Discussion Paper No. 3 Geotechnical Considerations

Size: px
Start display at page:

Download "Discussion Paper No. 3 Geotechnical Considerations"

Transcription

1 Eastern Hillsides Area Plan 2011 Discussion Paper No. 3 Geotechnical Considerations The Eastern Hillsides of Chilliwack is situated on the north slopes of the mountain ridge that separates Chilliwack River Valley from the flat agricultural land of the Fraser River Valley. It displays a relatively steep topography and faces access and servicing challenges. In some locations, slope instability is a concern. Creeks are fast flowing and deeply incised into the hillsides, resulting in a steep profile. Geotechnical issues are critical considerations in the development application process, and strong geotechnical report guidelines (with specific levels of safety) are necessary to ensure sufficient information for the evaluation of site capability and capacity. 1. Area Description The Eastern Hillsides is approximately 6 km long and 2 km wide. It has a north to northwest aspect and rises from the Fraser River lowland (El. 13 m) to mountains along the drainage divide with the Chilliwack River valley to the south. The highest levels of the Eastern Hillsides are about El. 650 m. To the south of the study area, the slopes rise sharply, culminating in four peaks, namely, Lookout Ridge (El. 706 m), Elk Mountain (El. 1,400 m), Mount Thurston (El. 1,639 m) and an unnamed peak (El. 1,582 m). The area is drained by a number of creeks in sharply chiselled channels, such as (from west to east) Calkin, Elk and Ford Creeks. They fan out into a significant number of tributaries, and not all of them are recorded on the base map of this report. 2. Bedrock Geology The bedrock in the study area comprises Cascade Range units rarely encountered in the Lower Mainland. (Mathews 1986.) They include meta-siltstone/sandstone and limestone of the Cultus Formation (Monger 1989), and shale, metasiltstone/sandstone, schist, meta-conglomerate and meta-volcanic rock that are layered to massive hard limestone of the Chilliwack Group. It is difficult to differentiate the units in these two formations because of their common elements and the tendency for the weaker rocks (typically shale) to weather recessively, thus limiting exposures.

2 Bedding surfaces documented by Monger (Monger1989) show bedding planes dipping ENE at 10 to 40. Flat, weathered shale beds and northward dipping hard schistose have been observed. Monger identifies several faults in the area but none are mapped or known in any detail. The Vedder Fault, below the Fraser Valley floor and north of the study area, may be capable of movement. Aerial photograph interpretation has located possible slope fissures, landslides (possible ancient, large bedrock landslides) and slide debris on the bedrock slopes above the southern study area limits. However, these interpreted occurrences have not been verified on the ground or by helicopter reconnaissance. In its study of the Eastern Hillsides Hazard areas, Thurber Engineering summarizes the evaluation of Golder Associates studies in 1993 and 1994 on a drawing for general reference (Thurber Engineering Ltd. 2003, Drawing ). (Please see the references at the end.) 3. Soil Conditions Detailed surficial geology conditions in the study area are not well known due to the limited site investigation by drill holes or test pits. Ancient debris flow deposits are speculated to have occurred along lower Ford Road (now part of Nixon Road). In addition, several apparently ancient alluvial fans have been found along the east side of middle Elk Creek. An unusually large alluvial and debris flood fan complex has also been identified below the gullied mountain-sides at the east end of the area. Wind-blown and glacial lake silts and clays are relatively abundant. They are highly erodible and may be subject to soil piping and caving. 4. Groundwater Conditions Little information is available on the groundwater conditions in the Eastern Hillsides. However, groundwater seepage areas have been noticed on the lower slopes and a perched water table should be expected to exist above the surface of the relatively impermeable glacial soils or bedrocks. The area typically has many springs at or near surface and they usually appear through excavation. 2

3 Figure 1 Slope Analysis 3

4 5. Geotechnical Issues 5.1 Panorama No-Build Area The Panorama No-Build Area is bounded by Patterson Road, Gilkins Creek and Patterson Brook West. The southern boundary has not been fully explored, which may extend further uphill and beyond the tentative boundary (at El. 300 m contour) suggested by Thurber Engineering. (TEL 2003, Dwg ) The No-Build Area was established in 2002 after earth movements had been detected and verified by GPS hubs. The No-Build Area is enforced through a moratorium on development within its limits and the situation remains under monitoring. 5.2 Top of Slope Hazard Setbacks A second issue concerns the potential hazard of building on top of a steep slope. A geotechnical setback is required for any building to locate near the top of a slope steeper than 50%. A detailed geotechnical study should be submitted as part of the development application to assess the risk and recommend an appropriate setback and other safety measures. Where creek channels and riparian zones are affected, the Riparian Area Regulations (RAR) would apply to setbacks from the top of the bank to all buildings, structures and pools. 5.3 Small Landslides Sixty percent or steeper slopes are susceptible to small slides, which are unpredictable be they natural or man-made events. Hence, no part of the Eastern Hillsides with such gradients (especially slopes of thick silty soils) can be considered free from slide hazard: they should be excluded from development. 5.4 Large Bedrock Landslide Hazards Large bedrock landslides and slope deformation features have been identified on steep mountain slopes above the study area by Golder Associates (GAL 1993). Many of these high slopes are unexplored and it is likely that more sites of landslides and slope deformations will be found. The nature, age, triggering mechanism and probability of reactivation of these ancient landslides are unknown. Data is also needed on the residual strength of the debris that may control its run-out to some extent. 4

5 Thurber Engineering (TEL 2001, Dwg ) shows a preliminary, conservative down-slope limit for the run-out of the landslide debris. Below that limit, residential development within the proposed potential low-risk areas may be permitted subject to further site specific study of large bedrock landslide hazards where warranted. In 2004 Thurber Engineering reviewed the preliminary limit for a development on Marble Hill Road 1 and concluded that the run-out limit should be moved uphill by at least 250 m. While this may be valid, its application to other areas in the Eastern Hillsides should await a thorough investigation of the ancient slide area 2 with helicopter reconnaissance and detailed field work. 5.5 Erodible Soil Highly erodible, silty to sandy, glacial and windblown soils occur in the study area and are susceptible to surface and sub-surface erosion. Erosion control and sediment catchment techniques will apply to developments under those soil conditions. 5.6 In-ground Storm Water Disposal The feasibility of in-ground disposal of storm water by means of subsurface drains or soak-away pits needs careful study of soil and slope stability conditions. Given the relative impermeability of shallow bedrock and silt-rich soils in the Eastern Hillsides, it is doubtful that in-ground disposal would be feasible over much of the study area. Further drainage study is necessary in order to adequately address this issue. 6. Current Development Requirements The City s Official Community Plan has designated the Eastern Hillsides as part of the Development Permit Area No. 2 for the protection of: Fish, wildlife and their habitats; and Existing and future developments from natural hazards such as flooding, debris torrents, channel bank erosion, and potential instability of adjacent slopes. All development proposals in this D.P. Area have to identify those habitats and hazards, and to submit plans to address any potential environmental and geo- 1 At 7195 Marble Hill Road. 2 This is city staff s opinion. 5

6 technical issues. Detailed information requirements are laid out in the City brochure for Development Permit Area 2, including: (i) (ii) (iii) (iv) (v) (vi) A site plan to illustrate D.P. Area 2 compliance A concept plan of the proposed development A Geo-hazard Assessment and Investigation report on: precautions and protocols of working with hazards during and after construction; soil profiles and depth of water table; setbacks from significant slopes and watercourses; and an on-site cut-and-fill scheme. A report/plan to address potential development impact on all watercourses, such as: proposed alterations or diversions of watercourses; drainage and silt abatement during construction; and drainage design showing retention/detention systems and connections with off-site storm drainage. Any diversion or work within and/or adjacent to a watercourse also requires approval from the Province of B.C. Ministry of Environment (Environmental Stewardship Division, Fish and Wildlife Branch) and the Federal Department of Fisheries and Oceans. Where fish-bearing streams or wildlife habitats are affected, the proposal must also be supported by an Environmental Consultant s report/plan that provides: a detailed inventory of fish and blue-listed wildlife species; the locations of the protected habitats; and guidelines for setback and meeting other Provincial conservation requirements; If a property owner wishes to clear land or harvest trees for commercial purposes, the development permit application shall include a report from a B.C. Licenced Professional Forester that : reviews the extent of trees to be harvested; addresses geotechnical, drainage, and habitat protection concerns; sets out a re-planting and land stabilization plan; and specifies a Tree and Green Space Management Plan. (vii) A Hazardous Tree Assessment by a Certified Arborist or Landscape Architect may also be required if there is imminent danger to the development site along the forest interface. The Assessment will identify trees to be retained and the location of new plantings for the tree density stipulated by the City. 6

7 (viii) A Fire Risk Assessment shall be submitted to the Fire Chief for new development in an identified moderate to extreme fire hazard area; 7. Opportunities and Constraints 7.1 Opportunities (i) (ii) (iii) Areas with 30% or less gradients slopes total to 55% of the Eastern Hillsides; however, some of these slopes are handicapped by other constraints as noted in this report. Thirteen potential low-risk areas have been identified for a total area of 519 ha; again, they may need to be scaled down in the future as detailed geotechnical studies become available. (See Figure 3.) Some basic utility (community water and sewer) and road systems and a small suburban settlement are in place. In brief, the basic ground work for the development of a suburban community has been laid down and the slope analysis suggests a number of opportunities for development. However, this initial impression has to be tempered with the on/off site constraints and other planning considerations. Slope Analysis of Eastern Hillsides Area Slope Gradient % of Planning Area Ha 0-10% 8.50% % 24.70% % 21.80% % 15.50% % 29.50% 369 All % 1,250 Note: Analysis by AECOM 7.2 Constraints (i) Slope with 30% or steeper gradients are considered unsuitable for development purposes according to the City s Hillside Development Guidelines, and at least 45% of the planning area falls into this category. Site planning proposals involving small-scale steep slopes (within the Potential low-risk areas) will be evaluated in the context of that development and the best practices as recommended by the Hillside Development Guidelines. 7

8 (ii) (iii) (iv) Streamside setbacks are to be in compliance with the provincial Riparian Area Regulation, and should not be closer than 15 m from the top the banks; wider setbacks may be warranted by exceptional ecological and slope stability conditions. Bedrock landslide areas have been identified on the upper slopes above the existing Eastern Hillsides developments. The debris run-out limits of those areas should be recognized as a potential geological hazard and no development should be permitted. This precaution should prevail if the runout limits and the Potential low-risk areas overlap. Nevertheless, some flexibility may be exercised if a site-specific geotechnical study can verify that the actual run-out limit lies beyond the proposed development site and that effective mitigation measures will be taken. Several creeks are known for their debris flows and represent significant hazards to future developments. Mitigation measures, including wider than standard setbacks from the stream banks, may be introduced to ensure sufficient protection of residents and properties. 8. Recommendations (i) (ii) (iii) Fully serviced hillside developments should be confined to potential lowrisk areas where major geological hazards are not known to exist, or are low and can be mitigated to a satisfactory level. However, these areas, or cells in Figure 3, need to be screened by future site-specific geotechnical studies, and economic feasibility and financial analyses in terms of servicing, road/highway improvement, and other on/off-site improvements. The actual developable areas will be significantly less than the potential low-risk areas as outlined in this report. Outside the potential low-risk areas, the existing acreage developments will continue but new acreage (10-acre plus lot) subdivisions will be limited in light of their low prospects of future road upgrade and municipal servicing (water and sewers). Developments within the potential low-risk areas must be supported by detailed geotechnical studies that identify localized geological hazards, and how they will be addressed through best practises in site planning and geotechnical engineering to minimize their environmental impact and to protect lives and properties. All development applications must comply with the requirements proposed in this report and other applicable municipal regulations, including the OCP and Development Permit Area No. 2, Hillside Development Guidelines and Tree Management (Land Development) Bylaw

9 (iv) The geological study of the Eastern Hillsides area should continue, in a comprehensive manner, in order to more accurately define or verify the hazard boundaries and the magnitude of the geotechnical risks to the existing and future developments. 9

10 Figure 2 Geotechnical Constraints 10

11 Figure 3 Constraint Overlays and Potential Development Cells 11

12 References: Major references presenting geotechnical and geological information for the Eastern Hillsides are listed below, generally in chronological order. This list does not included geotechnical reports pertaining to development of small parcels of land. Furthermore, the list is unlikely to be complete since some landowners or private developers may not have submitted their reports to the City. Also excluded from the list are numerous technical and expert opinion reports prepared for the Panorama Subdivision (identified as the Patterson Road and Stam Subdivision in reports prepared by Klohn Crippen for Dr. Morgenstern of the University of Alberta). The identification number proceeding the reference is used in this paper. 1. Mathews, W.H., Physiography of the Canadian Cordillera. Geological Survey of Canada map 1701A. 2. Monger, J.W.H., Geology of the Hope and Ashcroft Map areas, BC. Maps and :250,000 scale. 3. Cascade Engineering Ltd., Geotechnical Report Phase 1 Golf Course and Residential Development at Highway 1 and Annis Road, Chilliwack, BC. Report to Blackburn Developments Ltd. 4. Numerous other reports prepared by Cascade Engineering Ltd. for Blackburn Developments Ltd. between 1994 and 1999 on specific aspects of the development. 5. Golder Associates Ltd. (GAL), Preliminary Geotechnical Assessment Proposed Gold Spring Development Site Lookout Ridge Area near Hinkley Road, Chilliwack, BC. Report to Gold Spring Mountain Estates Ltd. 6. Golder Associates Ltd, (GAL), Geotechnical Hazard Evaluation of Proposed Marble Hill Subdivision, District of Chilliwack, BC. Report to Adriana Pacific Group. 7. Thurber Engineering Ltd. (TEL), Geotechnical Hazard Evaluation Eastern Hillsides, Chilliwack, BC. Report to Urban Systems Ltd. 8. Thurber Engineering Ltd. (TEL), Geotechnical Investigation of 7274 Marble Hill Development, Chilliwack, BC. Report to Suncor Development Corporation. 9. Thurber Engineering Ltd. (TEL),, Preliminary Engineering Infrastructure Evaluation Plan Eastern Hillsides Geotechnical Assessment. Report to UMA Engineering Ltd. 10. Thurber Engineering Ltd. (TEL),, Eastern Hillsides Hazard Areas, Chilliwack Geotechnical Assessment. Report to City of Chilliwack. 12

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes Chapter 2 Flash Flood Science A flash flood is generally defined as a rapid onset flood of short duration with a relatively high peak discharge (World Meteorological Organization). The American Meteorological

More information

HOMEOWNER S GUIDE. to LANDSLIDES. and MITIGATION RECOGNITION, PREVENTION, CONTROL, Compiled by Dr. Scott F. Burns Tessa M. Harden Carin J.

HOMEOWNER S GUIDE. to LANDSLIDES. and MITIGATION RECOGNITION, PREVENTION, CONTROL, Compiled by Dr. Scott F. Burns Tessa M. Harden Carin J. HOMEOWNER S GUIDE to LANDSLIDES RECOGNITION, PREVENTION, CONTROL, and MITIGATION Compiled by Dr. Scott F. Burns Tessa M. Harden Carin J. Andrew Federal Emergency Management Agency Region 10 If you are

More information

Earth Science. River Systems and Landforms GEOGRAPHY 1710. The Hydrologic Cycle. Introduction. Running Water. Chapter 14.

Earth Science. River Systems and Landforms GEOGRAPHY 1710. The Hydrologic Cycle. Introduction. Running Water. Chapter 14. Earth Science GEOGRAPHY 1710 River Systems and Landforms DAVID R. SALLEE Robert W. Christopherson Charlie Thomsen Chapter 14 Introduction Rivers and streams are dynamic systems that continually adjust

More information

SUBDIVISION AND DEVELOPMENT REGULATION

SUBDIVISION AND DEVELOPMENT REGULATION Province of Alberta MUNICIPAL GOVERNMENT ACT SUBDIVISION AND DEVELOPMENT REGULATION Alberta Regulation 43/2002 With amendments up to and including Alberta Regulation 119/2014 Office Consolidation Published

More information

Prepared By: Eric Chamberlain

Prepared By: Eric Chamberlain Prepared By: Eric Chamberlain Drainage 101 So, What s a Municipal Drain??? It is a Drainage System either open ditch or enclosed pipe system or any other water control structure Petitioned for by landowners

More information

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating

More information

Plan Plus Volume 1 No 1 2002 (117-123)

Plan Plus Volume 1 No 1 2002 (117-123) Plan Plus Volume 1 No 1 2002 (117-123) APPLICATION OF GIS (GEOGRAPHIC INFORMATION SYSTEM) FOR LANDSLIDE HAZARD ZONATION AND MAPPING DISASTER PRONE AREA: A STUDY OF KULEKHANI WATERSHED, NEPAL Purna Chandra

More information

Deserts, Wind Erosion and Deposition

Deserts, Wind Erosion and Deposition Deserts, Wind Erosion and Deposition By definition, a desert has less than 10 in (25 cm) of precipitation per year. Deserts occur at 30 o and 60 o in regions of descending air. Deserts can be hot or cold.

More information

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

SLOPE AND TOPOGRAPHY

SLOPE AND TOPOGRAPHY SLOPE AND TOPOGRAPHY What are Slope and Topography? Slope and topography describe the shape and relief of the land. Topography is a measurement of elevation, and slope is the percent change in that elevation

More information

3. The submittal shall include a proposed scope of work to confirm the provided project description;

3. The submittal shall include a proposed scope of work to confirm the provided project description; QIN Shoreline Master Program Project Summary The Shoreline Master Program (SMP) development process for the Quinault Indian Nation (QIN) includes the completion of inventory and analysis report with corresponding

More information

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SUSTAINABLE URBAN DRAINAGE SYSTEMS overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being

More information

FINAL PLAN OF REMEDIAL ACTION

FINAL PLAN OF REMEDIAL ACTION FINAL PLAN OF REMEDIAL ACTION 1000 FRENCH STREET SITE Wilmington, Delaware DE 1115 June 1999 Department of Natural Resources and Environmental Control Division of Air and Waste Management Site Investigation

More information

4.11 Geologic and Soil Resources

4.11 Geologic and Soil Resources 4.11 Geologic and Soil Resources Geology and soils are evaluated as part of an environmental document because conditions in the project area can influence the type and size of a project s structure, the

More information

Description of Simandou Archaeological Potential Model. 13A.1 Overview

Description of Simandou Archaeological Potential Model. 13A.1 Overview 13A Description of Simandou Archaeological Potential Model 13A.1 Overview The most accurate and reliable way of establishing archaeological baseline conditions in an area is by conventional methods of

More information

WEATHERING, EROSION, AND DEPOSITION PRACTICE TEST. Which graph best shows the relative stream velocities across the stream from A to B?

WEATHERING, EROSION, AND DEPOSITION PRACTICE TEST. Which graph best shows the relative stream velocities across the stream from A to B? NAME DATE WEATHERING, EROSION, AND DEPOSITION PRACTICE TEST 1. The diagram below shows a meandering stream. Measurements of stream velocity were taken along straight line AB. Which graph best shows the

More information

Landslides. Landslides-1. March 2007

Landslides. Landslides-1. March 2007 Landslides Learn if landslides, including debris flows, could occur in your area by contacting local officials, your state geological survey or department of natural resources, or the geology department

More information

Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices

Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices Purpose The purpose of this document is to provide guidance and recommendations for minimizing potential impacts to

More information

A Developer s Guide: Watershed-Wise Development

A Developer s Guide: Watershed-Wise Development A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another

More information

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES Integra Consulting Engineers Limited NS / 2543 Fountain House

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold CHAPTER 11 GLOSSARY OF TERMS Active Channel The channel that contains the discharge Leopold where channel maintenance is most effective, sediment are actively transported and deposited, and that are capable

More information

FLOOD PLAIN DESIGNATION AND PROTECTION

FLOOD PLAIN DESIGNATION AND PROTECTION CITY OF RICHMOND FLOOD PLAIN DESIGNATION AND PROTECTION BYLAW NO. 8204 EFFECTIVE DATE - SEPTEMBER 8, 2008 CONSOLIDATED FOR CONVENIENCE ONLY This is a consolidation of the bylaws listed below. The amendment

More information

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24 Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge

More information

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document LOCAL FLOOD RISK MANAGEMENT STRATEGY Summary Document October 2013 Local Flood Risk Management Strategy Summary 1 Introduction 2 Partner responsibilities 3 What do we know about flooding in the borough?

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

Angora Fire Restoration Activities June 24, 2007. Presented by: Judy Clot Forest Health Enhancement Program

Angora Fire Restoration Activities June 24, 2007. Presented by: Judy Clot Forest Health Enhancement Program Angora Fire Restoration Activities June 24, 2007 Presented by: Judy Clot Forest Health Enhancement Program California Tahoe Conservancy Independent California State Agency within the Resources Agency Governed

More information

CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS

CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS Last Update: 6/8/88 WAC 372-68-010 Authority. 372-68-020 Purpose. 372-68-030 Definitions. 372-68-040 Planning guide.

More information

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN 1 AUGUST 2011 LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN KEY ELEMENTS OF THE PLAN: 1. Replace the existing unsafe Ragged Mountain dam with a new dam and raise the reservoir pool level initially

More information

NATURAL RESOURCES & NATURAL FEATURES

NATURAL RESOURCES & NATURAL FEATURES A3 NATURAL RESOURCES & NATURAL FEATURES INTRODUCTION This chapter will discuss the topography, geology, soils, and other natural features found in Casco Township. The identification of the natural features

More information

WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES

WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES Who Should Read This Guide? Home Buyers/Owners Lending Institutions Landowners Developers Local Officials Construction Design Realtors Companies

More information

STAFF REPORT TO COMMITTEE OF THE WHOLE

STAFF REPORT TO COMMITTEE OF THE WHOLE STAFF REPORT TO COMMITTEE OF THE WHOLE DATE: November 7 2012 TO: FROM: SUBJECT: ATTACHMENT(S): COMMITTEE OF THE WHOLE GINA LAYTE-LISTON, SUPERVISOR, WASTEWATER Stormwater Management Funding Strategy None

More information

CIVL451. Soil Exploration and Characterization

CIVL451. Soil Exploration and Characterization CIVL451 Soil Exploration and Characterization 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally

More information

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter ENVIRONMENTAL STATEMENT: VOLUME 1 9.1 INTRODUCTION 9.1.1 This Chapter considers the effects of the Project on surface water and groundwater

More information

Floodplain Development Land Use Review

Floodplain Development Land Use Review COMMUNITY DEVELOPMENT DEPARTMENT Planning Division P.O. Box 490 333 Broadalbin Street SW Albany, OR 97321 Phone 541-917-7550 Fax 541-791-0150 www.cityofalbany.net Floodplain Development Land Use Review

More information

THE APPRAISAL OF REAL ESTATE 3 RD CANADIAN EDITION BUSI 330

THE APPRAISAL OF REAL ESTATE 3 RD CANADIAN EDITION BUSI 330 THE APPRAISAL OF REAL ESTATE 3 RD CANADIAN EDITION BUSI 330 REVIEW NOTES by CHUCK DUNN CHAPTER 10 Copyright 2010 by the Real Estate Division and Chuck Dunn. All rights reserved ARE 3 rd EDITION REVIEW

More information

SITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.:

SITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.: SITE DEVELOPMENT PLAN CHECKLIST 5/12/05 Rev.3/14/06 Project Name: Site Plan No.: REVIEW CRITERIA Plans: A site development plan (signed and sealed) shall be on a 24 x 36 sheet at a scale that is no smaller

More information

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Whitby CLOCA Whitby CLOCA LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT June 2008 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 STUDY AREA AND SCOPE... 4 3.0 METHODOLOGY...

More information

Appendix B. Introduction to Landslide Evaluation Tools Mapping, Remote Sensing, and Monitoring of Landslides

Appendix B. Introduction to Landslide Evaluation Tools Mapping, Remote Sensing, and Monitoring of Landslides Appendix B. Introduction to Landslide Evaluation Tools Mapping, Remote Sensing, and Monitoring of Landslides 66 The Landslide Handbook A Guide to Understanding Landslides Part 1. Mapping Maps are a useful

More information

Landslides & Mudflows

Landslides & Mudflows 1 2 - What is a Landslide? - Geologic hazard Common to almost all 50 states Annual global Billions in losses Thousands of deaths and injuries 3 1 - What is a Landslide? - Gravity is driving force Some

More information

REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 LEECH WATER SUPPLY AREA RESTORATION UPDATE

REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 LEECH WATER SUPPLY AREA RESTORATION UPDATE Making a difference... together Agenda Item #9 REPORT #RWSC 2013-17 REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 SUBJECT LEECH WATER SUPPLY AREA RESTORATION UPDATE

More information

EcoInformatics International Inc.

EcoInformatics International Inc. 1 von 10 03.08.2010 14:25 EcoInformatics International Inc. Home Services - solutions Projects Concepts Tools Links Contact EXPLORING BEAVER HABITAT AND DISTRIBUTION WITH GOOGLE EARTH: THE LONGEST BEAVER

More information

Mission Canyon Residential Design Guidelines Workshop. Table Focus: Environmental Issues and Concerns

Mission Canyon Residential Design Guidelines Workshop. Table Focus: Environmental Issues and Concerns Mission Canyon Residential Design Guidelines Workshop Table Focus: Environmental Issues and Concerns Grading How is Grading Regulated in Santa Barbara County? The technical aspects of grading are regulated

More information

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Harmony Creek subwatershed Harmony Creek subwatershed BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT April 2011 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska

How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska APPENDIX B Geotechnical Engineering Report GEOTECHNICAL ENGINEERING REPORT Preliminary Geotechnical Study Upper Southeast Salt Creek Sanitary Trunk Sewer Lincoln Wastewater System Lincoln, Nebraska PREPARED

More information

SUBDIVISION APPLICATION GUIDE

SUBDIVISION APPLICATION GUIDE SUBDIVISION APPLICATION GUIDE August 2013 This brochure provides an overview of the steps involved in the Subdivision Application process. This is a general guide only. It is not meant to replace bylaws

More information

7.0 Stream Restoration

7.0 Stream Restoration 7.0 Stream Restoration 7.1 Issue Statements One of the primary concerns of residents in the Bassett Creek watershed is the maintenance of the natural beauty of the creek in residential and recreational

More information

Vital Earth Composting Facility Flood Risk and Drainage Statement

Vital Earth Composting Facility Flood Risk and Drainage Statement Vital Earth Flood Risk and Drainage Statement Final December 2011 Prepared for Vital Earth Ltd Revision Schedule Flood Risk and Drainage Statement December 2011 Rev Date Details Prepared by Reviewed by

More information

Jackson Gulch Outlet Canal Rehabilitation Project

Jackson Gulch Outlet Canal Rehabilitation Project Jackson Gulch Outlet Canal Rehabilitation Project Preliminary Budgetary Estimate for Rehabilitation February 2004 Prepared for the Mancos Water Conservancy District Jackson Gulch Reservoir 42888 County

More information

FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY

FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY London Rd. WATERLOOVILE FOR McCarthy & Stone Ltd. July 2010 Such Salinger Peters Ltd 30558-1- Flood Risk Assessment & Drainage Strategy Contents Paragraph Page

More information

Ponds- Planning, Design, Construction

Ponds- Planning, Design, Construction United States Department of Agriculture Soil Conservation Service Agriculture Handbook Number 590 Ponds- Planning, Design, Construction This handbook describes the requirements for building a pond. It

More information

NAPA COUNTY WATERSHED SYMPOSIUM

NAPA COUNTY WATERSHED SYMPOSIUM Planning, Building, and Environmental Services NAPA VALLEY GROWTH NAPA COUNTY WATERSHED SYMPOSIUM Plunging Forward May 15, 2015 1 YOU CAN T CROSS THE SEA MERELY BY STANDING AND STARING AT THE WATER. Rabindranath

More information

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County,

More information

TABLE OF CONTENTS. GENERAL PROJECT INFORMATION...3 Project Location... 3 Project Description... 3 STUDY OVERVIEW... 3 SITE EVALUATION TECHNIQUES...

TABLE OF CONTENTS. GENERAL PROJECT INFORMATION...3 Project Location... 3 Project Description... 3 STUDY OVERVIEW... 3 SITE EVALUATION TECHNIQUES... App. P-2 TABLE OF CONTENTS GENERAL PROJECT INFORMATION...3 Project Location... 3 Project Description... 3 STUDY OVERVIEW... 3 SITE EVALUATION TECHNIQUES...4 SITE CONDITIONS... 4 Land Use and Zoning...

More information

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY ORDER NO. R5-2011-XXXX INFORMATION SHEET Background Triangle Rock, Inc. (Discharger) submitted a Report of Waste Discharge (RWD) on 23 August 2010. The Discharger is expanding the mining operations at

More information

Newbiggin House Farm,

Newbiggin House Farm, Newbiggin House Farm, Near Waberthwaite Flood Investigation Report 32 Flood Event 30/8/2012 Cumbria County Council Version Undertaken by Reviewed by Approved by Date Preliminary Colin Parkes Anthony Lane

More information

Rural Residential Buildable Lands Inventory

Rural Residential Buildable Lands Inventory The Dalles Periodic Review, May 2013 Rural Residential Lands Inventory Contents Introduction and Summary... 1 Concerns related to the 2007 Analysis... 2 Rural Residential Capacity Summary... 2 Methodology...

More information

Engineering Geological Asset Management for Large Dams. Yasuhito SASAKI (1)

Engineering Geological Asset Management for Large Dams. Yasuhito SASAKI (1) Engineering Geological Asset Management for Large Dams Yasuhito SASAKI (1) (1) Geology Research Team, Public Works Research Institute, Japan E-mail:ya-sasa@pwri.go.jp Abstract Comprehensive inspection

More information

DPAC- DLGSEM and MRT. Landslide planning matrix

DPAC- DLGSEM and MRT. Landslide planning matrix DPAC- DLGSEM and MRT Landslide planning matrix Thank you to MRT, council planners, and the TPC for their support in this work DPAC- DLGSEM and MRT Process thus far Regional workshops (April May) Follow

More information

COASTAL APPLICATION FOR A MAJOR SITING PERMIT

COASTAL APPLICATION FOR A MAJOR SITING PERMIT Frank M. Rabauliman Administrator Commonwealth of the Northern Mariana Islands OFFICE OF THE GOVERNOR Bureau of Environmental and Coastal Quality Division of Coastal Resources Management Gualo Rai Center

More information

East Riding of Yorkshire Council

East Riding of Yorkshire Council East Riding of Yorkshire Council Lead Local Flood Authority Interim Standing Advice Revision A - April 2015 1. Introduction From April 2015 the Lead Local Flood Authority (LLFA) became a statutory consultee

More information

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County Mission Creek Flood Control & Restoration Project City of Fremont, Alameda County Agenda Background Why are proposed improvements necessary? Proposed project components Challenges Construction schedule/phasing

More information

Riprap-lined Swale (RS)

Riprap-lined Swale (RS) Riprap-lined Swale (RS) Practice Description A riprap-lined swale is a natural or constructed channel with an erosion-resistant rock lining designed to carry concentrated runoff to a stable outlet. This

More information

Definition of Tower from the Bradley County Zoning Resolution

Definition of Tower from the Bradley County Zoning Resolution Definition of Tower from the Bradley County Zoning Resolution 43. TOWER. Any outdoor structure designed and constructed to support one (1) or more transmitting or receiving devices for telephone, radio

More information

Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan

Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan Throughout the Plan 1. There is a fundamental need for the revised plan to address how

More information

Hazard Identification and Risk Assessment

Hazard Identification and Risk Assessment Wildfires Risk Assessment This plan is an update of the 2004 City of Redmond Hazard Mitigation Plan (HMP). Although it is an update, this document has been redesigned so that it looks, feels, and reads

More information

Floodplain Connectivity in Restoration Design

Floodplain Connectivity in Restoration Design Floodplain Connectivity in Restoration Design 2015 Symposium on Restoration in a Contaminated Environment: Lessons Learned and Challenges in Moving Forward Part II April 2015 Karin Boyd Applied Geomorphology,

More information

The correct answers are given below. Some talking points have been added for the teachers use.

The correct answers are given below. Some talking points have been added for the teachers use. Natural Resources Canada 2011: Lesson Plan Grades 11 and 12 Landslide activity 5b: Landslides in Canada quiz Description: This is an independent study activity for grades 11 and 12. Students will read

More information

Environmentally Significant Areas of Alberta. Volume 3. Prepared by: Sweetgrass Consultants Ltd. Calgary, AB. for:

Environmentally Significant Areas of Alberta. Volume 3. Prepared by: Sweetgrass Consultants Ltd. Calgary, AB. for: Environmentally Significant Areas of Alberta Volume 3 Prepared by: Calgary, AB for: Resource Data Division Alberta Environmental Protection Edmonton, Alberta March 1997 EXECUTIVE SUMMARY Large portions

More information

King Fire Restoration Project, Eldorado National Forest, Placer and El Dorado Counties, Notice of intent to prepare an environmental impact statement.

King Fire Restoration Project, Eldorado National Forest, Placer and El Dorado Counties, Notice of intent to prepare an environmental impact statement. This document is scheduled to be published in the Federal Register on 12/24/2014 and available online at http://federalregister.gov/a/2014-30158, and on FDsys.gov [3410-11- P] DEPARTMENT OF AGRICULTURE

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.

More information

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WLPS BUNCEFIELD REBUILD Flood Risk Assessment Green Lane Hemel Hempstead Hertfordshire HP2 7HZ September 2009 Prepared

More information

NJ650.1404 Interception Drainage

NJ650.1404 Interception Drainage NJ650.1404 Interception Drainage Interception drainage is used to intercept surface and subsurface water. The investigation, planning, and construction of surface interception drains follow the requirements

More information

Igneous rocks formed when hot molten material (magma) cools and hardens (crystallizes).

Igneous rocks formed when hot molten material (magma) cools and hardens (crystallizes). Objectives You will learn about how the land of North Dakota was formed. Introduction North Dakota is a wonderful place to live. Have you ever though about how it was formed? To answer that question, you

More information

How To Amend A Stormwater Ordinance

How To Amend A Stormwater Ordinance Regulatory Alternatives to Address Stormwater Management and Flooding in the Marlboro Street Study Area Alternative 1: Amend Existing Local Regulations This proposed alternative provides an incremental

More information

CHAPTER 9 CONCLUSIONS AND RECOMMENDED MITIGATION

CHAPTER 9 CONCLUSIONS AND RECOMMENDED MITIGATION CHAPTER 9 CONCLUSIONS AND RECOMMENDED MITIGATION 9.1 Conclusions Based on the stability cross-sections down the SE flank of Snodgrass Mountain, most landslides on low- to moderate-gradient slopes have

More information

CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES

CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES WATER RESOURCES MANAGEMENT DIVISION Water Investigations

More information

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality

More information

EFB 496.10/696.03 Online Wetland Restoration Techniques Class Syllabus

EFB 496.10/696.03 Online Wetland Restoration Techniques Class Syllabus EFB 496.10/696.03 Wetland Restoration Techniques Online Class Syllabus SUNY-ESF College of Environmental Science and Forestry Summer Session II 2015 Wetland Restoration Techniques is a graduate and undergraduate

More information

Type of Sewer Systems. Solomon Seyoum

Type of Sewer Systems. Solomon Seyoum Type of Sewer Systems Solomon Seyoum 0 Learning objectives Upon completion of this lecture, the participants will be able to differentiate between types of sewer systems and discuss different aspects of

More information

Avison Management Services Ltd. COMPANY PROFILE

Avison Management Services Ltd. COMPANY PROFILE Avison Management Services Ltd. COMPANY PROFILE Providing resource management through environmental leadership. Mission Statement: We are committed to providing high quality, timely, and cost effective

More information

LOW LEVEL ROAD RE-ALIGNMENT PACIFIC YEW TREE ASSESSMENT ENKON File No. 1590-001

LOW LEVEL ROAD RE-ALIGNMENT PACIFIC YEW TREE ASSESSMENT ENKON File No. 1590-001 April 11, 2012 Port Metro Vancouver 100 The Pointe, 999 Canada Place Vancouver, BC V6C 3T4 Attention: RE: Carolina Eliasson, Environmental Specialist LOW LEVEL ROAD RE-ALIGNMENT PACIFIC YEW TREE ASSESSMENT

More information

SURFACE REMEDIATION AND MANAGEMENT OVERVIEW

SURFACE REMEDIATION AND MANAGEMENT OVERVIEW SURFACE REMEDIATION AND MANAGEMENT OVERVIEW Giant Mine Remediation Project Environmental Assessment Public Hearings September 10-14, 2012 Adrian Paradis (AANDC) Mike Nahir (AANDC) Bruce Halbert (Technical

More information

Corridor Goals and Objectives

Corridor Goals and Objectives Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty

More information

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013. Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank

More information

Asbestos Storage Facility Plan Examples

Asbestos Storage Facility Plan Examples Asbestos Storage Facility Plan Examples The purpose of this document This document contains examples of what an operational plan, plans and specification, contingency plan and closure plan should look

More information

Storm Water Runoff. Managing. A Self-Assessment Guide for Wisconsin Businesses. Storm water runoff is coming. This guide provides businesses

Storm Water Runoff. Managing. A Self-Assessment Guide for Wisconsin Businesses. Storm water runoff is coming. This guide provides businesses Managing Storm Water Runoff A Self-Assessment Guide for Wisconsin Businesses Storm water runoff is coming under increasing scrutiny as both a source of pollutants to our lakes and streams, and as a cause

More information

APPLICATION PROCESS FOR LAND DISTURBING PERMIT

APPLICATION PROCESS FOR LAND DISTURBING PERMIT PREFACE: APPLICATION PROCESS FOR LAND DISTURBING PERMIT The property owner, developer and designated planners and engineers shall review the general development plans and detailed plans of the Local Issuing

More information

Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12

Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12 CIVL 1112 - Part 1 1/12 The water cycle, also known as the hydrologic cycle, describes the continuous movement of water on, above and below the surface of the Earth. The water cycle, also known as the

More information

Homeowner s Guide to Drainage

Homeowner s Guide to Drainage Homeowner s Guide to Drainage a scottsdale homeowner s guide to drainage produced by the city of scottsdale s stormwater management division Transportation Department TABLE OF CONTENTS Introduction 2 Drainage

More information

Restoration Planning and Development of a Restoration Bank

Restoration Planning and Development of a Restoration Bank Restoration Planning and Development of a Restoration Bank Black Creek Pioneer Village, South Theatre 8:30 a.m. to 3:30 p.m. Habitat Restoration and Environmental Monitoring Projects Section Restoration

More information

Tool 2.3.1: General information on the causes of rainfall-induced landslides

Tool 2.3.1: General information on the causes of rainfall-induced landslides Impacts of Climate Change on Urban Infrastructure & the Built Environment A Toolbox Tool 2.3.1: General information on the causes of rainfall-induced landslides Author G. Dellow Affiliation GNS Science,

More information

Various options are discussed below.these low cost, low impact interventions can also be applied as general erosion control methods.

Various options are discussed below.these low cost, low impact interventions can also be applied as general erosion control methods. Week 10 River Hydraulics Rehabilitating Urban Waterways (From http://hubpages.com/hub/river-bank-erosion-control-methods) See also the resources placed on Moodle. Water channels should be viewed as a resource

More information

Georgia Performance Standards Framework for Science Grade 6. Unit Organizer: Water in Earth s Processes. (Approximate Time: 5-6 Weeks)

Georgia Performance Standards Framework for Science Grade 6. Unit Organizer: Water in Earth s Processes. (Approximate Time: 5-6 Weeks) The following instructional plan is part of a GaDOE collection of Unit Frameworks, Performance Tasks, examples of Student Work, and Teacher Commentary. Many more GaDOE approved instructional plans are

More information

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk 1 Introduction 1.1 Key objective The aim of this study is to identify and assess possible options for improving the quality of the river channel and habitats in the River South Esk catchment whilst helping

More information

13. ENVIRONMENTAL PROTECTION/ RESOURCE MANAGEMENT

13. ENVIRONMENTAL PROTECTION/ RESOURCE MANAGEMENT 13. ENVIRONMENTAL PROTECTION/ RESOURCE MANAGEMENT A. Existing Conditions Ramsey is fortunate to have an ample amount of natural resources and open space areas and a community attitude that is increasingly

More information

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1 COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES April 20, 2010 EXHIBIT 1 ELEMENT 4 WATER RESOURCES TABLE OF CONTENTS 4.1 INTRODUCTION 4.2 GOALS AND POLICIES 4.2.A General Goals and Policies 1 4.2.B

More information

Landslides & Mudslides

Landslides & Mudslides Landslides & Mudslides Landslides, also known as mudslides and debris flow, occur in all U.S. states and territories. In snowy mountainous areas winter snow landslides are called avalanches. Landslides

More information

London Borough of Merton Local Flood Risk Management Strategy

London Borough of Merton Local Flood Risk Management Strategy Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has recently enacted the Flood

More information