -

More information

COBIM. Series 8. Use of models for visualization. Common BIM Requirements 2012. v 1.0

COBIM. Series 8. Use of models for visualization. Common BIM Requirements 2012. v 1.0 COBIM v 1.0 Common BIM Requirements 2012 Series 8 Use of models for visualization Foreword The publication series Common BIM Requirements 2012 is the result of a broadbased development project entitled

More information

BIM-based Safety Management and Communication for Building Construction

BIM-based Safety Management and Communication for Building Construction VTT RESEARCH NOTES 2597 Markku Kiviniemi, Kristiina Sulankivi, Kalle Kähkönen, Tarja Mäkelä & Maija-Leena Merivirta BIM-based Safety Management and Communication for Building Construction VTT TIEDOTTEITA

More information

1 Introduction. Kari I. Leväinen

1 Introduction. Kari I. Leväinen 1 Introduction Kari I. Leväinen Professor of Real Estate and Facilities Management, Helsinki University of Technology, Institute of Real Estate Studies, PL 1200, FIN-02015 TKK The municipal organisations

More information

REHABILITATION OF CONCRETE BEAM BRIDGES IN CROATIAN STATE ROAD NETWORK

REHABILITATION OF CONCRETE BEAM BRIDGES IN CROATIAN STATE ROAD NETWORK REHABILITATION OF CONCRETE BEAM BRIDGES IN CROATIAN STATE Danijel Tenžera, Krešimir Futivić, Boris Ukrainczyk Summary Bridge structures deteriorate with years of use and exposure to adverse environmental

More information

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No. Classification: Cluster: Location: Total Area: No. of Stories Aquarium Acreage Owned: Acquired: 1904 Most Recent Improvements: THE AQUARIUM Close to junction of Inselrhue and Loiter Way, Belle Isle Two

More information

BIM and API Extensions

BIM and API Extensions REVIT BUILDING INFORMATION MODELING BIM and API Extensions This whitepaper explains how the utility of BIM solutions such as Revit Structure software can be broadened through the use of specialized software

More information

CAPPELEN MEMORIAL BRIDGE REHABILITATION

CAPPELEN MEMORIAL BRIDGE REHABILITATION CAPPELEN MEMORIAL BRIDGE REHABILITATION Owner: Hennepin County Engineering: HNTB with Olson-Nesvold Engineering (ONE) and others Section 106 Historical Committee: Hennepin County, MnDOT Cultural Resources

More information

Vico Office R3.0 Help

Vico Office R3.0 Help 1 Vico Office R3.0 Help User guide 2 Contents 3 Vico Office R3.0 Help Revision 1 4 Vico Office Introduction Welcome to Vico Office, Vico's integrated Virtual Construction environment. The Vico Office Suite

More information

INITIAL SITE INSPECTION OF MOTORCYCLE COLLISIONS WITH ROADSIDE OBJECTS IN NEW JERSEY

INITIAL SITE INSPECTION OF MOTORCYCLE COLLISIONS WITH ROADSIDE OBJECTS IN NEW JERSEY INITIAL SITE INSPECTION OF MOTORCYCLE COLLISIONS WITH ROADSIDE OBJECTS IN NEW JERSEY Allison Daniello Ben Powell Nicholas Schaeffer Aaliyah McClinton Yusuf Mehta Rowan University United States Kimberly

More information

LOAD TESTING OF SOME NEW BRIDGES IN LATVIA

LOAD TESTING OF SOME NEW BRIDGES IN LATVIA LOAD TESTING OF SOME NEW BRIDGES IN LATVIA Edmunds Akimovs, Civ.Eng., Bridge Engineer, Consulting Company Inzenierbuve, Address: Azenes st. 20, Riga, LV1048, Latvia. E-mail: eakimovs@inzenierbuve.lv Ainars

More information

Civil Engineering and Architecture (CEA) Detailed Outline

Civil Engineering and Architecture (CEA) Detailed Outline Civil Engineering and Architecture (CEA) Detailed Outline Unit 1: Overview of Civil Engineering and Architecture (23 days) Lesson 1.1: History of Civil Engineering and Architecture 1. Many features of

More information

3.1 Historical Considerations

3.1 Historical Considerations 3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible

More information

Tekla Structures More than a detailing tool. Precast concrete

Tekla Structures More than a detailing tool. Precast concrete Tekla Structures More than a detailing tool Precast concrete Much more Than a detailing tool a Tekla Structures is much more than design and detailing software: it is the most accurate and comprehensive

More information

~iffiui ~ Bridge Condition Survey. Inspection Date: 21 May 2003 District: San Angelo County: Tom Green Highway:

~iffiui ~ Bridge Condition Survey. Inspection Date: 21 May 2003 District: San Angelo County: Tom Green Highway: Texas Depadment of Transpo,tation Bridge Condition Survey Inspection Date: 21 May 2003 District: San Angelo County: Tom Green Highway: Irving Street Facility Name: Lone Wolf Bridge Structure Number: B00315-031

More information

SharePoint for Engineering Document Management & Control

SharePoint for Engineering Document Management & Control SharePoint for Engineering Document Management & Control Managing and controlling engineering documents and drawings with SharePoint A white paper by Cadac Organice BV Date: 01-03-2012 Table of contents

More information

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition. Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer

More information

Maintenance and Management of JR East Civil Engineering Structures

Maintenance and Management of JR East Civil Engineering Structures Maintenance and Management of JR East Civil Engineering Structures Tadayoshi Niitsu Introduction Japan s problem of aging population and declining birth-rate has been known for years and the labour force,

More information

Exterior Elevated Elements Inspection Guidelines

Exterior Elevated Elements Inspection Guidelines Exterior Elevated Elements Inspection Guidelines Planning and Development 1. Guideline Purpose These guidelines are intended to assist practicing professionals in complying with Berkeley Municipal Code

More information

05-15-98 CIVIL ENGINEERING ASSOCIATE, 7246

05-15-98 CIVIL ENGINEERING ASSOCIATE, 7246 CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION POSTED JUNE 1999 05-15-98 CIVIL ENGINEERING ASSOCIATE, 7246 Summary of Duties: Performs professional civil engineering work in researching,

More information

Introduction to Structural Drafting

Introduction to Structural Drafting DFTG-1352 Structural Drafting Trung Dao, Instructor Introduction to Structural Drafting Update: Jan 12-2013 Copyright 2006 by K. Plantenberg Restricted use only OBJECTIVES Define structural drafting Indentify

More information

reality Revit check Autodesk have long Identify possible Utilize structural Tool Works Building bcg.com

reality Revit check Autodesk have long Identify possible Utilize structural Tool Works Building bcg.com Autodesk Revit reality check for residential construction: Scott Babin Illinois Tool Works, Building Components Group AB6105-V Using Autodesk Revit for architectural and structural design in the residential

More information

Granger Bay Boulevard and Green Point Roundabout

Granger Bay Boulevard and Green Point Roundabout Granger Bay Boulevard and Green Point Roundabout INTRODUCTION Aurecon was appointed for the design and construction supervision of the Granger Bay Boulevard and Green Point roundabout that provides access

More information

Paving Capitalization Work Categories and Treatments

Paving Capitalization Work Categories and Treatments Statement of ODOT Infrastructure Capitalization Policy Government Accounting Standards Board (GASB) 34 requires public agencies to capitalize infrastructure assets on their financial statements for periods

More information

ODOT Major Construction, Bikeways and Enhancements Report for Lucas County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Lucas County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Lucas County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #

More information

COBIM. Series 3. Architectural design. Common BIM Requirements 2012. v 1.0

COBIM. Series 3. Architectural design. Common BIM Requirements 2012. v 1.0 COBIM v 1.0 Common BIM Requirements 2012 Series 3 Architectural design Series 3 Author Gravicon Oy Tomi Henttinen Foreword The publication series Common BIM Requirements 2012 is the result of a broad-based

More information

3 Tappan Zee Bridge Rehabilitation Options

3 Tappan Zee Bridge Rehabilitation Options 3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:

More information

Autodesk Robot Structural Analysis Professional 2010. Break it down before you build it up.

Autodesk Robot Structural Analysis Professional 2010. Break it down before you build it up. Autodesk Robot Structural Analysis Professional 2010 Break it down before you build it up. Building Information Modeling for Structural Engineering Integrated tools for modeling, coordination, analysis,

More information

IH-635 MANAGED LANES PROJECT, SEG. 3.2

IH-635 MANAGED LANES PROJECT, SEG. 3.2 IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,

More information

Slab Track Austria. System ÖBB-PORR elastically supported slab

Slab Track Austria. System ÖBB-PORR elastically supported slab Slab Track Austria System ÖBB-PORR elastically supported slab 5. 2. 3. 4. 7. 6. Five holes for spindles 2. ÖBB-PORR slab 3. elastomeric layer 4. concrete joint sealing compound 5. rail support seat 6.

More information

The rail engineering service provider. Consulting, planning, project management

The rail engineering service provider. Consulting, planning, project management The rail engineering service provider Consulting, planning, project management The rail engineering service provider Rail infrastructure is a complex system in which all the elements must be precisely

More information

New construction Repairing failed or old foundations Retrofit foundations Permanent battered piers Machinery/equipment foundations

New construction Repairing failed or old foundations Retrofit foundations Permanent battered piers Machinery/equipment foundations from New construction foundations don t have to be a headache. The CHANCE Helical Pier Foundation System gives you the performance of concrete without the drawbacks and liabilities of driven piles and

More information

BIM: FOR PROJECT MANAGERS. 2011 CSI Southwest Region Conference Program 1B 8:45am 11:00am

BIM: FOR PROJECT MANAGERS. 2011 CSI Southwest Region Conference Program 1B 8:45am 11:00am BIM: FOR PROJECT MANAGERS ANA BAKER BRANDON GARRETT 2011 CSI Southwest Region Conference Program 1B 8:45am 11:00am 1 2 3 4 BIM Overview BIM Level of Development Evolution of the Drawing Process BIM Workflow

More information

REFOR-tec REPAIR AND STRENGTHENING OF STRUCTURES WITH U.H.P.F.R.C.C. Ultra High Performance Fiber Reinforced Cementitious Composites

REFOR-tec REPAIR AND STRENGTHENING OF STRUCTURES WITH U.H.P.F.R.C.C. Ultra High Performance Fiber Reinforced Cementitious Composites REFOR-tec REPAIR AND STRENGTHENING OF STRUCTURES WITH U.H.P.F.R.C.C. Ultra High Performance Fiber Reinforced Cementitious Composites Lisbon, 25 th of October 2013 TECNOCHEM ITALIANA SpA Dr. D. Rosignoli

More information

How To Understand Building Information Modeling

How To Understand Building Information Modeling BIM (Building Information Modeling) and Pedagogical Challenges Jeong Han Woo Western Illinois University Macomb, IL BIM is a new building design and documentation methodology that makes the construction

More information

How To Study The Use Of Information Technology In Road Construction

How To Study The Use Of Information Technology In Road Construction Research Programme: The Application of Information Technology in Mechanical, Civil and Automation Engineering (KITARA) 2005-2009 ICT and automation applications in road repairing and road construction

More information

BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM

BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM Swaminathan Srinivasan, P.E., M.ASCE H.C. Nutting/Terracon David Tomley, P.E., M.ASCE KZF Design Delivering Success for

More information

Road Asset Management

Road Asset Management Road Asset Management A Tolling Experience July 2011 Barry King Construction & Asset Engineer ConnectEast Group Australia s largest road project ConnectEast EastLink is owned and operated by ConnectEast.

More information

New Business Models in Construction

New Business Models in Construction New Business Models in Construction Results of the Finnish BIM Survey 2013 CIB BIM & IDDS Seminar, Tokyo 1.11.2013 Dipl. Ing. Helena Soimakallio, M. Sc. (CE), B. Sc. (BA), M. aff. ASCE Managing Director

More information

Fall protection systems and practices Duty to have fall protection Protection at or above 6' level.

Fall protection systems and practices Duty to have fall protection Protection at or above 6' level. Duty to have fall protection Protection at or above 6' level. Walking/working surfaces inspected before work begins. Employees can only work on surfaces strong enough to support them. Page 1 Protection

More information

Built Environment Process Reengineering (PRE): Infra FINBIM

Built Environment Process Reengineering (PRE): Infra FINBIM RAKENNETTU YMPÄRISTÖ Tarvitaanko tätä palkkia? (PRE): Infra FINBIM buildingsmart and Infra FINBIM - Nordic Workshop in Helsinki November 30th 2011 30.11.2011 Built Built Environment Process Innovations

More information

Mari Karttunen, NCC Housing Property Development Manager, Architecture. 7.10.2014 NCC-yhtiöt 1

Mari Karttunen, NCC Housing Property Development Manager, Architecture. 7.10.2014 NCC-yhtiöt 1 Mari Karttunen, NCC Housing Property Development Manager, Architecture 7.10.2014 NCC-yhtiöt 1 1. NCC 2. VDC in NCC 3. Positive experience 1. NOVO, Denmark 2. KVÆSTHUSBROEN, Denmark 4. Savings 1. Renovation

More information

Preliminary steel concrete composite bridge design charts for Eurocodes

Preliminary steel concrete composite bridge design charts for Eurocodes Preliminary steel concrete composite bridge 90 Rachel Jones Senior Engineer Highways & Transportation Atkins David A Smith Regional Head of Bridge Engineering Highways & Transportation Atkins Abstract

More information

Design of an Orphanage, Learning and Community Center in Ethiopia Abstract

Design of an Orphanage, Learning and Community Center in Ethiopia Abstract Design of an Orphanage, Learning and Community Center in Ethiopia Abstract An Ethiopian immigrant approached us to design an orphanage, learning and community center on her 10-acre property in Ethiopia.

More information