1 ROADSIDE / LANDSCAPE DEVELOPMENT CONSTRUCTION INSPECTION HANDBOOK Commonwealth of Pennsylvania Department of Transportation Bureau of Design Publication No Edition

2 INTRODUCTION - Roadside Development, also known as Landscape Development, is an integral part of all highway construction projects. The necessity of re-vegetating bare soil areas created during construction is of prime importance in preventing soil erosion that can lead to water pollution on or off the construction right-of-way. The application of various types of seed and soil supplements is a major factor in controlling soil erosion. Planting trees, shrubs, and other ground cover plants at various locations within the right-of-way helps to create a more pleasing, functional and harmonious landscape that imparts an aesthetic and beautifying property to the construction scarred roadsides and the surrounding environs. Plants are also major construction items in the development of environmental mitigation areas such as wetland creation, wildlife habitat replacement, and stream relocations. Many of these mitigation areas are required to be monitored beyond the end of the construction to verify that the plants are growing and providing the desired mitigation. PENNDOT and consultant construction inspectors receive little or no formal training in how to inspect roadside development construction operations. These work operations are found in the Section 800 series of Publication 408 Specifications, and on Roadway Construction Standard Drawing RC-91M. This handbook is developed to provide a handy reference, office/field guide to assist the Project Inspector in using criteria that will help to determine whether landscape plants and other materials as well as installation operations are acceptable. The handbook should also help to eliminate the often subjective nature of approving plants and other landscape material prior to installation and their ultimate acceptance at the end of the construction project. The handbook is divided into various Sections that correspond to the Section 800 series of Publication 408. Benefits derived from using this handbook may include: Instill respect for using proper landscape materials and construction methods. Raise the expectations for landscape planting survival and seeding establishment. Promote the timely and proper training of inspection personnel. Encourage landscape contractors to police their industry ranks in providing the proper size and quality of plants and other landscape material. Encourage proper planting operations that are necessary for a successful completion of the Landscape Plan and plant survival. Encourage cooperation between project inspectors, district, and central office roadside personnel. Chinese proverb: "A journey of a thousand miles, begins with the first step"

3

4 ROADSIDE DEVELOPMENT INSPECTION GUIDE SECTION 801 STOCKPILING TOPSOIL OR TOPSOIL MIXTURE SECTION 802 TOPSOIL FURNISHED AND PLACED SECTION 803 PLACING STOCKPILED TOPSOIL OR TOPSOIL MIXTURE

5 Table of Contents Page Section Stockpiling Topsoil & Topsoil Mixture Topsoil Topsoil Mixture Topsoil Collection Topsoil Mixture Collection Glossary Section Topsoil Furnished and Placed Top Soil Glossary Section Placing Stockpiled Topsoil and Topsoil Mixture Material Placing Stockpiled Topsoil Placing Stockpiled Topsoil Mixture Glossary

6 Section 801 Stockpiling Topsoil or Topsoil Mixture Material collected within the Project Site Topsoil: Existing, acceptable friable loam (surface soil) found within the project right-of-way. Topsoil material that is reasonably free of subsoil, clay lumps, brush, roots, weeds, other objectionable vegetation, stones, other foreign material larger than 50 mm (2 inches) in any dimension, litter, and/or other material unsuitable or harmful to plant growth. 2.0 Topsoil Mixture: Existing, shredded/slashed, top-growth vegetation and soil collected (stripped) from within the project right-of-way. Material is derived from designated vegetation under 100 mm (4 inches) in caliper that is shredded/slashed by special equipment during clearing and grubbing operations to create material with a maximum rough size of 300 mm (12 inches) long and 50 mm (2 inches) in diameter. The vegetative slashings can include crushed or shredded branches, stems, bark, leaves, seeds and roots. This material is collected and then collected and mixed with the top 200 mm 300 mm (8 to 12 inches) of under-laying soil. 3.0 Topsoil Collection: After clearing and grubbing operations Direct designated topsoil removal (collection) operations where topsoil can be collected for future use. Ensure that topsoil removal does not contain undesired subsoil material. Verify that topsoil is not removed in wet or frozen condition. Approve location of stockpile for the collected topsoil. Stockpile should be located in an area where it will not conflict with other construction activities or require movement to another location. Approve stockpile size and shape of pile. Direct the temporary seeding and mulching of the stockpile to avoid potential loss of material from erosion. Verify the proper measurement of stockpiled material following Section 203.4(a)2. 3

7 4.0 Topsoil Mixture Collection: During clearing and grubbing operations Direct designated topsoil mixture removal (collection) operations where material is desired for future use. Approve location of stockpile for the collected topsoil mixture. Stockpile should be located in an area where it will not conflict with other construction activities or require movement to another location. Approve self-powered, land clearing shredding/slashing equipment. Equipment to demonstrate the ability to process vegetation material to the desired size and as specified. Verify that processed material meets the specified maximum rough size of 300 mm (12 inches) long by 50 mm (2 inches) in diameter. Direct collection of the organic vegetation slashings with the top mm ( 8-12 inches) depth of soil under-laying the designated slashed vegetation. Direct transport to approved stockpile area for future use. Approve stockpile size and shape of pile. Ensure designated material is not compacted at the stockpile. Verify that the stockpile is periodically watered to keep slashed vegetation moist and not allowed to dry out. Verify the proper measurement of stockpiled material following Section 203.4(a)2. 4

8 5.0 Glossary of Terms - Clay Mineral soil particles comprised of fine sized (0.002 mm and smaller) hydrous aluminum silicates and other material that becomes plastic when moist and hard when fired. Particles are smaller than silt. A clay soil will contain from 20 to 30 % clay particles. Friable A soil that is easily crumbled or pulverized. Loam A soil consisting of readily workable, friable mixture of varying proportions of clay, silt, sand and organic matter that drains well yet retains sufficient moisture to keep plants alive and growing. A larger percentage of clay in the soil will make the soil less friable. Optimum Moisture Content The point at which a soil will not absorb any more water. Organic Matter Material derived from living plant or animal organisms (decayed or alive) containing carbon compounds. Organic matter adds nutrient value to the soil and improves workability by modifying the soil texture. Organic matter in clay soils makes them more porous, faster draining and better aerated while giving added body to sandy soils by delaying the too fast drainage of the soil. Sand Loose, granular mineral material that results from the disintegration of rocks with particles smaller than gravel (0.2 to 0.02 mm) but coarser than silt. A sandy soil will contain 85% or more of sand with a maximum of 10% clay. Silt - Mineral rock particles usually 0.02 to mm in diameter. A silty soil will contain 80% or more of silt and less than 12% clay. Stockpile A collection point for material stored in one area and generally kept for future use. Topsoil Natural surface layer of soil that includes varying proportions of clay, silt, sand and organic matter packed together to form a semi-rigid, sponge-like mass capable of growing and sustaining vegetation. Topsoil is considered the best growing medium for crops and other vegetation. Topsoil Mixture Vegetation matter derived from cutting, crushing, shredding or slashing of small diameter vegetation. The slashed material is collected with the under-laying soil and will contain a seed bank of the various cut top-growth material. This process is used to help re-vegetate areas with the same material that was collected. Vegetation Slashings Downed vegetative material derived from using special land clearing equipment designed to shred, crush, cut and otherwise clear and grub ground surfaces covered by light woods or brush. 5

9 Section 802 Topsoil Furnished and Placed 1.0 Topsoil An acceptable, friable loam reasonably free of subsoil, clay lumps, brush, roots, weeds and other objectionable vegetation, stones and other foreign matter larger than 50 mm (2 inches) in any diameter, litter, and other material unsuitable or harmful to plant growth. Natural surface soil consisting of not less than 2% and not more than 10% organic matter as determined by AASHTO T-194 parameters. Acceptable gradation analysis of soil particles: 100% passing 50 mm (2 inch) sieve 75 % passing 4.75 mm (No.4) sieve 60% passing 2 mm (No.10 ) sieve The sand, silt and clay particles passing the 2 mm (No. 10) sieve should be within the following ranges: Sand - 5 to 70%, Silt - 10 to 70%, Clay - 5 to 36%. Verify that the topsoil presented for use is obtained from outside the project right-of-way where the soil quality has proven the ability to grow crops. Verify acceptance of the quality of the topsoil source, depth of topsoil to be removed and method of removal prior to Contractor s operations. Require certification of topsoil following Section (b)3. Verify the re-conditioning of areas where topsoil was removed following Section Verify that the areas to receive topsoil have been graded to the desired project soil surface elevations. Ensure that stones 50 mm (2 inches) or larger in dimension and any foreign material have been removed from the topsoil placement area. This operation may require mechanical raking or other approved methods. Verify at the prepared areas, the proper placement, spreading and compaction of the placed topsoil material at the specified 100 mm (4 inches) uniform depth. Acceptable allowance is 40 mm (1-1/2 inches). Instruct the removal of over depth topsoil unless other wise agreed upon in writing. Topsoil should not be placed in a wet or frozen condition. Note: Topsoil can be applied in a moisten condition but should not be in a overly wet, sodden condition. Verify that the proper weighted rollers are used for compacting the topsoil to the desired depth. 6

10 Verify the number and size of the hauling vehicles delivering topsoil to the project areas following Section (b). 2.0 Glossary of Terms - Clay Mineral soil particles comprised of fine sized (0.002 mm and smaller) hydrous aluminum silicates and other material that becomes plastic when moist and hard when fired. Particles are smaller than silt. A clay soil will contain from 20 to 30 % clay particles. Friable A soil that is easily crumbled or pulverized. Loam A soil consisting of readily workable, friable mixture of varying proportions of clay, silt, sand and organic matter that drains well yet retains sufficient moisture to keep plants alive and growing. A larger percentage of clay in the soil will make the soil less friable. Organic Matter Material derived from living plant or animal organisms (decayed or alive) containing carbon compounds. Organic matter adds nutrient value to the soil and improves workability by modifying the soil texture. Organic matter in clay soils makes them more porous, faster draining and better aerated while giving added body to sandy soils by delaying the too fast drainage of the soil. Sand Loose, granular mineral material that results from the disintegration of rocks with particles smaller than gravel (0.2 to 0.02 mm) but coarser than silt. A sandy soil will contain 85% or more of sand with a maximum of 10% clay. Silt - Mineral rock particles usually 0.02 to mm in diameter. A silty soil will contain 80% or more of silt and less than 12% clay. Topsoil Natural surface layer of soil that includes varying proportions of clay, silt, sand and organic matter packed together to form a semi-rigid, sponge-like mass capable of growing and sustaining vegetation. Topsoil is considered the best growing medium for crops and other vegetation. 7

11 Section 803 Placing Stockpiled Topsoil and Topsoil Mixture 1.0 Material See Sections 801 and 802 of this Inspection Guidebook. 2.0 Placing Stockpiled Topsoil Verify that the topsoil is removed from the project stockpile(s) using an acceptable method that does not contaminate the topsoil with foreign material including subsoil, stones, litter, rubbish, etc. Follow inspection guidelines for placing the stockpiled topsoil from Section 802 Topsoil Furnished and Placed of this Guidebook. Verify the number and size of the hauling vehicles delivering the stockpiled topsoil to the project areas to receive this material following Section (b). Verify the return of any unused material to the stockpile and that the stockpile is uniformly re-shaped and conditioned following Section Placing Stockpiled Topsoil Mixture Verify that the surface preparation for placing the topsoil mixture has been completed as specified and prior to bringing the material from the stockpile. Preparation to include: Surfaces to be scarified and loosened to a depth of 150 mm ( 6 inches) lateral to the slope face. Loose soil to be moistened to the optimum moisture content. Avoid excessive runoff of water from this operation. Debris and any other foreign material 50 mm (2 inches) or larger in any dimension to be removed. Verify the topsoil mixture is placed and compacted to a 150 mm (6 inch) depth after compaction. Application tolerance is 25 mm (1 inch). Verify that the specified sheepsfoot roller is used to bond the topsoil mixture to the soil prepared soil surface and provides a firm, stable, rough textured surface. If areas can not be accessed with the desired sheepsfoot roller, verify and approve the use of another roller type having a mass (weight) not over 180 kg/m (120 lbs/ft) width of the roller. Rolling is a necessary step to help incorporate and bond the material to the loosened soil surface to encourage rooting and seed bank germination from the collected material. 8

12 Verify that the topsoil mixture is not placed in a wet or frozen condition. Note: Topsoil can be placed when moist but should not be placed in an overly wet, sodden condition. Verify the number and size of the hauling vehicles delivering the stockpiled topsoil mixture to the project areas to receive this material following Section (b). Verify the return of any unused material to the stockpile and that the stockpile is uniformly re-shaped and conditioned following Section Glossary of Terms - Stockpiled Topsoil: Existing, acceptable friable loam (surface soil) found within the project right-of-way, collected and stockpiled for future use. Stockpiled material is reasonably free of subsoil, clay lumps, brush, roots, weeds, other objectionable vegetation, stones, other foreign material larger than 50 mm (2 inches) in any dimension, litter, and/or other material unsuitable or harmful to plant growth. Stockpiled Topsoil Mixture: Existing, shredded/slashed, top-growth vegetation and soil collected (stripped) from within the project right-of-way and stockpiled for future use. Material is derived from designated vegetation under 100 mm (4 inches) in caliper that is shredded/slashed by special equipment during clearing and grubbing operations to create material with a maximum rough size of 300 mm (12 inches) long and 50 mm (2 inches) in diameter. The vegetative slashings can include crushed or shredded branches, stems, bark, leaves, seeds and roots. This material is collected and then collected and mixed with the top 200 mm 300 mm (8 to 12 inches) of under-laying soil. 9

13 NOTES

14

15 ROADSIDE DEVELOPMENT INSPECTION GUIDE SECTION 804 SEEDING AND SOIL SUPPLEMENTS SECTION 809 SODDING

16 Table of Contents Section Seeding and Soil Supplements Seed Type-Formulas Metric Unit...4 English Units Pulverized Agricultural Limestone Commercial Fertilizer Slow Release Fertilizer Seed Inoculant Herbicides Water Application of Seed & Soil Supplements Tillage Application of soil supplements Application of Inoculant Application of seed Hydraulic seeding Rolling Herbicides Liability and Compliance Maintenance of Area...16 Page 2

17 11.0 Glossary of Terms...16 Section Sodding Sodding Materials Sod Lime Fertilizer Water Installation of Sod Site Preparation Sod Placement Maintenance of Sodded Area Glossary of Terms

18 Section Seeding and Soil Supplements 1.0 Seed Type-Formulas (Metric Units) 4

19 1.0 Seed Type-Formulas (English Units) 5

20 2.0 Pulverized Agricultural Limestone - Check product labels for correct percentage (%) of oxides, calcium carbonate, & fineness. Verify that the limestone product provides an Effective Neutralizing Power (E.N.P.) of not less than 64. Limestone products with E.N.P. values less than 64 should be rejected. Check delivery invoices/shipping documents. Verify quantity & limestone type delivered to the project. Quantity calculation: For the specified limestone application rate of 435 kg / 1,000 m2 (800 lbs/1,000 s.y.) and limestone delivered in bags weighing 50 lbs, there should be 16 bags of limestone delivered for each 1,000 s.y. of project lime area. The applied limestone material is to be incorporated into the top 2 inches of the soil being amended if applied dry in a separate operation. Limestone can also be applied as part of a hydroseeding operation. Gather / count empty limestone bags to verify that the specified quantity has been used on the project. Agricultural Limestone Information: % Total Oxides 50 (total calcium oxide and magnesium oxide equivalent) % Calcium Carbonate equivalent - % by mass (weight) 89 % Fineness - minimum % by mass (weight) material passing No. 20 sieve 95 material passing No. 60 sieve 60 material passing No. 100 sieve 50 Pulverized agricultural limestone is the most common material used to neutralize soil ph. Limestone consists either of calcium carbonate (calcitic limestone) or calcium/magnesium carbonate (dolomitic limestone). By maintaining a proper soil ph, you can increase the effectiveness of fertilizers and herbicides which do not work as well in excessively acidic soil. Many beneficial soil microorganisms do not thrive in strongly acidic soils either. Different liming materials have different acid neutralizing capabilities. Determination of soil ph is a measurement of the acidity or alkalinity of a soil. The ph scale ranges from 0 (most acidic) to 14 (most alkaline). At ph 7, the soil is neutral, neither acidic or alkaline. Plant growth and plant nutrient availability from a soil are strongly influenced by soil ph. Most grass and other types of plants grow best between ph values of 6.0 to 7.2. While some acidic loving plants such as rhododendron, holly, azalea, etc. grow better in lower ph values from 5.2 to

21 Most Pennsylvania soils are naturally acidic. In an effort to maintain an optimum soil ph for our roadside plantings, we amend our soils with lime that will help to neutralize soil acidity during vegetation establishment. PENNDOT s lime application rate has been selected to provide a general benefit to most soils throughout PA without requiring extensive project site ph soil tests. Formula L (hard & red fescues) and Formula D (mainly tall fescues) prefer a ph of 6.0 to 6.5 while Formula B (mainly Kentucky bluegrass) prefers a ph of 6.5 to 7.2. At present, liquid lime is not approved for PENNDOT projects. Agricultural limestone products are regulated by the Pennsylvania Agricultural Liming Material Act of March 17, 1978 P.L. 15, No. 9. Agricultural limestone materials sold in the Commonwealth should have affixed on the outside of each package a plainly presented label or tag, or in the case of bulk sales, a delivery slip with the following information: 1. Name and principal office address of the manufacturer or distributor 2. Brand or trade name of the material 3. Identification of the product as to type of the agricultural liming material 4. Net weight of the agricultural liming material 5. The minimum % calcium oxide and magnesium oxide and/or calcium carbonate and magnesium carbonate. Sample Limestone Label 7

22 3.0 Commercial Fertilizer The specified commercial fertilizer is applied prior to or during the initial seeding operations. Verify fertilizer provided for general seeding and sodded areas is a dry formula of analysis. Verify that the specified application rate of 80 kg / 1,000 m2 (140 lbs / 1,000 s.y.) is applied. Quantity calculation: For the specified application rate of 140 lbs per 1000 s.y. and a fertilizer bag weighing 50 lbs, then three bags should be delivered for each 1,000 s.y. of seeded area. Check any other specified fertilizer analysis product to be provided on the project. Check invoice/shipping documents for correct quantities and types. Gather/count empty fertilizer bags to verify specified quantity has been used on the project. The applied fertilizer material is to be incorporated into the top 2 inches of the soil being amended if applied dry in a separate operation. Fertilizer can also be applied as part of a hydroseeding operation. Understanding Fertilizer Terms A complete fertilizer is one that contains nitrogen (N), phosphate (P), and soluble potash (K). The three numbers listed for analysis are the percentages of the three major elements in the bag. In a bag of fertilizer with the analysis , there is 10% nitrogen, 20% phosphate, and 20% soluble potash by mass (weight). If the bag is 80 lbs, then the 10% nitrogen present in the bag is 8 lbs, the 20% phosphate is 16 lbs, and the 20% potash is 16 lbs. The remaining 40 lbs of material in the bag is inert material. Generally, a quality fertilizer is guaranteed to be 10% total nitrogen (N) with 35% or more of the total nitrogen being water insoluble nitrogen (WIN) and is also known as slowrelease nitrogen. To determine the total % of nitrogen you must know the analysis and the percentage of WIN. This information will be listed on the bag. Divide the % of WIN by the total % of N, then multiply by 100. (Example: The WIN amount in an 80 lb bag of analysis fertilizer, with 4% WIN would be 4% divided by 10 x 100 or 40% of the total nitrogen present in the bag. This equates to 3.2 lbs of the 8 lbs of nitrogen is insoluble or slow release nitrogen). 8

23 4.0 Slow Release Fertilizer Dry Formulation Slow release fertilizer is a separate fertilizer application performed after germination of the seeded areas and prior to project completion. Direct the application of this fertilizer to the grassed areas seeded with Formula B, D, L and W. Do not approve application of this fertilizer during July or August when cool season grasses are generally dormant (not actively growing) or during periods of prolonged drought Ureaform Total Nitrogen (TN) Cold Water Insoluble (WIN) Nitrogen (WIN) Activity Index (AI) Urea Nitrogen 38.0% Minimum 25.0% Minimum 40.0% Minimum 3.5% Minimum to sulfur coated urea with a 7 day dissolution range of 20% - 30% IBDU Water Insoluble Nitrogen (WIN) Coarse grade (0.7 to 2.5 mm) 27.0% minimum Other fertilizer analysis as indicated. Check labels, invoices, & shipping documents to verify correct quantities & products. Gather/count empty slow-release fertilizer bags to verify specified quantity has been used on site. Verify that the proper application rate is applied using approved equipment. Generally, this material is provided in 50 lb bags. See sample calculation for number of bags needed for each fertilizer type in Section Ureaform to Sulfur Coated Urea IBDU 30 kg /1,000 m2 (50 lbs / 1,000 s.y.) kg /1,000 m2 (59 50 lbs/1,000 s.y.) 35 kg / 1,000 m2 (61 lbs / 1,000 s.y.) 9

24 Sample - Granular Nitrogen Fertilizer Label 10

25 5.0 Seed Determine if the correct seed formula is being used. Check labels, invoice and shipping documents for type being used. Seed is to be pre-tested for purity and germination analysis by the PA Department of Agriculture, Bureau of Plant Industry. Use premixed seed formulas. Check seed for seed inspection tag, stamped, dated, and signed by PA Department of Agriculture inspector. Inspection tag to be sewn or stapled to the outside of the seed bag. Do not use seed, unless it has been inspected and sampled as specified, or sampled as an individual seed species lot and mixed to the desired formula on the project under PENNDOT supervision. Do not use seed from non-sealed containers or seed that has been stored with herbicides. Verify that seed test date does not exceed 9 months. If seed test date is beyond 9 months, the seed will need to be re-tested for the desired specified criteria. Gather/count empty seed bags to verify specified seed quantities have been used for the various seed formulas. Verify that any designated certified seed has been provided. Certified seed types are Crownvetch, Kentucky Bluegrass, Perennial Ryegrass, Creeping Red Fescue, Chewings Fescue, Hard Fescue, and Birdsfoot Trefoil. Sample - Certified Seed label 11

26 Sample Seed Label 6.0 Inoculant - Commercial product containing a nitrogen-fixing bacteria culture used to treat leguminous seeds that enhances germination and growth. The inoculant is used with Seed Formulas C & W. Crownvetch is the leguminous seed in Formula C and Birdsfoot Trefoil is the leguminous seed in Formula W. Verify inoculant is appropriate for use with the selected seed type. 12

27 Gather/count empty inoculant packaging to verify specified quantity and type have been used on site as recommended by the inoculant manufacturer. Check expiration date of product. Do not approve inoculant for use if material is past the expiration date on the container. 7.0 Herbicides Water - Do not approve herbicide if it is not furnished in the manufacturer s labeled container. Gather/count empty herbicide packaging to verify specified quantity and product have been used. For controlling broadleaf weeds in areas seeded with Formula B or D. Verify the use of Type 1, Class C herbicide listed in Specification No. H-16 of the PA Department of General Services. Type 1 2, 4-D Formulations Class C Liquid amine salt formulations (Dimethylamine) Verify the use and source of relatively clean water, free of debris. 9.0 Application of Seed and Soil Supplements Tillage - Topsoiled Areas, 1:3 (3:1) and flatter, verify that the top 50 mm (2 inches) of the designated soil to be seeded has been loosened by disking, harrowing, or by another acceptable method to help the seed lodge in better contact with the soil. Glazed, crusted, or over compacted soil surfaces should also be tilled or scarified prior to seeding. Non-Topsoiled Areas, 1:3 (3:1) and flatter, tillage is only performed when directed. Verify that all surface irregularities and depressions are filled and leveled. Ensure that all metal objects and stones larger than 50 mm (2 inches) diameter and any other debris that will be detrimental to mowing operations have been removed prior to the seeding operation. 13

28 9.2 Application of Soil Supplements - Check labels of limestone and fertilizers to verify correct products are being used Check for correct application rate. 9.3 Application of Inoculant - Only required for Seed Formulas C & W. Verify proper inoculant for the seed type used. Verify inoculant is not applied to soon and becomes inactive. Seed must be re-inoculated if not sown within 24 hours of adding the inoculant. Verify that 4 times the normal inoculant amount is used if the inoculated seed is to be sown in a hydraulic seeder. If the inoculated seed is held in a slurry with fertilizers for more than 1 hour before use, the inoculant must be re-applied or the leguminous seed must be sown separately. 9.4 Application of Seed - Check seed bags with specifications to verify proper formula is used. Check the inspection date on the seed bags to verify the test seed date of the seed. Verify seeding is accomplished within the desired calendar dates established for each seed formula. Formula B, D, and L March 15 to June 1 and August 1 to October 15 Formula C Ryegrass portion: March 1 to October 15 Crownvetch portion: Anytime except Sept. and Oct. Formula E March 15 to October 15 Formula W April 15 to June 15 and August 16 to September 15 The seeding dates can be extended if project conditions warrant. Verify what specified full treatment or 50% partial treatments will be used and schedule the time to finish the seeding within the next specified seeding dates. Periodically check the seeding equipment and verify the specified seed application rate is being used and that the seed is being evenly distributed. Formula B 11.5 kg / 1,000 m2 (21.0 lbs / 1,000 s.y.) Formula C 5.00 kg / 1,000 m2 ( 9.0 lbs / 1,000 s.y.) 14

29 Formula D 11.5 kg / 1,000 m2 (21.0 lbs / 1,000 s.y.) Formula E 5.5 kg / 1,000 m2 (10.0 lbs / 1,000 s.y.) Formula L 13.0 kg / 1,000 m2 (24.0 lbs / 1,000 s.y.) Formula W 5.5 kg / 1,000 m2 (10.5 lbs / 1,000 s.y.) Other Special Provision Formulas as specified Check seed application technique to be used on the project. Helicopter Hydroseeding Broadcast Drill Hand Seeding Hydraulic Seeder (Hydroseeder) Broadcast Typical Seeding Methods Drill 9.5 Hydraulic Seeding (Hydroseeding) Operations Rolling - If hydroseeding is the sowing technique used; the limestone, fertilizer, and seed can be mixed together in the hydroseeder tank and applied to the soil surface in one operation. Rolling should not be used on a steeply sloped site. Rolling is desirable for lawn type turf areas that will be well maintained by mowing. Many roadside seeding applications will not need to be rolled. Determine the need for rolling the project seeding areas. Verify weight of roller does not exceed 100 kg/m (65 lbs/ft.). Verify that rolling when applicable is performed after seeding is applied. Do not approve rolling if soil is wet or frozen. 9.7 Herbicides - Check labels, invoices, shipping slips to verify correct product is used. 15

30 Verify herbicides are used only when and where specified. Verify that the herbicide is prepared in accordance with manufacturer s mixing directions and that the proper application rate is used. Verify pesticide applicator s PA Department of Agriculture license is current and that he is licensed to apply the designated herbicide. Verify the proper application equipment is used. 9.8 Liability and Compliance Conduct any necessary testing or sampling. Direct re-application of seeding and soil supplement construction operations necessary to establish the desired vegetative surfaces Maintenance of Area - Verify that maintenance mowing is preformed as indicated or directed throughout the entire project length until final acceptance. Coordinate any maintenance needs and directions with the District Roadside Specialist. Verify that noxious weed plant growth (defined by law) within the project limits is controlled by approved herbicides or cutting Glossary of Terms - Certified Seed Seed that is certified by the seed grower to be the seed type and variety requested and that it has been grown, collected, conditioned, cleaned and inspected under regulated seed grower industry methods. Hydraulic Seeder Mechanical equipment designed to blow seed, fertilizer and mulch products either separately or in combination in a water based slurry onto soil surfaces. Hydraulic seeder or hydraulic seeding is the proper generic terms used for this equipment and the application operation. Hydroseeder and hydroseeding are the more commonly used terms. Soil Supplements Material such as pulverized agricultural limestone, commercial fertilizer and slow release fertilizer that is added to the soil to be seeded. The supplements help to amend various soil properties to enrich the soil and promote better grass establishment. 16

31 Section Sodding 12.0 Sodding Materials Sod - Verify that the sod being used conforms to the current edition of the Turfgrass Producers International s Guideline Specifications to Turfgrass Sodding. Check delivery/shipping invoices. Every shipment of turfgrass sod should be accompanied by an invoice or sales slip indicating whether the material is of a single grass variety, a blend or a mixture. The invoice will also label the quality of the turfgrass sod. Check sod against the following guidelines: Certified Turfgrass Sod cultivated of two or more approved Kentucky bluegrass varieties. A bluegrass blend is a blend of 2 or more varieties of Kentucky bluegrass. The names of the varieties and percentage of the original seed blend is available from the sod producer upon request. Contains not more than 10% of other fine turf grass species. Entirely free from weeds, as defined in the Pennsylvania Seed Act of 1965 and amendments. Grown in a cultured mineral soil. Certified by the Pennsylvania Department of Agriculture or the Department of Agriculture of the state from which the sod is obtained. Rectangular machine sections 300 mm (12inches) to 600 mm (2 feet) to 1800mm (6 feet) long, with a uniform soil thickness of approximately 20 mm ( 3/4 inch) excluding top growth and thatch. Do not accept broken sections or sections having torn or uneven ends. The strength of the sod is tested by holding a piece of sod by it s narrow end and raising it overhead without the sod tearing or falling apart. Grass height, maximum 40 mm (1-1/2 inches). Soil/root zone in well-moistened condition. Fresh turfgrass sod will be moist not hard and dry. The grass blades will be dark green and cool to the touch. Relatively free of thatch up to 15 mm ( 1/2 inch) uncompressed thickness acceptable. Net grown sod may be approved for use. Verify that a representative sample of the sod meets the desired specifications Lime - See Section 2.0 of the Section 804 Guideline Fertilizer - See Section 3.0 of the Section 804 Guideline. 17

32 12.4 Water - See Section 8.0 of the Section 804 Guideline Installation of Sod - Verify by checking shipping invoice or sales slips that sod has been placed within 36 hours after having been cut at the sod farm supplier. Verify that the sod is kept in temporary storage and kept moist and protected from drying by sunlight or wind if contractor cannot install when or as specified. Sod should be unrolled as soon as possible after delivery to the project site. The uniformity of the sod for texture, mowed height, and overall quality can be determined by placing several pieces of sod on the ground and looking for extreme variations and any visible weeds Site Preparation - Verify that any specified soil preparation or topsoiling has been completed to the required depths prior to sod installation. 2.2 Sod Placement - Stones and other foreign debris 50 mm (2 inches) or larger should not be present Sod bed should be at proper depth so that the top of the sod will be flush with the surrounding finished grade. Verify that the soil surface to be sodded is thoroughly moistened to point of round-off prior to planting. Verify that all soil supplements have been properly applied. Verify that sod is placed when moisture and temperature conditions are suitable. Do not permit sod cutting or placement of sod when temperature is lower than 0 º C (32º F). Do not permit placement of frozen sod. Verify that sod is placed by hand, with tight joints, no overlap, and in straight lines with rows placed parallel to and tight against each other. Verify that the sod is adequately watered to full depth saturation point to close joints and ensure close contact between the sod and the under lying soil. Initial watering is incidental to the sod installation. Verify that the sod is tamped to obtain a smooth, even sod surface, free from bumps and depressions. Transverse joints are to be staggered. 18

33 Pitchforks and other tools that could damage the sod are not permitted for use in laying the sod. Do not approve any sod that is dumped from vehicles. Sod must be carefully handled and unloaded from the delivery vehicles. Verify that the sod is rolled, if necessary to smooth out installation and that the roller weight is no more that 100 kg/m (65 lbs./ft.) of width. Direct this operation when necessary. In ditches and on slope areas,1:3 (3:1) or greater, verify that each strip of sod is staked securely using at least one wood stake for each 0.2 m 2 (2 square feet) of sod. Wooden stakes should be 13 mm x 25 mm ( 1/2 inch x 1 inch) and with a length 200 mm (8 inches) to 300 mm (12 inches). Stakes should be driven flush with the sod surface, with the wide face parallel to the slope contour. 3.0 Maintenance of Sodded Area - Verify that site is properly maintained until the project has been accepted. Maintenance measures may include repeated watering, mowing and repairs or replacement of sod in areas that fail to show a uniform growth of grass, or are damaged in any way. Direct additional watering to keep sod alive after the initial installation. Subsequent watering to keep grass alive until final acceptance of the project is paid for separately. Do not permit maintenance mowing of the sodded area until the sod has firmly rooted in place. Maintenance mowing is the mowing necessary to keep the area looking neat and to keep the turfgrass sod at a desired height of approximately 40 mm (1-1/2 inches). Direct mowing operations on a regular schedule as necessary during the growing season until final acceptance of the project. The initial mowing is considered incidental to the sod installation while subsequent maintenance mowing is paid separately. 19

34 4.0 Glossary of Terms Certified Turfgrass Sod A superior sod grown from certified, high quality seed of known origin or from plantings of certified grass seedlings or stolons. The sod is inspected and certified by the PA Department of Agriculture to assure satisfactory genetic identity and purity, overall high quality and freedom from noxious weed plants at the time of harvest. The sod must meet the published PA Department of Agriculture standards for certification. The turfgrass sod is a living grass product that is grown and harvested with a living root mass system that can be transported and transplanted onto a prepared soil area to quickly establish a grassed surface. Cultured Mineral Soil Soil that is amended to provide a good quality textured soil with the desired proportions of clay, sand, shale and organic matter as a growing medium for turfgrass sod production. Kentucky Bluegrass - A cool-season grass with dark green, medium texture leaf blades that forms a strong uniform sod via rhizomes (roots). Bluegrass thrives in sunny locations but goes into summer dormancy in excessively hot, dry conditions without irrigation. It has medium drought tolerance. This grass is the primary grass type grown for lawns. Net Grown Turfgrass Sod Turfgrass sod grown in a soil reinforced with a net material that allows the roots to intertwine into the net material. Thatch Accumulated, un-decomposed and usually compacted grass clippings that have built up in the sod and can adversely prevent the absorption of water, fertilizer and air to the roots of the sod. Turfgrass - Widely adapted grass surface lawn formed by turf-type producing grasses such as bluegrasses, perennial ryegrasses, fine fescues, or tall fescues. Turfgrass withstands moderate foot traffic and recovers quickly from occasional abuse. Sod - The grassed, upper layer of the ground surface containing grass top-growth (grass leaf blades), the grass root system, and the soil in which the roots grow. Turfgrass sod and sod is used interchangeably in this document. 20

35 NOTES

36

37 ROADSIDE DEVELOPMENT INSPECTION GUIDE SECTION 805 MULCHING

38 Table of Contents Page 1.0 Mulch Seeded Areas Hay Straw: Wood Fiber Pellet Mulch: Planting and Other Areas Tanbark Shredded Bark Washed Gravel: Sewage Sludge Compost: Wood Chips Mulch Binders Recycled Cellulose Fiber Wood Fiber Nonasphaltic Emulsion Polyvinyl Acetate Recycled Cellulose Fiber/ Wood Fiber Mixture Mulch Control Netting Plastic Netting Coconut Coir

39 4.0 Weed Barrier and Weed Control Mats Weed Barrier Mat Weed Control Mat Staples Wood Stakes Bonded Fiber Matrix (BFM) Polymer or Hydrocolloid Binder Matrix Gypsum Binder Matrix Application of Mulching Materials Mulching Seeded Areas Mulch Control Netting Bonded Fiber Matrix Mulching Planted Areas Mulch Maintenance Glossary of Terms

40 1.0 Mulch Mulch is a protective covering spread on the ground to help conserve soil moisture, maintain even soil temperatures, prevent soil erosion, control weeds and eventually, if biodegradable material is used, decompose to enrich the soil. The recommended mulch depths will vary from product to product. Mulch must be free from foreign material, coarse stems, mold, substances toxic to plant growth, and mature seed bearing stalks or roots of prohibited and noxious weeds, as defined by law. 1.1 Seeded Area Either one or a combination of the following will be accepted: Check labels, shipping slips, and/or invoices to verify that the specified mulch is being used on the project seeded areas. Count number of bales, bags or delivery vehicles (for loose mulch material) delivered to the project. Verify that the mulch application rate follows the specifications. Hay: Timothy hay, mixed clover and timothy hay, or other acceptable native or forage grasses, well-cured to less than 20% moisture content, by mass (weight); usually delivered in bound bales with an average weight of lbs. Straw: Either wheat or oat straw, reasonably free of visible seed, well cured to less than 20% moisture content, by mass (weight); usually delivered in bound bales with an average weight of lbs. Wood Fiber: Delivered to site in plastic wrapped (net wt. 60 lb) bags Count number of bags delivered to site. Wood fiber is specially prepared, biodegradable, air-dried wood fibers manufactured from 100% wood chips or bark from lumber mill processing operations. Tinted with nontoxic, green dye and containing an organic tackifier approved for use with wood fibers; manufactured to be applied with hydraulic seeding equipment; and meeting the following requirements: Moisture Content Organic Matter (Oven-Dried Basis) Water Holding Capacity (Grams of Water per 100 Grams of Fiber) 15% Maximum 95% Minimum 1000 Minimum Tackifier Content (Mass / Weight) 2.5% to 3.5% 4

41 Pellet Mulch: A biodegradable, water-absorbing, paper-based pellet that when wetted loses its pellet shape, breaks down and adheres to other pellets, forming a thin, protective mulch mat. Delivered in 50 lb. bags. Meeting the following requirements: Paper Content 85% Fertilizer 5% Polyacrylate 2 to 5% Moisture Content 5 to 8% Pellet Dimensions Absorption Potential 3 mm (1/8-inch) diameter, 6 mm to 19 mm (1/4 to 3/4-inch) length Minimum, 3 times dry weight 1.2 Planting and Other Areas Check labels, shipping slips, and/or invoices to verify that the specified mulch is being used on planting areas. Generally delivered by loose bulk load; verify delivery vehicle size and volume of material. Verify that application rate follows the specifications. Tanbark: Fibrous, shredded, ground or chunked, aged tanbark. Free from insect life, not decomposed, and between 6 mm to 50 mm (1/4 -inch to 2 inches) in any dimension. Shredded Bark: Shredded, chunked or ground pieces of predominantly aged, but not decomposed, hardwood or pinewood tree bark. Free of excessively fine particles and having a general size range of 6 mm to 50 mm (1/4-inch to 2 inches) in any dimension. Washed Gravel: Uncrushed, washed, No. 67 Coarse Aggregate, less than 50 mm (1-inch) in size and having 90% - 100% pass the 19 mm (3/4-inch) square sieve openings. See Pub 408 Section 703.2, Table C for other size and grading criteria. Sewage Sludge Compost: A blend of secondary, dewatered sewage sludge and wood chips, composed for at least 21 days and cured from 30 to 60 days at a PA 5

42 DEP permitted site. Free from foreign material and substances toxic to plant growth, non-burning, weed free, screened, and meeting the following requirements: Minimum of 50% Organic Matter - (Oven-Dried Basis) Minimum of 100% Water Holding Capacity Particle Size -10 mm (3/8-inch) to 80 mm (3 inches) ph- 6.0 minimum Heavy Metals and Toxic Compounds (Based on Sewage Sludge Content) Maximum PPM Cadmium 25 Chromium 1,000 Copper 1,000 Lead 1,000 Mercury 10 Nickel 200 Zinc 2,500 PCBs 3 Verify that certified laboratory analysis was submitted with each shipment. Wood Chips: Chipped or ground wood material produced from predominantly live or non-decayed trees, logs, or brush including leaves or post-consumer lumber. General chip size range of 15 mm to 50 mm (1/2-inch to 2 inches) in any dimension and free of excessively fine stringy particles. Chips produced and stockpiled during clearing and grubbing operations or aged chips, at least 6 months old, from lumber mill operations of the desire size and free from foreign debris should also be accepted. Spent Mushroom Soil Compost: Compost material from organic substrate used in mushroom production that has been steam sterilized, then composted for a minimum of 90 days in well managed windrows and on a properly surfaced and protected composting pad and blended with ground brush (yard waste), recycled wood and/or composted bark. Meets the following requirements: Moisture content 60% Maximum Particle size 10 mm (3/8-inch) to 80 mm (3 inches) ph 5.5 to 8.0 Soluble salt concentration 20 ds Maximum Organic matter 40 % Minimum (oven dry basis) 6

43 Trace elements Man-made foreign matter 2.0 Mulch Binders Meet US EPA Part 503 limits Less than 1% by mass (weight) Mulch Binder Product containing a tackifier (organic or polyacrylamide polymer sticking agent) that is applied over mulch surfaces such as straw or hay to keep the loose mulch in place so that it will not be blown off the seeded soil surface. The application of the mulch binder is an incidental construction operation to the application of the specified straw or hay mulch. Check labels, shipping slips, and/or invoices to verify specified mulch binder is being used and that it meets specifications. Recycled Cellulose Fiber: Specifically prepared, biodegradable, shredded paper particles, composed of recycled newsprint or other recycled wood cellulose fiber. containing a surfactant and nontoxic, green dye. Product is specially manufactured to be applied with hydraulic seeding equipment and meet the following specifications: Moisture Content Organic Matter (Oven-Dried Basis) Water Holding Capacity 17% Maximum 80% Minimum 900 Minimum (Grams of Water per 100 Grams of Fiber) Wood Fiber: (see Section Wood Fiber) 7

SECTION 13 REPLACEMENT AND CLEANUP 13.01 SCOPE OF WORK

SECTION 13 REPLACEMENT AND CLEANUP 13.01 SCOPE OF WORK 13.01 SCOPE OF WORK Under this item, the Contractor will restore all lawns, trees, gardens, landscape plantings, sidewalks, ramps, trails, fences, commercial signs, water courses and sand, gravel, dirt,

More information

1 yard per 100 120 sq. ft. @ 2 Depth. Color is a personal choice. Dye fades due to sunlight. Although color remains, fading begins to occur

1 yard per 100 120 sq. ft. @ 2 Depth. Color is a personal choice. Dye fades due to sunlight. Although color remains, fading begins to occur PRODUCT INFORMATION PRODUCT DESCRIPTION USES ADVANTAGES DISADVANTAGES COVERAGE MULCHES Premium Shredded Hardwood Bark Mulch DECO MULCHES Shredded Bark from Hardwood Trees Planting Beds Borders Horticulturally

More information

DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION MATERIALS CONSTRUCTION REQUIREMENTS

DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION MATERIALS CONSTRUCTION REQUIREMENTS 304.06 DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION 304.01 This work consists of furnishing and placing one or more courses of aggregate and additives, if required, on a prepared subgrade.

More information

PREVENTING PEST DAMAGE IN HOME LAWNS

PREVENTING PEST DAMAGE IN HOME LAWNS PREVENTING PEST DAMAGE IN HOME LAWNS Quick Tips Summary Use mixed grass seeds rather than a single variety Fertilize with composted organics or slow-acting synthetic products Keep soil at ph 5.8 6.5 Keep

More information

ennessee is one of the top livestock producing states in the country. Much of the livestock in Tennessee is raised by smaller-scale, parttime

ennessee is one of the top livestock producing states in the country. Much of the livestock in Tennessee is raised by smaller-scale, parttime T ennessee is one of the top livestock producing states in the country. Much of the livestock in Tennessee is raised by smaller-scale, parttime producers. No matter what size operation, good pasture management

More information

Potting Mix Choices and Recommendations

Potting Mix Choices and Recommendations Potting Mix Choices and Recommendations Ted Bilderback Nursery Crops Specialist North Carolina State University There are no "one size fits all" recipes for growing containerized ornamental plants. However,

More information

Maintaining a Healthy Lawn

Maintaining a Healthy Lawn Maintaining a Healthy Lawn in Western Oregon A.M. VanDerZanden and T. Cook EC 1521 Reprinted February 2001 $1.50 The typical home lawn is an evolving ecosystem that gets more complex each year. At first,

More information

SECTION 31 20 00 EARTH MOVING

SECTION 31 20 00 EARTH MOVING SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to

More information

Installation PowerPoint for Grasscrete Formers

Installation PowerPoint for Grasscrete Formers Installation PowerPoint for Grasscrete Formers 1 This document describes the two single-use tools utilized to create the Grasscrete product. The original Former is a vacuum formed light gauge plastic mold

More information

Fertilizer, Weed Control, Grubs, and General Application Questions

Fertilizer, Weed Control, Grubs, and General Application Questions Lawn Care FAQ s Fertilizer, Weed Control, Grubs, and General Application Questions Why do we have so many weeds? Dandelions in particular, weeds in general, do not seem concerned about how long lawn has

More information

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS December 2014 CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications...

More information

INDEX 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6

INDEX 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6 03010_Dec22_2009.pdf Page 1 of 5 INDEX Page 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6 03010_Dec22_2009.pdf

More information

Erosion and Storm Water Management Unit Mail Stop 620 395 John Ireland Blvd. St. Paul, MN 55155

Erosion and Storm Water Management Unit Mail Stop 620 395 John Ireland Blvd. St. Paul, MN 55155 Minnesota Department of Transportation Office of Environmental Stewardship Erosion and Storm Water Management Unit Mail Stop 620 395 John Ireland Blvd. St. Paul, MN 55155 Memo Office Tel:651-366-3629 Fax:651-366-3603

More information

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT

More information

Waterwise Landscaping: Designing a Drought-tolerant (and deer-resistant) Landscape and Garden

Waterwise Landscaping: Designing a Drought-tolerant (and deer-resistant) Landscape and Garden Waterwise Landscaping: Designing a Drought-tolerant (and deer-resistant) Landscape and Garden Basic principles of xeriscaping How to Design and Implement Plants and Practical Information UCCE Master Gardeners

More information

COMPOST A USER'S GUIDE TO. The Beauty of Your Lawn & Garden Blossoms from the Soil

COMPOST A USER'S GUIDE TO. The Beauty of Your Lawn & Garden Blossoms from the Soil A USER'S GUIDE TO COMPOST The Beauty of Your Lawn & Garden Blossoms from the Soil Compost adds organic material and nutrients to the soil, increases water-holding capacity and biological activity, and

More information

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE 311.1 DESCRIPTION: This item shall consist of a cement treated subgrade base course composed of a mixture of local soil, portland

More information

How To Plan A Buffer Zone

How To Plan A Buffer Zone Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other

More information

Erosion and Storm Water Management Unit Mail Stop 620 395 John Ireland Blvd. St. Paul, MN 55155

Erosion and Storm Water Management Unit Mail Stop 620 395 John Ireland Blvd. St. Paul, MN 55155 Minnesota Department of Transportation Office of Environmental Stewardship Erosion and Storm Water Management Unit Mail Stop 620 395 John Ireland Blvd. St. Paul, MN 55155 Memo Office Tel:651-366-3629 Fax:651-366-3603

More information

GRADATION OF AGGREGATE FOR CONCRETE BLOCK

GRADATION OF AGGREGATE FOR CONCRETE BLOCK GRADATION OF AGGREGATE FOR CONCRETE BLOCK Although numerous papers have been written concerning the proper gradation for concrete mixes, they have generally dealt with plastic mixes, and very little published

More information

NO-TILL AND NITROGEN FIXING INOCULANTS

NO-TILL AND NITROGEN FIXING INOCULANTS NO-TILL AND NITROGEN FIXING INOCULANTS Tom Wacek R & D Director for Urbana Laboratories St. Joseph, Missouri Nitrogen fixation is the utilization of the free gaseous nitrogen in the air by soil bacteria

More information

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,

More information

INDEX TO SECTION 02831 CHAIN LINK FENCES AND GATES. Paragraph Title Page

INDEX TO SECTION 02831 CHAIN LINK FENCES AND GATES. Paragraph Title Page INDEX TO SECTION 02831 CHAIN LINK FENCES AND GATES Paragraph Title Page PART 1 GENERAL 1.1 Section Includes 02831 1 1.2 Related Sections 02831 1 1.3 Measurement and Payment 02831 1 1.4 References 02831

More information

WHAT IS WRONG WITH MY LAWN?

WHAT IS WRONG WITH MY LAWN? WHAT IS WRONG WITH MY LAWN? Lawn problems can occur in small areas or larger patches and entire lawns can be affected. Sometimes the problems are due to poor growing conditions, improper lawn care practices,

More information

Chapter 11 Site Rehabilitation and Stabilization

Chapter 11 Site Rehabilitation and Stabilization Chapter 11 Site Rehabilitation and Stabilization Chapter 11 Layout: Part 1 - Page 131 Planning Site Rehab Part 2 - Page 132 Controlling Runoff and Capturing Sediment Part 3 - Page 133 Rehab for Crossings

More information

Fertility Guidelines for Hops in the Northeast Dr. Heather Darby, University of Vermont Extension Agronomist

Fertility Guidelines for Hops in the Northeast Dr. Heather Darby, University of Vermont Extension Agronomist Fertility Guidelines for Hops in the Northeast Dr. Heather Darby, University of Vermont Extension Agronomist The increasing acreage of hops in the Northeast has prompted the need for fertility guidelines

More information

Self-Certification Checklist

Self-Certification Checklist Rhode Island Department of Environmental Managment Sustainable Turf Management for Landscaping Self-Certification Checklist Sustainable Turf Management for Landscaping Certification Program Rhode Island

More information

For all turfgrass areas. Now you can test soil reaction at different levels in the soil profile. Check Soil ph on:

For all turfgrass areas. Now you can test soil reaction at different levels in the soil profile. Check Soil ph on: Turf-Tec ph Meter Test soil ph in the mat, thatch and above and below the root zone. ph can be checked, 0" to 4" inch level right on the turfgrass area. Simply insert probe to desired depth, allow to stand

More information

Turfgrass Management of Bermudagrass Football Fields

Turfgrass Management of Bermudagrass Football Fields HLA-6600 Turfgrass Management of Bermudagrass Football Fields Oklahoma Cooperative Extension Service Dennis Martin Extension Turfgrass Specialist The first step in developing a turfgrass management program

More information

Strawberry Production Basics: Matted Row

Strawberry Production Basics: Matted Row Strawberry Production Basics: Matted Row David T. Handley, Vegetable and Small Fruits Specialist University of Maine Cooperative Extension Highmoor Farm, P.O. Box 179, Monmouth, Maine 04259 (207) 933-2100

More information

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09 Guidelines for Control of Water Runoff on Small Lots Revised 6/09 Table of Contents Introduction and Purpose 3 Administrative Procedures 3 Plan Submittal Requirements 3 General Design Criteria 4 Dry Wells

More information

Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices

Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices Purpose The purpose of this document is to provide guidance and recommendations for minimizing potential impacts to

More information

Standard Test Procedures Manual

Standard Test Procedures Manual STP 206-4 Standard Test Procedures Manual Section: 1. SCOPE 1.1. Description of Test This method describes the procedure for determining the liquid limit, plastic limit and the plasticity index of coarse-grained

More information

NOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT.

NOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT. September 1, 2003 CONCRETE MANUAL 5-694.300 MIX DESIGN 5-694.300 NOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT. 5-694.301

More information

Flooding on Sports Fields

Flooding on Sports Fields www.stma.org Flooding on Sports Fields Flooding events caused by excessive rainfall can be extremely detrimental to sports fields. Flooding saturates a rootzone and creates an unfavorable soil environment

More information

SECTION 4Aggegate Subbase

SECTION 4Aggegate Subbase The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages

More information

Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems

Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems The septic tank-absorption field sewage treatment system is composed of two major elements; the

More information

LIFETIME COMPOST TUMBLER HOW TO INSTRUCTIONS

LIFETIME COMPOST TUMBLER HOW TO INSTRUCTIONS LIFETIME COMPOST TUMBLER HOW TO INSTRUCTIONS LIFETIME COMPOST TUMBLER COMPOSTING - ACCELERATING NATURE S PROCESS In nature, such as grasslands or forests, plants die or shed their foliage which returns

More information

Environmental Issues In Your Backyard

Environmental Issues In Your Backyard Environmental Issues In Your Backyard How to Keep a Healthy Lawn In the pursuit of maintaining green, weed-free lawns, some homeowners may over-apply fertilizer to encourage vigorous growth and pesticides

More information

PUTTING FORAGES TOGETHER FOR YEAR ROUND GRAZING

PUTTING FORAGES TOGETHER FOR YEAR ROUND GRAZING PUTTING FORAGES TOGETHER FOR YEAR ROUND GRAZING Jimmy C. Henning A good rotational grazing system begins with a forage system that allows the maximum number of grazing days per year with forages that are

More information

Understanding Erosion. Revised Universal Soil Loss Equation

Understanding Erosion. Revised Universal Soil Loss Equation Understanding Erosion with the Revised Universal Soil Loss Equation Towards a Better Understanding of the What, Why & How Erosion is a process of detachment and transport of soil particles by erosive forces.

More information

SECTION 02100 SITE PREPARATION

SECTION 02100 SITE PREPARATION SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division

More information

Onion & Leek Planting Guide

Onion & Leek Planting Guide Onion & Leek Planting Guide Important Remove plants from box immediately. Do not put in soil or water before planting. Keep cool and dry until you can plant. Follow the instructions inside for best results.

More information

GENERAL WATERING & CARE GUIDE

GENERAL WATERING & CARE GUIDE GENERAL WATERING & CARE GUIDE Between 30-60 percent of water applied to lawns and gardens is never absorbed by the plants. Water is often wasted because it is applied too quickly and runs off, evaporates

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks

More information

Virginia s Turfgrass Industry

Virginia s Turfgrass Industry Virginia s Turfgrass Industry Published August 2006 Compiled By National Agricultural Statistics Service Virginia Field Office USDA/NASS Virginia Field Office 02 Governors St. LL20 Richmond, VA. 2329-3676

More information

TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER

TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER I. Scope of Work Work done under this item shall consist of the construction, reconstruction, or alteration of a one-course Portland

More information

REQUEST FOR PROPOSAL LANDSCAPING AND LAWN MAINTENANCE FIRE DISTRICT NO. 3 TOWNSHIP OF HAMILTON MERCER COUNTY

REQUEST FOR PROPOSAL LANDSCAPING AND LAWN MAINTENANCE FIRE DISTRICT NO. 3 TOWNSHIP OF HAMILTON MERCER COUNTY REQUEST FOR PROPOSAL LANDSCAPING AND LAWN MAINTENANCE FIRE DISTRICT NO. 3 TOWNSHIP OF HAMILTON MERCER COUNTY PROPOSALS MUST BE SUBMITTED BY: APRIL 4, 2014 Hamilton Township Fire District No. 3 Office of

More information

UTAH CERTIFIED NURSEY PROFESSIONAL UCNP TEST SYLLABUS

UTAH CERTIFIED NURSEY PROFESSIONAL UCNP TEST SYLLABUS UTAH CERTIFIED NURSEY PROFESSIONAL UCNP TEST SYLLABUS Contact Information: Utah Green-UNLA 1174 E 2760 S #16 Salt Lake City UT 84152 801-484-4426 or unlautahgreen@aol.com UCNP Program Description: The

More information

Appendix C. Re-vegetation and Rehabilitation Sub-Plan

Appendix C. Re-vegetation and Rehabilitation Sub-Plan Appendix C Re-vegetation and Rehabilitation Sub-Plan DRENNAN SOLAR ENERGY FACILITY REVEGETATION & REHABILITATION PLAN PRODUCED FOR ERM ON BEHALF OF SOLAIREDIRECT BY Simon.Todd@3foxes.co.za JUNE 2013 BACKGROUND

More information

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting

More information

Understanding the. Soil Test Report. Client and Sample Identification

Understanding the. Soil Test Report. Client and Sample Identification Understanding the Soil Test Report Page 1 of 7 Crops absorb the nutrients required from soil in order to grow, so ensuring that your soil is meeting the crops needs is critical. Having the proper level

More information

GREEN ROOFS. Location. Design SMALL COMMERCIAL GUIDE CITY OF ATLANTA, GEORGIA DEPARTMENT OF WATERSHED MANAGEMENT

GREEN ROOFS. Location. Design SMALL COMMERCIAL GUIDE CITY OF ATLANTA, GEORGIA DEPARTMENT OF WATERSHED MANAGEMENT SMALL COMMERCIAL GUIDE CITY OF ATLANTA, GEORGIA DEPARTMENT OF WATERSHED MANAGEMENT GREEN ROOFS A green roof is a system consisting of waterproofing material, growing medium, and vegetation, and is used

More information

Retail Lawn Seed Mixtures for Western Oregon and Western Washington

Retail Lawn Seed Mixtures for Western Oregon and Western Washington Retail Lawn Seed Mixtures for Western Oregon and Western Washington EM 9100 November 2014 Stan Baker, Alec Kowalewski, Brian McDonald, and Rob Golembiewski A number of new lawn seed products have become

More information

Chapter D9. Irrigation scheduling

Chapter D9. Irrigation scheduling Chapter D9. Irrigation scheduling PURPOSE OF THIS CHAPTER To explain how to plan and schedule your irrigation program CHAPTER CONTENTS factors affecting irrigation intervals influence of soil water using

More information

Sample Punch List. Garth Ruffner Landscape Architect (916) 797-2576. Page 1 of 5

Sample Punch List. Garth Ruffner Landscape Architect (916) 797-2576. Page 1 of 5 Sample Punch List This document is provided primarily for landscape contractors who have not previously worked with Garth and would like to know what issues are frequently addressed by site observation

More information

Amazing World Under Our Feet

Amazing World Under Our Feet Crop Science Investigation Workshop Series Lesson Plans Amazing World Under Our Feet Subject: Crop Production Intro to Soil Grade Level(s): 4 th 8 th grades Lesson Title: What is soil and why is soil important?

More information

HOW TO IMPORT FOREIGN SOIL and HOW TO MOVE SOIL within the UNITED STATES

HOW TO IMPORT FOREIGN SOIL and HOW TO MOVE SOIL within the UNITED STATES Circular Q-330.300-2 Soil (01/2001) U.S. Department of Agriculture Animal and Plant Health Inspection Service Plant Protection and Quarantine 4700 River Road, Unit 133 Riverdale, Maryland 20737-1228 HOW

More information

Uniform Voluntary Product Guidelines for Horticultural Mulches, Growing Media and Landscape Soils

Uniform Voluntary Product Guidelines for Horticultural Mulches, Growing Media and Landscape Soils Uniform Voluntary Product Guidelines for Horticultural Mulches, Growing Media and Landscape Soils October 2015 1 Mulch & Soil Council Uniform Voluntary Product Guidelines Revised October 2015 These Uniform

More information

Hydroseed Care Guide

Hydroseed Care Guide Hydroseed Care Guide Please read carefully and sign the invoice in the space provided to show us that you have received the Instructional Care Guide and acknowledge your responsibility to read and implement

More information

City of Shelbyville Site Inspection Checklist

City of Shelbyville Site Inspection Checklist City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather

More information

Summary Statement of Work

Summary Statement of Work Exhibit A PennDOT District 2-0 Tree Work Specifications for a Specialized / Expandable Arboriculture Complement Summary Statement of Work I. DESCRIPTION A. This statement of work is in addition to the

More information

Irrigation - How Best to Water Your Desert Trees

Irrigation - How Best to Water Your Desert Trees Irrigation - How Best to Water Your Desert Trees John Eisenhower, ISA Certified Arborist WE-5213A Integrity Tree Service, Inc. 602-788-0005 www.itreeservice.com How much water do my trees need? How much

More information

CULLINAN IRRIGATION & LAWN CARE 763-913-1670 CULLINANIRRIGATION.COM

CULLINAN IRRIGATION & LAWN CARE 763-913-1670 CULLINANIRRIGATION.COM Get ready for the growing and mowing months with a maintained mower and irrigation system. Give your sprinkler system a spring tune-up. Activate the system by closing drain valves, turning the water on,

More information

Do not work in clay soil when it is wet. Mowing wet lawns or working in wet flower and vegetable beds compacts the soil and spreads fungal diseases.

Do not work in clay soil when it is wet. Mowing wet lawns or working in wet flower and vegetable beds compacts the soil and spreads fungal diseases. NC STATE UNIVERSITY Urban Horticulture Note No. 3 North Carolina Cooperative Extension Service Durham County Center 721 Foster Street Durham, North Carolina 27701 919-560-0525 Fax: 919-560-0530 www.ces.ncsu.edu/durham/

More information

METHOD A7 THE DETERMINATION OF THE MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT OF GRAVEL, SOIL AND SAND

METHOD A7 THE DETERMINATION OF THE MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT OF GRAVEL, SOIL AND SAND SCOPE METHOD A7 THE DETERMINATION OF THE MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT OF GRAVEL, SOIL AND SAND Definition The maximum dry density and optimum moisture content, as defined below, is

More information

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE The following template may be used as a general guide for development of a Stormwater Pollution Prevention Plan (SWPPP) for construction activities.

More information

Virginia Gardener http://www.hort.vt.edu/envirohort

Virginia Gardener http://www.hort.vt.edu/envirohort The Virginia Gardener http://www.hort.vt.edu/envirohort Name Help Sheets: Seeds What Is a Seed? A seed is a very young plant that is in the dormant, or resting stage. It is very much alive. There are three

More information

Summer Stress Arrives Early on Cool Season Lawns

Summer Stress Arrives Early on Cool Season Lawns Summer Stress Arrives Early on Cool Season Lawns Figure 1. A fall installed tall fescue sod showing the first signs of summer stress following the arrival of record setting heat in central Virginia in

More information

IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION

IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION 199 9.1(479,479B) General information. 9.1(1) Authority. The standards contained herein

More information

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices

More information

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies. RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.htm#storm Definition: A permanent, erosion-resistant ground cover

More information

Composting is one of the healthiest means of Organic Gardening.

Composting is one of the healthiest means of Organic Gardening. Master Gardeners Nearly 30 years ago Washington State University began a program of training volunteers to help instruct members of their communities about proper gardening practices. That program has

More information

Mud in the Water. www.agclassroom.org/ok. Oklahoma Academic Standards. Objective. Background. Resources Needed. Activities

Mud in the Water. www.agclassroom.org/ok. Oklahoma Academic Standards. Objective. Background. Resources Needed. Activities Mud in the Water Objective Students will learn about soil erosion and water pollution by building a demonstration model from pop bottles and observing the movement of pollutants from soil into water. Background

More information

Filter Berms and Filter Socks: Standard Specifications for. Compost for Erosion/Sediment Control

Filter Berms and Filter Socks: Standard Specifications for. Compost for Erosion/Sediment Control Filter Berms and Filter Socks: Standard Specifications for Compost for Erosion/Sediment Control Completed by: Ron Alexander R. Alexander Associates, Inc. 1212 Eastham Drive Apex, NC 27502 Telephone - 919-367-8350

More information

Turfgrass Traffic and Compaction: Problems and Solutions

Turfgrass Traffic and Compaction: Problems and Solutions PUBLICATION 8080 Turfgrass Traffic and Compaction: Problems and Solutions M. ALI HARIVANDI, University of California Cooperative Extension Environmental Horticulture Advisor, Alameda, Contra Costa, and

More information

Compost-Based Stormwater Best Management Practices Using Compost to Improve Stormwater Management and Erosion Control On Roadsides

Compost-Based Stormwater Best Management Practices Using Compost to Improve Stormwater Management and Erosion Control On Roadsides Compost-Based Stormwater Best Management Practices Using Compost to Improve Stormwater Management and Erosion Control On Roadsides Chris Newman US EPA Region 5 Chicago, IL Compost-Based BMPs Compost-based

More information

Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors

Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors The Right Concrete Mix Placing and Finishing Joints Correctly Spaced Curing for Durability "Concrete durability is the ability to

More information

The estimated costs of corn, corn silage,

The estimated costs of corn, corn silage, Estimated Costs of Crop Ag Decision Maker Production in Iowa - 2015 File A1-20 The estimated costs of corn, corn silage, soybeans, alfalfa, and pasture maintenance in this report are based on data from

More information

Land Application of Drilling Fluids: Landowner Considerations

Land Application of Drilling Fluids: Landowner Considerations SCS-2009-08 Land Application of Drilling Fluids: Landowner Considerations Mark L. McFarland, Professor and Extension State Water Quality Specialist Sam E. Feagley, Professor and Extension State Environmental

More information

Phone: 989.673.5300 x 304 Caro MI 48723 URL: www.tisd.k12.mi.us Email: aslagh@tisd.k12.mi.us

Phone: 989.673.5300 x 304 Caro MI 48723 URL: www.tisd.k12.mi.us Email: aslagh@tisd.k12.mi.us AGRI SCIENCE LANDSCAPING / TURFGRASS TECHNOLOGY SYLLABUS SCHOOL: Tuscola Technology Center Instructor: Arlon Slagh ADDRESS: 1401 Cleaver Road Phone: 989.673.5300 x 304 Caro MI 48723 URL: www.tisd.k12.mi.us

More information

SOIL-LIME TESTING. Test Procedure for. TxDOT Designation: Tex-121-E 1. SCOPE 2. APPARATUS 3. MATERIALS TXDOT DESIGNATION: TEX-121-E

SOIL-LIME TESTING. Test Procedure for. TxDOT Designation: Tex-121-E 1. SCOPE 2. APPARATUS 3. MATERIALS TXDOT DESIGNATION: TEX-121-E Test Procedure for SOIL-LIME TESTING TxDOT Designation: Tex-121-E Effective Date: August 2002 1. SCOPE 1.1 This method consists of three parts. 1.1.1 Part I determines the unconfined compressive strength

More information

Busting the Most Common Lawn Myths and Misconceptions Aaron Patton

Busting the Most Common Lawn Myths and Misconceptions Aaron Patton DIVISION OF AGRICULTURE R E S E A R C H & E X T E N S I O N University of Arkansas System Agriculture and Natural Resources FSA6142 Busting the Most Common Lawn Myths and Misconceptions Aaron Patton Assistant

More information

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains

More information

The Ultimate Medium for Erosion Control and Revegetation. Flexible Growth Medium (FGM ) TM

The Ultimate Medium for Erosion Control and Revegetation. Flexible Growth Medium (FGM ) TM The Ultimate Medium for Erosion Control and Revegetation Flexible Growth Medium (FGM ) TM $4,000 Flexterra Flexterra $6,000 Blankets Blankets Flexible Slope Protection at the Lowest Overall Cost. New Flexterra

More information

Estimated Costs of Crop. Production in Iowa - 2016 File A1-20 The estimated costs of corn, corn silage, Ag Decision Maker

Estimated Costs of Crop. Production in Iowa - 2016 File A1-20 The estimated costs of corn, corn silage, Ag Decision Maker Estimated Costs of Crop Ag Decision Maker Production in Iowa - 2016 File A1-20 The estimated costs of corn, corn silage, soybeans, alfalfa, and pasture maintenance in this report are based on data from

More information

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations SWPPP for Park Operations 2 Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations Bordered by Lake Washington & Lake Sammamish, the City of Bellevue has more than 60 miles of streams,

More information

COVER CROPS FOR RASPBERRY PLANTINGS

COVER CROPS FOR RASPBERRY PLANTINGS COVER CROPS FOR RASPBERRY PLANTINGS Dr. Marvin Pritts, Department of Horticulture, Cornell University s College of Agriculture and Life Sciences, Ithaca, NY 14853 (For more information visit www.fruit.cornell.edu)

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

Salinity Management and Soil Amendments for Southwestern Pecan Orchards

Salinity Management and Soil Amendments for Southwestern Pecan Orchards Salinity Management and Soil Amendments for Southwestern Pecan Orchards Thomas L. Thompson, Professor and Soils Specialist James L. Walworth, Associate Professor and Soils Specialist Department of Soil,

More information

NORTH COUNTY TRANSFER CENTER METRO Contract Numbers 01756/01862 100% - DESIGN DEVELOPMENT SECTION 32 90 13 NEW PLANTING MAINTENANCE

NORTH COUNTY TRANSFER CENTER METRO Contract Numbers 01756/01862 100% - DESIGN DEVELOPMENT SECTION 32 90 13 NEW PLANTING MAINTENANCE SECTION 32 90 13 NEW PLANTING PART 1 - GENERAL 1.01 INTENT A. The intent of the landscape maintenance program is to maintain the landscape areas (lawn and shrub plantings) in a vigorous, healthy and attractive

More information

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems

More information

Production and Marketing of Organic Fertilizer and Compost Manufactured at the Çamli Besicilik Composting and Pelletizing Facility

Production and Marketing of Organic Fertilizer and Compost Manufactured at the Çamli Besicilik Composting and Pelletizing Facility Production and Marketing of Organic Fertilizer and Compost Manufactured at the Çamli Besicilik Composting and Pelletizing Facility Lewis M. Naylor Black & Veatch Corp. International Executive Service Corps

More information

2014 Product Catalogue

2014 Product Catalogue Works 2014 Product Catalogue Creating Sustaining Soils Baltimore, Maryland chesapeakecompost.com 410-355-1730 Complete Sustenance For Your Soil Our compost is made from recycled food scraps, resulting

More information

WHAT IS IN FERTILIZER OTHER THAN NUTRIENTS?

WHAT IS IN FERTILIZER OTHER THAN NUTRIENTS? WHAT IS IN FERTILIZER OTHER THAN NUTRIENTS? Raymond C. Ward Ward Laboratories Inc. Kearney, NE Commercial fertilizer is a source of plant nutrients that can be applied to soil to nourish crops when the

More information

Appendix C. Municipal Planning and Site Restoration Considerations

Appendix C. Municipal Planning and Site Restoration Considerations Appendix C Municipal Planning and Site Restoration Considerations 67 68 Appendix C - Municipal Planning and Site Restoration Considerations This appendix contains best practice standards for site planning

More information

Erosion Control Blanket (ECB)

Erosion Control Blanket (ECB) Erosion Control Blanket (ECB) Practice Description To aid in controlling erosion on critical areas by providing a protective cover made of straw, jute, wood or other plant fibers; plastic, nylon, paper

More information

Soils and Aggregates Division

Soils and Aggregates Division Dan Sajedi, Division Chief 443-572-5162 George Hall, Assistant Division Chief Field Operations 443-572-5271 Eric Frempong, Assistant Division Chief Laboratory 443-572-5055 Aggregate Materials, Controlled

More information

Storm Drain Inlet Protection - IP

Storm Drain Inlet Protection - IP Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior

More information

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

CONCRETE SEGMENTAL RETAINING WALL SYSTEM CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Vintage TM unit segmental retaining wall (SRW)

More information