Mitigating the Right Turn Conflict Using Protected-Yet-Concurrent Phasing for Cycle Track and Pedestrian Crossings

Size: px
Start display at page:

Download "Mitigating the Right Turn Conflict Using Protected-Yet-Concurrent Phasing for Cycle Track and Pedestrian Crossings"

Transcription

1 0 Mitigating the Right Turn Conflict Using Protected-Yet-Concurrent Phasing for Cycle Track and Pedestrian Crossings Peter G. Furth, Northeastern University Peter J. Koonce, City of Portland Miao Yu, Northeastern University Fei Peng, Northeastern University Michael Littman, Northeastern University Submitted to the Transportation Research Board, August, 0 Revised November, 0 ABSTRACT Pedestrian and bicycle crossings may need to be protected from right turns as well as left turns in situations where there are high right turn volumes or speeds. The right turn volume threshold at which a protected crossing is appropriate can be still smaller for cycle track crossings. This paper explores a phasing scheme in which right turns as well as left turns have their own phase. The crossing runs at a different time from the turn phases, yet concurrent with the parallel vehicular through phase. This protected-yet-concurrent phasing scheme is far more efficient than using an all-ped phase. A general framework for sequencing phases accounting for the right turn crossing conflict is shown using four rings instead of the usual two. Seven examples of protected-yet-concurrent phasing from the U.S. and the Netherlands are used to illustrate the scheme and to characterize its likely impacts in terms of delay and street footprint. Overall delay and footprint impacts are found to be modest; factors that affect the impact of protected phasing include complexity of the phasing plan, coordination, and the possibility of using phase re-service. Because protected-yet-concurrent phasing makes efficient use of time, it is also economical with space. While it requires right turn lanes, its use can reduce the needed number of through lanes, especially in comparison with all-ped phasing. 0 Where a bike path (cycle track) runs along the right side of a road, there is a conflict between throughgoing bikes and right-turning traffic, just as there is between pedestrians and right turns. The conflict can either be permitted (turning vehicles advance on a green ball while the crossing phase is timing and are expected to yield to through bikes and pedestrians) or protected. Protected phasing, meaning conflicting turning movements are not allowed to run concurrently, can be provided either through an all-ped phase (assuming bikes are allowed to use it), or by giving right turns, like left turns, their own signal phase, governed by turn arrows and running at a different time than the crossing. In this latter scheme, the crossing phase usually runs concurrently with a parallel through traffic phase, which presents no conflict with the crossing. For this reason it may be called protected-yet-concurrent phasing. Permitted conflicts with right turns are generally considered acceptable for pedestrian crossings as long as the geometry forces right turns to be made at low speed and the right turn volume is acceptably TRB 0 Annual Meeting

2 0 0 small. There is no national standard for small. In Massachusetts, a state guideline is to recommend allpedestrian phases where right turning volumes exceed 0 vehicles per hour (about vehicles per cycle with a 0 s cycle). In the U.S., there are no national guidelines for permitted conflicts at bike crossings. Dutch guidelines are that conflicts with up to 0 right turning veh/h are acceptable for one-way cycle tracks, and that two-way cycle tracks should avoid all permitted conflicts (). However, in Dutch practice, twoway cycle tracks sometimes have permitted right turn conflicts where there are low turn volumes, along with warning signs. Permitted conflicts are almost never allowed with two-way cycle tracks. An alternative to protected-yet-concurrent phasing is the all-ped phase, provided bikes are allowed to advance during this phase. All-ped phases have two important drawbacks. One is efficiency they severely reduce an intersection s capacity (). Where sufficient capacity remains, all-ped phases lead to substantially longer signal cycles which, in turn, lead to such long waits for pedestrians that they often refuse to wait for their phase and try to walk with the parallel vehicle traffic as well, creating unexpected conflicts. For these reasons, all-ped phases are rarely used in the Netherlands while protected-yetconcurrent phasing is used routinely. With protected-yet-concurrent phasing, bikes have their own phase that runs during a distinct interval that differs from other traffic phases. The widespread application of this phasing scheme in several European countries is one of the reasons that bicycle-specific signals are routinely used there, along with the physical distance separating motor vehicle lanes from cycle tracks, both laterally and longitudinally (the stopline for Dutch cycle tracks is often 0 to 0 ft further downstream than the stopline for motor traffic ()). American reviews of bicycle-specific traffic signals also recognize that one of their values is allowing bikes to have their own phases (, ). Even if the bike crossing is shared by the pedestrian crossing, the longer clearance time needed by pedestrians also militates for bike-specific signals, rather than expecting cyclists to follow the pedestrian signal. Other methods to mitigate the bicycle right turn conflict include leading bike intervals, pocket bike lanes (bike lanes between a right turn lane and a through lane, which move the conflict upstream of the intersection), and permitted conflicts with raised crossings, a treatment that is widely used in Boulder, CO to slow right-turning traffic that conflicts with a bike path. This paper explores the protected-yet-concurrent crossing treatment, with application to both bike and pedestrian crossings. The main research questions are: () How does its application vary depending on what other phases are present and on arterial coordination? () Compared to crossings with permitted conflicts, protected-yet-concurrent phasing limits the time that the crossing and conflicting turns can run. One caution sometimes given against cycle tracks is that the protected phasing they require creates extra delay for cyclists as well as motorists (). How much additional delay does protected-yet-concurrent phasing impose on pedestrians, cyclists, and other road users? () Compared to crossings with permitted conflicts and all-ped phases, how much does protected-yetconcurrent phasing increase road footprint, since it requires right turn lanes? 0 A Quad-Ring Formulation for Protected Phasing Since about 0, U.S. practice has structured signal phase sequences using a dual ring, a structure that is ideal for dealing with conflicts between through and left turn movements (). Accounting for the right turn ped/bike crossing conflict requires expanding the dual ring formulation. For standard -leg intersections, a quad-ring as illustrated in Figure can be used to structure phase sequences with a full set of protected-yet-concurrent phases. Phases are identified by the movement they serve. EB, WB, NB, and SB refer to eastbound, westbound, northbound, and southbound, respectively, while L, R, and T refer to left, right, and through, respectively. The two central rings in the diagram are the standard dual ring; the TRB 0 Annual Meeting

3 outer rings contain the right turn and crossing phases. The figure has been drawn with lagging lefts and leading rights; leading lefts and lagging rights are also possible. This control structure is common at intersections in the Netherlands, where most main roads have cycle tracks. In the U.S., most modern controller software allows for four or more rings. As the figure shows, right turn phases can overlap two central phases: a parallel left turn phase from the cross street and a through phase from the same approach. Crossings are concurrent with a parallel through phase, but may begin later or end earlier than the through phase to allow more time for the conflicting right turn phase. Signal cycle length is governed by a critical ring or critical conflict group, a set of mutually conflicting movements that must be served serially and require more time to be served than any other such group of movements. Traffic volumes are usually such that the right turns are rarely critical. That means that the rings with the right turn and crossing phases usually have some slack that can be used to improve safety and efficiency. WBR SBR EBR SBL WBT EBL SBT NBL NBL EBT WBL NBT SBL EBR NBR WBR One Cycle Figure. Quad ring structure for a full set of protected-yet-concurrent crossings at a -leg junction, drawn with lagging lefts and leading rights. Dashed lines indicate a phase that (partially) belongs to a previous or later cycle. Heavy lines indicate the standard dual ring. Vertical bars represent bike-ped crossings. 0 0 Examples This research examines several examples of protected-yet-concurrent phasing drawn from the U.S. and the Netherlands. For many of them, the phasing sequence can be structured with fewer than four rings. The last example shows a potential quad-ring application in the U.S. Broadway Lovejoy: Simple Right Turn Overlap Cyclists going southwest (labeled south) over the Broadway Bridge in Portland, OR are directed from a shared use path into a one-way cycle track as they approach Lovejoy Street, where they have a conflict with a heavily used right turning movement whose geometry allows higher speed turns. The phasing plan in Figure characterizes signal operations before the recent expansion of the Portland Streetcar to this intersection. It is a classic case in which the conflicting right turn movement, SBR, can run concurrently with the cross street left turn (EBL), so that the time of the mainline through (SBT) phase can then be TRB 0 Annual Meeting

4 split between serving excess demand for SBR and serving bikes and pedestrians on the west side crossing. This sort of configuration is commonly implemented using overlaps in the signal controller and essentially provides a third ring to the standard NEMA ring-barrier structure. The phases are actuated, so that SBR consumes no more of the mainline through phase than is needed each cycle. That way slack time goes to the bike crossing, helping lower cyclist delay. Lovejoy EBL(R) SBR SBT 0 0 Figure. Phase Sequences for Broadway Lovejoy. Protected bike-ped crossing and right turn movement are shown as intervals with heavy outline. Because the traffic volume and geometry of the conflict requires a protected crossing of Lovejoy for pedestrians, providing a protected crossing for cyclists imposes no additional delay on motorists. For through cyclists, a protected crossing gives cyclists less green time than they would have if the bicycle treatment were to transition the cycle track to a pocket bike lane, which would allow cyclists to be served during the entire SBT phase. If d is defined as the difference in average delay for bikes between operation with versus without protected phasing, then Δd = ( C g ) ( C g ) C bike C thru v s where C = cycle length, g bike and g thru are the effective green times for a protected bike phase and for the parallel through traffic phase respectively, and v/s is the flow ratio for bicycles. Example calculations assume that v/s = 0.0, C = 0 s, g T = s, and that g b ranges from s (as might happen if the right turn movement is not much heavier than the EBL movement) to s (as might happen when the right turn movement is heavy). With a pocket bike lane and therefore without protected phasing, average delay is s; with a cycle track and protected phasing, average delay is in the range to s, depending on how much time SBR traffic needs. The additional delay is a small and reasonable price for cyclists to pay for the benefit of protection from conflict with turning traffic. An interesting result of Equation is that when right turn volume is low, which is when a pocket bike lane would be most acceptable to cyclists, the additional delay from protected phasing is also very small. rd Street: Left Side Conflicts on One-Way Streets Long Beach, California s rd Street and New York City s th Avenue are examples of one-way streets with one-way cycle tracks positioned along the left side, which eliminates bike conflicts at bus stops. The left side position creates intersection conflicts with left turning traffic that correspond to the conventional right turn conflict, but with no opportunity for the conflicting turns to run during an overlap with a cross street phase. Therefore, protected phasing requires that the bike-ped crossing and the conflicting lefts allocate between them the half-cycle controlled by the mainline through movement. NBT TRB 0 Annual Meeting

5 A generalized phasing plan is shown in Figure, with mainline being westbound. The lower ring shows the westbound half-cycle divided between one interval for the bike-ped crossing and two intervals for left turns, similar to a conditional service operation (). Actual operation on rd Street uses leading lefts and skips the lagging left interval unless the leading left was skipped for lack of a call. When left turn demand is enough that leading lefts occur routinely, the additional delay to bikes compared to unprotected phasing is about s, assuming random bike arrivals and a 0 s cycle with a 0 s split for the mainline. WBT N S WBL Figure. Phase Sequence with Left Turn Reservice and a Protected Crossing for Left-Side Cycle Track Where the conflicting turning movement is actuated, the most advantageous sequence for bikes is when the conflicting turn leads and the bike crossing lags. That way, the conflicting turns consume only the time they need, and the remainder of the mainline half-cycle goes to the bikes, maximizing their green. This can be especially valuable where the mainline half-cycle does not have a fixed ending time. With fixed time control, sequence does not affect delay, but there may be a safety advantage to leading with the bike-ped crossing, since pedestrians and cyclists are eager to cross as soon as the cross street phase ends and may not wait for a lagging phase. For Long Beach s rd Street, compared to the previous regime in which westbound lefts had a permissive green during the entire mainline half-cycle, having a short protected phase and no turn on red increases this movement s delay considerably. The lagging left option helps reduce left turn delay during light traffic periods of the day, and imposes no additional delay on bikes since it is only applied when the leading left is skipped. Where the mainline half-cycle is long enough, the turning movement delay could be reduced substantially by setting the controller to routinely provide both leading and lagging turn phases, following the model of Figure. This reservice tactic roughly halves the length of the red periods facing the turning movement, and therefore roughly halves its delay, though it involves some additional bike delay. Where the intersecting street is also one-way, a third way to reduce turning movement delay is to have a part-time restriction on left or right turn on red, using blank-out signs indicating No Turn on Red during the protected crossing while allowing turns during other parts of the cycle. Portland, OR has used this technique effectively to minimize the added delay imposed on turning traffic from protecting bicycling movements. th Avenue: Delay Related to Arterial Coordination New York s th Avenue is a one-way street with a left side cycle track with protected phasing, with a leading bike-ped phase followed by a fixed duration lagging left. Due to the close intersection spacing and one-way progression, bicycles do not arrive at random, but rather arrive as they are released from upstream intersections. If the signals progress at a speed greater than cyclist speed, through-going cyclists starting on a fresh green will be able to travel without delay through several intersections, arriving later and later within the green band, until they arrive so late that they have to stop for a full red period. Using a continuous approximation and assuming a common cycle length C and effective bicycle green period g at all intersections, the distance x nonstop that a cyclist can travel between stops is given by WBL TRB 0 Annual Meeting

6 0 0 0 x nonstop g = ub u p () where u b = bicycle speed and u p = progression speed for the traffic signals (assuming u p > u b ). Cyclist delay per unit distance,, is one red period s duration per distance x nonstop, or C g δ = g u b u p Equation shows that with arterial coordination, bike delay is doubly sensitive to effective green time less green time means both more delay per stop (reflected in the numerator), and more frequent stops (reflected in the denominator). Some example results are given in Table, assuming C = 0 s, u b = mph, a mainline through effective green of s, and a s split for a protected left turn phase if provided. With a progression speed of 0 ft/s (about mph), introducing a protected left turn phase increases delay to through bikes by a substantial. min/mi, because it shortens x nonstop from 0 to 0 ft. However, cyclists need for a long green period is not as important if the progression speed is closer to bike speed. As the table shows, if progression speed is lowered to ft/s (about mph), bikes effective speed increases substantially, and the same shortening of the bike green increases their delay by only 0. min/mi. Lower progression speeds also improve safety, progression for buses, and throughput (by compressing platoons when vehicles turn off the arterial). For these reasons, Portland times its downtown traffic signals with a progression speed of to mph depending on time of day. San Francisco also uses low progression speeds on some of its corridors as part of its Green Wave program (). Taylor and Mahmassani () point out that perfect bicycle and motor vehicle progression can also be provided in a scheme in which bicycles take one full cycle longer (or any integer number of cycles) to reach the next intersection than motor vehicles. For example, if motor vehicle speed is ft/s and bikes ft/s, and intersection spacing is 0 ft, then motor vehicles need s and bikes s to reach the next intersection. If the cycle length is 0 s, then an offset giving ideal progression for motor vehicles will also provide ideal progression for bikes. The closer to ideal bike progression is, the less sensitive bike delay is to having its green time shortened for protected phasing. However, such a scheme is dependent on intersection spacing being matched to cycle length, limiting possibilities for application. For short sections of road with arterial progression, the distance over which bikes can progress nonstop can be increased by giving bikes a leading phase at the early set of intersections and a lagging phase at the latter intersections. With this device, x nonstop with protected phasing will be the same as it would be if bikes used the full mainline green interval. Broadway & N. Williams: Coordination Results in Little Bike Delay in Spite of a Short Bike Phase At the junction of Broadway and N. Williams Avenue in Portland, westbound bikes along Broadway face a conflict from a very heavy right turn flow from Broadway onto N. Williams en route to the I- freeway entrance. Until 0, bikes had a pocket bike lane with a right turn lane on their right and a through-right lane on their left not a desirable layout. In 0, the through-right lane was converted to right turn only, giving Broadway dual right turn lanes, and the bike lane was shifted to the right curb. At the same time, protected phasing was introduced to separate bikes from the dual right turns. (This example illustrates how protected bike phasing can be applied with bike lanes as well as with cycle tracks.) Because the heavy right turning demand requires a fair amount of green time, the protected bike phase would have to be short. With bikes arriving at random, that would result in rather long delays for bikes. Instead, a coordination scheme was developed in which a bike phase was also introduced at the upstream TRB 0 Annual Meeting

7 intersection, Victoria, so that most bikes would arrive at N. Williams in a platoon, with the offset between the two intersections set so that platoon arrivals at N. Williams will have no delay. The phasing scheme is shown in Figure. A third, downstream intersection was also included in the coordination scheme. N. Williams Broadway Victoria 0 Figure. Coordinated, Leading Bike Phases Near Broadway and N. Williams At Victoria, westbound bikes get a leading interval by allowing them to overlap with NBL. Most bikes passing Victoria depart in a platoon at this release point. An in-pavement bike detector at the Victoria stop bar sends a call for a bike phase at N. Williams, so that the bike phase at N. Williams will be started in time for the platoon to pass through without delay. There is also a bike detector at the N. Williams stopline that will call for a bike phase for bikes that arrive when the bike signal is red. A web site created by two of the authors () further describes the operation and has simulation videos of traffic operations that illustrate the bike coordination. Actuated Control with a Test of Phasing Sequences: A Motorway Northside Princes Beatrixlaan A two-way cycle track runs along the west side of Princes Beatrixlaan in Rijswijk, the Netherlands, where it intersects the northside ramps of the A motorway. This site was chosen for simulation tests because it has a protected bike phase that can result in long delays for bikes, yet it has a flexible actuated / isolated control structure that allows various options to be tested. Figure shows the intersection layout, the control structure, and the traffic volumes used for simulation testing. Pedestrian volume is negligible. With these volumes, there are three critical phases, which belong to the ring beginning with NBL. In the ring diagram, the bike crossing is indicated by zebra stripes. TRB 0 Annual Meeting

8 SBR reservice Option : reservice SBR Option : leading rights NBL SBR SBT WBL Base Case, using Option : lagging rights NBT 0 0 WBR WBR Figure. Intersection layout, hourly traffic volumes, and control structures for A ramp junction. The north-south street is Princes Beatrixlaan. Base case structure is shown in large box; options and represent alternative ways of sequencing the top ring. The critical phases are shown with heavier lines. Because the bike crossing and SBR conflict only with each other and with NBL, they divide between them the time controlled by the SBT and WBL phases. Our study tests three sequencing options. Sequencing option, which is part of the base case, has a leading bike crossing, with SBR lagging. This option offers the worst service to bikes, in that they get a short green phase and a (potentially) very long red, resulting in a long average delay. At the same time, it is most advantageous to the SBR movement, because it gets all the slack time waiting for the start of NBL. This option can be seen as the most conservative in that it minimizes the chance of queue spillback in the SBR approach lane. Option reverses the sequence of the bike crossing / SBR conflict pair. SBR leads and, once it has passed its minimum green and gapped out, yields to the bike crossing, which then holds until the start of NBL, thus maximizing green for the bike crossing. However, this sequence has the potential to create long queues in the SBR lane if the SBT and WBL phases run for a long time. A third option is reservice, with the bike crossing both leading and lagging. With reservice, some green time is lost to the additional phase change, but because the bike-sbr conflict pair is not critical, some capacity loss in this ring can be afforded. The more important feature of reservice is that by splitting the bikes green time into two parts, the length of its red periods is substantially shortened; and because delay is a function of the length of red periods, not green periods, giving bikes two short green periods is far more advantageous than giving them a single longer period. In this third option, the bike reservice phase will be skipped if its start would occur after the start of WBL in order to lessen the risk that the bike phase will still be timing its minimum green when WBL gaps out, which would then delay the start of the next signal cycle. Simulation tests were performed using VISSIM.0, using its ring-barrier controller to program signal control logic. Performance statistics are shown in Table. Bike delay changes as expected with the three options. In going between option and, average delay for bikes and for SBR essentially switch places, depending on which has the favored (lagging) position. In option, bike reservice, average bike delay is smallest. SBR delay is unchanged from option ; however, because the reservice interval is actuated, option provides good protection against long queues developing in the SBR approach lane. Because of the bike phase s minimum green requirement, giving it a lagging position (options or ) increases average cycle length by a few seconds, as it can be the constraining factor in switching control back to NBL to start a new cycle. For option, the longer cycle length is probably responsible for the. s increase in average delay to vehicular movements. In practice, the intersection runs with option when traffic is heavy, and otherwise runs with an extended version of option in which the bike crossing leads, and after it, SBR and the bike crossing alternate back and forth until WBL begins, after which no further switching is allowed. During long TRB 0 Annual Meeting

9 cycles (about 0 s), the bike crossing can be served in as many as three distinct intervals. This kind of flexibility results in very low delay to both bikes and SBR, while maintaining protected phases for safety. Table. Performance statistics for three control options at the A ramp junction. Leading Bikes (Option ) Lagging Bikes (Option ) Bike Reservice (Option ) Average bike delay (s) Average delay, 0 southbound right (s) Average delay, all vehicular movements (s) Average cycle length (s) 0 0 Roxbury Crossing: Capacity and Footprint Impacts of Concurrent, Yet Protected Bike / Ped Crossings Where an intersection currently operates without right turn lanes, providing protected bike-ped crossings requires either using an all-ped phase or introducing right turn lanes and using protected-yet-concurrent phasing. Introducing right turn lanes can increase the intersection footprint; at the same time, however, because protected-but-concurrent phasing uses time more efficiently than all-ped phases, it may reduce the number of through lanes needed. A study was done at Roxbury Crossing, a busy -leg junction in Boston, to compare the capacity and footprint impacts of using an all-ped phase (current operation) versus with concurrent-but-protected phasing. In the current layout, shown in Figure a, the north-south (N-S) street has a left turn lane plus three through lanes (one shared with right turns) per direction, resulting in -ft long crosswalks. From the westbound approach (Malcomb X Blvd), a right turn lane leads to a free right turn behind a corner island. Because the sharp turn forces traffic to go slowly and pedestrians have priority at this one-lane crossing, this treatment was considered sufficiently protected for pedestrians in both the current and alternative layouts. P.M. peak volumes are shown in Figure. Pedestrian demand is strong on all crosswalks thanks to a nearby metro station, community college, and two high schools. A shared use path along the west side creates a strong bike demand at the west leg crossing. TRB 0 Annual Meeting

10 Figure. Existing and alternative layout for Roxbury Crossing. Compared to existing, the alternative layout converts the thru-right approach lanes on the N-S street to right turn lanes and decreases the number of receiving lanes per direction from to, shortening the crosswalks across the N-S street. 0 Figure. Turning movements at Roxbury Crossing (vehicles/hour, p.m. peak) In the alternative layout, shown in Figure b, the existing curb lanes on the N-S approaches have been redesignated as turn lanes, leaving only two through lanes per direction. That, in turn, allows, the number of receiving lanes on the N-S street to be reduced from three to two, which in turn allows the southwest and northeast corners to be extended, shortening the crossings of the N-S street from ft to 0 ft. Phasing plans and splits for the current and alternative layout are shown in Figure. In the current layout, the eastbound and westbound approaches both have permitted left turns (eastbound also has a protected left phase). In the alternative layout, all left turns are protected only in order to protect the concurrent crossings. The alternative plan allows one permitted conflict, between eastbound right turns and the south leg crosswalk, because the sharp turning angle forces turning vehicles to go slowly and because turning demand is low (about cars per cycle in the p.m. peak hour). The alternative plan provides more than enough capacity; it is able to meet demand with a % degree of saturation with a s cycle, while the current plan, owing to its long all-ped phase, operates with a cycle of s, creating undesirably long waits for pedestrians and the 0 buses per hour passing through the intersection. TRB 0 Annual Meeting

11 a. Existing phasing sequence and splits. b. Phasing sequence for the alternative layout with protected-concurrent crossing. Splits indicate the minimum needed to achieve a degree of saturation of 0., plus (in parentheses) slack time for the non-critical phases. Figure. Existing and alternative timing plans for Roxbury Crossing. Performance of existing and alternative plans, operating with fixed time control, was compared using Synchro and VISSIM. Synchro predicts delay using standard formulas, while VISSIM models traffic in microsimulation. Results are shown in Table. The models agree relatively well, with VISSIM predicting lower delays for the northbound and southbound movements in the alternative case. Depending on the model used, the alternative plan lowers average vehicular delay by to s, and reduces pedestrian delay by s. The alternative plan has much to commend it smaller footprint, shorter pedestrian crossing, less delay for pedestrians and cyclists (which in turn lessens the incentive to non- TRB 0 Annual Meeting

12 0 compliance), and less delay for motorists and transit vehicles. It maintains protected crossings, but allows them to be concurrent with through phases, making more efficient use of time than using an all-pedestrian phase. It alleviates one drawback of the current plan, which is that many pedestrians and cyclists are unwilling to wait for the all-ped phase (the wait for pedestrians could be as great as s) and try to walk or ride with the concurrent phase, creating conflicts with right- and left-turning traffic. Table. Average user delay (s) for the current versus alternative plan Model Plan Eastbound Westbound Northbound Southbound All vehicles All peds Synchro Current 0 0 Alternative 0 0 VISSIM Current 0 Alternative 0 In a separate analysis, a pair of neighboring intersections along the proposed Casey Arborway in Boston were analyzed to compare the footprint need of the base proposed operating plan, which has concurrent pedestrian crossings with permitted right turn conflicts, with an alternative plan that provides protected-but-concurrent crossings for the seven approaches at the two intersections whose predicted peak hour right turning volumes exceeded 0. The need to consider protected crossings is especially strong for the three crossings that will serve a two-way cycle track as well as pedestrians. Providing all-ped phases was out of the question because of its capacity impact, while protected-yet-concurrent phasing was considered to be contrary to the project goal of minimizing the road footprint because it would require introducing six right turn lanes (one of those approaches was already planned with a right turn lane). However, an analysis using Synchro showed that with right turning traffic diverted to right turn lanes and pedestrian conflicts eliminated, many of the approaches would have sufficient capacity by redesignating the curb lane as a right turn lane without the need for adding a new lane. Considering the eight approaches involved in the two intersections combined, providing protected-yet-concurrent crossings would increase the number of approach lanes by only two, from to. This example shows the importance of a combined analysis of spatial layout with signal phasing and timing design, as the signal timing analysis showed that the price of better protected crossings was a much smaller increase in street footprint than previously expected. 0 Conclusion Compared to crossings with permitted conflicts, protected-yet-concurrent phasing offers a means to eliminate conflicts, with a potential increase in safety, with little additional delay to cyclists and pedestrians, though the increase is often small. Factors and tactics that help limit the added delay include having balanced demand between the conflicting right turn and a parallel, protected left turn, having only a few phases in a short cycle, reservice (in a longer cycle), and coordination with one or a few neighboring intersections. With arterial coordination, protected-yet-concurrent phasing adds little delay when the progression speed is close to bike speed, but can add considerable delay when progression speed is considerably faster than bike speed. Because protected-yet-concurrent phasing makes efficient use of time, it is also economical with space. In one example, compared to a solution with an all-ped phase, it needed fewer lanes to serve the traffic; in another, it was found that introducing right turn lanes so that protected-yet-concurrent phasing TRB 0 Annual Meeting

13 could be applied would entail a much smaller than expected increase to the intersection footprint because it allowed several curb lanes to be converted to right turn lanes. Compared to permitted phasing, protected phasing can offer substantial safety and service benefits to pedestrians and especially to cyclists. As more North American cities plan cycle tracks, making good use of protected-yet-concurrent phasing could be important to achieving safety and service objectives while maintaining road capacity and avoiding increasing street footprint. Acknowledgement Rock Miller provided helpful information about signal operations on Long Beach s rd Avenue. 0 0 References. Design Manual for Bicycle Traffic. Ede, The Netherlands: CROW, 00.. Tian, Z.Z., Urbanik, T., Engelbrecht, R., and Balke, B. Pedestrian Timing Alternatives and Impacts on Coordinated Signal Systems Under Split-Phasing Operations. Transportation Research Record, 00.. Markenlei. 0. Junction design the Dutch cycle-friendly way. Available at FlApbxLzpA.. Thompson, S. et. al. Bicycle-Specific Traffic Signals: Results from a State-of-the-Practice Review. Submitted to TRR as paper -0, 0.. Monsere, C., M. Figliozzi, and S. Thompson. Operational Guidance for Bicycle-Specific Traffic Signals in the United States: A Review. Interim Report. Portland State University, 0.. ITE Pedestrian and Bicycle Council. Separated Bikeways. ITE, 0.. Koonce, P., L. Rodegerdts, K. Lee, S. Quayle, S. Beaird, C. Braud, J. Bonneson, P. Tarnoff, and T. Urbanik. Traffic Signal Timing Manual. Report No. FHWA-HOP-0-0. Federal Highway Administration, U.S. Department of Transportation, Washington, D.C., June 00.. Koonce, P. J. V, T. Urbanik, and D. Bullock. Evaluation of Diamond Interchange Signal Controller Settings by Using Hardware-in-the-Loop Simulation. Transportation Research Record,, pp. -.. Taylor, D.B. and H.S. Mahmassani. Coordinating Traffic Signals for Bicycle Progression. Transportation Research Record 0, 000, pp. -.. Littman, M. and P.G. Furth. Protecting the Bike Dual Right Turn Lane Conflict in Portland. sites.google.com/site/studentprojectstraffic/home. TRB 0 Annual Meeting

Elwood and Joliet, Illinois. June 2015. Village of Elwood. Prepared for:

Elwood and Joliet, Illinois. June 2015. Village of Elwood. Prepared for: Truck Routing Study Elwood and Joliet, Illinois June 2015 Prepared for: Village of Elwood INTRODUCTION Kimley-Horn and Associates, Inc. (Kimley-Horn) was retained by the Village of Elwood to evaluate the

More information

Median Bus Lane Design in Vancouver, BC: The #98 B-Line

Median Bus Lane Design in Vancouver, BC: The #98 B-Line Li 1 Median Bus Lane Design in Vancouver, BC: The #98 B-Line Simon Li, P.Eng. PTOE Acting Program Manager, Road and Bridge Projects TransLink (Greater Vancouver Transportation Authority) 1600 4720 Kingsway

More information

Disputed Red Light Accidents: A Primer on Signal Control. Jon B. Landerville, MSME, PE Edward C. Fatzinger, MSME, PE Philip S.

Disputed Red Light Accidents: A Primer on Signal Control. Jon B. Landerville, MSME, PE Edward C. Fatzinger, MSME, PE Philip S. Disputed Red Light Accidents: A Primer on Signal Control Jon B. Landerville, MSME, PE Edward C. Fatzinger, MSME, PE Philip S. Wang, MSME Intersection Accident Statistics Intersection accidents occur on

More information

6: LANE POSITIONS, TURNING, & PASSING

6: LANE POSITIONS, TURNING, & PASSING 6: LANE POSITIONS, TURNING, & PASSING BASIC LANE POSITIONS Traffic law says that slower vehicles should stay to the right. But where exactly should bicycles ride? Here are some basics. Never Ride Against

More information

APPENDIX J TRAFFIC STUDY

APPENDIX J TRAFFIC STUDY APPENDIX J TRAFFIC STUDY May 7, 2014 Ms. Leianne Humble Denise Duffy and Associates, Inc. 947 Cass Street, Suite 5 Monterey, CA 93940 Re: Traffic Study for the Heritage Oaks Memorial Park in San Jose,

More information

Multi-Modal Data Analytics Comparative Visualization Tool: A Case Study of Pedestrian Crossing Design

Multi-Modal Data Analytics Comparative Visualization Tool: A Case Study of Pedestrian Crossing Design 0 0 0 0 Multi-Modal Data Analytics Comparative Visualization Tool: A Case Study of Pedestrian Crossing Design Shayan Khoshmagham, Graduate Research Assistant (Corresponding Author) Department of Systems

More information

Microscopic Simulation of Traffic at a Suburban Interchange

Microscopic Simulation of Traffic at a Suburban Interchange Microscopic Simulation of Traffic at a Suburban Interchange Roger V. Lindgren and Sutti Tantiyanugulchai Abstract Recent advances in computer hardware and software technology have led to the increased

More information

Evaluation of the Shared-Use Arrow

Evaluation of the Shared-Use Arrow Evaluation of the Shared-Use Arrow Table of Contents Page Evaluation of the Shared-Use ARROW Background... 1 ARROW Design... 1 ARROW Placement... 2 Wayne E. Pein William W. Hunter J. Richard Stewart Report

More information

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application):

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application): Transportation Assessment and Management Study Guidelines for Consultants INTRODUCTION This document is intended to provide guidelines for transportation consultants who produce Transportation reports

More information

Stone Way N Rechannelization: Before and After Study. N 34th Street to N 50th Street

Stone Way N Rechannelization: Before and After Study. N 34th Street to N 50th Street City of Seattle Department of Transportation Stone Way N Rechannelization: Before and After Study N 34th Street to N 50th Street May, 2010 INTRODUCTION Population density in Seattle is increasing within

More information

WYDOT Quick Facts TRAFFIC SIGNALS

WYDOT Quick Facts TRAFFIC SIGNALS TRAFFIC SIGNALS WYDOT Quick Facts 2 Advantages of traffic signals WYDOT Quick Facts Traffic signals control vehicle and pedestrian traffic by assigning priorities to various traffic movements to influence

More information

Mobility Management Plan Study of the Busch Boulevard Corridor

Mobility Management Plan Study of the Busch Boulevard Corridor Mobility Management Plan Study of the Busch Boulevard Corridor March 2000 Hillsborough County Metropolitan Planning Organization 601 E. Kennedy, 18th Floor Tampa, Florida 33602-5117 813/272-5940 FAX NO:

More information

BENNINGTON LOCAL ROADWAY NETWORK TRAFFIC ANALYSIS

BENNINGTON LOCAL ROADWAY NETWORK TRAFFIC ANALYSIS Documentation for: BENNINGTON LOCAL ROADWAY NETWORK TRAFFIC ANALYSIS Bennington, VT Prepared for: Bennington County Regional Commission & Town of Bennington August 2003 TABLE OF CONTENTS 1.0 INTRODUCTION...1

More information

THE BENEFITS OF SIGNAL GROUP ORIENTED CONTROL

THE BENEFITS OF SIGNAL GROUP ORIENTED CONTROL THE BENEFITS OF SIGNAL GROUP ORIENTED CONTROL Authors: Robbin Blokpoel 1 and Siebe Turksma 2 1: Traffic Engineering Researcher at Peek Traffic, robbin.blokpoel@peektraffic.nl 2: Product manager research

More information

CHAPTER 11: PEDESTRIAN SIGNS AND SIGNALS

CHAPTER 11: PEDESTRIAN SIGNS AND SIGNALS CHAPTER 11: PEDESTRIAN SIGNS AND SIGNALS Traffic signs and signals should be useful for all pedestrians. It is essential to provide signals that are phased and timed to allow senior citizens, children,

More information

First Transit Contra Flow Lane in Downtown San Francisco

First Transit Contra Flow Lane in Downtown San Francisco Introduction First Transit Contra Flow Lane in Downtown San Francisco Javad Mirabdal, Bond Yee Traffic congestion places a tremendous burden on transit vehicles in cities worldwide. San Francisco, located

More information

9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015

9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Kunzman Associates, Inc. 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Prepared by: Bryan Crawford Carl Ballard,

More information

Advantages and Disadvantages of One Way Streets October 30, 2007

Advantages and Disadvantages of One Way Streets October 30, 2007 Advantages and Disadvantages of One Way Streets October 30, 2007 0 P age Background As the revitalization of the Central Waterfront area moves forward, one issue that might need closer analysis is the

More information

The partnership has selected three intersections where enforcement, education, and engineering initiatives are being implemented to improve safety:

The partnership has selected three intersections where enforcement, education, and engineering initiatives are being implemented to improve safety: Hamilton-Finn Suite 310 Tel. (403) 207-6000 Road Safety 3016 5th Avenue N.E. Fax. (403) 273-3440 Consultants Ltd. Calgary, Alberta dawatt.dawatt.com www.hamiltonfinn.ca January 19, 2005 Mr. Don Szarko,

More information

SIGHT DISTANCE. Presented by Nazir Lalani P.E. Traffex Engineers Inc. N_lalani@hotmail.com WHY IS SIGHT DISTANCE SO IMPORTANT?

SIGHT DISTANCE. Presented by Nazir Lalani P.E. Traffex Engineers Inc. N_lalani@hotmail.com WHY IS SIGHT DISTANCE SO IMPORTANT? SIGHT DISTANCE Presented by Nazir Lalani P.E. Traffex Engineers Inc. N_lalani@hotmail.com WHY IS SIGHT DISTANCE SO IMPORTANT? Drivers must be able to: Stop for objects in the roadway Stop for stationary

More information

Measuring the Street:

Measuring the Street: Measuring the Street: New Metrics for 21st Century Streets 1 Measuring the Street: New Metrics for 21st Century Streets New York City s streets are constantly called on to the meet new and varied needs

More information

Chapter 6. Intersections. 6 Intersections

Chapter 6. Intersections. 6 Intersections Chapter 6 Intersections 6 Intersections Chapter 6 Intersection Design 6.1 Introduction An intersection is the area where two or more streets join or cross at-grade. The intersection includes the areas

More information

Near Westside Neighborhood and University Avenue Corridor Transportation Study. Public Workshop #2. September 12 and 23, 2013

Near Westside Neighborhood and University Avenue Corridor Transportation Study. Public Workshop #2. September 12 and 23, 2013 Near Westside Neighborhood and University Avenue Corridor Transportation Study Public Workshop #2 September 12 and 23, 2013 Presentation Outline: Brief Review of Study Scope, Background, and Current Conditions

More information

ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES

ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES How to Get Started ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES Design Elements Selecting appropriate design treatments for school neighborhoods creates environments that address the needs of all

More information

BEFORE-AND-AFTER STUDY OF THE EFFECTIVENESS OF RECTANGULAR RAPID-FLASHING BEACONS USED WITH SCHOOL SIGN IN GARLAND, TEXAS

BEFORE-AND-AFTER STUDY OF THE EFFECTIVENESS OF RECTANGULAR RAPID-FLASHING BEACONS USED WITH SCHOOL SIGN IN GARLAND, TEXAS BEFORE-AND-AFTER STUDY OF THE EFFECTIVENESS OF RECTANGULAR RAPID-FLASHING BEACONS USED WITH SCHOOL SIGN IN GARLAND, TEXAS Marcus A. Brewer (corresponding author) Associate Research Engineer Texas Transportation

More information

Doing a little can accomplish a lot. Proposed Change of Municipal Class Environmental Assessment from Schedule from B to A+

Doing a little can accomplish a lot. Proposed Change of Municipal Class Environmental Assessment from Schedule from B to A+ Doing a little can accomplish a lot. Proposed Change of Municipal Class Environmental Assessment from Schedule from B to A+ Erin Mills Parkway Intersections at Dundas Street and Burnhamthorpe Road Index

More information

A SPECIAL APPLICATION OF A VIDEO-IMAGE SYSTEM FOR VEHICLE TRACKING AND SPEED MEASUREMENT

A SPECIAL APPLICATION OF A VIDEO-IMAGE SYSTEM FOR VEHICLE TRACKING AND SPEED MEASUREMENT A SPECIAL APPLICATION OF A VIDEO-IMAGE SYSTEM FOR VEHICLE TRACKING AND SPEED MEASUREMENT Zong Tian (Corresponding Author) Texas Transportation Institute The Texas A&M University System College Station,

More information

CHAPTER 2 TRAFFIC SIGNS AND HIGHWAY MARKINGS

CHAPTER 2 TRAFFIC SIGNS AND HIGHWAY MARKINGS CHAPTER 2 TRAFFIC SIGNS AND HIGHWAY MARKINGS This chapter summarizes traffic signs, signals and road markings that control the flow of traffic, making streets and highways safer for motorists, bicyclists

More information

PROGRAM FOR ARTERIAL SYSTEM SYNCHRONIZATION (PASS) STANDARD SCOPE OF WORK, SCHEDULE AND BUDGET

PROGRAM FOR ARTERIAL SYSTEM SYNCHRONIZATION (PASS) STANDARD SCOPE OF WORK, SCHEDULE AND BUDGET PROGRAM FOR ARTERIAL SYSTEM SYNCHRONIZATION (PASS) STANDARD SCOPE OF WORK, SCHEDULE AND BUDGET The purpose of the Program for Arterial System Synchronization (PASS) is to provide technical and financial

More information

North Avenue Corridor Study. Advisory Committee Meeting #5 June 11, 2014

North Avenue Corridor Study. Advisory Committee Meeting #5 June 11, 2014 North Avenue Corridor Study Advisory Committee Meeting #5 June 11, 2014 Agenda Welcome and introductions Concept refinement and evaluation: Public meeting and web survey General cross-section concepts

More information

Stop The stop sign, a red octagon with white lettering, means come to a full stop and be sure the way is clear before proceeding.

Stop The stop sign, a red octagon with white lettering, means come to a full stop and be sure the way is clear before proceeding. Tr a f f i c S i g n s 7 7. TRAFFIC SIGNS Many collisions and near crashes occur as a result of drivers who ignore or fail to respond appropriately to traffic signs. It is essential that the meaning of

More information

MEMORANDUM. Robert Nichols, Acting Corridor Design Manager Northgate Link Extension

MEMORANDUM. Robert Nichols, Acting Corridor Design Manager Northgate Link Extension MEMORANDUM DATE: September 23, 2014 TO: Robert Nichols, Acting Corridor Design Manager Northgate Link Extension FROM: SUBJECT: COPIES: Katherine Casseday, PE, PTOE, Casseday Consulting Tony Lo, PE, Parsons

More information

Road Signs Recognition Quiz

Road Signs Recognition Quiz Road Signs Recognition Quiz Place your answer for each of the signs/pavement markings on the answer sheet. Ready to Roll? Here Comes Sign # 1... #1 A No right turn B Right turn only C Warning, no turn

More information

THE SAFETY OF URBAN CYCLE TRACKS: A REVIEW OF THE LITERATURE

THE SAFETY OF URBAN CYCLE TRACKS: A REVIEW OF THE LITERATURE THE SAFETY OF URBAN CYCLE TRACKS: A REVIEW OF THE LITERATURE Beth Thomas Pedestrian & Bicycle Coordinator California Department of Transportation, District 4 Note: This presentation is for academic informational

More information

Maximum speed. Stop and Give way to Manually operated temporary No entry for give way traffic on STOP and GO signs vehicular traffic major road

Maximum speed. Stop and Give way to Manually operated temporary No entry for give way traffic on STOP and GO signs vehicular traffic major road Signs giving orders Signs with red circles are mostly prohibitive. Plates below signs qualify their message. Entry to 20 mph zone End of 20 mph zone Maximum speed National speed limit applies School crossing

More information

Two-Way Street Networks: More Efficient than Previously Thought?

Two-Way Street Networks: More Efficient than Previously Thought? Two-Way Street Networks: More Efficient than Previously Thought? V I K A S H V. G A Y A H N E - WAY S T R E E T S I N D W N T W N A R E A S A R E R E C E I V I N G A critical look. City officials and urban

More information

RandstadRail: Increase in Public Transport Quality by Controlling Operations

RandstadRail: Increase in Public Transport Quality by Controlling Operations RandstadRail: Increase in Public Transport Quality by Controlling Operations Niels van Oort HTM, Urban public transport, Research and development P.O. Box 28503, 2502 KM The Hague, The Netherlands, e-mail:

More information

Why build the Silvertown Tunnel?

Why build the Silvertown Tunnel? Why build the Silvertown Tunnel? Over the last 30 years east London has changed with the redevelopment of former industrial areas into major commercial and residential districts. The development of Canary

More information

3 Tappan Zee Bridge Rehabilitation Options

3 Tappan Zee Bridge Rehabilitation Options 3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:

More information

88.1 Traffic Signals at Roundabouts 213

88.1 Traffic Signals at Roundabouts 213 System Considerations 88.1 Traffic Signals at Roundabouts 213 8.1.1 Metered entrance 214 8.1.2 Nearby vehicular and pedestrian signals 214 8.1.3 Full signalization of the circulatory roadway 215 8.2 At-Grade

More information

0.0 Curb Radii Guidelines Version 1.0.2

0.0 Curb Radii Guidelines Version 1.0.2 Background In early 2014, Transportation Services initiated a review of the Division's design guidelines and standards to move our organization in a direction consistent with the transportation departments

More information

These "rules of the road" are based on Texas Transportation Code statutes. Find the complete bicycle code at the bottom of the page

These rules of the road are based on Texas Transportation Code statutes. Find the complete bicycle code at the bottom of the page Texas Bicycle Laws These "rules of the road" are based on Texas Transportation Code statutes. Find the complete bicycle code at the bottom of the page Bicyclists have the rights and duties of other vehicle

More information

Section 6 Traffic Analysis

Section 6 Traffic Analysis Section 6 Traffic Analysis Traffic Operations of the Preferred Network Alternative After the Preferred Network was identified and confirmed by local policy makers and area residents, detailed traffic analysis

More information

TEST ON Driving Safely Among Bicyclists and Pedestrians

TEST ON Driving Safely Among Bicyclists and Pedestrians TEST ON Driving Safely Among Bicyclists and Pedestrians Next you will take a 16 question test about driving safely among bicyclists and pedestrians. Please take out a sheet of paper to mark down and score

More information

TERMINAL 91 2011 TRAFFIC MONITORING STUDY

TERMINAL 91 2011 TRAFFIC MONITORING STUDY DRAFT TERMINAL 91 2011 TRAFFIC MONITORING STUDY Prepared for: Port of Seattle Prepared by: 6544 NE 61st Street, Seattle, WA 98115 ph: (206) 523-3939 fx: (206) 523-4949 NOVEMBER 4, 2011 TABLE OF CONTENTS

More information

Nashville Area MPO Regional Freight Study fast action projects

Nashville Area MPO Regional Freight Study fast action projects Project #1 Beechcroft road (sr 247) at csx crossing Motor carrier survey location Maury County (Spring Hill, Tn) / City of Spring Hill Current at-grade railway crossing causes traffic delays as a result

More information

California Manual on Uniform Traffic Control Devices. FHWA s MUTCD 2009 Edition as amended for use in California

California Manual on Uniform Traffic Control Devices. FHWA s MUTCD 2009 Edition as amended for use in California California Manual on Uniform Traffic Control Devices FHWA s MUTCD 2009 Edition as amended for use in California Federal Highway Administration California Division 650 Capitol Mall, Suite 4-100 Sacramento

More information

ENGINEERING REPORT. College Street: Interstate 85 to Donahue Drive Traffic Signal System Feasibility Study Auburn, Alabama

ENGINEERING REPORT. College Street: Interstate 85 to Donahue Drive Traffic Signal System Feasibility Study Auburn, Alabama ENGINEERING REPORT College Street: Interstate 85 to Donahue Drive Traffic Signal System Feasibility Study Auburn, Alabama Prepared for: The City of Auburn Prepared by: 3644 Vann Road Suite 100 Birmingham,

More information

chapter 3 basic driving skills

chapter 3 basic driving skills chapter 3 basic driving skills When curving to the left, keep the front wheels close to the right edge of the lane to keep your driver s side rear wheels out of the next lane of traffic. Curve ahead slow

More information

Siting Of Inductive Loops For Vehicle Detecting Equipments At Permanent Road Traffic Signal Installations

Siting Of Inductive Loops For Vehicle Detecting Equipments At Permanent Road Traffic Signal Installations Traffic Systems and Signing MCE 0108 Issue C March 2002 Siting Of Inductive Loops For Vehicle Detecting Equipments At Permanent Road Traffic Signal Installations Crown Copyright 2002 Applications to reproduce

More information

Transportation Management Plan Template

Transportation Management Plan Template DATE: TO: FROM: SUBJECT: Date Name Position Transportation Service Center Name Position Transportation Service Center Transportation Management Plan Job Number(s) Control Section(s) Route Details County

More information

Walkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps

More information

CAPACITY AND LEVEL-OF-SERVICE CONCEPTS

CAPACITY AND LEVEL-OF-SERVICE CONCEPTS CHAPTER 2 CAPACITY AND LEVEL-OF-SERVICE CONCEPTS CONTENTS I. INTRODUCTION...2-1 II. CAPACITY...2-2 III. DEMAND...2-2 IV. QUALITY AND LEVELS OF SERVICE...2-2 Service Flow Rates...2-3 Performance Measures...2-3

More information

Chapter 3 - GPS Data Collection Description and Validation

Chapter 3 - GPS Data Collection Description and Validation Chapter 3 - GPS Data Collection Description and Validation The first step toward the analysis of accuracy and reliability of AVI system was to identify a suitable benchmark for measuring AVI system performance.

More information

Accident Analysis of Sheridan Road between Isabella Street and South Boulevard

Accident Analysis of Sheridan Road between Isabella Street and South Boulevard Accident Analysis of Sheridan Road between Isabella Street and South Boulevard Prepared for TranSystems Corporation for the City of Evanston Submitted by Regina Webster & Associates, Inc. Date: 08/15/2008

More information

AIR QUALITY TECHNICAL MEMORANDUM

AIR QUALITY TECHNICAL MEMORANDUM AIR QUALITY TECHNICAL MEMORANDUM AIR QUALITY TECHNICAL MEMORANDUM GOLDEN GLADES INTERCHANGE PD&E STUDY Miami-Dade County, Florida Financial Management Number: 428358-1-22-01 Efficient Transportation Decision

More information

I-25 / Rio Bravo Interchange

I-25 / Rio Bravo Interchange I-25 / Rio Bravo Interchange TONIGHT S MEETING SCHEDULE OPEN HOUSE 6:00 PM TO 6:30 PM PRESENTATION BEGINS AT 6:30 PM Q & A FOLLOWING PRESENTATION CN A300280 / PNA300280 I-25 / Rio Bravo Interchange SECOND

More information

BEST PRACTICE FOR TRAFFIC ENGINEERING DEVICES & OPERATIONS IN SCHOOL AREAS

BEST PRACTICE FOR TRAFFIC ENGINEERING DEVICES & OPERATIONS IN SCHOOL AREAS C I T Y O F C O L O R A D O S P R I N G S E N G I N E E R I N G D I V I S I O N T R A F F I C E N G I N E E R I N G T E A M SCHOOL SAFETY PROGRAM POLICY MANUAL BEST PRACTICE FOR TRAFFIC ENGINEERING DEVICES

More information

Bicycle riding is a great way to get into shape

Bicycle riding is a great way to get into shape Bicycle riding is a great way to get into shape and have fun. To remain safe on Illinois roads, it is important to follow the same traffic safety laws that govern vehicle drivers. No amount of bicycle

More information

Lawson Outline Plan External Traffic Analysis Working Paper

Lawson Outline Plan External Traffic Analysis Working Paper Total Lawson Development ACTPLA 16 January 2009 Document No.: Prepared for ACTPLA Prepared by Maunsell Australia Pty Ltd Level 2, 60 Marcus Clarke Street, Canberra ACT 2600, Australia T +61 2 6201 3000

More information

Massachusetts Department of Transportation, Highway Division Ten Park Plaza, Boston, MA 02116-3973. A Guide on Traffic Analysis Tools

Massachusetts Department of Transportation, Highway Division Ten Park Plaza, Boston, MA 02116-3973. A Guide on Traffic Analysis Tools Massachusetts Department of Transportation, Highway Division Ten Park Plaza, Boston, MA 02116-3973 A Guide on Traffic Tools Revised October 5, 2012 1. PURPOSE The Massachusetts Department of Transportation,

More information

Smart Cycling IN SANTA MONICA SANTA MONICA POLICE DEPARTMENT BE SMART. BE VISIBLE. BE ATTENTIVE. HAVE FUN!

Smart Cycling IN SANTA MONICA SANTA MONICA POLICE DEPARTMENT BE SMART. BE VISIBLE. BE ATTENTIVE. HAVE FUN! Smart Cycling IN SANTA MONICA BE SMART. BE VISIBLE. BE ATTENTIVE. HAVE FUN! Safety Tips and Rules of the Road for Cyclists SANTA MONICA POLICE DEPARTMENT Rules of the Road Drivers, bicyclists, and pedestrians

More information

City of Columbus, Ohio Department of Public Safety Division of Police February 2006

City of Columbus, Ohio Department of Public Safety Division of Police February 2006 City of Columbus, Ohio Department of Public Safety Division of Police February 2006 Columbus Focus on Safety Photo Red Light Enforcement MISSION STATEMENT A. The Traffic Bureau s primary mission is the

More information

The Corporation of the TOWN OF MILTON

The Corporation of the TOWN OF MILTON The Corporation of the TOWN OF MILTON Report to: From: Mayor G. A. Krantz & Members of Council M. Paul Cripps, P. Eng., Director, Engineering Services Date: November 11, 2013 Report No. ENG-039-13 Subject:

More information

Railway Crossing Information System

Railway Crossing Information System Railway Crossing Information System ITS Canada Presentation June 2, 2014 Ian Steele, P.Eng Agenda Click to edit Master title style RBRC Program Project Background Concept of Operations Design Process Design

More information

FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST

FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST August 2003 Background: The Federal Highway Administration (FHWA) has retained all approval rights to the control

More information

A Short Course on Techniques for Determining Construction Related Road User Costs

A Short Course on Techniques for Determining Construction Related Road User Costs TEXAS TRANSPORTATION INSTITUTE A Short Course on Techniques for Determining Construction Related Road User Costs prepared by TEXAS TRANSPORTATION INSTITUTE THE TEXAS A&M UNIVERSITY SYSTEM 701 NORTH POST

More information

Boston Traffic Management Center Activity Report for FY 2013 Real-time Traffic Signal Adjustments

Boston Traffic Management Center Activity Report for FY 2013 Real-time Traffic Signal Adjustments Boston Traffic Management Center Activity Report for FY 2013 Real-time Traffic Signal Adjustments The mission of the Traffic Management Center (TMC) within the Boston Transportation Department is to monitor,

More information

Accuracy of Pneumatic Road Tube Counters

Accuracy of Pneumatic Road Tube Counters Accuracy of Pneumatic Road Tube Counters By: Patrick McGowen and Michael Sanderson Abstract: Pneumatic road tube counters are a tool that is commonly used to conduct traffic counts on streets and roads.

More information

Bus Priority Measures in Calgary: Past, Present and Future. Chris Jordan, M.Sc., P.Eng., Coordinator, Strategic Transit Planning, Calgary Transit

Bus Priority Measures in Calgary: Past, Present and Future. Chris Jordan, M.Sc., P.Eng., Coordinator, Strategic Transit Planning, Calgary Transit Bus Priority Measures in Calgary: Past, Present and Future Chris Jordan, M.Sc., P.Eng., Coordinator, Strategic Transit Planning, Calgary Transit Nora Kajdy, P.Eng., Transit Priority Engineer, Calgary Transit

More information

TRAFFIC DEMAND MANAGEMENT IN ACTION! Sue Peden, Travelwise Development Manager Southampton University Hospitals NHS Trust

TRAFFIC DEMAND MANAGEMENT IN ACTION! Sue Peden, Travelwise Development Manager Southampton University Hospitals NHS Trust TRAFFIC DEMAND MANAGEMENT IN ACTION! Sue Peden, Travelwise Development Manager Southampton University Hospitals NHS Trust 1. THE SETTING Southampton University Hospitals NHS Trust is a large 1,000 bed

More information

ROAD SIGNS IN JAPAN PARKING SIGNS. No Parking or Stopping Anytime SIZE & WEIGHT LIMIT SIGNS SPEED LIMIT SIGNS

ROAD SIGNS IN JAPAN PARKING SIGNS. No Parking or Stopping Anytime SIZE & WEIGHT LIMIT SIGNS SPEED LIMIT SIGNS ROAD SIGNS IN JAPAN Stop Slow & all Do Not Enter & Motorcycles Road Large Sized Trucks & Special Duty Road All Except Two Wheeled Light Except Bicycles Large Passenger No Right Turn No Passing No U-Turn

More information

Investigation of Red Light Running Factors

Investigation of Red Light Running Factors Investigation of Red Light Running Factors Final Report July 2004 Prepared for: Southeast Transportation Center The University of Tennessee Knoxville, Tennessee Prepared by: Scott S. Washburn Assistant

More information

Is Encouraging More Bike Ridership On El Camino Real A Good Idea?

Is Encouraging More Bike Ridership On El Camino Real A Good Idea? Is Encouraging More Bike Ridership On El Camino Real A Good Idea? In the above illustration there is a shared right turn lane on southbound El Camino Real at the intersection with Santa Cruz Avenue. Turning

More information

Downtown Louisville Two-Way Street Study

Downtown Louisville Two-Way Street Study Final Draft Report Downtown Louisville Two-Way Street Study Submitted to Downtown Development Corporation Submitted by ENTRAN, PLC Submitted October 2009 Table of Contents Introduction Study Purpose...1

More information

SOLVING CONGESTION BY DESIGNING OF TRAFFIC SIGNAL AT T-INTERSECTION (QAMARWARI CHOWK) IN SRINAGAR, J&K

SOLVING CONGESTION BY DESIGNING OF TRAFFIC SIGNAL AT T-INTERSECTION (QAMARWARI CHOWK) IN SRINAGAR, J&K International Journal of Civil Engineering and Technology (IJCIET) Volume 7, Issue 3, May June 2016, pp. 385 391, Article ID: IJCIET_07_03_039 Available online at http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=7&itype=3

More information

How To Collect Bicycle And Pedestrian Data In Ohio

How To Collect Bicycle And Pedestrian Data In Ohio Research Project Work Plan for Design and Implementation of Pedestrian and Bicycle-Specific Data Collection Methods in Oregon SPR-13-754 Submitted by Miguel Figliozzi Christopher M. Monsere Portland State

More information

7 th Street SW Cycle Track: Calgary s First Centre City Cycle Track

7 th Street SW Cycle Track: Calgary s First Centre City Cycle Track 7 th Street SW Cycle Track: Calgary s First Centre City Cycle Track Nominated for: The City of Calgary Category: Sustainable Urban Transportation Award Contact: Surendra Mishra, P. Eng., Traffic Engineer,

More information

Multi-Modal Corridor Degree of Complexity: High Cost/Benefit: High

Multi-Modal Corridor Degree of Complexity: High Cost/Benefit: High Multi-Modal Corridor Degree of Complexity: Cost/Benefit: Maintain the same level of service for Ensures continuous flow through the Might impact other transportation Consider road diet and/or different

More information

TRACKING DRIVER EYE MOVEMENTS AT PERMISSIVE LEFT-TURNS

TRACKING DRIVER EYE MOVEMENTS AT PERMISSIVE LEFT-TURNS TRACKING DRIVER EYE MOVEMENTS AT PERMISSIVE LEFT-TURNS Michael A. Knodler Jr. Department of Civil & Environmental Engineering University of Massachusetts Amherst Amherst, Massachusetts, USA E-mail: mknodler@ecs.umass.edu

More information

California Crossing Guard Training: Online Course Part 2

California Crossing Guard Training: Online Course Part 2 California Crossing Guard Training: Online Course Part 2 Prepared by the Safe Routes to School Technical Assistance Resource Center The Safe Routes to School Technical Assistance Resource Center is a program

More information

Design and Implementation of Slot Left-Turn Lanes on the Manitoba Highway Network

Design and Implementation of Slot Left-Turn Lanes on the Manitoba Highway Network Design and Implementation of Slot Left-Turn Lanes on the Manitoba Highway Network Brent Hartmann, P. Eng., Project Design Engineer, Manitoba Infrastructure and Transportation Derek Durant, P. Eng., Senior

More information

Clarendon at Portsmouth K - 8 Safer Routes to School (SR2S) Draft Engineering Strategies Report Approved October 9, 2008

Clarendon at Portsmouth K - 8 Safer Routes to School (SR2S) Draft Engineering Strategies Report Approved October 9, 2008 Introduction Clarendon at Portsmouth K - 8 Safer Routes to School (SR2S) Draft Engineering Strategies Report Approved October 9, 2008 The Portland Office of Transportation (PDOT) initiated a Safer Routes

More information

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN December 21, 2009 Public Works Department 171 N. Ross Street, Suite 200 Auburn,

More information

A Statistical Analysis of Bicycle Rider Performance: The impact of gender on riders performance at signalized intersections

A Statistical Analysis of Bicycle Rider Performance: The impact of gender on riders performance at signalized intersections Wheeler, Conrad, and Figliozzi 1 A Statistical Analysis of Bicycle Rider Performance: The impact of gender on riders performance at signalized intersections Nikki Wheeler, Ryan Conrad Graduate Research

More information

Appendix G.3 Crain & Associates, Peer Review

Appendix G.3 Crain & Associates, Peer Review Appendix G.3 Crain & Associates, Peer Review Transportation Planning / Traffic Engineering VIA HAND DELIVERED Wendy Lockwood Sirius Environmental 1478 N. Altadena Drive Pasadena, California 91107 Subject:

More information

Aerial View E Looking West

Aerial View E Looking West Figure 3-9 Aerial View E Looking West 3-19 Urban Design Figure 3-10 Aerial View F Looking North West 3-20 Urban Design Figure 3-11 Skyline and Massachusetts Avenue Gateway 3-21 Urban Design 4.0 TRANSPORTATION

More information

3. DESCRIPTION OF THE COMPUTER MODEL USED

3. DESCRIPTION OF THE COMPUTER MODEL USED EVALUATION OF IMPROVEMENTS IN ROAD INFRASTRUCTURE, TRAFFIC OPERATION AND ACCESSIBILITY FOR PEDESTRIANS TO THE FORTALEZA CITY STADIUM, DURING THE FIFA WORLD CUP 2014, USING MICROSIMULATION. Daniel Lustosa

More information

MCH 1352 Issue D February 2002

MCH 1352 Issue D February 2002 Traffic Systems and Signing MCH 1352 Issue D February 2002 Crown Copyright 2002 Applications to reproduce this material should be made to The Controller of Her Majesty's Stationery Office First published

More information

- FREE! - The Official San Francisco BIKE GUIDE. 1st Edition

- FREE! - The Official San Francisco BIKE GUIDE. 1st Edition - FREE! - The Official San Francisco BIKE GUIDE 1st Edition SF BIKE LAWS SAN FRANCISCO BICYCLISTS MUST: Yield to People Walking Whether they re in a crosswalk or not, ALWAYS yield to people walking. Stop

More information

Improving Access in Florida International University Biscayne Bay Campus Executive Summary

Improving Access in Florida International University Biscayne Bay Campus Executive Summary EXECUTIVE SUMMARY Improving Access in Florida International University Biscayne Bay Campus Executive Summary Prepared for: Miami-Dade County Metropolitan Planning Organization (Miami-Dade MPO) Prepared

More information

Sir Francis Drake Boulevard Rehabilitation Project Bicyclist and Pedestrian Intercept Interviews Report

Sir Francis Drake Boulevard Rehabilitation Project Bicyclist and Pedestrian Intercept Interviews Report Sir Francis Drake Boulevard Rehabilitation Project Bicyclist and Pedestrian Intercept Interviews Report Sir Francis Drake Boulevard Rehabilitation Project Bicyclist and Pedestrian Intercept Interviews

More information

Safety Evidence for Bicycling

Safety Evidence for Bicycling Photo: Boegh (Flickr) Cycling in Cities Research Program School of Population & Public Health The University of British Columbia Faculty of Health Sciences Simon Fraser University Driving near bicyclists

More information

Criteria 3: Criteria 4: Traffic flow and traffic signals. Shakespeare Grove would be made one way running into Acland Street.

Criteria 3: Criteria 4: Traffic flow and traffic signals. Shakespeare Grove would be made one way running into Acland Street. Attachment D - Option Analysis Acland Street Acland Street Options Criteria 1: Criteria 7: Local access to the shopping strip - by walking, bike riding and by car (parking) Traffic flow and traffic signals

More information

TRANSPORTATION IMPACT ANALYSIS PROCEDURES MANUAL

TRANSPORTATION IMPACT ANALYSIS PROCEDURES MANUAL TRANSPORTATION IMPACT ANALYSIS PROCEDURES MANUAL INTRODUCTION The Town of Harrisburg is committed to establishing an interconnected, multimodal transportation system that increases mobility, safety, connectivity,

More information

DRIVING TEST POSSIBLE QUESTIONS & ANSWERS.

DRIVING TEST POSSIBLE QUESTIONS & ANSWERS. DRIVING TEST POSSIBLE QUESTIONS & ANSWERS. Question 1. What shape and colour is a warning sign? Diamond Shape - Yellow and Black Question 2. When should you not drive? While under the influence of alcohol,

More information

TABLE OF CONTENTS. 1 Overview... 1-1. 1.1 Introduction... 1-1 1.2 Timing Goals... 1-1 Review of Signal Timing... 1-1

TABLE OF CONTENTS. 1 Overview... 1-1. 1.1 Introduction... 1-1 1.2 Timing Goals... 1-1 Review of Signal Timing... 1-1 May 2013 MnDOT Traffic Signal Timing and Coordination Manual TABLE OF CONTENTS 1 Overview... 1-1 1.1 Introduction... 1-1 1.2 Timing Goals... 1-1 Review of Signal Timing... 1-1 2 Data Collection and Information

More information

Major Improvement Schemes in Basingstoke

Major Improvement Schemes in Basingstoke Major Improvement Schemes in Basingstoke 1. Welcome Welcome to this exhibition, which provides information about the planned highway improvements being delivered in Basingstoke from 2015 2018. A30 Winchester

More information

INTEGRATION OF PUBLIC TRANSPORT AND NMT PRINCIPLES AND APPLICATION IN AN EAST AFRICAN CONTEXT

INTEGRATION OF PUBLIC TRANSPORT AND NMT PRINCIPLES AND APPLICATION IN AN EAST AFRICAN CONTEXT INTEGRATION OF PUBLIC TRANSPORT AND NMT PRINCIPLES AND APPLICATION IN AN EAST AFRICAN CONTEXT MARK BRUSSEL CONTENTS Examples of integration from the Netherlands Rationale and principles of integration

More information