1 Project Overview Summary: The Project restored what Architectural Forum magazine described as the first modern Civic Center built in any American city to its original glory. This 1940s Pflueger design has transitioned into the 21 st century in style. Description of the Project: This project included three major buildings; the 71,000 square foot City Hall, the 56,000 square foot former Hall of Justice building, and the 160,000 square foot Memorial Auditorium and Art Center complex, all arranged around the Civic Center Plaza. Since the original completion of the City Hall and former Hall of Justice in 1949, and the Auditorium in 1951, Richmond has enjoyed the Civic Center complex. Originally envisaged by the internationally recognized practice of Schindler and Neutra during the 1930 s, the facilities were brought to fruition in the 1940 s by Timothy L. Pflueger, San Francisco s most prominent civic architect, and completed by his brother Milton after Timothy s death. As the first modern Civic Center built in any American city, the architectural and historic significance of this post World War II modernist array of buildings, dedicated as a memorial to World War II, cannot be overstated. In 2002, City offices began vacating Civic Center due to a plethora of problems with the buildings, the most prevalent being the need for seismic upgrading and water-proofing the basements in City Hall and the former Hall of Justice. In June of 2006, the City of Richmond chose a development team to implement the project. With community input through a public design review process, the overriding goal was established to retain the look and feel of the original design, but create a fully modern and sustainable Civic Center. The result of these efforts is a set of truly world class facilities, all of which have a new lease on life. The iconic Pflueger design is fully respected, meeting the Secretary of the Interior s Standards, while bringing a twenty-first century presence to the Civic Center Historic District in the center of the City. The Plaza is now enhanced by a water feature, which was featured in Pflueger s original pencil drawing that was presented in 1945, but never built. All exterior architecture was painstakingly designed to respect the original design and preserve as much of the historic buildings as possible while creating a first class office environment. Replacement bricks were custom made to match originals. The accessible ramps were done with great respect to the original Plaza design. Near the two original Plaza flag poles, four monuments saved from the original plaza honor the memory of World War and those who sacrificed to achieve victory. New high-tech glazing systems were designed to be faithful to the look of the original system while minimizing solar gain. The interior of the office buildings required a complete renovation; however, the original center grand stairway of the City Hall building was preserved and restored to its original luster, with several new terrazzo panels fabricated to match original panels that had to be replaced. The original fluted interior concrete columns were left exposed as much as possible to show their elegance. The interiors were designed to hearken back to 1950 while using sustainable materials and modern technology, keying off the original anodized aluminum window frames and terrazzo on the grand stairway. Page 1

2 Project Page 2 of 2 Overview Summary and Description of the Project April 26, 2010 Setting the trend in the bay area for sustainable approaches to the development, the City chose to re-use their historic set of buildings, instead of demolishing them and building anew. Through a carefully orchestrated design process the development team was able to attain LEED Gold Certification for both 1949 vintage office buildings on the Plaza. The overall reduction of water usage and the control of runoff, state of the art heating ventilation and air conditioning, as well as solar panels and state of the art glazing systems, played key roles in achieving these goals. This effort continues through sustainable operation practices.

3 Aeroplane view conceptual design for the Civic Center by Timothy Pflueger, c

4 The Civic Center in 2007, prior to rehabilitation. At top right, view from Nevin Avenue into Plaza; at bottom right, view from Barrett Avenue to City Hall.

5 Above: The Civic Center Plaza on December 30, Below: The completed Civic Center Rehabilitation in 2009.

6 Clockwise from upper right: The Plaza prior to rehabilitation in 2007; the plaza during construction in early 2009; the completed plaza.

7 Above: City Hall c. 1953, with banner celebrating All America City. The ground floor is an open breezeway. Right: City Hall in The open breezeway has been converted to glass-enclosed office space.

8 Above: Original City Hall third floor plan. Below: City Hall third floor plan in 2009, following rehabilitation.

9 Clockwise from upper left: Original building section at City Hall with open central stair; the restored stair; terrazzo restoration and cleaning in progress.

10 The project included extensive brick restoration and seismic strengthening, seen here at the lobby of 440 Civic Center Plaza, the former Hall of Justice.

11 Clockwise from upper left: Restored Auditorium exterior; original lobby interior; restored lobby interior; the Auditorium under construction c

12 Pflueger s original concept for the plaza included a central fountain; his vision was realized in the rehabilitation with the addition of a central water feature.

13 Text Sustainability features helping City Hall earn LEED Gold certification included: rooftop photovoltaic panels, water-saving restroom fixtures, and recycled materials at the second floor one-stop customer service counter.

14 The restored Civic Center in 2009, at project completion, with Pflueger s original concept at inset.

MARQUETTE UNIVERSITY: McCabe Hall

MARQUETTE UNIVERSITY: McCabe Hall MARQUETTE UNIVERSITY: McCabe Hall THE SITE Newly acquired by Marquette, the vintage 1920 s building is located on the northeast corner of Wisconsin and 17th Streets. The urban setting offers immediate

More information

DISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf

DISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf DISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf Discovery Hall reflects its dynamic program and dramatic site, as well as the collaborative and student-centered spirit of

More information

1 Buffalo Street ID: Grant: $81,000. Total Project: $1,350,000. Before. After

1 Buffalo Street ID: Grant: $81,000. Total Project: $1,350,000. Before. After 1 Buffalo Street Grant: $81,000 Total Project: $1,350,000 Complete Exterior and Interior Renovation of four connected buildings; including new facades along two streets, new roofs, electrical, mechanical

More information

Deep Energy Savings in Existing Buildings

Deep Energy Savings in Existing Buildings Case Study Deep Energy Savings in Existing Buildings Overview Site Details Owner: Alliance for Sustainable Colorado Location: Denver, CO Building Type: Office Project Description: Major Renovation Size

More information

FRANCIS L. CARDOZO HIGH SCHOOL 1200 CLIFTON STREET NW WASHINGTON, DC 20009

FRANCIS L. CARDOZO HIGH SCHOOL 1200 CLIFTON STREET NW WASHINGTON, DC 20009 FRANCIS L. CARDOZO HIGH SCHOOL 1200 CLIFTON STREET NW WASHINGTON, DC 20009 FRANCIS L. CARDOZO HIGH SCHOOL SCHOOL HISTORY Francis L. Cardozo High School, located at 1200 Clifton Street and bounded by Florida

More information

The Economic Development Advantages of High Performance Rehabilita;on Projects. 2013 VCU Energy & Sustainability Conference January 30, 2013

The Economic Development Advantages of High Performance Rehabilita;on Projects. 2013 VCU Energy & Sustainability Conference January 30, 2013 The Economic Development Advantages of High Performance Rehabilita;on Projects 2013 VCU Energy & Sustainability Conference January 30, 2013 Founding Firm Philosophy REBUILDING COMMUNITY As a practice,

More information

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Printed On: 2003/04/03 St Patrick CES, 7932 Study [03.3-050 Plumbing Piping Systems] Study condition, remaining service

More information

FAUQUIER HIGH SCHOOL FAUQUIER HIGH SCHOOL 200 E MARKET STREET, CHARLOTTESVILLE, VA PH : 434.296.5684 WWW VMDO.COM

FAUQUIER HIGH SCHOOL FAUQUIER HIGH SCHOOL 200 E MARKET STREET, CHARLOTTESVILLE, VA PH : 434.296.5684 WWW VMDO.COM FAUQUIER HIGH SCHOOL 00 E MARKET STREET, CHARLOTTESVILLE, VA PH :.9. WWW VMDO.COM PROJECT OVERVIEW The strategy for the addition and renovation of Fauquier High School unites disparate school wings into

More information

Finegold Alexander Architects / LIBRARIES

Finegold Alexander Architects / LIBRARIES Finegold Alexander Architects / LIBRARIES 1 2 Westwood Public Library Westwood, Massachusetts Finegold Alexander has designed a 37,000 SF two-story new library for the town of Westwood. The design creates

More information

APPENDIX E Comparison of Original Design and Constructed Project

APPENDIX E Comparison of Original Design and Constructed Project APPENDIX E Comparison of Original Design and Constructed Project CAPITOL TOWERS V TOWER High rise towers Three One Multi-story parking garages Three multi-story One Penthouse Two penthouse floors with

More information

The siting of the structure respects the fundamental mission of working with maritime enterprises while creating an iconic headquarters on Seattle s

The siting of the structure respects the fundamental mission of working with maritime enterprises while creating an iconic headquarters on Seattle s The Harley and Lela Franco Maritime Center represents a 21st century working waterfront business focused on marine innovation, sustainability and employee success. The project goal was to create one of

More information

Yale Arts Complex. The design results from the integration of programmatic, structural and mechanical needs. It includes

Yale Arts Complex. The design results from the integration of programmatic, structural and mechanical needs. It includes New Haven, Connecticut 1 2 Yale University s Rudolph Building formerly known as the Art and Architecture Building was designed in 1963 by the modern master and then chair of the School of Architecture,

More information

Innovation in Affordable Housing Incorporating GREEN in Development

Innovation in Affordable Housing Incorporating GREEN in Development Innovation in Affordable Housing Incorporating GREEN in Development 2014 Housing Innovation Marketplace Conference INTRODUCTION A small idea can grow into something that really bears fruit and, if good

More information

Existing building renewal case study: Beardmore Building

Existing building renewal case study: Beardmore Building Existing building renewal case study: Beardmore Building Building Stats Overview Originally built in 1922 by Charles Beardmore, a timber and mining pioneer, the Beardmore Building in Priest River, Idaho,

More information

Lyndon P. Lorusso Applied Technology Building

Lyndon P. Lorusso Applied Technology Building www.capecod.edu Lyndon P. Lorusso Applied Technology Building Cape Cod Community College Cape Cod Community College is an innovative institution providing educational programs and services to meet the

More information

Saint Cloud Business Center

Saint Cloud Business Center Saint Cloud Business Center 14 7th Avenue North Saint Cloud, MN 56303 For Sale Located on 7th Avenue in the heart of downtown across from the Court House Square. A large professional reception area with

More information

KBC Chapter 34 : Applying the Kentucky Building Code to Existing and Historic Buildings

KBC Chapter 34 : Applying the Kentucky Building Code to Existing and Historic Buildings KBC Chapter 34 : Applying the Kentucky Building Code to Existing and Historic Buildings Presented by: Kentucky Department of Housing, Buildings, and Construction Kentucky Heritage Council Louisville Metro

More information

100% 50% 92% 99% LEED Facts PROJECT HIGHLIGHTS. Multi-occupant spaces have adjustable thermostats and lighting. Reduced water usage for landscaping

100% 50% 92% 99% LEED Facts PROJECT HIGHLIGHTS. Multi-occupant spaces have adjustable thermostats and lighting. Reduced water usage for landscaping UNIVERSITY OF RICHMOND CAROLE WEINSTEIN INTERNATIONAL CENTER 28 Westhampton Way, Richmond VA 23173 LEED NC v2.2 GOLD 2015 Completed in 2010, the Carole Weinstein International Center showcases the University

More information

Cultural Services FY 2014-16 Performance Plan

Cultural Services FY 2014-16 Performance Plan Contents I. Mission Statement... 1 II. Department Overview... 1 III. Program Description and Responsibilities... 1... 1 IV. Accomplishments for FY 2013-14... 2 V. Key Challenges and Outstanding Issues...

More information

Jefferson County (Colorado). Facilities Construction Project Drawings, 1950-1987

Jefferson County (Colorado). Facilities Construction Project Drawings, 1950-1987 Jefferson County (Colorado). Facilities Construction Project Drawings, 1950-1987 Series # 109 Originally Processed: 1998 Re-Processed and New Container List Typed by: Ronda Frazier Date Completed: October,

More information

STAR VALLEY RANCH Star Valley Ranch, WY

STAR VALLEY RANCH Star Valley Ranch, WY STAR VALLEY RANCH Star Valley Ranch, WY ARCHITECTURAL BUILDING ASSESSMENT and CODE ANALYSIS: GAMBREL BARN & SILO Architecture Interior Design Lonciscope Architecture 101 North MciIn Street Tel. (208) 232-374'

More information

DADE COUNTY COURTHOUSE 73 WEST FLAGLER STREET

DADE COUNTY COURTHOUSE 73 WEST FLAGLER STREET DADE COUNTY COURTHOUSE 73 WEST FLAGLER STREET Designation Report City of Miami REPORT OF THE CITY OF MIAMI PLANNING DEPARTMENT TO THE HERITAGE CONSERVATION BOARD ON THE POTENTIAL DESIGNATION OF DADE COUNTY

More information

HILBERT CIRCLE THEATRE

HILBERT CIRCLE THEATRE Project Name: Hilbert Circle Theatre Submission Category: 25 Year Award Project Type: Symphonic Performance Hall Project Address: 45 Monument Circle, Indianapolis, IN 46204 Date of Substantial Completion:

More information

Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study

Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study Robert C. Burns, AIA, LEED AP Principal Director of Historic Architecture 804. 648. 5040, ext. 1107

More information

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School Introduction Background The Duke School of Nursing building offers a new three-story state of the art facility that has helped strengthen the quality and integrity of the School of Nursing at Duke. The

More information

A/E REVIEW CHECKLIST ARCHITECTURAL

A/E REVIEW CHECKLIST ARCHITECTURAL A/E REVIEW CHECKLIST ARCHITECTURAL Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Architectural, Boiler Safety Devices Operation Checklist,

More information

For Historically Designated Homes & Buildings

For Historically Designated Homes & Buildings Ninth Street Historic Park Acknowledgements This project was paid for in part by a State Historical Fund grant from the Colorado Historical Society. The contents contained herein do not necessarily reflect

More information

Historic Renovation. passionate principals + committed professionals + unparalleled service

Historic Renovation. passionate principals + committed professionals + unparalleled service Historic Renovation passionate principals + committed professionals + unparalleled service HISTORIC RENOVATION Construction work on a historic building may include preservation, restoration, repair, refurbishment,

More information

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No. Classification: Cluster: Location: Total Area: No. of Stories Aquarium Acreage Owned: Acquired: 1904 Most Recent Improvements: THE AQUARIUM Close to junction of Inselrhue and Loiter Way, Belle Isle Two

More information

Mohammed Ageli. BA (Hons) DipArch ARB

Mohammed Ageli. BA (Hons) DipArch ARB Mohammed Ageli CV CV Mohammed Ageli BA (Hons) DipArch ARB 2012 Studio Ageli Architects Director and principal 2006 2012 Eric Parry Architects architect 2003 2005 PDD Architects Architectural assistant

More information

The Importance of Construction Documents to Restoration Architects

The Importance of Construction Documents to Restoration Architects 176 American Archivist / Vol. 59 / Spring 1996 History and Special Interests The Importance of Construction Documents to Restoration Architects ALICE CAREY Abstract: The needs of preservation architects

More information

PARKVILLE HIGH SCHOOL LIMITED RENOVATION

PARKVILLE HIGH SCHOOL LIMITED RENOVATION PARKVILLE HIGH SCHOOL LIMITED RENOVATION DESIGN BRIEFING For Dr. Joe A. Hairston BALTIMORE COUNTY PUBLIC SCHOOLS August 11, 2009 Smolen 3 Emr + Associates Architects 1355 Piccard Drive, Suite 200 Rockville,

More information

FLORIDA STATE UNIVERSITY INTERNATIONAL PROGRAMS VALENCIA "GOLD" STUDY CENTER

FLORIDA STATE UNIVERSITY INTERNATIONAL PROGRAMS VALENCIA GOLD STUDY CENTER FLORIDA STATE UNIVERSITY INTERNATIONAL PROGRAMS VALENCIA "GOLD" STUDY CENTER REPORT ABOUT RESTORATION, ARCHAEOLOGICAL AND HISTORICAL REMAINS AND SUSTAINABLE "GARNET AND GOLD GO GREEN" DECISIONS. 1.- RESTORATION

More information

FOR SALE OR LEASE 518 W. Riverside Avenue Spokane, WA 99201

FOR SALE OR LEASE 518 W. Riverside Avenue Spokane, WA 99201 FOR SALE OR LEASE 518 W. Riverside Avenue Spokane, WA 99201 Historic Office Building Historic, Downtown Spokane Office Building Classic, Late 19th Century styling completely updated New, energy efficient

More information

65 RORIE STREET NORTHERN ELECTRIC BUILDING HISTORICAL BUILDINGS COMMITTEE

65 RORIE STREET NORTHERN ELECTRIC BUILDING HISTORICAL BUILDINGS COMMITTEE 65 RORIE STREET NORTHERN ELECTRIC BUILDING HISTORICAL BUILDINGS COMMITTEE 18 DECEMBER 1984 65 RORIE STREET NORTHERN ELECTRIC BUILDING This building is presently enjoying a new lease on life as the Rorie

More information

Plan to Develop Housing for Homeless Veterans at Fort Snelling Upper Post. January 23 rd, 2013 VA Medical Center, Minneapolis

Plan to Develop Housing for Homeless Veterans at Fort Snelling Upper Post. January 23 rd, 2013 VA Medical Center, Minneapolis Plan to Develop Housing for Homeless Veterans at Fort Snelling Upper Post January 23 rd, 2013 VA Medical Center, Minneapolis Project Roles Department of Veterans Affairs CommonBond Communities Developer

More information

9770 CULVER BOULEVARD CULVER CITY, CA 90232-0507 www.culvercity.org. Incidental improvements: improvements that do not qualify as minor or

9770 CULVER BOULEVARD CULVER CITY, CA 90232-0507 www.culvercity.org. Incidental improvements: improvements that do not qualify as minor or 9770 CULVER BOULEVARD CULVER CITY, CA 90232-0507 www.culvercity.org Construction Permitting Guidelines for Businesses Moving into Existing Buildings in Culver City If your business is moving into an existing

More information

2012 Historic Preservation Awards Script November 13, 2012 Unity Temple

2012 Historic Preservation Awards Script November 13, 2012 Unity Temple 2012 Historic Preservation Awards Script November 13, 2012 Unity Temple The Historic Preservation Commission awarded six projects who represent some of the best preservation work in the Village of Oak

More information

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal

More information

Mitigation Leads to Preservation and Economic Recovery For One Community: Darlington, Wisconsin

Mitigation Leads to Preservation and Economic Recovery For One Community: Darlington, Wisconsin Mitigation Leads to Preservation and Economic Recovery For One Community: Darlington, Wisconsin The Effects of Flooding During the past half century, multiple flooding events along the Pecatonica River

More information

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS HIGH SCHOOL REPAIRS AND UPGRADES SITE Construction Estimate = $100,000

More information

Historic Preservation Certification Application Part 2 343-345 Main Street West South Haven, Vermont NPS Project No. 12345

Historic Preservation Certification Application Part 2 343-345 Main Street West South Haven, Vermont NPS Project No. 12345 Exterior Features 1 site and drainage 2 foundation 3 wood siding and trim 4 exterior doors 5 windows / storm windows 6 porches front and rear 7 chimneys 8 roofing Interior Features 9 frame 10 basement

More information

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015 Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015 Town Hall Complete building restoration (state historic preservation award) High efficiency

More information

Physician s Residence. Historic Structure Report IV. Building Treatment Approach

Physician s Residence. Historic Structure Report IV. Building Treatment Approach Physician s Residence Historic Structure Report Building Treatment Approach IV. Building Treatment Approach IV A. Standards for the Treatment of Historic Buildings The Physician s Residence is listed as

More information

7.0 REHABILITATION /RESTORATION / MAINTENANCE PLAN

7.0 REHABILITATION /RESTORATION / MAINTENANCE PLAN 7.0 REHABILITATION /RESTORATION / MAINTENANCE PLAN This section will detail and outline the rehabilitation, restoration, and maintenance plan for the 418 South June Street residence. Future work shall

More information

BROWNSVILLE STRUCTURES STUDY. July 2012. Prepared by. LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania 15219 1208

BROWNSVILLE STRUCTURES STUDY. July 2012. Prepared by. LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania 15219 1208 BROWNSVILLE STRUCTURES STUDY July 2012 Prepared by LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania 15219 1208 TABLE OF CONTENTS I. SUMMARY OF BUILDING ANALYSIS.. 1 II. INDIVIDUAL BUILDING

More information

Dunbar Hotel. 4255 S. Central Avenue, Los Angeles, CA 90011 (Constructed 1928)

Dunbar Hotel. 4255 S. Central Avenue, Los Angeles, CA 90011 (Constructed 1928) Dunbar Hotel 4255 S. Central Avenue, Los Angeles, CA 90011 (Constructed 1928) W.E.B. Du Bois, celebrated author, Harvard s first African American Ph.D. graduate, and hotel guest described the Dunbar Hotel

More information

Riverside Community College District / Renaissance Block

Riverside Community College District / Renaissance Block Riverside Community College District / Renaissance Block Site Location Parking Structure Four levels 224 parking spaces Access Street Coil School of the Arts Two levels 36,420 sf Plaza of the Arts Culinary

More information

Historic Tax Credits in Texas: Combining the New State Credit with the Federal Investment Tax Credit. Downtown Amarillo 17 December 2013

Historic Tax Credits in Texas: Combining the New State Credit with the Federal Investment Tax Credit. Downtown Amarillo 17 December 2013 Historic Tax Credits in Texas: Combining the New State Credit with the Federal Investment Tax Credit Downtown Amarillo 17 December 2013 Ben Dupuy Anna Mod Stonehenge is a nationally respected finance company

More information

UNIQUE LIVE/WORK LOFT

UNIQUE LIVE/WORK LOFT SALES PACKAGE 2625 & 2617 6th Ave. South Birmingham, Alabama UNIQUE LIVE/WORK LOFT building for sale or lease Asking Sales Price: $1,500,000 Asking Rental Rate: $12.00 PSF NNN OFFERED BY Rich Vanchina,

More information

University of Texas Medical School Building HABS No. TX-292 914-916 Strand Galveston H^B3 Galveston County IBx Texas <g<+_ ^^

University of Texas Medical School Building HABS No. TX-292 914-916 Strand Galveston H^B3 Galveston County IBx Texas <g<+_ ^^ m University of Texas Medical School Building HABS No. TX-292 914-916 Strand Galveston H^B3 Galveston County IBx Texas

More information

CASE STUDY: The EVERGREEN

CASE STUDY: The EVERGREEN CASE STUDY: The EVERGREEN 1691 Palm Ave Summary Information Type: Residential Occupancy: Single Family Residence Size: 3,075 square feet Completed: 2009 Owner: Rob and Denise Smith Developer: E2 Homes,

More information

CITY OF SOMERVILLE, MASSACHUSETTS MAYOR S OFFICE OF STRATEGIC PLANNING & COMMUNITY DEVELOPMENT

CITY OF SOMERVILLE, MASSACHUSETTS MAYOR S OFFICE OF STRATEGIC PLANNING & COMMUNITY DEVELOPMENT CITY OF SOMERVILLE, MASSACHUSETTS MAYOR S OFFICE OF STRATEGIC PLANNING & COMMUNITY DEVELOPMENT MICHAEL F. GLAVIN EXECUTIVE DIRECTOR JOSEPH A. CURTATONE MAYOR PLANNING DIVISION STAFF GEORGE PROAKIS, DIRECTOR

More information

3. HERITAGE GRANT APPROVAL 192 MOORHOUSE AVENUE, CHRISTCHURCH

3. HERITAGE GRANT APPROVAL 192 MOORHOUSE AVENUE, CHRISTCHURCH 3. HERITAGE GRANT APPROVAL 192 MOORHOUSE AVENUE, CHRISTCHURCH General Manager responsible: General Manager, Strategy and Planning Group, DDI: 941-8281 Officer responsible: Author: PURPOSE OF REPORT Programme

More information

SOUTH DAKOTA BOARD OF REGENTS. Committee on Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Committee on Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Committee on Budget and Finance AGENDA ITEM: III G DATE: October 9-10, 2013 ****************************************************************************** SUBJECT: South Dakota

More information

HICKAM AIR FORCE BASE

HICKAM AIR FORCE BASE BUILDING TYPE OVERVIEW BARRACKS There is only a single facility within the Barracks historic building category. Building 1102, once a 3200- men barracks, now serves as the Pacific Air Forces Headquarters.

More information

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS Permit applicants shall submit three (3) COMPLETE SETS of plans and specifications with each application for a permit. Plans and specifications

More information

Historic Preservation Tax Incentives

Historic Preservation Tax Incentives Historic Preservation Tax Incentives Sloane Bullough, Historic Preservation Specialist New York State Office of Parks, Recreation and Historic Preservation The greenest building is one that s already built.

More information

Friends Seminary Presentation to NYC Landmarks Preservation Commission 21 April 2015 Kliment Halsband Architects

Friends Seminary Presentation to NYC Landmarks Preservation Commission 21 April 2015 Kliment Halsband Architects Presentation to NYC Landmarks Preservation Commission 21 April 2015 Kliment Halsband Architects FRIENDS SEMINARY RE-DEVELOPMENT PROJECT NYC LPC SUBMISSION 16 APRIL 2015 INDEX 1 Project Description 2 Stuyvesant

More information

Columbia. 1142 West Grace Street Richmond, Virginia. NAI EAGLE 2250 Old Brick Road, Suite 240 Glen Allen, VA 23060 www.naieagle.

Columbia. 1142 West Grace Street Richmond, Virginia. NAI EAGLE 2250 Old Brick Road, Suite 240 Glen Allen, VA 23060 www.naieagle. 1142 West Grace Street Richmond, Virginia NAI EAGLE 2250 Old Brick Road, Suite 240 Glen Allen, VA 23060 www.naieagle.com Located in the Fan District - Richmond, VA Contact Harrison Hall (804) 217-6903

More information

M E M O R A N D U M PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT CITY OF SANTA MONICA PLANNING DIVISION

M E M O R A N D U M PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT CITY OF SANTA MONICA PLANNING DIVISION M E M O R A N D U M PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT CITY OF SANTA MONICA PLANNING DIVISION DATE: September 10, 2007 TO: FROM: The Honorable Landmarks Commission Planning Staff SUBJECT: 11A.

More information

FY2014 Budget Support Act Section 9014. District of Columbia Public Library

FY2014 Budget Support Act Section 9014. District of Columbia Public Library FY2014 Budget Support Act Section 9014 District of Columbia Public Library Introduction The DC Public Library s Martin Luther King Jr. Memorial Library, located at 901 G Street, NW, needs a major renovation

More information

HRI Properties New Orleans, Louisiana. Select Projects financed with State and Federal Historic Tax Credits

HRI Properties New Orleans, Louisiana. Select Projects financed with State and Federal Historic Tax Credits HRI Properties New Orleans, Louisiana Select Projects financed with State and Federal Historic Tax Credits Thirty-four States Offer Historic Tax Credits King Edward Hotel and Apartments Restoration of

More information

Windows, Exterior Doors and Decorative Metals

Windows, Exterior Doors and Decorative Metals Windows, Exterior Doors and Decorative Metals Introduction The 1936 and 1938 original drawings indicate that the historic windows and several of the exterior doors in the Hall of Waters building were to

More information

WINDOW AND DOOR REPLACEMENT SAMPLE PLAN

WINDOW AND DOOR REPLACEMENT SAMPLE PLAN To aid in communication between yourself, the inspectors, and the plans examiners, we have prepared this sample plan to assist in the preparations of your plan for window and door replacement. Follow the

More information

STATE UNIVERSITY OF NEW YORK COLLEGE OF ENVIRONMENTAL SCIENCE AND FORESTRY 2015 CAMPUS STATEMENT

STATE UNIVERSITY OF NEW YORK COLLEGE OF ENVIRONMENTAL SCIENCE AND FORESTRY 2015 CAMPUS STATEMENT STATE UNIVERSITY OF NEW YORK COLLEGE OF ENVIRONMENTAL SCIENCE AND FORESTRY 2015 CAMPUS STATEMENT Established in 1911 by an act of the New York State Legislature as the State s institution for educational

More information

Guernsey s Structural Engineering Experience

Guernsey s Structural Engineering Experience Guernsey s Structural Engineering Experience Foundation Settlement Issues: Trinity Valley Electric Cooperative, Kaufman, TX: Analyzed their headquarters facility for issues with soil movement that was

More information

DAHLONEGA, Ga., Nov. 28, 2012 Back in the early 1950s, when noted Atlanta architect

DAHLONEGA, Ga., Nov. 28, 2012 Back in the early 1950s, when noted Atlanta architect FOR IMMEDIATE RELEASE News Release Contact: Anne Taylor Carros Lord, Aeck & Sargent 404-253-6710 acarros@lasarchitect.com or Ann Kohut Kohut Communications Consulting 770-913-9747 annielk@bellsouth.net

More information

EcoSteel Pre-Engineered Steel Building System Overview

EcoSteel Pre-Engineered Steel Building System Overview EcoSteel Pre-Engineered Steel Building System Overview Overview EcoSteel Pre-Engineered Steel Buildings provide the world s most advanced Eco-friendly construction systems. In our ever expanding product

More information

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

SECTION XI OPINION OF PROBABLE COST

SECTION XI OPINION OF PROBABLE COST SECTION XI OPINION OF PROBABLE COST OPINION OF PROPABLE COSTS HARBOR ISLAND THE PAVILION 1) Provide a sprinkler system for the entire building. 8000 SF X $15/SF $120,000 2) Remove and replace existing

More information

CULLINAN STUDIO FOUNDRY (CULLINAN STUDIO OFFICES)

CULLINAN STUDIO FOUNDRY (CULLINAN STUDIO OFFICES) FOUNDRY ( OFFICES) Location: Islington, London, UK Client: Cullinan Studio Started on site: October 20 Completed: September 202 Size: 78sqm (GIA) Construction cost:.m Awards: RICS London Awards - Design

More information

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and

More information

31289 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JANUARY, 5.00 12, 2012

31289 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JANUARY, 5.00 12, 2012 31289 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JANUARY, 5.00 12, 2012 BOARD OF TRUSTEES OF COMMUNITY COLLEGE DISTRICT NO. 508 COUNTY OF COOK AND STATE OF ILLINOIS JOB ORDER CONTRACT

More information

TRANSBAY JOINT POWERS AUTHORITY

TRANSBAY JOINT POWERS AUTHORITY STAFF REPORT FOR CALENDAR ITEM NO.: 14 FOR THE MEETING OF: November 13, 2014 BRIEF DESCRIPTION: TRANSBAY JOINT POWERS AUTHORITY Amending Contract No. 08-04-CMGC-000, authorizing Webcor/Obayashi Joint Venture

More information

Design of a Concrete Masonry House: NCMA Foundation Partners with NC State University School of Architecture

Design of a Concrete Masonry House: NCMA Foundation Partners with NC State University School of Architecture Design of a Concrete Masonry House: NCMA Foundation Partners with NC State University School of Architecture Thanks to the generous support of the NCMA Foundation, a team of architecture students from

More information

University of Washington Foster School of Business. Seattle, Washington

University of Washington Foster School of Business. Seattle, Washington University of Washington Foster School of Business Seattle, Washington University of Washington Foster School of Business LMN PACCAR Hall Phase I of the University of Washington Michael G. Foster School

More information

Montana Law Enforcement Academy

Montana Law Enforcement Academy Montana Law Enforcement Academy State-Owned Heritage Properties Biennial Report 2012 2013 Report Prepared by: Beth Strandberg Administrative Officer Montana Law Enforcement Academy TABLE OF CONTENTS Executive

More information

john jay college of criminal justice

john jay college of criminal justice AIA NEW YORK CHAPTER 2013 DESIGN AWARDS ARCHITECTURE john jay college of criminal justice NEW YORK, NEW YORK FULL PROJECT NARRATIVE John Jay College of Criminal Justice s new building provides all the

More information

Ohio Department of Transportation. Lytle Tunnel Rehabilitation Phase 2 Public Information Meeting

Ohio Department of Transportation. Lytle Tunnel Rehabilitation Phase 2 Public Information Meeting Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Lytle Tunnel Rehabilitation Phase 2 Public Information Meeting HAM-71-1.34, PID 87268 July 23, 2013 Project Overview Purpose

More information

REFERENCES-COMMERCIAL. Montgomery County Community College. 60,000 Sq. Ft. Montgomery County Community College 12,000 Sq. Ft.

REFERENCES-COMMERCIAL. Montgomery County Community College. 60,000 Sq. Ft. Montgomery County Community College 12,000 Sq. Ft. Montgomery County Community College West Campus Expansion 60,000 Sq. Ft. Warehouse adaptive reuse of the former Vaughn Knitting Mill, a major architectural component of Pottstown s Industrial Heritage.

More information

IEA SHC Task 47 Renovation of Non-Residential Buildings towards Sustainable Standards

IEA SHC Task 47 Renovation of Non-Residential Buildings towards Sustainable Standards Date of revision: 15.6.2012 Osram Culture Centre Copenhagen, Denmark Valhalsgade 4, 2200 Copenhagen N 1. INTRODUCTION PROJECT SUMMARY Construction year: 1953 Energy renovation: 2009 No past energy renovations

More information

Why does the renovation and expansion of an EXISTING SCHOOL sometimes cost about the SAME or MORE than the construction of a NEW SCHOOL?

Why does the renovation and expansion of an EXISTING SCHOOL sometimes cost about the SAME or MORE than the construction of a NEW SCHOOL? Why does the renovation and expansion of an EXISTING SCHOOL sometimes cost about the SAME or MORE than the construction of a NEW SCHOOL? 1. BASIC FACTS: The current Abington High School building is 111,831

More information

July 29, 2014. Revise Section 1.1 (BACKGROUND AND CONTEXT) to the following:

July 29, 2014. Revise Section 1.1 (BACKGROUND AND CONTEXT) to the following: ADDENDUM NO. 2 TO REQUEST FOR QUALIFICATIONS FOR NEW DEVELOPMENT OF OAKLAND UNIFIED SCHOOL DISTRICT PROPERTIES, INCLUDING THE PARCELS HOUSING THE PAUL ROBESON ADMINISTRATION BUILDING AND DEWEY HIGH SCHOOL

More information

DESIGN GUIDELINES FOR UTILITY METERS D.C. HISTORIC PRESERVATION REVIEW BOARD

DESIGN GUIDELINES FOR UTILITY METERS D.C. HISTORIC PRESERVATION REVIEW BOARD DESIGN GUIDELINES FOR UTILITY METERS D.C. HISTORIC PRESERVATION REVIEW BOARD Introduction Utility meters are a necessary component for any building. When older buildings were originally provided with utility

More information

Multidisciplinary Design of a Sustainable, Environmental-Friendly, and Affordable House

Multidisciplinary Design of a Sustainable, Environmental-Friendly, and Affordable House Abstract Multidisciplinary Design of a Sustainable, Environmental-Friendly, and Affordable House A multidisciplinary team of over forty graduate and undergraduate students from Civil, Electrical, and Mechanical

More information

Facility Assessment for. 11801 East Main Street, Huntley, IL

Facility Assessment for. 11801 East Main Street, Huntley, IL Facility Assessment for 11801 East Main Street, Huntley, IL July 12, 2012 Prepared by: Dewberry Architects Inc. 25 S. Grove Avenue, Suite 500 Elgin, IL 60120 (847) 695-5840 The Village of Huntley requested

More information

ESSENTIAL CURRICULUM ARCHITECTURAL DESIGN ACADEMY

ESSENTIAL CURRICULUM ARCHITECTURAL DESIGN ACADEMY ESSENTIAL CURRICULUM ARCHITECTURAL DESIGN ACADEMY HOWARD COUNTY MARYLAND ARCHITECTURAL DESIGN ACADEMY Architectural Design 1 Introduction / Overview of Course This course will introduce the basic principles

More information

WAR MEMORIAL VETERANS BUILDING

WAR MEMORIAL VETERANS BUILDING WAR MEMORIAL VETERANS BUILDING Seismic Retrofit and Improvements Project Page 1 HISTORY Due to its role in key international events of historical importance and its status as a major American performing

More information

LAND USE ELEMENT GOALS AND POLICIES

LAND USE ELEMENT GOALS AND POLICIES City of Pasadena General Plan LAND USE ELEMENT GOALS AND POLICIES Excerpt of policies for Design Commission review Urban Form and Placemaking "Urban form" is often defined as (a) the "general pattern of

More information

PROPERTY management. Case Studies

PROPERTY management. Case Studies PROPERTY management Case Studies SIERRA REAL ESTATE CASE STUDIES REINVIGORATING 648 BROADWAY 648 Broadway Commercial building 50,000 SF 10 floors Owner-managed for over 25 years Sierra Real Estate assumed

More information

TOWARD A SUSTAINABLE DALLAS

TOWARD A SUSTAINABLE DALLAS TOWARD A SUSTAINABLE DALLAS An Overview of LEED, Green Building Programs and recommendations for next steps Presented to the Dallas City Council OCTOBER 17, 2007 w w w. d a l l a s c i t y h a l l. c o

More information

Harmon Court 1128 Harmon Place Minneapolis, Minnesota

Harmon Court 1128 Harmon Place Minneapolis, Minnesota Harmon Court 1128 Harmon Place Minneapolis, Minnesota Building Specifications Location 1128 Harmon Place Minneapolis, Minnesota 55403 Building Size 31,350 rentable square feet 3 office floors Year Built

More information

Building Foundation and Structure

Building Foundation and Structure Building Foundation and Structure Overview The construction of the Hall of Waters building began in 1936, and was constructed over the original site of the Siloam and Sulpho-Saline Springs. The original

More information

LOS ANGELES COMMUNITY COLLEGE DISTRICT Los Angeles Trade Technical College PROGRESS REPORT NOVEMBER 2013

LOS ANGELES COMMUNITY COLLEGE DISTRICT Los Angeles Trade Technical College PROGRESS REPORT NOVEMBER 2013 1.0 EXECUTIVE SUMMARY 1.1 Campus Program Summary There are seven (7) projects in pre-design and programming; five (5) are in design; and six (6) in construction. A summary of the Trade-Tech construction

More information

SILICON VALLEY INTERNET CAPITAL 301 UNIVERSITY AVENUE, PALO ALTO, CALIFORNIA

SILICON VALLEY INTERNET CAPITAL 301 UNIVERSITY AVENUE, PALO ALTO, CALIFORNIA Kaplan Architects is a San Francisco based architectural firm doing projects throughout the Bay Area and beyond. Edward Kaplan AIA, NCARB is an award winning, licensed architect and has been responsible

More information

Angelo State University Construction Report

Angelo State University Construction Report May 12, 2009 Angelo State University Construction Report Modular buildings will temporarily house ASU staff during the Hardeman renovation starting this fall. Prepared for: John Russell, Director of Planning

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE FORM GEN. 160 CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE Date: November 2 4, 2 01 4 CAO File No. 0640-01386-0022 To: The Honorable Members of the City Council From: Sharon M. Tso, Chief Legislative

More information

The work has continued on final Phase 4 and is nearing completion.

The work has continued on final Phase 4 and is nearing completion. Updates-January 22, 2013 29369-Rehab Plaza Deck/Drainage Budget: $18,000,000, constr. Start 8/2009 The work has continued on final Phase 4 and is nearing completion. The main plaza area of phase 4 is now

More information

ATLANTA, April 19, 2004 Swan House, a Neoclassical style home-turned-historic house

ATLANTA, April 19, 2004 Swan House, a Neoclassical style home-turned-historic house News Release FOR IMMEDIATE RELEASE Contact: Ken Higa Lord, Aeck & Sargent 404-253-6732 khiga@lasarchitect.com or Ann Kohut Kohut Communications Consulting 770-913-9747 annielk@bellsouth.net Swan House

More information