1 DISPELLING MISPERCEPTIONS REGARDING THE PERFORMANCE OF CPVC FIRE SPRINKLER SYSTEMS DURING SEISMIC EVENTS Third-Party Seismic Testing and Field Performance Document Superior Reliability of CPVC Pipe and Fittings By Andy Olah, Ph.D Few people in the building industry would dispute the fact that the seismic requirements in building codes have gotten tougher in recent years, especially for such critical life safety products as fire sprinkler systems. As a result, today there are additional seismic requirements for sprinkler systems that go far beyond those originally specified in NFPA 13. What prompted the changes? Seismic activity continues to monopolize news headlines in both the consumer and trade media outlets. At the core of this increased focus is the perception that earthquakes might actually be on the increase. Based on the frequency of news reports relative to earthquake damage, it may seem that we are having more earthquakes in the U.S. and abroad. However, according to the United States Geological Survey s (USGS) Earthquake Hazards Program, earthquakes of magnitude 7.0 or greater have remained fairly consistent over the years. What has changed, however, is the number of earthquakes that can now be documented each year. This is because of the tremendous increase in the number of seismograph stations in the world and the many improvements in global communications. In 1931, there were about 350 stations operating in the world. Today, there are more than 8,000 stations, and the data comes in rapidly from these stations via electronic mail, Internet and satellite. As a result of such technological advances, the National Earthquake Information Center (NEIC) now locates about 20,000 earthquakes each year, which translates into approximately 50 per day. Of course, not all earthquakes are notable from a building code standpoint. The majority, in fact, occur without any tremors felt on the earth s surface. According to long-term records that have been kept since about 1900, the USGS predicts there will be about 17 major earthquakes ( on the Richter scale) and one great earthquake (8.0 or above) in any given year. So if earthquakes are not truly on the rise, why the increased focus on the seismic performance of such nonstructural components as fire sprinkler systems? The answer likely relates to the increased amount of damage that earthquakes cause. As urban areas have continued to grow, the damage resulting from an earthquake-as measured both in terms of the loss of human lives, as well as structural collapse-have increased substantially. As a result, we have seen industry-wide initiatives to improve the post-earthquake reliability of fire safety systems through stricter bracing requirements and the selection of piping system materials.

2 Fire is a real concern during and after major earthquakes in major urban areas since the tremors are often followed by major destructive fires that result from accidental ignition due to earthquake shaking. In addition, earthquake damage to fire safety systems can likely cause a loss of water supplies for fire suppression. These were only a few of the observations documented after the 1989 Loma Prieta and the 1994 Northridge earthquakes which caused catastrophic nonstructural damage, including that to the steel fire sprinkler systems inside. What Changed? Between 2004 and 2007, there was an agreement between NFPA and ASCE to incorporate changes to NFPA 13 that made them consistent with ASCE Most changes up to 2007 focused on providing additional support to a fire sprinkler system in the form of sway bracing-both lateral and longitudinal. This added support ensures that the sprinkler system will remain integral to the structure and not undergo oscillatory modes counter to that of the surrounding structural environment. These modes can impart catastrophic damage to the system, rendering it inoperable in the time of need. More recently, there has been greater focus on the material used in the piping system. Chlorinated polyvinyl chloride (better known as CPVC) has grown steadily in popularity since it was first used in fire sprinkler systems more than 25 years ago. Today, it is the material of choice for many residential and commercial contractors and specifiers who favor its ease of installation, corrosion resistance and overall lower cost structure. Dispelling the Myths The challenge, to date, in specifying CPVC for larger commercial projects located in major seismic zones is that the industry continues to be plagued by myths regarding the performance and reliability of CPVC pipe and fittings during and after a significant seismic event. This article is designed to address two of the more common myths: 1. A CPVC piping system is more likely to be compromised as the result of seismic activity than steel 2. Since CPVC systems require twice as many support hangers as steel systems, the CPVC bracing requirement should also be doubled or, at least, increased in order for the system to withstand seismic loading. Actual field performance, as well as lab tests conducted by third-party engineers and materials scientists, proves that CPVC is at least as good, if not better, than steel during and after a seismic event. Why? Because the yield point of stress of CPVC is much greater than most people realize. In fact, the forcible bending of a BlazeMaster CPVC fire sprinkler system, in particular, can far exceed that specified by the support spacing

3 criterion. Although CPVC is considered a rigid material, it offers added flexibility over steel. Such flexibility is critical to a fire sprinkler system s ability to adjust to movement and distortion. As for the debate over bracing requirements, it should be noted that hanger support requirements are based more on aesthetics than performance. Hanger spacing requirements of every six feet (for 1 pipe) have been established to prevent any appreciable sagging between the hangers. Not only is sagging an aesthetics issue, but it also relates to the NFPA requirement that wet systems must drain. Since CPVC is more flexible, added hangers are needed to eliminate trapped water that could form in sagging pipes. Therefore, it is not accurate to assume that a CPVC system would require additional hangers to withstand seismic loading. Rather, hanger requirements should reflect the mid-span deflection of the CPVC pipe. Scientific mid-span loading testing has shown that BlazeMaster CPVC 1 pipe, specifically, can withstand a mid-span load of at least 300 pounds, which parallels the amount of force of seismic loading. In the past, approvals agencies such as FM have questioned whether CPVC pipe could move enough to adapt to the hangers moving in a direction as a result of seismic activity. It was Lubrizol that led the industry effort to demonstrate how well a CPVC fire sprinkler system could perform without rupturing, despite large-scale deformation of the system. It is also important to note that seismic requirements typically start with cross-mains and feed-mains. Branch lines are seldom required to have seismic bracing. Because of the superior C-factor of BlazeMaster CPVC pipe and the fact that it is only installed in Light Hazard applications, it is not uncommon for a CPVC system to be installed without any seismic hangers, thus minimizing any concerns of the system being able to adapt to hangers moving in a contrary direction. Tests for Determining Seismic Performance It was Wiss, Janney, Elstner Associates, Inc. (WJE), a nationally renowned engineering, architectural and materials testing company that conducted not one, but two tests, utilizing different methodologies to confirm that a CPVC fire sprinkler system could better tolerate the type of motion experienced during an earthquake than threaded steel. With more than 50 years in the business, 400+ professionals and 19 offices nationwide, Chicago-based WJE is a recognized leader in both product testing and specification. WJE first tested the performance of BlazeMaster CPVC pipe and fittings and compared it to the performance of steel pipe (1 in diameter) using cyclic loading. The test setup consisted of suspending the piping from dimensional lumber connected to steel framing, which was anchored to the structural lab floor. Pipe support hangers were spaced 6ft. for each pipe. The test configuration consisted of installing 1 diameter BlazeMaster CPVC pipe in a Z-shape with two 90-degree connections to the test framing. Steel pipe 1 in diameter was assembled independently in the same design configuration. The hangers on one side of the framing were positioned and connected to the wood members such that this section of the piping was allowed to slide during loading. The pipe was filled with water and pressurized to 175 psi before the start of each test. Displacement of the pipe was controlled using a hydraulic actuator. A load cell was in-line with the actuator and pipe to measure the force required to move the pipe.

4 Both types of pipe were displaced a maximum of +3, or a total displacement of 6, during which time the connections were monitored for water leakage. The actuator moved at a frequency of 0.04 Hz (or approximately two cycles every 50 seconds) for a period of nearly 20 minutes. After 50 cycles, the BlazeMaster CPVC system remained uncompromised. Failure did not occur at the elbow connections or along the pipe length. And, the pressure remained at 175 psi throughout the test. In contrast, the steel pipe failed at a 90-degree elbow after approximately 33 cycles of +3 of displacement. The failure not only created a loss in pressure but also caused water to spray out of the joint connection. Upon careful analysis, it was determined that a fatigue failure had occurred at the elbow threaded connection. In a separate test, WJE performed displacement testing on BlazeMaser CPVC pipe in order to compare the performance of CPVC pipe to Schedule 80 steel pipe. Three different assemblies were created: BlazeMaster pipe with solvent welded connections, Schedule 80 steel pipe with fitted connections, and Schedule 80 steel pipe with welded connections. The pipe was assembled to make a straight or Z-shape configuration and then displaced a predetermined amount while pressurized with water. Before testing, each sample was pressurized with water to 175 psi for the straight segment test. A hydraulic ram was attached to one end of the pipe. The opposite end was restrained to resist the applied load from the hydraulic ram. Each sample was laterally displaced 3 at mid-length. The pipe was then pushed longitudinally 18 for 100 cycles or failure, whichever came first. The BlazeMaster CPVC sample did not develop a leak even after 100 cycles. The steel pipe with a threaded coupler failed as it was pushed longitudinally during the first cycle at the coupler threads. The steel pipe with welded coupler could be pushed 8 and 10 in longitudinally for 20 cycles without failure. When pushed 12 longitudinally, the sample failed after three cycles at the connection from hydraulic ram and developed a permanent bend. For the Z-shape configuration testing, a hydraulic ram was attached to one end of the pipe. The opposite end was restrained to resist the applied load from the hydraulic ram. Each sample was placed in a neutral position and displaced +10 for 200 cycles or failure, whichever came first. The BlazeMaster CPVC sample did not develop a leak, even after 200 cycles. The steel pipe with welded elbows did not develop a leak but had a permanent bend from the displacement. The steel pipe with welded elbows did not develop a leak but did exhibit a permanent bend from the cyclic displacement. These permanent bends, in addition to potentially compromising the long-term integrity of the pipe, also can restrict water flow. Proven Performance in the Field Only seven months after its installation-on October 10, 1986, at 11:00 a.m.-a BlazeMaster CPVC fire sprinkler system was put to one of its toughest tests when San Salvador suffered a devastating earthquake that lasted seven seconds and measured 7.5 on the Richter scale. Not only was the epicenter of the earthquake in close

5 proximity to the embassy where the BlazeMaster system was installed, but it is estimated that roughly 1,300 aftershocks rocked the immediate area in the week after the main tremor. Estimates of casualties varied greatly but were believed to be around 1,000 with another 150,000 people left homeless. More than 200 buildings in San Salvador were destroyed or severely damaged, including those in the embassy complex. The main embassy building suffered major damage throughout and had to be immediately abandoned. In fact, a number of massive 1 and 1-1/4 thick steel reinforcement bars embedded in the building s concrete support columns were bent like pretzels from the force of the earthquake. The annex building suffered only moderate damage and remained in operation. A thorough assessment of the main building after the earthquake determined that the building was no longer usable. Although the building had previously survived several quakes along the secondary fault line that ran directly beneath the embassy compound, the damage from this latest quake was irreparable, since the quake cut through two of the building s main supporting pillars and cracked another two, causing the main beams to sag. Despite the massive structural damage, including the complete destruction of all HVAC and plumbing systems, and the fact that fire sprinkler systems are not specifically designed to withstand explosions or earthquakes, the BlazeMaster CPVC fire sprinkler system remained largely intact. Despite two breaks in the main building, the entire system substantially stayed online. Immediately following the incident, the State Department sent a team of engineering experts that confirmed that the BlazeMaster system would have been able to suppress any fire in the complex caused by the earthquake. In fact, once the two breaks were temporarily isolated by embassy personnel shortly after the earthquake, the balance of the complex was fully protected at all times. Amazingly, there were no other breaks or leaks caused by any type of sprinkler system failure. The system maintained pressure and the fire pump cycled, as designed, meaning that, had a fire accompanied the earthquake, the sprinkler system would have worked. Of the two breaks in the main building only, one was understandably caused by the crushing action of a large air conditioner duct falling on a section of distribution pipe. The other break occurred at the steel branch riser on the top level where the building experienced the most vibration. It was also later determined that the break at the branch riser on the top level resulted because the steel riser was not able to absorb the same shock that the more flexible CPVC branch line was able to withstand. The repair of the job was done with ease. The entire rehab effort at the main building (including evaluation of the sprinkler system, completion of necessary repairs, isolation of the two breaks and retesting the system) was accomplished by a three-man team in less than one day. It s also important to note that the sprinkler system in the annex was completely undamaged and required no rehabilitation efforts.

6 Since the fire sprinkler system was not compromised, the city of San Salvador had safe access to the system s water supply. This was critical as it became the only convenient source for water for domestic use immediately following the earthquake, because the municipal water distribution system was completely destroyed by fractured street mains. As amazing as this story is, it is equally interesting to note that in the 25+ years since Lubrizol introduced the first CPVC compound specifically for fire sprinkler systems under the BlazeMaster name, the company has not received notification of any system failures as the result of an earthquake (despite the fact that hundreds/thousands of BlazeMaster systems have been installed in residential and commercial buildings, many of which are located in major seismic zones). Conclusion Stricter building codes are pushing the limits of performance of today s fire sprinkler piping materials. This article has demonstrated that, despite the various myths surrounding the long-term reliability and durability of CPVC pipe and fittings, this high-performance thermoplastic can and has outperformed steel piping during and after seismic events. As a result, it deserves serious consideration when specifying and building residential and commercial projects-especially those located in areas identified as having high seismic activity. Moreover, when installed within structures not falling under the guidelines of NFPA 13 seismic hanging and bracing instructions, the performance and survivability of a BlazeMaster CPVC fire sprinkler system will equal, if not exceed, that of a steel sprinkler system. About the Author: Dr. Olah is the technical manager for BlazeMaster Fire Sprinkler Systems of The Lubrizol Corporation. He has nearly 25 years of experience in the area of CPVC research and development. Olah is a member of the National Fire Protection Association, the National Fire Sprinkler Association, the American Fire Sprinkler Association, ASTM Standards Committee E-5 on Fire Safety Products, Committee F-17 on Plastic Pipe and Building Materials and Committee D-20 on Plastics. He has also served on several Underwriters Laboratories, Standards Technical panels. His Ph.D. in polymer science is from Case Western Reserve University in Cleveland.

Earthquakes and Data Centers

Earthquakes and Data Centers 7x24 Exchange Fall Symposium September 11, 2013 Hilton Bellevue Andrew W. Taylor, Ph.D., S.E., FACI Earthquake Hazards 2 September 11, 2013 1 Cascadia Earthquake Sources Figure Credit: Craig Weaver, Pacific

More information

How do scientists measure earthquakes?

How do scientists measure earthquakes? Name: Source: http://www.scholastic.com/browse/article.jsp?id=4892 http://gizmodo.com/5833688/what-do-earthquake-magnitudes-mean http://www.kids-fun-science.com/moment-magnitude-scale.html http://tremor.nmt.edu/faq/how.html

More information

Earthquakes. Earthquakes: Big Ideas. Earthquakes

Earthquakes. Earthquakes: Big Ideas. Earthquakes Earthquakes Earthquakes: Big Ideas Humans cannot eliminate natural hazards but can engage in activities that reduce their impacts by identifying high-risk locations, improving construction methods, and

More information

THE DESIGN OF BUILDING SERVICES FOR EARTHQUAKE RESISTANCE

THE DESIGN OF BUILDING SERVICES FOR EARTHQUAKE RESISTANCE THE DESIGN OF BUILDING SERVICES FOR EARTHQUAKE RESISTANCE Graeme J BEATTIE 1 SUMMARY The design of seismic restraints for building services equipment is often a matter that is overlooked because there

More information

METHOD OF STATEMENT FOR STATIC LOADING TEST

METHOD OF STATEMENT FOR STATIC LOADING TEST Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents

More information

AFTER THE BIG ONE, WILL CRITICAL COUNTY SERVICES SURVIVE?

AFTER THE BIG ONE, WILL CRITICAL COUNTY SERVICES SURVIVE? AFTER THE BIG ONE, WILL CRITICAL COUNTY SERVICES SURVIVE? SUMMARY There is a 67% probability that Southern California will be hit by a magnitude 6.7 or larger earthquake in the next 30 years according

More information

Chapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE

Chapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE Chapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE To satisfy the performance goals of the NEHRP Recommended Seismic Provisions, a number of characteristics are important to the

More information

DISASTER RESISTANCE EARTHQUAKES AND STRUCTURES

DISASTER RESISTANCE EARTHQUAKES AND STRUCTURES DISASTER RESISTANCE EARTHQUAKES AND STRUCTURES EARTHQUAKES Origin of earthquakes The earth was a single land about two hundred million years ago. This land split progressively over a long period of time

More information

Unit 4 Lesson 6 Measuring Earthquake Waves. Copyright Houghton Mifflin Harcourt Publishing Company

Unit 4 Lesson 6 Measuring Earthquake Waves. Copyright Houghton Mifflin Harcourt Publishing Company Shake, Rattle, and Roll What happens during an earthquake? As plates of the lithosphere move, the stress on rocks at or near the edges of the plates increases. This stress causes faults to form. A fault

More information

SEISMIC DESIGN. Various building codes consider the following categories for the analysis and design for earthquake loading:

SEISMIC DESIGN. Various building codes consider the following categories for the analysis and design for earthquake loading: SEISMIC DESIGN Various building codes consider the following categories for the analysis and design for earthquake loading: 1. Seismic Performance Category (SPC), varies from A to E, depending on how the

More information

Chapter. Earthquake Damage: Types, Process, Categories

Chapter. Earthquake Damage: Types, Process, Categories 3 Chapter Earthquake Damage: Types, Process, Categories Earthquakes leave behind a trail of damage and destruction. People s lives are affected by the loss of loved ones, destruction of property, economic

More information

AN ANALYSIS OF FIRE SPRINKLER SYSTEM FAILURES DURING THE NORTHRIDGE EARTHQUAKE AND COMPARISON WITH THE SEISMIC DESIGN STANDARD FOR THESE SYSTEMS

AN ANALYSIS OF FIRE SPRINKLER SYSTEM FAILURES DURING THE NORTHRIDGE EARTHQUAKE AND COMPARISON WITH THE SEISMIC DESIGN STANDARD FOR THESE SYSTEMS 13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 2136 AN ANALYSIS OF FIRE SPRINKLER SYSTEM FAILURES DURING THE NORTHRIDGE EARTHQUAKE AND COMPARISON WITH

More information

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona for Earthen Material and Straw Bale Structures SECTION 70 - GENERAL "APPENDIX CHAPTER 7 - EARTHEN MATERIAL STRUCTURES 70. Purpose. The purpose of this chapter is to establish minimum standards of safety

More information

FOURTH GRADE EARTHQUAKES 1 WEEK LESSON PLANS AND ACTIVITIES

FOURTH GRADE EARTHQUAKES 1 WEEK LESSON PLANS AND ACTIVITIES FOURTH GRADE EARTHQUAKES 1 WEEK LESSON PLANS AND ACTIVITIES PLATE TECTONIC CYCLE OVERVIEW OF FOURTH GRADE VOLCANOES WEEK 1. PRE: Comparing different structures of volcanoes. DURING: Modeling three types

More information

Five reasons buildings fail in an earthquake and how to avoid them

Five reasons buildings fail in an earthquake and how to avoid them Five reasons buildings fail in an earthquake and how to avoid them by Jeff White, AIA Published in Healthcare Design magazine There s a saying among seismologists: Earthquakes don t kill people. Buildings

More information

The Severity of an Earthquake - ---- U.S. Department of the Interior/Geological Survey

The Severity of an Earthquake - ---- U.S. Department of the Interior/Geological Survey The Severity of an Earthquake - ---- U.S. Department of the Interior/Geological Survey ----~ Earthquakes can be measured in terms of either the effect of the earthquake (intensity) or of the energy released

More information

STRUCTURAL ASSESSMENT REPORT BOLINAS MARINE STATION - BOLINAS, CALIFORNIA

STRUCTURAL ASSESSMENT REPORT BOLINAS MARINE STATION - BOLINAS, CALIFORNIA STRUCTURAL ASSESSMENT REPORT BOLINAS MARINE STATION - BOLINAS, CALIFORNIA College of Marin c/o Swinerton Management & Consulting P.O. Box 144003 835 College Avenue, Building MS-3 Kentfield, California

More information

EARTHQUAKE PREDICTION

EARTHQUAKE PREDICTION Lecture 15 Earthquake Prediction EARTHQUAKE PREDICTION To successfully predict an earthquake we would like to know:- PLACE TIME MAGNITUDE (rather like a weather forecast) 1 Evidence must be integrated

More information

Protecting Your Facility from the Dangers of Earthquakes

Protecting Your Facility from the Dangers of Earthquakes Protecting Your Facility from the Dangers of Earthquakes Identify Earthquake Exposures Earthquake is a rare natural hazard that can not be prevented or predicted with any certainty. Fortunately, this reality

More information

Bolting: Attachment Of The Mudsill To The Foundation

Bolting: Attachment Of The Mudsill To The Foundation Bolting: Attachment Of The Mudsill To The Foundation If the mudsill of a house (the pink area in the illustration at right) is not bolted, the lateral loads (back and forth motions) of an earthquake can

More information

DIVISION 4300 STORM DRAINAGE

DIVISION 4300 STORM DRAINAGE DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES

More information

Earthquakes. www.earthquakes.bgs.ac.uk

Earthquakes. www.earthquakes.bgs.ac.uk Earthquakes www.earthquakes.bgs.ac.uk Introduction Earthquakes are among the most deadly natural hazards. There are around 100 earthquakes each year of a size that could cause serious damage. They strike

More information

REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE

REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE A.Rito Proponte, Lda, Lisbon, Portugal J. Appleton A2P Consult, Lda, Lisbon, Portugal ABSTRACT: The Figueira da Foz Bridge includes a 405 m long cable stayed

More information

Structural Failures Cost Lives and Time

Structural Failures Cost Lives and Time Structural Failures Cost Lives and Time Recent failures of storage bins, silos and other structures highlight the need to increase awareness of hazards associated with these structures. Since 2010, one

More information

PVC PIPE PERFORMANCE FACTORS

PVC PIPE PERFORMANCE FACTORS PVC PIPE PERFORMANCE FACTORS PVC pipe, like all flexible pipe products, is very dependent on the surrounding soil for its structural capacity, in addition, the pipe material must have sufficient inherent

More information

SECTION 1 GENERAL REQUIREMENTS

SECTION 1 GENERAL REQUIREMENTS Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,

More information

Current Status of Seismic Retrofitting Technology

Current Status of Seismic Retrofitting Technology CONTENTS Current Status of Seismic Retrofitting Technology Damages of Past Earthquakes Seismic Diagnosis Method Building Control Section Urban Building Division Bureau of Urban Development, TMG Seismic

More information

Optimum proportions for the design of suspension bridge

Optimum proportions for the design of suspension bridge Journal of Civil Engineering (IEB), 34 (1) (26) 1-14 Optimum proportions for the design of suspension bridge Tanvir Manzur and Alamgir Habib Department of Civil Engineering Bangladesh University of Engineering

More information

PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT

PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT GENERAL INFORMATION 1.1 This section applies to piping systems for chilled water, hot water, condenser water, steam, condensate return, fuel oil, refrigerant

More information

Locating the Epicenter and Determining the Magnitude of an Earthquake

Locating the Epicenter and Determining the Magnitude of an Earthquake Locating the and Determining the Magnitude of an Earthquake Locating the Measuring the S-P time interval There are hundreds of seismic data recording stations throughout the United States and the rest

More information

Name Date Class. By studying the Vocabulary and Notes listed for each section below, you can gain a better understanding of this chapter.

Name Date Class. By studying the Vocabulary and Notes listed for each section below, you can gain a better understanding of this chapter. CHAPTER 7 VOCABULARY & NOTES WORKSHEET Earthquakes By studying the Vocabulary and Notes listed for each section below, you can gain a better understanding of this chapter. SECTION 1 Vocabulary In your

More information

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION General 7 www.meadowburke.com 877-518-7665 MB1109 CONCRETE FLOOR SLAB AND CASTING BED CONSTRUCTION Quality Construction Begins at Ground Level Everything

More information

Structural Audit of Buildings

Structural Audit of Buildings International Journal of Civil Engineering Research. ISSN 2278-3652 Volume 5, Number 4 (2014), pp. 411-416 Research India Publications http://www.ripublication.com/ijcer.htm Structural Audit of Buildings

More information

Earthquakes. www.earthquakes.bgs.ac.uk. Seismograph stations operated by the British Geological Survey

Earthquakes. www.earthquakes.bgs.ac.uk. Seismograph stations operated by the British Geological Survey Seismograph stations operated by the British Geological Survey Earthquakes Photograph supplied by Andy Thompson, Arup Advanced Technology, EEFIT Mission www.earthquakes.bgs.ac.uk Introduction Earthquakes

More information

Green Thread Product Data

Green Thread Product Data Green Thread Product Data Applications Dilute Acids Caustics Produced Water Industrial Waste Hot Water Condensate Return Materials and Construction All pipe manufactured by filament winding process using

More information

Name: Date: Class: Finding Epicenters and Measuring Magnitudes Worksheet

Name: Date: Class: Finding Epicenters and Measuring Magnitudes Worksheet Example Answers Name: Date: Class: Finding Epicenters and Measuring Magnitudes Worksheet Objective: To use seismic data and an interactive simulation to triangulate the location and measure the magnitude

More information

AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL)

AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL) AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL) Site Biography Market Area: Chicago, IL Location: Lisle, IL 60532 Address: 4513 Western Avenue CLLI,POP, NPA/NXX Code: LSLEILAA, EQLAILAA

More information

EARTHQUAKES. Compressional Tensional Slip-strike

EARTHQUAKES. Compressional Tensional Slip-strike Earthquakes-page 1 EARTHQUAKES Earthquakes occur along faults, planes of weakness in the crustal rocks. Although earthquakes can occur anywhere, they are most likely along crustal plate boundaries, such

More information

EARTHQUAKE MAGNITUDE

EARTHQUAKE MAGNITUDE EARTHQUAKE MAGNITUDE Earliest measure of earthquake size Dimensionless number measured various ways, including M L local magnitude m b body wave magnitude M s surface wave magnitude M w moment magnitude

More information

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST RESIDENTIAL FIRE SPRINKLERS NFPA 13R

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST RESIDENTIAL FIRE SPRINKLERS NFPA 13R July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST RESIDENTIAL FIRE SPRINKLERS NFPA 13R Address: Permit #: Inspector: Date: Status: Inspector: Date: Status: A-Approved;

More information

C I T Y O F S E L M A F I R E D E P A R T M E N T

C I T Y O F S E L M A F I R E D E P A R T M E N T C I T Y O F S E L M A F I R E D E P A R T M E N T Informational Bulletin Regarding Residential Fire Sprinkler Systems for One and Two Family Homes: Frequently Asked Questions ADMINISTRATIVE PROVISIONS:

More information

The Dynamic Crust 2) EVIDENCE FOR CRUSTAL MOVEMENT

The Dynamic Crust 2) EVIDENCE FOR CRUSTAL MOVEMENT The Dynamic Crust 1) Virtually everything you need to know about the interior of the earth can be found on page 10 of your reference tables. Take the time to become familiar with page 10 and everything

More information

US 51 Ohio River Bridge Engineering and Environmental Study

US 51 Ohio River Bridge Engineering and Environmental Study US 51 Ohio River Bridge Engineering and Environmental Study ITEM NOS. 1-100.00 & 1-1140.00 Prepared by: Michael Baker Jr., Inc. 9750 Ormsby Station Rd Louisville, KY 40223 August 16, 2013 Table of Contents

More information

/ Marley Class 800 Mechanical Draft Cooling Tower /

/ Marley Class 800 Mechanical Draft Cooling Tower / / Marley Class 800 Mechanical Draft Cooling Tower / / Design Integrity Design Flexibility / 8 Cell Medical Center HVAC system The Marley Class 800 counterflow concrete cooling tower has proven itself as

More information

SECTION 7 Engineered Buildings Field Investigation

SECTION 7 Engineered Buildings Field Investigation SECTION 7 Engineered Buildings Field Investigation Types of Data to Be Collected and Recorded A field investigator looking at engineered buildings is expected to assess the type of damage to buildings.

More information

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL 7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction

More information

Earthquakes: Risk & Insurance Issues

Earthquakes: Risk & Insurance Issues Earthquakes: Risk & Insurance Issues An earthquake is a sudden and rapid shaking of the earth caused by the breaking and shifting of rock beneath the earth s surface. This shaking can sometimes trigger

More information

DESIGN CRITERIA. Determination of earthquake demand. Building importance level. Component categories SEISMICALLY RESILIENT NON-STRUCTURAL ELEMENTS

DESIGN CRITERIA. Determination of earthquake demand. Building importance level. Component categories SEISMICALLY RESILIENT NON-STRUCTURAL ELEMENTS FACT SHEET 2 NZS 4219:2009 Seismic performance of engineering systems in buildings requires the arrangement and layout of engineering systems within a building to allow for earthquake actions. NZS 4219:2009

More information

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal Ontario Fire Code SECTION 5.13 DIP TANKS Illustrated Commentary Office of the Ontario Fire Marshal Dip Tanks Illustrated Commentary 1 5.13.1. Location 5.13.1.1. Dip tank operations involving flammable

More information

inimi ing damage and repair osts to manufa tured omes during an eart ua e

inimi ing damage and repair osts to manufa tured omes during an eart ua e inimi ing damage and repair osts to manufa tured omes during an eart ua e Prepared for T e Department of Housing and Urban Development Offi e of Poli y Development and eesear by t e National Conferen e

More information

Chapter 3 Pre-Installation, Foundations and Piers

Chapter 3 Pre-Installation, Foundations and Piers Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory

More information

The Jockey Pump, an Important Part of a Fire Pump System.

The Jockey Pump, an Important Part of a Fire Pump System. The Jockey Pump, an Important Part of a Fire Pump System. May 18, 2008 A Jockey Pump is an important component of a fire pump system. The Jockey Pump is not as mundane, as many engineers, contractors and

More information

SECTION 8 Industrial Facilities Field Investigation

SECTION 8 Industrial Facilities Field Investigation SECTION 8 Industrial Facilities Field Investigation Types of Data to Be Collected and Recorded Warehouses, manufacturing facilities, energy-producing facilities, and factories should be inspected for performance

More information

Underground Storage Tanks

Underground Storage Tanks Underground Storage Tanks An Informational and Guidance Document for the University Community. Please contact Yale Environmental Health and Safety for latest Regulatory Requirements. A typical UST installation

More information

More inside :: Tackle even the toughest water treatment piping challenges with

More inside :: Tackle even the toughest water treatment piping challenges with More inside :: Tackle even the toughest water treatment piping challenges with Corzan Industrial Systems Corrosion to pipes, valves and fittings caused by chemicals and microbes can greatly impact the

More information

MERCER ISLAND FIRE DEPARTMENT FIRE COMMERCIAL SPRINKLER STANDARDS

MERCER ISLAND FIRE DEPARTMENT FIRE COMMERCIAL SPRINKLER STANDARDS MERCER ISLAND FIRE DEPARTMENT FIRE COMMERCIAL SPRINKLER STANDARDS COMMERCIAL FIRE SPRINKLER SYSTEMS Page 1-5 SCOPE: Fire sprinkler systems in the City of Mercer Island shall meet the criteria as set forth

More information

ASSESSMENT AND PROPOSED STRUCTURAL REPAIR STRATEGIES FOR BRIDGE PIERS IN TAIWAN DAMAGED BY THE JI-JI EARTHQUAKE ABSTRACT

ASSESSMENT AND PROPOSED STRUCTURAL REPAIR STRATEGIES FOR BRIDGE PIERS IN TAIWAN DAMAGED BY THE JI-JI EARTHQUAKE ABSTRACT ASSESSMENT AND PROPOSED STRUCTURAL REPAIR STRATEGIES FOR BRIDGE PIERS IN TAIWAN DAMAGED BY THE JI-JI EARTHQUAKE Pei-Chang Huang 1, Graduate Research Assistant / MS Candidate Yao T. Hsu 2, Ph.D., PE, Associate

More information

ELEVATOR TRAVELING CABLE - DESIGN EVOLUTION

ELEVATOR TRAVELING CABLE - DESIGN EVOLUTION ELEVATOR TRAVELING CABLE - DESIGN EVOLUTION by Richard Laney Introduction Elevator traveling cable is a vital link between the elevator car and controller. In conventional elevators, all power and signal

More information

CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS

CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS 1.0 DESIGN 1.1 Scope of Work 1.1.1 This work shall consist of furnishing Isolation Bearings and installing Isolation Bearing Assemblies at the locations

More information

Introduction to Pressure Pipe Rehabilitation with CIPP

Introduction to Pressure Pipe Rehabilitation with CIPP Introduction to Pressure Pipe Rehabilitation with CIPP Founded in early 1990 s RS Technik is a global leader in the rehabilitation of underground pipes RS Technik uses Cured-in- Place (CIPP) technology

More information

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI 318-14

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI 318-14 Draft Table of Contents Building Code Requirements for Structural Concrete and Commentary ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318 14) Chapter 1 General 1.1 Scope of ACI 318

More information

Embedded Parts Introduction - Anchors

Embedded Parts Introduction - Anchors In the plant construction or process plants such as chemical, petrochemical, gas or power plants various disciplines are brought into contact and built on each other. Civil, mechanical, electro technical

More information

Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE

Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE 1.0 GENERAL 1.1 DESCRIPTION This section addresses the procedures to be employed for pipe bursting existing water/sewer pipelines, as identified on the drawings, and replacing with new Restrained Joint

More information

Fire Sprinkler System Maintenance and Testing Page 1 MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS

Fire Sprinkler System Maintenance and Testing Page 1 MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS Page 1 MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS Introduction When properly installed and maintained, automatic fire sprinkler systems have proven to be the most effective means for protecting

More information

Pyroguard Wired Glass

Pyroguard Wired Glass Fire-rated Glass Pyroguard Wired Glass Where glass becomes architecture Section 15 03 Introduction Oldcastle Glass stocks nonwired Pyroguard laminated safety glass and polished wired glass for commercial,

More information

Project Report. Structural Investigations Hotel del Sol Yuma, Arizona

Project Report. Structural Investigations Hotel del Sol Yuma, Arizona Project Report Structural Investigations Yuma, Arizona Prepared by: 2619 Spruce Street Boulder, CO 80302 303-444-3620 Prepared for: Principle Engineering Group, Inc. 833 East Plaza Circle, Suite 100 Yuma,

More information

Prepared For San Francisco Community College District 33 Gough Street San Francisco, California 94103. Prepared By

Prepared For San Francisco Community College District 33 Gough Street San Francisco, California 94103. Prepared By Project Structural Conditions Survey and Seismic Vulnerability Assessment For SFCC Civic Center Campus 750 Eddy Street San Francisco, California 94109 Prepared For San Francisco Community College District

More information

Georgia Performance Standards Framework for Shaky Ground 6 th Grade

Georgia Performance Standards Framework for Shaky Ground 6 th Grade The following instructional plan is part of a GaDOE collection of Unit Frameworks, Performance Tasks, examples of Student Work, and Teacher Commentary. Many more GaDOE approved instructional plans are

More information

TECHNICAL DATA 2. LISTINGS AND APPROVALS. Spray Nozzle 11. December 20, 2013

TECHNICAL DATA 2. LISTINGS AND APPROVALS. Spray Nozzle 11. December 20, 2013 Spray Nozzle 11 1. DESCRIPTION Viking Model C-1 Window Sprinklers are non-automatic, open, outside intended for protection of windows, walls, and roofs against exposure fires. The directional discharge

More information

We look forward to working with you. Worldwide Headquarters 1400 Pennbrook Parkway Lansdale, PA 19446. www.tyco-rapidresponse.com

We look forward to working with you. Worldwide Headquarters 1400 Pennbrook Parkway Lansdale, PA 19446. www.tyco-rapidresponse.com TYCO IS HERE TO HELP Tyco will work closely with you to make the installation of Rapid Response Residential Fire Sprinkler Systems a quick and easy addition to your new home construction. We can develop

More information

Enhancing the Gas and Electricity Business Model to Meet Social Needs

Enhancing the Gas and Electricity Business Model to Meet Social Needs In addition to supplying city gas, Tokyo Gas is actively engaged in power generation from natural gas, taking advantage of its LNG Value Chain. Efforts are underway to stably supply gas and electricity

More information

Building Code Clarifications - 7. Fire Resistance

Building Code Clarifications - 7. Fire Resistance Building Code Clarifications - 7. Fire Resistance 7.1 (15-12-030) Use of combustibles in Type III construction roof assemblies Code Section (15-12-030) Use of Combustibles was revised on May 17, 2000,

More information

CH. 2 LOADS ON BUILDINGS

CH. 2 LOADS ON BUILDINGS CH. 2 LOADS ON BUILDINGS GRAVITY LOADS Dead loads Vertical loads due to weight of building and any permanent equipment Dead loads of structural elements cannot be readily determined b/c weight depends

More information

Chapter 5 Bridge Deck Slabs. Bridge Engineering 1

Chapter 5 Bridge Deck Slabs. Bridge Engineering 1 Chapter 5 Bridge Deck Slabs Bridge Engineering 1 Basic types of bridge decks In-situ reinforced concrete deck- (most common type) Pre-cast concrete deck (minimize the use of local labor) Open steel grid

More information

Evaluating an Illinois Earthquake

Evaluating an Illinois Earthquake Evaluating an Illinois Earthquake Grade Level: 7-8 Adapted from an activity by Robert A. Bauer, GeoActivity HAZD-1, ISGS GeoActivities Series, Activities and Other Resources for Teaching Geology, Illinois

More information

TRANSPORT OF DANGEROUS GOODS

TRANSPORT OF DANGEROUS GOODS Recommendations on the TRANSPORT OF DANGEROUS GOODS Manual of Tests and Criteria Fifth revised edition Amendment 1 UNITED NATIONS SECTION 38 38.3 Amend to read as follows: "38.3 Lithium metal and lithium

More information

Requirements for Fire Protection of Light Weight Floor Systems **Act 1 Revisited**

Requirements for Fire Protection of Light Weight Floor Systems **Act 1 Revisited** PHRC Webinar Series Tuesday, September 9, 2014 1:00 pm Requirements for Fire Protection of Light Weight Floor Systems **Act 1 Revisited** Presented by: Bryan Heitzmann Credit(s) earned on completion of

More information

ASTM D 1599 Standard Test Method for Resistance to Short-Time Hydraulic Pressure of Plastic Pipe, Tubing, and Fittings

ASTM D 1599 Standard Test Method for Resistance to Short-Time Hydraulic Pressure of Plastic Pipe, Tubing, and Fittings ASTM D 1599 Standard Test Method for Resistance to Short-Time Hydraulic Pressure of Plastic Pipe, Tubing, and Fittings This test method establishes the short-time hydraulic failure pressure of pipe and

More information

Reinforced Concrete Design

Reinforced Concrete Design FALL 2013 C C Reinforced Concrete Design CIVL 4135 ii 1 Chapter 1. Introduction 1.1. Reading Assignment Chapter 1 Sections 1.1 through 1.8 of text. 1.2. Introduction In the design and analysis of reinforced

More information

Cost Evaluation of Black Steel Pipe and Galvanized Pipe When Using a Nitrogen Generator

Cost Evaluation of Black Steel Pipe and Galvanized Pipe When Using a Nitrogen Generator Cost Evaluation of Black Steel Pipe and Galvanized Pipe When Using a Nitrogen Generator Andy L. Kaempfer Business Development Manager Potter Electric Signal Company, LLC 1609 Park 370 Place St. Louis,

More information

SANITARY SEWER SPECIFICATIONS

SANITARY SEWER SPECIFICATIONS SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,

More information

Presentations. Session 1. Slide 1. Earthquake Risk Reduction. 1- Concepts & Terminology

Presentations. Session 1. Slide 1. Earthquake Risk Reduction. 1- Concepts & Terminology Earthquake Risk Reduction Presentations Session 1 Slide 1 Earthquake Risk Reduction 1- Concepts & Terminology Welcome to the World Bank Institute s (WBI) Distance Learning (DL) course on Earthquake Risk

More information

Designed and Engineered to Perform

Designed and Engineered to Perform History EARTH CONTACT PRODUCTS, L.L.C., is a family owned company, based in Olathe, Kansas. This company was built upon Don May s U.S. Patented fourth-generation Steel Piering System that has led to the

More information

CTI TECHNICAL BULLETIN Number 6: A publication of the Cable Tray Institute

CTI TECHNICAL BULLETIN Number 6: A publication of the Cable Tray Institute CTI TECHNICAL BULLETIN Number 6: A publication of the Cable Tray Institute Circuit Integrity of Cable Tray Wiring Systems During Natural Disasters The January 17,1994 Los Angles, California earthquake

More information

Standard Practice for Installation of Ceiling Suspension Systems for Acoustical Tile and Lay-in Panels in Areas Subject to Earthquake Ground Motions 1

Standard Practice for Installation of Ceiling Suspension Systems for Acoustical Tile and Lay-in Panels in Areas Subject to Earthquake Ground Motions 1 Designation: E 580/E 580M 09a Standard Practice for Installation of Ceiling Suspension Systems for Acoustical Tile and Lay-in Panels in Areas Subject to Earthquake Ground Motions 1 This standard is issued

More information

Flowserve - Edward Valves Development of the Flowserve Edward Equiwedge Gate Valve

Flowserve - Edward Valves Development of the Flowserve Edward Equiwedge Gate Valve Flowserve - Edward Valves Development of the Flowserve Edward Equiwedge Gate Valve Problem Gate valves in severe service applications that experience premature trim wear from seat guided discs or leakage

More information

NFPA 25 FAQs. 1. When inspecting an old system (60 years or older), when/where does NFPA 25 require a system to be upgraded to present standards?

NFPA 25 FAQs. 1. When inspecting an old system (60 years or older), when/where does NFPA 25 require a system to be upgraded to present standards? NFPA 25 FAQs Responses to FAQs are prepared by NFPA technical staff to assist users in reading and understanding NFPA codes and standards. The responses, however, are not Formal Interpretations issued

More information

ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES

ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES August 2012 Dam Safety and Earthquakes Position Paper of International Commission on Large Dams (ICOLD) Prepared by ICOLD Committee on Seismic Aspects

More information

Clark County Fire Prevention

Clark County Fire Prevention Clark County Fire Prevention Mission Statement: To provide the highest level of fire protection and related services TITLE: REQUIREMENTS FOR A NEW SPRINKLER SYSTEM IN ACCORDANCE WITH THE 2002 EDITION OF

More information

Video Camera Installation Guide

Video Camera Installation Guide Video Camera Installation Guide The intent of this guide is to provide the information needed to complete or modify a video camera installation to avoid lightning and induced power surge damage. This guide

More information

FACILITY FIRE-SUPPRESSION WATER-SERVICE PIPING 21 11 00

FACILITY FIRE-SUPPRESSION WATER-SERVICE PIPING 21 11 00 211100_flexheadin_01_MS_0409 5/22/09 PTC 56 Lowland Street Holliston, MA 01746 Phone: (800) 829-6975 Phone: (508) 893-9596 Fax: (508) 893-6020 E-mail: sales1@flexhead.com www.flexhead.com This MANU-SPEC

More information

INSTRUCTION MANUAL IM042. Slide Rail Systems - Series A10 INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

INSTRUCTION MANUAL IM042. Slide Rail Systems - Series A10 INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS INSTRUCTION MANUAL IM042 Slide Rail Systems - Series A10 INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS TABLE OF CONTENTS SUBJECT PAGE Safety Instructions... 3 Descriptions and Specifications...

More information

APPENDIX A RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYSTEM

APPENDIX A RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYSTEM APPENDIX A RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYSTEM Because of the variable conditions encountered, it is impractical to lay down definite detailed rules of procedure for determining the sizes

More information

Seismic Assessment of Engineering Systems in Hospitals A Challenge for Operational Continuity

Seismic Assessment of Engineering Systems in Hospitals A Challenge for Operational Continuity Seismic Assessment of Engineering Systems in Hospitals A Challenge for Operational Continuity S.R. Uma GNS Science, Lower Hutt. G.J. Beattie Building Research Association of New Zealand, Porirua. 2010

More information