1 ITS specification Ramp meter site layout (ITS-05-01) NZ Transport Agency Effective from September 2011

2 Copyright information This publication is copyright NZ Transport Agency (NZTA). Material in it may be reproduced for personal or inhouse use without formal permission or charge, provided suitable acknowledgement is made to this publication and the NZTA as the source. Requests and enquiries about the reproduction of material in this publication for any other purpose should be made to: NZ Transport Agency Private Bag 6995 Wellington 6141 The permission to reproduce material in this publication does not extend to any material for which the copyright is identified as being held by a third party. Authorisation to reproduce material belonging to a third party must be obtained from the copyright holder(s) concerned. Disclaimer The NZTA has endeavoured to ensure material in this document is technically accurate and reflects legal requirements. However, the document does not override governing legislation. The NZTA does not accept liability for any consequences arising from the use of this document. If the user of this document is unsure whether the material is correct, they should refer directly to the relevant legislation and contact the NZTA. More information Published September 2011 If you have further queries, call our contact centre on or write to us: NZ Transport Agency Private Bag 6995 Wellington 6141 This document is available on the NZTA s website at

3 Page i Document management plan 1) Purpose The purpose of this document is to specify the general requirements for Ramp Meter site layout design. 2) Document information Document name Document number Document status Document availability ITS specification: Ramp meter site layout ITS Final This document is located in electronic form on the NZ Transport Agency s website at Document author Waterview ITS Requirements Working Group: Jamie French (09) Tom Harris (09) Document owner Henry Pretorius 3) Key words ITS Ramp Meter Site Layout requirements.

4 Page ii Record of amendments Amendment number Section amended Description of change Updated by Effective date Draft R0 All ITS Draft Specifications Issue JF/TLH 23/9/2010 Draft R1 All AMA Specifications Review JF & TLH 26/1/2011

5 Page iii Contents Document management plan Record of amendments i ii 1.0 Ramp meter system site layout Scope Design assumptions Standard drawings Layout design requirements Stop line Loop types General Count and mainline loops Queue loops Count loop configuration and locations Configuration Mainline loop configuration, ramp merge Mainline loop configuration, lane gain On-ramp count loops Motorway off-ramps Ramp signal by-pass lanes Queue loop configuration and locations Configuration First on-ramp queue loop Additional queue loops Arterial queue loops Ramp signal loop identification General Primary queue loop identification Primary count loop numbering Mainline loops Secondary loop identification Signal controller location General 10

6 Page iv Controller identification Advance warning signs General Type A AWS Type B AWS Advanced warning sign identification Ramp signals Static signage Ramp signal signage Regulatory speed signs PW 43-1 special signage, road narrows both sides PW 3 traffic signal sign Priority bypass lanes Line markings Motorway to motorway ramp signalling Journey time information, type D sign 15

7 Page Ramp meter system site layout 1.1 Scope The purpose of this document is to identify the design requirements for the equipment layouts at a Ramp Meter Site in order for a detailed ITS design to be undertaken. In general each Ramp Meter Site will consist of: a. A Ramp Meter Controller used to manage the operation of the lights and advanced warning signs; b. Mainline and Ramp Count and Occupancy Detector Loops monitoring the flow rates on the motorway for the RMS to determine the best operating conditions; c. Queue Detector Loops to monitor queue lengths on the on-ramp and arterial road; d. Ramp Meter Signals to limit the traffic on the on-ramp to control the flow on traffic onto the motorway; e. Type A Advanced Warning Signs giving motorists prior warning of Ramp Signal Operation; f. Type B Advanced Warning Signs warning motorists to stop at the Ramp Signals; g. Power supply; h. Roadside Communications cabinet, plinth and apron; i. Communications interfacing equipment; j. Guardrail protection and other accessories as necessary. This document also outlines the details for the Journey Time Information Variable Message Signs (VMS Type D) and their location and connectivity. This specification should be used as guidance as to the following: a. Stop Line Positioning b. Loop Positioning c. Signal Controller Location d. AWS Location including e. Traffic Signal Location f. Static Signage g. Line Markings. This document should be read in conjunction with the NZ Transport Agency s (NZTA) ITS specification: Ramp meter supply and installation (ITS-05-02). 1.2 Design assumptions The Ramp Metering System is a traffic management technique, which manages the number of vehicles joining a motorway at peak periods. The fundamental purpose of the RMS is to prevent or delay the onset of flow breakdown on the main carriageway by a combination of: a. Managing the flow on the entry slip road to avoid large platoons of vehicles entering the main carriageway and causing flow breakdown; and

8 Page 2 b. Restricting the flow onto the motorway of additional traffic that, if unrestricted would trigger flow breakdown. By preventing or delaying this flow breakdown, the system provides the following benefits: a. Less congestion and improved traffic flows on the main carriageway; b. Higher throughput during peak periods on the main carriageway; and, c. Smoother and more reliable journey times on the main carriageway. For the ramp meter equipment layout design it is assumed that the associated road layout has been designed and the road geometry requirements for the Ramp Meter System have been met. Note: This document is intended as a design guideline and any design created using this document must be audited and approved prior to construction. 1.3 Standard drawings The standard drawings for Ramp Meter System layouts are attached in the NZTA s ITS specification: Ramp meter system standard drawings (ITS-05-03). The standard drawings are provided for information to provide a basis for design. The contractor shall provide site specific detailed design drawings for all structures and foundations associated with the project for review prior to commencement of fabrication. The drawings attached in the NZTA s ITS specification: Ramp meter system standard drawings (ITS-05-03) should be used as guidance only.

9 Page Layout design requirements 2.1 Stop line The stop line will be the point at which the vehicles are brought to a halt on the on-ramp prior to release onto the motorway. It is from this starting point of stop line placement that will facilitate the remainder of the design. The stop line will typically be located m upstream of the physical nose as detailed in NZTA M2 Standard Ramp Metered Entrance Details drawing attached within section 1 Layout Drawings of the NZTA s ITS specification: Ramp meter system standard drawings (ITS-05-03). Upon placement of the stop line the positioning of loops can commence. 2.2 Loop types General The supply and installation of any inductive loop for the purpose of ramp signalling shall be done in accordance with the National Traffic Signal Specification attached within the appendices of the NZTA s ITS specification: Ramp meter supply and installation (ITS-05-02) and the NZTA s ITS specification: Inductive loops and feeder cables (ITS-03-01). There are two types of detector loops required for ramp signaling: Count and mainline loops Count and Occupancy Detector Loops (referred to as Count Loop), these are installed in the following locations: a. On the on-ramp after the stop line; b. On the mainline motorway; c. On off-ramps Queue loops Queue Detector Loops (referred to as Queue Loops), these are installed in the following locations: a. At the beginning and along the on-ramps; b. In adjoining arterial roads.

10 Page Count loop configuration and locations Configuration The typical configuration of a Count Loop is detailed in Figure 1. Figure 1 To Controller 2m 3m 2m 0.7m 0.7m Count Loop Edge Line Edge Line The loops shall be physically installed in line with the NZTA s ITS specification: Inductive loops and feeder cables (ITS-03-01). Where required a pair of Count Loops shall be installed in each lane. Ramp Signalling Count Loops shall be located as per the following configuration scenarios:

11 Page Mainline loop configuration, ramp merge For merge on-ramps two sets of mainline loops are required, one set to be located 20m beyond the end of the marked ramp, and the other set is to be located within 20m of the end of merge taper, as detailed in Figure 2. Figure 2: Mainline count loops, ramp merge Mainline loop configuration, lane gain For lane gain on-ramps the mainline loops are required to be located 50m beyond the physical nose as detailed in figure 3. Figure 3: Mainline count loop, lane gain

12 Page On-ramp count loops The on-ramp count loops shall be located in such a way that ensures that only one vehicle is detected at any one time, for example In a dual lane on-ramp the loops will need to be positioned after the vehicles have merged Typically an on-ramp count loop shall be located adjacent to the physical nose as detailed in figure 4, the exception to this is where the lane merge is completed downstream of point Z, in this case the count loop shall be located just after the completion of the merge. Figure 4: On-ramp count loop Motorway off-ramps For motorway off-ramps the mainline and off-ramp count loops will be installed, where practical, adjacent to the physical nose, as detailed in figure 5. Figure 5: Off-ramp count loop

13 Page Ramp signal by-pass lanes Ramp Signals sites that are installed with a priority/by-pass lane will have count loops positioned at the end of the by-pass lane, as detailed in figure 6. Figure 6: Bypass lane 2.4 Queue loop configuration and locations Configuration The number of queue loops required shall be dependent on the number of lanes and the length of lanes before the stop line. Within a dual lane on-ramp the queue loops shall be installed adjacent to each other. Queue loop shall be installed in pairs; typical configuration of a queue loop is detailed in figure 7. Figure 7: Queue loop

14 Page First on-ramp queue loop To facilitate the design process and to determine the length of the on-ramp, a set of queue loops will need to be located near the top of the on-ramp. Typically the first set of queue loops to be installed on an on-ramp, whether the installation is for a single lane or a dual lane ramp, shall be located a minimum of 20m downstream from the start of the ramp or at the point all arterial merging has taken place as detailed in figure 8. Figure 8: First set of queue loops Additional queue loops Depending on the length of the on-ramp additional queue loops may be required to facilitate in the operation of ramp signals, if the distance between the stop line and the first set of loops on the on-ramp is greater than 130m an additional set of queue loops may be needed. However it is not advisable to have a set of count loops within 70m of the stop line. Figure 9: Single queue loop The location of the additional loops shall be positioned at a distance of 60% of the distance between the stop line and the required loops installed near the top of the on-ramp. For example: The stop line is located 100m upstream of the physical nose of the on-ramp To Controller 1.75m The Primary set of loops at the top of the on-ramp is installed 20m from the arterial road. The measured distance between the stop line and the first set of loops is 160m, the additional set of queue loops shall be installed upstream of the stop line at 60% of the distance, thus being: 160/100x60 = 96m The additional set of loops shall be installed 96m upstream of the stop line 64m from the primary set of queue loops. Additional queue loops shall be installed as a single loop as per figure 9. Toby Box Edge Line 1m 1.75m 0.7m 0.7m Single Queue Loop Edge Line

15 Page Arterial queue loops Additional queue loops may be required on arterial roads dependent on the calculated length of the on-ramp. If the on-ramp is long enough to require additional on-ramp loops generally there would be no need for the installation of arterial loops. Ramps that have only one set of queue loops and have less than 130m between the stop line and the first queue loops may require additional queue loops installed on the left merge lanes and right turn lanes of the arterial road. The location of these loops will be dependent on local conditions. For an example of arterial loops refer to M2 Standard Ramp Metered Entrance Details drawing attached within section 1 Layout drawings of the NZTA s ITS specification: Ramp meter system standard drawings (ITS-05-03). 2.5 Ramp signal loop identification General In order for a Signal Controller personality to be created the loops must be identified. Currently the existing Ramp Metering System is only able to operate with a maximum of 24 inductive loops connected into the ramp meter controller at the site. Only double Queue loops require both their primary and secondary loops to be connected and operational, where a single queue loop is installed no secondary queue loop exists, all secondary Count and secondary Mainline Loops are installed but not connected, this is for resilience purpose only in the event of primary loop failure. No secondary Queue Loop will operate with an identification higher than 24. All loops within the installation, regardless of their connection status shall be assigned a number following this numbering methodology. The primary loop in a pair of loops is the leading loop in the pair. The secondary loop in a pair of loops is the second loop of the pair. For a graphical representation of loop numbering refer to section 2 Loop identification of the NZTA s ITS specification: Ramp meter system standard drawings (ITS-05-03). The following process shall be followed to identify the loops Primary queue loop identification The primary loop of the first set of queue loops on an on-ramp (or left turn lane in dual lane on-ramp configuration) shall be numbered Q1. All other primary queue loops installed for the site shall be numbered in an anticlockwise direction around Q1 until all the primary queue loops are identified. Loops in multi lane ramps shall be numbered closest to the left hand kerb first. The arc of the anti-clockwise numbering shall be continued to extend to incorporate all primary queue loops in the arterial road. Any queue loops that have been installed as a single queue loop shall be classed a primary loop, for example: On-ramp primary queue loops are identified as Q1 (LH Lane), Q2 (RH Lane), and Q3 (LH Lane), Q4 (RH Lane), then arterial road primary queue loops are identified as Q5 and Q6.

16 Page Primary count loop numbering The primary off-ramp count loop (or loops) shall be the starting point for numbering the Count Loops. The number assigned to the first count loop will depend on the number of queue loops, for example: If the last queue loop was identified as Q6, then the primary off-ramp Count Loop shall be identified as C7. Typically there will be one set of off-ramp count loops and one set of on-ramp count loops and the primary onramp count loop shall be numbered next in the sequence, for example: The primary off-ramp count loop is identified as C7; the primary on-ramp count loop is identified as C8. Where there are two off-ramp lanes the primary off-ramp Count Loop will be C7 and C8 and the primary on-ramp count loop would be C9. Ramps installed with a by-pass lane will have two sets of count loops with the primary on-ramp count loop that is closest to the left hand kerb numbered first Mainline loops The first mainline primary loop to be numbered shall be the primary loop in lane 1 adjacent to the off-ramp count loops, the other mainline primary loops shall be numbered across the carriageway and in the direction of travel, for example: Where the last primary count loop was identified as C9, the primary mainline loops adjacent to the off-ramp count loops will be numbered M11 in Lane 1, M12 in Lane 2 and M12 in lane 3. Moving in the direction of travel the next primary mainline loops encountered shall be the next loop to be identified, for example: The previous primary mainline loop was located in lane 3 and identified as M12, the next primary mainline loop encountered will be the lane 1 loop adjacent to the on-ramp count loop, this loop will be identified as M13, repeating the process across the carriageway and moving in the direction of travel until all primary mainline loops have been numbered Secondary loop identification Once all the primary loops have been identified the numbering returns to the first set of queue loops on the onramp and the secondary loops are numbered sequentially in the same order as the primary loops. Refer to Loop identification example in section 2 of the NZTA s ITS specification: Ramp meter system standard drawings (ITS-05-03). 2.6 Signal controller location General The signal controller is responsible for the monitoring and performance of the ramp signal and associated loops, traffic signals and advanced warning signs. Ideally the controller cabinet shall be located adjacent to a network communications cabinet to facilitate in the connection to the fibre network and be easily accessible for maintenance without the need for Traffic Management, where practical. Ideally the controller shall be in such a location that would allow a ramp signal engineer to clearly see the operation of the traffic signals and be of easy access for a maintenance vehicle. All ramp meter system loop feeder cables shall be connected to the loop detector card within the controller, where practical no loops should extend more than 500m from the controller.

17 Page Controller identification Ramp Signals Controllers shall be identified by the SCATS identifier number assigned to the Ramp Meter Site with the cabinet identified as per ITS Roadside Cabinet Specification. The SCATS identifier number assigned shall be in the identifying numbers for all the ramp meter equipment connected to the controller in accordance with Section and the identifying number of the ramp signal controller cabinet in accordance and section of the NZTA s ITS specification: General requirements (ITS-01-01). 2.7 Advance warning signs General Advanced warning signs (AWS) are used to notify road users of the current status of the ramp signals; they come in two types and operate as follows: a. Type A. Advise motorist that ramp signals are in operation; b. Type B. Advise motorist of an impending stop or that the Ramp Signals are not operating Type A AWS Type A sign shall be located on all arterial roads that feed into the on-ramp and in a position that is clear to all motorists intending to use the ramp that sign is feeding. The AWS shall be installed as per specification in the NZTA s ITS specification: Ramp meter supply and installation (ITS-05-02) and will ideally not be more than 75m from the start of the on-ramp but at a point that still enables a motorist to make a choice of whether to enter the on-ramp or remain on the arterial road. In installations where a congestion of Type A signs are present the direction the sign feeds shall be attached to the AWS pole via a metal cardinal plate, refer to drawing C-007 in section 4 Static signs of the NZTA s ITS specification: Ramp meter system standard drawings (ITS-05-03) Type B AWS The number of lanes associated with the on-ramp shall determine the number of Type B signs. For a single lane on-ramp one Type B sign shall be located on the left hand side of the on-ramp For a dual lane on-ramp two Type B signs shall be installed one on the left of the left on-ramp lane and one on the right of the right on-ramp lane. For an on-ramp that has been installed with a priority by-pass lane one Type B shall be located on the right hand side. The Type B signs shall be located at a distance of 90% of the distance from the stop line to the primary set of queue loops at the start of the on-ramp, for example: The stop line is located 100m upstream of the physical nose of the on-ramp The Primary sets of loops at the top of the on-ramp are installed 20m from the arterial road. The measured distance between the stop line and the first set of loops is 160m, the Type B Sign shall be installed upstream of the stop line at 90% of this distance, thus being: 160/100x90 = 144m Therefore the Type B Sign shall be installed 144m upstream of the stop line.

18 Page Advanced warning sign identification Ramp Signal AWS shall be identified in accordance with section of the NZTA s ITS specification: General requirements (ITS-01-01). 2.8 Ramp signals The Ramp Signal LED Traffic Signals Heads shall either be pole mounted or attached on an overhead gantry, typically for single and dual lane on-ramps, without any priority by-pass lanes shall have post mounted signal heads installed. Three lane on-ramps and on-ramps installed with priority by-pass priority lanes shall be installed on an overhead gantry. Regardless of the ramp configuration the ramp signal Traffic Signals Heads shall be located 10m downstream of the stop line. For pole, gantry and the required installation details please refer to NZTA s ITS specification: Ramp meter supply and installation (ITS-05-02). 2.9 Static signage The static signage used within Ramp Signal installations will be dependent on the configuration of the on-ramp but all installations will typically consist of the following: Ramp signal signage Static Signage associated with the ramp signal traffic signal head shall be installed with the following message: One Vehicle per Green In a dual lane configuration this sign will be supplemented by an additional sign: Each Lane The location of these signs shall be dependent on the installation method of the traffic signal itself, for details of pole mounted signs refer to: Typical Entry Ramp Meter System 2 Lanes Metered Side Mount Option, drawing attached in section 1 Layout drawings of the NZTA s ITS specification: Ramp meter system standard drawings (ITS-05-03). For details of gantry mounted signs refer to: Typical Entry Ramp Meter System 2 Lanes Metered Side Gantry Option, drawing attached in section 1 Layout drawings of the NZTA s ITS specification: Ramp meter system standard drawings (ITS-05-03). For static sign details refer to section 4 Static signs of the NZTA s ITS specification: Ramp meter system standard drawings (ITS-05-03) Regulatory speed signs The NZTA s Manual of traffic signs and markings (MOTSAM) policy: Either RG-2 (100 km/h) signs or the alternative RG-2.1 DE-RESTRICTION sign must be installed at locations where a lesser speed limit (either temporary or permanent) changes to the general maximum speed limit, ie.100 km/h. RG-2 100kmph Regulatory Road Signs shall be installed 50m downstream of the stop line on either side of the lane.

19 Page 13 Refer to Typical Entry Ramp Meter System 2 Lanes Metered Side Mount Option, drawing attached in section 1 Layout drawings of the NZTA s ITS specification: Ramp meter system standard drawings (ITS-05-03) for RG-2 location. For details of the signs refer to PW 43-1 special signage, road narrows both sides Any on-ramp other than single lane ramps will narrow into one lane prior to motorway merging occurs. A PW Special road narrow sign shall be used at all locations that involve lane merging. Each sign shall be located beyond the stop line and prior to the merge point into one lane. For details of the sign refer to PW 3 traffic signal sign A PW-3 sign shall be used to notify motorists of the presence of traffic signals, these shall be installed on-top of each Type B AWS sign. For details of the sign refer to Priority bypass lanes Any site that is configured with a priority by-pass lane shall use static signage detailing the requirements of that lane; the information displayed on those signs shall be dependent on the vehicles that are allowed to use that lane. The location of these signs shall be dependent on the message each sign displays but will typically conform to drawing: Ramp Meter System 2 Lanes Metered plus Bypass attached in section 1 Layout drawings the NZTA s ITS specification: Ramp meter system standard drawings (ITS-05-03). For individual sign details refer to section 4 Static signs of the NZTA s ITS specification: Ramp meter system standard drawings (ITS-05-03). Note that these sign guides are provided as a point of reference, and information displayed on the sign will be site specific and as per the detailed design Line markings All line markings shall be accordance with: MOTSAM Part 3 Section 12: Road Markings and Delineation. Stop Lines shall be in accordance with part 2, section 3.06 of the NZTA s MOTSAM. Centre lines installed on dual lane on-ramps from the stop line shall be in accordance with part 2, section 3.02 of MOTSAM.

20 Page Motorway to motorway ramp signalling In certain circumstances and where traffic volumes dictate, ramp metering may be used on motorway to motorway intersection. The location of the stop line and traffic signals follows the same methodology already detailed in this document. Queue loops will be set back from the stop line in 100m intervals until the previous merge point, detailed in drawing Entry Ramp Meter System Motorway to Motorway attached in section 1 layout drawings of the NZTA s ITS specification: Ramp meter system standard drawings (ITS-05-03). Enlarged Advanced Warning Signs will be used, details of which can be found in appendix D, to inform motorist of ramp signal operation. The Type A sign shall be located on the previous motorway in a location prior to the lane split in order for road users to make an informed decision on the route they take. As with standard Ramp Signal installations the Type B sign shall be located on the ramp itself, depending on the length of the motorway to motorway ramp the Type B sign shall not be located any more than 150m upstream of the stop line. All rules regarding static signage and road marking still apply.

21 Page Journey time information, type D sign In addition to the advanced warning signs each ramp signal installation shall be complimented with additional message signs detailing estimated journey times in minutes via the motorway. The Type D signs are Variable Message Signs controlled independently of the ramp signal system and shall comply with the technical requirements of the NZTA s ITS specification: Variable message sign supply and installation (ITS-06-02). Type D VMS shall be located on the arterial roads that lead directly to the motorway on-ramps; they shall be located in a manner that clearly defines the direction they feed. In installations where a congestion of Type D signs are present the direction the sign feeds shall be attached to the VMS pole via a metal cardinal plate, refer to drawing C-007 in section 4 Static signs of the NZTA s ITS specification: Ramp meter system standard drawings (ITS-05-03). All Type D signs shall communicate with the NZTA Journey Time Information System, MACCA. Connections will be via multimode fibre cable as detailed in the NZTA s ITS specification: Variable message sign supply and installation (ITS-06-02). If direct connection the NZTA fibre network is not possible ADSL or other suitable methods of communications may be considered.

ITS specification Handover and commissioning process (ITS-10-01)

ITS specification Handover and commissioning process (ITS-10-01) ITS specification Handover and commissioning process (ITS-10-01) NZ Transport Agency Effective from September 2011 Copyright information This publication is copyright NZ Transport Agency (NZTA). Material

More information

ITS specification Motorway emergency telephones (ITS-09-01)

ITS specification Motorway emergency telephones (ITS-09-01) ITS specification Motorway emergency telephones (ITS-09-01) NZ Transport Agency Effective from September 2011 Copyright information This publication is copyright NZ Transport Agency (NZTA). Material in

More information

ITS specification Jointing chambers and pull pits (ITS-02-02)

ITS specification Jointing chambers and pull pits (ITS-02-02) ITS specification Jointing chambers and pull pits (ITS-02-02) NZ Transport Agency Effective from September 2011 Copyright information This publication is copyright NZ Transport Agency (NZTA). Material

More information

Alternative fatigue management scheme (AFMS): AFMS 1 standard

Alternative fatigue management scheme (AFMS): AFMS 1 standard Alternative fatigue management scheme (AFMS): AFMS 1 standard NZ Transport Agency www.nzta.govt.nz July 2010 ISBN 978-0-478-36467-5 (online) Copyright information This publication is copyright NZ Transport

More information

Guideline for preparing an Environmental and Social Management Plan

Guideline for preparing an Environmental and Social Management Plan Guideline for preparing an Environmental and Social Management Plan NZ Transport Agency www.nzta.govt.nz Version 1: April 2014 ISBN 978-0-478-41934-4 (online) Copyright information This publication is

More information

Part 5: Configuration and placement of vehicle detection sensors

Part 5: Configuration and placement of vehicle detection sensors Manual Traffic and Road Use Management Volume 4 Intelligent Transport Systems and Electrical Technology Part 5: Configuration and placement of vehicle detection sensors April 2015 Copyright http://creativecommons.org/licenses/by/3.0/au/

More information

Copyright information

Copyright information Copyright information This publication is copyright NZ Transport Agency. Material in it may be reproduced for personal or inhouse use without formal permission or charge, provided suitable acknowledgement

More information

Siting Of Inductive Loops For Vehicle Detecting Equipments At Permanent Road Traffic Signal Installations

Siting Of Inductive Loops For Vehicle Detecting Equipments At Permanent Road Traffic Signal Installations Traffic Systems and Signing MCE 0108 Issue C March 2002 Siting Of Inductive Loops For Vehicle Detecting Equipments At Permanent Road Traffic Signal Installations Crown Copyright 2002 Applications to reproduce

More information

MCH 1352 Issue D February 2002

MCH 1352 Issue D February 2002 Traffic Systems and Signing MCH 1352 Issue D February 2002 Crown Copyright 2002 Applications to reproduce this material should be made to The Controller of Her Majesty's Stationery Office First published

More information

PART B: LOCATION REFERENCING P ART B: METHOD LOCATION REFERENCING METHOD

PART B: LOCATION REFERENCING P ART B: METHOD LOCATION REFERENCING METHOD PART B: LOCATION REFERENCING P ART B: METHOD LOCATION REFERENCING METHOD Manual No. SM051 B-1 RECORDING A ROUTE POSITION Overview This chapter explains how the location referencing signs, described in

More information

ROAD SAFETY AUDITS ON ABU DHABI CITY ROAD NETWORK

ROAD SAFETY AUDITS ON ABU DHABI CITY ROAD NETWORK ROAD SAFETY AUDITS ON ABU DHABI CITY ROAD NETWORK Sami ALmusawi Bani Hashim, MCIHT Head of Road Design Section History of Road Safety Audits in Abu Dhabi A View from the Abu Dhabi and a few other things

More information

SUPERSEDED. Code of practice for temporary traffic management (CoPTTM) Section E. Traffic Control Devices Manual Part 8. manual number: SP/M/010

SUPERSEDED. Code of practice for temporary traffic management (CoPTTM) Section E. Traffic Control Devices Manual Part 8. manual number: SP/M/010 Traffic Control Devices Manual Part 8 Code of practice for temporary traffic management (CoPTTM) manual number: SP/M/010 Section E NZ Transport Agency www.nzta.govt.nz Fourth edition, Amendment 2 of Code

More information

Delineation. Section 4 Longitudinal markings

Delineation. Section 4 Longitudinal markings Delineation Section 4 Longitudinal markings The delineation guidelines have been developed to assist in designing and maintaining a quality delineation system. The guidelines are to comprise 19 sections

More information

Integrated Data System Structure for Active Traffic Management - Planning and Operation

Integrated Data System Structure for Active Traffic Management - Planning and Operation Integrated Data System Structure for Active Traffic Management - Planning and Operation NATMEC 2010 Dr. Xiao-Yun Lu, Research Engineer California PATH, U. C. Berkeley J. Palen, Caltrans DRI 1 Outlines

More information

Traffic Control Devices 2004

Traffic Control Devices 2004 Land Transport Rule Traffic Control Devices 2004 Rule 54002 Note: This Rule should be read in conjunction with Land Transport Rule: Traffic Control Devices Amendment 2005, Land Transport Rule: Traffic

More information

Auckland Motorways Network Performance Monitoring

Auckland Motorways Network Performance Monitoring Network Performance Monitoring Anita Lin & Hanford Cheung Page 0 Auckland Motorways Network Performance Monitoring Authors Anita Lin Auckland Motorways (Presenter) Traffic Optimisation Leader BE, ME GIPENZ

More information

Ramp Metering. Index. Purpose. Description. Relevance for Large Scale Events. Options. Technologies. Impacts. Integration potential.

Ramp Metering. Index. Purpose. Description. Relevance for Large Scale Events. Options. Technologies. Impacts. Integration potential. Ramp Metering Index Purpose Description Relevance for Large Scale Events Options Technologies Impacts Integration potential Implementation Best Cases and Examples 1 of 7 Purpose Ramp metering is a technique

More information

RTMS Solutions. Detection solutions to fit your city s needs.

RTMS Solutions. Detection solutions to fit your city s needs. RTMS Solutions Detection solutions to fit your city s needs. Keeping your daily commute free of congestion - and maintenance. Behind the scenes in cities all over the world, RTMS radar detection solutions

More information

Wisconsin Department Intelligent Transportation Systems (ITS) CHAPTER 7 CRASH INVESTIGATION SITES

Wisconsin Department Intelligent Transportation Systems (ITS) CHAPTER 7 CRASH INVESTIGATION SITES CHAPTER 7 CRASH INVESTIGATION SITES December, 2000 7. Crash Investigation Sites (CIS) 7.1. Introduction and Usage The idea of "crash investigation sites" or areas outside of the freeway mainline where

More information

6. Warning Signs CHAPTER 6

6. Warning Signs CHAPTER 6 6. Warning Signs CHAPTER 6 Traffic Signs Manual Chapter 6 Warning Signs Contents 6.1 Introduction... 6/3 General... 6/3 Design of Warning Signs... 6/3 Sign Size and Location... 6/4 Application of Warning

More information

Route Optimisation / Traffic Signals Efficiency

Route Optimisation / Traffic Signals Efficiency Route Optimisation / Traffic Signals Efficiency Glossary Auckland Council Advanced Real-time Traffic Information System Auckland Transport Closed Circuit Television (Traffic cameras) Full Time Equivalent

More information

PREPARATION AND SCHEMES IMPLEMENTATION. Part 2 HD 19/15 ROAD SAFETY AUDIT SUMMARY

PREPARATION AND SCHEMES IMPLEMENTATION. Part 2 HD 19/15 ROAD SAFETY AUDIT SUMMARY DESIGN MANUAL FOR ROADS AND BRIDGES VOLUME 5 SECTION 2 ASSESSMENT AND PREPARATION OF ROAD SCHEMES PREPARATION AND IMPLEMENTATION Part 2 HD 19/15 ROAD SAFETY AUDIT SUMMARY This document provides the requirements

More information

6.1 GUIDANCE FOR SIGNALIZATION

6.1 GUIDANCE FOR SIGNALIZATION 6 SIGNALS Bicyclists have unique needs at signalized intersections. Bicycle movements may be controlled by the same indications that control motor vehicle movements, by pedestrian signals, or by bicyclespecific

More information

Effectiveness of Incident Management on Network Reliability Stage 2 June 2014. NZ Transport Agency research report LTR-118

Effectiveness of Incident Management on Network Reliability Stage 2 June 2014. NZ Transport Agency research report LTR-118 Effectiveness of Incident Management on Network Reliability Stage 2 June 2014 NZ Transport Agency research report LTR-118 Effectiveness of Incident Management on Network Reliability Stage 2 June 2014

More information

Guidelines for visibility at driveways RTS 6

Guidelines for visibility at driveways RTS 6 Guidelines for visibility at driveways RTS 6 May 1993 Reprinted June 1998, July 2001 Land Transport Safety Authority PO Box 2840 Wellington Telephone 04 494 8600 Fascimile 04 494 8601 ISSN: 1170-5337 ISBN:

More information

Highway Code guidance

Highway Code guidance Highway Code guidance Road Markings along the carriageway Rule 127 A broken white line. This marks the centre of the road. When this line lengthens and the gaps shorten, it means that there is a hazard

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Introduction This (CTMP) has been prepared in order to discharge Condition 20 of planning permission ref 07/02879/EFUL for the enabling site works associated with the wider Bath Western Riverside development.

More information

3. WEIGH-IN-MOTION SYSTEM DISCUSSION. Table 3.1 WIM System Principles Checklist. WIM System Principle

3. WEIGH-IN-MOTION SYSTEM DISCUSSION. Table 3.1 WIM System Principles Checklist. WIM System Principle 3. WEIGH-IN-MOTION SYSTEM DISCUSSION This section will discuss three types of weigh-in-motion (WIM) systems: bending plate, piezoelectric sensors, and load cell. Information will be presented for each

More information

Duplication for publication or sale is strictly prohibited without prior written permission of the Transportation Research Board.

Duplication for publication or sale is strictly prohibited without prior written permission of the Transportation Research Board. Paper No. 01-2757 Duplication for publication or sale is strictly prohibited without prior written permission of the Transportation Research Board. Title: Measuring and Analyzing Vehicle Position and Speed

More information

FREEWAY CORRIDOR TRAFFIC MANAGEMENT

FREEWAY CORRIDOR TRAFFIC MANAGEMENT FREEWAY CORRIDOR TRAFFIC MANAGEMENT Table of Contents 3-1.00 INTRODUCTION...2 3-1.01 Purpose...2 3-1.02 Chapter Organization...2 3-2.00 GLOSSARY...2 3-3.00 REGIONAL TRANSPORTATION MANAGEMENT CENTER (RTMC)...3

More information

1 Introduction 6. 2 Current status and future development 6. 3 Glossary 7. 4 Standards and legislation 9

1 Introduction 6. 2 Current status and future development 6. 3 Glossary 7. 4 Standards and legislation 9 Contents 1 Introduction 6 2 Current status and future development 6 3 Glossary 7 4 Standards and legislation 9 4.1 Code of practice for temporary traffic management (COPTTM) 9 4.2 Local road supplement

More information

Traffic Management During Construction

Traffic Management During Construction Traffic Management During Construction The construction of Dublin Port Tunnel couldn t begin until a traffic management plan had been developed and agreed to facilitate construction of the Tunnel and to

More information

Lineside Signal Spacing and Speed Signage

Lineside Signal Spacing and Speed Signage Document comes into force on 05/12/15 Supersedes GKRT0075 Iss 3 on 05/12/15 Date September 15 Lineside Signal Spacing and Speed Synopsis This document specifies the minimum distances that must be provided

More information

Draft Transportation Management Plan for Via Verdi Repair Project

Draft Transportation Management Plan for Via Verdi Repair Project for Via Verdi Repair Project prepared for City of Richmond This report was prepared by: This report was reviewed by: Ryan McClain, P.E. Fehr & Peers TABLE OF CONTENTS 1.0 INTRODUCTION & PROJECT DESCRIPTION...

More information

Auckland Traffic Management Unit Traffic Signals Design Guidelines. Version 3.0

Auckland Traffic Management Unit Traffic Signals Design Guidelines. Version 3.0 Auckland Traffic Management Unit Traffic Signals Design Guidelines Version 3.0 August 2010 Disclaimer This document is subject to Copyright Laws. The concepts and information contained in this document

More information

Proposed bylaw for signage

Proposed bylaw for signage Proposed bylaw for signage Recommendations That the Board: i. approves the commencement of the Auckland Transport public consultation on the combined Auckland Council/Auckland Transport Statement of Proposal

More information

Version 1.3 FIXED SAFETY CAMERA OPERATING PRACTICES

Version 1.3 FIXED SAFETY CAMERA OPERATING PRACTICES FIXED SAFETY CAMERA OPERATING PRACTICES Table of contents Introduction... 2 General operating practices... 3 Site selection practices... 3 Fixed safety camera systems... 5 Fixed safety camera types...

More information

Traffic Accommodation

Traffic Accommodation Traffic Accommodation in Work Zones MAY 2001 2ND EDITION ATRANSPORTATION TRAFFIC ACCOMMODATION IN WORK ZONES Date of Issue: May, 1999 2 nd Edition: May, 2001 Copyright, May, 1999 The Crown in right of

More information

Railway Crossing Information System

Railway Crossing Information System Railway Crossing Information System ITS Canada Presentation June 2, 2014 Ian Steele, P.Eng Agenda Click to edit Master title style RBRC Program Project Background Concept of Operations Design Process Design

More information

FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST

FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST August 2003 Background: The Federal Highway Administration (FHWA) has retained all approval rights to the control

More information

Engineering Procedure

Engineering Procedure Engineering Procedure Common Owner: Approved by: EPD 0017 DESIGN DOCUMENTATION AND RECORDS Version 2.1 Issued September 2012 Manager Engineering Standards and Configuration Neville Chen Authorised Natalie

More information

Understanding school road safety

Understanding school road safety Understanding school road safety 1. The purpose of these guidelines The safety of students travelling to and from school is one of the most important issues for school communities. Road environments around

More information

Lineside Signal Spacing and Speed Signage

Lineside Signal Spacing and Speed Signage Document to be withdrawn as of 03/12/11 To be superseded by GKRT0075 Iss 2 published on 03/09/11 Date March 11 Lineside Signal Spacing and Speed Synopsis This document specifies the minimum distances that

More information

Redoubt - Mill Road Corridor Project NoR 1-3: Route Selection (incl. existing Mill Road Alignment)

Redoubt - Mill Road Corridor Project NoR 1-3: Route Selection (incl. existing Mill Road Alignment) Memorandum AECOM New Zealand Limited 121 Rostrevor Street Hamilton 3204 PO Box 434, Waikato MC Hamilton 3240 New Zealand www.aecom.com +64 7 834 8980 tel +64 7 834 8981 fax To Richard Black Page 1 CC Subject

More information

Rail Network Configuration Management

Rail Network Configuration Management Division / Business Unit: Function: Document Type: Enterprise Services Engineering Procedure Rail Network Configuration Management Applicability ARTC Network Wide SMS Publication Requirement Internal /

More information

SIGNING SEQUENCE IN ADVANCE OF VEHICLE INSPECTION. STATIONS (VIS & MIS) Page 1of 3

SIGNING SEQUENCE IN ADVANCE OF VEHICLE INSPECTION. STATIONS (VIS & MIS) Page 1of 3 Issued: JUL 2007 STATIONS (VIS & MIS) Page 1of 3 RECOMMENDED PRACTICES PART SECTION SUB-SECTION HIGHWAY SIGNS TYPICAL SIGNING PLANS General The safety of motorists using Alberta highways, and the maintenance

More information

Full Licence Test guide (class 1)

Full Licence Test guide (class 1) Full Licence Test guide (class 1) Roads Corporation (VicRoads) 2008 September 2012 ISBN 978-0-478-39412-2 (online) ISBN 978-0-478-39411-5 (print) Copyright information This publication is copyright Roads

More information

Delineation. Section 8 - Diagonal and chevron markings

Delineation. Section 8 - Diagonal and chevron markings Delineation Section 8 - Diagonal and chevron markings The delineation guidelines have been developed to assist in designing and maintaining a quality delineation system. The guidelines are to comprise

More information

AWS and TPWS Interface Requirements

AWS and TPWS Interface Requirements Railway Group Standard AWS and TPWS Interface Synopsis This document defines the track / train and driver / machine interface requirements for the Automatic Warning System (AWS) and the Train Protection

More information

New Jersey Turnpike Authority

New Jersey Turnpike Authority GUIDELINE FOR USE OF VMS SYSTEMS FOR CONSTRUCTION MARCH 2012 PREPARED BY AND TABLE OF CONTENTS I. PURPOSE OF GUIDELINE... 2 II. OVERVIEW Of VARIABLE MESSAGE SIGNS... 2 A. Permanent Variable Message Signs...

More information

DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST

DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST State of California Business, Transportation and Housing Agency DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST District / EA: District 3/ EA 03-3E380 Date Prepared: 1/10/2013 Prepared By: Robert Himes Stage

More information

Delineation. Section 6 - Transverse markings

Delineation. Section 6 - Transverse markings Delineation Section 6 - Transverse markings The delineation guidelines have been developed to assist in designing and maintaining a quality delineation system. The guidelines are to comprise 19 sections

More information

NZQA registered unit standard version 5 Page 1 of 5. Title Operate a rigid vehicle to meet the requirements for a full Class 2 driver licence

NZQA registered unit standard version 5 Page 1 of 5. Title Operate a rigid vehicle to meet the requirements for a full Class 2 driver licence Page 1 of 5 Title Operate a rigid vehicle to meet the requirements for a full Class 2 driver licence Level 3 Credits 7 Purpose This unit standard is for drivers of rigid vehicles who hold a New Zealand

More information

Access requests to County streets and roadways are processed through one of the following methods:

Access requests to County streets and roadways are processed through one of the following methods: 13.1 GENERAL APPLICATION PROCESS Access requests to County streets and roadways are processed through one of the following methods: A. Planned Developments may set general locations for access points.

More information

23 February 2015. Enfield Intermodal Logistics Centre

23 February 2015. Enfield Intermodal Logistics Centre Enfield Intermodal Logistics Centre Overarching Operational Traffic Management Plan February 2015 Table of Contents 1. Introduction... 2 2. Purpose of the Plan... 2 3. Objective of the Plan... 3 4. Road

More information

Setting of Speed Limits 35. Schedule 1. Speed Limits New Zealand. Guidelines for setting speed limits and procedures for calculating speed limits

Setting of Speed Limits 35. Schedule 1. Speed Limits New Zealand. Guidelines for setting speed limits and procedures for calculating speed limits Setting of Speed Limits 35 Schedule 1 Speed Limits New Zealand Guidelines for setting speed limits and procedures for calculating speed limits 36 Land Transport Rule Setting of Speed Limits 37 Contents

More information

Temporary Traffic Control for Building and Maintaining Single and Multi-Lane Roundabouts

Temporary Traffic Control for Building and Maintaining Single and Multi-Lane Roundabouts Purpose and Background Temporary Traffic Control for Building and Maintaining Single and Multi-Lane Roundabouts Although roundabouts have recently gained popularity and use in the United States, minimal

More information

DRAFT PLANNING THE OPENING OF A ROAD PROJECT GUIDELINE 1

DRAFT PLANNING THE OPENING OF A ROAD PROJECT GUIDELINE 1 DRAFT PLANNING THE OPENING OF A ROAD PROJECT GUIDELINE 1 Guideline: DRAFT Planning the opening of a road project guideline Version: 1.1 Issue: September 2009 Approved By: Phil Margison General Manager,

More information

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES INTRODUCTION What is a Construction Management Plan? The City of Vincent requires careful management of construction involving excavation and retention

More information

STANDARD DETAILS CITY OF TAMARAC PAVEMENT MESSAGE DETAIL 1 7/8" 5/16"x 3/4" HEX. NUT TYPICAL SIGN POST +-1/8" 3 1/16" +-1/16" 1 9/32"

STANDARD DETAILS CITY OF TAMARAC PAVEMENT MESSAGE DETAIL 1 7/8 5/16x 3/4 HEX. NUT TYPICAL SIGN POST +-1/8 3 1/16 +-1/16 1 9/32 SHEET PM-1 3'-3"R 2'-4"R 8' 30" 9'-10" 8'-2" 1' 7' CHANNEL SIGN POST 3#/FT FLANGED U-CHANNEL TYPE PAINT TRAFFIC GREEN. ARROW DETAIL 8' 36" 5'-9" (SOURCE FDOT INDEX NO. 17346.) PAVEMENT MESSAGE DETAIL NOTES:

More information

LAND TRANSPORT (ROAD USER) AMENDMENT RULE 2011

LAND TRANSPORT (ROAD USER) AMENDMENT RULE 2011 Chair Cabinet Business Committee Office of the Minister of Transport LAND TRANSPORT (ROAD USER) AMENDMENT RULE 2011 Proposal 1. The purpose of this paper is to notify the Cabinet Business Committee (the

More information

Median Bus Lane Design in Vancouver, BC: The #98 B-Line

Median Bus Lane Design in Vancouver, BC: The #98 B-Line Li 1 Median Bus Lane Design in Vancouver, BC: The #98 B-Line Simon Li, P.Eng. PTOE Acting Program Manager, Road and Bridge Projects TransLink (Greater Vancouver Transportation Authority) 1600 4720 Kingsway

More information

Urban Vehicle Crossing Application To be completed and fees paid for prior to approval

Urban Vehicle Crossing Application To be completed and fees paid for prior to approval Urban Vehicle Crossing Application To be completed and fees paid for prior to approval Applicant Details Name: Postal Address: Telephone Home: Work: Signed: Date: Proposed Contractor: Proposed Start Date:

More information

CONSTRUCTION TRAFFIC MANAGEMENT PLAN V11, 26/09/12

CONSTRUCTION TRAFFIC MANAGEMENT PLAN V11, 26/09/12 If the project you are constructing was subject to planning permission and a condition requiring a Construction Traffic Management Plan (CTMP) was applied to the planning consent, this condition will need

More information

PERFORMANCE ACTIVITY 408 TREE REMOVAL

PERFORMANCE ACTIVITY 408 TREE REMOVAL PERFORMANCE ACTIVITY 408 TREE REMOVAL WORK DESCRIPTION 1 WORK DESCRIPTION 2 Fallen Tree Standing Tree 408 TREE REMOVAL ACTIVITY DESCRIPTION Cut and remove tree as necessary. WORK DESCRIPTION 1 Fallen Tree

More information

The water supply system shall have a design life of not less than 100 years for in-ground pipeline components.

The water supply system shall have a design life of not less than 100 years for in-ground pipeline components. Authorised by : Water & Waste Services Manager Page 1 of 7 PART 6: WATER SUPPLY 6.1 INTRODUCTION This Manual sets out the basic design principles for the provision of reticulation for the supply of water.

More information

AN INTEGRATED KNOWLEDGE-BASE/SIMULATION SYSTEM FOR REAL- TIME INCIDENT MANAGEMENT

AN INTEGRATED KNOWLEDGE-BASE/SIMULATION SYSTEM FOR REAL- TIME INCIDENT MANAGEMENT AN INTEGRATED KNOWLEDGE-BASE/SIMULATION SYSTEM FOR REAL- TIME INCIDENT MANAGEMENT Nan Zou, Pei-Wei Lin 1, Gang-Len Chang 2, Saed Rahwanji 3 ABSTRACT This paper presents a real-time incident management

More information

Contents. A Introduction from the Chief Executive 1. B Purpose and scope 2. C Features of an effective enterprise risk management system 3

Contents. A Introduction from the Chief Executive 1. B Purpose and scope 2. C Features of an effective enterprise risk management system 3 Copyright information This publication is copyright NZ Transport Agency (NZTA). Material in it may be reproduced for personal or inhouse use without formal permission or charge, provided suitable acknowledgement

More information

Satellite Trial Product Terms

Satellite Trial Product Terms [Customer] This document is a Standard Form of Access Agreement for the purposes of Part XIC of the Competition and Consumer Act 2010. NBN Co Limited Satellite Trial Product Terms NBN Co Networks: Satellite

More information

CHAPTER 7 DRIVEWAYS. The following definitions must be used in conjunction with the criteria described in this Chapter.

CHAPTER 7 DRIVEWAYS. The following definitions must be used in conjunction with the criteria described in this Chapter. CHAPTER 7 DRIVEWAYS 7.0 INTRODUCTION It is in the public interest to regulate the location, design, construction, maintenance and drainage of access driveways, local roads and other property within State

More information

INTERIM ADVICE NOTE 179/14

INTERIM ADVICE NOTE 179/14 INTERIM ADVICE NOTE 179/14 Guidance on the Use of Vehicle Mounted High Level to provide advance warning of lane closures for Relaxation Works on Dual Carriageways with a Hard Shoulder Summary Guidance

More information

VEHICLE DETECTION CHAPTER 16

VEHICLE DETECTION CHAPTER 16 Vehicle detectors act as the eyes of the traffic signal controller thereby allowing it to become traffic responsive. The loss of even one vehicle detector could greatly disrupt the timing of the signal

More information

FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005

FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005 FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005 Background: It is in the national interest to maintain the Interstate System to provide the highest level of

More information

SIGNS AND LAYOUT DIAGRAMS

SIGNS AND LAYOUT DIAGRAMS CODE OF PRACTICE FOR TEMPORARY TRAFFIC MANAGEMENT E0-3 SP/M/010 - Third Edition: November 2004 Update SECTION E3 LEVEL 1 ROADS SIGNS AND LAYOUT DIAGRAMS MOBILE OPERATIONS E3.1 MOBILE CLOSURE - TWO-WAY

More information

Traffic Engineering Manual Volume 1 Chapter 7: Speed Zoning Guidelines

Traffic Engineering Manual Volume 1 Chapter 7: Speed Zoning Guidelines Traffic Engineering Manual Volume 1 Chapter 7: Speed Zoning Guidelines 2 Amendment Record Ed/Rev No Page(s) Issue Date Amendment Description Ed 1 All February 1993 Initial release (ref. F:\PTE\93\EB93019C.JJ)

More information

THE PRACTICAL APPLICATION OF ANPR FOR JOURNEY TIME MONITORING IN ESSEX

THE PRACTICAL APPLICATION OF ANPR FOR JOURNEY TIME MONITORING IN ESSEX THE PRACTICAL APPLICATION OF ANPR FOR JOURNEY TIME MONITORING IN ESSEX Mark Bodger Systems Marketing Manager Siemens Traffic Controls Sopers Lane, Poole Dorset, BH17 7ER Tel: +44 (0)1202 782848 Email:

More information

CHANGES TO NSW ROAD RULES

CHANGES TO NSW ROAD RULES CHANGES TO NSW ROAD RULES From 1 July 2008 there will be changes to NSW Road Rules. Some of the rules have only minor amendments but all will attract fines and some will also attract demerit point penalties.

More information

Auditing Standard ASA 230 Audit Documentation

Auditing Standard ASA 230 Audit Documentation Compiled Auditing Standard ASA 230 (November 2013) Auditing Standard ASA 230 This compilation was prepared on 11 November 2013 taking into account amendments made by ASA 2013-2 Prepared by the Auditing

More information

Facilities Access Service OVERVIEW OF THE NBN CO FACILITIES ACCESS SERVICE

Facilities Access Service OVERVIEW OF THE NBN CO FACILITIES ACCESS SERVICE Facilities Access Service OVERVIEW OF THE NBN CO FACILITIES ACCESS SERVICE NBN Co Limited Overview of the NBN Co Facilities Access Service April 2012 Copyright This document is subject to copyright and

More information

USE OF ITS DURING MAJOR ROAD WORKS

USE OF ITS DURING MAJOR ROAD WORKS USE OF ITS DURING MAJOR ROAD WORKS Charlotte Vithen Head of Office for Traffic Management and ITS The Danish Road Directorate CONTENT OF PRESENTATION Background Success criteria and strategy Traffic management

More information

Temporary Traffic Management

Temporary Traffic Management Temporary Traffic Management Tom Kiddle 4 th July 2012 Temporary Traffic Management Auckland Transport TTM Operation Requirements AT TTM Audits Qualified Persons on site Pedestrian Management 1 AT Temporary

More information

Guide to the Preparation of a Traffic Management Plan

Guide to the Preparation of a Traffic Management Plan Guide to the Preparation of a Traffic Management 1. INTRODUCTION... 4 2. PREPARATION OF TRAFFIC MANAGEMENT PLANS... 5 2.1. LEASEHOLDER SITE... 5 2.1.1. Site Operations... 6 2.1.2. Statutory Requirements...

More information

Irish Road Traffic Signs

Irish Road Traffic Signs Irish Road Traffic Signs Regulatory traffic signs Stop Yield Yield School wardens stop sign No stopping No left turn No right turn No entry No parking Maximum speed limit Taxi rank No entry for large vehicles

More information

GUIDE TO THE PREPARATION OF TRAFFIC MANAGEMENT PLANS

GUIDE TO THE PREPARATION OF TRAFFIC MANAGEMENT PLANS Issue Date: 27 June 2014 GUIDE TO THE PREPARATION OF TRAFFIC MANAGEMENT PLANS This document is owned and authorised by the Executive Director Road Network Services. Please submit all comments and requests

More information

The Traffic Light Camera Handbook (Second Edition) Provisional

The Traffic Light Camera Handbook (Second Edition) Provisional The Traffic Light Camera Handbook (Second Edition) Provisional A guide to type approval procedures for traffic light cameras used for road traffic law enforcement in Great Britain Dr Steve R Lewis Publication

More information

Buckinghamshire County Council Transport for Buckinghamshire ANPR Code of Practice

Buckinghamshire County Council Transport for Buckinghamshire ANPR Code of Practice Buckinghamshire County Council Transport for Buckinghamshire ANPR Code of Practice 1 Introduction 1.1 Buckinghamshire County Council (BCC) Transportation Service has Automatic Number Plate Recognition

More information

Brisbane s yellow BICYCLE symbols

Brisbane s yellow BICYCLE symbols Brisbane s yellow BICYCLE symbols a new way to show how to Share the Road Prepared by Michael Yeates, Convenor, Bicycle User Research Group 7 Marston Avenue, Indooroopilly, Brisbane, Queensland, AUSTRALIA

More information

NZ Transport Agency Safer journeys for schools: guidelines for school communities 2

NZ Transport Agency Safer journeys for schools: guidelines for school communities 2 NZ Transport Agency Safer journeys for schools: guidelines for school communities 2 Understanding school road safety 1. The purpose of these guidelines The safety of students travelling to and from school

More information

NATIONAL CODE OF PRACTICE. for. UTILITY OPERATORS ACCESS to TRANSPORT CORRIDORS

NATIONAL CODE OF PRACTICE. for. UTILITY OPERATORS ACCESS to TRANSPORT CORRIDORS NATIONAL CODE OF PRACTICE for UTILITY OPERATORS ACCESS to TRANSPORT CORRIDORS Approved by theminister for Infrastructure 10 November 2011 Contents Definitions v Abbreviations Used... xii 1. Introduction...

More information

Why Traffic Management Works Prof. dr. Serge Hoogendoorn Chair of Traffic Operations and Management, Delft University of Technology

Why Traffic Management Works Prof. dr. Serge Hoogendoorn Chair of Traffic Operations and Management, Delft University of Technology Why Traffic Management Works Prof. dr. Serge Hoogendoorn Chair of Traffic Operations and Management, Delft University of Technology Physics of a Traffic Jam Traffic jam occurs when demand exceeds road

More information

GUIDELINE. Roadside Vending on State-controlled Roads

GUIDELINE. Roadside Vending on State-controlled Roads - GUIDELINE Roadside Vending on State-controlled Roads Purpose This guideline is intended to guide the Department of Transport and Main Roads (TMR), local governments and roadside vendors in the consistent

More information

COMMON STANDARD NO. 10 HEALTH & SAFETY STANDARDS FOR PEDESTRIAN ACCESS ROUTES

COMMON STANDARD NO. 10 HEALTH & SAFETY STANDARDS FOR PEDESTRIAN ACCESS ROUTES INTRODUCTION Slips, trips and falls account for a large proportion of the accidents that occur at our workplace. We must therefore ensure that safe access is provided to all our places of work and is maintained

More information

Sec. No. & Description

Sec. No. & Description Table of Contents Sec. No. & Description Page No. 1- Introduction 1 2- Parking evaluation methodology 2 2.1 Introduction 2 2.2 Summary of parking analysis results 3 2.3 Basic definitions 5 2.4 Data collection

More information

Guidelines for the Installation of New Traffic Signals 2009

Guidelines for the Installation of New Traffic Signals 2009 Guidelines for the Installation of New Traffic Signals 2009 Engineering Department City of Kingston Introduction and Background The Engineering Department regularly receives requests for traffic signals

More information

TMP reference: Contractor: Principal (Client): RCA:

TMP reference: Contractor: Principal (Client): RCA: TRAFFIC MANAGEMENT PLAN (TMP) FULL FORM Use this form for complex activities. Refer to the NZ Transport Agency s Traffic control devices manual, part 8 Code of practice for temporary traffic management

More information

Key Information in relation to Residential Solar Systems 2012

Key Information in relation to Residential Solar Systems 2012 Key Information in relation to Residential Solar Systems 2012 1. Key Information Standard Lead Times Standard lead times for the commencement of solar system installations are generally between 6 8 weeks

More information

Maximum speed. Stop and Give way to Manually operated temporary No entry for give way traffic on STOP and GO signs vehicular traffic major road

Maximum speed. Stop and Give way to Manually operated temporary No entry for give way traffic on STOP and GO signs vehicular traffic major road Signs giving orders Signs with red circles are mostly prohibitive. Plates below signs qualify their message. Entry to 20 mph zone End of 20 mph zone Maximum speed National speed limit applies School crossing

More information

Authority to Travel (ATT) and Train Route Acceptance (TRA) Requirements

Authority to Travel (ATT) and Train Route Acceptance (TRA) Requirements Network Safety Management System STANDARD SAF/STD/0114/INF/NET Authority to Travel (ATT) and Train Route Acceptance (TRA) Requirements Version 2.0 Date: 24 / 05 / 2016 Authorisation This document is approved

More information

VARIABLE MESSAGE SIGNS

VARIABLE MESSAGE SIGNS VARIABLE MESSAGE SIGNS Index Purpose Description Relevance for Large Scale Events Options Technologies Impacts Integration potential Implementation Best Cases and Examples 1 of 10 Purpose Variable Message

More information

BEST PRACTICES FOR PLANNING AND DESIGN OF FREEWAY FACILITIES

BEST PRACTICES FOR PLANNING AND DESIGN OF FREEWAY FACILITIES 1 BEST PRACTICES FOR PLANNING AND DESIGN OF FREEWAY FACILITIES 1. PREAMBLE 1.1 Function of Freeways For purposes of this paper, freeways are defined as high capacity, high speed, multi-lane roadways with

More information