REPAIR OF SEVERELY DISTRESSED PAVEMENT 10 MINUTES AFTER COMPACTION. Simple, Permanent & Environmentally Friendly

Size: px
Start display at page:

Download "REPAIR OF SEVERELY DISTRESSED PAVEMENT 10 MINUTES AFTER COMPACTION. Simple, Permanent & Environmentally Friendly"

Transcription

1 REPAIR OF SEVERELY DISTRESSED PAVEMENT 10 MINUTES AFTER COMPACTION Simple, Permanent & Environmentally Friendly

2 INTRODUCING PAVEMEND concrete repair products have been acknowledged by professionals for their unrivaled performance in the most difficult repair environments. We are excited to announce that INSTANT ASPHALT extends that performance to asphalt surfaces that have suffered severe pavement distress. Simple, Permanent & Sustainable

3 Easy as Cold Mix & Durable as Hot Mix with segment leading Planet Friendly Technology PAVEMEND Instant Asphalt s exceptional performance is derived from a proprietary reactive binder based on plant oils. Developed in Europe, this reactive asphalt repair technology has proven itself throughout European climates and service conditions. The 100% solvent free binder reacts with water Made with natural raw materials Made in America After a short time, performance is equivalent to a hot mix material forming a strong, durable repair with it s own integrity, consistently demonstrating exceptional resistance to rutting, pushing and shoving. Sustainability is defined by the material chemistry, cost (time and effort to effect repair) as well as product durability. Pavemend Instant Asphalt redefines sustainable asphalt repair.

4 Now it s incredibly easy to perform a PERMANENT Asphalt Repair 1. Place Instant Asphalt (place approximately 1 1/2 of material for every 1 of depth to allow compaction to grade) 2. Saturate with water (with approx. 1/2 US Gallon of water per 55 lb pail). 3. Compact (use hand tamper, vibratory plate, roller) Put your equipment away and open to traffic!

5 Advanced Placement Characteristics Extraordinary technology that provides permanent repair year round, in all climates. Wet Dry Hot Even below freezing! (Contact Field Engineering for placement techniques in temperatures below freezing). Rapid Return to Service. Potholes (confined) Open to traffic immediately. Lane Repairs (unconfined) Open to traffic minutes after placement. Exceptional bond to existing asphalt. SEVERE FAILURE OF ASPHALT, REPAIR SUBJECT TO TRAFFIC 30 MINUTES AFTER PLACEMENT

6 Simple Site Preparation Blow out standing water (primarily to remove loose debris). Permanent repairs can be made even when the area is wet, and if required, with standing water. Place the material in the water and proceed. Remove dirt or debris To ensure the best performance, remove loose debris and bond to a sound perimeter and substrate (compacted gravel or asphalt). Instant Asphalt will bond well to concrete - however for permanent repairs Pavemend recommends concrete repair materials for concrete, asphalt for asphalt. Preparing the repair with a clean, angular perimeter, a minimum of 1 at edge will ensure the greatest durability. However, many repairs are simply placed against uneven, but sound existing asphalt and durability is exceptional. Remove broken, weak material from the perimeter to ensure a durable, permanent repair (the Instant Asphalt will not break down, but the surrounding material may continue to fail).

7 Technical Information Minimum repair depth: One inch (utilize the fine grade for repairs one inch deep). Maximum repair depth: Material may be placed in multiple lifts of 2-3. Place, Saturate and compact, place the next lift. The 2-3 requirement ensures water saturates the entire placement, and compaction is effective. Multiple layers will bond exceptionally well to themselves. Storage & Shelf Life: Material has a shelf life of 2 years in sealed pails. Once the seal is broken, reaction begins (exposure to moisture in the atmosphere), and excess material in the pail should be quickly resealed to preserve shelf life of opened units by 2-4 weeks after opening. Tack Coat Option: Difficult repairs (where circumstances have led to multiple failures) may benefit from an asphalt tack coat around the perimeter. However, the vast majority of repairs will not utilize this, and will perform exceptionally. FIRST LIFT BEING SATURATED, PRIOR TO COMPACTION AND APPLICATION OF SECOND LIFT

8 The Value of a Permanent Repair How many times can you repeat the same repair, and at what cost? Potholes appear in the worst conditions of the year, and as such are typically treated as a temporary repair. Adverse conditions (rain & cold) render these temporary repairs ineffective, and the road hazard quickly reappears. Cold mix materials typically utilized for these repairs pull out quickly after placement, and other alternatives may be subject to unacceptable durability, providing an uneven repair, subject to shoving & rutting. Repair costs include much more than material expenditure. The much greater proportion of repair costs includes labor, mobilization, lane closures, traffic interruptions, and the liability of failed repairs - road hazards. Instant Asphalt provides permanent repairs at a fraction of the cost typically incurred. Repair it once, with PAVEMEND

9 Revolutionizing Asphalt Maintenance The ability to easily perform permanent, sound repair of potholes and distressed pavements means; Reduced need to mobilize hot mix crews with extensive lane closures and costs. The ability to perform effective repairs regardless of seasons, temperature and the remoteness of the repair. Maintaining properties and highways quickly and efficiently reduces road hazards and liabilities. Green, sustainable repair of roads ensure no pollutants move from the repair into the environment and water systems. Superior ROI on repair efforts, crews address repairs once.

10 Applications Fast, permanent pothole repair in a wide range of climates, geographies & conditions regardless of accessibility. Fast, permanent lane repairs on asphalt highways and bridge decks as an alternative to mobilizing hot mix crews, with lengthy lane closures. Environmentally friendly Asphalt repairs around drainage systems. Fast, permanent asphalt repairs around manholes and utility installations, trenches etc.

11 Product Configuration Pavemend Instant Asphalt is available in two grades; VDOT TEST PLACEMENT Instant Asphalt 6.0 (1/4 Aggregate) Sku # IA60-55 Instant Asphalt 9.0 (3/8 Aggregate) Sku # IA90-55 Call or your local Pavemend representative or contact Pavemend at info@pavemend.com, VDOT TEST PLACEMENT AFTER 18 MONTHS

APPENDIX B. I. Background Information

APPENDIX B. I. Background Information APPENDIX B GUIDELINES FOR IDENTIFYING AND REPAIRING LOCALIZED AREAS OF DISTRESS IN AC PAVEMENTS PRIOR TO CAPITAL PREVENTIVE MAINTENANCE OR REHABILITATION REPAIRS I. Background Information A. AC Pavement

More information

Pavement Patching Repair for AC and PCC Pavement Surfaces. Vern Thompson www.crafco.com

Pavement Patching Repair for AC and PCC Pavement Surfaces. Vern Thompson www.crafco.com Pavement Patching Repair for AC and PCC Pavement Surfaces Vern Thompson www.crafco.com Overview and Objective New Methods For Pavement Patching-Overview What are they How they are applied New Methods Secti

More information

Why Maintain Your Asphalt?

Why Maintain Your Asphalt? Asphalt Maintenance Why Maintain Your Asphalt? Asphalt pavement is basically sand, gravel and glue. The glue used to keep the sand and gravel together is asphalt, a heavy by-product of oil refining. While

More information

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,

More information

Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling

Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling Asphalt Pavements 7-7 Chapter 7 Pavement Rehabilitation Pavement rehabilitation can be accomplished

More information

Construction of Quality Hot Mix Asphalt Pavements

Construction of Quality Hot Mix Asphalt Pavements 59 th Annual Asphalt Paving Conference Outline Best Practices for Pavement Construction Placement Best Practices Surface Prep Project planning Understanding the paver Factors affecting the screed Screed

More information

WATERPROOFING FOR CONCRETE STRUCTURES

WATERPROOFING FOR CONCRETE STRUCTURES MANUAL OF CONTRACT DOCUMENTS FOR ROAD WORKS VOLUME 1 SPECIFICATION FOR ROAD WORKS SERIES 2000 WATERPROOFING FOR CONCRETE STRUCTURES Contents Clause Title Page 2001 General 2 2002 Protection of Bridge Deck

More information

SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES

SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES 1. DESCRIPTION. Asphalt Waterproofing Mix (AWM) is a highly elastomeric, polymermodified, impermeable asphalt

More information

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14)

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14) POLYMERIC CONCRETE BRIDGE DECK OVERLAY (Adopted 02-20-14) Description The polymeric concrete bridge deck overlay shall consist of an epoxy polymer that acts together with special aggregate to form an overlay

More information

GUIDE SPECIFICATION COMBINATION SURFACE SYSTEM FOR NEW HOT MIX ASPHALT TENNIS COURTS I. PART 1 - GENERAL

GUIDE SPECIFICATION COMBINATION SURFACE SYSTEM FOR NEW HOT MIX ASPHALT TENNIS COURTS I. PART 1 - GENERAL COMBINATION SURFACE SYSTEM FOR NEW HOT MIX ASPHALT TENNIS COURTS I. PART 1 - GENERAL 1.1 SUMMARY A. This section is a part of the entire set of Contract Documents and shall be coordinated with the applicable

More information

SECTION 4Aggegate Subbase

SECTION 4Aggegate Subbase The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials SECTION 03 92 50 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings,

More information

Building Your Interlocking Concrete Pavement to Last a Lifetime

Building Your Interlocking Concrete Pavement to Last a Lifetime Building Your Interlocking Concrete Pavement to Last a Lifetime A Guide for Consumers Contents Building Your Interlocking Concrete Pavement to Last a Lifetime.... 3 What Does Installation Involve?....

More information

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS AN ERGONARMOR COMPANY TECHNICAL INFORMATION SPECIFICATION FOR INSTALLATION 07/11 SUPERSEDES 04/00 PAGE 1 OF 6 CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS 1. SCOPE 1.1 This specification

More information

Otta Seal BACKGROUND GENERAL DESCRIPTION DESIGN ASPECTS. Category : Technical Information/On-carriageway/

Otta Seal BACKGROUND GENERAL DESCRIPTION DESIGN ASPECTS. Category : Technical Information/On-carriageway/ Otta Seal Category : Technical Information/On-carriageway/ BACKGROUND An Otta seal is a thin bituminous seal comprising graded gravel or crushed aggregate containing all sizes and either a cut-back or

More information

Decision Matrix for Pavement Preservation. Mike Mamlouk Arizona State University

Decision Matrix for Pavement Preservation. Mike Mamlouk Arizona State University Decision Matrix for Pavement Preservation Mike Mamlouk Arizona State University Outline 1. Concept of preventive maintenance 2. Effectiveness of treatments 3. Treatment selection 2 Pavement Pavement Preservation

More information

SC2000 CEMENT BONDING PROCEDURES

SC2000 CEMENT BONDING PROCEDURES Pg.1 SC2000 CEMENT BONDING PROCEDURES Widely recognized as the world s finest cold vulcanizing cement REMA SC2000 is the solution to your industrial bonding problems. By using REMA UTR20 hardener with

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,

More information

Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements

Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements University of Pittsburgh Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements Authors: J. M Vandenbossche S. Sachs August 2013 1. Introduction Bonded concrete overlays of asphalt

More information

Warranty Information TABLE OF CONTENTS PROCEDURES FOR WARRANTY 2

Warranty Information TABLE OF CONTENTS PROCEDURES FOR WARRANTY 2 Warranty Information TABLE OF CONTENTS PROCEDURES FOR WARRANTY 2 PROTECTING YOUR DURO-LAST ROOFING 3 Safety Measures 3 Inspection 3 Maintenance Program 4 Sealants 4 Drainage 4 Parapets Walls 4 Building

More information

Division 2 Section 32 14 13.19 Section 02795

Division 2 Section 32 14 13.19 Section 02795 Note: The text must be edited to suit specific project requirements. It should be reviewed by a qualified civil or geotechnical engineer, or landscape architect familiar with the site conditions. Edit

More information

INTERIM ADVICE NOTE 96 /07 Revision 1 GUIDANCE ON IMPLEMENTING RESULTS OF RESEARCH ON BRIDGE DECK WATERPROOFING

INTERIM ADVICE NOTE 96 /07 Revision 1 GUIDANCE ON IMPLEMENTING RESULTS OF RESEARCH ON BRIDGE DECK WATERPROOFING Interim Advice Note 96/07 INTERIM ADVICE NOTE 96 /07 Revision 1 GUIDANCE ON IMPLEMENTING RESULTS OF RESEARCH ON BRIDGE DECK WATERPROOFING Summary This interim advice note provides guidance on improving

More information

Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005

Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005 Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005 Purpose The purpose of this review is to capture for technical deployment the most advanced

More information

Minor Cracks in Horizontal Surfaces

Minor Cracks in Horizontal Surfaces Cracks, chips and broken or flaking areas in concrete are not only unsightly, they can lead to further deterioration of the surface. The result is a costly replacement project as opposed to a simple repair.

More information

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS Research & Development Division RD/GN/033 June 2008 THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE

More information

SECTION 31 20 00 EARTH MOVING

SECTION 31 20 00 EARTH MOVING SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to

More information

C. Section 014510 TESTING LABORATORY SERVICE.

C. Section 014510 TESTING LABORATORY SERVICE. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,

More information

40-9 PERMEABLE INTERLOCKING CONCRETE PAVEMENT

40-9 PERMEABLE INTERLOCKING CONCRETE PAVEMENT 40-9 PERMEABLE INTERLOCKING CONCRETE PAVEMENT 40-9.01 GENERAL 40-9.01A Summary Section 40-9 includes specifications for furnishing and installing concrete pavers for permeable interlocking concrete pavement

More information

Unit Price Averages Reports

Unit Price Averages Reports Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation

More information

Introduction. Emulsify with water. Asphalt Emulsions 101. Asphalt Binder Properties. Why Heat Asphalt? So It Can Be:

Introduction. Emulsify with water. Asphalt Emulsions 101. Asphalt Binder Properties. Why Heat Asphalt? So It Can Be: Asphalt Emulsions 101 Introduction Chris Lubbers Technical Sales and Marketing Mgr Kraton Polymers, LLC 50 TH Annual Idaho Asphalt Conference Moscow, ID October 28, 2010 Semi Solid Liquid Asphalt Binder

More information

Resurfacing Concrete. Page 1 of 5

Resurfacing Concrete. Page 1 of 5 Resurfacing Concrete Materials List QUIKRETE Concrete Resurfacer (No. 1131) (see calculator on page 5 for quantity needed) QUIKRETE Concrete and Stucco Wash (No. 8601) QUIKRETE Concrete Sealer (No. 8800)

More information

DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION MATERIALS CONSTRUCTION REQUIREMENTS

DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION MATERIALS CONSTRUCTION REQUIREMENTS 304.06 DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION 304.01 This work consists of furnishing and placing one or more courses of aggregate and additives, if required, on a prepared subgrade.

More information

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS Research & Development Division RD/GN/032 June 2007 1. Purpose ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS

More information

DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job

DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION Using the Full Range of Tools for a Challenging Job Report To: TTI Committee May 13, 2014 1 Pavement Management - Suggested Treatments

More information

Recovering from the 2010 Nashville Flood

Recovering from the 2010 Nashville Flood Recovering from the 2010 Nashville Flood Pavement Management as a Tool in Long Term Disaster Recovery Donald Reid, Metro Nashville Public Works Jacob Walter, Applied Research Associates What Happened?

More information

SPECIFICATION FOR CONSTRUCTION OF UNBOUND GRANULAR PAVEMENT LAYERS

SPECIFICATION FOR CONSTRUCTION OF UNBOUND GRANULAR PAVEMENT LAYERS TNZ B/02:2005 SPECIFICATION FOR CONSTRUCTION OF UNBOUND 1. SCOPE This specification shall apply to the construction of unbound granular pavement layers. The term pavement layer shall apply to any layer

More information

International Greenhouse Company

International Greenhouse Company Greenhouse Foundation Design As with any building, a good solid foundation is crucial for the long term durability and functionality of your greenhouse. A weak foundation will cause your greenhouse to

More information

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE 311.1 DESCRIPTION: This item shall consist of a cement treated subgrade base course composed of a mixture of local soil, portland

More information

ROOF INSPECTION & MAINTENANCE

ROOF INSPECTION & MAINTENANCE Physical Plant Administration Facilities Maintenance Department ROOF INSPECTION & MAINTENANCE All roofs require periodic inspection and maintenance in order to perform as designed and to provide a long

More information

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS The (NRDCA) has prepared this document to provide customers and installers information that the industry

More information

TERMOSIGN APPLICATION INSTRUCTIONS

TERMOSIGN APPLICATION INSTRUCTIONS TERMOSIGN APPLICATION INSTRUCTIONS Product s characteristics Termosign - preformed thermoplastic pavement marking system must be applied to a completely dry surface; must be applied to a surface free of

More information

Joint Rehabilitation. Driving Forces for Concrete Pavement Joint Repairs

Joint Rehabilitation. Driving Forces for Concrete Pavement Joint Repairs Long Life Concrete Pavement Joint Performance Joint Rehabilitation Gary Fick, Trinity Construction Management Services, Inc. Representing the National CP Tech Center Driving Forces for Concrete Pavement

More information

Carpet Tile Installation Guidelines

Carpet Tile Installation Guidelines NOTICE FAILURE TO FOLLOW THESE GUIDELINES CAN RESULT IN VOIDING THE CARPET WARRANTY. Installation Guidelines The following instructions should be reviewed prior to installation. Shaw Industries will not

More information

Permeable Pavement Operation & Maintanence Guide

Permeable Pavement Operation & Maintanence Guide Permeable Pavement Operation & Maintanence Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems

More information

G VYCOR DECK PROTECTOR. For longer lasting decks, install Grace Vycor Deck Protector. It s an easy add-on to your deck projects.

G VYCOR DECK PROTECTOR. For longer lasting decks, install Grace Vycor Deck Protector. It s an easy add-on to your deck projects. For longer lasting decks, install Grace Vycor Deck Protector. It s an easy add-on to your deck projects. G VYCOR DECK PROTECTOR Self-Adhered Flashing NEW FROM THE MAKERS OF G Ice & Water Shield I Moisture

More information

High Performance PSA in Sheet Membrane in Water Protection

High Performance PSA in Sheet Membrane in Water Protection High Performance PSA in Sheet Membrane in Water Protection Xia Cao, Senior R&D Chemist, W. R. Grace, Cambridge MA 02140 Jyoti Seth, Strategic Program Leader, W. R. Grace, Cambridge MA 02140 Concrete is

More information

Proposed Revision to Bridge Design & Drafting Manual

Proposed Revision to Bridge Design & Drafting Manual INTEROFFICE MEMO TECHNICAL SERVICES Bridge Engineering Section Office Phone: (503) 986-4200 Fax Number: (503) 986-3407 DATE: February 5, 2014 TO: Scott Liesinger Bridge Design Standards Engineer FROM:

More information

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING. 16.1 General...16-1. 16.2 Materials...16-1. 16.3 Equipment...

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING. 16.1 General...16-1. 16.2 Materials...16-1. 16.3 Equipment... SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING TABLE OF CONTENTS 16.1 General...16-1 16.2 Materials...16-1 16.3 Equipment...16-1 16.4 Installation...16-2 16.4.1 Traffic Restrictions...16-2

More information

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles INSTALLATION RECOMMENDATIONS Outdoor Rubber Tiles Prior to Installation: The Outdoor Rubber Tiles and accessory transition pieces intended for this installation have been shipped to you via a freight carrier

More information

Metal Rescue Rust Remover Technical Data

Metal Rescue Rust Remover Technical Data Technical Data Product Description Metal Rescue TM is an innovative new technology that efficiently removes rust without harming surrounding materials. It is a water-based, non-toxic solution that is biodegradable

More information

Reflectex TM Reflective Concrete Interlayer Geotextile INSTALLATION GUIDELINES

Reflectex TM Reflective Concrete Interlayer Geotextile INSTALLATION GUIDELINES Reflectex TM Reflective Concrete Interlayer Geotextile INSTALLATION GUIDELINES Page 1 Table of Contents WHAT IS REFLECTEX TM?... 2 STORAGE AND HANDLING... 3 SITE PREPARATION... 3 PREPARATION OF EXISTING

More information

Aqua-Bric PERMEABLE PAVERS

Aqua-Bric PERMEABLE PAVERS Aqua-Bric PERMEABLE PAVERS Essential Pavers for Plazas, Walkways, Entrances and Parking Lots Belden Brick Aqua-Bric Permeable Pavers PERMEABLE PAVING IS A DESIGNED APPLICATION TO MANAGE STORM WATER RUN-OFF

More information

Adhesive Recommendation for Altro Flooring. Porous (absorbent) subfloors (most wood subfloors and some concrete)

Adhesive Recommendation for Altro Flooring. Porous (absorbent) subfloors (most wood subfloors and some concrete) Adhesive Recommendation for Altro Flooring Product Safety Sheet Flooring Smooth Sheet Flooring Porous (absorbent) subfloors (most wood subfloors and some concrete) Altrofix 30/31 (excessively heavy rolling

More information

BLACK JACK ALL WEATHER ROOF COATING

BLACK JACK ALL WEATHER ROOF COATING PAGE: 1 of 6 PRINT DATE: 16/09/2004 BLACK JACK ALL WEATHER ROOF COATING DESCRIPTION BLACK JACK ALL WEATHER ROOF COATING is a solvent based, full bodied black brushable compound with added fibres for reinforcement.

More information

Vinyl Composition Tile Installation System

Vinyl Composition Tile Installation System Vinyl Composition Tile Installation System Product Gauge Size Vinyl No-Wax (Dry Back) Urethane No-Wax (Dry Back) 0.045" (1.1 mm) 0.080" (2.0 mm) IMPERIAL TEXTURE 0.094" (2.4 mm) STONETEX ChromaSpin COMPANION

More information

Specification Guidelines: Allan Block Modular Retaining Wall Systems

Specification Guidelines: Allan Block Modular Retaining Wall Systems Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. At the engineer of record's

More information

CID STREET INFRASTRUCTURE ASSESSMENT

CID STREET INFRASTRUCTURE ASSESSMENT ABSTRACT An evaluation of the street infrastructure in Foxberry Estates Phase 1, including pavement condition, verification of construction techniques, and subgrade quality. Recommendations and costs for

More information

How To Get A Street Opening Permit In Belham

How To Get A Street Opening Permit In Belham TOWN OF BELLINGHAM STREET OPENING SPECIFICATION December 2004 - Revisions I. GENERAL A. Definitions and Abbreviations: Town Street shall mean a Town owned right of way or public travel way that the Town

More information

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Introduction Wastewater of petrochemical industries and refineries contains high amounts of emulsified aliphatic or

More information

Installation PowerPoint for Grasscrete Formers

Installation PowerPoint for Grasscrete Formers Installation PowerPoint for Grasscrete Formers 1 This document describes the two single-use tools utilized to create the Grasscrete product. The original Former is a vacuum formed light gauge plastic mold

More information

T R A N S F E R A B L E F U L LY

T R A N S F E R A B L E F U L LY HSTOPS A WALL OF WATER 22 FT. HIG! F U L LY T R A N S F E R A B L E RESISTS10 PSI ! 1 F U L LY T R A N S F E R A B L E HSTOPS A WALL OF WATER 22 FT. HIG RESISTS10 PSI Guaranteed To Stop Water Even Under

More information

DUPLEX ROLLERS AND TRENCH COMPACTORS. LP range

DUPLEX ROLLERS AND TRENCH COMPACTORS. LP range DUPLEX ROLLERS AND TRENCH COMPACTORS LP range GET IT DONE Customers look to you for great compaction. Our job is to provide equipment that help you deliver. Together we create quality. A customer that

More information

SUBDIVISION ROAD CONSTRUCTION AND INSPECTION PROCEDURES

SUBDIVISION ROAD CONSTRUCTION AND INSPECTION PROCEDURES BOARD OF COUNTY COMMISSIONERS ST. MARY S COUNTY LEONARDTOWN, MARYLAND SUBDIVISION ROAD CONSTRUCTION AND INSPECTION PROCEDURES APRIL, 1991 AMENDED: JUNE, 2002 DEPARTMENT OF PUBLIC WORKS & TRANSPORTATION

More information

Does Part of My Basement Floor Have to Be Removed to Install. Where Does the Water from the Sump Pump Go?...Page 5

Does Part of My Basement Floor Have to Be Removed to Install. Where Does the Water from the Sump Pump Go?...Page 5 PROTECTIVE PLUMBING - WHAT IS IT? TABLE OF CONTENTS Protective Plumbing What is it?...page 1 What is Foundation Drainage?...Page 2 What is a Sump Pumping System?...Page 4 Does Part of My Basement Floor

More information

Airfield Pavement Rehabilitation Planning Choosing the right fix. Rob McLure, M.Eng., P.Eng. Senior Associate Hatch Mott MacDonald

Airfield Pavement Rehabilitation Planning Choosing the right fix. Rob McLure, M.Eng., P.Eng. Senior Associate Hatch Mott MacDonald Airfield Pavement Rehabilitation Planning Choosing the right fix Rob McLure, M.Eng., P.Eng. Senior Associate Hatch Mott MacDonald Presentation Objective ¾ Review the pavement rehabilitation strategy development

More information

SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS

SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS PART 1: GENERAL 1.01 SECTION INCLUDES A. Abandonment in place, by cutting and capping, of existing sewers, junction structures, manholes, service lines, and

More information

NOTES TO THE PERFORMANCE BASED SPECIFICATION FOR HOTMIX ASPHALT WEARING COURSE SURFACING

NOTES TO THE PERFORMANCE BASED SPECIFICATION FOR HOTMIX ASPHALT WEARING COURSE SURFACING TNZ P/23 NOTES: 2005 FOR HOTMIX ASPHALT WEARING COURSE SURFACING 1. BACKGROUND 1.1 Specification Use The specification is to be used where the Engineer requires a dense graded, open graded (permeable)

More information

Section 02702 SEWER PIPE INSTALLATION AND TESTING

Section 02702 SEWER PIPE INSTALLATION AND TESTING PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete

More information

Product and Specification Developments affecting Road Surface Maintenance

Product and Specification Developments affecting Road Surface Maintenance Product and Specification Developments affecting Road Surface Maintenance Dr Howard Robinson Chief Executive Todays menu Quick RSTA intro Consider some new guidance and specifications affecting surface

More information

Technical Manual - Section 1 Introduction to Lytag lightweight aggregate

Technical Manual - Section 1 Introduction to Lytag lightweight aggregate Uniclass L6129 EPIC F122 CI/SfB Yp3 Technical Manual - Section 1 Introduction to Lytag lightweight aggregate Introduction... 2 Product... 2 Sustainability... 2 Physical Properties of Lightweight Aggregate...

More information

CA-48 TECHNICAL SPECIFICATION

CA-48 TECHNICAL SPECIFICATION CA-48 TECHNICAL SPECIFICATION SafeLane surface overlay Pavement Substrate A Cargill Deicing Technology Product Providing customers with deicing solutions that save lives and enhance commerce. Helping to

More information

Cost Considerations of In-Place Recycling as a Pavement Rehabilitation Alternative Brian Diefenderfer, PhD, PE Alex Apeagyei, PhD, PE

Cost Considerations of In-Place Recycling as a Pavement Rehabilitation Alternative Brian Diefenderfer, PhD, PE Alex Apeagyei, PhD, PE Cost Considerations of In-Place Recycling as a Pavement Rehabilitation Alternative Brian Diefenderfer, PhD, PE Alex Apeagyei, PhD, PE A partnership of the Virginia Department of Transportation and the

More information

The AASHO Road Test site (which eventually became part of I-80) at Ottawa, Illinois, was typical of northern climates (see Table 1).

The AASHO Road Test site (which eventually became part of I-80) at Ottawa, Illinois, was typical of northern climates (see Table 1). Página 1 de 12 AASHO Road Test The AASHO Road Test, a $27 million (1960 dollars) investment and the largest road experiment of its time, was conceived and sponsored by the American Association of State

More information

CHAPTER 6 ASPHALT ROLL ROOFING

CHAPTER 6 ASPHALT ROLL ROOFING CHAPTER 6 ASPHALT ROLL ROOFING Section I. DESCRIPTION AND GENERAL DISCUSSION 6.1.1 General 6.1.3 Mineral-Surfaced Asphalt roll roofing is roofing in sheet form Mineral-surfaced roll roofing is composed

More information

Crack Sealing & Filling. Crack Sealing Why, Where, & How. 5 Benefits of Crack Sealing. Crack Sealing - Overview. Repair Many Types of Cracks

Crack Sealing & Filling. Crack Sealing Why, Where, & How. 5 Benefits of Crack Sealing. Crack Sealing - Overview. Repair Many Types of Cracks Crack Sealing Why, Where, & How Dennis Roberts Remac Asphalt Maintenance, Inc. Freeman, Virginia www.remacus.com 434-634-2111 Crack Sealing & Filling Crack repair treatments are an important part of all

More information

Pace s plant had minimal problems producing warm-mix asphalt for the paving project.

Pace s plant had minimal problems producing warm-mix asphalt for the paving project. Pace s plant had minimal problems producing warm-mix asphalt for the paving project. 22 Hot Mix Asphalt Technology SEPTEMBER/OCTOBER 2006 By Chuck MacDonald Tractor-trailer trucks crawled along an open

More information

Section 300 Base Courses

Section 300 Base Courses Table of Contents 1. Importance of Base Courses... 300-1 2. Types of Bases... 300-3 A. Cement Treated Permeable Base Course... 300-3 B. Bituminous Concrete Base Courses... 300-6 C. Superpave Asphalt HMA

More information

INSTALLATION SPECIFICATIONS FOR AQUAPERM TM PAVER

INSTALLATION SPECIFICATIONS FOR AQUAPERM TM PAVER INSTALLATION SPECIFICATIONS FOR AQUAPERM TM PAVER Applicable to all AquaPerm TM Permeable Unit Paver Systems FOREWORD These outline specifications have been prepared for the general guidance of architects,

More information

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing 1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize

More information

Sika Membran System For Sealing and Waterproofing Construction Gaps in Building Façades

Sika Membran System For Sealing and Waterproofing Construction Gaps in Building Façades Construction Sika For Sealing and Waterproofing Construction Gaps in Building Façades Waterproof and Airtight Flexible Seal Controlled Vapour Diffusion Bonds to any Building Substrate Prevents Interstitial

More information

Wecryl Waterproofing System under surfacing supplied by others

Wecryl Waterproofing System under surfacing supplied by others Brief description The Wecryl waterproofing system allows a high-quality, seamless and crack-bridging waterproofing layer to be installed under loose-laid or bonded surfacing supplied by others (stone slabs,

More information

STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200

STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200 STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES PART 1 - GENERAL A. Description This section includes materials, testing, and installation of precast concrete

More information

Permeable Pavement Construction Guide

Permeable Pavement Construction Guide Permeable Pavement Construction Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems that reduce

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-31 31 16.19 (February 2016) -------------------------------- Preparing Activity: NAVFAC Superseding UFGS 31 31 16.19 (August 2014) UFGS 31 31 16.20 (April 2006) UFGS

More information

Commercial Roof Management

Commercial Roof Management Disclaimer: This material is designed and intended for general informational purposes only, and is not intended, nor shall it be construed or relied upon, as specific legal advice. Roof damage is a leading

More information

CHAPTERS 600 670 PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS

CHAPTERS 600 670 PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS HIGHWAY DESIGN MANUAL 600-1 May 7, 2012 CHAPTERS 600 670 PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS Topic 601 - Introduction Pavement engineering involves the determination of the type and thickness

More information

SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS

SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS 1 SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS TABLE OF CONTENTS I. Introduction II. General Information and Requirements A. Applying for Sewer connection B. Excavation C. Cutting Concrete and Asphalt

More information

Solvent Cementing Instructions For Plastic Pipe & Fittings

Solvent Cementing Instructions For Plastic Pipe & Fittings Solvent Cementing Instructions For Plastic Pipe & Fittings Description Solvent cementing is the process of fusing plastic pipe and fittings by the use of an adhesive containing a suitable active solvent

More information

Soils, Foundations & Moisture Control

Soils, Foundations & Moisture Control Soils, Foundations & Moisture Control Soil The top loose layer mineral and/or organic material on the surface of the Earth that serves as a natural medium for the growth of plants and support for the foundations

More information

CONCRETE REPAIR GUIDELINES. Concrete repairs can be broken down into four basic types, plus special repairs and planing.

CONCRETE REPAIR GUIDELINES. Concrete repairs can be broken down into four basic types, plus special repairs and planing. CONCRETE REPAIR GUIDELINES Concrete repairs can be broken down into four basic types, plus special repairs and planing. Note: It is recommended that investigation into soundness of pavement be performed

More information

Installation System. Existing Resilient Sheet Floors

Installation System. Existing Resilient Sheet Floors Vinyl Composition Tile Installation System Product Adhesive/Full Spread Adhesive/Tile-On Comment Imperial Texture MultiColor RAVE Stonetex Companion Square Feature Tile/Strips ARTEFFECTS SAFETY ZONE Vinyl

More information

WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM

WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM SPECIFICATION NO. SMAA-2P-8xE UPGRADE SMOOTH SURFACE / CAP SHEET / SINGLE PLY 2 PLY POLYESTER REINFORCED ACRYLIC

More information

ROAD CONSTRUCTION. Pavement Base Reinforcement Subgrade Stabilization

ROAD CONSTRUCTION. Pavement Base Reinforcement Subgrade Stabilization ROAD CONSTRUCTION Pavement Base Reinforcement Subgrade Stabilization TM Road Construction applications have specific needs and objectives. No one understands that better than Road construction applications

More information

STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES

STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES ROOFING APPLICATION STANDARD (RAS) No. 117 STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES Scope 1.1.

More information

CURRENT PRACTICE SHEET

CURRENT PRACTICE SHEET CURRENT PRACTICE SHEET INTRODUCTION An expansion joint can be defined as a device to support the surfacing, or to provide a running surface, across the expansion gap, ie the area between adjacent spans

More information

INDEX 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6

INDEX 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6 03010_Dec22_2009.pdf Page 1 of 5 INDEX Page 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6 03010_Dec22_2009.pdf

More information

H: Road Asset Management Plan February 2015

H: Road Asset Management Plan February 2015 H: Road Asset Management Plan February 2015 Document Format This plan forms one part of a suite of Asset Management Plans that have been developed: A. Bridges B. Buildings C. Drainage D. Footpath E. Levee

More information

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS BSW HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS BSW is a fully reinforced Pre-Applied system membrane designed for horizontal and vertical external blind-side

More information

The URETEK Deep Injection Process (UDI) For Roadways and Building Structures

The URETEK Deep Injection Process (UDI) For Roadways and Building Structures The URETEK Deep Injection Process (UDI) For Roadways and Building Structures A URETEK USA/ICR White Paper www.worldofuretek.com 888-287-3835 Introduction Since the early days of modern civilization, road

More information