1 ACEC Partnering Workshop Metro Region Mega Projects I 75 February 4, 2016

2 I 75 Modernization Project North of M 102 to South Boulevard Approximately 17.7 miles total length Reconstruct existing pavement Add new High Occupancy Vehicle (HOV) lane in each direction(peak hour operation only) Upgrade ITS Replace bridges Improve drainage system Upgrade geometrics and interchanges Incorporate aesthetics Upgrade, improve and construct carpool lots

3 Significance Key commercial, commuter, tourist, local area residential & business route Accommodate existing & future traffic Increase mobility Reduce congestion Address safety issues Improve bridge & pavement condition

4 Project History 1992: I 75 Northern Oakland County Corridor Study precipitated by new developments including the Great Lakes Crossing Mall 1999: I 75 SEMCOG/MDOT Corridor Study (Oakland County Line to Genesee County Line) further analyzed corridor needs for increasing traffic

5 Project History 2002: Environmental Impact Statement formal, Federal study initiated to develop the most environmentally sound, preferred alternative to address existing and future freeway needs 2005: Final Environmental Impact Statement (FEIS) identified most environmentally sound and preferred alternative 2006: Record of Decision (ROD) issued by FHWA recognizing the preferred alternative as the selected alternative

6 Project History 2009: Engineering Report for 12 Mile Road to M 59 refined the geometrics and design in the northern part of the corridor 2010: Engineering Report for M 102 to 12 Mile Road refined the geometrics and design in the southern part of the corridor

7 Project History 2011: Success Management Workshops developed new design modifications where applicable 2013: Design Modification review ensured they are reasonable and feasible 2013/2014: Community preferences workshops developed a project logo & corridor enhancements 2014: Owners Representative formed the project team to assist with the delivery of the project

8 Add a Lane Add one lane in each direction High Occupancy Vehicle lane operation in the peak hours General lane operation for the remaining hours

9 Replace Bridges 51 in corridor 47 Replacements 41 vehicular 6 pedestrian 4New 12 Mile Road interchange I 696 area ramps

10 Improve Drainage New System M 102 to south of 12 Mile Road Consolidate drain runs to single system North of 12 Mile Enclose median drainage

11 Improve Geometrics Grade separate/ braid I 696 Service Drive over and 11 Mile Road under (new ramp)

12 Improve Geometrics Remove Left Hand Ramps Square Lake Road Interchange

13 Right of Way Impacts 58 Impacts (2018, 2026, 2028 & 2030) (total, strips, sidewalks, radius, etc.) 30 residential impacts, between I 696 and 11 Mile on northbound service drive due to the braid of I 696 on ramp and 11 Mile Road off ramp 12 impacts, south of I 696 for pedestrian bridge replacements in ADA compliance (strips & sidewalks) 11 impacts due to freeway geometric and cross street improvements (strips & sidewalks) 5 impacts, southwest corner of 12 Mile Road interchange for geometric improvements (strips & sidewalks)

14 Most preferred elements Aesthetic Cross Street View

15 Most preferred elements Aesthetic Main Line View

16 Mega Project Milestones Completed FHWA Cost Estimate Review (June 2015) Approved FHWA/MDOT Project Management Plan (December 2015) Approved FHWA Environmental Re Evaluation (January 2016) Approved FHWA Interchange Access Justification (January 2016) Approved Initial Financial Plan (Pending)

17 Management Innovations FHWA Specially Designated Project Oversight Manager MDOT Senior Project Manager MDOT Senior Construction Engineer Owner's Representative Consultants Technical Staff Participation from Lansing, Metro and TSG

18 8 Construction Segments

19 Total Project Cost $1.32B Year of Expenditure Dollars Roadway Bridges Right of way Maintenance of traffic Design Construction engineering

20 Segment One 3.1 miles from North of Coolidge to North of South Boulevard Reconfigure Square Lake Road interchange Reconstruction on Adams Road, Squirrel Road and Square Lake Road Re alignment/reconstruct existing freeway lanes and ramps Replace bridges (Adams Road, Squirrel Road and Square Lake Road) Expand and upgrade Adams Road carpool lot Rehabilitate, replace and extend Dan Devine, Sprague and Old Amy Drain Construct pedestrian facilities on Squirrel Rd, Adams Rd and Square Lake Rd Incorporate community developed aesthetic improvements Total Construction and CE Cost $127.36M

21 Design Build

22 Design Build

23 2016 Segment Schedule Innovations Owner's Representative Staff Co location of Team (Design Builder, MDOT, Owner s Rep) HOV Lanes Carbon Fiber Reinforcement (option) Connected Vehicle Coordination Bridge Deck Warning System (ITS) for Icing Alternative Pavement Bid A + B Contracting Vibration Monitoring Shared Risk Item

24 2016 Segment Schedule Issued RFQ: September 2015 Short Listed Submitters (3 teams): December 2015 Issued RFP (ITP, Books 1 3, RID): January 29, 2016 Submit Technical and Price Proposals: May 2016 Notify Proposer with Low Bid: May 2016 Substantial Completion: September 2018

25 Next Steps Begin design work and drainage studies for next segments Acquire Right of Way Start environmental clearance for re evaluation for next segments Update Initial Financial Plan Update Project Management Plan

26 Questions

Texas Department of Transportation Highway Safety Improvement Program (HSIP) Work Codes Table. Revised 10/01/2015

Texas Department of Transportation Highway Safety Improvement Program (HSIP) Work Codes Table. Revised 10/01/2015 Texas Department of Transportation Highway Safety Improvement Program (HSIP) Work Codes Table Revised 10/01/2015 HSIP Work Codes Table This document contains a current and complete listing of work codes

More information

IH 10 (KATY FWY) SL 8 (Sam Houston Tollway) to IH 610W (West Loop) 2010 Rank: Rank 21

IH 10 (KATY FWY) SL 8 (Sam Houston Tollway) to IH 610W (West Loop) 2010 Rank: Rank 21 Mobility Investment Priorities Project Houston IH 10 IH 10 (KATY FWY) SL 8 (Sam Houston Tollway) to IH 610W (West Loop) Current Conditions From IH 610 North to Beltway 8 (Sam Houston Tollway), IH 10 is

More information

FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST

FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST August 2003 Background: The Federal Highway Administration (FHWA) has retained all approval rights to the control

More information

CHAPTER 7 DRIVEWAYS. The following definitions must be used in conjunction with the criteria described in this Chapter.

CHAPTER 7 DRIVEWAYS. The following definitions must be used in conjunction with the criteria described in this Chapter. CHAPTER 7 DRIVEWAYS 7.0 INTRODUCTION It is in the public interest to regulate the location, design, construction, maintenance and drainage of access driveways, local roads and other property within State

More information

Maryland Invests $845 Million in New Highway and Bridge Projects

Maryland Invests $845 Million in New Highway and Bridge Projects Maryland Invests $845 Million in New Highway and Bridge Projects Completing Widening of MD 404 Talbot And Caroline Counties Top Regional Priority Queen Anne s, Talbot, and Caroline Counties Widening MD

More information

BEST PRACTICES FOR PLANNING AND DESIGN OF FREEWAY FACILITIES

BEST PRACTICES FOR PLANNING AND DESIGN OF FREEWAY FACILITIES 1 BEST PRACTICES FOR PLANNING AND DESIGN OF FREEWAY FACILITIES 1. PREAMBLE 1.1 Function of Freeways For purposes of this paper, freeways are defined as high capacity, high speed, multi-lane roadways with

More information

Pentagon Boulevard. From: Grange Hall Rd. To: North Fairfield Rd.

Pentagon Boulevard. From: Grange Hall Rd. To: North Fairfield Rd. Pentagon Boulevard From: Grange Hall Rd. To: North Fairfield Rd. 154 Corridor # 52 Corridor Length Functional Classification Number of Lanes Speed Limit Existing Non-Motorized Transportation Facilities

More information

US 281 Comal County Line to SL 1604 (Anderson Loop)

US 281 Comal County Line to SL 1604 (Anderson Loop) Mobility Investment Priorities Project San Antonio US 281 US 281 Comal County Line to SL 1604 (Anderson Loop) Current Conditions U.S. Highway 281 North is a multi-lane divided highway in a developing suburban

More information

CENTRAL CORRIDOR LIGHT RAIL TRANSIT PRELIMINARY DESIGN PLANS. TRANSPORTATION AND PUBLIC WORKS COMMITTEE of the MINNEAPOLIS CITY COUNCIL.

CENTRAL CORRIDOR LIGHT RAIL TRANSIT PRELIMINARY DESIGN PLANS. TRANSPORTATION AND PUBLIC WORKS COMMITTEE of the MINNEAPOLIS CITY COUNCIL. CENTRAL CORRIDOR LIGHT RAIL TRANSIT PRELIMINARY DESIGN PLANS TRANSPORTATION AND PUBLIC WORKS COMMITTEE of the MINNEAPOLIS CITY COUNCIL June 10, 2008 I. INTRODUCTION The for the Central Corridor LRT project

More information

PATTULLO CORRIDOR STUDY

PATTULLO CORRIDOR STUDY PATTULLO CORRIDOR STUDY MAY 2008 - SW1109SWA The Pattullo Corridor Study provides technical analysis to assist in the development of a long term replacement and / or rehabilitation strategy for the existing

More information

PRIORITIZATION PROCESSES

PRIORITIZATION PROCESSES PROJECT SELECTION & PRIORITIZATION PROCESSES STIP Workshop Presented by: Bill Lawrence April 2011 Purpose and Review Overview of Project Selection Process Review Various Prioritization Processes Tk Take

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS Engineering Design Services for the Preliminary (Design) Engineering 1. Imlay City Road Imlay City Road at Wilder Road (signal modernization), Lapeer Township 2. Imlay City Road Imlay

More information

Chairman: Kevin Coggin. Purpose

Chairman: Kevin Coggin. Purpose 23 Transportation Chairman: Kevin Coggin Purpose The purpose of this committee is to identify transportation related issues for the City and provide recommendations for support of significant projects

More information

Bicycle and Pedestrian Planning Purpose and Process

Bicycle and Pedestrian Planning Purpose and Process Prepared By: Jefferson County Transportation and Engineering Division 100 Jefferson County Parkway, Suite 3500, Golden, CO 80419 September 2013 This page was intentionally left blank Jefferson County Division

More information

TRANSPORTATION Carson Howell, Analyst

TRANSPORTATION Carson Howell, Analyst State of Utah FY 2008 Budget Recommendations Carson Howell, Analyst AGENCY BUDGET OVERVIEW Mission: Build and maintain the State s transportation system, plan and implement new highway projects, improve

More information

I-75 Update Northern Kentucky to Montgomery County. Traffic Engineering Workshop June 5, 2013

I-75 Update Northern Kentucky to Montgomery County. Traffic Engineering Workshop June 5, 2013 I-75 Update Northern Kentucky to Montgomery County Traffic Engineering Workshop June 5, 2013 Corridor Improvement Projects KY 338 and KY 536 DCD Interchanges Brent Spence Bridge Mill Creek Expressway Thru

More information

Subject: Presentation - TTC/Transportation Services Joint Surface Transit Initiatives

Subject: Presentation - TTC/Transportation Services Joint Surface Transit Initiatives INFORMATION Subject: Presentation - TTC/Transportation Services Joint Surface Transit Initiatives Date: May 27, 2015 Stephen Buckley, General Manager, Transportation Services has been invited by the Chair

More information

I-75 and Palmetto Express Lanes

I-75 and Palmetto Express Lanes I-75 and Palmetto Express Lanes PRESENTATION FOR 15th International Conference on Managed Lanes May, 2016 PRESENTED BY Judy Solaun-Gonzalez, PE FDOT District 6 Presentation Overview Project Limits and

More information

INDOT 2000-2025 Long Range Plan

INDOT 2000-2025 Long Range Plan Chapter 9 INDOT 2000-2025 Long Range Plan Highway Needs Analysis Overview The statewide transportation planning process provides for the identification of highway needs through a comprehensive process

More information

3 Tappan Zee Bridge Rehabilitation Options

3 Tappan Zee Bridge Rehabilitation Options 3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:

More information

E-03: Kirkland/Totem Lake to Central Issaquah via Bellevue LRT

E-03: Kirkland/Totem Lake to Central Issaquah via Bellevue LRT Project Number E-03 Subarea East King Primary Mode Light Rail Facility Type Corridor Length 17.5 miles Version ST Board Workshop Date Last Modified 12-23-2015 PROJECT AREA AND REPRESENTATIVE ALIGNMENT

More information

Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding

Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding C Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding These guidelines are intended to provide assistance in selecting OFF-SYSTEM

More information

SURFACE TRANSPORTATION PROGRAM (STP) PROCEDURES FOR THE OKLAHOMA CITY URBANIZED AREA FUNDS

SURFACE TRANSPORTATION PROGRAM (STP) PROCEDURES FOR THE OKLAHOMA CITY URBANIZED AREA FUNDS SURFACE TRANSPORTATION PROGRAM (STP) PROCEDURES FOR THE OKLAHOMA CITY URBANIZED AREA FUNDS October 2015 Background The Surface Transportation Program (STP) was originally established as Section 133 of

More information

ORANGE COUNTY TRANSPORTATION AUTHORITY. Final Long-Range Transportation Plan - Destination 2035. Attachment A

ORANGE COUNTY TRANSPORTATION AUTHORITY. Final Long-Range Transportation Plan - Destination 2035. Attachment A ORANGE COUNTY TRANSPORTATION AUTHORITY Final Long-Range Transportation Plan - Destination 2035 Attachment A DESTINATION 2035 DESTINATION 2035 EXECUTIVE SUMMARY ATTACHMENT A Moving Toward a Greener Tomorrow

More information

Nashville Area MPO Regional Freight Study fast action projects

Nashville Area MPO Regional Freight Study fast action projects Project #1 Beechcroft road (sr 247) at csx crossing Motor carrier survey location Maury County (Spring Hill, Tn) / City of Spring Hill Current at-grade railway crossing causes traffic delays as a result

More information

Benefit Cost Analysis

Benefit Cost Analysis Benefit Cost Analysis A benefit cost analysis involves the calculation of the stream of benefits and costs over the lifetime of the project. In addition to the benefit-cost analysis, non-monetary but quantifiable

More information

Vienna/Fairfax GMU Metro Station Intermodal Accessibility Measure Study Technical Report

Vienna/Fairfax GMU Metro Station Intermodal Accessibility Measure Study Technical Report Vienna/Fairfax GMU Metro Station Intermodal Accessibility Measure Study Technical Report Prepared for: Office of Intermodal Planning and Investment Prepared by: Michael Baker Inc., CDM Smith Inc., Renaissance

More information

3.1 Historical Considerations

3.1 Historical Considerations 3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible

More information

GANDY CORRIDOR PROJECT. Hillsborough County MPO Policy Committee April 2013

GANDY CORRIDOR PROJECT. Hillsborough County MPO Policy Committee April 2013 GANDY CORRIDOR PROJECT Hillsborough County MPO Policy Committee April 2013 Coordination with Community Groups Met with representatives of: Gandy/ Sun Bay South Bayside West Port Tampa Civic South Tampa

More information

civil and environmental engineering

civil and environmental engineering Developing a Methodology to Incorporate Transit, Pedestrian and Bicycle Design Features into Highway and Bridge Projects during the Planning and Design Phases of Project Development in Pennsylvania Research

More information

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements Presentation July 23, 2014 A. Morton Thomas and Associates, Inc. 800 King Farm Boulevard, 4 th Floor Rockville, Maryland 20850

More information

Surface Transportation Program (STP)

Surface Transportation Program (STP) Project Name: Project Sponsor: FEDERAL FUNDS PROJECT APPLICATION TRANSPORTATION IMPROVEMENT PROGRAM 2008-2013 SALT LAKE and OGDEN/ LAYTON URBAN AREAS Surface Transportation Program (STP) Urban Surface

More information

Chapter VIII: Long-Term Outlook and the Financial Plan

Chapter VIII: Long-Term Outlook and the Financial Plan A. Long-Term Outlook Chapter VIII: Long-Term Outlook and the Financial Plan When examining the long-term outlook for transportation planning and programming over the foreseeable future, there are several

More information

Federal Highway Administration 1200 New Jersey Avenue, SE Washington, DC 20590 202-366-4000

Federal Highway Administration 1200 New Jersey Avenue, SE Washington, DC 20590 202-366-4000 1 of 8 12/27/2013 8:21 AM U.S. Department of Transportation Federal Highway Administration 1200 New Jersey Avenue, SE Washington, DC 20590 202-366-4000 MAP-21 - Moving Ahead for Progress in the 21st Century

More information

Act 51 Section 10k Non-Motorized Expenditures Reporting Process. Prepared by: Josh DeBruyn, AICP

Act 51 Section 10k Non-Motorized Expenditures Reporting Process. Prepared by: Josh DeBruyn, AICP Act 51 Section 10k Non-Motorized Expenditures Reporting Process Prepared by: Josh DeBruyn, AICP Bicycle and Pedestrian Coordinator Transportation Planning Policy Division Act Summary Act 51 of 1951 as

More information

UDOT University College of Systems Planning and Programming Academic Business Plan

UDOT University College of Systems Planning and Programming Academic Business Plan UDOT University College of Systems Planning and Programming Academic Business Plan Vision UDOT College of Planning and Programming will be the place for advancing careers and developing an appreciation

More information

SUMMARY OF CATEGORIES 2007 STATEWIDE PRESERVATION PROGRAM (SPP) _MAINTAIN IT_

SUMMARY OF CATEGORIES 2007 STATEWIDE PRESERVATION PROGRAM (SPP) _MAINTAIN IT_ 2007 STATEWIDE PRESERVATION (SPP) _MAINTAIN IT_ 1 Preventive Maintenance and Rehabilitation MING AUTHORITY allocation by fmula. Projects selected by districts. State % 0% State Districts RANKING INDEX

More information

Background and Goals for the Project

Background and Goals for the Project City of Asheville, NC REQUEST FOR PROPOSALS Wilma Dykeman Riverway Environmental Analysis, Project Development, and Preliminary Design Submittal Address: Dan Baechtold, AICP City of Asheville Engineering

More information

Railroad Crossing Evaluation

Railroad Crossing Evaluation City of Ashland Railroad Crossing Evaluation Final Report Prepared for: City of Ashland Public Works 20 East Main Street Ashland, OR 97520 Prepared by: HDR, Inc. 1001 SW 5 th Avenue, Suite 1800 Portland,

More information

FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005

FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005 FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005 Background: It is in the national interest to maintain the Interstate System to provide the highest level of

More information

LIMITED SCOPE CONCEPT DEVELOPMENT REPORT

LIMITED SCOPE CONCEPT DEVELOPMENT REPORT LIMITED SCOPE CONCEPT DEVELOPMENT REPORT Route 33 Resurfacing Project Eastbound: Milepost 24.2 to Milepost 28.9 Westbound: Milepost 24.3 to Milepost 28.9 Manalapan & Freehold Townships, Monmouth County

More information

Florida Avenue Crossing

Florida Avenue Crossing Florida Avenue Crossing Prepared for: Arapahoe County Open Spaces On behalf of the High Line Canal Working Group 6934 South Lima Street, Suite A Centennial, CO 80112 Prepared by: Felsburg Holt & Ullevig

More information

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan. 3 Financial Plan The purpose of the financial plan is to identify funding options that would be likely sources of money to advance recommendations made by this study. The Capitol Region Transportation

More information

DESIGN ASSISTANCE APPLICATION

DESIGN ASSISTANCE APPLICATION DESIGN ASSISTANCE APPLICATION for FY 2016 NEW RIVER MULTI USE PATH: PINNACLE PEAK ROAD TO HAPPY VALLEY ROAD CITY OF PEORIA APPLICATIONS ARE DUE VIA ONLINE SUBMITTAL BY 10:00 AM ON MONDAY, JUNE 29, 2015

More information

Michael B. Hancock Mayor. October 31, 2014

Michael B. Hancock Mayor. October 31, 2014 Michael B. Hancock Mayor City and County of Denver OFFICE OF THE MAYOR CITY AND COUNTY BUILDING DENVER, CO 80202-5390 TELEPHONE: (720) 865-9090 FAX: (720) 865-8787 TTY/ TTD: (720) 865-9010 October 31,

More information

Twins Ballpark Transportation Mitigation Measures And Best Management Practices

Twins Ballpark Transportation Mitigation Measures And Best Management Practices PARKING MITIGATION MEASURES Twins Ballpark Transportation Mitigation Measures And Best Management Practices Disseminate way finding and parking location information prior to events through website, special

More information

The Corporation of the TOWN OF MILTON

The Corporation of the TOWN OF MILTON The Corporation of the TOWN OF MILTON Report to: From: Mayor G. A. Krantz & Members of Council M. Paul Cripps, P. Eng., Director, Engineering Services Date: November 11, 2013 Report No. ENG-039-13 Subject:

More information

NC 87 Regional Multimodal Corridor Mobility Plan. Public Workshop, June 14, 2011

NC 87 Regional Multimodal Corridor Mobility Plan. Public Workshop, June 14, 2011 NC 87 Regional Multimodal Corridor Mobility Plan Public Workshop, June 14, 2011 Purpose of tonight s workshop Form small groups to discuss issues and solutions Fill out survey as we go We want to hear

More information

THE COMMONWEALTH OF MASSACHUSETTS MASSACHUSETTS HIGHWAY DEPARTMENT PROJECT INITIATION FORM (PIF)

THE COMMONWEALTH OF MASSACHUSETTS MASSACHUSETTS HIGHWAY DEPARTMENT PROJECT INITIATION FORM (PIF) THE COMMONWEALTH OF MASSACHUSETTS MASSACHUSETTS HIGHWAY DEPARTMENT PROJECT INITIATION FORM (PIF) To: From: Contact Information: Roland Bartl, Planning, Town of Acton, 472 Main St. Acton MA 01440; 978-264-9639;

More information

GARFIELD STREET NEIGHBORHOOD BIKEWAY FEASIBILITY STUDY. City Park to Cherry Creek Connector

GARFIELD STREET NEIGHBORHOOD BIKEWAY FEASIBILITY STUDY. City Park to Cherry Creek Connector GARFIELD STREET NEIGHBORHOOD BIKEWAY FEASIBILITY STUDY City Park to Cherry Creek Connector Contents Introduction... 1 Existing Conditions... 2 Community Outreach... 4 Conceptual Plan... 10 Planning Cost...

More information

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN December 21, 2009 Public Works Department 171 N. Ross Street, Suite 200 Auburn,

More information

I-66 Pavement Rehabilitation

I-66 Pavement Rehabilitation I-66 Pavement Rehabilitation Fall Asphalt Conference Richmond, VA David Shiells, P.E. Virginia Department of Transportation David White Superior Paving Corporation October 2, 2012 Project Location 2 Goal

More information

Access Management System and Standards

Access Management System and Standards Access Management System and Standards Jim Gibbons Governor Susan Martinovich, P.E. Director Nevada Department of Transportation 1263 South Stewart Street Carson City, Nevada 89712 (775) 888-7000 pio@dot.state.nv.us

More information

Edgewater Drive Before & After Re-Striping Results Prepared by City of Orlando - Transportation Planning Bureau 11/1/02

Edgewater Drive Before & After Re-Striping Results Prepared by City of Orlando - Transportation Planning Bureau 11/1/02 Edgewater Drive Before & After Re-Striping Results Prepared by City of Orlando - Transportation Planning Bureau 11/1/02 INTRODUCTION Edgewater Drive is a north-south roadway that carries approximately

More information

Capacity Deficiency Project Application Jackson MPO Surface Transportation Program

Capacity Deficiency Project Application Jackson MPO Surface Transportation Program Capacity Deficiency Project Application Jackson MPO Surface Transportation Program The following information must be completed for all Capacity Deficiency proposed Jackson MPO STP projects. MPO staff will

More information

Improving Access in Florida International University Biscayne Bay Campus Executive Summary

Improving Access in Florida International University Biscayne Bay Campus Executive Summary EXECUTIVE SUMMARY Improving Access in Florida International University Biscayne Bay Campus Executive Summary Prepared for: Miami-Dade County Metropolitan Planning Organization (Miami-Dade MPO) Prepared

More information

SUPPLEMENTAL TRAFFIC IMPACT STUDY

SUPPLEMENTAL TRAFFIC IMPACT STUDY SUPPLEMENTAL TRAFFIC IMPACT STUDY for the proposed SHERWOOD APARTMENTS Heatherwood Drive TOWN OF HAMBURG ERIE COUNTY, NEW YORK Prepared for: Mr. David Burke DATO DEVELOPMENT, LLC S-554 Southwestern Boulevard

More information

1.0 Schedule Narrative

1.0 Schedule Narrative 1.0 Schedule Narrative 1.1 Introduction The D&B Team s approach in preparing the preliminary project baseline schedule is to minimize disruptions to users and adjacent facilities; ensure the safety of

More information

Surface Transportation Program (STP) Projects

Surface Transportation Program (STP) Projects Toledo Metropolitan Area Council of Governments American Reinvestment and Recovery Act (Economic Stimulus Program) Application Packet for: Surface Transportation Program (STP) Projects APPLICATIONS DUE

More information

Port Mann/Highway 1 Project Request For Proposals Volume 1 Instructions to Proponents

Port Mann/Highway 1 Project Request For Proposals Volume 1 Instructions to Proponents Port Mann/Highway 1 Project Request For Proposals Volume 1 Instructions to Proponents August 7, 2007 PAGE 1 OF 57 Table of Contents 1. Introduction... 5 1.1 Project Scope Overview... 5 1.2 Short-listed

More information

The Top 50 Highway Projects to Support Economic Growth and Quality of Life in Alabama

The Top 50 Highway Projects to Support Economic Growth and Quality of Life in Alabama The Top 50 Highway Projects to Support Economic Growth and Quality of Life in Alabama FEBRUARY 2016 Washington, DC 202-466-6706 Founded in 1971, TRIP of Washington, DC, is a nonprofit organization that

More information

Goals & Objectives. Chapter 9. Transportation

Goals & Objectives. Chapter 9. Transportation Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system

More information

Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis

Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis Transportation & Mobility projects that meet the following criteria: enhances regional mobility; supports public transit;

More information

Public Access Users Guide Transportation Project Management Database (TPMD)

Public Access Users Guide Transportation Project Management Database (TPMD) Public Access Users Guide Transportation Project Management Database (TPMD) The TPMD public access tool provides a quick and convenient way to look at transportation projects planned for Southeast Michigan

More information

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works Planned Public Works Projects in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works Planned Projects in Marina Del Rey Waterline Projects Phase II Phase III Roadway Projects Admiralty

More information

Commonwealth of Virginia Dean H. Gustafson, PE, PTOE State Operations Engineer. Transportation Management System Services. CTB Workshop May 15, 2013

Commonwealth of Virginia Dean H. Gustafson, PE, PTOE State Operations Engineer. Transportation Management System Services. CTB Workshop May 15, 2013 Commonwealth of Virginia Dean H. Gustafson, PE, PTOE State Operations Engineer Transportation Operations Centers and Advanced Transportation Management System Services CTB Workshop May 15, 2013 The Everyday

More information

Baseline Projects Report Oahu Regional Transportation Plan 2035 Project

Baseline Projects Report Oahu Regional Transportation Plan 2035 Project Baseline Projects Report Oahu Regional Transportation Plan 2035 Project Deliverable 7.2.2 July 2009 Prepared for the Oahu Metropolitan Planning Organization Prepared by Parsons Brinckerhoff This report

More information

Roadway Cost Per Centerline Mile Revised June 2014

Roadway Cost Per Centerline Mile Revised June 2014 Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743

More information

Access requests to County streets and roadways are processed through one of the following methods:

Access requests to County streets and roadways are processed through one of the following methods: 13.1 GENERAL APPLICATION PROCESS Access requests to County streets and roadways are processed through one of the following methods: A. Planned Developments may set general locations for access points.

More information

Doing a little can accomplish a lot. Proposed Change of Municipal Class Environmental Assessment from Schedule from B to A+

Doing a little can accomplish a lot. Proposed Change of Municipal Class Environmental Assessment from Schedule from B to A+ Doing a little can accomplish a lot. Proposed Change of Municipal Class Environmental Assessment from Schedule from B to A+ Erin Mills Parkway Intersections at Dundas Street and Burnhamthorpe Road Index

More information

Frequently asked questions

Frequently asked questions DECEMBER 2013 Frequently asked questions Q. What is the M1-M2 project? A. The proposed M1-M2 is a tolled motorway linking the M1 Pacific Motorway (formerly F3 Freeway) at Wahroonga to the M2 Motorway at

More information

Lincoln Downtown Master Plan Update

Lincoln Downtown Master Plan Update Lincoln Downtown Master Plan Update Table of Contents Executive Summary........................................... 1 Complete Streets Framework.................................... 3 Promenade Creating

More information

CHAPTER 4 PROJECT DEVELOPMENT PROCESS AND ENGINEERING CONSIDERATIONS

CHAPTER 4 PROJECT DEVELOPMENT PROCESS AND ENGINEERING CONSIDERATIONS CHAPTER 4 PROJECT DEVELOPMENT PROCESS AND ENGINEERING CONSIDERATIONS TABLE OF CONTENTS 4-1 OVERVIEW... 4-1 4-2 PROCEDURE... 4-2 4-2.1 Considerations... 4-2 4-2.2 Alternative Corridor Evaluation... 4-4

More information

US-95 Northwest Corridor Initial Financial Plan

US-95 Northwest Corridor Initial Financial Plan T G YO N N HI O N N WA S NW CORRIDOR ROA D US-95 Northwest Corridor Initial Financial Plan C AV E ENU L E TO KY A April 2009 TABLE OF CONTENTS INTRODUCTION----------------------------------------------------------------------------------

More information

University of Iowa Football Special Events Management Strategic Plan

University of Iowa Football Special Events Management Strategic Plan University of Iowa Football Special Events Management Strategic Plan April 2010 Prepared for Prepared by Table of Contents 1.0 Introduction... 1 2.0 Key Event Elements... 1 2.1 Event Characteristics and

More information

DRAFT DRAFT. Appendix B. Projects Table

DRAFT DRAFT. Appendix B. Projects Table DRAFT DRAFT Appendix B. Projects Table PRIMARY ERNATIVE Install median refuge island crossing to serve opposing bus stops at Highland 1 - Fairview Street from Highland St to S of W McFadden Av Enhanced

More information

PUBLIC MEETING & WORK SESSION

PUBLIC MEETING & WORK SESSION PUBLIC MEETING & WORK SESSION I-94 REHABILITATION PROJECT DETROIT Hosted by the Michigan Department of Transportation with assistance from INTRODUCTIONS Project Team 3 PURPOSE OF MEETING Part 1: Part 2:

More information

2013 ODOT Administered Cuyahoga County Construction Projects Listed in order by route (Interstate Route, U.S. Route, State Route, Local)

2013 ODOT Administered Cuyahoga County Construction Projects Listed in order by route (Interstate Route, U.S. Route, State Route, Local) 2013 ODOT Administered Cuyahoga County Construction Projects Listed in order by route (Interstate Route, U.S. Route, State Route, Local) * Denotes Active Projects Denotes minor impacts to traffic # Denotes

More information

100 Design Controls and Exceptions

100 Design Controls and Exceptions Table of Contents 100 Introduction... 1 101 Functional Classification... 1 101.1 General... 1 101.2 Urban & Rural... 1 101.3 Classification Used In ODOT Design Criteria... 1 102 Traffic Data... 2 102.1

More information

VAN WHITE BOULEVARD Open House - January 29, 2015

VAN WHITE BOULEVARD Open House - January 29, 2015 PUBLIC REALM IMPROVEMENTS Enhanced Park Programming, Performance Venue Seed Academy / Harvest Enhanced Streetscape Olson Memorial Hwy Trail Lighting Harrison Park Park Community Garden Plaza Wayfinding

More information

An Overview of Managed Lanes in the U.S.A. Darren Henderson, AICP

An Overview of Managed Lanes in the U.S.A. Darren Henderson, AICP An Overview of Managed Lanes in the U.S.A. Darren Henderson, AICP Today s s Discussion The Basics HOV Lanes Pricing Darren Henderson, AICP PB, Houston, TX Active Traffic Management The Latest Projects

More information

APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) To be considered for STP funding, a proposed project must

More information

Figure 4-21. L3: Level 2 SR 99 Elevated Light Rail Alternative Detail - 1 of 4

Figure 4-21. L3: Level 2 SR 99 Elevated Light Rail Alternative Detail - 1 of 4 4-34 SEE FIGURE 4-22 N 14TH ST ROOSEVELT WAY N 130th Street N 130TH ST NE NORTHGATE WAY N 0 1/4 Miles Elevated Light Rail At-Grade Light Rail Elevated Light Rail Station At-Grade Light Rail Station Figure

More information

Multi-Modal Corridor Degree of Complexity: High Cost/Benefit: High

Multi-Modal Corridor Degree of Complexity: High Cost/Benefit: High Multi-Modal Corridor Degree of Complexity: Cost/Benefit: Maintain the same level of service for Ensures continuous flow through the Might impact other transportation Consider road diet and/or different

More information

ACTION ITEM January 6, Routine Amendment to the Transportation Improvement Program (TIP)

ACTION ITEM January 6, Routine Amendment to the Transportation Improvement Program (TIP) ACTION ITEM January 6, 2011 To: From: Subject: Policy Board Charlie Howard Planning Director Routine Amendment to the 2010-13 Improvement Program (TIP) AT ISSUE Bothell, Edmonds, King County, Kitsap Transit,

More information

2013 Report Card for America s Infrastructure Findings

2013 Report Card for America s Infrastructure Findings 2013 Report Card for America s Infrastructure Findings Forty-two percent of America s major urban highways remain congested, costing the economy an estimated $101 billion in wasted time and fuel annually.

More information

Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain

Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain Effect on structures Uniform settlement - no concerns Angular distortion - causes damage due to tensile strain 1/500 - safe limit for no cracking of buildings 1/150 - potential structural damage 36 37

More information

The Northwest Corridor Project on Track!

The Northwest Corridor Project on Track! The Northwest Corridor Project on Track! I-575 Northwest Corridor (/I-575) Project Newsletter Spring 2012 Vol. 1, No. 5 "Adding new lanes - and the new capacity they will provide - is critical to a continued

More information

A Review of Transit Technology Specifications

A Review of Transit Technology Specifications . Transit Technologies Worksheet A Review of Transit Technology Specifications 1 2 3 4 5 6 1. Heavy Rail Transit 2. Commuter Rail Transit 3. Light Rail Transit 4. Modern Streetcar 5. Heritage Trolley 6.

More information

WASHINGTON S TOP TRANSPORTATION CHALLENGES:

WASHINGTON S TOP TRANSPORTATION CHALLENGES: WASHINGTON S TOP TRANSPORTATION CHALLENGES: Meeting the State s Need for Safe, Efficient Mobility and Economic Vitality APRIL 2015 202-466-6706 tripnet.org Founded in 1971, TRIP of Washington, DC, is a

More information

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS UPDATED: 01/31/14 SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS Q. 1. What are the County s plans for Seminole Pratt Whitney Road between SR 80 (Southern Blvd) and the Bee Line

More information

14-97. 14-97.002 Definitions. For the purposes of this rule chapter the following definitions shall apply unless the context clearly shows otherwise:

14-97. 14-97.002 Definitions. For the purposes of this rule chapter the following definitions shall apply unless the context clearly shows otherwise: 14-97 14-97.001 Purpose. This rule chapter sets forth an access control classification system and access management standards to implement the State Highway System Access Management Act of 1988. The implementation

More information

ADA POST INSPECTION CHECKLIST. Job No. Route County Location

ADA POST INSPECTION CHECKLIST. Job No. Route County Location ADA POST INSPECTION CHECKLIST Job No. Route County Location SIDEWALKS All sidewalks constructed within the project limits are ADA compliant. Sidewalks are 5 or greater in width. Exception, existing sidewalks

More information

Create good jobs within Alameda County by requiring local contracting that supports residents and businesses in Alameda County.

Create good jobs within Alameda County by requiring local contracting that supports residents and businesses in Alameda County. New transportation investments are needed throughout Alameda County. Over the term of this Plan, Alameda County s population will grow by almost 30%, and the senior population will double. This means more

More information

**The Winter 2010 edition of The Road Ahead newsletter is available online.

**The Winter 2010 edition of The Road Ahead newsletter is available online. RTC e-news Brief for January 29, 2010. This e-newsletter was created to keep you informed about key activities and issues pertaining to Your RTC. I encourage you to share this information with your board

More information

Planning for the Future. Phase 2: Exploring the Options Consultation Discussion Guide

Planning for the Future. Phase 2: Exploring the Options Consultation Discussion Guide Planning for the Future Phase 2: Exploring the Options Consultation Discussion Guide March I April 2013 George Massey Tunnel Replacement I WELCOME Welcome Thank you for participating in Phase 2: Exploring

More information

MONTGOMERY VILLAGE FOUNDATION, INC. TRANSPORTATION POLICY

MONTGOMERY VILLAGE FOUNDATION, INC. TRANSPORTATION POLICY MONTGOMERY VILLAGE FOUNDATION, INC. TRANSPORTATION POLICY BACKGROUND Montgomery Village is one of the oldest and largest planned communities in Maryland. Located in the heart of Montgomery County, the

More information

Implementation Strategy

Implementation Strategy Implementation Strategy 6 The following implementation strategy defines strategic points of intervention for complete streets programming, including visioning, goal-setting, local agency plans, coordination

More information

Transportation Infrastructure Asset Management

Transportation Infrastructure Asset Management 2015 NW Region TTAP& BIA Symposium Transportation Infrastructure Asset Management March, 2015 Happy Longfellow, PE hlongfellow@parametrix.com (206) 394-3649 ASSET MANAGEMENT OVERVIEW What? Why? How? Inventory

More information

Road Repaving and Street Safety Bond Quarterly Status Report presented to the Citizens General Obligation Bond Oversight Committee As of March 2016

Road Repaving and Street Safety Bond Quarterly Status Report presented to the Citizens General Obligation Bond Oversight Committee As of March 2016 Road Repaving and Street Safety Bond Quarterly Status Report presented to the Citizens General Obligation Bond Oversight Committee As of March 2016 Overview of RRSS Bond Scope and Budget (including accountability

More information