1 CRC Creative Research and Evaluation Centre Phone: P.O. Box Fax: Kampala, Uganda CRC Handout Project Monitoring and Evaluation Plans This handout is a draft template for a project M&E plan. It shows some standard pieces to be included in such a plan, gives options for additional detail, and presents the reader/user with guiding questions to facilitate the process. Additional information about developing such plans is available may be found by consulting the short reference list included within this template. 06 January 1999 tom barton

2 Project Name Project Monitoring and Evaluation Plan Dates of plan When plan created Who was responsible

3 Table of Contents [Example only, based on contents of this outline handout] Table of Contents... 1 Executive summary... 1 Project background... 1 M&E planning... 2 The M&E Information Matrix... 2 The M&E Workplan Matrix... 5 M&E timetable... 5 References... 5 Abbreviations... 8 Forms drafts and examples... 8 Executive summary [Can be quite short just a few paragraphs for an overview of what the plan contains and what it is about] Project background The Project, which is funded by, is working on (relief, rehabilitation, development) in sectors. The preliminary work for the project, including needs assessment and project design were done in 19. Implementation is due to start (has started) on and the project (the current phase of the project) will be terminating in. The main goals/objectives of the project are: Overall (or final goal) Specific (or intermediate goals) a) b) The principal strategies of the project include. The target population(s) is/are because. The project is (or will be) operational in districts/zones/regions in (country). Current regions of the project are shown on the accompanying map. (scan and insert map here, with project areas located on it) [if the project has a conceptual model, this is a good place to show it and give a very brief description] Project Name Monitoring, Reporting and Evaluation Plan 1

4 M&E planning This M&E plan was prepared during, and proposes activities for the period. During the preparation of the M&E plan, the staff of the project reached a number of critical decisions and identified essential strategies for M&E in the project. The main debates and decisions included. (feasibility, responsibility, frequency, indicators, etc., etc.) [what were the key issues/decisions? who were the main participants in the planning?] The main references used in preparing the M&E plan were: et al: Project Monitoring and Evaluation Workshop Report 19 et al: Project Document 19 et al: Project needs assessment, situation analysis, baseline survey report, etc. 19 T. Barton; How Are We Doing? Guidelines for Monitoring and Evaluation. CARE-Uganda, The M&E Information Matrix M&E matrix the matrix (table) on the following page was prepared by, based on discussions during the project M&E workshop with the staff. In this table, the objectives and indicators shown are the same (or modified from) those in the project document. The numbering of the objectives, outputs and indicators corresponds to the numbering in the project document log frame. The reader/user of this matrix should note that the frequency of reporting might differ from the frequency of data collection. Details to consider:: Type of information: good to have some explanation of the indicators. However, if there are any indicators that might be difficult or confusing to incoming staff/partners later on in the project, it might be useful to include a separate table or page for further explanation or definition. To help in this effort, see supplemental indicator tables on the page just after the information matrix in this draft outline. Methods of data gathering: if one says records review : what records/what reports, kept where, and accessible with whose permission? Will the records review be done with a checklist? Will they be reviewed for qualitative or quantitative data? What is meant by survey? Who to collect: does not specify who to do data processing/analysis/or write up; nor who will do the editing and feedback. Frequency of reporting: Note that this matrix does not show who will be getting the reports. It only shows reporting frequency, but not who the reports will go to ] Other essential monitoring Project risks and assumptions Project management Questions: what will be the relevant indicators, what means of verification, who will be responsible. Note that some of this is handled in the next matrix. Project Name Monitoring, Reporting and Evaluation Plan 2

5 Monitoring, Evaluation and Reporting Matrix for Project Indicator Type of information (short explanation of indicator) Sources of information Methods of data gathering Who to collect, analyse data Frequency of reporting Final goal: Intermediate goals (objectives numbered) and outputs (numbered by intermediate goals) 1. Intermediate goal 1.1 Output 1 for IG Output 2. Intermediate goal 2.1 Output 1 for IG Output Project Name Monitoring, Reporting and Evaluation Plan 3

6 Supplemental indicator tables (to be used only if needed) Indicators definitions, explanations, applications and considerations Indicator Indicator written out in words. [Sectors for this indicator] Definition Explanation Use/Application Consideration Definition of the Shows what changes the What use for assessing What factors influence this indicator, e.g., indicator, and any indicator can demonstrate inputs, activities, outputs, season, recall time period, etc. It is likely to critical concepts Influenced by what affects the effects, impacts of the take extra questions to assess accuracy, embedded in it. levels or results of the indicator project (or assumptions, reliability, etc.? Literature any literature for risks, context) comparison of findings. Indicators data requirements, tools, results Indicator Data Required Possible Methods/Tools Unit of Results Indicator written out in words. Many indicators require more than one data point, e.g., to calculate stunting, one needs to know the child s age, gender, and height [Sectors for this indicator] Preferred methods/tools, e.g., household survey questionnaire, physical measurements, etc. Optional - Can also include optional tools for more explanation or qualitative assessment. What will the results look like? What form/format? Project Name Monitoring, Reporting and Evaluation Plan 4

7 The M&E Workplan Matrix The first table following this section shows the M&E workplan which helps summarise data from the information matrix and shows more lines of responsibility. [see pages 36, 41, 115 in the CARE M&E guidelines] Queries and/or items to fill in: When activity occurs: review and consider carefully; may also be able to put dates to specific items like the baseline, mid-term and final evaluations. Using this column and the second last column on reporting should help in generating a GANTT chart for M&E activities (see annex section). Who participates: the CARE book has some ideas, but this column needs to be specific for this project Who leads: this column should reflect who is ultimately going to be responsible for each of the M&E activities. It might be the overall project manager, but it should come down to specific persons, if possible, not to committees. M&E timetable The table following the workplan matrix shows an example of a GANTT timetable for M&E activities in a three year project. [Include discussion of any critical factors affecting decisions about what is placed where in the timetable] References Barton, T. (1997) How Are We Doing? Guidelines to Monitoring and Evaluation. Prepared for CARE Uganda; adopted by CARE International as the standard guidelines for all CARE offices. Is available from CARE International in English, French and Spanish Barton, T. (1998) Program Impact Evaluation Process: Module 1 Overview. Prepared for CARE Uganda. Draft version; due for field testing in early Project Name Monitoring, Reporting and Evaluation Plan 5

8 M&E workplan matrix General and Specific activity Specific activity (what is assessed or being done) When activity occurs? (schedule) Who participates? (data collect, analysis) Who leads? (who is responsible for reporting?) When reported? (schedule) MONITORING Objectives Impacts, fundamental changes Annual (?) Annual Context, risks and assumptions Social, political, economic, environment Negative outcomes Annual Annual Effects Response of target population to project outputs Annual Annual Outputs, including institutional and organisational issues Project products achieved Monthly Quarterly Activities (physical) Distribution and delivery Monthly Quarterly Actual versus planned Inputs (financial) Resources; use versus budget Monthly Quarterly EVALUATION Baseline Indicators for impacts, effects, At start-up ASAP after study context, assumptions Annual review Financial, physical, outputs, Annual Annual effects, context, assumptions Mid-term evaluation Organisation structure, design Progress physical, financial Achievements Outputs, effects Context, risks, assumptions After 2 years ASAP after study Final evaluation OTHER Special studies Training on M&E Training on report writing As above, plus impacts, sustainability Possibly cost-benefit Within 6-9 months of end of project Prior to phase out For whom? (report to..) Project Name Monitoring, Reporting and Evaluation Plan 6

9 M&E activity time table (example by quarter for a three year project) General and Specific activity Yr 1 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Yr 2 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Yr 3 Qtr 1 Qtr 2 Qtr 3 Qtr 4 MONITORING Objectives Context, risks and assumptions Effects Outputs, including institutional and organisational issues Activities (physical) Inputs (financial) EVALUATION Baseline Annual review Mid-term evaluation Final evaluation OTHER Special studies Training on M&E Training on report writing Note: Objectives, context, risk, assumptions, and effects would all be part of the mid-term and final evaluations as well as the annual monitoring/review. Project Name Monitoring, Reporting and Evaluation Plan 7

10 Abbreviations ABA... CDE... ETC... GoX...Government of X MoH...Ministry of Health NGO...Non-Governmental Organisation [I am still gathering useful examples that work for this section] Forms drafts and examples Assessment of effects (e.g., as a monitoring form, or a checklist in evaluation analysis) Indicator Baseline value Current value Amount of change (#) Percent change (%) Explanatory notes: Baseline done (date) Current survey done (date) Amount of change = Current Baseline Percent change = Current Baseline Baseline (this allows either positive or negative results) Assessment of activities Quarterly physical activities accomplishment report Item no. Major components and activities Unit of This quarter measure Plan Accomplishment in this quarter % Annual plan Fiscal year to date Accomplishment up to end of this report % Remarks Assessment of risks and negative outcomes Problems encountered Levels of problems/concerns Community Level Project level (including partners) Policy and higher level (including donor, country office, headquarters, etc. Problems encountered Solutions recommended Decisions made (what, when) Actions taken (what, when) Project Name Monitoring, Reporting and Evaluation Plan 8

How To Monitor A Project

How To Monitor A Project Module 4: Monitoring and Reporting 4-1 Module 4: Monitoring and Reporting 4-2 Module 4: Monitoring and Reporting TABLE OF CONTENTS 1. MONITORING... 3 1.1. WHY MONITOR?... 3 1.2. OPERATIONAL MONITORING...

More information

IS&T Project Management: Project Management 101. June, 2006

IS&T Project Management: Project Management 101. June, 2006 IS&T Project Management: Project Management 101 June, 2006 Session Objectives Review basics management Discuss obstacles to effective management Share practices that work for you Empower you to try some

More information

PROJECT MANAGEMENT PLAN CHECKLIST

PROJECT MANAGEMENT PLAN CHECKLIST PROJECT MANAGEMENT PLAN CHECKLIST The project management plan is a comprehensive document that defines each area of your project. The final document will contain all the required plans you need to manage,

More information

M&E Officer. Location: [Africa] [Ghana] [Accra] Category: Field Operations. Job Type: Fixed term, Full-time

M&E Officer. Location: [Africa] [Ghana] [Accra] Category: Field Operations. Job Type: Fixed term, Full-time M&E Officer Location: [Africa] [Ghana] [Accra] Category: Field Operations Job Type: Fixed term, Full-time M&E Officer To be responsible for high quality design, monitoring and evaluation of Cocoa Life

More information

Supporting Effective Evaluations: A Guide to Developing Performance Measurement Strategies

Supporting Effective Evaluations: A Guide to Developing Performance Measurement Strategies Home > Centre of Excellence for Evaluation Supporting Effective Evaluations: A Guide to Developing Performance Measurement Strategies 6.0 Performance Measurement Strategy Framework 6.1 Overview of the

More information

Procurement Performance Measurement System

Procurement Performance Measurement System Public Procurement and Disposal of Public Assets Authority Procurement Performance Measurement System User's Guide August 2008 Public Procurement and Disposal of Public Assets Authority Procurement Performance

More information

STRATEGIC REVIEW OF HUMAN RESOURCE MANAGEMENT IN UNICEF. Terms of Reference July 20 2005

STRATEGIC REVIEW OF HUMAN RESOURCE MANAGEMENT IN UNICEF. Terms of Reference July 20 2005 1. Background STRATEGIC REVIEW OF HUMAN RESOURCE MANAGEMENT IN UNICEF Terms of Reference July 20 2005 UNICEF has decided to undertake a Strategic Review of its approach to and performance in Human Resource

More information

pm4dev, 2016 management for development series Project Scope Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS

pm4dev, 2016 management for development series Project Scope Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS pm4dev, 2016 management for development series Project Scope Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS A methodology to manage development

More information

Performance Monitoring Tools

Performance Monitoring Tools Performance Monitoring Tools M&E training for MoHSW & Business Coalition on HIV/AIDS Material adapted from USDOL/ILO HIV/AIDS Workplace Education programme Session Objectives Participants will be able

More information

Develop Project Charter. Develop Project Management Plan

Develop Project Charter. Develop Project Management Plan Develop Charter Develop Charter is the process of developing documentation that formally authorizes a project or a phase. The documentation includes initial requirements that satisfy stakeholder needs

More information

PROJECT MANAGEMENT TRAINING MODULES

PROJECT MANAGEMENT TRAINING MODULES PROJECT MANAGEMENT TRAINING MODULES KENYA PROJECTS ORGANIZATION < Projects Solutions Provider > Macjo Arcade, 4 th Flr., Suite 15E P.O Box, 3029 00200, Nairobi - Kenya Tel: 254 (0)202319748 Mob: 0725 788

More information

Retained Fire Fighters Union. Introduction to PRINCE2 Project Management

Retained Fire Fighters Union. Introduction to PRINCE2 Project Management Retained Fire Fighters Union Introduction to PRINCE2 Project Management PRINCE2 PRINCE stands for: PRojects IN Controlled Environments and is a structured method which can be applied to any size or type

More information

Resources for Implementing the WWF Project & Programme Standards. Step 4.3 Analyze Operational and Financial Functions/ Performance

Resources for Implementing the WWF Project & Programme Standards. Step 4.3 Analyze Operational and Financial Functions/ Performance Resources for Implementing the WWF Project & Programme Standards Step 4.3 Analyze Operational and Financial Functions/ Performance March 2007 Step 4.3 Analyze Operational and Financial Performance Contents

More information

The University of Adelaide Business School

The University of Adelaide Business School The University of Adelaide Business School MBA Projects Introduction There are TWO types of project which may be undertaken by an individual student OR a team of up to 5 students. This outline presents

More information

M&E/Learning Guidelines for IPs. (To be used for preparation of Concept Notes and Proposals to LIFT)

M&E/Learning Guidelines for IPs. (To be used for preparation of Concept Notes and Proposals to LIFT) Published: 17 March 2015 Background M&E/Learning Guidelines for IPs (To be used for preparation of Concept Notes and Proposals to LIFT) LIFT's new strategy (2015-2018) envisions LIFT as a knowledge platform.

More information

Guidance Note on Developing Terms of Reference (ToR) for Evaluations

Guidance Note on Developing Terms of Reference (ToR) for Evaluations Evaluation Guidance Note Series UNIFEM Evaluation Unit October 2009 Guidance Note on Developing Terms of Reference (ToR) for Evaluations Terms of Reference (ToR) What? Why? And How? These guidelines aim

More information

Poultry Production and Marketing Project. Kitui County. Terms of Reference. For. An End of Project Evaluation

Poultry Production and Marketing Project. Kitui County. Terms of Reference. For. An End of Project Evaluation Poultry Production and Marketing Project Kitui County Terms of Reference For An End of Project Evaluation Funded by: Implemented by: About Farm Africa Farm Africa is an international NGO whose goal is

More information

TOOL D14 Monitoring and evaluation: a framework

TOOL D14 Monitoring and evaluation: a framework TOOL D14 Monitoring and evaluation: a framework 159 TOOL D14 Monitoring and evaluation: a framework TOOL D14 For: About: Purpose: Use: Resource: Commissioners in primary care trusts (PCTs) and local authorities

More information

Writing Reports BJECTIVES ONTENTS. By the end of this section you should be able to :

Writing Reports BJECTIVES ONTENTS. By the end of this section you should be able to : Writing Reports By the end of this section you should be able to : O BJECTIVES Understand the purposes of a report Plan a report Understand the structure of a report Collect information for your report

More information

TOOL. Project Progress Report

TOOL. Project Progress Report TOOL SUMMARY: PROJECT PROGRESS REPORT The purpose of the is to compile information from the analysis done by project participants, partners and LWR country staff about the progress or advances the project

More information

Customer Feedback Report

Customer Feedback Report Customer Feedback Report Registrants and Customers Analysis 2015 FTPIMPROVEMENT@GDC-UK.ORG Table of Contents I. Overview... 2 II. Results Registrants... 4 III. Key findings Registrants... 5 IV. Key themes

More information

Scheduling and Review of Project Activities

Scheduling and Review of Project Activities Project Implementation Manual Scheduling and Review of Project Activities 1. INTRODUCTION 2. UNDERSTANDING CONTRACTUAL OBBLIGATIONS 3. PLANNING, MONITORING & AUDITING 4. PROCUREMENT 5. REPORTING 1.1 Purpose

More information

Learning Aims: To research, record and evaluate the difficulties of starting your own business.

Learning Aims: To research, record and evaluate the difficulties of starting your own business. Learning Aims: To research, record and evaluate the difficulties of starting your own business. 3.1 What is Business: 3.1.1 Understanding the Nature and Purpose of Business 3.1.1 requires you to investigate

More information

PERFORMANCE EVALUATIONS POLICY. Purpose: To provide feedback, coaching and development plans for employees on a regularly scheduled basis.

PERFORMANCE EVALUATIONS POLICY. Purpose: To provide feedback, coaching and development plans for employees on a regularly scheduled basis. PERFORMANCE EVALUATIONS POLICY Purpose: To provide feedback, coaching and development plans for employees on a regularly scheduled basis. Policy: Regular, annual performance evaluations are completed for

More information

PROJECT AUDIT METHODOLOGY

PROJECT AUDIT METHODOLOGY PROJECT AUDIT METHODOLOGY 1 "Your career as a project manager begins here!" Content Introduction... 3 1. Definition of the project audit... 3 2. Objectives of the project audit... 3 3. Benefit of the audit

More information

Logical Framework: Making it Results-Oriented

Logical Framework: Making it Results-Oriented 1 of 11 2001-04-05 09:58 Logical Framework: Making it Results-Oriented Table of Contents 1. Introduction 2. Purpose of Guide 3. The LFA Process 4. The Logical Framework Structure 5. The Vertical Logic

More information

Section Five Learning Module D:

Section Five Learning Module D: Section Five Learning Module D: the Project 5.1 Module D: Objectives At the conclusion of this module you will be able to: implement a project plan; keep control of a project plan; effectively review a

More information

Quick Reference Guide Interactive PDF Project Management Processes for a Project

Quick Reference Guide Interactive PDF Project Management Processes for a Project Project Processes for a Project Click the Knowledge Area title (below and left in blue underline) to view the details of each Process Group. Project Process Groups and Knowledge Areas Mapping Project Process

More information

1. Background and business case

1. Background and business case 1. Background and business case This section explains the context and why the project is being undertaken. It provides the justification for investing the time and resources in the project. 1.1 Reasons

More information

Monitoring and Reporting Recreation Programs (MARP) Tool User Guide October 2013

Monitoring and Reporting Recreation Programs (MARP) Tool User Guide October 2013 Monitoring and Reporting Recreation Programs (MARP) Tool October 2013 Supported By: 1 Table of Contents Overview... 1 What is Being Recorded?... 1 What is being Measured and Reported?... 1 Why were these

More information

National Disability Authority Resource Allocation Feasibility Study Final Report January 2013

National Disability Authority Resource Allocation Feasibility Study Final Report January 2013 National Disability Authority Resource Allocation Feasibility Study January 2013 The National Disability Authority (NDA) has commissioned and funded this evaluation. Responsibility for the evaluation (including

More information

GUIDELINES: Applying for your first IFS Individual Research Grant

GUIDELINES: Applying for your first IFS Individual Research Grant GUIDELINES: Applying for your first IFS Individual Research Grant TO COMPLETE THE APPLICATION FORM The Application Form is a Word document, available for downloading on the IFS website (here). It should

More information

TOOL. Project Progress Report

TOOL. Project Progress Report Purpose TOOL SUMMARY: LOGFRAME CHEAT SHEET The purpose of the is to compile information from the analysis done by project participants, partners and LWR country staff about the progress or advances the

More information

JOB DESCRIPTION. Program & Organizational Development (POD)- Program Manager

JOB DESCRIPTION. Program & Organizational Development (POD)- Program Manager JOB DESCRIPTION Position Title: Reports to: Line Management: Location of position: M&E (Monitoring and Evaluation) Manager Program & Organizational Development (POD)- Program Manager M&E Officer(s); Senior

More information

7 Directorate Performance Managers. 7 Performance Reporting and Data Quality Officer. 8 Responsible Officers

7 Directorate Performance Managers. 7 Performance Reporting and Data Quality Officer. 8 Responsible Officers Contents Page 1 Introduction 2 2 Objectives of the Strategy 2 3 Data Quality Standards 3 4 The National Indicator Set 3 5 Structure of this Strategy 3 5.1 Awareness 4 5.2 Definitions 4 5.3 Recording 4

More information

CDC UNIFIED PROCESS PRACTICES GUIDE

CDC UNIFIED PROCESS PRACTICES GUIDE Document Purpose The purpose of this document is to provide guidance on the practice of Requirements Definition and to describe the practice overview, requirements, best practices, activities, and key

More information

IPDET Module 6: Descriptive, Normative, and Impact Evaluation Designs

IPDET Module 6: Descriptive, Normative, and Impact Evaluation Designs IPDET Module 6: Descriptive, Normative, and Impact Evaluation Designs Intervention or Policy Evaluation Questions Design Questions Elements Types Key Points Introduction What Is Evaluation Design? Connecting

More information

Guide for the Development of Results-based Management and Accountability Frameworks

Guide for the Development of Results-based Management and Accountability Frameworks Guide for the Development of Results-based Management and Accountability Frameworks August, 2001 Treasury Board Secretariat TABLE OF CONTENTS Section 1. Introduction to the Results-based Management and

More information

Completing a Peer Review

Completing a Peer Review Completing a Peer Review University of Guelph, Integrative Biology Undergraduate Curriculum Committee 2011/2012 Completing a Peer Review Based on Writing in the Sciences an online resource provided by

More information

Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter

Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter 1 Mgmt / Initiating Process Group 4.1 Develop Project Charter Project statement of work Business case Agreements Facilitation techniques Project charter 26/02/2013 18:23:36 1 2 Mgmt / Planning Process

More information

(planning, monitoring, evaluation, reporting) Pocket guide. November 2012 (living draft)

(planning, monitoring, evaluation, reporting) Pocket guide. November 2012 (living draft) PMER (planning, monitoring, evaluation, reporting) Pocket guide November 2012 (living draft) Planning and evaluation department, Geneva International Federation of Red Cross and Red Crescent Societies

More information

GENERAL DESCRIPTION OF TASK(S) AND OBJECTIVES TO BE ACHIEVED

GENERAL DESCRIPTION OF TASK(S) AND OBJECTIVES TO BE ACHIEVED TERMS OF REFERENCE Consultant: Monitoring and Evaluation Consultant Division / Department: FAO Sub-regional Office for Central Africa (SFC), Libreville, Gabon Programme / Project number: Sustainable Management

More information

Kenya Health Initiative - Improving Basic Patient Safety Standards in Private and Public Health Sector Facilities

Kenya Health Initiative - Improving Basic Patient Safety Standards in Private and Public Health Sector Facilities Kenya Health Initiative - Improving Basic Patient Safety Standards in Private and Public Health Sector Facilities 1- Background and Context By Dr Njeri Mwaura, Operations Officer, IFC Presented at the

More information

CODE: E.003 Financial Services BUDGET AND BUSINESS PLANNING POLICY. 1.2 The essential activities covered by this policy include:

CODE: E.003 Financial Services BUDGET AND BUSINESS PLANNING POLICY. 1.2 The essential activities covered by this policy include: BUDGET AND BUSINESS PLANNING POLICY CONTENTS 1.1 Budget and business planning is undertaken to support strategic planning and decision-making and to serve accountability by enabling administration to plan

More information

Public Health Competency Based Employee Performance Management Checklist

Public Health Competency Based Employee Performance Management Checklist Public Health Competency Based Employee Performance Management Management Toolkit OPHA & Partners, Version 2 (2010) This work is licensed under the Creative Commons Attribution-Noncommercial-Share Alike

More information

Performance indicators in the frame of Networks of Excellence

Performance indicators in the frame of Networks of Excellence Performance indicators in the frame Networks Excellence Methodological guidance note Preliminary note Please note that these notes are merely intended for guidance. Networks Excellence (NoEs) will be varied

More information

Environmental & Social Assessment Procedures Basics

Environmental & Social Assessment Procedures Basics African Development Bank Group Environmental & Social Assessment Procedures Basics For public sector operations Compliance & Safeguards Division (ORQR.3) safeguards@afdb.org AFRICAN DEVELOPMENT BANK GROUP

More information

The Logical Framework Approach An Introduction 1

The Logical Framework Approach An Introduction 1 The Logical Framework Approach An Introduction 1 1. What is the Logical Framework Approach? 1.1. The background The Logical Framework Approach (LFA) was developed in the late 1960 s to assist the US Agency

More information

Solvency II Data audit report guidance. March 2012

Solvency II Data audit report guidance. March 2012 Solvency II Data audit report guidance March 2012 Contents Page Introduction Purpose of the Data Audit Report 3 Report Format and Submission 3 Ownership and Independence 4 Scope and Content Scope of the

More information

Practice Overview. REQUIREMENTS DEFINITION Issue Date: <mm/dd/yyyy> Revision Date: <mm/dd/yyyy>

Practice Overview. REQUIREMENTS DEFINITION Issue Date: <mm/dd/yyyy> Revision Date: <mm/dd/yyyy> DEPARTMENT OF HEALTH AND HUMAN SERVICES ENTERPRISE PERFORMANCE LIFE CYCLE FRAMEWORK PRACTIICES GUIIDE REQUIREMENTS DEFINITION Issue Date: Revision Date: Document

More information

Interview studies. 1 Introduction... 1. 2 Applications of interview study designs... 2. 3 Outline of the design... 3

Interview studies. 1 Introduction... 1. 2 Applications of interview study designs... 2. 3 Outline of the design... 3 Interview studies Contents 1 Introduction... 1 2 Applications of interview study designs... 2 3 Outline of the design... 3 4 Strengths and weaknesses of interview study designs... 6 5 References... 7 1

More information

PROJECT MANAGEMENT FRAMEWORK

PROJECT MANAGEMENT FRAMEWORK PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to

More information

Attachment 2 Project Management Plan Template PROJECT MANAGEMENT PLAN WORK PERFORMED UNDER AGREEMENT SUBMITTED BY PRINCIPAL INVESTIGATOR SUBMITTED TO

Attachment 2 Project Management Plan Template PROJECT MANAGEMENT PLAN WORK PERFORMED UNDER AGREEMENT SUBMITTED BY PRINCIPAL INVESTIGATOR SUBMITTED TO Attachment Project Management Plan Template PROJECT MANAGEMENT PLAN {Agreement Title} Revision {Revision Letter} {Date Prepared} WORK PERFORMED UNDER AGREEMENT DE-FE000{xxxx} SUBMITTED BY {Organization

More information

Funded Peak Activities

Funded Peak Activities Funded Peak Activities Triennial Service Plan Guidelines Version 2.0 Sector Development Directorate Ageing, Disability and Home Care Department of Family and Community Services NSW July 2012 Final Document

More information

Consultation on Insolvency Statistics

Consultation on Insolvency Statistics Consultation on Insolvency Statistics - Quarterly insolvency statistics release (National Statistics) - All other Official Statistics on insolvency A National Statistics Consultation July 2010 URN 10/1074

More information

LO2: Understand strategies and techniques used to improve engineering businesses. Using project monitoring tools GANTT Charts

LO2: Understand strategies and techniques used to improve engineering businesses. Using project monitoring tools GANTT Charts Unit 20: Business for Engineering LO2: Understand strategies and techniques used to improve engineering businesses Using project monitoring tools GANTT Charts Instructions and answers for teachers These

More information

GUIDELINES FOR PILOT INTERVENTIONS. www.ewaproject.eu ewa@gencat.cat

GUIDELINES FOR PILOT INTERVENTIONS. www.ewaproject.eu ewa@gencat.cat GUIDELINES FOR PILOT INTERVENTIONS www.ewaproject.eu ewa@gencat.cat Project Lead: GENCAT CONTENTS A Introduction 2 1 Purpose of the Document 2 2 Background and Context 2 3 Overview of the Pilot Interventions

More information

Promoting hygiene. 9.1 Assessing hygiene practices CHAPTER 9

Promoting hygiene. 9.1 Assessing hygiene practices CHAPTER 9 74 CHAPTER 9 Promoting hygiene The goal of hygiene promotion is to help people to understand and develop good hygiene practices, so as to prevent disease and promote positive attitudes towards cleanliness.

More information

4 Project Implementation and Monitoring

4 Project Implementation and Monitoring 4 Project Implementation and Monitoring Version 3, 29 July 2014 Contents 4. Implementation and Monitoring... 2 4.1 Project Implementation... 3 4.1.1 Setting up project implementation... 3 4.1.2 Development

More information

Writing Your PG Research Project Proposal

Writing Your PG Research Project Proposal Writing Your PG Research Project Proposal Typically, most research project proposals will contain the following elements: The proposed title of your research project An outline of the scope and rationale

More information

Project Management Professional (PMP)

Project Management Professional (PMP) Project Management Professional (PMP) Duration: 5 days Course Objectives: PMI s Project Management Professional (PMP) credential is the most important industry-recognized certification for project managers.

More information

Proposal Writing for Environmental Funds Tanzania

Proposal Writing for Environmental Funds Tanzania Proposal Writing for Environmental Funds Tanzania Paquita Bath September 2011 Funding Projects Most funders have a rigorous, careful process for selecting projects. They usually have a set of priorities

More information

Microsoft Project 2007 Level 1

Microsoft Project 2007 Level 1 Microsoft Project 2007 Level 1 One Day Course Course Description You need to gather information about the various tasks involved, resources required to accomplish the tasks, and the overall cost in order

More information

APPENDIX C. Internal Audit Report South Holland District Council Project Management

APPENDIX C. Internal Audit Report South Holland District Council Project Management APPENDIX C Internal Audit Report South Holland District Council Project Management Date: 20th December 2012 Contents Introduction and Scope 1 Executive Summary Assurance Opinion Key Messages 2 3 Management

More information

Chapter 2 Quantitative, Qualitative, and Mixed Research

Chapter 2 Quantitative, Qualitative, and Mixed Research 1 Chapter 2 Quantitative, Qualitative, and Mixed Research This chapter is our introduction to the three research methodology paradigms. A paradigm is a perspective based on a set of assumptions, concepts,

More information

HEALTH SPECIALIST VISITS (HSV) PROGRAMME. All Cook Islanders living healthier lives and achieving their aspirations

HEALTH SPECIALIST VISITS (HSV) PROGRAMME. All Cook Islanders living healthier lives and achieving their aspirations HEALTH SPECIALIST VISITS (HSV) PROGRAMME OUTPUTS SHORT TERM MEDIUM TERM LONG TERM GOAL OUTCOME OUTCOMES OUTCOME All Cook Islanders living healthier lives and achieving their aspirations Successful health

More information

The Gavi grant management change process

The Gavi grant management change process The Gavi grant management change process Overall change process Frequently asked questions June 2015 1. How was it decided that grant management changes were needed? Over recent years, through a series

More information

Project Integration Management

Project Integration Management Integration Initiating ning Executing Monitoring & Controlling Closing 4.1 Develop Charter Statement Of Work Business Case 4.2 Develop 4.3 Direct and Manage Work 4.4 Monitor and Control Work 4.5 Perform

More information

Prince 2 Health Check

Prince 2 Health Check Prince 2 Health Check Start-up Was there a Project Mandate? Was the Project Board designed/appointed before initiation was authorised? Was a Project Brief produced? Is the Project Brief to PRINCE standards?

More information

SAMPLE PWS FOR HRC MEO

SAMPLE PWS FOR HRC MEO PERFORMANCE WORK STATEMENT Human Resources Command (HRC) 1. Contract No. HRSOLUTIONS WILL COMPLETE 2. Requisition No. HRSOLUTIONS WILL COMPLETE 3. Amendment No. N/A 4. Scope. This task order requires that

More information

SPF GOOD PRACTICE GUIDE

SPF GOOD PRACTICE GUIDE Using this guide This guide accompanies the National Treasury s Strategic Procurement Framework (SPF) for Strategic Sourcing in the Public Sector. For more information, visit the National Treasury website

More information

ADVANCING PARTNERS & COMMUNITIES

ADVANCING PARTNERS & COMMUNITIES SUBAWARD RESOURCES & GUIDANCE ADVANCING PARTNERS & COMMUNITIES SUBAWARDEE GUIDANCE FOR THE PERFORMANCE MONITORING PLAN ADVANC Advancing Partners & Communities Advancing Partners & Communities (APC) is

More information

Learning Outcome 1 The learner will: Be able to initiate the preliminary stages of a project.

Learning Outcome 1 The learner will: Be able to initiate the preliminary stages of a project. Unit Title: Project Management Guided Learning Hours: 210 Level: Level 6 Number of Credits: 25 Learning Outcome 1 The learner will: Be able to initiate the preliminary stages of a 1.1 Identify an appropriate

More information

Community led planning questionnaire design and data service:

Community led planning questionnaire design and data service: Community led planning questionnaire design and data service: A FREE LIMITED SERVICE OFFERED TO COMMUNITY-LED PLANNING GROUPS IN SOUTH OXFORDSHIRE AND VALE OF WHITE HORSE Updated July 2015 INTRODUCTION

More information

Planning, Monitoring, Evaluation and Learning Program

Planning, Monitoring, Evaluation and Learning Program Planning, Monitoring, Evaluation and Learning Program Program Description Engineers Without Borders USA EWB-USA Planning, Monitoring, Evaluation 02/2014 and Learning Program Description This document describes

More information

Input, Output and Tools of all Processes

Input, Output and Tools of all Processes 1 CIS12-3 IT Project Management Input, Output and Tools of all Processes Marc Conrad D104 (Park Square Building) Marc.Conrad@luton.ac.uk 26/02/2013 18:22:06 Marc Conrad - University of Luton 1 2 Mgmt /

More information

Content Sheet 16-1: Introduction to Documents & Records

Content Sheet 16-1: Introduction to Documents & Records Content Sheet 16-1: Introduction to Documents & Records Role in quality management system The management of documents and records is one of the 12 essential elements of the quality system. The management

More information

Ninth Round PROJECT MONITORING, REPORTING, REVISION AND EXTENSION GUIDELINES

Ninth Round PROJECT MONITORING, REPORTING, REVISION AND EXTENSION GUIDELINES Ninth Round PROJECT MONITORING, REPORTING, REVISION AND EXTENSION GUIDELINES For all reporting templates, please visit the UNDEF website: http://www.un.org/democracyfund/grantees/grantees_r7.html This

More information

APPLYING THE STRATEGIC PLANNING PROCESS

APPLYING THE STRATEGIC PLANNING PROCESS MANAGEWARE APPLYING THE STRATEGIC PLANNING PROCESS Requirements Each department and agency of state government must engage in the process of strategic planning and must produce a strategic plan to be used

More information

Strengthening the capabilities of the Department of Statistics in Jordan MISSION REPORT

Strengthening the capabilities of the Department of Statistics in Jordan MISSION REPORT TWINNING CONTRACT JO/13/ENP/ST/23 Strengthening the capabilities of the Department of Statistics in Jordan MISSION REPORT on Activity 3.9: Quality Audit - I Mission carried out by Ms Orietta Luzi, Chief

More information

July 2012 Report No. 12-045. An Audit Report on The ReHabWorks System at the Department of Assistive and Rehabilitative Services

July 2012 Report No. 12-045. An Audit Report on The ReHabWorks System at the Department of Assistive and Rehabilitative Services John Keel, CPA State Auditor The ReHabWorks System at the Department of Assistive and Rehabilitative Services Report No. 12-045 The ReHabWorks System at the Department of Assistive and Rehabilitative Services

More information

Excel Templates for Budgets (Man Power) User Guide

Excel Templates for Budgets (Man Power) User Guide Excel Templates for Budgets (Man Power) User Guide This simple Excel-based template is is a convenient application to develop a manpower schedule/budget for up to 10 departments for a 3-year period. It

More information

ASSESSMENT, RECORDING AND REPORTING(ARR) POLICY.

ASSESSMENT, RECORDING AND REPORTING(ARR) POLICY. ASSESSMENT, RECORDING AND REPORTING(ARR) POLICY. Introduction The ARR Policy is closely linked to other key school policies (in particular: Teaching and Learning and Gifted and Talented) to ensure whole

More information

Using the logical framework matrix

Using the logical framework matrix Using the logical framework matrix Defining the M&E Strategy for a programme/project A logical framework Clearly defined results and risks Performance indicators and means of verification An M&E plan for

More information

Assessment of compliance with the Code of Practice for Official Statistics

Assessment of compliance with the Code of Practice for Official Statistics Assessment of compliance with the Code of Practice for Official Statistics Statistics from the National Travel Survey (produced by the Department for Transport) Assessment Report 58 October 2010 Crown

More information

Strategic Technology Plan

Strategic Technology Plan Strategic Technology Plan What is a Strategic Technology Plan? The strategic technology plan is a guide to how the organization will use technology to help accomplish its goals. The plan is created with

More information

FAO SmartFish Publication 04 MONITORING AND EVALUATION MISSION REPORT

FAO SmartFish Publication 04 MONITORING AND EVALUATION MISSION REPORT FAO SmartFish Publication 04 MONITORING AND EVALUATION MISSION REPORT Cover photograph courtesy of IOC REPORT/RAPPORT: SF-FAO/2012/04 Monitoring and Evaluation Mission report April - May 2012 GCP/RAF/466/EC

More information

Planning for monitoring and evaluation activities during the programme's lifetime

Planning for monitoring and evaluation activities during the programme's lifetime Developing a Monitoring and Evaluation Plan for Food Security and Agriculture Programmes Planning for monitoring and evaluation activities during the programme's lifetime Text-only version In this lesson

More information

7. ASSESSING EXISTING INFORMATION SYSTEMS AND INFORMATION NEEDS: INFORMATION GAP ANALYSIS

7. ASSESSING EXISTING INFORMATION SYSTEMS AND INFORMATION NEEDS: INFORMATION GAP ANALYSIS 7. ASSESSING EXISTING INFORMATION 6. COMMUNITY SYSTEMS AND LEVEL INFORMATION MONITORING NEEDS: OF THE INFORMATION RIGHT TO ADEQUATE GAP ANALYSIS FOOD 7. ASSESSING EXISTING INFORMATION SYSTEMS AND INFORMATION

More information

Research and information management strategy 2015-18. Using research and managing information to ensure delivery of the Commission s objectives

Research and information management strategy 2015-18. Using research and managing information to ensure delivery of the Commission s objectives Research and information management strategy 2015-18 Using research and managing information to ensure delivery of the Commission s objectives 1 1. Introduction This strategy sets out a range of research

More information

TRANSPORT CANADA MARINE SAFETY PLEASURE CRAFT OPERATOR COMPETENCY PROGRAM QUALITY MANAGEMENT SYSTEM FOR ACCREDITATION

TRANSPORT CANADA MARINE SAFETY PLEASURE CRAFT OPERATOR COMPETENCY PROGRAM QUALITY MANAGEMENT SYSTEM FOR ACCREDITATION TRANSPORT CANADA MARINE SAFETY PLEASURE CRAFT OPERATOR COMPETENCY PROGRAM FOR ACCREDITATION OF COURSE PROVIDERS PROJECT TRANSITION AND IMPLEMENTATION PLEASURE CRAFT OPERATOR COMPETENCY PROGRAM QUALITY

More information

Sample audit report. "Your career as a project manager starts here!"

Sample audit report. Your career as a project manager starts here! Sample audit report 1 Substantive project audit report entitled (PROJECT NAME) managed for (NAME OF THE PROJECT HOLDER) The audit has been implemented within the following extent: Project initiation phase

More information

Il Project Cycle Management :A Technical Guide The Logical Framework Approach

Il Project Cycle Management :A Technical Guide The Logical Framework Approach European Institute of Public Administration - Institut européen d administration publique Il Project Cycle Management :A Technical Guide The Logical Framework Approach learning and development - consultancy

More information

A framework to plan monitoring and evaluation

A framework to plan monitoring and evaluation 6. A framework to plan monitoring and evaluation Key ideas Monitoring and evaluation should be an integral part of (and therefore affect) all stages of the project cycle. As mentioned earlier, you need

More information

October 2006 GUIDELINES FOR PREPARATION OF FINAL REPORTS AND DOCUMENTS

October 2006 GUIDELINES FOR PREPARATION OF FINAL REPORTS AND DOCUMENTS October 2006 GUIDELINES FOR PREPARATION OF FINAL REPORTS AND DOCUMENTS AUTHORS PREPARED BY: UNDP/GEF Danube Regional Project Agentur Sieben AUTHORS: Marcella Fabianova Peter Whalley Fanak Mossaheb Style

More information

stepping stones to accrual accounting The transition from cash to accrual accounting for public financial management for public financial management

stepping stones to accrual accounting The transition from cash to accrual accounting for public financial management for public financial management stepping stones to accrual accounting The transition from cash to accrual accounting for public financial management for public financial management for public financial management CIPFA, the Chartered

More information

The 10 Knowledge Areas & ITTOs

The 10 Knowledge Areas & ITTOs This document is part of a series that explain the newly released PMBOK 5th edition. These documents provide simple explanation and summary of the book. However they do not replace the necessity of reading

More information

Equal Rights and Treatment for Roma in Moldova and Ukraine. Manual

Equal Rights and Treatment for Roma in Moldova and Ukraine. Manual Equal Rights and Treatment for Roma in Moldova and Ukraine Project Management Methodology Manual WELCOME TO THE COUNCIL OF EUROPE PROJECT MANAGEMENT METHODOLOGY In July 2001, the Council of Europe launched

More information

5.2. 5.2 Template for IT Project Plan. Template for IT Project Plan. [Project Acronym and Name]

5.2. 5.2 Template for IT Project Plan. Template for IT Project Plan. [Project Acronym and Name] 231 5.2 Template for IT Project Plan Name of the Tool: Source: Usage: Description: Template for IT Project Plan GIZ This template has been designed as a tool to support the planning of IT projects for

More information

SCOPE MANAGEMENT PLAN <PROJECT NAME>

SCOPE MANAGEMENT PLAN <PROJECT NAME> SCOPE MANAGEMENT PLAN TEMPLATE This Project Scope Management Plan Template is free for you to copy and use on your project and within your organization. We hope that you find this template useful and welcome

More information