1 Major Capital Projects Approval Process (Built Environment) Definitions: CPAC Capital Planning Advisory Committee CPD Campus Planning and Development Built Environment - refers to the human-made surroundings that provide the setting for human activity, ranging in scale from buildings and parks or green space to neighborhoods and cities that can often include their supporting infrastructure, such as water supply, or energy networks. PPS Physical Plant Services QUPC Queen s University Planning Committee VPOC Vice-Principals Operations Committee
2 Major Capital Projects Approval Process (Built Environment) Projects in excess of $2,500,000 Project proponent submits Space Request/Capital Project Form Estimated time elapsed since form submitted 1-2 months Phase 1: Project evaluation and triage (Steps 1-5) CPAC approval to proceed to Phase months 7-9 months months Phase 2: Project Development (Steps 6, 7) Phase 3: Preliminary institutional review and approvals (Steps 8-10) Phase 4: Project refinement (Steps 11 & 12) Needs analysis and business case with indicative cost estimates to VPOC QUPC approval to proceed to Phase months Phase 5: Final institutional review and approvals (Steps 13-16) Full business case with substantive cost estimates and concept drawings Board approval and project kick-off months Phase 6: Project initiation (Steps 17-20) Construction management process 1
3 Phase 1: Project Evaluation and Triage 1. Project proponent prepares and submits Space Request/Capital Project form to CPD 2. CPD/PPS reviews form to determine if project is a Major Capital Project Follow the appropriate approval process 3. CPD/PPS performs preliminary analysis of the project 4. VPOC Review and approval in principle Return to project proponent Maximum spend of $50k for preliminary need analysis, charette etc. 5. CPAC Initial review and recommendation Proceed to Phase 2 2
4 Step 1. Project Proponent prepares and submits Space Request/Capital Project (SRCP) Form to Campus Planning and Development (CPD) Form is completed by unit/department/faculty/division in consultation with Campus Planning & Development (CPD) and Physical Plant Services (PPS) and will: a) Briefly outline the goals and aspirations of the project, including the background and supporting rationale. b) Describe how the project supports the various university strategic plans, E.g. Campus Master Plan, Strategic Framework, Enrolment Plan, Research Strategic Plan etc. c) Specify the proposed budget required for the project. d) Identify funding source(s) for the project. If an internal loan is to be requested as a source of funding, an Internal Loan Application must accompany the SRCP form e) Identify initial startup funds for planning requirements, E.g. site tours, planning sessions, materials testing, initial consultants, visioning sessions, focus groups etc. Identify other information including: List of internal and external stakeholders Current building location(s) and floor(s) if relevant If applicable, outline of academic program requirements for example, is there an approved change to the program(s), numbers or students in the program, or staffing numbers, as related to the proposed capital project? Is program accreditation under review? f) Include the signature of the appropriate Dean/Director and Vice-Principal if over $2.5 million. Step 2. CPD & Physical Plant Services (PPS) reviews form to determine if project is a Major Capital Project CPD & PPS reviews form to determine, on the basis of scope, complexity, schedule, dependencies, and budget, if the project should follow the Major Capital Project Approval Process. Step 3. CPD & PPS performs preliminary analysis of the project a) CPD & PPS reviews the SRCP form and conducts a preliminary analysis against the relevant university strategic plans. b) PPS assigns a Project Manager as part of the Planning Team. c) CPD and PPS perform a project evaluation including a supply and demand analysis, and infrastructure review. Step 4. VPOC review and approval in principle VPOC reviews the proponent s submission (the SRCP form, with amendments from the CPD and PPS evaluation, if any) and supporting documentation to assess: University-wide implications of the project alignment with other institutional plans, priorities, and strategic needs 3
5 approval of sources of any funding required to prepare needs analysis. rmally this is not to exceed $50,000 unless specifically identified. This funding is to cover all costs up to and including Phase 2 of this process. Step 5. CPAC initial review and recommendation a) CPAC reviews recommendation from VPOC for adherence to the overall planning principles and strategies of the Campus Master Plan. b) CPAC provides input on appropriate consultation with relevant internal stakeholders e.g. University Teaching Space Committee (UTSC). c) CPAC provides initial feedback for development of the high level business case. d) CPAC Chair provides an update to Queen s University Planning Committee (QUPC). Phase 2: Project Development 6. Needs analysis and options identification 7. Preliminary Business Case Proceed to phase 3 Step 6. Needs Analysis and Options Identification a) The Needs Analysis Identification step is intended to be a consultative, transparent and iterative process with issues being rerouted back to CPAC and VPOC if required. b) CPD and the project proponent will discuss and agree upon potential timelines for the needs analysis and options identification. c) The project proponent and CPD will work with key stakeholders to prepare the needs analysis which may include: Arranging for site tours /retaining specialist consultants if required Reviewing existing space inventory of all departments/user groups, compiling data (by department and by building, and analyzing existing space utilization and requirements Developing the space requirements program and detailed room data sheets (including both net assignable and non-assignable spaces) 4
6 Preparing occupant/user profiles for the space as well as the adjacency matrices for all departments and groups in the space Explore real estate options, up to and including leasing, if space is not available on campus Assessing existing furniture for reuse and/or creating inventory of new furniture product required for the project Potentially developing blocking/stacking and functional plans Developing financial implications on the space budget d) PPS in consultation with CPD and the project proponent will: Review building, site and campus infrastructure considerations and alignment of the project with the Campus Master Plan and University approved standards for construction, sustainability, etc. Outline the project schedule and phasing of the project Prepare the Class D ( Functional Program a.k.a. Indicative Cost ) cost estimate for the project which will form the financial basis for the business case e) Internal/External Consultations (Costs associated with these reviews are identified and approved by VPOC in step #4). Depending on the scope of work, a Charrette/visioning session may be conducted through CPD. If conducted, this would be held early in the needs analysis process Consultation should be undertaken with units/committees responsible for Environmental Health and Safety, Accessibility, Communications, Information Technology Services, Insurance and other internal stakeholders as required External consultations will be conducted as required Step 7. Preliminary Business Case The project proponent, with appropriate consultations and sign-offs by CPD, PPS, and any other relevant units, will prepare a preliminary business case using the Major Capital Projects Business Case template. 5
7 Phase 3: Preliminary Institutional Review and Approvals Return to project proponent 8. VPOC Preliminary approval 9. CPAC review and recommendation to QUPC 10. QUPC preliminary approval Proceed to Phase 4 Step 8. VPOC Preliminary Approval a) Preliminary business case is submitted to VPOC for review/comments and/or approval to proceed to next phase. CPD arranges for project to be placed on VPOC agenda, and project proponent presents at VPOC with support from appropriate in-house subject matter experts. b) VPOC approves scalable funding for architectural drawings (scope, complexity, size and schedule) using the current Ontario Association of Architects fee schedule as a guideline. These fees should not normally exceed $100,000 unless specifically identified. c) Chair of VPOC recommends submission to CPAC for review. Step 9. CPAC Review and Recommendation to QUPC a) Review of Preliminary Business Case after VPOC revisions. b) Any significant change in scope or business case assumptions, subsequent to the preliminary approval, will necessitate return to VPOC with the revised Business Case. c) Chair of CPAC brings interim recommendation to QUPC for approval. 6
8 Step 10. QUPC Preliminary Approval a) Review and approval of Preliminary Business Case. b) Recommend revisions as necessary. c) Any significant change in scope or business case assumptions subsequent to initial approval will necessitate return to CPAC with the revised Business Case. d) QUPC informs Board of Trustees. Phase 4: Project Refinement 11. Concept drawing prepared 12. Full Business Case Proceed to Phase 5 Step 11. Concept Drawing Prepared Concept drawings are prepared in consultation with the project proponent and key stakeholders. Funding for concept drawings was secured in step 8. Step 12. Full Business Case a) The project proponent, together with PPS and CPD, refreshes and refines the preliminary Business Case template including, space programming, schedule, Total Cost of Ownership (TCO) analysis, risk matrix, and dependencies. The requisite internal consultations and sign-offs are obtained. b) A cost estimator prepares a Class B ( Design Development a.k.a. Substantive Cost ) cost estimate to be included in the Full Business Case. (Funding for cost estimator secured under Step 8.) 7
9 Phase 5: Final Institutional Review and Approvals Return to project proponent 13. VPOC final approval 14. CPAC Final recommendation 15. QUPC final approval 16. Board approval (secured through the Capital Assets and Finance Committee) Proceed to Phase 6 Step 13. VPOC Final Approval a) The Full Business Case is reviewed and approved by VPOC. b) Chair of VPOC submits project to CPAC. 8
10 Step 14. CPAC Final Recommendation a) CPAC reviews Full Business Case. b) Chair of CPAC forwards recommendation to QUPC. Step 15. QUPC Final Approval a) QUPC reviews and approves Full Business Case. b) Chair of QUPC submits project to the Capital Assets and Finance Committee of the Board for approval. Step 16. BOARD Approval (secured through the Capital Assets and Finance Committee) a) Capital Assets and Finance Committee review and approval of Full Business Case. b) Board approval of Project (Board Template submission), on recommendation of the Capital Assets and Finance Committee c) In the case of 100% funding already having been secured, the project can be approved for Project Initiation (Phase 6). d) If 100% funding is not secured, the project can be approved in principle, with accompanying approval for donor outreach. i. Once 100% funding has been secured, the project must be resubmitted to VPOC (Step 13) and must again proceed through this phase (Phase 5 comprising Steps 14, 15, and 16) prior to Project Initiation. e) Any significant change in scope or business case assumptions subsequent to this Project Initiation, will necessitate return to VPOC (Step 13) with the revised Business Case, and proceeding again through this phase (Phase 5 comprising Steps 14, 15, and 16). 9
11 Phase 6: Project Initiation 17. Building Committee selected 18. Scope and mandate of architect developed and Architect selected 19. CPAC/QUPC approval of architect selection 20. Construction project initiation Step 17. Building Committee Selected A Building Committee is selected with appropriate representation from the project proponent, PPS, CPD and other relevant stakeholders or user groups. 18. Scope and mandate of architect developed and architect selected The Building Committee will follow appropriate and current procurement guidelines for Architect Selection. An RFP will be prepared by CPD for approval by the Building Committee. Step 19. CPAC/QUPC Approval of Architect Selection QUPC, on the recommendation of CPAC, approves the selection of the winning architect from Step 18. Step 20. Construction Project Initiation Following selection of the architect, a construction project is initiated leveraging the work already prepared at the Concept Drawing stage. 10
12 GLOSSARY ACADEMIC PLAN A document prepared by the University which outlines the academic planning principles for the University CAMPUS MASTER PLAN A document prepared by the University which outlines the long term strategy for the campus and aligns with the Academic Plan CHARETTE A collaborative session in which the stakeholders of the project engage in an intense meeting to draft a solution to a design problem and promotes joint ownership of the solution. CLASS 'B' (Substantive) ESTIMATE A Class B estimate is a more reliable, higher quality estimate completed once more detailed information on the project is available. This estimate is based on design development drawings and outline specifications, which include the design of all major systems and subsystems, as well as the results of all site/installation investigations. CLASS 'D' (Indicative) ESTIMATE A Class D estimate is done early in project planning to provide a rough estimate of project costs for budget purposes. This estimate is based on unit cost analysis (such as cost per m²) based upon a comprehensive list of project requirements (i.e. scope) and assumptions. Based on historical cost data for similar projects, adjusted for such factors as inflation, location, risk, quality, size and time. CPAC Campus Planning Advisory Committee DESIGN DEVELOPMENT Production of floor plans, sections, and elevations with full dimensions. These drawings typically include door and window details and outline material specifications. This phase also lays out mechanical, electrical, plumbing, structural, and architectural details. PPS Physical Plant Services PRELIMINARY BUSINESS CASE A scalable document that provides a preliminary outline of the needs and costs for the potential project QUPC Queen s University Planning Committee UTSC University Teaching Space Committee VPOC Vice-Principals Operations Committee 11
University of Wisconsin Platteville IT Governance Model Final Report Executive Summary
University of Wisconsin Platteville IT Governance Model Final Report Executive Summary February 2013 Project Objectives & Approach Objectives: Build on the efforts of the Technology Oversight Planning
More informationInternal Quality Assurance Arrangements
National Commission for Academic Accreditation & Assessment Handbook for Quality Assurance and Accreditation in Saudi Arabia PART 2 Internal Quality Assurance Arrangements Version 2.0 Internal Quality
More informationForest Carbon Partnership Facility (FCPF)
Forest Carbon Partnership Facility (FCPF) Readiness Mechanism Review and Assessment of Readiness Preparation Proposals DRAFT September 4, 2009 This Program Document updates Program Document FMT 2009-1-Rev.2
More informationStatus Report on the Operations Manual and Appraisal Toolkit
Status Report on the Operations Manual and Appraisal Toolkit GCF/B.09/Inf.06 26 February 2015 Meeting of the Board 24-26 March 2015 Songdo, Republic of Korea Agenda item 17 Page 1 I. Introduction Status
More informationGartner, Inc. DIR-SDD-2042
Texas Department of Information Resources STATEMENT OF WORK (SOW) FOR DELIVERABLES-BASED INFORMATION TECHNOLOGY SERVICES Identity & Access Management Analysis IT Assessment & Planning Gartner, Inc. DIR-SDD-2042
More informationSaskatoon North Partnership for Growth (P4G) Draft Communications and Engagement Strategy
Saskatoon North Partnership for Growth (P4G) Draft Communications and Engagement Strategy Introduction This Communications and Engagement Strategy (Strategy) sets the communications and engagement framework
More informationStrategic Planning Process
Establishing a Strategic Planning Process Questions to consider #1 1. A strategic plan details the steps / actions needed to get us from where we are today to an envisioned destination. FGCU s destination
More informationMASTER PROJECT PLAN. Project Name: Forest Information Mall. Project Sponsor: Ralph Archibald. Project Manager: Greg Goss
MASTER PROJECT PLAN Project Name: Forest Information Mall Project Sponsor: Ralph Archibald Project Manager: Greg Goss Issue/Revision Date: June 13, 2005 1.0 Project Purpose The purpose for this project
More informationSetting up an Effective Enterprise Architecture capability. Simon Townson Principal Enterprise Architect SAP
Setting up an Effective Enterprise Architecture capability Simon Townson Principal Enterprise Architect SAP Agenda Why? People and Organisation EA Framework Standards and Templates Tools Processes SAP
More informationUNIVERSITY OF CALIFORNIA Office of Academic Personnel Academic Personnel Manual (APM) Policy Development Process Guide
Overview The at the University of California Office of the President manages the Academic Personnel Manual (APM) policy development process from inception to issuance on behalf of the Provost and Executive
More informationA CONSUMER S G UIDE TO C ONSTRUCTION F INANCING
A CONSUMER S G UIDE TO C ONSTRUCTION F INANCING ARE YOU BUILDING A CUSTOM HOME? This guide is a valuable resource for anyone planning to build a custom home. It provides information on the financing process,
More informationTEC Capital Asset Management Standard January 2011
TEC Capital Asset Management Standard January 2011 TEC Capital Asset Management Standard Tertiary Education Commission January 2011 0 Table of contents Introduction 2 Capital Asset Management 3 Defining
More information2016/17 Budget Update Report to the Board
School District No. 22 (Vernon)... a great place to learn 2016/17 Budget Update Report to the Board Introduction February 24, 2016 The Board of Education, School District No. 22 (Vernon), is accountable
More informationA consumer guide to construction financing.
A consumer guide to construction financing. Single Close Construction Loans Are you building a custom home? This guide is a valuable resource for anyone planning to build a custom home. It provides information
More informationCAIS 2012 Trustee/School Head Conference
CAIS 2012 Trustee/School Head Conference CAIS 2012 Trustee/School Head Conference Creating an Inspiring Master Planning Process Denise Gutches CEO, DKG Consulting Dwight Long Principal, Pfau Long Architecture
More informationRIBA Plan of Work 2013: Consultation document. You are invited to complete the online questionnaire by 12 August 2012.
RIBA Plan of Work 2013: Consultation document The RIBA is undertaking a comprehensive review of the RIBA Plan of Work. This document sets out the reasons and the rationale behind that review as well as
More informationHealth Facilities Capital Program Manual. Version 1.0
Health Facilities Capital Program Manual Version 1.0 TABLE OF CONTENTS TABLE OF CONTENTS... 2 1.0 INTRODUCTION... 9 1.1 Health Facilities Capital Program... 9 1.1.1 Major Capital Projects Total Project
More informationCreated 12-14-2010 12-13-2010 Actual Completion. Last Modified 12-03-2013 12-03-2013
Project Details Title Succession Planning: A Model for a Sustainable Future Status COMPLETED Category 5-Leading and Communicating Updated 09-26-2013 Timeline Reviewed 10-04-2013 Planned Project Kickoff
More informationCommunity Participation Program
-Draft- Community Participation Program Comprehensive Master Plan 2 0 3 0 City of Cartersville, Georgia Table of Contents Introduction 1 Public Participation History 2 Process and Expectations 2 Elements
More informationGUIDELINES FOR ACADEMIC PROGRAM REVIEW For self-studies due to the Office of the Provost on October 1, 2015 GRADUATE PROGRAMS
GUIDELINES FOR ACADEMIC PROGRAM REVIEW For self-studies due to the Office of the Provost on October 1, 2015 GRADUATE PROGRAMS OVERVIEW OF PROGRAM REVIEW At Illinois State University, primary responsibility
More informationTerms of Reference. Preparing Safety and Technical Management Programme for Electricity Licensees
Terms of Reference Preparing Safety and Technical Management Programme for Electricity Licensees Introduction Public Utilities Commission of Sri Lanka (PUCSL) has started regulating the electricity industry
More informationOctober 15, 2013. Mayor and Council City of New Westminster 511 Royal Avenue New Westminster, BC V3L 1H9
October 15, 2013 Mayor and Council City of New Westminster 511 Royal Avenue New Westminster, BC V3L 1H9 RE: Business Plan Advancing a Collaborative, Regional Approach to Flood Management in BC s Lower
More informationInformation Technology Governance Overview and Charter
Information Technology Governance Overview and Charter Prepared by: Project #: Date submitted Document version: IT Governance Charter v03.05.2012 1.0 48.0 - Page 1 of 34 Document History Version Date Author
More informationQuestions Re: RFP for Consultant to the Community Oversight Board (COB) for the Philadelphia Department of Human Services (DHS) Posted: March 23, 2012
Questions Re: RFP for Consultant to the Community Oversight Board (COB) for the Philadelphia Department of Human Services (DHS) Posted: March 23, 2012 1. In addition to the online submission, the RFP states
More informationSTEPS IN THEATRE PROJECT PLANNING
Janis A. Barlow & Associates Research, Planning and Management Consultants Specializing in Theatre since 1981 STEPS IN THEATRE PROJECT PLANNING Janis A. Barlow & Associates www.barlowandassociates.com
More information2010 2015 AIA Strategic Plan 1
2010 2015 Strategic Plan The American Institute of Architects Driving positive change through the power of design AIA THE AMERICAN INSTITUTE OF ARCHITECTS 2010 2015 AIA Strategic Plan 1 2010 2015 AIA Strategic
More informationGOVERNING BODY MEETING held in public 29 July 2015 Agenda Item 4.4
GOVERNING BODY MEETING held in public 29 July 2015 Agenda Item 4.4 APPENDIX A Strategic Planning Process 2016/17 Strategic Planning Process 2016/17 Interlocking processes 5 Year strategic process: reviewed
More informationREQUEST FOR PROPOSALS
Issued: November 19, 2015 Ah Nab Awen Park - Photo courtesy of Blaine Courts REQUEST FOR PROPOSALS Professional Planning Services City of Grand Rapids Parks & Recreation 2017-2021 Strategic Master Plan
More informationConcept of Operations for Line of Business Initiatives
Concept of Operations for Line of Business Initiatives Version 1.0 Office of E-Gov and IT, OMB March 2006 Table of Contents FOREWORD...2 1 OBJECTIVES OF THE LINES OF BUSINESS CONCEPT OF OPERATIONS...3
More informationUNIVERSITY OF GUELPH PROJECT MANAGEMENT FRAMEWORK
UNIVERSITY OF GUELPH PROJECT MANAGEMENT FRAMEWORK Table of Contents Document Purpose:... 3 What is a Project?... 3 What is not a Project? (e.g. Operational Tasks)... 3 What is Project Management?... 4
More informationACADEMIC POLICY FRAMEWORK
ACADEMIC POLICY FRAMEWORK Principles, Procedures and Guidance for the Development & Review of Academic Policies [V.1] Page 2 of 11 TABLE OF CONTENTS 1. FRAMEWORK OVERVIEW... 3 2. PRINCIPLES... 4 3. PROCESS...
More informationOverview of Performance Management
Overview of Performance Management Individual Performance Plan Performance Review & Evaluation 1 Performance Management: Why Me? Why Now? 2 Purpose To Provide an Overview of: The Who, What, and Why of
More informationDeliverable 6: Final Implementation Evaluation Report
Phase 2 Contract Number: HHSF223201010017B, Order No. 22313004 Deliverable 6: Final Implementation Evaluation Report February 1, 2016 TABLE OF CONTENTS 1. EXECUTIVE SUMMARY... 1 2. PROJECT BACKGROUND AND
More informationAppendix G: Organizational Change Management Plan. DRAFT (Pending approval) April 2007
Appendix G: Organizational Change Management Plan DRAFT (Pending approval) April 2007 Table of Contents TABLE OF CONTENTS... 1 INTRODUCTION:... 2 ABT ORGANIZATIONAL CHANGE MANAGEMENT SCOPE... 2 PEOPLESOFT
More informationYork Catholic District School Board
Ministry of Education York Catholic District School Board Follow-up Report to the Operational Review August 2012 TABLE OF CONTENTS 1. INTRODUCTION... 1 2. STATUS AND IMPLEMENTATION UPDATE... 3 3. GOVERNANCE
More informationLOAN APPLICATION. Name of Business (Legal Name): Address: City, State, Zip: Business Phone: Federal Tax ID #:
LOAN APPLICATION Name of Business (Legal Name): Business Phone: Federal Tax ID #: Fax: Principals Name: Phone: Social Security #: Type of Business Sole Proprietorship Corporation Partnership Date Established
More informationSITE PLAN APPROVAL PROCESS INTRODUCTION
SITE PLAN APPROVAL PROCESS INTRODUCTION File Manager System for Site Plan Approval Process Site Plan Control in the City of London The City of London utilizes site plan control to ensure high quality site
More informationProject Management Fact Sheet:
Project Management Fact Sheet: Project Documentation Version: 2.2, November 2008 DISCLAIMER This material has been prepared for use by Tasmanian Government agencies and Instrumentalities. It follows that
More informationGUIDELINES FOR ACADEMIC PROGRAM REVIEW For self-studies due to the Office of the Provost on October 1, 2016 RESEARCH AND SERVICE CENTERS
GUIDELINES FOR ACADEMIC PROGRAM REVIEW For self-studies due to the Office of the Provost on October 1, 2016 RESEARCH AND SERVICE CENTERS OVERVIEW OF PROGRAM REVIEW Primary responsibility for maintaining
More informationState of California Department of Transportation. Transportation System Data Business Plan
DRAFT Page i State of California Department of Transportation Transportation System Data Business Plan RFO# TSI DPA-0003 September 29, 2011 DRAFT Page ii Table of Contents Executive Summary... 4 Chapter
More informationLawrence Heights Revitalization Corporate Implementation Actions and Social Development Plan
STAFF REPORT ACTION REQUIRED Lawrence Heights Revitalization Corporate Implementation Actions and Social Development Plan Date: June 8, 2010 To: From: Wards: Community Development and Recreation Committee
More informationIS&T Project Management: Project Management 101. June, 2006
IS&T Project Management: Project Management 101 June, 2006 Session Objectives Review basics management Discuss obstacles to effective management Share practices that work for you Empower you to try some
More informationVoIP Deployment Committee Charter
Version 1.6 Prepared by William Green, ITS Last Edited October 30, 2012 Charter Summary A task force and executive committee of representatives from the College of Natural Sciences, Cockrell School of
More informationRequest for Proposal Name of Organization Title of work project
Request for Proposal Name of Organization Title of work project Introduction Insert brief introduction here. Background Insert background information here. Scope of Work Work Elements (those elements listed
More informationUNSOLICITED PROPOSALS
UNSOLICITED PROPOSALS GUIDE FOR SUBMISSION AND ASSESSMENT January 2012 CONTENTS 1 PREMIER S STATEMENT 3 2 INTRODUCTION 3 3 GUIDING PRINCIPLES 5 3.1 OPTIMISE OUTCOMES 5 3.2 ASSESSMENT CRITERIA 5 3.3 PROBITY
More informationPrepared by David Willson, OCIO in consultation with Marc Buchalter, Procurement Please send comments to David Willson at dwillson@berkeley.
Technology RFX Customer Guide Introduction This guide is intended for those that have identified a need to solicit bids from suppliers but may unclear on the different types of documents, the roles various
More informationAt the end of this chapter. Project Charter. What is a Project Charter? What is a Project Charter? Why is a Project Charter used?
At the end of this chapter Project Charter Describe what a project charter is and why it is critical to project success. Explain what a project scope statement is and why it is important. List the various
More information4.2 Project Procurement and Design
4.2 Project Procurement and Design 4.2.1 Standards and Guidelines The Standards and Guidelines sub-committee of the Joint Operations Committee has been established to: review current standards and guidelines
More informationSecond Amendment To the HIPAA 5010 and ICD-10 Technical Assistance and Support Services Contract
Second Amendment To the HIPAA 5010 and ICD-10 Technical Assistance and Support Services Contract This second Amendment to Contract Number is effective as of December 12, 2011, between the Iowa Department
More informationREPORT ON THE STRUCTURAL CHANGE SITE VISIT SOFIA UNIVERSITY SEPTEMBER 19, 2012. Team Roster: JoAnn Carter-Wells, Chair R. William Cash, Team Member
REPORT ON THE STRUCTURAL CHANGE SITE VISIT SOFIA UNIVERSITY SEPTEMBER 19, 2012 Team Roster: JoAnn Carter-Wells, Chair R. William Cash, Team Member The evaluation team in conducting its review was able
More informationContact address: Global Food Safety Initiative Foundation c/o The Consumer Goods Forum 22/24 rue du Gouverneur Général Eboué 92130 Issy-les-Moulineaux
Version 6.3 Contact address: Global Food Safety Initiative Foundation c/o The Consumer Goods Forum 22/24 rue du Gouverneur Général Eboué 92130 Issy-les-Moulineaux France Secretariat email: gfsinfo@theconsumergoodsforum.com
More informationEvaluation Reminders. For Team Chairs Evaluators, Financial Reviewers, And Generalists Institutions being Reviewed
Evaluation Reminders For Team Chairs Evaluators, Financial Reviewers, And Generalists Institutions being Reviewed Middle States Commission on Higher Education Published by the Middle States Commission
More information44-76 mix 2. Exam Code:MB5-705. Exam Name: Managing Microsoft Dynamics Implementations Exam
44-76 mix 2 Number: MB5-705 Passing Score: 800 Time Limit: 120 min File Version: 22.5 http://www.gratisexam.com/ Exam Code:MB5-705 Exam Name: Managing Microsoft Dynamics Implementations Exam Exam A QUESTION
More informationRequest for Proposal. Study: Site Plan Approval Process in Ontario. This Request for Proposal Closes at 16:00:00 EST on Monday, November 5, 2012
Request for Proposal Study: Site Plan Approval Process in Ontario This Request for Proposal Closes at 16:00:00 EST on Monday, November 5, 2012 Issued: October 24, 2012 Table of Contents A GENERAL INSTRUCTIONS
More information2012-2016 Business Plan Summary
Owner: 2012-2016 Business Plan Summary Program Corporate, Operational & Council Services Service grouping Corporate Services Service Type Internal Service Tom Johnson, Managing Director - Corporate Assets,
More informationConsulting Services for Arts, Culture & Heritage Strategic Plan
REQUEST FOR PROPOSALS RFP No. 14-11-01 Consulting Services for Arts, Culture & Heritage Strategic Plan Proposals will be received on or before 2:00 pm local time Tuesday, December 9, 2014 (Closing date
More informationFAQs Cal State Online
FAQs Cal State Online 1. What is Cal State Online? Cal State Online is a coordinated systemwide collection of services that not only support the delivery of online programs from systemwide campuses but
More informationFINAL REPORT - CONTRACT PROCUREMENT WORK GROUP RFP AND PROCUREMENT PROCESSES WORK GROUP RECOMMENDATIONS - AS APPROVED BY CABINET 8/21/13
FINAL REPORT - CONTRACT PROCUREMENT WORK GROUP RFP AND PROCUREMENT PROCESSES WORK GROUP RECOMMENDATIONS - AS APPROVED BY CABINET 8/21/13 Section I.F - Applicability: Page 4 references applicability to
More informationA&CS Assurance Review. Accounting Policy Division Rule Making Participation in Standard Setting. Report
A&CS Assurance Review Accounting Policy Division Rule Making Participation in Standard Setting Report April 2010 Table of Contents Background... 1 Engagement Objectives, Scope and Approach... 1 Overall
More informationRequest for Proposals. Site C Clean Energy Project. Worker Accommodation RFP #1807
RFP #1807 Issued SUMMARY OF KEY INFORMATION Page i RFP TITLE CONTACT PERSON The title of this RFP is: RFP #1807 Worker Accommodation Proponents should use this title on all correspondence. The Contact
More informationRequest for Consulting Services For the Preparation of an International Marketing Strategy EXECUTIVE SUMMARY
Request for Consulting Services For the Preparation of an International Marketing Strategy EXECUTIVE SUMMARY The City of Abbotsford, Economic Development Department, is seeking a consultant to develop
More informationIT Governance. IT Investment Proposal Review & Submission Workshop. Agenda. University of Manitoba IT Governance Proposal Workshop. March & April 2015
IT Governance IT Investment Proposal Review & Submission Workshop March & April, 2015 Agenda 1. Welcome & Introductions 2. IT Governance Overview 3. Proposal Review Processes 4. IT Investment Criteria
More informationFederal Data Center Consolidation Initiative
Federal Data Center Consolidation Initiative 2011 Data Center Consolidation Plan & Progress Report (date) 1 Introduction... 2 2 Agency Goals for Data Center Consolidation... 2 3 Implementing Shared Services/Multi-tenancy...
More informationMinnesota Health Insurance Exchange (MNHIX)
Minnesota Health Insurance Exchange (MNHIX) 1.2 Plan September 21st, 2012 Version: FINAL v.1.0 11/9/2012 2:58 PM Page 1 of 87 T A B L E O F C O N T E N T S 1 Introduction to the Plan... 12 2 Integration
More informationDARLINGTON BOROUGH COUNCIL LEARNING & SKILLS SERVICE SUPPLY CHAIN FEES AND CHARGES POLICY 2015/16
DARLINGTON BOROUGH COUNCIL LEARNING & SKILLS SERVICE SUPPLY CHAIN FEES AND CHARGES POLICY 2015/16 1. POLICY STATEMENT 1.1 Darlington Borough Council s Learning & Skills Service (the Service) is funded
More informationQlik UKI Consulting Services Catalogue
Qlik UKI Consulting Services Catalogue The key to a successful Qlik project lies in the right people, the right skills, and the right activities in the right order www.qlik.co.uk Table of Contents Introduction
More informationU.S. Nuclear Regulatory Commission
U.S. Nuclear Regulatory Commission 2011 Data Center Consolidation Plan and Progress Report Version 2.0 September 30, 2011 Enclosure Contents 1 Introduction... 2 2 Agency Goals for Data Center Consolidation...
More informationVendor Performance Evaluation
Vendor Performance Evaluation Canadian Public Procurement Council Oct. 27-29, 2014 Agenda 1) Objectives and 2) Evaluation 3) Evaluation Templates and 4) Use of Vendor Score 2 13:00 14:00 1 Objectives and
More informationEastern Illinois University information technology services. strategic plan. January,
Eastern Illinois University information technology services strategic plan January, 2014 Introduction With the selection of emerging technologies as one of the six themes of the university s recent strategic
More informationStrategic Plan 2015-2017
Strategic Plan 2015-2017 Page 1 Table of Contents Information Technology Mission... 5 Information Technology Vision Statement... 5 Information Technology Values... 5 The Information Technology s Alignment
More informationUniversity of Toronto Quality Assurance Process (UTQAP)
University of Toronto Quality Assurance Process (UTQAP) Revised version approved by the Ontario Universities Council on Quality Assurance September 21, 2012 Table of Contents 1 Quality Assurance Context
More informationRequest for Proposal. Institutional Cost Driver Analysis
Request for Proposal Institutional Cost Driver Analysis Date Issued: February 25, 2014 1560 Broadway, Suite 1600Denver, Colorado 80202(303) 866-2723 LT. GOV. JOSEPH A. GARCIA, EXECUTIVE DIRECTOR 1 1. Overview
More informationValue to the Mission. FEA Practice Guidance. Federal Enterprise Architecture Program Management Office, OMB
Value to the Mission FEA Practice Guidance Federal Enterprise Program Management Office, OMB November 2007 FEA Practice Guidance Table of Contents Section 1: Overview...1-1 About the FEA Practice Guidance...
More informationOffice of the Chief Information Officer
Office of the Chief Information Officer Business Plan: 2012 2015 Department / Ministère: Executive Council Date: November 15, 2012 1 P a g e This Page Left Intentionally Blank 2 P a g e Contents The Business
More informationMedicaid Information Technology Architecture (MITA) Overview Compiled from MITA Framework 2.0 documents issued by CMS - March 2006
Medicaid Information Technology Architecture (MITA) Overview Compiled from MITA Framework 2.0 documents issued by CMS - March 2006 CMS has worked with a number of stakeholders over the past two years to
More information2. Would awarding a contract for the BRA rebranding to a Canadian agency be seen favourably for the administration?
Addendum 1 1....we note in the RFP details that as part of the submission we are to provide for information on whether we are licensed or authorized to do business in the Commonwealth of Massachusetts.
More informationRISK ADVISORY SERVICES. HYDRO UTILITIES Overview of Internal Audit & Control Services: 2014 Credentials
RISK ADVISORY SERVICES HYDRO UTILITIES Overview of Internal Audit & Control Services: 2014 Credentials THE INCREASED IMPORTANCE OF INTERNAL CONTROLS FOR HYDRO UTILITIES TO MEET THE OBJECTIVES OF FINANCIAL
More information3 rd Review Meeting Convention on Nuclear Safety First Anniversary Report Status of Actions on Canada April 2006
3 rd Review Meeting Convention on Nuclear Safety First Anniversary Report Status of Actions on Canada April 2006 1. Introduction At the 3 rd review meeting of the Convention on Nuclear Safety, held in
More informationBuilding a Global Payroll Model. Charlotte N. Hodges, CPP
Building a Global Payroll Model Charlotte N. Hodges, CPP Virginia Statewide Payroll Conference October 9-10, 2014 Agenda Challenges Strategic Factors Global Payroll Strategy Global Payroll Model Key Partnerships
More informationDEGREE BREADTH PROCEDURE
DEGREE BREADTH PROCEDURE Approved by: Academic Coordinating Committee Authorizer: Executive Dean, Academic Administration Reference Code: D10 V1 Effective Date: 5/1/2013 PROCEDURE STATEMENT: All breadth
More information2007 Follow-Up Report on the Audit of Information Technology January 2005
2007 Follow-Up Report on the Audit of Information Technology January 2005 Natural Sciences & Engineering Research Council of Canada & Social Sciences & Humanities Research Council of Canada October 2007
More informationCity Planning Heritage Preservation
1. Planning and Heritage This theme is examining the current built form, policy framework and zoning in the Study Area to help inform the larger Revitalization Initiative. Staff will bring forward recommendations
More informationPPM V2.0 Frequently Asked Questions (FAQs) U.S. Department of Housing and Urban Development
PPM V2.0 Frequently Asked Questions (FAQs) U.S. Department of Housing and Urban Development December 2015 1. Getting Started with PPM Life Cycle 2. PPM Life Cycle Process 3. PPM V2.0 and Project Types
More informationELEMENT 4 - FUTURE LAND USE ELEMENT
ELEMENT 4 - FUTURE LAND USE ELEMENT Goal 1 To create a long-range development pattern which directs growth into developable areas and away from environmentally sensitive areas, in a manner that is compatible
More informationKENDALL-GRUNDY COMMUNITY ACTION MICRO-LOAN PRELIMINARY APPLICATION
KENDALL-GRUNDY COMMUNITY ACTION MICRO-LOAN PRELIMINARY APPLICATION The Kendall-Grundy Department of Community Action has established the CSBG Micro-Loan Program to assist in financing micro-businesses
More informationFacility Services PROJECT MANAGEMENT METHODOLOGY FRAMEWORK
Facility Services PROJECT MANAGEMENT METHODOLOGY FRAMEWORK Facility Services Project Management Methodology Framework 1 - Executive Summary The purpose of this document is to introduce the University community
More informationPROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE:
PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: Project Name Project Management Plan Document Information Document Title Version Author Owner Project Management Plan Amendment History
More information4.4 Commissioning, Handover and Warranty
4.4 Commissioning, Handover and Warranty 4.4.1 Building Commissioning and Manuals The Building Commissioning formalizes the review and integration of all project expectations during the planning and design,
More informationCentral Agency for Information Technology
Central Agency for Information Technology Development of a National IT Governance Framework Project Management Agenda 1 What is project management? Why it is important? 2 Leading practices 3 Project management
More informationRESOLUTION OF THE BOARD OF TRUSTEES APPROVING SCOPES OF ASSISTANCE FOR PROCUREMENT OF STUDIES MANDATED IN MARYLAND HEALTH BENEFIT EXCHANGE ACT OF 2011
RESOLUTION OF THE BOARD OF TRUSTEES APPROVING SCOPES OF ASSISTANCE FOR PROCUREMENT OF STUDIES MANDATED IN MARYLAND HEALTH BENEFIT EXCHANGE ACT OF 2011 WHEREAS, the Maryland Health Benefit Exchange Act
More informationOutline Brief for Development of Strategic Estates Plan for Bristol, South Gloucester, North Somerset and Somerset Clinical Commissioning Groups
Item 13 Strategic Estates Planning Outline Brief for Development of Strategic Estates Plan for Bristol, South Gloucester, North Somerset and Somerset Clinical Commissioning Groups Phase 1: Priorities and
More informationMERGERS, CONSOLIDATIONS, CHANGE OF OWNERSHIP, ACQUISITIONS, AND CHANGE OF GOVERNANCE, CONTROL, FORM, OR LEGAL STATUS
Southern Association of Colleges and Schools Commission on Colleges 1866 Southern Lane Decatur, Georgia 30033-4097 MERGERS, CONSOLIDATIONS, CHANGE OF OWNERSHIP, ACQUISITIONS, AND CHANGE OF GOVERNANCE,
More informationBusiness Case Template
Business Case Template For new or revised province-wide, regional and local distributor CDM programs The following template outlines the sections to be included in business cases for new distributor CDM
More informationCOLLEGE COUNCIL RECORD OF MEETING. February 5, 2010, Manzanita Conference Room
COLLEGE COUNCIL RECORD OF MEETING February 5, 2010, Manzanita Conference Room Committee Members Present: Erik Andal, Lonnie Blansit, Nancy Bull, Elissa Creighton, Dennis Gervin, W endy Hesse, Raelene Juarez,
More informationBudgeting and Planning Process
Budgeting and Planning Process Summary The budget is an important annual planning document for the university and reflects choices, priorities and tactics set forth as the result of intensive planning.
More informationFundamentals of Information Systems, Fifth Edition. Chapter 8 Systems Development
Fundamentals of Information Systems, Fifth Edition Chapter 8 Systems Development Principles and Learning Objectives Effective systems development requires a team effort of stakeholders, users, managers,
More informationProject Management Plan. Project Management Plan Guide. Strategic Capital, Infrastructure and Projects
Project Management Plan Guide A guide to completing the Project Management Plan Strategic Capital, Infrastructure and Projects Prepared by: Andrew Segrott / Strategic Capital, Infrastructure and Projects
More informationVisual Communications Project Brief
Visual Communications Project Brief S03/09373 26/03/2003 Version 1.0 Final For Distribution Document Control Page Document Number: S03/09373 File Number: 03-301/01/00023 Document Name: Visual Communications
More informationHTA NETWORK MULTIANNUAL WORK PROGRAMME 2016-2020
EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HEALTH AND FOOD SAFETY Healthcare systems, medical products and innovation Medical products: quality, safety, innovation Brussels, 20 May 2016 HTA NETWORK MULTIANNUAL
More information