1 SECTION VIBRATION ISOLATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract including General and Supplementary Conditions, Division 1 Specification Sections, and the Mechanical General Requirements Section apply to work of this Section, as if repeated herein SCOPE A. This Section describes noise and vibration control systems to be used in all phases of mechanical work OBJECTIVE A. The objective of this Section is to provide the necessary Specifications for the avoidance of excessive noise or vibration in the building due to the operation of machinery or equipment and/or due to interconnected piping, ductwork, conduit, or structure. B. Specific applications, features, or methods unique to a given phase of work will be delineated in other Divisions or Sections of the Specifications DESIGN CRITERIA A. Isolate all motor-driven mechanical equipment from the building structure and from the systems which they serve, to prevent equipment vibrations from being transmitted to the structure. B. Consider equipment weight distribution to provide uniform deflections. C. For equipment with variable speed capability, vibration isolation device shall be based upon the lowest speed.

2 1.05 CONTRACTOR RESPONSIBILITY A. Provide vibration isolation devices, frames, guides, and related material. B. Do not install any rotating mechanical equipment, associated piping, ductwork, etc., which makes rigid contact with the structure unless it is approved by the Architect. Structure includes slabs, beams, studs, walls, columns, lath, etc. C. Coordinate work with other trades to avoid rigid contact with the building. Inform other trades that follow, such as plastering or electrical, to avoid any contact which would reduce the efficiency of vibration isolation systems. D. Conflicts with other trades which will result in unavoidable contact with equipment, piping, etc., described herein, due to inadequate space, etc., shall be brought to the Architect's attention prior to installation. Corrective work necessitated by conflicts after installation shall be at the responsible Contractor's expense. E. Discrepancies between the Specifications and field conditions, changes required due to specific equipment selection, etc., shall be brought to the Architect's attention prior to installation. Corrective work necessitated by discrepancies after installation shall be at the Contractor's expense. F. Obtain inspection and approval from the Architect of any installation to be covered or enclosed prior to such closure. G. Obtain written and/or oral instructions from the vibration isolation manufacturer as to the proper installation and adjustment of vibration isolation devices. H. Correct, at no additional cost, any installation which is deemed defective in workmanship or materials by the Architect. I. The Contractor shall be responsible for proper operation of all systems, minor subsystems and services provided under this Section. He shall coordinate start-up procedures, calibration and system check-out with all subcontractors involved. System operational problems shall be diagnosed, and correctional procedures shall be initiated by various subcontractors involved, to bring the system into compliance with design requirements. Problems shall then be rechecked subsequent to completion of correctional work to verify that the system operates normally. Any remaining difficulties shall be brought to the attention of the Architect.

3 1.06 SUBMITTALS A. Submit shop drawings in accordance with General and Supplementary Conditions and General Mechanical Requirements Section B. Submit shop drawings of isolation devices indicating isolation materials, isolator heights both free and operating, isolator dimensions, deflections and isolation efficiency based on lowest operating speed. C. Submit flexible pipe connector shop drawing data, including maximum allowable temperature and pressure rating, overall face-to-face length, and elongation. In addition, include two test reports by independent consultants showing minimum reduction of 20 db in vibration acceleration, and 10 db in sound pressure levels at typical blade passage frequencies. D. Submit engineer's calculations for anchor/guide loads and isolator selection. E. Submit manufacturer's installation requirements. out. F. Submit verification of start-up procedures, calibration, and system check 1.07 COORDINATION A. Work under this Section must be coordinated with other structural, mechanical, and electrical work in order to accomplish interfacing necessary to provide a complete and operating system in conformance with intent of Contract Documents. PART 2 - PRODUCTS 2.01 ACCEPTABLE MANUFACTURERS A. Material unless specified otherwise 1. Amber-Booth Company 2. Caldyn 3. Korfund Company 4. Kinetics 5. Mason Industries 6. M.W. Sausee

4 B. Type 3-F, 4-F, and 5-F Flexible Pipe Connectors 2.02 MATERIALS 1. Griswold Controls 2. Flow Design, Inc. A. Design isolation devices for the equipment with which they are to be used. Materials used shall retain their isolation characteristics for the life of the equipment served. Elastomeric materials shall be industrial grade neoprene. Provide isolation devices subjected to weather with hot-dipped galvanized finish. B. Coordinate selection of devices with isolator and equipment manufacturer VIBRATION ISOLATION MOUNTING A. Type 1-M 1. Mason type WMW, neoprene waffle pads, 40 durometer. Select number and size of pads to accept the equipment operating weight evenly. B. Type 2-M (High Frequency Vibration) 1. Mason type ND or rails type DNR, double deflection neoprene mounts with cast-in metal inserts for bolting to equipment. 2. Both surfaces rib molded for skid resistance. On equipment such as small vent sets and close coupled pumps, steel rails shall be used above the mountings to compensate for the overhang. C. Type 3-M (Low Frequency Vibration) 1. Mason type SLFH combination spring and neoprene with rib molded base. Freestanding, laterally stable without any housing, complete with 1/2" neoprene acoustical friction pads between the baseplate and the support. 2. Where seismic vibration mounts are required, Mason type the SSLFH- housed single spring steel mounts shall be used. 3. Where seismic vibration mounts are required, Contractor shall have option of using Mason type SLF mounts in combination with a Mason type Z-1011 or Z-1225 all-directional seismic snubber.

5 4. Provide with leveling bolts rigidly bolted to the equipment. Springs shall have a minimum additional travel to solid equal to 50% of the rated deflection. Spring diameters shall be no less than 0.8 of the compressed height of the spring at rated load. D. Type 4-M 1. Mason type SLRH combination spring and neoprene with rib molded base similar to type 2-M mounts, except with a housing that includes vertical limit stops to prevent spring extension when weight is removed. 2. Installed and operating heights shall be the same. Maintain a minimum clearance of 1/2" around restraining bolts and between the housing and spring to eliminate interference with spring action. Limit stops shall be out of contact during normal operation VIBRATION ISOLATION HANGER A. Type 1-H 1. Mason type DNHS vibration hangers with a steel spring and 0.3" deflection neoprene element in series. Neoprene element shall be molded with a rod isolation bushing that passes through the hanger box. 2. Spring diameters and hanger box lower hole sizes shall be large enough to permit hanger rod to swing through a 30 degree arc before contacting the hole and short circuiting the spring. Springs shall have a minimum additional travel to solid equal to 50% of the rated deflection. B. Type 2-H 1. Mason type PCDNHS vibration hangers similar to Type 4-M, but precompressed to rated deflection to keep piping or equipment at a fixed elevation during installation. Design hangers with a release mechanism to free the spring after installation is complete and hanger is subjected to its full load. C. Type 4-H 1. Mason type W30 steel springs in a neoprene cup with a grommet to prevent short circuiting of the hanger rod. Provide load on the neoprene and prevent its extrusion.

6 2. Spring diameters and hanger box lower hold size to be large enough to permit the hanger rod to swing through a 30 degree arc before contacting the hole and short circuiting the spring. Springs to have a minimum additional travel to solid equal to 50% of the rated deflection. 3. Provide hangers with an eye bolt on the spring end and provision for attaching the housing to the flat iron duct straps VIBRATION ISOLATION PIPE ANCHORS AND GUIDES A. Pipe Anchors and Guides: 1. Mason type ADA or ADAH directional acoustical pipe anchors and guides for vertical piping, consisting of a telescopic arrangement of 2 sizes of steel tubing separated by a minimum half-inch thickness of heavy-duty neoprene and duct or neoprene isolation material. Vertical restraints shall prevent vertical travel in either direction. Allowable loads on the isolation materials shall not exceed 500 psi and the design shall be balanced for equal resistance in any direction. 2. Submittals shall include supporting calculations by a registered mechanical or civil engineer indicating anchor/guide loads and isolator selection. 2. Furnish thrust restraints complete with rods and angle brackets for attachment to both the equipment and ductwork or equipment and structure. Attach horizontal restraints at the centerline of thrust and symmetrically on either side of the unit VIBRATION ISOLATION FLEXIBLE PIPE CONNECTORS A. Requirements 1. Provide flexible connectors for piping connected to equipment mounted on vibration isolators and piping connected to rotating or reciprocating equipment.

7 PART 3 - EXECUTION 3.01 VIBRATION ISOLATION APPLICATION A. Refer to Equipment Schedules for "Type" and "Minimum Static Deflection." B. Piping Connected to Rotating or Reciprocating Equipment: Use flexible piping connections as scheduled. C. Horizontal Pipe Isolation. Provide Type 2-H hangers or Type 3-M mounts with deflections equal to the equipment isolation deflection at the first 3 support locations from the equipment. Provide Type 1-H hangers for piping at other locations within mechanical rooms or penthouses. D. Provide vibration isolation hangers for furnace/coil units and fans INSTALLATION A. Install vibration isolation devices and flexible pipe connectors in accordance with manufacturer's instructions. B. Install flexible pipe connections at right angles to displacement (horizontal and parallel to rotating equipment shafts) and on equipment side of shutoff valves. C) Flexible pipe connections and horizontal pipe isolation not required on equipment internally isolated and bolted rigid to structure. D. Equipment, ductwork and piping shall be seismically braced in accordance with drawings. SMACNA Guidelines, and all governing code authorities. **END OF SECTION**

Vibration Isolation Products. Spring Isolators. Isolation Hangers. Thrust Restraints. Flexible Connectors. Isolation Bases. Rooftop Isolation Curbs

Vibration Isolation Products. Spring Isolators. Isolation Hangers. Thrust Restraints. Flexible Connectors. Isolation Bases. Rooftop Isolation Curbs Spring Isolators Isolation Hangers Thrust Restraints Flexible Connectors Isolation Bases Rooftop Isolation Curbs Neoprene Isolators Fiberglass Isolators Air Mounts Seismic and Wind Restraint Isolators,

More information

VCS. MASON INDUSTRIES, Inc. COMPLETE HVAC ENGINEERING SPECIFICATIONS VCS-100-13 BULLETIN

VCS. MASON INDUSTRIES, Inc. COMPLETE HVAC ENGINEERING SPECIFICATIONS VCS-100-13 BULLETIN First Printing 1965 Revised 1973, 1974, 1975, 1976, 1979, 1982, 4/2001, 9/2001, 11/2003, 8/2005. 11/06, 1/08, 9/10 & MARCH 2014 MASON INDUSTRIES, Inc. Manufacturers of Vibration Control Products 350 Rabro

More information

INSTALLING SEISMIC RESTRAINTS FOR MECHANICAL EQUIPMENT

INSTALLING SEISMIC RESTRAINTS FOR MECHANICAL EQUIPMENT VISCMA 412/August 2014 INSTALLING SEISMIC RESTRAINTS FOR MECHANICAL EQUIPMENT August 2014 Developed originally by the Vibration Isolation and Seismic Control Manufacturers Association under a cooperative

More information

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC) APPLICATIONS Process Industry Weak Acids Alkalies Compressed Air Pulp & Paper MODELS ASM - Flanged Connection OPTIONS Control Rods Oil & Gas Water & Waste Pump suction & discharge Sea water Chemical lines

More information

SECTION 15140 - PIPE HANGERS AND SUPPORTS

SECTION 15140 - PIPE HANGERS AND SUPPORTS Part I - GENERAL 1.01 SECTION INCLUDES A. The work covered under this section consists of the furnishing of all necessary labor, supervision, materials, equipment, and services to completely execute the

More information

SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 08332 COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Counter Fire Doors. 1.2

More information

SECTION 26 05 49 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

SECTION 26 05 49 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS SECTION 26 05 49 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes seismic restraints and other earthquake-damage-reduction measures for electrical

More information

Section Fiberglass Reinforced Plastic Grating and Structural Fabrications

Section Fiberglass Reinforced Plastic Grating and Structural Fabrications Section 06600 Fiberglass Reinforced Plastic Grating and Structural Fabrications Part 1. General 1.01 Related documents: A. Contract drawings, including general drawings and addenda drawings. B. General

More information

ACOUSTIC ISOLATION DETAILS

ACOUSTIC ISOLATION DETAILS ACOUSTIC ISOLATION DETAILS Icelandic National Concert and Conference Center Reykjavík, Iceland January 5, 2007 Artec Report No. 7742 Artec Project No. 3760 Distribution: Stefán Hermannsson East Harbour

More information

SECTION 16402 UNDERGROUND ELECTRIC SERVICE

SECTION 16402 UNDERGROUND ELECTRIC SERVICE SECTION 16402 UNDERGROUND ELECTRIC SERVICE PART 1 GENERAL 1.1 SUMMARY A. Description of System 1. Furnish all labor, materials, and equipment for below grade work external to buildings as required, and

More information

MATERIAL SPECIFICATIONS

MATERIAL SPECIFICATIONS FENCING - 1 2-11-1 CHAIN LINK FENCE AND GATE(S) A. SCOPE MATERIAL SPECIFICATIONS This section covers the work necessary for the chain link fence gate(s), complete. General Like items of materials provided

More information

CLEAR-DIVISIONS CENTERFOLD

CLEAR-DIVISIONS CENTERFOLD CLEAR-DIVISIONS CENTERFOLD Introduction: The following three (3) part specification offers the Standard and Optional features for the CLEAR-DIVISIONS CENTERFOLD moveable The yellow highlighted areas in

More information

Residential Deck Safety, Construction, and Repair

Residential Deck Safety, Construction, and Repair Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the

More information

VIBRO/DYNAMICS Corporation Frequently Asked Questions

VIBRO/DYNAMICS Corporation Frequently Asked Questions GENERAL QUESTIONS Q. Why should I use isolators? A. Isolators offer many benefits that save money and time.! Installation Savings Machines are installed faster and easier than anchoring.! Case Histories

More information

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional

More information

1. Division 2 Section "Earthwork" for filling and for grading work. 2. Division 3 Section "Cast-in-Place Concrete" for concrete

1. Division 2 Section Earthwork for filling and for grading work. 2. Division 3 Section Cast-in-Place Concrete for concrete SECTION 02821 - FENCES AND GATES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

Section Fiberglass Reinforced Plastic Grating and Structural Fabrications

Section Fiberglass Reinforced Plastic Grating and Structural Fabrications Section 06600 Fiberglass Reinforced Plastic Grating and Structural Fabrications Part 1. General 1.01 Related documents: A. Contract drawings, including general drawings and addenda drawings. B. General

More information

M S. Laser Alignment Standards & Procedures

M S. Laser Alignment Standards & Procedures M M S Machine Monitoring Systems Ltd Tel: +44 (0) 1869 250801 Unit 4 Business Point Fax: +44(0) 1869 250802 P.O. Box 92 Bicester OX26 5EW Laser Alignment Standards & Procedures Contents Introduction Laser

More information

Spring-Flex Hangers Series SH/RSH

Spring-Flex Hangers Series SH/RSH Bulletin No. SH/14 Spring-Flex Hangers Series SH/RSH Two Basic Designs Effective Isolation of Noise and Vibration Loads to 5,000 pounds Static Deflections to 5 inches Quickly and Easily Installed Color

More information

CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS

CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS 1.0 DESIGN 1.1 Scope of Work 1.1.1 This work shall consist of furnishing Isolation Bearings and installing Isolation Bearing Assemblies at the locations

More information

Belleville Spring Washer Series

Belleville Spring Washer Series Belleville Spring Washer Series High Load in Small Spaces VARIOUS CONFIGURATIONS OF BELLEVILLE WASHERS Single ONE WASHER Parallel ALL WASHERS STACKED THE SAME WAY Series ALL WASHERS STACKED OPPOSITE EACH

More information

specifications A*COM SYSTEM bridging the gap. A*COM Commercial Ramp System PART 1 General

specifications A*COM SYSTEM bridging the gap.  A*COM Commercial Ramp System PART 1 General specifications A*COM Commercial Ramp System This section is based on products manufactured by A*COM and distributed by AlumiRamp, Inc., located at the following address: 855 Chicago Road, Quincy, MI 49082,

More information

SUGGESTED SPECIFICATION EXHAUST SYSTEM SILENCER, FLEX CONNECTOR, INSULATION BLANKETS, WALL / ROOF THIMBLES

SUGGESTED SPECIFICATION EXHAUST SYSTEM SILENCER, FLEX CONNECTOR, INSULATION BLANKETS, WALL / ROOF THIMBLES SUGGESTED SPECIFICATION EXHAUST SYSTEM SILENCER, FLEX CONNECTOR, INSULATION BLANKETS, WALL / ROOF THIMBLES 4121 N.W. 37 th Street, Lincoln, NE 68524 Telephone (402) 470-2627 Fax (404) 470-2410 www.gtexhaust.com

More information

ATTENTION ANYONE INSTALLING A MANUFACTURED HOME AFTER MAY 1, 2009

ATTENTION ANYONE INSTALLING A MANUFACTURED HOME AFTER MAY 1, 2009 Chester J. Culver Governor Patty Judge Lt. Governor Eugene T. Meyer Commissioner James Kenkel State Fire Marshal April 29, 2009 ATTENTION ANYONE INSTALLING A MANUFACTURED HOME AFTER MAY 1, 2009 The Iowa

More information

CLEAR-DIVISIONS VARIOFOLD

CLEAR-DIVISIONS VARIOFOLD CLEAR-DIVISIONS VARIOFOLD Introduction: The following three (3) part specification offers the Standard and Optional features for the CLEAR-DIVISIONS VARIOFOLD moveable The yellow highlighted areas in the

More information

GLASS WALL POCKET DOORS

GLASS WALL POCKET DOORS GLASS WALL POCKET DOORS KWIK-WALL... One Source for Wall Systems. KWIK-WALL s Pocket Doors for glass wall systems bring you the clear solution to your space division requirements. The beauty and elegance

More information

Pump Skid Fabrication for Magnetic Coupling. Rick Soltis Chief Mechanic City of Bedford

Pump Skid Fabrication for Magnetic Coupling. Rick Soltis Chief Mechanic City of Bedford Pump Skid Fabrication for Magnetic Coupling Rick Soltis Chief Mechanic City of Bedford Contents Magnetic Couplings What They Are, How They Work, Where They re Used Fabrication and Manufacturing of Pump

More information

VXT. Open Cooling Towers. Open Cooling Towers. Product Detail VXT - B 1. Engineering Data... B2. Structural Support... B6

VXT. Open Cooling Towers. Open Cooling Towers. Product Detail VXT - B 1. Engineering Data... B2. Structural Support... B6 - B 1 Product Detail Engineering Data... B2 Structural Support... B6 Engineering Specifications... B9 - B 2 Engineering Data REMARK: Do not use for construction. Refer to factory certified dimensions &

More information

SECTION 02563 SANITARY SEWER FORCE MAINS

SECTION 02563 SANITARY SEWER FORCE MAINS SECTION 02563 SANITARY SEWER FORCE MAINS 1.0 GENERAL A. Description Sanitary sewer force main installation shall include, but not necessarily be limited to, furnishing and installing pressure rated pipe,

More information

ACOUSTIC ISOLATION DETAILS

ACOUSTIC ISOLATION DETAILS ACOUSTIC ISOLATION DETAILS Icelandic National Concert and Conference Center Reykjavík, Iceland January 5, 2007 Artec Report No. 7742 Artec Project No. 3760 Distribution: Stefán Hermannsson East Harbour

More information

SECTION 32 31 13 CHAIN LINK FENCES AND GATES

SECTION 32 31 13 CHAIN LINK FENCES AND GATES SECTION 32 31 13 CHAIN LINK FENCES AND GATES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Fence framework, fabric, and accessories. 2. Excavation for post bases. 3. Concrete foundation for posts

More information

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations. DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,

More information

CLEAR-DIVISIONS VARIOTEC TRIMLESS

CLEAR-DIVISIONS VARIOTEC TRIMLESS CLEAR-DIVISIONS VARIOTEC TRIMLESS Introduction: The following three (3) part specification offers the Standard and Optional features for the CLEAR-DIVISIONS VARIOTEC TRIMLESS moveable glass wall system.

More information

2010 Residential Water Heater Replacement Check List

2010 Residential Water Heater Replacement Check List 2010 Residential Water Heater Replacement Check List The intent of this check list is to provide installers a general reference for the enforcement of code requirements in the Greater San Diego Area. This

More information

CATHODIC PROTECTION SPECIFICATION

CATHODIC PROTECTION SPECIFICATION CATHODIC PROTECTION SPECIFICATION AUTOMATICALLY CONTROLLED IMPRESSED CURRENT CATHODIC PROTECTION SYSTEM FOR THE INTERIOR OF STEEL WATER TANKS A. SCOPE The cathodic protection design/install constructor

More information

Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE

Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE 1.0 GENERAL 1.1 DESCRIPTION This section addresses the procedures to be employed for pipe bursting existing water/sewer pipelines, as identified on the drawings, and replacing with new Restrained Joint

More information

6 RETROFITTING POST & PIER HOUSES

6 RETROFITTING POST & PIER HOUSES Retrofitting Post & Pier Houses 71 6 RETROFITTING POST & PIER HOUSES by James E. Russell, P.E. 72 Retrofitting Post & Pier Houses Retrofitting Post & Pier Houses 73 RETROFITTING POST AND PIER HOUSES This

More information

SECTION 11014 WINDOW WASHING SYSTEMS

SECTION 11014 WINDOW WASHING SYSTEMS SECTION 11014 WINDOW WASHING SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section includes, but is not limited to, design and furnishing portable davits, davit sleeves, dvit bases, four (4) removable outriggers,

More information

1. Division-5 Section Metal Fabrications for material and welding requirements related to wrought iron fencing.

1. Division-5 Section Metal Fabrications for material and welding requirements related to wrought iron fencing. SECTION 02835 SITE FENCES AND GATES PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

CLEAR-DIVISIONS APERTO

CLEAR-DIVISIONS APERTO CLEAR-DIVISIONS Introduction: The following three (3) part specification offers the Standard and Optional features for the CLEAR-DIVISIONS moveable glass wall system. The yellow highlighted areas in the

More information

SECTION 27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

SECTION 27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS SECTION 27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such

More information

Timber Decks. Technical Note. March 2007

Timber Decks. Technical Note. March 2007 Timber Decks Technical Note. March 2007 This Technical Note contains general information for residential timber decks and floor frame structures for veranda s, patios etc which are exposed to the weather.

More information

SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK

SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK 1 GENERAL 1.1 GENERAL REQUIREMENTS A. This Section is coordinated with and complementary to the General Conditions and Supplementary General Conditions

More information

TYPICAL RESIDENTIAL OVERHEAD INSTALLATION

TYPICAL RESIDENTIAL OVERHEAD INSTALLATION TYPICAL RESIDENTIAL OVERHEAD INSTALLATION A. GENERAL NOTES: Service entrance line and load conductors, conduit straps, weatherhead, lock nuts, bushings, connectors, and miscellaneous mounting hardware

More information

SECTION 02832 CHAIN LINK FENCE AND GATES

SECTION 02832 CHAIN LINK FENCE AND GATES SECTION 02832 CHAIN LINK FENCE AND GATES PART 1 GENERAL 1.01 SECTION INCLUDES A. Fabrication, furnishing and installation of chain link fence, chain link gates, and extension brackets with barbed wire.

More information

FEDERAL EMERGENCY MANAGEMENT AGENCY FEMA 412/December 2002 INSTALLING SEISMIC RESTRAINTS FOR MECHANICAL EQUIPMENT

FEDERAL EMERGENCY MANAGEMENT AGENCY FEMA 412/December 2002 INSTALLING SEISMIC RESTRAINTS FOR MECHANICAL EQUIPMENT FEDERAL EMERGENCY MANAGEMENT AGENCY FEMA 412/December 2002 INSTALLING SEISMIC RESTRAINTS FOR MECHANICAL EQUIPMENT Notice: This guide was prepared by the Vibration Isolation and Seismic Control Manufacturers

More information

SECTION 710 GUARDRAIL MATERIALS

SECTION 710 GUARDRAIL MATERIALS 710.08 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 SECTION 710 GUARDRAIL MATERIALS 710.01 General. Metal beam

More information

POWERS Controls No. 4 Pneumatic Damper Actuator

POWERS Controls No. 4 Pneumatic Damper Actuator POWERS Controls No. 4 Pneumatic Damper Actuator Technical Instructions Document No. 155-032P25 AP 331-2 Actuator Assembly 331-2929 Typical Actuator Assembly 331-2904 Typical Actuator Assembly 331-3000

More information

Mark Cramer Inspection Services, Inc.

Mark Cramer Inspection Services, Inc. Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction

More information

SECTION 1 GENERAL REQUIREMENTS

SECTION 1 GENERAL REQUIREMENTS Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,

More information

MEZZANINE SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE

MEZZANINE SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE MEZZANINE SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE This specification is intended to describe the general requirements applicable to a proper structural mezzanine design. In addition, it is to serve as

More information

DENVER MODEL 30 X 30 SPECIFICATIONS

DENVER MODEL 30 X 30 SPECIFICATIONS DENVER MODEL 30 X 30 SPECIFICATIONS Dimensions: Roof Dimensions 30-0 x 30-0 (4) Columns (Center to Center) 25-6½ x 25-6½ Minimum Clearance 8-0 Roof Height @ Peak Dependent on Col. Ht. Hip Roof 4:12 pitch

More information

ASME B31.3 Process Piping

ASME B31.3 Process Piping ASME B31.3 Process Piping Charles Becht IV, PhD, PE Don Frikken, PE Instructors BECHT ENGINEERING COMPANY, INC. ayout and Support - 1 Piping Development Process 1. Establish applicable system standard(s)

More information

High Strain Dynamic Load Testing of Drilled Shafts

High Strain Dynamic Load Testing of Drilled Shafts Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain

More information

2-42 Flanged Vacuum Breaker. Operation, Maintenance and Installation Manual

2-42 Flanged Vacuum Breaker. Operation, Maintenance and Installation Manual Manual No. VB-OM1-1 2-42 Flanged Vacuum Breaker Operation, Maintenance and Installation Manual INTRODUCTION... 1 RECEIVING AND STORAGE... 1 DESCRIPTION OF OPERATION... 1 INSTALLATION... 2 DRAWING SS-1381...

More information

2. Division 05 Structural Steel Framing for steel framework requirements

2. Division 05 Structural Steel Framing for steel framework requirements SECTION 131200 - CLIMBING WALLS PART 1 GENERAL 1.1 SUMMARY A. This section includes the following: 1. GFRC Rock Realistic Climbing Wall System B. Related Sections 1. Division 04 Unit Masonry 2. Division

More information

Chapter 4 FLOOR CONSTRUCTION

Chapter 4 FLOOR CONSTRUCTION Chapter 4 FLOOR CONSTRUCTION Woodframe floor systems and concrete slab-on-grade floors are discussed in this chapter. Although cold-formed steel framing for floor systems also is permitted by the IRC,

More information

FEDERAL EMERGENCY MANAGEMENT AGENCY FEMA 413/January 2004 INSTALLING SEISMIC RESTRAINTS FOR ELECTRICAL EQUIPMENT

FEDERAL EMERGENCY MANAGEMENT AGENCY FEMA 413/January 2004 INSTALLING SEISMIC RESTRAINTS FOR ELECTRICAL EQUIPMENT FEDERAL EMERGENCY MANAGEMENT AGENCY FEMA 413/January 2004 INSTALLING SEISMIC RESTRAINTS FOR ELECTRICAL EQUIPMENT Notice: This guide was prepared by the Vibration Isolation and Seismic Control Manufacturers

More information

PART 1 GENERAL 1.1 SECTION INCLUDES

PART 1 GENERAL 1.1 SECTION INCLUDES J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including

More information

SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT

SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION A. The Work specified in this Section consists of designing, furnishing and installing factory-assembled

More information

MONDOATHENS BASKETBALL SET (Reference PK110)

MONDOATHENS BASKETBALL SET (Reference PK110) MONDOATHENS BASKETBALL SET (Reference PK110) DESCRIPTION The MONDOATHENS backstop unit is mainly designed for multi-sports pavilions and installations where the highest-level basketball competitions are

More information

1. Galvanized fence framework, fabric, and accessories. 2. Excavation for post bases, and concrete for post footings.

1. Galvanized fence framework, fabric, and accessories. 2. Excavation for post bases, and concrete for post footings. SECTION 32 31 13 CHAIN LINK FENCES PART 1 GENERAL 1.1 SUMMARY A. This Section includes: 1. Galvanized fence framework, fabric, and accessories. 2. Excavation for post bases, and concrete for post footings.

More information

COLORADO MODEL. 35 x 65 SPECIFICATIONS

COLORADO MODEL. 35 x 65 SPECIFICATIONS COLORADO MODEL 35 x 65 SPECIFICATIONS Dimensions: Roof Dimensions 35-0 x 65-0 Column Dimensions (center to center) 31-0 x 30-6 Minimum Clearance 14-0 Roof Height @ Peak ±18-8 Curved Roof ±42-6 radius Square

More information

A. ASME Compliance: Fabricate and install hydronic piping in accordance with ASME B31.9 "Building Services Piping.

A. ASME Compliance: Fabricate and install hydronic piping in accordance with ASME B31.9 Building Services Piping. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT

PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT GENERAL INFORMATION 1.1 This section applies to piping systems for chilled water, hot water, condenser water, steam, condensate return, fuel oil, refrigerant

More information

AURORA. 520 Series SINGLE STAGE SUMP PUMPS

AURORA. 520 Series SINGLE STAGE SUMP PUMPS AURORA 520 Series SINGLE STAGE SUMP PUMPS WWW.AURORAPUMP.COM AURORA 520 Series Single Stage Sump Pumps Capacities to 110 G.P.M. Heads to 40 Feet Temperatures to 180 F Introduction. Vertical extended shaft

More information

SECTION 02824 EXPANDED METAL MESH FENCE

SECTION 02824 EXPANDED METAL MESH FENCE SECTION 02824 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for expanded metal mesh fence on the right-of-way. 1.02 REFERENCE STANDARDS A. ASTM International (ASTM): 1.03 SUBMITTALS

More information

A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project.

A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project. DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) SECTION 23 08 02 PART 1 GENERAL 1.01 AUTHORITY (CxA) A. The Commissioning Authority (CxA) has been contracted or will be contracted directly

More information

Mobile Home Pre-Inspection Checklist

Mobile Home Pre-Inspection Checklist Mobile Home Pre-Inspection Checklist TWO (2) STEP INSPECTION PROCESS STEP ONE: CALL FOR THE FIRST INSPECTION WHEN THESE ITEMS ARE COMPLETE. 1. Septic tank installed and plumbing complete. (SEE PLUMBING

More information

SEISMIC and WIND Restraint Products. 55-years of product innovation and manufacturing excellence

SEISMIC and WIND Restraint Products. 55-years of product innovation and manufacturing excellence SEISMIC and WIND Restraint Products 55-years of product innovation and manufacturing excellence Why are Seismic and Wind Restraint Needed? For hospitals and healthcare facilities, the damaging effects

More information

SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE

SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE Community Development Permit Services SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE PROJECT NAME PROJECT ADDRESS PERMIT NUMBER CITY RECEIVED STAMP AND INITIALS Instructions: BEFORE

More information

The Kodiak 2400 Seating System by Royal Stewart Ltd.:

The Kodiak 2400 Seating System by Royal Stewart Ltd.: The Kodiak 2400 Seating System by Royal Stewart Ltd.: PART 1 GENERAL 1.1 Description Telescopic Bleacher Seating includes either manually or electrically operated systems of multiple tiered seating rows

More information

Do not locate the pump unit in a pit unless provisions have been made for proper drainage and ventilation.

Do not locate the pump unit in a pit unless provisions have been made for proper drainage and ventilation. Chemical Gear Pumps Installation Operation Repair Maintenance Installation Principal of Operation All Oberdorfer Chemical Gear pumps are the positive displacement type. A definite amount of liquid is displaced

More information

Nozzle Loads, Piping Stresses, and the Effect of Piping on Equipment

Nozzle Loads, Piping Stresses, and the Effect of Piping on Equipment Nozzle Loads, Piping Stresses, and the Effect of Piping on Equipment By Patty Brown & Mark van Ginhoven November 13, 2009 1 CA 2009 Fluor Corporation. All Rights Reserved. Topics Covered Introduction Nozzle

More information

Prefabricated FRP Lift Station Sample Specifications Section 1 General

Prefabricated FRP Lift Station Sample Specifications Section 1 General Section 1 General 1. Description 1.1 Scope of Work: Contractor shall furnish all labor, materials, equipment and performance of all work necessary or incidental to furnish and install a simplex/duplex

More information

SECTION 63 CHAIN-LINK FENCES (FAA F-162) ITEM F-162 CHAIN-LINK FENCES DESCRIPTION MATERIALS

SECTION 63 CHAIN-LINK FENCES (FAA F-162) ITEM F-162 CHAIN-LINK FENCES DESCRIPTION MATERIALS SECTION 63 CHAIN-LINK FENCES (FAA F-162) 63-1 GENERAL This specification covers the furnishing and installation of chain link fencing and gates, both permanent and temporary, at the locations shown on

More information

CEILING CASSETTE FAN COIL UNIT

CEILING CASSETTE FAN COIL UNIT CEILING CASSETTE FAN COIL UNIT Operation and Installation Manual MHCFC4W-04, 08, 12, 16 Four way ceiling cassette fan coil unit Please read this manual before using the fan coil unit. Installation and

More information

SECTION VALVE BOXES AND METER VAULTS

SECTION VALVE BOXES AND METER VAULTS SECTION 03 48 20 VALVE BOXES AND METER VAULTS PART 1: GENERAL 1.01 SECTION INCLUDES A. Valve boxes for water and cleanout boxes for wastewater service. B. Meter boxes for water service. C. Meter vaults

More information

POST AND FRAME STRUCTURES (Pole Barns)

POST AND FRAME STRUCTURES (Pole Barns) POST AND FRAME STRUCTURES (Pole Barns) Post and frame structures. The following requirements serve as minimum standards for post and frame structures within all of the following structural limitations:

More information

BLADDER SURGE CONTROL SYSTEM

BLADDER SURGE CONTROL SYSTEM PART I GENERAL 1.01 Description BLADDER SURGE CONTROL SYSTEM This specification describes the requirements for a Bladder Surge Control System. The purpose of the system is to minimize transient pressures

More information

SECTION 22 LIGHTNING PROTECTION SYSTEM

SECTION 22 LIGHTNING PROTECTION SYSTEM SECTION 22 LIGHTNING PROTECTION SYSTEM 22.01 SCOPE: A. These Specifications shall form a part of the Contract Documents and shall govern construction work for all buildings to be built or modified for

More information

Model 222S (Galvanized receiver optional) AURORA. 220 Series SINGLE STAGE CONDENSATE AND BOILER FEED PUMPS

Model 222S (Galvanized receiver optional) AURORA. 220 Series SINGLE STAGE CONDENSATE AND BOILER FEED PUMPS Model 222S (Galvanized receiver optional) AURORA 220 Series SINGLE STAGE CONDENSATE AND BOILER FEED PUMPS WWW.AURORAPUMP.COM AURORA 220 Series Single Stage Condensate and Boiler Feed Pumps 2 Introduction

More information

Since the Steel Joist Institute

Since the Steel Joist Institute SELECTING and SPECIFYING Wesley B. Myers, P.E. An insider s guide to selecting and specifying K-series, LH, DLH-series joists and joist girders Since the Steel Joist Institute adopted the first standard

More information

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS Page 1 of 9 SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS 1. GENERAL REQUIREMENTS 1. Description of Work: This work consists of furnishing all materials, equipment and

More information

The Manitoba Water Services Board SECTION 027110 Standard Construction Specifications September 2013 Page 1 of 12

The Manitoba Water Services Board SECTION 027110 Standard Construction Specifications September 2013 Page 1 of 12 September 2013 Page 1 of 12 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work shall consist of the supply and construction of a chain link fence, barb wire fences or mesh fences as shown on the Plans or

More information

THERMAL EXPANSION OF BOILERS

THERMAL EXPANSION OF BOILERS THERMAL EXPANSION OF BOILERS INTRODUCTION Boiler is made up of plates, tubes, pipes and simple steel of various grades depending upon the duty conditions. Depending on the service such as cold air / hot

More information

ROOF TOP MOUNTED Air Handler Specification

ROOF TOP MOUNTED Air Handler Specification ROOF TOP MOUNTED Air Handler Specification PART 1: GENERAL (Model RT) Mechanical Specification 1.01 WORK INCLUDED A. Provide complete air handling unit(s) suitable for outdoor installation. Contractor

More information

STANDARD OPEN PATIO COVER

STANDARD OPEN PATIO COVER STANDARD OPEN PATIO COVER BUILDING & SAFETY DIVISION 201 E. LA HABRA BLVD. LA HABRA, CA 90631 62-90-9710 Call Before You Dig 1-800-227-2600 PLEASE NOTE: This information Bulletin is made available to assist

More information

Wisconsin Building Products Evaluation

Wisconsin Building Products Evaluation Safety & Buildings Division 201 West Washington Avenue P.O. Box 2658 Madison, WI 53701-2658 Evaluation # 200813-O Wisconsin Building Products Evaluation Material Best Management Standards for Foundation

More information

ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT

ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT Description: This work shall consist of furnishing all materials, equipment and labor necessary for conducting an Osterberg Cell (O-Cell) Load

More information

SECTION CHAIN LINK FENCE AND GATES

SECTION CHAIN LINK FENCE AND GATES SECTION 02830 CHAIN LINK FENCE AND GATES PART 1 GENERAL 1.01 SCOPE OF WORK The work covered in this section shall include all materials, labor, and equipment necessary for a complete installation of the

More information

Reticulation sewers in basements Technical guidelines

Reticulation sewers in basements Technical guidelines Reticulation sewers in basements Technical guidelines Overview What These guidelines explain our technical requirements for laying sewers in building basements. The scope of the guide is restricted to

More information

Structural Failures Cost Lives and Time

Structural Failures Cost Lives and Time Structural Failures Cost Lives and Time Recent failures of storage bins, silos and other structures highlight the need to increase awareness of hazards associated with these structures. Since 2010, one

More information

SECTION 23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION 23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe hangers and supports. 2. Hanger rods. 3. Inserts. 4. Flashing. 5. Equipment

More information

Coupling Alignment Fundamentals

Coupling Alignment Fundamentals Page (1 of 14) CONTENTS I. Why Align Rotating Equipment? II. Defining Shaft Misalignment III. Alignment Methods Poor, Fair, Good and Best IV. Pre-Alignment Considerations V. Alignment Methods A. Rim and

More information

TCH ENGINEERING SPECIFICATIONS. Index. UL Classified V s, U s and Straight Flexible Connectors. Externally Pressurized Expansion Joints

TCH ENGINEERING SPECIFICATIONS. Index. UL Classified V s, U s and Straight Flexible Connectors. Externally Pressurized Expansion Joints Index UL Classified V s, U s and Straight Flexible Connectors Externally Pressurized Expansion Joints Flexible V and U Connectors Expansion Compensators Flexible Metal Braided Connectors PTFE Expansion

More information

SECTION 05 42 16 COLD-FORMED METAL DECK FRAMING Elevations Steel Deck Framing by Trex

SECTION 05 42 16 COLD-FORMED METAL DECK FRAMING Elevations Steel Deck Framing by Trex (Specifier Note: The purpose of this guide specification is to assist the specifier in correctly specifying cold-formed metal deck framing products and execution. The specifier needs to edit the guide

More information

Guidelines for Earthquake Bracing Residential Water Heaters

Guidelines for Earthquake Bracing Residential Water Heaters Guidelines for Earthquake Bracing Residential Water Heaters Department of General Services Division of the State Architect In accordance with the Health and Safety Code Section 19215, the Division of the

More information

City of Bellevue Submittal Requirements 70 TYPE I AND TYPE II KITCHEN HOOD SUBMITTAL CHECKLIST 7/1/2016. A. Project Address:

City of Bellevue Submittal Requirements 70 TYPE I AND TYPE II KITCHEN HOOD SUBMITTAL CHECKLIST 7/1/2016. A. Project Address: City of Bellevue Submittal Requirements 70 TYPE I AND TYPE II KITCHEN HOOD SUBMITTAL CHECKLIST 7/1/2016 This worksheet must accompany plan sets submitted with commercial kitchen hood permit applications.

More information