1 Data Center and Infrastructure Services Project Charter 1/25/2010
2 Table of Contents Introduction... 3 Objectives... 3 Scope... 4 Principles... 5 Expected Benefits... 5 Project Approach... 6 Project Structure... 9 Project Timeline Project Resources Appendix A - Work In Progress Revision History 12/15/09 Draft 01a...Initial draft 01/25/09 Draft 01b.... Executive Committee review dc services charter csg 2 6/25/2010
3 Introduction This project will initiate planning for the consolidation of campus data center facilities and IT infrastructure services. The directive for this initiative was provided by two recent planning groups the Cost Savings and Efficiencies Task Force and the IT Planning Task Force: The Cost Saving and Efficiencies Task Force (December 2008 April 2009) was formed to review options for reducing administrative costs and improving operational efficiency in response to state level and University of California budget reductions. Among other areas, the task force identified numerous cost reduction proposals associated with information technology including the consolidation of IT services and infrastructure for data centers and server hosting. Of the IT related proposals, the task force rated the consolidation of data centers and servers as the most important recommendation to implement. The IT Planning Task Force (August 2008 September 2009) was created to define a comprehensive strategic plan for IT at UCLA including IT priorities for enhancing UCLA s academic excellence and administrative efficiency, deriving greater value and efficiency from UCLA s IT infrastructure, and balancing the needs of individual divisions and departments against the benefits of institutional solutions. The UCLA IT Strategic Plan for drafted by the task force outlines the expected role of information technology at UCLA and proposes a new IT operating model to achieve those aspirations. The advantages of moving toward more centralized planning and sourcing of data center facilities and IT infrastructure for some specified areas was noted by both planning groups. It was also recognized that such a direction would be a major change from how IT infrastructure has been managed at UCLA over the past several decades. The sections that follow outline the proposed approach for planning this change and building a sustainable capability for campus wide IT infrastructure planning and consolidation. Objectives The overall goal of the study is to assess the current state of UCLA s IT infrastructure and develop a plan for the creation, delivery and management of large scale campus IT infrastructure services. This will include (1.) defining what infrastructure services should be provided at an institutional level, (2.) building UCLA s capabilities to efficiently and effectively deploy institutional IT services, and (3.) rationalizing current IT infrastructure through consolidation, standardization, integration and virtualization including: Data center facilities reducing the number of physically separate centers, rooms, closets and other locations where campus computing equipment operates IT infrastructure consolidation and virtualization of the hardware, software and service components that support institutional applications and IT enabled processes dc services charter csg 3 6/25/2010
4 IT operations rationalizing the management and support processes associated with data center and infrastructure operations The objectives are to be achieved within the framework of the IT Operating Model as outlined in the UCLA IT Strategic Plan. Scope The scope of the assessment will include evaluating opportunities to consolidate and expand UCLA s institutional IT infrastructure. Institutional IT infrastructure encompasses the centrally coordinated, shared IT services that provide the foundation for the university s IT capability. Infrastructure Scope Specific components of the IT infrastructure that will be studied include: Data center facilities, rooms and closets that currently exist at UCLA and options for data center expansion such as data center containers, data center facilities at other UC campuses and commercial or outsourced data center services. Shared computing platforms including the hardware and software for virtualized server environments, shared storage arrays, peripherals, database management, system monitoring and management. Opportunities to leverage cloud computing as a component of institutional IT infrastructure will also be evaluated. Middleware applications and services that include shared solutions such as identity and access management, data warehouse, content management and collaboration tools that are leveraged across many areas. Opportunities for developing and managing architecture standards for application middleware (e.g., enterprise service bus, messaging, workflow, web services, etc.) will also be evaluated. Human IT resources that provide the knowledge, skills, experience and capabilities to convert technology components into useful shared services. Security and risk management (e.g., disaster planning and recovery) related to institutional IT infrastructure will also be evaluated. Infrastructure components that will not be included in the scope of this analysis include network communications, e mail and calendaring, helpdesk and desktop support, institutional data management and enterprise applications as these areas are being addressed by other teams. Institutional Scope The scope will include IT infrastructure required to support the research, education and administrative activities of the university. Technology related to clinical care will not be evaluated. dc services charter csg 4 6/25/2010
5 Principles A number of principles for how IT planning at UCLA should proceed were outlined in the IT strategic plan and the cost efficiencies report. These principles represent a starting point for engaging campus stakeholders in developing the business plan and model for the delivery of IT infrastructure services. IT is a strategic tool that represents a significant investment. IT efforts and capabilities must be aligned with the goals of the institution to better enable the achievement of its mission and maximize the overall benefit of IT investments. Opportunities to consolidate common services should be actively explored. Redundant provisioning of common services increases support costs, results in uneven service levels and inhibits the ability to leverage economies of scale. Centralization should not automatically be viewed as the solution to every challenge. Conversely, centralization should not be automatically resisted. Choices should be made with an enterprise perspective and justified on the basis of the value they generate. Local IT autonomy, especially at the frontlines of research and education, is highly valued and is recognized as a critical component of innovation. Change initiatives must have strong support from campus leadership and broad support from the university community. Planning and implementation must involve faculty, staff and students as appropriate. Effective cost optimization may need new or continued investment to reap long term benefits. Some initiatives may take a period of years to implement. Expected Benefits The consolidation of IT infrastructure provides an opportunity to improve the business value of IT in a number of areas. The potential quantitative and qualitative benefits associated with infrastructure consolidation, standardization, integration and virtualization will be identified and validated in a business case for campus infrastructure services. Opportunity IT planning IT cost reduction IT integration Business Value Improve the ability to plan, forecast, manage and govern campus IT infrastructure. Reduce overall capital, operating and energy costs. Increase IT asset utilization. Rationalize architecture complexity. Improve real-time integration and data management capabilities. dc services charter csg 5 6/25/2010
6 Opportunity IT integrity IT agility Service quality Business Value Improve system availability, security and disaster recovery capabilities. Accelerate server and storage provisioning. Improve flexibility to accommodate new applications, peak loads and variable demand. Improve service delivery, management and measurement capabilities. A new IT funding model that provides appropriate and sufficient investment to effectively operate shared IT infrastructure services will also be necessary. Components that have been identified as important to this funding approach include: An institutional view and understanding of all IT infrastructure investments that are being made across the campus A systematic way of linking IT investments to the business strategy of the campus and an appropriate mechanism to allocate campus funding resources to IT A new baseline and total cost of ownership model for each institutional IT service that includes annual operating costs and amortizes replacement costs of hardware and software over the life of the service The creation of an IT reserve fund that will provide development and operational funding for institutional IT service needs over a ten year horizon Project Approach The analysis and planning for data center and infrastructure services will focus on three major areas data center facilities, infrastructure services and a new service delivery plan. Data center facilities: (1.) evaluation of current data center capacity, (2.) forecast of future data center needs, (3.) recommendations for optimal use and operation of existing facilities, and (4.) sourcing of additional / future data center capacity Work currently in progress to assess the structural and environmental features of the Math Sciences Addition (MSA) data center are outlined in Appendix A. Infrastructure services: (1.) evaluation of current infrastructure assets and technologies, (2.) identification of the needs and value associated with rationalized sourcing of infrastructure services related to data centers, servers, storage, data management, IT management systems, middleware, integration software, security and disaster recovery solutions, (3.) definition of the campus infrastructure services catalog including the scale, sourcing, sequence and timing of delivery, and (4.) specification of the infrastructure standards and architecture necessary to support campus services dc services charter csg 6 6/25/2010
7 Service delivery plan: (1.) the business and operating plan for the development, introduction and delivery of data center and infrastructure services, (2.) the roadmap for data center and IT infrastructure consolidation, (3.) investment needs for start up and funding model for sustaining on going service delivery, and (4.) a governance model for on going planning, sourcing and management of data center and infrastructure services dc services charter csg 7 6/25/2010
8 The assessment of opportunities associated data center and infrastructure services is dependent on a related initiative to inventory current UCLA IT assets. The inventory will provide a baseline for institution wide technology planning and benchmarks for the comparison of UCLA infrastructure to that of comparable institutions. As with any major initiative, effective project management will be critical to achieving successful outcomes. Project management activities set and manage the overall direction and timing of the project; help ensure effective project communication; coordinate activities across teams; manage issues and the quality of project deliverables. Implementing a new delivery model for data center and infrastructure services will also involve some significant changes in current practices and a well planned, well executed change leadership program will be required to help promote acceptance of these changes. An effective change leadership plan is needed in the initial stages of this analysis to appropriately engage campus leadership, involve campus stakeholders and communicate project activities in a manner that addresses the political challenges associated with IT infrastructure consolidation. dc services charter csg 8 6/25/2010
9 Project Structure The proposed structure for the planning initiative is depicted below. IT Plan Steering Committee Stakeholder Groups Vice Chancellors Deans Council Academic Senate Health System IT Planning Board (ITPB) Institute for Digital Research and Education (IDRE) Faculty Committee on Educational Technology (FCET) Committee on IT Infrastructure (CITI) Campus Computing Council (CCC) Common Systems Group (CSG) Sam Morabito Administrative Vice Chancellor Jim Davis Chief Academic Technology Officer Virginia McFerran CIO, UCLA Health System Steve Olsen Vice Chancellor Finance, Budget and Capital Programs Christopher Waterman Dean, School of the Arts and Architecture Project Directors Andrew Wissmiller Assistant Vice Chancellor, Administrative Information Systems Mike Kusunoki CIO and Director of Anderson Computing and Information Services Management Advisory Group Tito Deveryra Director, Information Technology School of Theater, Film and Television Bill Labate Director, Research Computing Technology and Academic Technology Services John Min Director, Housing IT Tom Phelan CIO, Social Sciences Computing Bill Jepson Director, School of the Arts and Architecture David Snow Manager, School of Medicine Information Technology Services Michael Storlie Senior Director, IT Operations Medical Information Technology Services (MITS) Albert Woo CIO, School of Law Change Leadership Project Manager Project Administration IT Inventory & Benchmarks Data Center Facilities Infrastructure Services Services Delivery Plan David Snow, TIER Tito Deveryra, TFT Mike Van Norman, CTS Albert Woo, Law Tony Escobar, AIS Bill Labate, ATS Albert Woo, Law C&T Engineering (Structural Assessment) Hewlett-Packard (Environmental Assessment) Tom Phelan, SSC Tito Deveryra, TFT Karen Melick, AIS Readius Hinton, AIS Anton Dembowsk, AGSM dc services charter csg 9 6/25/2010
10 Key project roles and responsibilities include: Executive Steering Committee Executive sponsors who provide strategic direction and support for the overall initiative and set priorities. Address and resolve issues related to business direction and organizational responsibilities. Support the project in securing necessary resources and funding. Stakeholder Groups Standing committees who are apprised of the initiative s progress, findings and recommendations. Provide input on project approach, issues and key recommendations. Support the project in evaluating opportunities and new service delivery models. Project Directors Program leaders responsible for managing the overall project scope, approach and execution. Coordinate assessment, planning and communication activities. Liaisons to executive sponsors and stakeholder groups. Facilitate issue management and provide quality assurance. Management Advisory Group Key stakeholder representatives who provide guidance on the project scope, approach and communications. Solicits support for the project, provides input on key project decisions and signs off on project deliverables. Project Manager Dedicated project manager to coordinate the project plan, timeline, resources and activities; facilitate issue resolution, quality assurance, change leadership and communication; and report project status. Project Teams Team leaders and resources who execute the assessment and planning activities related to Data Center Facilities, Infrastructure Services and the Services Delivery Plan. Project Support Project resources that provide administrative support, coordinate project logistics and support for the change leadership and communication plan. dc services charter csg 10 6/25/2010
11 Project Timeline The project timeline is dependent on the level of resources dedicated to this effort. A target / tentative timeline is depicted below. Deliverables As-Is To-Be Business Model M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 Project plan and initiation Assessment of data center options Assessment of data center capabilities Assessment and benchmark of current infrastructure technology Requirements for infrastructure services Business case for infrastructure consolidation Data center forecast and capacity plan Infrastructure architecture and services catalog Market strategy, business plan and operating model Roadmap for data center and infrastructure consolidation Investment requirements and financial plan Change readiness assessment Change leadership strategy and plan Communication strategy and plan Stakeholder engagement and communications IT Inventory & Benchmarks Project plan and initiation Inventory data collection dc services charter csg 11 6/25/2010
12 Project Resources A preliminary estimate of the project resource requirements follow. Resource M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 Hours Project Director Project Director Mgmt Advisory Group (10 * 10%) ,600 Project Manager ,600 Data Center Specialist Data Center Specialist Infrastructure Services ,200 Infrastructure Services ,120 Infrastructure Architecture ,600 Infrastructure Architecture Business Analysis ,040 Business Analysis ,040 Change Leadership ,120 Project Administration Total Hours ,024 1,584 1,744 1,744 1,744 1,744 1,424 1, , Total FTE Internal Hours ,080 External Hours ,560 dc services charter csg 12 6/25/2010
13 Appendix A Work In Progress MSA Data Center Assessment Objective assess the suitability of the Math Science Addition (MSA) data center for housing the most critical campus administrative and research computing systems Structural and Seismic Assessment Assess the risk of building damage or collapse during a major seismic disturbance Assess the risk to building systems / infrastructure within and adjacent to the data center site including electrical distribution, HVAC distribution equipment, water and other utility lines during a major seismic disturbance Assess the risk to computing equipment from collapse of the suspended ceiling, falling lighting or other objects during a major seismic disturbance Assess the load bearing capacity of the fourth floor data center and potential limitations or load distribution issues that might be associated with increasing the density and weight of computing equipment housed at the site Outcomes Overall understanding of the structural and seismic risks associated with the MSA facility and its appropriateness as a major campus data center facility Recommendations for minimizing property and equipment damage or loss of service related to a major seismic disturbance Facilities Environmental Assessment Assess the adequacy of fire detection, alarm and chemical / pre action water systems Assess the capacity, reliability and redundancy of power and power distribution systems Assess the capacity, reliability and redundancy of HVAC cooling and cooling distribution systems Assess potential risks associated with chilled water distribution for CRAH units and other HVAC related equipment, steam lines, domestic water lines, planter bed irrigation systems and other water sources within, adjacent to or above the data center Outcomes Recommendations to minimize potential risks related to fire and internal / external water sources Recommendations to minimize potential risks associated with failure of power and cooling systems and the optimal use of available cooling, power loading and power distribution systems Requirements (if any) for a reliable and redundant data center facility dedicated power and cooling systems, redundant UPS systems, redundant dedicated A/C units, backup power generation, etc. Operations Assessment and Planning Assess current data center management, monitoring and operational procedures Assess current data center management, monitoring and operational tools Develop planning model for data center space, power, cooling, rack and server capacity and data center floor plan Outcomes Recommendations for improving and automating data center management, monitoring and operations Planning model and what if scenarios for high capacity, high density, green computing center Master plan for data center facility, environmental, floor plan and computing infrastructure dc services charter csg 13 6/25/2010
CSG UCLA Enterprise Service Bus (ESB)
CSG UCLA Enterprise Service Bus (ESB) May 28, 2013 Draft Information Technology Services Enterprise Service Bus (ESB) The UCLA Enterprise Service Bus (ESB) is an application middleware solution designed
More informationStandards for Developing and Implementing Administrative Systems at UC Davis
Page 1 of 7 Standards for Developing and Implementing Administrative Systems at UC Davis Introduction The purpose of this document is to describe Standards for Developing and Implementing Administrative
More informationStrategic Goals. 1. Information Technology Infrastructure in support of University Strategic Goals
Strategic Goals 1. Information Technology Infrastructure in support of University Strategic Goals a. Work toward building a modern data center and providing data services that support campus units and
More informationFY13 Information Technology Operational Plan
1a: Work toward building a modern data center and providing data services that support campus units and the strategic goals of the University. Create a technical and financial plan for a data center Q1-
More informationDEPARTMENT AGENCY STATEMENT OF OBJECTIVES FOR CLOUD MIGRATION SERVICES: INVENTORY, APPLICATION MAPPING, AND MIGRATION PLANNING MONTH YYYY TEMPLATE
DEPARTMENT AGENCY STATEMENT OF OBJECTIVES FOR CLOUD MIGRATION SERVICES: INVENTORY, APPLICATION MAPPING, AND MIGRATION PLANNING MONTH YYYY TEMPLATE 1 Introduction and Instructions This sample Statement
More informationCHIEF INFORMATION OFFICER (CIO) San Francisco, California ORGANIZATIONAL OVERVIEW
CHIEF INFORMATION OFFICER (CIO) San Francisco, California ORGANIZATIONAL OVERVIEW As the University of California's first law school, UC Hastings College of the Law boasts a rich history of achievement
More informationIowa State University Proposal for HR-01 ISU HR Operating Model
Iowa State University Proposal for HR-01 ISU HR Operating Model Overview: Iowa State University proposes undertaking the HR-01 ISU HR Operating Model business case to transform the quality, manner and
More informationMigrating and consolidating even the simplest of data
CALIBRE An Employee-Owned Management and Technology Services Company 6354 Walker Lane, Suite 300, Metro Park Alexandria, Virginia 22310-3252 USA p. 703.797.8500 or 1.888.CALIBRE international p. 011.1.888.CALIBRE
More informationShared Services Update. What is a Shared Service? Governor s Directive 09 02 1/27/2011. FMAC Group January 27, 2011
Shared Services Shared Services Update FMAC Group January 27, 2011 What is a Shared Service? Washington State Government defines shared IT services as: The concentration of state and other related IT resources
More informationHR Service Delivery: Campus Initiatives
HR Service Delivery: Campus Initiatives David Odato, UCSF Jeannine Raymond, UCB Ramona Agrela, UCI Karen Hull, UCD Facilitated by: Scott Bolman, Mercer University of California Human Resources December
More informationPROJECT CONTROL DOCUMENT
PROJECT CONTROL DOCUMENT PERSISTENT EMAIL (AKA EMAIL MODEL) EM-PCD-001 Draft 06/09/2004 Prepared by Don D Worth UCLA PERSISTENT EMAIL Copyright 2002-2004, The Regents of the University of California All
More informationQlik UKI Consulting Services Catalogue
Qlik UKI Consulting Services Catalogue The key to a successful Qlik project lies in the right people, the right skills, and the right activities in the right order www.qlik.co.uk Table of Contents Introduction
More informationWHITE PAPER: STRATEGIC IMPACT PILLARS FOR EFFICIENT MIGRATION TO CLOUD COMPUTING IN GOVERNMENT
WHITE PAPER: STRATEGIC IMPACT PILLARS FOR EFFICIENT MIGRATION TO CLOUD COMPUTING IN GOVERNMENT IntelliDyne, LLC MARCH 2012 STRATEGIC IMPACT PILLARS FOR EFFICIENT MIGRATION TO CLOUD COMPUTING IN GOVERNMENT
More informationFederal Data Center Consolidation Initiative
Federal Data Center Consolidation Initiative 2011 Data Center Consolidation Plan & Progress Report (date) 1 Introduction... 2 2 Agency Goals for Data Center Consolidation... 2 3 Implementing Shared Services/Multi-tenancy...
More informationSTUDENT INFORMATION SYSTEM PLANNING PROJECT
Name of Responder: CIBER Inc, CIBER Enterprise Solutions Tom Payne Director of Sales 3556 Burch Ave Cincinnati, OH 45208 (o) 513-321-4090 (m) 513-403-6462 (f) 513-321-3868 tpayne@ciber.com Bruce Moore
More informationDallas IIA Chapter / ISACA N. Texas Chapter. January 7, 2010
Dallas IIA Chapter / ISACA N. Texas Chapter Auditing Tuesday, October Project 20, 2009 Management Controls January 7, 2010 Table of Contents Contents Page # Project Management Office Overview 3 Aligning
More informationInformation Technology Transformation Plan Phase I Status Report for October 2013 Issued November 2013
Contents Executive Summary Transformation Plan Phase I Status Report for October Issued November October Status Report and Project Milestones through FY2014 Executive Summary Implementation of the recommendations
More informationThe University of Alabama at Birmingham. Information Technology. Strategic Plan 2011 2013
The University of Alabama at Birmingham Information Technology Strategic Plan 2011 2013 Table of Contents Message from the Vice President... 3 About UAB... 4 About UAB Information Technology Meeting needs
More informationUNIVERSITY OF CALIFORNIA Office of Academic Personnel Academic Personnel Manual (APM) Policy Development Process Guide
Overview The at the University of California Office of the President manages the Academic Personnel Manual (APM) policy development process from inception to issuance on behalf of the Provost and Executive
More informationGAO DATA CENTER CONSOLIDATION. Strengthened Oversight Needed to Achieve Cost Savings Goal. Report to Congressional Requesters
GAO United States Government Accountability Office Report to Congressional Requesters April 2013 DATA CENTER CONSOLIDATION Strengthened Oversight Needed to Achieve Cost Savings Goal GAO-13-378 April 2013
More informationTechnology Consulting. Infrastructure Consulting: Next-Generation Data Center
Technology Consulting Infrastructure Consulting: Next-Generation Data Center Page Next-generation Heading data centers: Page Sub Title Provisioning IT services for high performance Elasticity is not the
More informationEnterprise Directory Project Pre-Feasibility Study Information and Educational Technology
UC DAVIS: OFFICE OF THE VICE PROVOST INFORMATION & EDUCATIONAL TECHNOLOGY Enterprise Directory Project Pre-Feasibility Study Information and Educational Technology Background Unprecedented growth and an
More informationArchitecture Principles
Architecture Principles Table of Contents 1 GENERAL INFORMATION...2 2 INTENT...2 3 OWNERSHIP...2 4 APPLYING THE PRINCIPLES...2 5 ARCHITECTURAL OBJECTIVES...2 6 ARCHITECTURE PRINCIPLES...3 6.1 General...
More informationIT Transformation Program. Update 14 April 2004
IT Transformation Program Update 14 April 2004 Key points: 1. The IT model is client-centric. 2. We meet the needs of faculty, staff & students by providing a portfolio of defined, intuitive, managed services.
More informationAudit of the Data Center Consolidation Initiative at NARA. OIG Draft Audit Report No. 12-09. May 10, 2012
Audit of the Data Center Consolidation Initiative at NARA OIG Draft Audit Report No. 12-09 May 10, 2012 Table of Contents Executive Summary... 3 Background... 4 Objectives, Scope, Methodology... 7 Audit
More informationDatacenter Management Optimization with Microsoft System Center
Datacenter Management Optimization with Microsoft System Center Disclaimer and Copyright Notice The information contained in this document represents the current view of Microsoft Corporation on the issues
More informationOperationalize Policies. Take Action. Establish Policies. Opportunity to use same tools and practices from desktop management in server environment
Microsoft IT Systems Strategy DATACENTER APPLICATIONS Process-Led, Model-Driven Unified and Virtualized USER-CENTRICITY ServiceEnabled Basic Standardize d Rationalized Dynamic Cost center Efficient cost
More informationELECTRONIC FILE STORAGE. Laurie Hafner Dahms Mark Wilson. David Bronder
ELECTRONIC FILE STORAGE Project Information Project Team Leads: Project Manager: Laurie Hafner Dahms Mark Wilson David Bronder TeamDynamix Project Number: 241112 Project Overview Centralize standard electronic
More informationU.S. Nuclear Regulatory Commission
U.S. Nuclear Regulatory Commission 2011 Data Center Consolidation Plan and Progress Report Version 2.0 September 30, 2011 Enclosure Contents 1 Introduction... 2 2 Agency Goals for Data Center Consolidation...
More informationMigration Planning and Execution:
WHITE PAPER: FDCCI INDUSTRY DAY MIGRATION PLANNING AND EXECUTION Migration Planning and Execution: CA Technologies Services for Effective Data Center Consolidation SEPTEMBER 2011 Table of Contents Executive
More informationEnhancing Career Development Services
Enhancing Career Development Services Project Sponsor: Linda Deanna, AVCSA, Dean of Students Project Team Lead: Thy Nguyen Prepared by: Thy Nguyen Date: 5/26/2015 Content Purpose Scope Project Deliverables
More informationO C T O B E R 7, 2 0 0 9 A N D Y P A L M S I T S
U-M Data Centers Status O C T O B E R 7, 2 0 0 9 A N D Y P A L M S I T S U-M Data Centers Agenda What U-M has What U-M still wants What s out there What we re working on U-M Data Centers 2 The Issues Capacity
More informationInstitutional Data Recommendations for UC Berkeley: A Roadmap for the Way Forward
InstitutionalDataRecommendations forucberkeley: ARoadmapfortheWayForward June29,2009 Preparedby:MaryBethBaker,ExternalConsultant InstitutionalDataRoadmap,06/29/09 1 I. OVERVIEW of INSTITUTIONAL DATA RECOMMENDATIONS
More informationALIGNING BUSINESS STRATEGY TO CLOUD APPLICATIONS
ALIGNING BUSINESS STRATEGY TO CLOUD APPLICATIONS AGENDA Introductions Business challenges Cloud answers Organization adoption Migration to Cloud Governance, risk and compliance Panel discussion Summary
More informationApplying Business Architecture to the Cloud
Applying Business Architecture to the Cloud Mike Rosen, Chief Scientist Mike.Rosen@ WiltonConsultingGroup.com Michael Rosen Agenda n What do we mean by the cloud? n Sample architecture and cloud support
More informationEvery Student I Every Day I Every Possibility
For the Facilities Master Plan March 4, 2015 1 Introduction This has been prepared to describe a proposed process to be implemented in order to develop comprehensive Facility Master Plans for all schools
More informationTECHNOLOGY STRATEGY AUDIT
TECHNOLOGY STRATEGY AUDIT Executive Summary It is our intention to facilitate the understanding of technology strategy and its integration with business strategies. This guideline is organized as series
More informationThe fact is that 90% of business strategies are not implemented through operations as intended. Overview
Overview It is important to recognize that a company s network determines its supply chain efficiency and customer satisfaction. Designing an optimal supply chain network means the network must be able
More informationFederal Data Center Consolidation Initiative (FDCCI)
Federal Data Center Consolidation Initiative (FDCCI) Final Data Center Consolidation Plan U. S. Office of Personnel Management Office of the Chief Information Officer Update 9/30/2011 1 Introduction...
More informationAE Initiative Summary Business Case Data Center Aggregation
AE Initiative Summary Business Case Data Center Aggregation Business Sponsorship & Ownership Project Name: Team Members Business Unit(s): Business Process Owner(s): Preliminary Cost Estimate: Preliminary
More informationCHARTER. Interagency Information Systems Working Group. Timber Regulation and Forest Restoration Program June 23, 2015
Mission and Background CHARTER Interagency Information Systems Working Group Timber Regulation and Forest Restoration Program June 23, 2015 The Mission of the Interagency Information Systems (IIS) Working
More informationPMINJ Chapter May 5 th Symposium 2014. Best Practices to Manage Disruptive Technologies
PMINJ Chapter May 5 th Symposium 2014 Best Practices to Manage Disruptive Technologies Steve Carter The 451Group 451 Research, LLC www.451research.com Best Practices to Manage Disruptive Technologies Steve
More informationSTATEMENT OF. Dr. David McClure Associate Administrator Office of Citizen Services and Innovative Technologies General Services Administration
STATEMENT OF Dr. David McClure Associate Administrator Office of Citizen Services and Innovative Technologies General Services Administration BEFORE THE HOUSE COMMITTEE ON OVERSIGHT AND GOVERNMENT REFORM
More informationUniversity of Massachusetts Medical School's Data Center Relocation For the period July 1, 2008 through August 31, 2010
` Official Audit Report Issued September 30, 2011 University of Massachusetts Medical School's Data Center Relocation For the period July 1, 2008 through August 31, 2010 State House Room 230 Boston, MA
More informationUniversity of Wisconsin Platteville IT Governance Model Final Report Executive Summary
University of Wisconsin Platteville IT Governance Model Final Report Executive Summary February 2013 Project Objectives & Approach Objectives: Build on the efforts of the Technology Oversight Planning
More informationData Center Consolidation Survey and Assessment User Guide and Frequently Asked Questions
State of California Office of the State Chief Information Officer Data Center Consolidation Survey and Assessment User Guide and Frequently Asked Questions October 2010 Contents Survey Overview... 3 Instructions/Frequently
More informationData Center Assistance Group, Inc. DCAG Contact: Tom Bronack Phone: (718) 591-5553 Email: bronackt@dcag.com Fax: (718) 380-7322
Business Continuity and Disaster Recovery Job Descriptions Table of Contents Business Continuity Services Organization Chart... 2 Director Business Continuity Services Group... 3 Manager of Business Recovery
More informationAPPENDIX 3 TO SCHEDULE 8.1
APPENDIX 3 TO SCHEDULE 8.1 TO THE COMPREHENSIVE INFRASTRUCTURE AGREEMENT 1.0 Transition Services and Affected Employees The highest priority in the design of Northrop Grumman s transition plan is to transfer
More informationTechnology Replacement & Deployment Plan 2008-09
Technology Replacement & Deployment Plan 2008-09 Description The Technology Replacement & Deployment Plan (TRDP) describes the processes, procedures and authorities for the procurement and deployment of
More informationThe Advantages of a Technology Governance
One of the most important responsibilities of a CIO is to work with the campus to create a governance structure for technology. The scope of governance must be campus-wide in order to create a collaborative,
More informationBest Practices for Consolidation Projects
Best Practices for Consolidation Projects Lynne Glickman Solution Architect Hewlett-Packard 2004 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without
More informationHOW TO PREPARE A DATA CENTER STRATEGY. What you need to know to build a business case for Data Center sourcing
HOW TO PREPARE A DATA CENTER STRATEGY What you need to know to build a business case for Data Center sourcing Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal
More informationFederal Data Center Consolidation Initiative (FDCCI) FAQs May 2012
Federal Data Center Consolidation Initiative (FDCCI) FAQs May 2012 1. What is the Federal Data Center Consolidation Initiative (FDCCI)? The Federal CIO Vivek Kundra established the FDCCI in a memo dated
More informationEnterprise Shared Services
Enterprise Shared Services Dave Kirk Manager, Enterprise Initiatives Management of Strategic Technologies Division Department of Information Services State of Washington DaveK@DIS.WA.GOV (360) 902-3561
More informationRequest for Proposal to
Request for Proposal to ( 2016 /ح ك/ 3 ) No. Tender General Response for All Raised Questions Taking into consideration the requirements outlined in the RFP and this Q&A document, bidders need to respond
More informationSAM Benefits Overview SAM SOFTWARE ASSET MANAGEMENT
SAM Benefits Overview SAM SAM is critical to managing an IT environment because effectiveness is seriously compromised when an organization doesn t know what software assets it has, where they are located,
More informationInformation Technology Integration Putting IT to work in driving deal success
February 2013 A publication from PwC's Deals M&A Integration practice Information Technology Integration Putting IT to work in driving deal success At a glance Research consistently shows that integrating
More informationFederal Data Center Consolidation Initiative
Federal Data Center Consolidation Initiative United States Agency for International Development (USAID) 2011 Data Center Consolidation Plan & Progress Report September 30, 2011 1 Introduction...2 2 Agency
More informationHow Managed Services Has Changed Remote Infrastructure Management. Presented by: Bill Whitney March 26, 2008
How Managed Services Has Changed Remote Infrastructure Management Presented by: Bill Whitney March 26, 2008 Why are businesses looking to partners such as Managed Service Providers (MSPs) for remote infrastructure
More informationData Centre Outsourcing a Buyer s Guide
Data Centre Outsourcing a Buyer s Guide The inside guide to deciding whether to outsource your data centre facility and operations and how to select an appropriate partner. This Guide will help you Determine
More informationOur Business Knowledge, Your Winning Edge. Consulting & Thought Partnership
Our Business Knowledge, Your Winning Edge. Consulting & Thought Partnership To be the preferred partner delivering exceptional value to customers, driving improved business outcomes and reducing total
More informationDivision: Information Technology Plan 2012-2017
Division: Information Plan 2012-2017 I. Introduction State your administrative department/unit/division mission statement. The Information Division's mission is to provide effective leadership for selecting,
More informationAudit of the Management of Projects within Employment and Social Development Canada
Unclassified Internal Audit Services Branch Audit of the Management of Projects within Employment and Social Development Canada February 2014 SP-607-03-14E Internal Audit Services Branch (IASB) You can
More informationContinuity Planning and Disaster Recovery
Responsible Officer: AVP - Information Technology Services & UC Chief Information Officer Responsible Office: IT - Information Technology Services Issuance Date: 7/27/2007 Effective Date: 7/27/2007 Scope:
More informationINFORMATION AND EDUCATIONAL TECHNOLOGY
INFORMATION AND EDUCATIONAL TECHNOLOGY IET Change Management Process Model This document describes the IET Change Management Process. The process seeks to minimize business risk during a change to a service,
More informationPima Community College Strategic Planning. Framework and Process, May 12, 2016
Pima Community College Strategic Planning Framework and Process, May 12, 2016 0 Pima Community College Strategic Planning: Framework and Process Approved by the Executive Leadership Team on May 3, 2016
More informationReport of Audit OFFICE OF INSPECTOR GENERAL. Information Technology Infrastructure Project Management A-07-02. Tammy Rapp Auditor-in-Charge
OFFICE OF INSPECTOR GENERAL Report of Audit Information Technology Infrastructure Project Management A-07-02 Tammy Rapp Auditor-in-Charge FARM CREDIT ADMINISTRATION Memorandum Office of Inspector General
More informationFAQs Cal State Online
FAQs Cal State Online 1. What is Cal State Online? Cal State Online is a coordinated systemwide collection of services that not only support the delivery of online programs from systemwide campuses but
More informationInformation Technology Transformation Plan Phase I Status Report for November 2013 Issued December 2013
Transformation Plan Phase I Status Report for November Issued December Contents Executive Summary November Status Report and Project Milestones Through FY2014 Executive Summary Implementation of the recommendations
More informationDCM 18.1 How to Prepare a Data Center Strategy
DCM 18.1 How to Prepare a Data Center Strategy What you need to know to build a business case for data center sourcing Presented by: Steve Miano, Managing Principal, & Gary Davis, Principal/Director, Data
More informationUniversity of Oregon Information Technology Risk Assessment. December 2, 2015
December 2, 2015 Table of Contents EXECUTIVE SUMMARY... 3 BACKGROUND... 3 APPROACH... 4 IT UNITS... 5 NOTED STRENGTHS... 5 THEMES... 6 IT RISKS... 11 IT RISKS DESCRIPTIONS... 12 APPENDIX A: BAKER TILLY
More informationProject Charter. Office 365 2015 Migrations Document Version 2.0 Prepared by Sabina Winters, ITS Last Edited February 19, 2015
Prepared by Sabina Winters, ITS Last Edited February 19, 2015 SOLUTION PLAN REQUIREMENTS ANALYSIS DESIGN BUILD TEST TRAIN/DEPLOY MAINTENANCE Executive Summary In December of 2014, the IT Governance Architecture
More informationIET Application Infrastructure and Systems Development Powered by Specialized Project Management
IET Application Infrastructure and Systems Development Powered by Specialized Project Management Application Infrastructure and Systems Development (AISD) To realize the UC Davis vision for excellence,
More informationBC / DR Implementation Tying Disaster Recovery Investment to Measurable Business Value
BC / DR Implementation Tying Disaster Investment to Measurable Business Value Continuity Insights Conference May 16-18, 2005 Agenda Purpose Discuss best practice process and tools that might be leveraged
More informationPPM Maturity Value Assessment for Your Company
PPM Maturity Value Assessment for Your Company Date Sponsored by: Prepared For: Valued Customer Name Third party model, methodology and data provided by: Disclaimer: NOTICE - THIS INFORMATION IS PROVIDED
More informationData Center Consolidation Survey and Assessment User Guide and Frequently Asked Questions
State of California California Technology Agency Data Center Consolidation Survey and Assessment User Guide and Frequently Asked Questions December 2010 Contents Survey Overview... 3 Instructions/Frequently
More informationPROJECT REQUEST REPORT UNIVERSITY OF WASHINGTON DATA CENTER
UNIVERSITY OF WASHINGTON OFFICE OF THE VICE PROVOST PLANNING AND BUDGETING Capital and Space Planning PROJECT REQUEST REPORT UNIVERSITY OF WASHINGTON DATA CENTER JULY 31, 2006 University of Washington
More informationOutlookSoft Budget & Planning Software (Business Performance Management System)
Page 1 of 6 EXECUTIVE SUMMARY ACTION ITEM: OutlookSoft Budget & Planning Software (Business Performance Management System) ISSUE: NAU seeks the Board s approval to purchase and implement a Business Performance
More informationFixed Scope Offering for Implementation of Sales Cloud & Sales Cloud Integration With GTS Property Extensions
Fixed Scope Offering for Implementation of Sales Cloud & Sales Cloud Integration With GTS Property Extensions Today s Business Challenges Adopt leading CRM practices and stream line processes Take advantage
More informationHR Function Optimization
HR Function Optimization People & Change Advisory Services kpmg.com/in Unlocking the value of human capital Human Resources function is now recognized as a strategic enabler, aimed at delivering sustainable
More informationSubject: Overview of Information Technology Services and the Strategic Technology Plan. Proposed Committee Action No Action Required Information Only.
AGENDA ITEM: IV Florida Polytechnic University Board of Trustees Technology Committee Subject: Overview of Information Technology Services and the Strategic Technology Plan Proposed Committee Action No
More informationRevitalising your Data Centre by Injecting Cloud Computing Attributes. Ricardo Lamas, Cloud Computing Consulting Architect IBM Australia
Revitalising your Data Centre by Injecting Attributes Ricardo Lamas, Consulting Architect IBM Australia Today s datacenters face enormous challenges: I need to consolidate to reduce sprawl and OPEX. I
More informationUniversity of Wisconsin Stout Project Kick-Off. February 12, 2013
University of Wisconsin Stout Project Kick-Off February 12, 2013 Project Approach Huron will partner with UW-Stout to conduct a detailed analysis to identify potential cost savings opportunities and operational
More informationAn Analysis of FCLA and CCLA Data Center Transition Plans
An Analysis of FCLA and CCLA Data Center Transition Plans By the Technology Subcommittee Task Force on the Future of Academic Libraries in Florida The Technology Subcommittee was requested by the Chair
More informationIDC US UPCOMING EVENT CALENDAR
IDC US UPCOMING EVENT CALENDAR Software as a Service (SaaS) Summit Contact: Patty Caron, Program Director, pcaron@idc.com Lead Analysts: Michael Fauscette and Robert P. Mahowald September 17, 2008 San
More informationUCPath Project Status Report
UCPath Project Status Report Report Date September 20, 2013 Program Directors Mark Cianca Sabu Varguese Executive Sponsors Nathan Brostrom Peter Taylor Project Summary The project s near-term priorities
More informationProcess Improvement: Impact on Provider Efficiency and Patient Care
Col(s) Kevin Kaps, D.O., Chief, Customer Deployment Support Ms. Mildred Bostick, Acting Chief, Business Process Mgmt Major Matthew Barnes M.D., Chief, Tri-Service Workflow 2015 Defense Health Information
More informationSTATE OF HAWAII CHIEF INFORMATION OFFICER AND THE OFFICE OF INFORMATION MANAGEMENT AND TECHNOLOGY UPDATE ON THE INFORMATION TECHNOLOGY STRATEGIC PLAN
STATE OF HAWAII CHIEF INFORMATION OFFICER AND OFFICE OF INFORMATION MANAGEMENT AND TECHNOLOGY REPORT ON UPDATE ON THE INFORMATION TECHNOLOGY STRATEGIC PLAN DECEMBER 2011 SUBMITTED TO THE TWENTY-SIXTH STATE
More informationProject Charter and Scope Statement
Prepared by: Mike Schmidt Version: 1.0 Last Revision Date: April 14, 2010 Create Date: May 6, 2010 EXECUTIVE SUMMARY... 3 1 INTRODUCTION... 4 2 PROJECT OBJECTIVES... 4 2.1 MISSION... 4 2.2 OBJECTIVES...
More informationOffice of Information Technology - Strategic Plan FY 2015 2020
Office of Information Technology (OIT) Strategic Plan FY 2015 2020 Office of Information Technology - Vision, Mission, Pillars, and Values Vision Statement We believe in the promise and capacity of information
More informationThe facility in a converged infrastructure Michalis Kefalakis HP Data Centre Facilities Strategy Lead EMEA
The facility in a converged infrastructure Michalis Kefalakis HP Data Centre Facilities Strategy Lead EMEA Agenda Introduction A typical data centre facility program A converged approach The data centre
More informationPPS Initiative Changing the Way We Work*
PPS Initiative Changing the Way We Work* Anthony Tony Lo Project Director Personnel Payroll Initiative Office of the President November 2011 * Includes Information developed by Aon Hewitt Project Consultant
More informationIBM SERVICE MANAGEMENT: IT & the Business
John Seyerle IBM Tivoli Automation Sales for Central & Easter Europe 26/05/2009 IBM SERVICE MANAGEMENT: IT & the Business 1 Agenda IBM Service Management IT & Business Service Management Not just traditional
More informationNational Geospatial Data Asset Management Plan
National Geospatial Data Asset Management Plan Portfolio Management Implementation Plan for the OMB Circular A 16 Supplemental Guidance as it relates to OMB Circular A 16, Coordination of Geographic Information
More informationGUIDELINES FOR ACADEMIC PROGRAM REVIEW For self-studies due to the Office of the Provost on October 1, 2015 GRADUATE PROGRAMS
GUIDELINES FOR ACADEMIC PROGRAM REVIEW For self-studies due to the Office of the Provost on October 1, 2015 GRADUATE PROGRAMS OVERVIEW OF PROGRAM REVIEW At Illinois State University, primary responsibility
More informationBusiness Process Management and Cloud Computing
Business Process Management and Cloud Computing Michael Connaughton, Director, BPM The following is intended to outline our general product direction. It is intended for information purposes only, and
More informationEvaluation Reminders. For Team Chairs Evaluators, Financial Reviewers, And Generalists Institutions being Reviewed
Evaluation Reminders For Team Chairs Evaluators, Financial Reviewers, And Generalists Institutions being Reviewed Middle States Commission on Higher Education Published by the Middle States Commission
More informationICT Category Sub Category Description Architecture and Design
A A01 Architecture and Design Architecture and Design Enterprise & Business Architecture A02 Architecture and Design Information Architecture A03 Architecture and Design Solution Architecture B Benchmarking
More informationGSA Services Catalog
INCLUDES CHANGES THROUGH MODIFICATION P00007 immixtechnology, Inc. N00104-08-A-ZF31 GS-35-F-0265X Attachment D GSA Services Catalog Training Services... 2 Introductory Training - WebEx... 4 Level 1 Help
More informationHealth Information Technology Financial Subcommittee
Health Information Technology Financial Subcommittee Mission The Financial Subcommittee has been created to oversee the operational budget and capital investment planning for Health Information Technology
More information