PRIORITIZATION MODEL RESULTS AIRPORT Prioritization Project Prioritization Rank Name Score 1 Terminal Auto Parking Lot Expansion 55.

Size: px
Start display at page:

Download "PRIORITIZATION MODEL RESULTS AIRPORT Prioritization Project Prioritization Rank Name Score 1 Terminal Auto Parking Lot Expansion 55."

Transcription

1 PRIORITIZATION MODEL RESULTS AIRPORT itization Project itization Rank Name Score 1 Terminal Auto Parking Lot Expansion Runway Safety Extension Terminal Expansion Runway Rehabilitation and Pavement Markings Looping Water Main Rehabilitate and Expand Terminal Apron with Lighting Reconstruct Southeast and Northeast Taxiways Access Road Reconstruction ( Blvd) Stormwater Detention Pond and System Taxilane for Box Hangers Six Box Hangers New Corporate Hanger 13.95

2 FIGURE 1 Benefit Score by Criteria Weight Composition Be enefit Score Energy O & M (Operations & Maintenance) System Influence/Capacity Partnerships Economic Development/Retention Innovation User Experience (Level of Service) Coordination with Other Projects Funding Master Plan Objectives Sustainability Framework Goals Safety/Compliance/Emergency Preparedness 10 0 Project

3 PROJECT NAME: Access Road Reconstruction ( Blvd) Project ID: TR AP itization Model Rank: 8 Project Type: Capital Maintenance itization Model Score: Rehabilitation of existing Blvd. Include pedestrain sidepath along one side of Blvd (approximately 2000 LF); include boulevard entrance at Ellsworth; install curb and gutter and conveyance storwater pipes thereby reducing flow to County drain system Condition Analysis Design Start: October December 2015 Design End: January March 2016 $32, Construction: April June 2016 To: October December 2016 $407, enue Source Name 2748 $0 $22 $0 $0 $0 $0 $0 $0 $ MI: Other State Grants (, MDNR) $0 $417 $0 $0 $0 $0 $0 $0 $417 $0 $439 $0 $0 $0 $0 $0 $0 $439

4 PROJECT NAME: Looping Water Main Project ID: TR AP itization Model Rank: 5 Project Type: New Construction itization Model Score: City Completion of water main loop identified during plan review of new box hangars Twp involvement with connecting to Twp main in Ellsworth. Backflow prevention. Capacity Analysis Master Plan 1: Master Plan 2: Design Start: October December 2017 Design End: January March 2019 $30, Construction: April June 2019 To: July September 2019 $300, enue Source Name 2748 $0 $0 $0 $330 $0 $0 $0 $0 $330 $0 $0 $0 $330 $0 $0 $0 $0 $330

5 PROJECT NAME: Storm Water Detention Pond and System Project ID: TR AP itization Model Rank: 9 Project Type: New Construction & Replacement itization Model Score: Modification of the airport's stormwater drainage and detention system for the airport's existing and future facilities north of the Wood Drain Creekshed, including the removal of an small, existing pond at the Bijan Air facility. Market driven (need for additional hangars) Allowance for future hanger develo Design Start: October December 2023 Design End: January March 2024 $15, Construction: April June 2024 To: July September 2024 $113, enue Source Name 2748 $0 $0 $0 $0 $0 $0 $0 $6 $ MI: Other State Grants (, MDNR) $0 $0 $0 $0 $0 $0 $0 $122 $122 $0 $0 $0 $0 $0 $0 $0 $128 $128

6 PROJECT NAME: New Corporate Hangar Project ID: TR AP itization Model Rank: 12 Project Type: New Construction itization Model Score: New corporate hangar near terminal Economy driven for need Tenants Capacity Analysis Master Plan 1: Master Plan 2: Design Start: October December 2017 Design End: January March 2018 $70, Construction: April June 2018 To: October December 2018 $930, enue Source Name 2748 $0 $0 $0 $1,000 $0 $0 $0 $0 $1,000 $0 $0 $0 $1,000 $0 $0 $0 $0 $1,000

7 PROJECT NAME: Reconstruct Southeast and Northeast Taxiways Project ID: TR AP itization Model Rank: 7 Project Type: Replacement itization Model Score: Southeast and Northeast Taxiways Reconstruction of aged pavements Examine possible use of permeable pavement; coordination with tenants Condition Analysis Planning Start: 0 Planning End: 0 $0.00 Design Start: July September 2021 Design End: October December 2021 $75, Construction: April June 2022 To: July September 2022 $1,063, enue Source Name 2260 MI: Other State Grants (, MDNR) $0 $0 $0 $0 $0 $0 $0 $1,138 $1,138 $0 $0 $0 $0 $0 $0 $0 $1,138 $1,138

8 PROJECT NAME: Rehabilitate and Expand Terminal Apron with Lighting Project ID: TR AP itization Model Rank: 6 Project Type: New Construction & Replacement itization Model Score: Rehabilitate existing and expand terminal apron. Replace existing terminal apron lighting and install lighting for the new general aviation aircraft parking apron. Examine use of LED's. Condition Analysis Customer Level of Service Capacity Analysis Design Start: October December 2021 Design End: January March 2022 $100, Construction: April June 2022 To: July September 2022 $1,457, enue Source Name 2748 $0 $0 $0 $0 $0 $0 $0 $78 $ MI: Other State Grants (, MDNR) $0 $0 $0 $0 $0 $0 $0 $1,479 $1,479 $0 $0 $0 $0 $0 $0 $0 $1,557 $1,557

9 PROJECT NAME: Runway Rehabilitation and Pavement Markings Project ID: TR AP itization Model Rank: 4 Project Type: Capital Maintenance itization Model Score: 43.8 Rehabilitate aging runways Refresh pavement markings for runways and taxiways; miscellaneous concrete repairs to runways and taxiways Condition Analysis Customer Level of Service Master Plan 1: Master Plan 2: Planning Start: 0 Planning End: 0 $0.00 Design Start: July September 2017 Design End: October December 2017 $16, Construction: April June 2018 To: July September 2018 $154, enue Source Name 2748 $0 $0 $0 $170 $0 $0 $0 $0 $170 $0 $0 $0 $170 $0 $0 $0 $0 $170

10 PROJECT NAME: Runway Safety Extension Project ID: TR AP itization Model Rank: 2 Project Type: New Construction itization Model Score: (Runway 6 24) Addressing local safety concerns clearance at State Road (15 foot minimum) and Part 77 Transitional Surface (steep approach angle); line of sight problem from tower; runway overruns. B2 aircraft critical aircraft under state (4300 foot runway recommended), existing runway 3500 feet; Consider State Rd Corridor Study recommendations; shifting runway to southwest to address safety concerns; LED's; include approach study; rehabilitate WC Master Plan 3: State Road Corridor Study (Pittsfield) Master Plan 4: Design Start: January March 2015 Design End: April June 2015 $233, Construction: July September 2015 To: October December 2015 $2,656, enue Source Name 2748 $0 $144 $0 $0 $0 $0 $0 $0 $ MI: Other State Grants (, MDNR) $0 $2,745 $0 $0 $0 $0 $0 $0 $2,745 $0 $2,889 $0 $0 $0 $0 $0 $0 $2,889

11 PROJECT NAME: Six Box Hangers Project ID: TR AP itization Model Rank: 11 Project Type: New Construction itization Model Score: Additional tenant space Timing based on market demand. Tenants Capacity Analysis Design Start: October December 2017 Design End: January March 2018 $100, Construction: April June 2018 To: October December 2018 $900, enue Source Name 2748 $0 $0 $0 $1,000 $0 $0 $0 $0 $1,000 $0 $0 $0 $1,000 $0 $0 $0 $0 $1,000

12 PROJECT NAME: Taxilane For Box Hangers Project ID: TR AP itization Model Rank: 10 Project Type: New Construction itization Model Score: Connect new box hangers to taxiway Timing based on market demand for new box hangers Tenants Capacity Analysis Planning Start: July September Planning End: July September $0.00 Design Start: October December 2022 Design End: January March 2023 $12, Construction: April June 2023 To: October December 2023 $181, enue Source Name 2748 $0 $0 $0 $0 $0 $0 $0 $10 $ MI: Other State Grants (, MDNR) $0 $0 $0 $0 $0 $0 $0 $183 $183 $0 $0 $0 $0 $0 $0 $0 $193 $193

13 PROJECT NAME: Terminal Auto Parking Lot Expansion Project ID: TR AP itization Model Rank: 1 Project Type: New Construction itization Model Score: Expand existing terminal area automobile parking lot. Examine parking lot standards for Pittsfield Township with goal to achieve them; consider porous pavement and rain gardens (stormwater BMP's), LED lighting. Capacity Analysis Design Start: July September 2016 Design End: October December 2016 $33, Construction: April June 2017 To: October December 2017 $323, enue Source Name 2748 $0 $0 $18 $0 $0 $0 $0 $0 $ MI: Other State Grants (, MDNR) $0 $0 $338 $0 $0 $0 $0 $0 $338 $0 $0 $356 $0 $0 $0 $0 $0 $356

14 PROJECT NAME: Terminal Expansion Project ID: TR AP itization Model Rank: 3 Project Type: New Construction & Capital Maintenance itization Model Score: Expand terminal to include full access (day and night), accessible restrooms and meeting room(s) and pilot's lounge. Energy improvements; examine use of green roof Capacity Analysis Condition Analysis Customer Level of Service Design Start: October December 2018 Design End: January March 2019 $57, Construction: April June 2019 To: July September 2019 $704, enue Source Name 2748 $0 $0 $0 $0 $38 $0 $0 $0 $ MI: Other State Grants (, MDNR) $0 $0 $0 $0 $723 $0 $0 $0 $723 $0 $0 $0 $0 $761 $0 $0 $0 $761

Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices

Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices Amy H. Brennan (440) 975-3870 www.crwp.org abrennan@crwp.org Chagrin River Watershed Partners Formed

More information

Strategic Business Plan

Strategic Business Plan Williams Gateway Airport Authority Strategic Business Plan Fiscal Years 2011-2015 Adopted May 24, 2010 by the Phoenix-Mesa Gateway Airport Authority Board of Directors Page 2 TABLE OF CONTENTS Purpose...4

More information

Cuyahoga County Airport - A Guide to Funding Capital Improvements

Cuyahoga County Airport - A Guide to Funding Capital Improvements 7.01 General CHAPTER 7 - FINANCIAL PLAN This chapter presents a financial plan to assist with future capital improvements and provide a guide for implementing the development of Cuyahoga County Airport.

More information

Existing Facilities. Current and Forecast Demand

Existing Facilities. Current and Forecast Demand Existing Facilities JIA is served by a number of airside and landside facilities. There are two runways that serve the airport in an open V configuration. The Annual Service Volume (ASV) of the runway

More information

Green Streets, Places, and Spaces

Green Streets, Places, and Spaces Thursday October 23, 2014 Green Streets, Places, and Spaces Green Streets reduce stormwater runoff and improve a street s ecological performance. Often, strategies for sustainable stormwater management

More information

Pavement Maintenance Management Katie Zimmerman, P.E. Applied Pavement Technology, Inc. (APTech)

Pavement Maintenance Management Katie Zimmerman, P.E. Applied Pavement Technology, Inc. (APTech) Pavement Maintenance Management Katie Zimmerman, P.E. Applied Pavement Technology, Inc. (APTech) Presentation Approach Definitions Importance System Components Use of Technology Wrap-Up How Would You Describe

More information

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall

More information

Integrating Asset Management Principals to Watershed Management: A Risk-Based Approach to Managing Stormwater Assets

Integrating Asset Management Principals to Watershed Management: A Risk-Based Approach to Managing Stormwater Assets Integrating Asset Management Principals to Watershed Management: A Risk-Based Approach to Managing Stormwater Assets Presenters: Mark VanAuken, PE, CMS4S, ENV SP Stormwater/MS4 Discipline Leader Kevin

More information

Implementing Green Infrastructure in Atlanta

Implementing Green Infrastructure in Atlanta City of Atlanta Mayor Kasim Reed Department of Watershed Management Implementing Green Infrastructure in Atlanta SESWA Southeast Regional Stormwater Seminar April 9, 2014 Jo Ann J. Macrina, P.E. Commissioner

More information

The City of Rockwall Request for Proposals for Fixed Base Operator Services at Ralph M. Hall / Rockwall Municipal Airport

The City of Rockwall Request for Proposals for Fixed Base Operator Services at Ralph M. Hall / Rockwall Municipal Airport The City of Rockwall Request for Proposals for Fixed Base Operator Services at Ralph M. Hall / Rockwall Municipal Airport All proposals shall be addressed to: City of Rockwall Attn: Lea Ann Ewing, Purchasing

More information

MICHIGAN AIRPORT DEVELOPMENT PROGRAM PACKAGE MDOT Office of Aeronautics. Airport Capital Improvement Plan 2014-2018

MICHIGAN AIRPORT DEVELOPMENT PROGRAM PACKAGE MDOT Office of Aeronautics. Airport Capital Improvement Plan 2014-2018 MICHIGAN AIRPORT DEVELOPMENT PROGRAM PACKAGE MDOT Office of Aeronautics Airport Capital Improvement Plan 20142018 Prepared for: West Michigan Regional Airport Holland, Michigan August 2013 Contact: Mr.

More information

SECTION 108 - INLETS 108.1 INLET LOCATIONS

SECTION 108 - INLETS 108.1 INLET LOCATIONS Greene County Design Standards -Adopted April 5, 1999 SECTION 108 - INLETS SECTION 108 - INLETS 108.1 INLET LOCATIONS 108.2 INLET INTERCEPTION CAPACITIES 108.2.1 Clogging Factors 108.3 INTERCEPTION AND

More information

CASFM Stormwater Quality Field Trip June 23rd, 2011

CASFM Stormwater Quality Field Trip June 23rd, 2011 CASFM Stormwater Quality Field Trip June 23rd, 2011 The 2011 CASFM Stormwater field trip included 42 attendees coming from as far south as Colorado Springs up to the Denver area and another 12 who joined

More information

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT Volkert Field Office 80 M Street SE, Suite 725 Washington, DC 20003 RIVERSMART WASHINGTON - CONSTRUCTION RIVERSMART MACFARLAND, RIVERSMART LAFAYETTE AND GREEN ALLEYS CHEVY CHASE D.C. Contract No.: DCKA-2013-C-0160

More information

AREA: 2.37 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF. Single-family, Non-conforming machine shop

AREA: 2.37 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF. Single-family, Non-conforming machine shop FILE NO.: Z-8958 NAME: Rock Structure Repair Short-form PID LOCATION: Located at 8024 Stanton Road DEVELOPER: Rock Structure Repair Attn. Rudy Gutierrez 3 Kipling Court Little Rock, AR 72209 ENGINEER:

More information

City of Minot CDBG Disaster Recovery Action Plan Amendment #3

City of Minot CDBG Disaster Recovery Action Plan Amendment #3 City of Minot CDBG Disaster Recovery Action Plan Amendment #3 Table 2: Method of Distribution for Program Activities. Project delivery costs are in green [AMENDMENT #2 ADDED PROJECT DELIVERY TO EACH ACTIVITY]

More information

Fairlington Community Center

Fairlington Community Center Williamsburg Boulevard Green Street Project June 13, 2012 Williamsburg Middle School Relevant Outreach November 12, 2008: Introduction to Little Pimmit Run Watershed Retrofits Workshop, Yorktown High School

More information

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements Presentation July 23, 2014 A. Morton Thomas and Associates, Inc. 800 King Farm Boulevard, 4 th Floor Rockville, Maryland 20850

More information

City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions

City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions City of Atlanta Department of Watershed Management Post-Development Stormwater Management Ordinance Summary of Revisions Cory Rayburn, CPESC Environmental Program Manager crayburn@atlantaga.gov Stormwater

More information

DRAINAGE SERVICE CHARGES

DRAINAGE SERVICE CHARGES DRAINAGE SERVICE CHARGES Louisville and Jefferson County Metropolitan Sewer District 700 West Liberty Street Louisville, Kentucky 40203-1913 EFFECTIVE FOR ALL BILLS ISSUED ON AND AFTER AUGUST 1, 2013 A

More information

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix. Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations

More information

VILLAS OF TRADITIONS AT GREY OAKS

VILLAS OF TRADITIONS AT GREY OAKS Report of Turnover Survey VILLAS OF TRADITIONS AT GREY OAKS Grey Oaks Development Naples, Collier County, Florida Forge Engineering Project Number 2907-001.01 March 2015 Richard P..Lundberg, P.E cn=richard

More information

Chapter 5.0. Stormwater Credits for Innovative Site Planning

Chapter 5.0. Stormwater Credits for Innovative Site Planning Chapter 5.0 Stormwater Credits for Innovative Site Planning Chapter 5. Stormwater Credits...Introduction 5.0 Stormwater Credits In Maryland, there are many programs at both the State and local level that

More information

Asset Management Approaches to Maximize Effectiveness of Your Stormwater Program

Asset Management Approaches to Maximize Effectiveness of Your Stormwater Program Asset Management Approaches to Maximize Effectiveness of Your Stormwater Program Presenters: Mark VanAuken, PE, CMS4S, ENV SP Stormwater/MS4 Discipline Leader Celine Hyer, P.E. Conveyance Market Sector

More information

How To Fund An Airport Project

How To Fund An Airport Project FY 2013-2014 Project Number Project Name 1 180555 Carver Gym Insulation 2 305150 Beachside Pavilions Replacements MINOR CAPITAL PROJECTS BY FUND

More information

DEVELOPMENT STANDARDS FOR FACILITIES & IMPROVEMENTS. The Virginia Tech/Montgomery Regional Airport Authority November 19, 2002

DEVELOPMENT STANDARDS FOR FACILITIES & IMPROVEMENTS. The Virginia Tech/Montgomery Regional Airport Authority November 19, 2002 DEVELOPMENT STANDARDS FOR FACILITIES & IMPROVEMENTS The Virginia Tech/Montgomery Regional Airport Authority November 19, 2002 These Standards shall reflect all pre-existing agreements Adopted March 12,

More information

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?

More information

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd ENVIRONMENTAL SITE DESIGN (ESD) REDEVELOPMENT EXAMPLES OCTOBER 2010 1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan,

More information

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness 3 Chapter 3 of Concentration and Travel Time Time of Concentration and Travel Time Travel time ( T t ) is the time it takes water to travel from one location to another in a watershed. T t is a component

More information

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09 Guidelines for Control of Water Runoff on Small Lots Revised 6/09 Table of Contents Introduction and Purpose 3 Administrative Procedures 3 Plan Submittal Requirements 3 General Design Criteria 4 Dry Wells

More information

Operations at Coulter Airfield

Operations at Coulter Airfield Operations at Coulter Airfield Outline Background Assets Budget Options Questions/Direction Vision (January 2010) 1. Maximize Economic Viability of Coulter Field as an Asset to the City Strategic Issue

More information

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS The following section provides descriptions, advantages, limitations, and schematics of allowable best management practices (BMPs) for

More information

Merrill Field Airport Anchorage: Performance. Value. Results.

Merrill Field Airport Anchorage: Performance. Value. Results. Merrill Field Airport Anchorage: Performance. Value. Results. Mission Safely operate and maintain Merrill Field Airport to meet the aviation and business needs of our customers. Core Services Maintain

More information

Locust Valley High School Flood Remediation

Locust Valley High School Flood Remediation Locust Valley High School Flood Remediation Location: Locust Valley, NY Client: Locust Valley Central School District Design Firm(s): BBS Architects Prime, Greenman Pedersen Inc. Sub, Civil Engineering

More information

Appendix 6. Permeable Alley Preliminary Evaluation

Appendix 6. Permeable Alley Preliminary Evaluation Appendix 6 Permeable Alley Preliminary Evaluation ACHD Alley Retrofit Project Initial Evaluation Site Selection, Design, and Construction (October 2014) The purpose of this document is to characterize

More information

CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R

CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R CCTV PIPE INSPECTION AND EVALUATION For RUNWAY 17L-35R At ST. PETERSBURG CLEARWATER INTERNATIONAL AIRPORT February 2011 CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R ST. PETERSBURG CLEARWATER INTERNATIONAL

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS

DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS The City of DeSoto s Department of Development Services is the point of contact for storm drainage related issues. The following are some frequently

More information

SUSTAINABILITY INITIATIVE: 01-02 PERMEABLE PAVEMENT: ADAPTING TO STORMWATER MANAGEMENT CHALLENGES

SUSTAINABILITY INITIATIVE: 01-02 PERMEABLE PAVEMENT: ADAPTING TO STORMWATER MANAGEMENT CHALLENGES PERMEABLE PAVEMENT: ADAPTING TO STORMWATER MANAGEMENT CHALLENGES SUSTAINABILITY INITIATIVE: 01-02 : ADAPTING TO STORMWATER MANAGEMENT CHALLENGES Impermeable surfaces, such as streets, parking lots, and

More information

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix F RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 4400 South Street - Piping and Collection

More information

Permeable Interlocking Concrete Pavements

Permeable Interlocking Concrete Pavements Permeable Interlocking Concrete Pavements Program 000003 Revised 1-29-08 Permeable Interlocking Concrete Pavements This program is registered with the AIA/CES and ASLA CPE for continuing education professional

More information

Figure 3 Pipe Cracking

Figure 3 Pipe Cracking The illustration shown below depicts the system analyzed. As-built drawings and survey information were not available; aerial photos and survey shots of inverts were used to determine the system s geometries.

More information

City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP

City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP PROJECT ESTIMATED COST ESTIMATED COUNCIL IDENTIFIED FUNDING SOURCES STRATEGIC COMPLETION INITIATIVES FM 2351/Beamer

More information

Home Drainage & Causes of Basement Flooding. Water

Home Drainage & Causes of Basement Flooding. Water Home Drainage & Causes of Basement Flooding Understanding Drainage There are two separate sewer systems Eavestroughs & Downspout Road Property Line Floor Drain Catch basin Access Cover Weeping Tile House

More information

Module 6 : Quantity Estimation of Storm Water. Lecture 6 : Quantity Estimation of Storm Water

Module 6 : Quantity Estimation of Storm Water. Lecture 6 : Quantity Estimation of Storm Water 1 P age Module 6 : Quantity Estimation of Storm Water Lecture 6 : Quantity Estimation of Storm Water 2 P age 6.1 Factors Affecting the Quantity of Stormwater The surface run-off resulting after precipitation

More information

Green Alley. Handbook. The Chicago. Richard M. Daley, Mayor City of Chicago. An Action Guide to Create a Greener, Environmentally Sustainable Chicago

Green Alley. Handbook. The Chicago. Richard M. Daley, Mayor City of Chicago. An Action Guide to Create a Greener, Environmentally Sustainable Chicago The Chicago Green Alley Handbook An Action Guide to Create a Greener, Environmentally Sustainable Chicago Printed on recycled paper, 30% post-consumer waste Richard M. Daley, Mayor City of Chicago Cheri

More information

Comprehensive Plan Drainage Subelement

Comprehensive Plan Drainage Subelement Comprehensive Plan Drainage Subelement Adopted January 26, 2010 Ordinance 210-19 Prepared by: CITY OF POMPANO BEACH 100 West Atlantic Boulevard Pompano Beach, Florida 33060 Telephone: 954.786.4600 website:

More information

SECTION 5 DRAFTING STANDARDS

SECTION 5 DRAFTING STANDARDS SECTION 5 DRAFTING STANDARDS 1 SECTION FIVE TABLE OF CONTENTS Description Page TABLE OF CONTENTS... 5-2 GENERAL... 5-3 DRAFTING STANDARDS... 5-5 DRAFTING MINIMUM REQUIREMENTS HANDOUT... 5-8 2 GENERAL 1.

More information

COPPER BEECH TOWNHOME DEVELOPMENT

COPPER BEECH TOWNHOME DEVELOPMENT COPPER BEECH TOWNHOME DEVELOPMENT This 28 acre, 30 Townhome development is slated to open doors in time for the 2007 2008 college school year. To accommodate this project s tight time line, Dennis Corporation

More information

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion Project Overview Sanitary Sewer System 2 Town of Surfside Project Overview Potable Water System 3 Town of Surfside Project Overview Storm Water

More information

STORM DRAINS CHAPTER 7

STORM DRAINS CHAPTER 7 CHAPTER 7 Chapter 7 - Storm Drains A storm drain is a drainage system that conveys water or stormwater, consisting of two or more pipes in a series connected by one or more structures. Storm drains collect

More information

Introduction to sustainable drainage. www.ciria.org/suds

Introduction to sustainable drainage. www.ciria.org/suds Introduction to sustainable drainage Outline of presentation Challenges of existing drainage Drivers for SuDS SuDS philosophy and principles Benefits of SuDS Examples of SuDS Challenges of SuDS Summary

More information

FIRST RESPONSE: STORM DAMAGE MITIGATION OF A BMP FAILURE

FIRST RESPONSE: STORM DAMAGE MITIGATION OF A BMP FAILURE FIRST RESPONSE: STORM DAMAGE MITIGATION OF A BMP FAILURE Author: Audrey G. Beaulac, P.E., CPSWQ Company: (Hoyle, Tanner), Manchester, New Hampshire INTRODUCTION In early July 2013, 2 inches of rain fell

More information

CHAPTER 8 - FINANCIAL PLAN

CHAPTER 8 - FINANCIAL PLAN 8.01 General CHAPTER 8 - FINANCIAL PLAN This chapter presents a financial plan to support capital improvement decisions and to serve as a guide for orderly development of Erie International Airport. It

More information

Review of Footing Drain Disconnection Projects

Review of Footing Drain Disconnection Projects Wastewater Master Plan DWSD Project No. CS-1314 Review of Footing Drain Disconnection Projects Technical Memorandum Original Date: August 8 2002 Revision Date: September 2003 Author: CDM Table of Contents

More information

PARKVILLE HIGH SCHOOL LIMITED RENOVATION

PARKVILLE HIGH SCHOOL LIMITED RENOVATION PARKVILLE HIGH SCHOOL LIMITED RENOVATION DESIGN BRIEFING For Dr. Joe A. Hairston BALTIMORE COUNTY PUBLIC SCHOOLS August 11, 2009 Smolen 3 Emr + Associates Architects 1355 Piccard Drive, Suite 200 Rockville,

More information

STANDARD SPECIFICATIONS

STANDARD SPECIFICATIONS STANDARD SPECIFICATIONS Standard Slope: Unless otherwise specified on the permit, the sidewalk grade shall be sloped upward from the existing curb at a rate of 2% (approx. ¼ inch per foot). New work required

More information

San Francisco s Urban Watershed Framework: A Decision Making Process to Support Multi-Benefit Wastewater and Stormwater Projects September 26, 2011

San Francisco s Urban Watershed Framework: A Decision Making Process to Support Multi-Benefit Wastewater and Stormwater Projects September 26, 2011 San Francisco s Urban Watershed Framework: A Decision Making Process to Support Multi-Benefit Wastewater and Stormwater Projects September 26, 2011 Karen Kubick, P.E., SSIP Program Director, SFPUC Randy

More information

4.3 Cisterns and Rain Barrels

4.3 Cisterns and Rain Barrels 4.3 Cisterns and Rain Barrels Rain barrels, cisterns, and tanks are structures designed to intercept and store runoff from rooftops. Rain barrels are used on a small scale while cisterns and tanks may

More information

Permeable Pavement Operation & Maintanence Guide

Permeable Pavement Operation & Maintanence Guide Permeable Pavement Operation & Maintanence Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems

More information

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater) Applicability: Required for projects that create and/or replace 5,000 square feet or greater of impervious surface (i.e. asphalt roads, concrete structures, building area, sidewalks, etc.). Impervious

More information

Executive Director s Budget Message

Executive Director s Budget Message Executive Director s Budget Message As Clatsop County continues to grow, it is presented with new opportunities. The Port will carefully coordinate its efforts with our community partners to develop public

More information

PROPERTY EVALUATION AND RESERVE FUND STUDY

PROPERTY EVALUATION AND RESERVE FUND STUDY PROPERTY EVALUATION AND RESERVE FUND STUDY COMPLEX NORTH & WEST AVENUES LAS VEGAS, NV Prepared for: HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM ENGINEERS 22 Monument Square Portland, ME 04101 CONTENTS

More information

PUBLIC WORKS COMMISSION: PAVING WORK GROUP

PUBLIC WORKS COMMISSION: PAVING WORK GROUP Permeable Interlocking Concrete Pavers (PICP) PUBLIC WORKS COMMISSION: PAVING WORK GROUP IT S NOT ABOUT FILLING POTHOLES ANY MORE ENVIRONMENTALLY SUSTAINABLE INTEGRATED PAVING STRATEGIES FOR THE 21 ST

More information

Columbus State Community College MASTER PLANNING

Columbus State Community College MASTER PLANNING Columbus State Community College MASTER PLANNING Current State Facilities and Utilities Assessment November 2011 Columbus State Community College MASTER PLANNING EXISTING UTILITIES AND FACILITIES ASSESSMENT

More information

Visual Integration of Compound Events. A presentation to the Climate Compact of Southeast Florida

Visual Integration of Compound Events. A presentation to the Climate Compact of Southeast Florida Visual Integration of Compound Events A presentation to the Climate Compact of Southeast Florida What is the Compact? Agreement between Broward, Miami-Dade, Monroe, and Palm Beach County Commissions (set

More information

Project Rankings. Fiscal Year 2015 2019 Capital Improvement Plan

Project Rankings. Fiscal Year 2015 2019 Capital Improvement Plan Fiscal Year 2015 2019 Capital Improvement Plan Project Rankings 99 CIP Ranking Worksheet 101 104 Final Ranking Scores The following matrix shows all of the projects within the five-year period that were

More information

Computing Stormwater Runoff Rates and Volumes

Computing Stormwater Runoff Rates and Volumes New Jersey Stormwater Best Management Practices Manual February 2004 C H A P T E R 5 Computing Stormwater Runoff Rates and Volumes This chapter discusses the fundamentals of computing stormwater runoff

More information

Table of Contents ALPHABETIZED LIST OF CIP PROJECTS... 1 CIP 5 YEAR SUMMARY BY CATEGORY... 18 SMART CITY CIP 5 YEAR SUMMARY BY VISION...

Table of Contents ALPHABETIZED LIST OF CIP PROJECTS... 1 CIP 5 YEAR SUMMARY BY CATEGORY... 18 SMART CITY CIP 5 YEAR SUMMARY BY VISION... Table of Contents ALPHABETIZED LIST OF CIP PROJECTS... 1 CIP 5 YEAR SUMMARY BY VISION... 5 CIP 5 YEAR SUMMARY BY CATEGORY... 18 SMART CITY CIP 5 YEAR SUMMARY BY VISION... 33 CAPITAL IMPROVEMENT PROJECTS

More information

Summary of Potential Storm Drain Projects and Programs

Summary of Potential Storm Drain Projects and Programs Summary of Potential Storm Drain Projects and Programs CAPITAL IMPROVMENTS PUMP STATION UPGRADES The storm runoff from a large portion of Palo Alto cannot flow by gravity into one of the local creeks.

More information

Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report

Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. A. Introduction A Stormwater Report must be submitted with the Notice of Intent

More information

SOLD. Lot 1. 1 Mile: Population: 10,200 Median HH Income: $33,100. 3 Mile: Population: 80,200 Median HH Income: $34,900

SOLD. Lot 1. 1 Mile: Population: 10,200 Median HH Income: $33,100. 3 Mile: Population: 80,200 Median HH Income: $34,900 Walmart Outparcels For Sale College Station, TX Store # 1150 1815 Brothers Blvd FM 2818 W SOLD Texas Ave S/ Hwy 6 Longmire Dr Brothers Blvd Lot 1 For more information about this site, contact: Lot 1: ±2.41

More information

MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH

MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH MARYLAND AVENUE BACKUPS COMMUNITY OUTREACH MEETING AGENDA Introductions History of PWSA Actions August 31 Storm Impacts Short

More information

Accela Automation User Manual for Gwinnett County Automated Inspection Request System (IVR)

Accela Automation User Manual for Gwinnett County Automated Inspection Request System (IVR) Accela Automation User Manual for Gwinnett County Automated Inspection Request System (IVR) Version 1.2 9/30/2010 Table of Contents IVR Instructions...3 Initial Entry Instructions...3 Permit Access Instructions

More information

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000 Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 SEMCOG 2000 Prepared

More information

PROJECT PROPOSAL FOR THE SUPPLY AND OF A MULTI-PURPOSE AIRCRAFT HANGAR, A PARALLEL TAXI-WAY, NEW TERMINAL BUILDING AND

PROJECT PROPOSAL FOR THE SUPPLY AND OF A MULTI-PURPOSE AIRCRAFT HANGAR, A PARALLEL TAXI-WAY, NEW TERMINAL BUILDING AND PROJECT PROPOSAL FOR THE SUPPLY AND INSTALLATION OF A RADAR SYSTEM, CONSTRUCTION OF A MULTI-PURPOSE AIRCRAFT HANGAR, A PARALLEL TAXI-WAY, NEW TERMINAL BUILDING AND PRESIDENTIAL LOUNGE AT BANJUL INTERNATIONAL

More information

CHAPTER 8 CIVIL DESIGN

CHAPTER 8 CIVIL DESIGN CHAPTER 8 CIVIL DESIGN A. GENERAL This Chapter includes standards and design considerations for other civil engineering design in structural, drainage and utilities. Design considerations for electrical

More information

Triple Bottom Line (TBL) Analysis Favors Green Infrastructure Over Offline Storages to Mitigate the Upper Olentangy CSOs

Triple Bottom Line (TBL) Analysis Favors Green Infrastructure Over Offline Storages to Mitigate the Upper Olentangy CSOs Triple Bottom Line (TBL) Analysis Favors Green Infrastructure Over Offline Storages to Mitigate the Upper Olentangy CSOs Hunter Kelly, PE, Columbus DPU Kwasi Amoah, PE, Dynotec, Inc. Hazem Gheith, PhD,

More information

Description Quantity Cost Total Cost

Description Quantity Cost Total Cost APPENDIX: ITEMIZED CONSTRUCTION COST ESTIMATE Description Quantity Cost Total Cost 1 CASCADE FALLS 1a Existing Cascade Falls Upgrades Structural Repairs - Steps, Railing, Walls, Pool Lump Sum $500,000

More information

Operations and Maintenance

Operations and Maintenance Seattle Public Utilities Green Stormwater Infrastructure: O&M Program Operations and Maintenance O&M Maintenance Took Kit 1. Landscape Maintenance Manual 2. GSI/LID Maintenance Manual for ROW 3. Identifiable

More information

DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job

DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION Using the Full Range of Tools for a Challenging Job Report To: TTI Committee May 13, 2014 1 Pavement Management - Suggested Treatments

More information

CHAPTER 7. AIRSPACE 7.1 AFFECTED ENVIRONMENT

CHAPTER 7. AIRSPACE 7.1 AFFECTED ENVIRONMENT CHAPTER 7. AIRSPACE 7.1 AFFECTED ENVIRONMENT 7.1.1 Definition of Resource Airspace management is defined as directing, controlling, and handling flight operations in the volume of air that overlies the

More information

Thin Whitetopping Application at Williamsburg Regional Airport and Other Thin Whitetopping Airport Applications.

Thin Whitetopping Application at Williamsburg Regional Airport and Other Thin Whitetopping Airport Applications. Thin Whitetopping Application at Williamsburg Regional Airport and Other Thin Whitetopping Airport Applications. Author: Gary L. Mitchell, P.E. Director Airports, American Concrete Pavement Association

More information

Table 4.9 Storm Drain Inlet Protetion Applicable for

Table 4.9 Storm Drain Inlet Protetion Applicable for BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection

More information

AIRFIELD DRIVING TEST

AIRFIELD DRIVING TEST AIRFIELD DRIVING TEST NAME: COMPANY: DATE: SCORE: 1. Runway incursions are primarily caused by the following errors, except a. Pilot/ground vehicle/controller communication errors b. Lack of airport familiarity

More information

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates

More information

2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS

2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS 2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS Water system improvements proposed for inclusion into Western s service area shall be designed in accordance with all appropriate AWWA standards, include

More information

HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES

HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES Approved 6/26/01 HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES All new, modified and/or changed use access(es) onto county roads shall be subject to the access and corridor protection guidelines

More information

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY. a guide to PREVENTING SEWER BACKUPS AND FLOODING

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY. a guide to PREVENTING SEWER BACKUPS AND FLOODING DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY a guide to PREVENTING SEWER BACKUPS AND FLOODING Sewer backups and flooding can damage District homes and businesses. Sewer blockages are most commonly found

More information

Alternatives RIAC 5.1 INTRODUCTION 5.2 WORKING ASSUMPTIONS

Alternatives RIAC 5.1 INTRODUCTION 5.2 WORKING ASSUMPTIONS CHAPTER 5 Runway/Taxiway Alternatives 5.1 INTRODUCTION This chapter presents the development and analysis of different layouts and configurations of both Runway 10-28 and its related taxiways. A primary

More information

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial

More information

CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW)

CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW) CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW) January, 2013 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS DRAINAGE STRUCTURES DRN-01 Corrugated metal pipe drop inlet DNR-02 Storm Drain

More information

Private storm drain inlet retrofitting requirements - Purpose. Sec.13-21.1. Private storm drain inlet retrofitting requirements - Definitions.

Private storm drain inlet retrofitting requirements - Purpose. Sec.13-21.1. Private storm drain inlet retrofitting requirements - Definitions. 2011-7 AN ORDINANCE ESTABLISHING STANDARDS FOR THE PRIVATE STORM DRAIN INLET RETROFITTING AND AMENDING THE "CODE OF THE TOWNSHIP OF PRINCETON, NEW JERSEY, 1968". BE IT ORDAINED by the Township Committee

More information

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE The following template may be used as a general guide for development of a Stormwater Pollution Prevention Plan (SWPPP) for construction activities.

More information

STAFF REPORT TO COMMITTEE OF THE WHOLE

STAFF REPORT TO COMMITTEE OF THE WHOLE STAFF REPORT TO COMMITTEE OF THE WHOLE DATE: November 7 2012 TO: FROM: SUBJECT: ATTACHMENT(S): COMMITTEE OF THE WHOLE GINA LAYTE-LISTON, SUPERVISOR, WASTEWATER Stormwater Management Funding Strategy None

More information

AGENCY COORDINATION AND PUBLIC INVOLVEMENT

AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5 AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5.1 AGENCY COORDINATION As part of the planning process for the Oregon Avenue Final EA, DDOT conducted an agency coordination program. This coordination included

More information

SUMP PUMP. City of Ann Arbor & C O L L E C T I O N S Y S T E M G L O S S A R Y

SUMP PUMP. City of Ann Arbor & C O L L E C T I O N S Y S T E M G L O S S A R Y Foundation A foundation is the bottom part of a building. It s the element that anchors the building to the ground and transmits the building s gravity load directly to the earth. Water damage weakens

More information

ORDINANCE NO. 511 ORDINANCE ESTABLISHING A COST REIMBURSEMENT PROGRAM FOR THE INSTALLATION OF OVERHEAD SEWERS OR BACKFLOW PREVENTION DEVICES

ORDINANCE NO. 511 ORDINANCE ESTABLISHING A COST REIMBURSEMENT PROGRAM FOR THE INSTALLATION OF OVERHEAD SEWERS OR BACKFLOW PREVENTION DEVICES ORDINANCE NO. 511 ORDINANCE ESTABLISHING A COST REIMBURSEMENT PROGRAM FOR THE INSTALLATION OF OVERHEAD SEWERS OR BACKFLOW PREVENTION DEVICES WHEREAS, Wheaton Sanitary District had a cost reimbursement

More information

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development

More information

Operation & Maintenance Document Templates

Operation & Maintenance Document Templates Appendix G Operation & Maintenance Document Templates The following templates are provided to assist project applicants in preparing stormwater treatment measure maintenance plans, which municipalities

More information