1 Local Government Sustainability Objectives and Indicators DECEMBER 2011 Local Government Division Department of Premier and Cabinet

2 Contents 1. INTRODUCTION Challenges to the sustainability of the local government sector Responding to the challenges The Local Government Project OVERVIEW OF THE SUSTAINABILITY OBJECTIVES AND INDICATORS PROJECT DATA COLLECTION METHOD SUSTAINABILITY OBJECTIVES... 8 Table 1: Sustainability objectives SUSTAINABILITY INDICATORS Financial and asset management indicators Table 2: Sustainability indicators TARGETS

3 1. Introduction 1.1 CHALLENGES TO THE SUSTAINABILITY OF THE LOCAL GOVERNMENT SECTOR The local government sector in Tasmania is facing a number of challenges to its sustainability in the medium to long term. These challenges include skills shortages, financial stress, limited revenue-raising capacity, asset deterioration and replacement costs, ageing populations, growing community demands, and governance issues. The sector is committed to sustainability, and performance measurement and improvement. This is clear from consultation with the sector undertaken for the Local Government Sustainability: Objectives and Indicators Project. This is also true at the national level. The Australian Government has committed to assisting sustainability reform within the sector, providing $8 million to the Australian Centre of Excellence in Local Government (ACELG) to Enhance professionalism and skills in local government, showcase innovation and best practice, and facilitate a better-informed policy debate. Further information can be found at ACELG s website: 3

4 1.2 RESPONDING TO THE CHALLENGES The State Government is working with local government to progress a range of initiatives to help the local government sector enhance its sustainability. Initiatives include: The implementation of long-term financial and asset management plans in all councils Tasmania received $ under the Australian Government s Local Government Reform Fund to develop long-term financial and asset management planning templates and implement plans in all councils. The project has been led by the Local Government Association of Tasmania (LGAT) with input from the State Government. A review of valuation and local government rating the review aims to identify a valuation and local government rating model that will be simpler, more efficient, cost-effective, equitable and sustainable into the long term. The implementation of regional planning schemes The Tasmanian Government provided over $2.3 million to develop three regional land-use strategies to improve consistency among council planning schemes leading to development, investment, settlement and infrastructure decisions that meet regional needs. 1.3 THE LOCAL GOVERNMENT SUSTAINABILITY OBJECTIVES AND INDICATORS PROJECT The Local Government Sustainability: Objectives and Indicators Project (SOI Project) is a key initiative of the Tasmanian Government to drive sustainability reform and performance improvement, and to support and encourage councils to do the same. The SOI Project is supported by the Premier, the Minister for LGAT s General Management Committee. It is overseen by the Premier s Local Government Council (PLGC). At its December 2009 meeting, the PLGC agreed to oversee the SOI Project. A Steering Committee, which contained local government representatives, was established shortly afterward to progress the project. In August 2010 a discussion paper was released for consultation. The consultation paper is available at In September 2010, the SOI Project Steering Committee established an Expert Working Group (EWG) to develop draft indicators, which the PLGC approved for further consultation at its April 2011 meeting. The final set of indicators, contained in this document, was approved by the PLGC at its December 2011 meeting. 4

5 The local government sector, the Tasmanian Audit Office, State Government agencies and other relevant stakeholders, as well as the broader community, have had input into the project. 5

6 2. Overview of the sustainability objectives and indicators project The overall objective of the project is to promote excellence in council performance and to support the long-term sustainability of the local government sector. For the purposes of this project, sustainability is defined as the ability of a council or councils to access and optimise all of its resources and capabilities to best serve its individual community, and the Tasmanian community collectively, now and into the future. The project will allow councils to assess their performance in key areas. It will enable better engagement between councils and communities. It will also assist the State and Local Governments to set priorities for improved performance within the sector. For the purposes of this project, performance refers to how well councils provide quality service to their communities, manage their resources, and ensure long-term economic, social, environmental and cultural sustainability. Councils performance in key strategic priority areas will be measured against sustainability indicators that have been jointly developed through a comprehensive consultation process. Councils will be supported and encouraged to continually improve performance by: identifying and sharing best practice after analysing their performance against the indicators; tracking their performance over time, and against other similar councils; and communicating with their communities about their performance. The project has the following audiences: councils; communities; and Australian, State and Local Government policy makers. 6

7 3. Data collection method Robust and relevant data is necessary to measure and improve sustainability and performance. It provides the foundation of evidence-based policy to achieve both ends. The Local Government Division (LGD) aims to be the central repository of local government data and information and the SOI Project is a key part of achieving that. In this role, the LGD will therefore: be able to provide clear, relevant and robust data to the local government sector, stakeholders, State and Australian Government agencies and the Tasmanian community; use this information to measure, and assist the sector to measure, local council performance and sustainability; develop evidence-based policy toward sustainability and performance improvement; and assist the local government sector itself to develop evidence-based policy. Data for the SOI Project will be collected through existing data sources including the annual Consolidated Data Collection (CDC) process and LGAT s biannual community satisfaction survey. The CDC is managed by the LGD and collects data from Local Government on behalf of the Australian Bureau of Statistics and the State Grants Commission as well as the State Government. Data for financial management, asset management, and planning and development will be collected on an annual basis using the annual CDC process and other State Government agency sources. Data on community satisfaction, and some on planning and development, will be collected biannually from the LGAT survey. The data collected as part of this project will be publicly available on the LGD s website: 7

8 4. Sustainability objectives The SOI Project has three sustainability objectives: to improve performance management at the local council level; to develop a culture of continuous improvement in the local government sector; and to provide a tool to build a sustainable local government sector. Councils will be measured against four areas of measurement which are considered to provide the best indication of a council s sustainability and performance. Achievement on each of the sustainability objectives is measured by councils performance in all four areas of measurement. Each area of measurement has a related objective that is linked to one or more of the sustainability indicators. This represents a linked hierarchy of measurement. Working backwards, the indicators will show councils performance that relate to an objective, which are linked to a related area of measurement. The areas of measurement (and the objectives associated with them) are in turn linked to each of the sustainability objectives of the project. Achievement of the objectives will be therefore be shown by councils performance in the areas of measurement. This will enable councils to: identify and share best practice after analysing their performance against the indicators; track their performance over time, and against other similar councils; and communicate with their communities about their performance. This will help to achieve the overall objective of the SOI Project: to promote excellence in council performance and to support the long-term sustainability of the local government sector. The sustainability objectives, their descriptors and the objectives linked to the four areas of measurement are contained in Table 1. 8

9 TABLE 1: SUSTAINABILITY OBJECTIVES Sustainability objective Improve performance management at the local council level Develop a culture of continuous improvement in the local government sector Provide a tool to build a sustainable local government sector. Descriptor This refers to how well councils can improve quality service to their communities; manage their resources; and ensure long-term economic, social, environmental and cultural sustainability. This refers to the ability of councils to continuously improve: the quality of their service to the community; and performance in financial and asset management, planning and development and community satisfaction. This refers to the ability of the sector to optimise all of its resources and capabilities to best serve the Tasmanian community now and into the future. Areas of measurement and associated objectives M 2. ASSET MANAGEMENT: To manage assets in a way that E maximises asset service delivery, A manages related risks and accounts for whole-of-life costs. S 3. PLANNING AND U DEVELOPMENT: To develop, R implement and improve planning and development practices that E improve access to facilities and D services, utilisation of resources, appropriate infrastructure provision and sustainable environmental practices. B Y 1. FINANCIAL MANAGEMENT: To achieve and/or improve financial sustainability through meeting the requirements of sound fiscal management. 4. COMMUNITY SATISFACTION: To ensure communities are satisfied with councils provision of services in the areas of: a) planning and development; b) community involvement; c) infrastructure; d) environmental management / waste; e) recreation / culture; f) community health and safety; and g) overall satisfaction. 9

10 5. Sustainability indicators Best practice performance management requires that performance indicators link directly with objectives, therefore providing a measure of performance against those objectives. To usefully provide an insight into performance, performance indicators need to measure efficiency, effectiveness and appropriateness. Efficiency refers to the relative cost of achieving positive impacts via the program under consideration. Effectiveness refers to the match between program outcomes and program objectives. Appropriateness refers to the match between current community and government priorities and program objectives. 1 Indicators should also: measure outcomes not activity; be verifiable, free from bias, and based on credible information; focus on the most important components of the objective; and include both qualitative and quantitative information. The sustainability indicators were developed to meet all the criteria above, to ensure the data has greater descriptive power and utility. This will allow both State and Local Governments to usefully measure sustainability and performance over time, contributing to continuous improvement in the management and quality of services and resources by councils. This will also lead to better outcomes for both Local Government and the Tasmanian community. The sustainability indicators including their descriptions are contained in table 2. 1 John M Owen, Program Evaluation: Forms and Approaches (1993). 10

11 5.1 FINANCIAL AND ASSET MANAGEMENT INDICATORS In 2007 the Local Government and Planning Minister s Council (LGPMC) defined financial sustainability as follows: A council s long-term financial performance and position is sustainable where planned long-term service and infrastructure levels and standards as prioritised through community engagement and consultation are met without unplanned increases in rates and charges or disruptive cuts to services. 2 In 2007 the LGPMC also endorsed national frameworks for assessing financial sustainability, asset planning and management, and financial planning and reporting for local government. The Tasmanian Government is currently working with LGAT to implement the longterm financial and asset management planning frameworks in all Tasmanian councils. The other aspect of the LGPMC 2007 commitment is the development of national performance indicators for financial and asset management. This is currently being done by the Australian Centre of Excellence for Local Government (ACELG). The indicators are likely to be the same as those used by the Institute of Public Works Engineering Australia (IPWEA). At the State level, the Tasmanian Audit Office (TAO) reports on financial and asset management indicators from the local government sector in Tasmania. The TAO has been reviewing its own financial and asset management indicators and has worked with various parties to develop a suite of nationally consistent and recognised indicators that can be used to meaningfully assess the financial sustainability of local councils. The TAO has arrived at a set of seven indicators, which align with seven of the eight indicators currently used by the IPWEA. 3 Given that the TAO has adopted the seven national IPWEA indicators, these indicators have been used for the SOI Project. 2 Local Government and Planning Minister s Council, Local Government Financial Sustainability - Nationally Consistent Frameworks. Framework 1: Criteria for Assessing Financial Sustainability (May 2007). 3 The IPWEA financial and asset management indicators are contained in the Australian Infrastructure Financial Management Guidelines Version 1.0 (2009). The indicator that the Tasmanian Audit Office will not collect is the Interest Cover Ratio, which is a proportion of day to day income used to pay interest on loans net of interest income. The Auditor-General views this as an indicator of operational financial management, rather than an indicator of financial sustainability. Given this, and that the Project Steering Committee wished to align the SOI financial and asset management indicators with those collected by the Tasmanian Auditor- General, the Interest Cover Ratio Indicator has been omitted. 11

12 The financial and asset management indicators are geared to: measure those factors which define financial sustainability (noting the definition of financial sustainability above); be relatively few in number; and be based on information that is readily available and reliable. 12

13 TABLE 2: SUSTAINABILITY INDICATORS Areas of measurement Objective Indicator Indicator questions / descriptions Data source 1. Financial management To achieve and/or improve financial sustainability through meeting the requirements of sound fiscal management. Operating surplus Operating surplus ratio Description: The difference between day-to-day income and expenses for the period. Comment: An operating surplus (or deficit) arises when operating income (excluding capital income) exceeds (or is less than) operating expenses for a period (usually a year). Calculation: Operating income (excluding amounts received specifically for new or upgraded assets and physical resources received free of charge) less operating expenses for the reporting period. Description: The percentage by which the major controllable income source plus operating grants varies from day to day expenses. Comment: The operating surplus ratio is the operating surplus (or deficit) expressed as a percentage of general and other rates and operating grants. Calculation: Operating surplus (or deficit) divided by general and other rate income and operating grants. Auditor- General Auditor- General Net financial liabilities Description: What is owed to others less money held, invested or owed to the entity. Comment: Net financial liabilities equals total liabilities less financial assets. Calculation: Total liabilities less financial assets (cash and cash equivalents plus trade and other receivables plus other financial assets). Auditor- General 13

14 Areas of measurement Objective Indicator Indicator questions / descriptions Data source 2. Asset management To manage assets in a way that maximises asset service delivery, manages related risks and accounts for whole-of-life costs. Net financial liabilities ratio Asset sustainability ratio Asset consumption ratio Asset renewal funding ratio Description: The significance of net amount owed compared with the period s income. Comment: Indicates the extent to which net financial liabilities could be met by operating income. Calculation: Net financial liabilities divided by operating income. Description: The ratio of asset replacement expenditure relative to depreciation for a period. It measures whether assets are being replaced at the rate they are wearing out. Comment: Indicates whether the entity is replacing or renewing non-financial assets at the same rate that its overall stock of assets is wearing out for the period. Calculation: Capital expenditure on replacement / renewal of existing plant and equipment and infrastructure assets divided by their annual depreciation expense. Description: The average proportion of as new condition left in assets. Comment: Shows the depreciated replacement cost of an entity s depreciable assets relative to their as new (replacement) value Calculation: The depreciated replacement cost of plant, equipment and infrastructure assets divided by the current replacement cost of depreciable assets. Description: The ratio of net present value of asset renewal funding accommodated over a Auditor- General Auditor- General Auditor- General Auditor- General 14

15 Areas of measurement Objective Indicator Indicator questions / descriptions Data source 3. Planning and development To develop, implement and improve planning and development practices that improve access to facilities and services, utilisation of resources, appropriate infrastructure provision and sustainable environmental practices. Percentage of Development Applications (DAs) completed within statutory timeframe. Average days to process planning and development applications (statutory time as per legislation, exclude days where clock ten year period in a long-term financial plan relative to the net present value of the projected capital renewal expenditures identified in an asset management plan for the same period. Comment: Indicates whether the entity has the financial capacity to fund asset renewal as required and therefore continue to provide existing levels of asset-based services in the future without additional operating income or reductions in operating expenses, or an increase in net financial liabilities above that currently projected. Calculation: The net present value of projected ten-year capital renewal funding outlays in a long-term financial plan divided by the net present value of projected ten-year capital renewal expenditures in an asset management plan in current values. What percentage of DAs was completed within the statutory timeframe of 42 days? What are the: Average number of calendar days to process applications: - planning: permitted use - planning: discretionary use - building CDC - Land Use and Planning Section CDC - Land Use and Planning Section 15

16 Areas of measurement Objective Indicator Indicator questions / descriptions Data source stopped). Percentage of decisions by the Resource Management and Planning Appeals Tribunal (RMPAT) in favour of the council. Total number of all planning applications lodged Total number of all building applications lodged How many council planning decisions were referred to RMPAT? How many decisions were in favour of the council? RMPAT 4. Community satisfaction 4 a) Planning and development b) Community involvement To ensure communities are satisfied with councils provision of services in the areas of: a) Planning and development b) Community involvement c) Infrastructure d) Environmental management / waste e) Recreation / culture f) Community health and safety g) Overall Satisfaction with councils performance in planning and development. Satisfaction with councils performance in community involvement. On a scale of 1-5, how do respondents rate their satisfaction on their council s performance in consistent and appropriate planning policies (see footnote 4 below) On a scale of 1-5, how do respondents rate their satisfaction on their council s performance in community involvement in relation to: informing residents about Council activities involving residents in local decision making access to Councillors / Aldermen LGAT survey LGAT survey LGAT survey 4 The questions in the LGAT survey ask the respondent to rate their satisfaction on a Likert scale of 1 to 5; 1 indicates very dissatisfied and 5 indicates very satisfied. 16

17 Areas of measurement Objective Indicator Indicator questions / descriptions Data source satisfaction c) Infrastructure Safe and well maintained roads, pedestrian areas and local road networks. d) Environmental management / waste e) Recreation, cultural facilities and programs Waste management Provision and management of recreational and cultural facilities and programs. On a scale of 1-5, how do respondents rate their satisfaction on their council s performance in providing: safe and well maintained local roads safe and well maintained pedestrian areas an efficient road network an effective stormwater system On a scale of 1-5, how do respondents rate their satisfaction on their council s performance in: household garbage collection recycling services including kerbside recycling and depots operation of local tip and transfer stations maintaining a clean and tidy city/town On a scale of 1-5, how do respondents rate their satisfaction on their council s performance in: sports grounds and recreation facilities parks and playgrounds community centres and halls arts and entertainment facilities including museums and art galleries arts and entertainment activities and special events management of natural areas LGAT survey LGAT survey LGAT survey 17

18 Areas of measurement Objective Indicator Indicator questions / descriptions Data source f) Community health and safety g) Overall satisfaction Hygiene standards of food outlets, restaurants and public facilities, council immunisation programs and animal control. Satisfaction with overall performance of council. On a scale of 1-5, how do respondents rate their satisfaction on their council s performance in: hygiene standards of food outlets, restaurants and public facilities council immunisation programs animal control On a scale of 1-5, how satisfied are you with your council s performance overall? LGAT survey LGAT survey 18

19 6. Targets Performance targets give performance data meaning and provide a comparison point that shows whether the performance of an organisation is satisfactory or otherwise. For consistency, the SOI project will adopt the benchmarks used by the Auditor- General for the financial and asset management indicators. The benchmarks are as follows: Indicator Formula Benchmark [target] Operating surplus ratio Asset sustainability ratio Asset renewal funding ratio Asset consumption ratio (roads) Net financial liabilities ratio (net operating surplus)/(total operating revenue) (renewal and upgrade expenditure on existing assets)/(depreciation on existing assets) (Future (planned) asset replacement expenditure)/(future asset replacement expenditure (actual) required) (depreciated replacement cost)/(current replacement cost) (total liabilities less liquid assets)/(total operating revenue) Greater than 0 At least 100 per cent At least 90 per cent Greater than 60 per cent Between zero to negative 50 per cent of operating income The PLGC will consider targets for other indicators once the data sets have been established and populated. Targets will be easier to set and more meaningful once data is available. 19

Financial and Asset Management. Glossary of Terms and Abbreviations

Financial and Asset Management. Glossary of Terms and Abbreviations Financial and Asset Management Glossary of Terms and Abbreviations ABP see Annual Business Plan Accrual accounting: An accounting approach by which expenses, revenue, assets and liabilities are recognised

More information

City of Canning. Asset Management Strategy 2015 2018

City of Canning. Asset Management Strategy 2015 2018 City of Canning Asset Management Strategy 2015 2018 Document Control Version No Version Date Description TRIM Reference 1.0 11 December 2012 Asset Management Strategy D12/68776 2.0 23 September 2015 Updated

More information

Information Paper 9. Local Government Financial Indicators

Information Paper 9. Local Government Financial Indicators Information Paper 9 Local Government Financial Indicators November, 2006 Introduction Formal financial statements contain a wealth of information. Unfortunately their detail and format often mean it is

More information

Framework for Long Term Financial and Asset Management Planning for all Tasmanian Councils

Framework for Long Term Financial and Asset Management Planning for all Tasmanian Councils TASMANIAN STATE GOVERNMENT and LOCAL GOVERNMENT ASSOCIATION OF TASMANIA Framework for Long Term Financial and Asset Management Planning for all Tasmanian Councils FINAL REPORT September 2009 Document Control

More information

Sustainability Objectives and Indicators

Sustainability Objectives and Indicators Sustainability Objectives and Indicators EVALUATION REPORT DECEMBER 2014 Local Government Division Summary of key findings 1. There is strong support for a performance assessment system for local government

More information

Lake Macquarie City Council Asset Management Strategy and Asset Management Plans. Table of Contents

Lake Macquarie City Council Asset Management Strategy and Asset Management Plans. Table of Contents Lake Macquarie City Council Asset Management Strategy and Asset Management Plans Table of Contents 1. Lake Macquarie Asset Management Strategy 2010-2020- Version 3, April 2013 2. Roads and Infrastructure

More information

4 Adoption of Asset Management Policy and Strategy

4 Adoption of Asset Management Policy and Strategy 4 Adoption of Asset Management Policy and Strategy Abstract The report recommends the adoption of an updated Asset Management Policy 2014 and an Asset Management Strategy 2014-2019. Both documents are

More information

Asset Management. Framework and Guidelines. Part 2 - Asset Management Guidelines for Western Australian Local Governments p1.

Asset Management. Framework and Guidelines. Part 2 - Asset Management Guidelines for Western Australian Local Governments p1. Asset Management Framework and Guidelines Part 2 - Asset Management Guidelines for Western Australian Local Governments p1. Contents Foreword 4 Part 1 Asset Management Framework 5 1. Introduction 7 2.

More information

ASSET MANAGEMENT STRATEGY

ASSET MANAGEMENT STRATEGY Wattle Range Council ASSET MANAGEMENT STRATEGY Version February 2014 V1 Wattle Range Council Asset Management Strategy Document Control Document Control NAMS.PLUS Asset Management www.ipwea.org.au/namsplus

More information

Asset Management Policy

Asset Management Policy Printed copies of this document are uncontrolled. Before using this printed copy, check Council's Intranet to verify that this is a current copy. Asset Management Policy Reference Number: 4.7 Classification:

More information

DEBT FUNDING GUIDELINES FOR LOCAL GOVERNMENT

DEBT FUNDING GUIDELINES FOR LOCAL GOVERNMENT DEBT FUNDING GUIDELINES FOR LOCAL GOVERNMENT The Context Local government financial statements, like those of other sectors of government and the corporate sector, include many items of considerable financial

More information

ASSET MANAGEMENT STRATEGY

ASSET MANAGEMENT STRATEGY ASSET MANAGEMENT STRATEGY Version 3 - Final Adopted 19 February 2013 NAMS.PLUS Burnie City Council Asset Strategy Document Control Document Control NAMS.PLUS Asset www.ipwea.org.au/namsplus Document ID:

More information

Central bank corporate governance, financial management, and transparency

Central bank corporate governance, financial management, and transparency Central bank corporate governance, financial management, and transparency By Richard Perry, 1 Financial Services Group This article discusses the Reserve Bank of New Zealand s corporate governance, financial

More information

Report of the Auditor-General No. 5 of 2013-14. Infrastructure Financial Accounting in Local Government. Strive Lead Excel To Make a Difference

Report of the Auditor-General No. 5 of 2013-14. Infrastructure Financial Accounting in Local Government. Strive Lead Excel To Make a Difference Report of the Auditor-General No. 5 of 2013-14 Infrastructure Financial Accounting in Local Government December 2013 Strive Lead Excel To Make a Difference The Role of the Auditor-General The Auditor-General

More information

ASSET MANAGEMENT STRATEGY

ASSET MANAGEMENT STRATEGY City of Salisbury ASSET MANAGEMENT STRATEGY Version 6 June 2015 City of Salisbury Asset Management Strategy Document Control Document Control NAMS.PLUS Asset Management www.ipwea.org/namsplus Document

More information

CORPORATE PERFORMANCE MANAGEMENT GUIDELINE

CORPORATE PERFORMANCE MANAGEMENT GUIDELINE -001 CORPORATE PERFORMANCE MANAGEMENT GUIDELINE -001 TABLE OF CONTENTS 1 Introduction... 3 1.1 Scope... 3 1.2 Purpose... 3 2 Performance Management Framework Overview... 4 3 Performance Management Framework...

More information

Page 1 of 24. To present the Asset Management Policy 2014 for Council adoption.

Page 1 of 24. To present the Asset Management Policy 2014 for Council adoption. Page 1 of 24 COMMUNITY AND SERVICES SPECIAL COMMITTEE REPORT 9 DECEMBER 2104 AGENDA ITEM 6.1 ASSET MANAGEMENT POLICY 2014 REVIEW Director: Manager: Ian Butterworth Director Infrastructure and Engineering

More information

Project Management Fact Sheet:

Project Management Fact Sheet: Project Management Fact Sheet: Project Documentation Version: 2.2, November 2008 DISCLAIMER This material has been prepared for use by Tasmanian Government agencies and Instrumentalities. It follows that

More information

Session 1 Asset Management and Financial Planning

Session 1 Asset Management and Financial Planning Session 1 Asset Management and Financial Planning Based on Australian Infrastructure Financial Management Guidelines John Howard, IPWEA NAMS.AU Project Manager Jeff Roorda & Associates AASHTO Workshops

More information

Australian Communications and Media Authority. Entity resources and planned performance

Australian Communications and Media Authority. Entity resources and planned performance Australian Communications and Media Authority Entity resources and planned performance 91 AUSTRALIAN COMMUNICATIONS AND MEDIA AUTHORITY Section 1: Entity overview and resources... 95 1.1 Strategic direction

More information

HORNSBY SHIRE COUNCIL LONG TERM FINANCIAL PLAN 2014/15-2023/24 HORNSBY SHIRE COUNCIL LONG TERM FINANCIAL PLAN 2014/15-2023/24 SECTION INTRODUCTION

HORNSBY SHIRE COUNCIL LONG TERM FINANCIAL PLAN 2014/15-2023/24 HORNSBY SHIRE COUNCIL LONG TERM FINANCIAL PLAN 2014/15-2023/24 SECTION INTRODUCTION HORNSBY SHIRE COUNCIL LONG TERM FINANCIAL PLAN 2014/15-2023/24 HORNSBY SHIRE COUNCIL LONG TERM FINANCIAL PLAN 2014/15-2023/24 SECTION INTRODUCTION P1 P2 CONTENTS Executive Summary Financial Results Future

More information

Building Infrastructure Asset Management Plan

Building Infrastructure Asset Management Plan Building Infrastructure Asset Management Plan Version 1.1 Building Infrastructure Asset Management Plan (Version 1.1) Page 1 of 19 Document Control Council policy documents change from time to time and

More information

LONG TERM FINANCIAL PLAN 2011/2012 2020/2021

LONG TERM FINANCIAL PLAN 2011/2012 2020/2021 LONG TERM FINANCIAL PLAN 2011/2012 2020/2021 INDEX TO CONTENTS 1. Long Term Financial Planning Defined 1.1 Purpose 1.2 Principles 1.3 CEO Statement on Financial Sustainability 2. Impacts upon the Current

More information

CGAM022.1/12/10. Asset Management Improvement Strategy 2010

CGAM022.1/12/10. Asset Management Improvement Strategy 2010 Asset Management Improvement Strategy 2010 Version Control Version No. Date Details Author/s 1.0 July 2009 Adopted Strategy 2.0 October 2010 Update TABLE OF CONTENTS OF CONTENTS 4 OF THE ASSET MANAGEMENT

More information

Long-Term Asset Management Plan 2011-2021

Long-Term Asset Management Plan 2011-2021 Long-Term Asset Management Plan 2011-2021 Contents Introduction...3 A shared vision...4 Strategic planning to achieve our goals...4 Towards 2031...5 A long-term vision, communicated by our community...5

More information

National Assessment Frameworks For Local Government Asset Management and Financial Planning Implementation Proposal Paper

National Assessment Frameworks For Local Government Asset Management and Financial Planning Implementation Proposal Paper For Local Government Asset Management and Financial Planning Prepared by Chris Champion and Leon Patterson, Institute of Public Works Engineering Australia June 2012 Contents Executive Summary... 1 Introduction...

More information

Glenorchy City Council Asset Management Strategy for Infrastructure Assets

Glenorchy City Council Asset Management Strategy for Infrastructure Assets Glenorchy City Council Asset Strategy for Infrastructure Assets 2014/15 to 2017/18 Version 1.3 June 2014 Glenorchy City Council Asset Strategy for Infrastructure Assets Document Control Document Control

More information

Sustaining Local Assets. Local government asset management policy statement

Sustaining Local Assets. Local government asset management policy statement Sustaining Local Assets Local government asset management policy statement December 2003 ISBN 0 646 42106 9 Authorised by the Victorian Government Address: Local Government Victoria Department for Victorian

More information

Abacus Wodonga Land Fund

Abacus Wodonga Land Fund Abacus Wodonga Land Fund DISCLOSURE OF INFORMATION The Australian Securities and Investments Commission (ASIC) has developed six benchmarks and eight disclosure principles for unlisted property trusts

More information

ASSET MANAGEMENT POLICY

ASSET MANAGEMENT POLICY : SHIRE OF MOUNT MAGNET ASSET MANAGEMENT POLICY Version 1.1 April 2013 Asset Management Policy Document Control Rev No Date Revision Details Author Reviewer Approver 0 November 2012 Original final document

More information

Asset Management Strategy

Asset Management Strategy Asset Management Strategy File Ref: CM.STD.6 Synergy Ref: NMP1331737 Version: 25/06/2013 City of Albany 2013 102 North Road, Yakamia WA 6330 PO Box 484, ALBANY WA 6331 Tel: (08) 9841 9333 Fax: (08) 9841

More information

Financial Management Strategy & Long Term Financial Plan 2014/2015 2023/2024

Financial Management Strategy & Long Term Financial Plan 2014/2015 2023/2024 Financial Management Strategy & Long Term Financial Plan 2014/2015 2023/2024 February 2014 Table of Contents Page 1.0 EXCUTIVE SUMMARY 1.1 Introduction 1.2 Financial Management Strategy 1.3 Long Term

More information

TITLE C171 ASSET MANAGEMENT POLICY DEPARTMENT. Engineering Services POLICY DIRECTIVE

TITLE C171 ASSET MANAGEMENT POLICY DEPARTMENT. Engineering Services POLICY DIRECTIVE TITLE C171 ASSET MANAGEMENT POLICY DEPARTMENT Engineering Services POLICY DIRECTIVE This Asset Management policy will ensure that Asset Management is clearly recognised by Council and community in accordance

More information

Financial Sustainability Information Paper 8. Long-term Financial Plans

Financial Sustainability Information Paper 8. Long-term Financial Plans Financial Sustainability Information Paper 8 Long-term Financial Plans Revised January 2012 Introduction This Information Paper is one of a series of Information Papers about Financial Sustainability and

More information

Long Term Financial Plan 2014 2023 Adopted December 2013

Long Term Financial Plan 2014 2023 Adopted December 2013 Long Term Financial Plan 2014 2023 Adopted December 2013 District Council of Mallala CONTENTS 1 Introduction 1 2 Planning Framework 2 3 Assumptions 7 4 Summary & Financial Statements 10 Estimated Comprehensive

More information

a) raises the funds required by the Council to meet approved service levels in the most effective manner;

a) raises the funds required by the Council to meet approved service levels in the most effective manner; ITEM FINANCIAL STRATEGY 2016/17 2020/21 Report By Chief Financial Officer SCOTTISH BORDERS COUNCIL 11 February 2016 1 PURPOSE AND SUMMARY 1.1 This report seeks approval for the financial strategy for the

More information

INTEGRATED PLANNING AND REPORTING

INTEGRATED PLANNING AND REPORTING Government of Western Australia Department of Local Government INTEGRATED PLANNING AND REPORTING Framework and Guidelines Integrated Planning and Reporting Framework and Guidelines p1. Contents Foreword

More information

Asset Management Policy. Sutherland Shire Council. Council Online - IM/Policies - Policies & Forms - IM/Policy Asset Management1

Asset Management Policy. Sutherland Shire Council. Council Online - IM/Policies - Policies & Forms - IM/Policy Asset Management1 Asset Management Policy Sutherland Shire Council Council Online - IM/Policies - Policies & Forms - IM/Policy Asset Management1 Document review and approval This document has been approved by Subject matter

More information

Financial Strategy 2016 2026

Financial Strategy 2016 2026 Financial Strategy 2016 2026 Table of Contents 1. Executive Summary and Overview... 4 1.1 Executive Summary... 4 1.1.1 The Financial Strategy and Long-Term Financial Forecast... 4 1.1.2 The Financial Strategy

More information

to Asset Management Policy and Guidance Draft Version 1.4 9 July 2015

to Asset Management Policy and Guidance Draft Version 1.4 9 July 2015 D to Asset Management Policy and Guidance Draft Version 1.4 9 July 2015 This page has been left blank intentionally Page 2 of 24 Page 3 of 24 This page has been left blank intentionally Page 4 of 24 Strategic

More information

1. Trustees annual report

1. Trustees annual report 1. Trustees annual report Accounting and reporting by charities Overview and the purpose of the trustees annual report 1.1. The primary purpose of the trustees annual report (the report) is to ensure that

More information

THE SOUTH AFRICAN HERITAGE RESOURCES AGENCY MANAGEMENT OF PERFORMANCE INFORMATION POLICY AND PROCEDURES DOCUMENT

THE SOUTH AFRICAN HERITAGE RESOURCES AGENCY MANAGEMENT OF PERFORMANCE INFORMATION POLICY AND PROCEDURES DOCUMENT THE SOUTH AFRICAN HERITAGE RESOURCES AGENCY MANAGEMENT OF PERFORMANCE INFORMATION POLICY AND PROCEDURES DOCUMENT ACCOUNTABLE SIGNATURE AUTHORISED for implementation SIGNATURE On behalf of Chief Executive

More information

Collaborative development of evaluation capacity and tools for natural resource management

Collaborative development of evaluation capacity and tools for natural resource management Collaborative development of evaluation capacity and tools for natural resource management Helen Watts (Adaptive Environmental Management, formerly NSW Department of Environment and Climate Change) Sandra

More information

Long Term Financial Planning

Long Term Financial Planning Long Term Financial Planning Framework and Guidelines Long Term Financial Planning Framework and Guidelines for Western Australian Local Governments p1. Contents Foreword 4 1. Introduction 7 2. Purpose

More information

Council Policy: Asset Management

Council Policy: Asset Management Classification: Council Policy: Asset Management Council Policy First Issued: 7 November 2006 Dates of Review: 4 March 2014 Version Number: 2 DW Doc set ID: 459426 Next Review Due: 4 March 2019 Applicable

More information

Rate Setting, Asset Management and Financial Sustainability. A guide for local governments June 2013

Rate Setting, Asset Management and Financial Sustainability. A guide for local governments June 2013 Rate Setting, Asset Management and Financial Sustainability A guide for local governments June 2013 1 Rate Setting, Asset Management and Financial Sustainability A guide for local governments June 2013

More information

DEPARTMENT OF LOCAL GOVERNMENT AND COMMUNITY SERVICES. Performance Indicators Information Paper

DEPARTMENT OF LOCAL GOVERNMENT AND COMMUNITY SERVICES. Performance Indicators Information Paper DEPARTMENT OF LOCAL GOVERNMENT AND COMMUNITY SERVICES Performance Information Paper 1. Introduction Performance management is the process of setting agreed objectives and monitoring progress against these

More information

Monitoring Highways England The monitoring framework

Monitoring Highways England The monitoring framework Monitoring Highways England The monitoring framework October 2015 Contents Executive summary 4 Roads reform 4 ORR s role in monitoring Highways England 5 What we will do next 10 1. Overview of this document

More information

Information Paper 10. Debt Management

Information Paper 10. Debt Management Information Paper 10 Debt Management February 2007 Introduction Local Government financial statements, like those of other spheres of government and the corporate sector, include a good many items of considerable

More information

Medicare Australia. Agency resources and planned performance

Medicare Australia. Agency resources and planned performance Medicare Australia Agency resources and planned performance 87 MEDICARE AUSTRALIA Section 1: Agency overview and resources...91 1.1 Strategic direction...91 1.2 Agency resource statement...94 1.3 Budget

More information

Asset Management Strategy (2013-2017) Doing things Differently A New Approach for a sustainable future

Asset Management Strategy (2013-2017) Doing things Differently A New Approach for a sustainable future Asset Management Strategy (2013-2017) A New Approach for a sustainable future Contents Introduction... 2 The Asset Management Vision, Policy Statement & Strategic Themes... 5 Part B The Asset Management

More information

LOCAL GOVERNMENT AND PLANNING MINISTERS COUNCIL. Local Government Financial Sustainability. Nationally Consistent Frameworks.

LOCAL GOVERNMENT AND PLANNING MINISTERS COUNCIL. Local Government Financial Sustainability. Nationally Consistent Frameworks. LOCAL GOVERNMENT AND PLANNING MINISTERS COUNCIL Local Government Financial Sustainability Nationally Consistent Frameworks Framework 2 ASSET PLANNING AND MANAGEMENT May 2007 ASSET PLANNING AND MANAGEMENT

More information

Fédération des Experts Comptables Européens ACCRUAL ACCOUNTING IN THE PUBLIC SECTOR. January 2007. A Paper from the FEE Public Sector Committee

Fédération des Experts Comptables Européens ACCRUAL ACCOUNTING IN THE PUBLIC SECTOR. January 2007. A Paper from the FEE Public Sector Committee Fédération des Experts Comptables Européens ACCRUAL ACCOUNTING IN THE PUBLIC SECTOR A Paper from the FEE Public Sector Committee CONTENTS Executive Summary...4 Introduction...4 Nature of this paper...4

More information

CLEAN GREEN & SUSTAINABLE NS1439215

CLEAN GREEN & SUSTAINABLE NS1439215 CLEAN GREEN & SUSTAINABLE NS1439215 1 Contents 2 Introduction Strategic Alignment 1 - Energy Efficiency 2 - Water Management 3 - Fleet and Plant Management 4 - Carbon Offsets 5 - Waste Management Everything

More information

1 The Role of Accounting

1 The Role of Accounting 5 1 The Role of Accounting Accounting Information Accounting provides financial information for a variety of entities to enable them to make informed judgements and decisions. It is important that you

More information

Foundations in Financial Management (FFM) September 2016 to June 2017

Foundations in Financial Management (FFM) September 2016 to June 2017 Foundations in Financial Management (FFM) September 2016 to June 2017 This syllabus and study guide is designed to help with teaching and learning and is intended to provide detailed information on what

More information

CONSOLIDATED PROFIT AND LOSS ACCOUNT For the six months ended June 30, 2002

CONSOLIDATED PROFIT AND LOSS ACCOUNT For the six months ended June 30, 2002 CONSOLIDATED PROFIT AND LOSS ACCOUNT For the six months ended June 30, 2002 Unaudited Unaudited Note Turnover 2 5,576 5,803 Other net losses (1) (39) 5,575 5,764 Direct costs and operating expenses (1,910)

More information

Australian National Audit Office. Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO

Australian National Audit Office. Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO Australian National Audit Office Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO Commonwealth of Australia 2002 ISBN 0 642 80678 0 10 December 2002 Dear Mr

More information

stepping stones to accrual accounting The transition from cash to accrual accounting for public financial management for public financial management

stepping stones to accrual accounting The transition from cash to accrual accounting for public financial management for public financial management stepping stones to accrual accounting The transition from cash to accrual accounting for public financial management for public financial management for public financial management CIPFA, the Chartered

More information

Reporting Service Performance Information

Reporting Service Performance Information AASB Exposure Draft ED 270 August 2015 Reporting Service Performance Information Comments to the AASB by 12 February 2016 PLEASE NOTE THIS DATE HAS BEEN EXTENDED TO 29 APRIL 2016 How to comment on this

More information

Campbelltown City Council Asset Management Strategy 2012-2022

Campbelltown City Council Asset Management Strategy 2012-2022 Campbelltown City Council Asset Management Strategy 2012-2022 Disclaimer This document was first published on 1 July 2012. The information contained in this document is to be considered general in nature

More information

Business Planning for Major Capital Works and Recurrent Services in Local Government

Business Planning for Major Capital Works and Recurrent Services in Local Government Business Planning for Major Capital Works Business Planning for Major Capital Works September 2011 Victorian Auditor-General s Report Telephone 61 3 8601 7000 Facsimile 61 3 8601 7010 www.audit.vic.gov.au

More information

Asset Management Plan Overview

Asset Management Plan Overview Council Strategy Asset Management Plan Overview City of Albany 2013 File Ref: CM.STD.6 Synergy Ref: NMP1331749 102 North Road, Yakamia WA 6330 Version: 25/06/2013 PO Box 484, ALBANY WA 6331 Tel: (08) 9841

More information

FLINTSHIRE COUNTY COUNCIL COMMUNITY ASSET TRANSFER GUIDANCE NOTES

FLINTSHIRE COUNTY COUNCIL COMMUNITY ASSET TRANSFER GUIDANCE NOTES FLINTSHIRE COUNTY COUNCIL COMMUNITY ASSET TRANSFER GUIDANCE NOTES CONTENTS Page (s) 1. PURPOSE OF THE GUIDE 1 2. KEY STAGES OF CAT PROCESS Stage 1 Expression of Interest Stage 2 Business Modelling Stage

More information

Diploma in Business Competence. Learning outcomes for the Diploma in Business Competence (EBCL)

Diploma in Business Competence. Learning outcomes for the Diploma in Business Competence (EBCL) Diploma in Business Competence Learning outcomes for the Diploma in Business Competence (EBCL) Section 1: Understanding Business Accounts Overall Learning Objectives Upon completing this section you will

More information

The Long Term (Financial) Plan

The Long Term (Financial) Plan The Long Term (Financial) Plan Chris Champion CEO, IPWEA cchampion@ipwea.org.au Sustainably managing your Community ASSET MANAGEMENT PLAN Services required, how provided & funds required FINANCIAL SUSTAINABILITY

More information

Tasmanian Local Government Asset Management Policy

Tasmanian Local Government Asset Management Policy Tasmanian Local Government Asset Management Policy CA389719 Minister s Foreword The Tasmanian Government is committed to a sustainable local government sector and is working with local government and the

More information

Revenue and Financing Policy

Revenue and Financing Policy Revenue and Financing Policy Objective Provide the funding mechanisms to ensure the equitable distribution of costs to those who benefit, and provide for the financial sustainability of the activities

More information

Comcare, the Safety, Rehabilitation and Compensation Commission, and the Seafarers Safety, Rehabilitation and Compensation Authority

Comcare, the Safety, Rehabilitation and Compensation Commission, and the Seafarers Safety, Rehabilitation and Compensation Authority Comcare, the Safety, Rehabilitation and Compensation Commission, and the Seafarers Safety, Rehabilitation and Compensation Authority Agency Resources and Planned Performance COMCARE, THE SAFETY, REHABILITATION

More information

BUSINESS TOOLS. Preparing Agricultural Financial Statements. How do financial statements prove useful?

BUSINESS TOOLS. Preparing Agricultural Financial Statements. How do financial statements prove useful? Preparing Agricultural Financial Statements Thoroughly understanding your business financial performance is critical for success in today s increasingly competitive agricultural, forestry and fisheries

More information

Income Measurement and Profitability Analysis

Income Measurement and Profitability Analysis PROFITABILITY ANALYSIS The following financial statements for Spencer Company will be used to demonstrate the calculation of the various ratios in profitability analysis. Spencer Company Comparative Balance

More information

Draft Local Government Performance Reporting Framework & Indicators. Working Paper

Draft Local Government Performance Reporting Framework & Indicators. Working Paper Draft Local Government Performance Reporting Framework & Indicators Working Paper May 2013 2 CONTENTS 1. PURPOSE OF THIS PAPER... 4 2. OBJECTIVE AND GUIDING PRINCIPLES... 6 3. SERVICE PERFORMANCE... 8

More information

Guidelines for Minimum Standards Property Management Planning. Financial Management Module

Guidelines for Minimum Standards Property Management Planning. Financial Management Module Guidelines for Minimum Standards Property Management Planning Financial Management Module June 2011 June 2011 Acknowledgements All stakeholders who contributed to the development of the Financial Management

More information

Ministry of Aboriginal Relations

Ministry of Aboriginal Relations Ministry of Aboriginal Relations Financial Statements For the Year Ended March 31, 2010 MINISTRY OF ABORIGINAL RELATIONS Financial Statements For the Year Ended March 31, 2010 Contents Auditor s Report

More information

HEALTH SYSTEM. Introduction. The. jurisdictions and we. Health Protection. Health Improvement. Health Services. Academic Public

HEALTH SYSTEM. Introduction. The. jurisdictions and we. Health Protection. Health Improvement. Health Services. Academic Public FUNCTIONS OF THE LOCAL PUBLIC HEALTH SYSTEM Introduction This document sets out the local PH function in England. It was originally drafted by a working group led by Maggie Rae, FPH Local Board Member

More information

How To Write An Annual Budget For Town Of Golden

How To Write An Annual Budget For Town Of Golden 2013 Proposed Annual Budget (2013-2017 Five-Year Financial Plan) Public Consultation and Information Package We Want Your Opinion! Building the Annual Budget A Summary How we Build the Annual Budget (Financial

More information

LONG TERM FINANCIAL PLAN (INTERIM) 2012/13 to 2022/23

LONG TERM FINANCIAL PLAN (INTERIM) 2012/13 to 2022/23 LONG TERM FINANCIAL PLAN (INTERIM) 2012/13 to 2022/23 INTRODUCTION Long term financial planning is a key element of the Integrated Planning and Reporting Framework. It is the mechanism that enables local

More information

Job Description. To lead and effectively manage the Empty Homes team which is responsible for:

Job Description. To lead and effectively manage the Empty Homes team which is responsible for: Job Description Post Title Post Number Service Area / Department SDU Accountable to (Line Manager) Responsible for (Direct Reports Post Title) Empty Homes Manager RT01008 Leasehold and Lettings Housing

More information

Accounts Receivable. Policy Statement

Accounts Receivable. Policy Statement Accounts Receivable Policy Statement Policy name: Accounts Receivable Policy number: Finance Key result areas: Finance Branch: HR and Corporate Services Responsibility for review: Accountant Location:

More information

City Planning - Council's Improvement Strategy

City Planning - Council's Improvement Strategy Warringah Council Policy Policy No. Number 1 Purpose of Policy The purpose of this policy is to establish the strategic financial planning and sustainability framework to guide Council when developing

More information

august09 tpp 09-05 Internal Audit and Risk Management Policy for the NSW Public Sector OFFICE OF FINANCIAL MANAGEMENT Policy & Guidelines Paper

august09 tpp 09-05 Internal Audit and Risk Management Policy for the NSW Public Sector OFFICE OF FINANCIAL MANAGEMENT Policy & Guidelines Paper august09 09-05 Internal Audit and Risk Management Policy for the NSW Public Sector OFFICE OF FINANCIAL MANAGEMENT Policy & Guidelines Paper Preface Corporate governance - which refers broadly to the processes

More information

How To Manage The Council

How To Manage The Council Mole Valley District Council Corporate Communications Strategy 2002-2005 CONTENTS Content Section 1: Introduction Section 2: Stakeholders Section 3: Objectives Section 4: Targets Section 5: Principles

More information

Initial Public Offering. Are you ready to float?

Initial Public Offering. Are you ready to float? Initial Public Offering Are you ready to float? What is an IPO? Are you considering listing your company on a stock exchange? In recent times, the phrases listing and floating have been replaced with an

More information

Shire of Northam. Strategic Community Plan 2012-2022

Shire of Northam. Strategic Community Plan 2012-2022 commerce lifestyle heritage Shire of Northam Strategic Community Plan 2012-2022 TABLE OF CONTENTS The Strategic Community Plan is the principal planning document for the Shire of Northam and will provide

More information

ASSET MANAGEMENT STRATEGY

ASSET MANAGEMENT STRATEGY ASSET MANAGEMENT STRATEGY Adopted May 2011 Table of Contents Page 1. Introduction 3 2. Purpose 4 3. Asset Register System 4 4. Asset Management Working Group 4 5. Asset Management Plans 5 6. Condition

More information

PACIFIC ISLANDS FORUM SECRETARIAT FEMM BIENNIAL STOCKTAKE 2012

PACIFIC ISLANDS FORUM SECRETARIAT FEMM BIENNIAL STOCKTAKE 2012 PACIFIC ISLANDS FORUM SECRETARIAT PIFS(12)FEMK.05 FORUM ECONOMIC MINISTERS MEETING Tarawa, Kiribati 2-4 July 2012 SESSION 2 FEMM BIENNIAL STOCKTAKE 2012 The attached paper, prepared by the Forum Secretariat,

More information

Strategic Plan 2011 2012 to 2014 2015. Working Together for Australian Sport

Strategic Plan 2011 2012 to 2014 2015. Working Together for Australian Sport Strategic Plan 2011 2012 to 2014 2015 Working Together for Australian Sport Strategic Plan 2011 2012 to 2014 2015 Working Together for Australian Sport Australian Sports Commission 2011 Ownership of intellectual

More information

CODE OF ETHICAL POLICY

CODE OF ETHICAL POLICY CODE OF ETHICAL POLICY POLICY STATEMENT The BBC is committed to ensuring a high standard of ethical and environmental trade practices, including the provision of safe working conditions and the protection

More information

Asset and Development Coordinator

Asset and Development Coordinator Department: Section: Location: Works and Services Technical Services City Offices Position Overview The is a critical role within Council s Technical Services section of the Works and Services Department

More information

CONSULTATION ON DRAFT LEGISLATION & REGULATIONS DEFERRED SETTLEMENT OF EXCISE & EXCISE EQUIVALENT CUSTOMS DUTY

CONSULTATION ON DRAFT LEGISLATION & REGULATIONS DEFERRED SETTLEMENT OF EXCISE & EXCISE EQUIVALENT CUSTOMS DUTY 1 General Manager Indirect Tax Division The Treasury Langton Crescent PARKES ACT 2600 Dear Ms Berkeley CONSULTATION ON DRAFT LEGISLATION & REGULATIONS DEFERRED SETTLEMENT OF EXCISE & EXCISE EQUIVALENT

More information

NET FINANCIAL LIABILITIES

NET FINANCIAL LIABILITIES CHAPTER 5: NET FINANCIAL LIABILITIES Net Financial Liabilities of the General Government Sector are estimated to fall by $6,456 million over the four years to June 2001 and reduce by a further $1,209 million

More information

TEC Capital Asset Management Standard January 2011

TEC Capital Asset Management Standard January 2011 TEC Capital Asset Management Standard January 2011 TEC Capital Asset Management Standard Tertiary Education Commission January 2011 0 Table of contents Introduction 2 Capital Asset Management 3 Defining

More information

Conducting Formative Research

Conducting Formative Research Conducting Formative Research 1 The foundation of any sound sanitation marketing program is formative research. Formative research follows a process and includes a set of tools that can be used to help

More information

Infrastructure Asset Management Strategy

Infrastructure Asset Management Strategy Infrastructure Asset Management Strategy Strategy Owner Manager Parks and Assets Engineering and Infrastructure Creation Date 27 March 2006 Revision Date 4 March 2015 Please check Council s Intranet to

More information

Waste Management Action Plan 2011-2015

Waste Management Action Plan 2011-2015 Waste Management Action Plan 2011-2015 Approved on: 7 June 2011 Owner: Program Manager, 8203 7723 Trim Reference: ACC2011/77875 Next Review Date: June 2014 Executive Summary This Waste Management Action

More information

Frequently Asked Questions

Frequently Asked Questions Integrated Planning & Reporting Framework Frequently Asked Questions and their answers August 2009 Question Why are the planning and reporting requirements for local councils being changed? Page 3 What

More information

Best Practice Asset Management

Best Practice Asset Management Case Study Best Practice Asset Management An example of an Activity Management Plan, published by the Working Group Case Study AMP 01-2014 The Working Group was established by the Road Efficiency Group

More information

The Importance of Retail Leasing in Franchising

The Importance of Retail Leasing in Franchising The Importance of Retail Leasing in Franchising For franchises operated from a fixed location such as a shop or office (rather than a mobile vehicle-based franchise), the lease agreement and conditions

More information

1 What is the role of a financial planner when advising a client about retirement planning?

1 What is the role of a financial planner when advising a client about retirement planning? Questions with Guided Answers by Graeme Colley 2013 Reed International Books Australia Pty Limited trading as LexisNexis. Permission to download and make copies for classroom use is granted. Reproducing

More information

Local Government and Planning Ministers Council

Local Government and Planning Ministers Council Attachment A Local Government and Planning Ministers Council First National Report on Development Assessment Performance 2008/09 Prepared by the South Australian Government Attachment A Table of Contents

More information