1 PART 1 GENERAL 1.01 SECTION INCLUDES A. HVAC demolition. 1. Exhaust Fans 2. Ductwork 3. Aire Terminal Units 1.02 RELATED REQUIREMENTS SECTION MINOR HVAC DEMOLITION A. Section Testing, Adjusting, and Balancing for HVAC B. Additional requirements for alterations work SUBMITTALS A. See Section Administrative Requirements, for submittal procedures. B. Demolition Plan: Submit a written plan indicating the specific approach for HVAC demolition. C. Project Record Documents: Indicate deficiencies that would prevent proper use of systems to achieve performance. 1. Submit draft copies of Project Record Documents for review prior to final acceptance of Project. Provide final copies for Architect and for inclusion in closeout documentation. 2. Provide Project Record Documents in clear format complete with project identification. Include set of drawings with duct and inlets and outlets identified to correspond locations. 3. Include the following in the Project Record Documents: a. Name of company completing work. b. Address of company completing work. c. Telephone number of company completing work. d. Project name. e. Project location. f. Project Architect. g. Project Engineer. h. Project Contractor. i. Report date. j. Ductwork: 1) Identify size of supply, return and or exaust. 2) Identify type of construction. 3) Identify type and thickness of insulation. 4) Identify location of riser. Include location. PART 2 PRODUCTS 2.01 MATERIALS AND EQUIPMENT A. Materials and equipment for patching and extending work: As specified in individual sections. PART 3 EXECUTION 3.01 EXAMINATION A. Verify field measurements and duct arrangements are as shown on Drawings. B. Verify that abandoned ductwork and equipment serve only abandoned facilities. C. Demolition drawings are based on casual field observation. D. Report discrepancies to Architect before disturbing existing installation. E. Beginning of demolition means installer accepts existing conditions PREPARATION A. Disconnect HVAC systems in walls, floors, a.nd ceilings to be removed MINOR HVAC DEMOLITION

2 3.03 DEMOLITION AND EXTENSION OF EXISTING HVAC WORK A. Remove, relocate, and extend existing installations to accommodate new construction. B. Remove abandoned ductwork to source of supply. C. Remove exposed abandoned ductwork, including abandoned ductwork above accessible ceiling finishes. Cut ductwork flush with walls and floors, and patch surfaces. D. Disconnect abandoned air outlets and inlets and remove. Remove abandoned air outlets and inlets if ductwork servicing them is abandoned and removed. Provide blank covers for abandoned air outlets and inlets that are not removed. E. Remove exhaust fans as noted. F. Remove piping as noted. G. Repair adjacent construction and finishes damaged during demolition and extension work. H. Maintain access to existing HVAC installations that remain active. Modify installation or provide access panel as appropriate. I. Extend existing installations using materials and methods as specified CLEANING AND REPAIR A. Clean and repair existing materials and equipment that remain or that are to be reused. END OF SECTION MINOR HVAC DEMOLITION

3 PART 1 GENERAL 1.01 SECTION INCLUDES SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC A. Testing, adjustment, and balancing of air systems. B. Measurement of final operating condition of HVAC systems RELATED REQUIREMENTS A. Section Minor HVAC Demolition 1.03 REFERENCE STANDARDS A. AABC MN-1 - AABC National Standards for Total System Balance; Associated Air Balance Council; B. ASHRAE Std 111 -Practices for Measurement, Testing, Adjusting and Balancing of Building Heating, Ventilation, Air-Conditioning, and Refrigeration Systems; American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.; C. NEBS (TAB)- Procedural Standards for Testing Adjusting Balancing of Environmental Systems; National Environmental Balancing Bureau; 2005, Seventh Edition. D. SMACNA (TAB)- HVAC Systems Testing, Adjusting, and Balancing; Sheet Metal and Air Conditioning Contractors' National Association; SUBMITTALS A. See Section Administrative Requirements, for submittal procedures. B. Control System Coordination Reports: Communicate in writing to the controls installer all setpoint and parameter changes made or problems and discrepancies identified during TAB that affect, or could affect, the control system setup and operation. C. Final Report: Indicate deficiencies in systems that would prevent proper testing, adjusting, and balancing of systems and equipment to achieve specified performance. 1. Revise TAB plan to reflect actual procedures and submit as part of final report. 2. Submit draft copies of report for review prior to final acceptance of Project. Provide final copies for Architect and for inclusion in operating and maintenance manuals. 3. Include actual instrument list, with manufacturer name, serial number, and date of calibration. 4. Form of Test Reports: Where the TAB standard being followed recommends a report format use that; otherwise, follow ASHRAE Std Units of Measure: Report data in 1-P (inch-pound) units only. 6. Include the following on the title page of each report: a. Name of Testing, Adjusting, and Balancing Agency. b. Address of Testing, Adjusting, and Balancing Agency. c. Telephone number of Testing, Adjusting, and Balancing Agency. d. Project name. e. Project location. f. Project Architect. g. Project Engineer. h. Project Contractor. i. Report date. D. Project Record Documents: Record actual locations of flow measuring stations. PART 2 PRODUCTS- NOT USED PART 3 EXECUTION 3.01 GENERAL REQUIREMENTS A. Perform pre-modification system measurement of existing systems TESTING, ADJUSTING, AND BALANCING FOR HVAC

4 B. Perform total system balance in accordance with one of the following: 1. AABC MN-1, AABC National Standards for Total System Balance. 2. ASH RAE Std 111, Practices for Measurement, Testing, Adjusting and Balancing of Building Heating, Ventilation, Air-Conditioning, and Refrigeration Systems. 3. NEBB Procedural Standards for Testing Adjusting Balancing of Environmental Systems. 4. SMACNA HVAC Systems Testing, Adjusting, and Balancing. C. Begin work after completion of systems to be tested, adjusted, or balanced and complete work prior to Substantial Completion of the project. D. TAB Agency Qualifications: 1. Having minimum of three years experience EXAMINATION A. Testing, adjustment, and balancing of air systems. B. Verify that systems are complete and operable before commencing work. Ensure the following conditions: 1. Systems are started and operating in a safe and normal condition. 2. Temperature control systems are installed complete and operable. 3. Proper thermal overload protection is in place for electrical equipment. 4. Final filters are clean and in place. If required, install temporary media in addition to final filters. 5. Duct systems are clean of debris. 6. Fans are rotating correctly. 7. Air outlets are installed and connected. 8. Duct system leakage is minimized. C. Submit field reports. Report defects and deficiencies that will or could prevent proper system balance. D. Beginning of work means acceptance of existing conditions PREPARATION A. Hold a pre-balancing meeting at least one week prior to starting TAB work. 1. Require attendance by all installers whose work will be tested, adjusted, or balanced. B. Provide instruments required for testing, adjusting, and balancing operations. Make instruments available to Architect to facilitate spot checks during testing. C. Provide additional balancing devices as required ADJUSTMENT TOLERANCES A. Air Handling Systems: Adjust to within plus or minus 5 percent of design for supply systems and plus or minus 10 percent of design for return and exhaust systems. B. Air Outlets and Inlets: Adjust total to within plus 10 percent and minus 5 percent of design to space. Adjust outlets and inlets in space to within plus or minus 10 percent of design RECORDING AND ADJUSTING A. Ensure recorded data represents actual measured or observed conditions. B. Permanently mark settings of valves, dampers, and other adjustment devices allowing settings to be restored. Set and lock memory stops. C. Mark on the drawings the locations where traverse and other critical measurements were taken and cross reference the location in the final report. D. After adjustment, take measurements to verify balance has not been disrupted or that such disruption has been rectified. E. Leave systems in proper working order, replacing belt guards, closing access doors, closing doors to electrical switch boxes, and restoring thermostats to specified settings TESTING, ADJUSTING, AND BALANCING FOR HVAC

5 3.06 AIR SYSTEM PROCEDURE A. Adjust air handling and distribution systems to provide required or design supply, return, and exhaust air quantities. B. Make air quantity measurements in ducts by Pitot tube traverse of entire cross sectional area of duct. C. Measure air quantities at air inlets and outlets. D. Adjust distribution system to obtain uniform space temperatures free from objectionable drafts and noise. E. Use volume control devices to regulate air quantities only to extend that adjustments do not create objectionable air motion or sound levels. Effect volume control by duct internal devices such as dampers and splitters. F. Vary total system air quantities by adjustment offan speeds. Provide drive changes required. Vary branch air quantities by damper regulation. G. Provide system schematic with required and actual air quantities recorded at each outlet or inlet. H. For variable air volume system powered units set volume controller to air flow setting indicated. Confirm connections properly made and confirm proper operation for automatic variable air volume temperature control. I. On fan powered VAV boxes, adjust air flow switches for proper operation SCOPE A. Test, adjust, and balance the following: 1. Air Handling Units 2. Air Terminal Units 3. Air Inlets and Outlets 3.08 MINIMUM DATA TO BE REPORTED A. Air Moving Equipment: 1. Location 2. Manufacturer 3. Model number 4. Serial number 5. ArrangemenVCiass/Discharge 6. Air flow, actual 7. Return air flow, actual 8. Outside air flow, actual 9. Total static pressure (total external), actual 10. Inlet pressure 11. Discharge pressure 12. Sheave Make/Size/Bore 13. Number of Belts/Make/Size 14. Fan RPM B. Duct Traverses: 1. System zone/branch 2. Duct size 3. Area 4. Test velocity 5. Test air flow 6. Duct static pressure C. Terminal Unit Data: 1. Manufacturer 2. Type, constant, variable, single, dual duct TESTING, ADJUSTING, AND BALANCING FOR HVAC

6 3. Identification/number 4. Location 5. Model number 6. Size 7. Minimum static pressure 8. Minimum design air flow 9. Maximum design air flow 10. Maximum actual air flow 11. Inlet static pressure D. Air Distribution Tests: 1. Room number/location 2. Test (final) air flow END OF SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC

7 PART 1 GENERAL 1.01 SECTION INCLUDES A. Metal ductwork. B. Nonmetal ductwork. C. Duct cleaning RELATED REQUIREMENTS A. Section Air Terminal Units. B. Section Air Outlets and Inlets. SECTION HVAC DUCTS AND CASINGS C. Section Testing, Adjusting, and Balancing for HVAC REFERENCE STANDARDS A. ASHRAE (FUND)- ASHRAE Handbook- Fundamentals; B. ASTM A36/A36M- Standard Specification for Carbon Structural Steel; C. ASTM A653/A653M- Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process; D. ASTM E84- Standard Test Method for Surface Burning Characteristics of Building Materials; 2013a. E. SMACNA (DCS)- HVAC Duct Construction Standards; F. SMACNA (FGD)- Fibrous Glass Duct Construction Standards; Sheet Metal and Air Conditioning Contractors' National Association; G. UL 181 -Standard for Factory-Made Air Ducts and Air Connectors; Underwriters Laboratories Inc.; Current Edition, Including All Revisions QUALITY ASSURANCE A. Manufacturer Qualifications: Company specializing in manufacturing the type of products specified in this section, with minimum three years of experience. B. Installer Qualifications: Company specializing in performing the type of work specified in this section, with minimum three years of experience FIELD CONDITIONS PART 2 PRODUCTS 2.01 DUCT ASSEMBLIES A. All Ducts: Galvanized steel, unless otherwise indicated. B. Low Pressure Supply (System with Cooling Coils): 1/2 inch w.g. pressure class, galvanized steel. C. Return and Relief: 1/2 inch w.g. pressure class, galvanized steel. D. General Exhaust: 1/2 inch w.g. pressure class, galvanized steel MATERIALS A. Galvanized Steel for Ducts: Hot-dipped galvanized steel sheet, ASTM A653/A653M FS Type B, with G60/Z180 coating. B. Joint Sealers and Sealants: Non-hardening, water resistant, mildew and mold resistant. 1. Type: Heavy mastic or liquid used alone or with tape, suitable for joint configuration and compatible with substrates, and recommended by manufacturer for pressure class of ducts. 2. Surface Burning Characteristics: Flame spread of zero, smoke developed of zero, when tested in accordance with ASTM E84. State Project # HVAC DUCTS AND CASINGS

8 C. Hanger Rod: ASTM A36/A36M; steel; threaded both ends, threaded one end, or continuously threaded DUCTWORK FABRICATION A. Fabricate and support in accordance with SMACNA HVAC Duct Construction Standards and as indicated. B. No variation of duct configuration or size permitted except by written permission. Size round duct installed in place of rectangular ducts in accordance with ASHRAE Handbook Fundamentals. C. Provide duct material, gages, reinforcing, and sealing for operating pressures indicated. D. Increase duct sizes gradually, not exceeding 15 degrees divergence wherever possible; maximum 30 degrees divergence upstream of equipment and 45 degrees convergence downstream. E. Fabricate continuously welded round and oval duct fittings in accordance with SMACNA HVAC Duct Construction Standards FIBROUS GLASS DUCTS A. Fibrous Glass Ducts: 1 inch thick rigid glass fiber with aluminum foil, glass scrim and Kraft or plastic jacket vapor barrier; maximum 0.23 K value at 75 degrees F. 1. UL labeled to UL 181. B. Fabricate in accordance with SMACNA Fibrous Glass Duct Construction Standards, except as indicated. C. Machine fabricate fibrous glass ducts and fittings. Make only minor on site manual adjustments. D. Do not use fibrous glass ducts within 12 inches of electric or fuel fired heaters. PART 3 EXECUTION 3.01 INSTALLATION A. Install, support, and seal ducts in accordance with SMACNA HVAC Duct Construction Standards. B. Install in accordance with manufacturer's instructions. C. During construction provide temporary closures of metal or taped polyethylene on open ductwork to prevent construction dust from entering ductwork system. D. Duct sizes indicated are inside clear dimensions. For lined ducts, maintain sizes inside lining. E. Locate ducts with sufficient space around equipment to allow normal operating and maintenance activities CLEANING A. Clean duct systems with high power vacuum machines. Protect equipment that could be harmed by excessive dirt with filters, or bypass during cleaning. Provide adequate access into ductwork for cleaning purposes. END OF SECTION HVAC DUCTS AND CASINGS

9 PART 1 GENERAL 1.01 SECTION INCLUDES A. Constant volume terminal units RELATED REQUIREMENTS SECTION AIR TERMINAL UNITS A. Section HVAC Ducts and Casings SUBMITTALS A. See Section Administrative Requirements for submittal procedures. B. Product Data: Provide data indicating configuration, general assembly, and materials used in fabrication. Include catalog performance ratings that indicate air flow, static pressure, and NC designation. Include electrical characteristics and connection requirements. C. Shop Drawings: Indicate configuration, general assembly, and materials used in fabrication, and electrical characteristics and connection requirements. D. Manufacturer's Installation Instructions: Indicate support and hanging details, and service clearances required. E. Project Record Documents: Record actual locations of units. F. Operation and Maintenance Data: Include manufacturer's descriptive literature, operating instructions, maintenance and repair data, and parts lists. Include directions for resetting constant volume regulators. G. Warranty: Submit manufacturer warranty and ensure forms have been completed in State of Missouri Office of Administration, Div FMDC's name and registered with manufacturer QUALITY ASSURANCE A. Manufacturer Qualifications: Company specializing in manufacturing the type of products specified in this section, with minimum three years of documented experience. B. Products Requiring Electrical Connection: Listed and classified by Underwriters Laboratories Inc. as suitable for the purpose specified and indicated WARRANTY A. See Section Closeout Submittals, for additional warranty requirements. B. Provide five year manufacturer warranty for air terminal units. PART 2 PRODUCTS 2.01 MANUFACTURERS A. Price Product As indicated on drawings.. B. Other acceptable manufacturers offering equivalent products MANUFACTURED UNITS A. Ceiling mounted fan powered supply air control terminals for connection to single duct, central air systems, with mechanical constant volume control. B. Identify each terminal unit with clearly marked identification label and air flow indicator. Include unit nominal air flow, maximum factory set airflow, minimum factory set air flow, and coil type. PART 3 EXECUTION 3.01 INSTALLATION A. Install in accordance with manufacturer's instructions. B. Support units individually from structure. Do not support from adjacent ductwork. C. Connect to ductwork in accordance with Section State Project # AIR TERMINAL UNITS

10 D. Verify that electric power is available and of the correct characteristics ADJUSTING A. Reset volume with damper operator attached to assembly allowing flow range modulation from 1 00 percent of design flow to 0 percent full flow SCHEDULES A. Provide as indicated on drawings. END OF SECTION AIR TERMINAL UNITS

11 PART 1 GENERAL 1.01 SECTION INCLUDES A. Diffusers. B. Registers/grilles RELATED REQUIREMENTS SECTION AIR OUTLETS AND INLETS A. Section Painting and Coating: Painting of ducts visible behind outlets and inlets REFERENCE STANDARDS A. AMCA 500-L- Laboratory Methods of Testing Louvers for Rating; Air Movement and Control Association International, Inc.; B. ASH RAE Std 70- Method of Testing the Performance of Air Outlets and Inlets; American Society of Heating, Refrigerating and Air Conditioning Engineers, Inc.; 2006 (R2011 ) SUBMITTALS A. See Section Administrative Requirements for submittal procedures. B. Product Data: Provide data for equipment required for this project. Review outlets and inlets as to size, finish, and type of mounting prior to submission. Submit schedule of outlets and inlets showing type, size, location, application, and noise level. C. Project Record Documents: Record actual locations of air outlets and inlets QUALITY ASSURANCE A. Test and rate air outlet and inlet performance in accordance with ASHRAE Std 70. B. Test and rate louver performance in accordance with AMCA 500-L QUALITY ASSURANCE A. Manufacturer Qualifications: Company specializing in manufacturing the type of products specified in this section, with minimum three years of documented experience. PART 2 PRODUCTS 2.01 MANUFACTURERS A. Carnes Company HVAC: B. Krueger: C. Price Industries: D. Titus: RECTANGULAR CEILING DIFFUSERS A. Provide as indicated Air Outlet/Inlet Device Schedule on drawings CEILING SUPPLY REGISTERS/GRILLES A. Provide as indicated Air Outlet/Inlet Device Schedule on drawings CEILING EXHAUST AND RETURN REGISTERS/GRILLES A. Provide as indicated Air Outlet/Inlet Device Schedule on drawings CEILING EGG CRATE EXHAUST AND RETURN GRILLES A. Provide as indicated Air Outlet/Inlet Device Schedule on drawings WALL SUPPLY REGISTERS/GRILLES A. Provide as indicated Air Outlet/Inlet Device Schedule on drawings AIR OUTLETS AND INLETS

12 PART 3 EXECUTION 3.01 INSTALLATION A. Install in accordance with manufacturer's instructions. B. Check location of outlets and inlets and make necessary adjustments in position to conform with architectural features, symmetry, and lighting arrangement. C. Install diffusers to ductwork with air tight connection. D. Provide balancing dampers on duct take-off to diffusers, and grilles and registers, despite whether dampers are specified as part of the diffuser, or grille and register assembly. E. Paint ductwork visible behind air outlets and inlets matte black. Refer to Section SCHEDULES A. Indicated on drawings. END OF SECTION AIR OUTLETS AND INLETS

SECTION 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION

SECTION 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION SECTION 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION The purpose of this guide specification is to assist the specifier in correctly specifying Mechanical System Testing

More information

NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES

NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES 8.1 INTRODUCTION Testing, adjusting, and balancing of HVAC systems can best be accomplished by following a series of systematic procedures. The NEBB TAB

More information

AABC Specifications for Testing and Balancing HVAC Systems

AABC Specifications for Testing and Balancing HVAC Systems AABC Specifications for Testing and Balancing HVAC Systems The Associated Air Balance Council (AABC) Total System Balancing Specifications for HVAC Testing, Balancing and Performance Verification TOTAL

More information

SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM

SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Packaged rooftop air conditioning unit (5 tons and smaller). 2. Roof curb. 1.2

More information

A. Air-Conditioning and Refrigeration Institute: 1. ARI 850 - Commercial and Industrial Air Filter Equipment.

A. Air-Conditioning and Refrigeration Institute: 1. ARI 850 - Commercial and Industrial Air Filter Equipment. SECTION 23 40 00 - HVAC AIR CLEANING DEVICES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Activated carbon filters. 2. Extended surface rigid air filter with synthetic media. 3. Disposable panel

More information

SECTION 233000 HVAC AIR DISTRIBUTION

SECTION 233000 HVAC AIR DISTRIBUTION 1320 / Talent Community Center 233000-1 HVAC AIR DISTRIBUTION SECTION 233000 HVAC AIR DISTRIBUTION PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Ductwork. 2. Ductwork accessories. 3. Fans. 4. Air

More information

SECTION 11 78 13 MORTUARY REFRIGERATORS

SECTION 11 78 13 MORTUARY REFRIGERATORS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 11 78 13 MORTUARY REFRIGERATORS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable in

More information

SECTION 23 81 43 HEAT PUMPS

SECTION 23 81 43 HEAT PUMPS SECTION 23 81 43 HEAT PUMPS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Packaged rooftop heat pumps. 1.2 REFERENCES A. American Society of Heating, Refrigerating and Air-Conditioning Engineers:

More information

SECTION 15750 PACKAGED ROOFTOP AIR CONDITIONING UNITS

SECTION 15750 PACKAGED ROOFTOP AIR CONDITIONING UNITS SECTION 15750 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for roof mounted, self-contained units, with electric cooling, and electric or reverse refrigeration cycle (heat pump) heating

More information

SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT

SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION A. The Work specified in this Section consists of designing, furnishing and installing factory-assembled

More information

All work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition.

All work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition. DIVISION 15 MECHANICAL SECTION 15100 - PLUMBING PART 1 - GENERAL SCOPE Plumbing work includes all domestic water, gas, and sanitary sewer systems as shown on plans. Also all fixtures and equipment which

More information

DESIGN AND INSTALLATION OF RESIDENTIAL FLEXIBLE DUCTWORK SYSTEMS

DESIGN AND INSTALLATION OF RESIDENTIAL FLEXIBLE DUCTWORK SYSTEMS DESIGN AND INSTALLATION OF RESIDENTIAL FLEXIBLE DUCTWORK SYSTEMS A. SCOPE 1. This information is intended to assist contractors, installers and code officials in the proper design and installation of flexible

More information

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 16050 A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1

More information

SECTION 15936 AIR INLETS AND OUTLETS

SECTION 15936 AIR INLETS AND OUTLETS SECTION 15936 AIR INLETS AND OUTLETS PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Diffusers. 2. Registers. 3. Grilles. 4. Louvers. 5. Lowered Penthouses. 6. Gravity Roof Hoods. 7. Gravity Roof

More information

Element D Services Heating, Ventilating, and Air Conditioning

Element D Services Heating, Ventilating, and Air Conditioning PART 1 - GENERAL 1.01 OVERVIEW A. This section supplements Design Guideline Element D3041 on air handling distribution with specific criteria for projects involving design of a Data Center spaces B. Refer

More information

07 21 19 Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

07 21 19 Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM 07 21 19 STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM 7819 Broadview Road Cleveland, OH 44131 800-522-4522 February, 2011 SPEC NOTE: This guide specification is intended for use when specifying

More information

SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK

SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK 1 GENERAL 1.1 GENERAL REQUIREMENTS A. This Section is coordinated with and complementary to the General Conditions and Supplementary General Conditions

More information

UNIVERSITY OF MISSOURI 23 0000 - Heating Ventilating and Air-Conditioning (HVAC) March 2015.01

UNIVERSITY OF MISSOURI 23 0000 - Heating Ventilating and Air-Conditioning (HVAC) March 2015.01 GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per

More information

SECTION 15732 AIR CONDITIONING UNIT

SECTION 15732 AIR CONDITIONING UNIT SECTION 15732 AIR CONDITIONING UNIT PART 1 GENERAL 1.01 SUMMARY A. Section includes: 1. Packaged, split system air conditioning unit No. 1. 1.02 REFERENCES A. Air-Conditioning, Heating, and Refrigeration

More information

SPECIFICATION DIVISION 23 SECTION DESCRIPTION DIVISION 23 HEATING, VENTILATING AND AIR CONDITIONING (HVAC) SECTION 238221 - BLOWER COIL UNITS

SPECIFICATION DIVISION 23 SECTION DESCRIPTION DIVISION 23 HEATING, VENTILATING AND AIR CONDITIONING (HVAC) SECTION 238221 - BLOWER COIL UNITS ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION

More information

Mechanical Heating Ventilation and Air Conditioning Ductwork and Duct Accessories

Mechanical Heating Ventilation and Air Conditioning Ductwork and Duct Accessories Basis of Design This section applies to the design and installation of ductwork, air terminal boxes, air outlets and inlets, volume dampers, pressure relief dampers, smoke/fire dampers, and smoke/fire

More information

COMMISSIONING OF HVAC SYSTEMS

COMMISSIONING OF HVAC SYSTEMS FORM CL-01 SYSTEMS / EQUIPMENT INCLUDED : SYSTEM STARTUP CHECKLIST I - PRE - STARTUP INSPECTION EQUIPMENT MOUNTING & SETTING CONTROL, INTERLOCK & POWER WIRING ALIGNMENT OF MOTORS & DRIVES PIPING, CONNECTIONS

More information

HVAC Air Duct Leakage. Eli P. Howard, III Group Director Technical Resources SMACNA

HVAC Air Duct Leakage. Eli P. Howard, III Group Director Technical Resources SMACNA HVAC Air Duct Leakage Eli P. Howard, III Group Director Technical Resources SMACNA Key Variables that Affect the Amount of Leakage Static Pressure Amount of Duct Openings in the Duct Surface Seams, Joints,

More information

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION

More information

The Embassy of the United States of America invites you to submit an offer for supply and install the following A/Cs:

The Embassy of the United States of America invites you to submit an offer for supply and install the following A/Cs: RFQ number PR4877728 The Embassy of the United States of America invites you to submit an offer for supply and install the following A/Cs: A- Supplying and installing 30 high wall A/C split unit 3HP- 24,000

More information

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715, 4658.4500 PLUMBING SYSTEMS; NEW CONSTRUCTION. Subpart 1. Installation. All plumbing systems must be installed and tested according to this chapter and chapter 4715, the Minnesota Plumbing Code. Subp. 2.

More information

LAKE COUNTY ANIMAL SERVICES EXPANSION SECTION 15459

LAKE COUNTY ANIMAL SERVICES EXPANSION SECTION 15459 SECTION 15459 PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections, apply to work

More information

DUCT SYSTEMS CHAPTER 6

DUCT SYSTEMS CHAPTER 6 CHAPTER 6 DUCT SYSTEMS SECTION 601 GENERAL 601.1 Scope. Duct systems used for the movement of air in air-conditioning, heating, ventilating and exhaust systems shall conform to the provisions of this chapter

More information

SECTION 15190 HVAC INSULATION. A. All work specified in this Section is subject to the provisions of Section 15010.

SECTION 15190 HVAC INSULATION. A. All work specified in this Section is subject to the provisions of Section 15010. SECTION 15190 HVAC INSULATION PART ONE - GENERAL PART 1 - GENERAL 1.01 DESCRIPTION A. All work specified in this Section is subject to the provisions of Section 15010. B. All insulation products shall

More information

Guide Specification SECTION 23 08 00 - COMMISSIONING OF HVAC PART 1 - GENERAL 1.1 SUMMARY

Guide Specification SECTION 23 08 00 - COMMISSIONING OF HVAC PART 1 - GENERAL 1.1 SUMMARY SECTION 23 08 00 - COMMISSIONING OF HVAC PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. HVAC Commissioning description. 2. HVAC Commissioning responsibilities. 1.2 REFERENCES A. American Society

More information

B. ASTM C 533 Calcium Silicate Block and Pipe Thermal Insulation. C. ASTM C 547 Mineral Fiber Preformed Insulation

B. ASTM C 533 Calcium Silicate Block and Pipe Thermal Insulation. C. ASTM C 547 Mineral Fiber Preformed Insulation PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

Air-side Systems: Air Duct Design

Air-side Systems: Air Duct Design BBSE3006: Air Conditioning and Refrigeration II http://www.hku.hk/bse/bbse3006/ Air-side Systems: Air Duct Design Dr. Sam C M Hui Department of Mechanical Engineering The University of Hong Kong E-mail:

More information

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES These guidelines are to be used for ALL commercial cooking hoods, ventilation systems and related fire suppression

More information

Components HVAC General Standards HVAC Guidelines HVAC System Selection Life Cycle Cost Analysis

Components HVAC General Standards HVAC Guidelines HVAC System Selection Life Cycle Cost Analysis Components HVAC General System Selection Life Cycle Cost Analysis Outdoor Air Design Values Indoor Air Design Values Outdoor Air Ventilation Welding Ventilation Temperature Control Systems Ductwork HVAC

More information

NADCA GENERAL SPECIFICATIONS FOR THE CLEANING OF COMMERCIAL HEATING, VENTILATING AND AIR CONDITIONING SYSTEMS

NADCA GENERAL SPECIFICATIONS FOR THE CLEANING OF COMMERCIAL HEATING, VENTILATING AND AIR CONDITIONING SYSTEMS NADCA GENERAL SPECIFICATIONS FOR THE CLEANING OF COMMERCIAL HEATING, VENTILATING AND AIR CONDITIONING SYSTEMS National Air Duct Cleaners Association 1518 K Street, N.W. Suite 503 Washington, DC 20005 (202)

More information

SECTION 15950 - TESTING, ADJUSTING, AND BALANCING

SECTION 15950 - TESTING, ADJUSTING, AND BALANCING SECTION 15950 - TESTING, ADJUSTING, AND BALANCING PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

CHAPTER 6 DUCT SYSTEMS

CHAPTER 6 DUCT SYSTEMS CHAPTER 6 DUCT SYSTEMS SECTION MC 601 GENERAL 601.1 Scope. Duct systems used for the movement of air in air-conditioning, heating, ventilating and exhaust systems shall conform to the provisions of this

More information

FINAL December 2012 SECTION 233100 DUCTWORK

FINAL December 2012 SECTION 233100 DUCTWORK SECTION 233100 DUCTWORK 1.0 Acoustical duct lining in any part of the duct system is prohibited. All ductwork requiring insula tion shall be externally insulated (Refer to the Sheet Metal Ductwork Insulation

More information

SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word

More information

4 Installation Requirements

4 Installation Requirements 4 Installation Requirements 9 4.1 Code Reference The authority having jurisdiction should be referenced to determine what law, ordinance or code shall apply in the use of flexible duct. Ducts conforming

More information

FIRESTOPPING & SMOKE SEALS

FIRESTOPPING & SMOKE SEALS SPECIFICATION SECTION 07 84 00 FIRESTOPPING & SMOKE SEALS 1 GENERAL 1.1 SECTION INCLUDES 1.1.1 Comply with Division 1, General Requirements and Documents referred to therein. 1.1.2 It is the intent of

More information

FIRE DAMPER APPLICATION GUIDE

FIRE DAMPER APPLICATION GUIDE FIRE AND CEILING RADIATION DAMPERS FIRE DAMPER APPLICATION GUIDE Use this application guide to help determine what type of fire damper best suits the application. Below are listed the ten Metal-Fab fire

More information

Terms of Reference Air Handling Unit (HVAC System) Cleaning

Terms of Reference Air Handling Unit (HVAC System) Cleaning Terms of Reference Air Handling Unit (HVAC System) Cleaning Introduction General cleaning of the air handling units is currently undertaken by the Mechanical Division staff composing of 3 personnel. Cleaning

More information

HVAC Duct Construction. Bob Wasilewski Project Manager, Technical Resources SMACNA

HVAC Duct Construction. Bob Wasilewski Project Manager, Technical Resources SMACNA HVAC Duct Construction Bob Wasilewski Project Manager, Technical Resources SMACNA HVAC Duct Construction Standards WHAT? WHY? HOW? Today's Program 1 st 2 nd Edition HVAC-DCS Review Joints and Limitations

More information

Life Safety Dampers Selection and Application Manual. Ceiling Radiation Dampers Fire Dampers Combination Fire Smoke Dampers Smoke Dampers

Life Safety Dampers Selection and Application Manual. Ceiling Radiation Dampers Fire Dampers Combination Fire Smoke Dampers Smoke Dampers Life Safety Dampers Selection and Application Manual Ceiling Radiation Dampers Fire Dampers Combination Fire Smoke Dampers Smoke Dampers May 2014 1 2 Table of Contents HOW TO USE THIS MANUAL DAMPER APPLICATION

More information

SECTION 23 01 30.51 HVAC AIR-DISTRIBUTION SYSTEM CLEANING

SECTION 23 01 30.51 HVAC AIR-DISTRIBUTION SYSTEM CLEANING SECTION 23 01 30.51 HVAC AIR-DISTRIBUTION PART 1 - GENERAL 1.1 SUMMARY A. Section includes cleaning of interior surfaces of HVAC equipment. The HVAC equipment cleaning work includes the following: 1. Air

More information

SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 08332 COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Counter Fire Doors. 1.2

More information

PART 1 GENERAL 1.1 SECTION INCLUDES

PART 1 GENERAL 1.1 SECTION INCLUDES J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including

More information

CEILING CASSETTE FAN COIL UNIT

CEILING CASSETTE FAN COIL UNIT CEILING CASSETTE FAN COIL UNIT Operation and Installation Manual MHCFC4W-04, 08, 12, 16 Four way ceiling cassette fan coil unit Please read this manual before using the fan coil unit. Installation and

More information

Commercial Gas Furnace Upflow

Commercial Gas Furnace Upflow Commercial Gas Furnace Upflow Model G24-200 80% A.F.U.E. 200,000 Btuh Input Heating Cap. 7.5 or 10 Tons Nominal Add-On Cooling GUK FEATURES Certified by A.G.A./C.G.A. Laboratories. Heavy gauge painted

More information

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association Air-Conditioning, Heating, and Refrigeration Institute Sheet Metal and Air-Conditioning Contractors National Association GUIDELINE B-1997 ACKNOWLEDGEMENT These guidelines for Roof Mounted Outdoor Air-

More information

1.2 Refrigerant Equipment. General

1.2 Refrigerant Equipment. General Part 1 General 1.1 Summary.1 Unless otherwise indicated, follow the standards below when specifying heating, ventilation and air conditioning (HVAC) work. These standards are not intended to restrict or

More information

ARMSTRONG AIR HEAT PUMPS www.armstrongair.com

ARMSTRONG AIR HEAT PUMPS www.armstrongair.com INDEX ELECTRIC FURNACE MODULAR AIR SYSTEM EFC/EFV... 5-10 electric Heat Kits... 5-11 evaporator coils EC1P / EM1P UPFLOW / COUNTERFLOW APPLICATIONS and upflow / horizontal applications (CASED)... 5-6 5-7

More information

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook Trainee:... Training Provider:... Year:... Trainee Contact no:... Competency Based Skill Training Logbook Introduction

More information

A D D E N D U M # 3 QUESTIONS FROM BIDDERS: DATE: November 5, 2012. All Bidders. Jenne dos Santos, CBI Consulting Inc. City of Chelsea, MA

A D D E N D U M # 3 QUESTIONS FROM BIDDERS: DATE: November 5, 2012. All Bidders. Jenne dos Santos, CBI Consulting Inc. City of Chelsea, MA Page 1 of 10, Addendum No. 3 Temporary Garage Structure City of Chelsea, MA November 5, 2012 CBI Job No.: 12055-A A D D E N D U M # 3 DATE: November 5, 2012 TO: FROM: PROJECT: All Bidders Jenne dos Santos,

More information

T 3 Series VAV Diffusers Analog Diffuser Steel Square Panel Horizontal Pattern Model: T 3 SQ

T 3 Series VAV Diffusers Analog Diffuser Steel Square Panel Horizontal Pattern Model: T 3 SQ TSQ--0 7-7-07 T Series VAV Diffusers Analog Diffuser Steel Square Panel Horizontal Pattern Model: T SQ Model Configuration T SQ- Heating / Cooling Border Type (Lay-In) Full Face Nominal Round Duct Size

More information

SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront PART 1 GENERAL 1.01 Work Included SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS System 402 Flush-Glazed Screw Spline Storefront A. Furnish and install aluminum architectural storefront system

More information

Fire Barrier Duct Wrap 15A

Fire Barrier Duct Wrap 15A 3 Fire Barrier Duct Wrap 15A Commerical Kitchen Grease Duct Fire Protection System Product Data and Installation Instructions Compliance 1998 Edition Complies with International Mechanical Code Complies

More information

FIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval.

FIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval. Polk School District Specifications for the New Fire Alarm in the Existing Building Eastside Elementary School FIRE ALARM SYSTEM 1.01 SUBMITTALS A. Shop drawings shall be submitted as follows: 1. Manufacturer's

More information

HVAC Checklist - Long Form

HVAC Checklist - Long Form HVAC Checklist - Long Form Page 1 of 14 Appendix B discusses HVAC system components in relation to indoor air quality. utside Air Intake Location pen during occupied hours? Unobstructed? Standing water,

More information

SECTION 15140 - PIPE HANGERS AND SUPPORTS

SECTION 15140 - PIPE HANGERS AND SUPPORTS Part I - GENERAL 1.01 SECTION INCLUDES A. The work covered under this section consists of the furnishing of all necessary labor, supervision, materials, equipment, and services to completely execute the

More information

plenum slot diffusers

plenum slot diffusers light powered Redefine your comfort zone. www.titus-hvac.com dual-function smart logic light powered energy solutions Table of Contents PLENUM SLOT IFFUSERS products Plenum Slot iffusers Products... 4

More information

DRYER VENTING SPECIFICATIONS DRYER SAFETY

DRYER VENTING SPECIFICATIONS DRYER SAFETY DRYER VENTING SPECIFICATIONS Table of Contents DRYER SAFETY...1 INSTALLATION REQUIREMENTS...4 Venting Requirements...5 DRYER INSPECTION AND CLEANING...7 Frequency of Exhaust System Cleaning...7 Inspecting

More information

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table

More information

Replacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue. Photo Essay

Replacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue. Photo Essay Original HVAC Units: Replacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue Photo Essay One fan motor draws air from the lower section of the unit,

More information

RFI Response RFP: HSCG88-16-R-PQQ015 Replace HVAC Bldg A & C San Diego, CA.

RFI Response RFP: HSCG88-16-R-PQQ015 Replace HVAC Bldg A & C San Diego, CA. 1. There is verbiage in the hazardous material report referring to a state licensed abatement contractor. Within the recommendations part of the report (page 64 of 111 of the specification pdf) is the

More information

2012 BIM Guidelines and Standards (Rev. 00) University at Albany

2012 BIM Guidelines and Standards (Rev. 00) University at Albany A. Building Information Modeling (BIM) Guidelines: The Office of AECM will require the submission of BIM modeling files as part of an electronic file submission to the AECM project manager as requested

More information

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations. DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,

More information

SECTION 23 34 13. A. Horsepower: Do not increase or decrease fan motor horsepower without written approval from Engineer.

SECTION 23 34 13. A. Horsepower: Do not increase or decrease fan motor horsepower without written approval from Engineer. PART 1 GENERAL SECTION 23 34 13 HVAC FANS 1.01 SUMMARY A. Section Includes: 1. Exhaust fans. 2. Transfer fans. B. Related Documents: 1. Drawings and general provisions of the Contract, including General

More information

ENHANCED LABORATORY HVAC SYSTEM

ENHANCED LABORATORY HVAC SYSTEM ENHANCED LABORATORY HVAC SYSTEM INTRODUCTION Since the early 1980's the attention to more energy efficient laboratory designs has been on the rise due to the increase in energy cost and the emergence of

More information

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

ST. MONICA FOOD PANTRY HOUSTON, TEXAS PROJECT MANUAL FOR ST. MONICA FOOD PANTRY HOUSTON, TEXAS OWNER: ST. MONICA CATHOLIC CHURCH 8421 W. MONTGOMERY ROAD HOUSTON, TEXAS 77088 ARCHITECT: C SIX ARCHITECTURE, LLC 4606 F.M. 1960 WEST, STE 400 HOUSTON,

More information

2014 British Columbia Building Code Changes

2014 British Columbia Building Code Changes District of Houston 250-845-2238 2014 British Columbia Building Code Changes A District of Houston interpretation of the 2014 Building Code Changes for 9.36 & 9.32 The following changes reflect the most

More information

SWIMMING POOL HEAT PUMP

SWIMMING POOL HEAT PUMP SWIMMING POOL HEAT PUMP Installation & User Manual Model HP40B HP50B HP65B Hayward Pool Products Canada, Inc. T: 1-888-238-7665 www.haywardpool.ca CONTENT I. Application 4 II. Features 4 III. Technical

More information

SECTION 16853 ZONED (DC LOOP) FIREALARM SYSTEM

SECTION 16853 ZONED (DC LOOP) FIREALARM SYSTEM SECTION 16853 ZONED (DC LOOP) FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1

More information

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 18, 2013

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 18, 2013 SECTION 233416 - CENTRIFUGAL HVAC FANS PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. Fans shall be dynamically balanced and factory-tested and certified in accordance with applicable AMCA test codes. All

More information

Acumen Enterprises, Inc.

Acumen Enterprises, Inc. Hourly rates Discount w/o Rebate Electrician $78.00 10% $70.20 $70.73 HVAC Technician $78.00 10% $70.20 $70.73 Insulator $42.00 10% $37.80 $38.08 Sheet Metal Worker $74.00 10% $66.60 $67.10 Plumber/Pipefitter

More information

This permit does not include replacement or upgrading of the existing electrical panel or service (a separate electrical permit must be obtained).

This permit does not include replacement or upgrading of the existing electrical panel or service (a separate electrical permit must be obtained). CITY OF MILPITAS Building & Safety Department 455 E. Calaveras Blvd. Milpitas, CA 95035 408-586-3240 www.ci.milpitas.ca.gov RESIDENTIAL AIR CONDITIONING, REPLACEMENT 1. PERMIT INFORMATION: The replacement

More information

Evaluate, Clean, and Tune Guidance

Evaluate, Clean, and Tune Guidance Evaluate, Clean, and Tune Guidance The Evaluate, Clean and Tune (ECT) process serves three essential purposes in the Weatherization Assistance Program (WAP). The first is to evaluate the existing system

More information

Basics of HVAC Cleaning

Basics of HVAC Cleaning Basics of HVAC Cleaning Seminar Outline Residential 1. Types of systems used and why 2. Types of air distribution systems 3. System components 4. Determining the need for cleaning (ACR2002) 5. Project

More information

C. Burner management system to follow requirements of Industrial Risk Insurers (IRI).

C. Burner management system to follow requirements of Industrial Risk Insurers (IRI). SECTION 23 52 30 PART 1 - GENERAL 1.01 RELATED WORK A. Section 23 05 00: Common Work Results for HVAC B. Section 23 25 00: Chemical Water Treatment C. Section 23 51 23: Flue Piping 1.02 QUALITY ASSURANCE

More information

A Prototype Alternative Ventilation System for Retrofit, Rehab and Renovation of Rural Alaska Houses

A Prototype Alternative Ventilation System for Retrofit, Rehab and Renovation of Rural Alaska Houses A Prototype Alternative Ventilation System for Retrofit, Rehab and Renovation of Rural Alaska Houses Robert L Crosby Jr, Biorealis Systems, Inc. Abstract: Bristol Bay Housing Authority (BBHA) currently

More information

Controlling Condensation On CWP Insulation BY ED LIGHT, MEMBER ASHRAE; JAMES BAILEY, P.E., MEMBER ASHRAE; AND ROGER GAY

Controlling Condensation On CWP Insulation BY ED LIGHT, MEMBER ASHRAE; JAMES BAILEY, P.E., MEMBER ASHRAE; AND ROGER GAY This article was published in ASHRAE Journal, Decemeber 2014. Copyright 2014 ASHRAE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically or in paper form without

More information

SECTION 23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION 23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe hangers and supports. 2. Hanger rods. 3. Inserts. 4. Flashing. 5. Equipment

More information

SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING

SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING PART ONE GENERAL DESCRIPTION This section includes pre-formed standing seam metal roofing and related flashings, closures, trim and accessories including,

More information

HVAC Design Requirements

HVAC Design Requirements Maintenance of HVAC HVAC Design Requirements Air Flow Diagram แบบ Recirculation Air Flow Diagram แบบ Once Through Definition Of Conditions As built At rest In operation air air air Maintenance GMP Requirements

More information

Duct Design. Presented by Dave Janquart

Duct Design. Presented by Dave Janquart Duct Design Presented by Dave Janquart Overview of Topics Duct design Duct insulation SMACNA Standards Factors Influencing Duct Design Equipment Losses Air Velocity Duct Material Duct Size & Shape Length

More information

Tremco Fire Protection Systems Group Technical Bulletin

Tremco Fire Protection Systems Group Technical Bulletin Compartmentalization products and design play a key role in protecting lives and property from fire. Understanding the tools and techniques available for firestopping is of utmost importance to designers,

More information

SAM HOUSTON STATE UNIVERSITY

SAM HOUSTON STATE UNIVERSITY PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the

More information

Air Conditioning. The opportunity for energy efficiency. Low cost actions to reduce energy usage now

Air Conditioning. The opportunity for energy efficiency. Low cost actions to reduce energy usage now Fact Sheet #6 Air Conditioning In this fact sheet you will discover: The opportunity for energy efficiency How air conditioning works Low cost actions to reduce energy usage now Investments to reduce costs

More information

Exhaust Calculation Booklet

Exhaust Calculation Booklet Exhaust Calculation Booklet American Dryer Corporation 88 Currant Road Fall River MA 02720-4781 Telephone: (508) 678-9000 / Fax: (508) 678-9447 e-mail: techsupport@amdry.com ADC Part No. 450450 Exhaust

More information

Element D Services Plumbing

Element D Services Plumbing PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses domestic cold, hot and hot water return distribution systems within and to five feet beyond building perimeter. PART 2 - DESIGN CRITERIA 2.01 GENERAL

More information

2010 Residential Water Heater Replacement Check List

2010 Residential Water Heater Replacement Check List 2010 Residential Water Heater Replacement Check List The intent of this check list is to provide installers a general reference for the enforcement of code requirements in the Greater San Diego Area. This

More information

Performance Rating of Room Fan- Coils

Performance Rating of Room Fan- Coils ANSI/AHRI Standard 440 with Addendum 1 (Formerly ARI Standard 440) 2008 Standard for Performance Rating of Room Fan- Coils ANSI/AHRI STANDARD 440-2008 WITH ADDENDUM 1, PERFORMANCE RATING OF ROOM FAN-COILS

More information

DIVISION 23 HEATING, COOLING, AIR CONDITIONING AND VENTILATION

DIVISION 23 HEATING, COOLING, AIR CONDITIONING AND VENTILATION SECTION 230713- ALUMAGUARD ENGINEER SPECIFICATION DIVISION 23 HEATING, COOLING, AIR CONDITIONING AND VENTILATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract,

More information

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders INTRODUCTORY INFORMATION TABLE OF CONTENTS 00 0101 PROJECT TITLE PAGE PROCUREMENT REQUIREMENTS (PROJECT MANUAL) Tab A - Invitation for Bids Tab B - Instructions to Bidders Tab C Bid Form for General Bids

More information

Balancing of a water and air system

Balancing of a water and air system Balancing of a water and air system Roger D. Holder MSME A well performed testing, adjusting and balancing (TAB) of a HVAC system is essential for the proper performance of that system and can enhance

More information

NSN 4120-01-21 4-3692

NSN 4120-01-21 4-3692 *TM 9-4120-388-14 TECHNICAL MANUAL Operator s, Unit, Direct Support, And General Support Maintenance Manual AIR CONDITIONER, VERTICAL, COMPACT, 18,000 BTU/HR 208 VOLT, 3 PHASE, 50/60 HERTZ NSN 4120-01-21

More information

Class II Type B2 Laminar Flow Biological Safety Cabinets at Ordering Criteria for the National Institutes of Health

Class II Type B2 Laminar Flow Biological Safety Cabinets at Ordering Criteria for the National Institutes of Health Background Class II Type B2 Laminar Flow Biological Safety Cabinets at Ordering Criteria for the National Institutes of Health This document provides guidelines for the design and installation of Class

More information

A. Section includes air conditioning units, controls and control panels.

A. Section includes air conditioning units, controls and control panels. SECTION 23 81 23 - COMPUTER-ROOM AIR-CONDITIONERS PART 1 - GENERAL 1.1 SUMMARY A. Section includes air conditioning units, controls and control panels. 1.2 REFERENCES A. Air-Conditioning, Heating, and