1 Readington Township Green Acres Scoping Hearing March 12, 2014

2 > Introductions Transcontinental Gas Pipe Line Company, LLC John B. Todd, P.E., Project Management, Williams Carol Peabody, Senior Land Representative, Williams Brent Simmons, Senior Environmental Scientist, Williams Michael Gartman, Chief Project Manager, Ecology and Environment, Inc. 2

3 Purpose of this Scoping Hearing > The scoping hearing is being held in connection with Transco s proposed Leidy Southeast Project, Pleasant Run Loop. > Readington Township is considering the proposed diversion of a portion of parkland identified as Block 50, Lots 13, 14, 14.01, and 41; Block 75, Lots 32 and 32.03; and Block 76, Lot > New Jersey Administrative Code (N.J.A.C.) 7: Major disposals or diversions of parkland; scoping hearing (a) Prior to submitting a pre-application to Green Acres for a major disposal or diversion of parkland under N.J.A.C. 7: , a local government unit or nonprofit intending to seek approval of a major disposal or diversion of parkland shall conduct a scoping hearing to solicit preliminary public comment on the proposed disposal or diversion. 3

4 Purpose of this Scoping Hearing > At the scoping hearing, the local government unit or nonprofit shall: Explain that the purpose of the hearing is to accept public comment on a major disposal or diversion of parkland that is under consideration; Describe the proposed disposal or diversion, including the lands affected, the total acreage of parkland to be affected and the project for which the disposal or diversion is sought; Set forth the compelling public need that the project would fulfill, the significant public benefit it would yield, or the exceptional recreational and/or conservation benefit it would provide; Discuss past and ongoing efforts to identify alternatives to the proposed disposal or diversion considered by the local government unit or nonprofit and the reason(s) for rejecting any alternatives, and, to the extent known, the compensation that the local government unit or nonprofit would provide for the proposed disposal or diversion; and Accept comment on any alternative sites suggested by the public and on alternative methods of achieving its project objectives without the diversion or disposal of parkland. N.J.A.C. 7: (d). 4

5 Who is Williams Who is Transco > Williams owns & operates the Transco interstate natural gas pipeline. > Transco s pipeline system consists of 10,200 miles of pipeline and 52 compressor stations and storage facilities. > System design capacity of 9.8 bcf/day. Enough energy to heat approximately 42 million homes every day. > Transports 8% of the natural gas consumed in the U.S. 5

6 Leidy Southeast: Project Overview > Project Components Four pipeline loops Dorrance Loop: 5.27 miles in Luzerne County (Dorrance and Slocum Townships), Pennsylvania Franklin Loop: miles in Monroe and Luzerne Counties (Tobyhanna and Buck Townships), Pennsylvania Pleasant Run: 6.92 miles in Somerset and Hunterdon Counties (Branchburg and Readington Townships), New Jersey Skillman Loop: 6.31 miles in Mercer and Somerset Counties (Princeton and Montgomery Townships), New Jersey > What is a pipeline loop? A segment of pipeline installed adjacent to an existing pipeline and connected to it at both ends A loop allows more gas to be moved through the system 6

7 Leidy Southeast: Project Overview 7

8 The FERC Regulatory Process > FERC is the governing body that determines whether the project is needed and in the public s best interest > Transco seeks approval for pipeline expansion projects by filing an application for a Certificate of Public Convenience and Necessity > FERC requires concurrent filing of federal and state permit applications > Transco filed the FERC Application for the Leidy Southeast project, which includes the proposed Pleasant Run and Skillman Loops, in October 2013 and is now working under docket number CP > Environmental document is anticipated to be issued by Spring/Summer 2014 > FERC Order requested Fall 2014 > Should the Project be approved, the construction start date is anticipated to be early 2015 with the anticipated in-service date being November 1,

9 Readington Township: What lands are proposed to be diverted? > The proposed Pleasant Run Loop will affect seven (7) parcels within the Green Acres inventory for Readington Township: Properties owned by Readington Township Block 50, Lots 13, 14.01, and 41 Block 75, Lot Block 76, Lot 3.01 Privately owned properties Block 50, Lot 14 (owned by Judith Garfield) Block 75, Lot 32 (owned by Marcia Zweerink) Transco proposes to acquire a permanent easements totaling acres Transco proposes to acquire temporary workspace totaling acres 9

10 Readington Township: Green Acres Impacts Property Location Property Owner Permanent Easement within Green Acres Restricted Areas (Acres) Temporary Workspace within Green Acres Restricted Areas (Acres) Block 76, Lot 3.01 Readington Township Block 75, Lot 32 Zweerink Block 75, Lot Readington Township Block 50, Lot 14 Garfield Block 50, Lot Readington Township Block 50, Lot 13 Readington Township Block 50, Lot 41 Readington Township Total

11 Leidy Southeast Project Public Need > The public need is determined by the Federal Energy Regulatory Commission when a Certificate of Public Convenience and Necessity is issued > Transport natural gas to meet increasing demand for energy in Northeastern U.S. > Provide an additional 525,000 dt/day of firm transportation capacity to delivery points that would be accessible by customers in the mid- Atlantic and Southeast states > Provide access to new sources of domestic natural gas supply and support the overall reliability of the energy infrastructure > The Project s incremental volumes of gas are fully contracted > Cleaner source of fuel than coal or petroleum 11

12 Leidy Southeast Project Alternatives: Block 76, Lot

13 Leidy Southeast Project Alternatives: Block 76, Lot 3.01 Length (mi) Acres of New Permanent ROW* Pleasant Run Loop - Readington Township New Permanent Green Acres Impacts (Acres) Other (non-green Acres) Restrictions on Alternatives Parcels Acres of NJDEP Wetlands crossed NHD Stream Crossings Route Block 76, Lot 3.01 (Readington) Proposed Alternate ¹ 0 1 Alternate ¹ Preserved Farm (1) (#) = number of parcels with specific restriction ¹ = Includes a parcel(s) that is assumed Green Acres based on landowner (Township or County owned) * For the proposed loop opposite the alternative, New ROW was calculated by querying workspaces "Perm ROW outside Existing ROW" for that section * For the alternatives a 50 ft row was assumed for New ROW 13

14 Leidy Southeast Project Alternatives: Block 75, Lots 32 and

15 Leidy Southeast Project Alternatives: Block 75, Lots 32 and Route Pleasant Run Loop - Readington Township Other (non-green Acres) Restrictions on Alternatives Acres of NJDEP Wetlands Acres of New New Permanent Length (mi) Permanent ROW* Green Acres Impacts (Acres) Parcels crossed Block 75, Lot 32 (Zweerink) & Block 75, Lot (Readington) NHD Stream Crossings Proposed Alternate Alternate (#) = number of parcels with specific restriction ¹ = Includes a parcel(s) that is assumed Green Acres based on landowner (Township or County owned) * For the proposed loop opposite the alternative, New ROW was calculated by querying workspaces "Perm ROW outside Existing ROW" for that section * For the alternatives a 50 ft row was assumed for New ROW 15

16 Leidy Southeast Project Alternatives: Block 50, Lots 41, 13, and 14 16

17 Leidy Southeast Project Alternatives: Block 50, Lots 41, 13, and 14 Pleasant Run Loop - Readington Township Other (non-green New Permanent Acres) Restrictions Green Acres on Alternatives Impacts (Acres) Parcels Acres of New Permanent ROW* Acres of NJDEP Wetlands crossed Route Length (mi) NHD Stream Crossings Block 50, Lot 14 (Garfield); Block 50, Lot (Readington); Block 50, Lot 13 (Readington); & Block 50, Lot 41 (Readington) Proposed Drainage Alternate Easement (3) Alternate ¹ (#) = number of parcels with specific restriction ¹ = Includes a parcel(s) that is assumed Green Acres based on landowner (Township or County owned) * For the proposed loop opposite the alternative, New ROW was calculated by querying workspaces "Perm ROW outside Existing ROW" for that section * For the alternatives a 50 ft row was assumed for New ROW 17

18 Leidy Southeast Project Alternatives - Readington Township > Much of the additional right-of-way ( ROW ) and most temporary workspace needed for construction were acquired prior to the various parcels being encumbered with Green Acres restrictions > Expansion of existing ROWs preferred by the FERC and the NJDEP to the creation of a new ROW corridor because: New ROW would result in far greater land use impacts Expansion is safer, easier to monitor and more efficient from an operational perspective > There is no feasible or reasonable alternative to the proposed route 18

19 Other Alternatives > No-Action Alternative Transco would not construct the project Energy Conservation Energy Alternatives (coal, oil) Nuclear Renewable Energy Sources (solar, hydroelectric, wind, geothermal, fuel cells, wood) > System Alternatives Make use of other existing, modified, or proposed pipeline systems > Construction Alternatives Horizontal Directional Drilling Reduced temporary construction ROW Reduced permanent operational ROW > Route Alternatives 19

20 Compensation > If Readington Township decides to proceed with the diversion, it will negotiate with Transco for the rights needed to build the proposed Project and will be compensated in accordance with Green Acres regulations. 20

21 Scoping Period You may submit written comments by March 26, 2014 to Vita Mekovetz, Municipal Clerk, Township of Readington, 509 Route 523, Whitehouse Station, New Jersey A copy of any written comments must also be provided by you to Kevin Appelget, New Jersey Department of Environmental Protection, Green Acres Program, Bureau of Legal Services and Stewardship, Mail Code , P.O. Box 420, Trenton, New Jersey Information on the Project is available at (Docket # CP13-551) 21

Frequently Asked Transmission Pipeline Questions

Frequently Asked Transmission Pipeline Questions Frequently Asked Transmission Pipeline Questions Who is PennEast, LLC? PennEast was formed by the partnership of AGL Resources, NJR Pipeline Company, South Jersey Industries and UGI Energy Services (UGIES).

More information

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION PennEast Pipeline Company, LLC Docket No. PF15-1-000 NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PLANNED PENNEAST

More information

Williams is in the preliminary

Williams is in the preliminary Hillabee Expansion Project www.williams.com/hillabee Winter 2013 2014 Public Feedback Sought for Proposed Williams Pipeline Expansion Williams is in the preliminary stages of developing a multiphased pipeline

More information

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

TENNESSEE GAS PIPELINE COMPANY, L.L.C. TENNESSEE GAS PIPELINE COMPANY, L.L.C. SILT FENCE DESIGN CRITERIA AND METHODOLOGY FOR THE ACCESS ROADWAYS CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,

More information

Frequently Asked Questions About PennEast Pipeline Project

Frequently Asked Questions About PennEast Pipeline Project Frequently Asked Questions About PennEast Pipeline Project Who is PennEast Pipeline Company, LLC? AGL Resources, NJR Pipeline Company, South Jersey Industries, PSEG Power LLC and UGI Energy Services (UGIES)

More information

PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of 9-25-14)

PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of 9-25-14) PIPELINE SYSTEMS (as of 9-25-14) The Northeast Gas Association (NGA) has prepared this summary based on publicly-available information. NGA will strive to keep the information as updated as possible and

More information

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PIPELINE ROUTING PERMIT For A NATURAL GAS PIPELINE IN DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PUC DOCKET No. G002/GP-05-1706 In accordance with the requirements

More information

Version Part Section Description 0.0.0 II 13.27 Summary of Negotiated Rate Agreement

Version Part Section Description 0.0.0 II 13.27 Summary of Negotiated Rate Agreement Transcontinental Gas Pipe Line Company, LLC 2800 Post Oak Boulevard (77056) P.O. Box 1396 Houston, Texas 77251-1396 (713) 215-2000 Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

NEW HAMPSHIRE PIPELINE INSTALLATION

NEW HAMPSHIRE PIPELINE INSTALLATION NORTHEAST ENERGY DIRECT NEW HAMPSHIRE PIPELINE INSTALLATION Benefits to New Hampshire January 2015 Overview of Proposed New Hampshire Facilities The proposed Northeast Energy Direct Pipeline (NED) routed

More information

Northern Middlesex Council of Governments

Northern Middlesex Council of Governments Northern Middlesex Council of Governments The Federal Energy Commission (FERC) is the agency charged with evaluating whether the proposed route should be approved Cooperating agencies generally include

More information

Millennium Pipeline Company, LLC Response to New York State Energy Highway RFI

Millennium Pipeline Company, LLC Response to New York State Energy Highway RFI Millennium Pipeline Company, LLC Response to New York State Energy Highway RFI www.millenniumpipeline.com One Blue Hill Plaza, 7th Floor Post Office Box 1565 Pearl River, N Y 10965 845.620.1300 Voice 845.620.1320

More information

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Elba Liquefaction Company, L.L.C. Southern LNG Company, L.L.C. Elba Express Company, L.L.C. Docket No. PF13-3-000 NOTICE OF INTENT TO PREPARE

More information

TENNESSEE GAS PIPELINE COMPANY 300 LINE PROJECT Vernon, West Milford Townships and Ringwood Borough, New Jersey

TENNESSEE GAS PIPELINE COMPANY 300 LINE PROJECT Vernon, West Milford Townships and Ringwood Borough, New Jersey Prepared for: Houston, TX COMPREHENSIVE MITIGATION PLAN HIGHLANDS REGION TENNESSEE GAS PIPELINE COMPANY 300 LINE PROJECT Vernon, West Milford Townships and Ringwood Borough, New Jersey AECOM, Inc. September

More information

Comanche Trail Pipeline Project. September 2015

Comanche Trail Pipeline Project. September 2015 Comanche Trail Pipeline Project September 2015 2 Comanche Trail Pipeline Project The Comanche Trail Pipeline is a Texas intrastate pipeline (1) designed to transport 1.1 billion cubic feet per day of clean-burning

More information

APPENDIX K NATURAL GAS PIPELINE STORAGE PERMITTING PROCESSES

APPENDIX K NATURAL GAS PIPELINE STORAGE PERMITTING PROCESSES APPENDIX K NATURAL GAS PIPELINE & STORAGE PERMITTING PROCESSES Natural Gas Pipeline & Storage Permitting Processes NiSource follows the Federal Energy Regulatory Commission (FERC) planning and permitting

More information

OVERVIEW ABOUT WBI ENERGY

OVERVIEW ABOUT WBI ENERGY OVERVIEW The proposed Demicks Lake Pipeline Project involves approximately 22 miles of 24-inch diameter natural gas pipeline between a natural gas processing plant proposed by ONEOK Rockies Midstream (ONEOK)

More information

Update to List of Non-Conforming Service Agreements Docket No. RP16-

Update to List of Non-Conforming Service Agreements Docket No. RP16- Transcontinental Gas Pipe Line Company, LLC 2800 Post Oak Boulevard (77056) P.O. Box 1396 Houston, Texas 77251-1396 (713) 215-2000 January 12, 2016 Federal Energy Regulatory Commission 888 First Street,

More information

Natural Gas Summit 11/14/12

Natural Gas Summit 11/14/12 Natural Gas Summit 11/14/12 1 Natural Gas Summit 11/14/12 Maureen Ball Joined Central New York Oil and Gas (Inergy) in 1999. Participated in the development and construction of various storage, compression,

More information

CHICAGO MARKET EXPANSION PROJECT PHASE 2 NOTICE OF NON-BINDING SOLICITATION OF INTEREST CMEP PHASE 1 UPDATE

CHICAGO MARKET EXPANSION PROJECT PHASE 2 NOTICE OF NON-BINDING SOLICITATION OF INTEREST CMEP PHASE 1 UPDATE CMEP PHASE 1 UPDATE Natural Gas Pipeline Company of America LLC (NGPL) is pleased to announce its acceptance of the FERC Certificate Order issued March 17, 2016 in Docket No. CP15-505-000, as filed June

More information

SR-18 Corridor Improvements in Wood County

SR-18 Corridor Improvements in Wood County Public Meeting Information Package SR- Corridor Improvements in Wood County Thursday, May 19, 2011 10:00 a.m. to 1:00 p.m. Meeting Location: Hancock-Wood Electric Cooperative Building 1399 Business Park

More information

OSU Extension FACT SHEET

OSU Extension FACT SHEET OHIO STATE UNIVERSITY EXTENSION! OSU Extension FACT SHEET Ohio State University Extension, 2120 Fyffe Road, Columbus, OH 43210 Shale Oil and Gas Development Fact Sheet Series A Landowner s Guide to Understanding

More information

Right-Of-Way Acquisition Information

Right-Of-Way Acquisition Information Right-Of-Way Acquisition Information Introduction Larimer County covers 2,600 square miles, and has over 1,000 lineal miles of public roads. These roads are located within public right-of-way (an area

More information

BLANKET CERTIFICATE PROGRAM NOTICE TO LANDOWNERS

BLANKET CERTIFICATE PROGRAM NOTICE TO LANDOWNERS BLANKET CERTIFICATE PROGRAM NOTICE TO LANDOWNERS FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA June 2007 (updated May 5, 2010) The Role of the Federal Energy Regulatory Commission The Federal

More information

Turning Brownfields into Clean Energy. Today s Discussion

Turning Brownfields into Clean Energy. Today s Discussion Turning Brownfields into Clean Energy NOVEMBER 18, 2009 Today s Discussion Chesapeake Energy: Who are we? Barnett Shale overview What lead us to purchase Brownfields? Making a positive impact in Fort Worth

More information

Effingham County Compressor Station and Meter Stations

Effingham County Compressor Station and Meter Stations FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426 OFFICE OF ENERGY PROJECTS In Reply Refer To: OEP/DG2E/Gas 2 Elba Liquefaction Company, L.L.C., Southern LNG Company, L.L.C., and Elba Express

More information

COMMONWEALTH OF PENNSYLVANIA AGRICULTURAL SECURITY AREA HANDBOOK

COMMONWEALTH OF PENNSYLVANIA AGRICULTURAL SECURITY AREA HANDBOOK COMMONWEALTH OF PENNSYLVANIA AGRICULTURAL SECURITY AREA HANDBOOK Bureau of Farmland Preservation 2301 North Cameron Street Harrisburg, PA 17110 Phone: 717-783-3167 Fax: 717-772-8798 www.agriculture.state.pa.us

More information

Northeast Energy Direct (NED) Project Frequently Asked Questions

Northeast Energy Direct (NED) Project Frequently Asked Questions Northeast Energy Direct (NED) Project Frequently Asked Questions The Need for the Pipeline Why do we need a new pipeline? Tennessee Gas Pipeline Company, L.L.C. (Tennessee), a Kinder Morgan company, has

More information

THE LOCAL ROLE IN PERMITTING INTERSTATE NATURAL GAS PIPELINES MASSACHUSETTS ASSOCIATION OF CONSERVATION COMMISSIONS

THE LOCAL ROLE IN PERMITTING INTERSTATE NATURAL GAS PIPELINES MASSACHUSETTS ASSOCIATION OF CONSERVATION COMMISSIONS THE LOCAL ROLE IN PERMITTING INTERSTATE NATURAL GAS PIPELINES PRESENTATION AT CITIZEN PLANNER TRAINING COLLABORATIVE CONFERENC E BY EUGENE B. BENSON, EXECUTIVE DIRECTOR, MACC MARCH 21, 2015 Massachusetts

More information

Michigan Department of Natural Resources Oil and Gas Leases Frequently Asked Questions

Michigan Department of Natural Resources Oil and Gas Leases Frequently Asked Questions What is the DNR s authority for leasing oil and gas? How are state-owned oil and gas rights leased? Who decides which state-owned oil and gas rights will be offered for lease at the auction? How often

More information

Sabal Trail Transmission, LLC

Sabal Trail Transmission, LLC FGU 2014 ANNUAL MEETING JUNE 25, 2014 Sabal Trail Transmission, LLC Connecting diverse natural gas supplies to southeast markets Josh Browning Changing Natural Gas Flows Value of capacity increases with

More information

S Y S T E M M O D E R N I Z A T I O N

S Y S T E M M O D E R N I Z A T I O N S Y S T E M M O D E R N I Z A T I O N T H E L I N E M B E X T E N S I O N P R O J E C T B A L T I M O R E A N D H A R F O R D C O U N T I E S, M A R Y L A N D Project Overview Columbia Gas Transmission

More information

PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of 7-24-15)

PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of 7-24-15) PIPELINE SYSTEMS (as of 7-24-15) The Northeast Gas Association (NGA) has prepared this summary based on publicly-available information. NGA will strive to keep the information as updated as possible and

More information

June 2016 Commission Meeting Summaries

June 2016 Commission Meeting Summaries June 2016 Commission Meeting Summaries These are summaries of orders voted by the Federal Energy Regulatory Commission at its June 16, 2016 public meeting. The summaries are produced by FERC s Office of

More information

Evaluating Oil & Gas Lease Proposals

Evaluating Oil & Gas Lease Proposals Evaluating Oil & Gas Lease Proposals Theodore A. (Ted) Feitshans Department of Agricultural & Resource Economics North Carolina State University 919-515-5195 ted_feitshans@ncsu.edu April 26, 2011 The author

More information

Eldorado-Ivanpah Transmission Project WELCOME To Southern California Edison Company s Eldorado-Ivanpah Transmission Project OPEN HOUSE

Eldorado-Ivanpah Transmission Project WELCOME To Southern California Edison Company s Eldorado-Ivanpah Transmission Project OPEN HOUSE WELCOME To Southern California Edison Company s Eldorado-Ivanpah Transmission Project OPEN HOUSE 1 1 Welcome to The Eldorado-Ivanpah Transmission Project Open House How is the open house organized? This

More information

Liquid Capital. Cochran s Creek: A Case Study in Stream Mitigation Banking in Georgia

Liquid Capital. Cochran s Creek: A Case Study in Stream Mitigation Banking in Georgia Liquid Capital Cochran s Creek: A Case Study in Stream Mitigation Banking in Georgia Basic Bank Permitting Process Submit Prospectus to IRT. If approved then: Conduct site visit with IRT. If approved then:

More information

REQUEST FOR PROPOSALS For Natural Gas Pipeline Infrastructure and Transportation Services

REQUEST FOR PROPOSALS For Natural Gas Pipeline Infrastructure and Transportation Services REQUEST FOR PROPOSALS For Natural Gas Pipeline Infrastructure and Transportation Services Stillwater Electric Utilities A Division of Stillwater Utilities Authority City of Stillwater, Oklahoma Dated:

More information

1. Nuclear - In YOUR OWN WORDS (not your partner s words) explain how this energy source works.

1. Nuclear - In YOUR OWN WORDS (not your partner s words) explain how this energy source works. ENERGY RESOURCES ACTIVITY Integrated Science 4 Name: Date: Period: Directions: In groups, you will be going from station to station answering questions about differing energy resource. Each individual

More information

Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey

Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey Rutgers Cooperative Extension Water Resources Program Christopher C. Obropta, Ph.D., P.E. Email: obropta@envsci.rutgers.edu

More information

Request for Proposals RFP To Develop a Senior Affordable Housing Complex in Vernon Town Center

Request for Proposals RFP To Develop a Senior Affordable Housing Complex in Vernon Town Center Request for Proposals RFP To Develop a Senior Affordable Housing Complex in Vernon Town Vernon Township, Sussex County, New Jersey Issued by: Mayor Victor J. Marrotta and the Vernon Township Council 21

More information

What Do I Need to Know?

What Do I Need to Know? An Interstate Natural Gas Facility on My Land? What Do I Need to Know? Prepared by the Federal Energy Regulatory Commission Federal Energy Regulatory Commission Washington, DC www.ferc.gov An Interstate

More information

Citizens Guide to Stopping LNG Pipelines on Private Land in Oregon

Citizens Guide to Stopping LNG Pipelines on Private Land in Oregon CitizensGuidetoStoppingLNGPipelines onprivatelandinoregon OregonLNGplanstobuildover85milesofhigh pressurenaturalgaspipelinetoconnectits proposedlngterminalalongthecolumbiariverinwarrentontoaninterconnectnear

More information

Re: Preliminary Permit Application for the Rose Creek Pumped Storage Project

Re: Preliminary Permit Application for the Rose Creek Pumped Storage Project September 12, 2013 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Preliminary Permit Application for the Dear Ms. Bose, Please find attached

More information

Minnesota Public Utilities Commission Staff Briefing Papers

Minnesota Public Utilities Commission Staff Briefing Papers Minnesota Public Utilities Commission Staff Briefing Papers Meeting Date: April 17, 2014...Agenda Item *3 Company: Docket No. Minnesota Power E015/GP-13-978 In the Matter of the Application of Minnesota

More information

Control Number : 38597. Item Number: 373. Addendum StartPage: 0

Control Number : 38597. Item Number: 373. Addendum StartPage: 0 Control Number : 38597 Item Number: 373 Addendum StartPage: 0 { C31 ^ IOF DENTUN 215 E. McKINNEY DENTON, TX 76201 (940) 349-8230 FAX (940) 349-8120 UTILITY ADMINISTRATION September 21, 2010 Public Utility

More information

How to Register: 1. Enter http://www.ferc.gov/docs-filing/efiling.asp into your browser. The page should look like this:

How to Register: 1. Enter http://www.ferc.gov/docs-filing/efiling.asp into your browser. The page should look like this: !!!!!!! September 25, 2015 Becoming an Intervenor in FERC Atlantic Coast Pipeline Docket #: CP15-554 On September 18, 2015, Dominion Resources, Inc. filed their Certificate Application for the Atlantic

More information

Economic Growth Environment Social

Economic Growth Environment Social Economic Growth and Green Energy EGGE exists to provide proactive outreach, foster innovation and deliver resources which h enable stakeholders to balance environmental stewardship, economic growth and

More information

STV. ENDURING. DRIVEN. VISIONARY. ENERGY SERVICES

STV. ENDURING. DRIVEN. VISIONARY. ENERGY SERVICES STV. ENDURING. DRIVEN. VISIONARY. ENERGY SERVICES STV has served the energy industry for more than 25 years, providing services for projects that transport crude oil, refined petroleum products, natural

More information

Regulation of Natural Gas Pipelines. June 23, 2008

Regulation of Natural Gas Pipelines. June 23, 2008 Regulation of Natural Gas Pipelines June 23, 2008 Federal and State Regulations Federal: 49 United States Code 60101. et. seq. Title 49 Code of Federal Regulations The Office of Pipeline Safety (OPS),

More information

Pipeline Engineering and Field Services

Pipeline Engineering and Field Services Pipeline Engineering and Field Services Field Services Professionals Your Reliable Partner Mustang s Pipeline Field Services Group is recognized by the industry as a reliable partner for providing a complete

More information

Platts 3 rd Annual Midstream Development & Management Conference - Houston, Texas

Platts 3 rd Annual Midstream Development & Management Conference - Houston, Texas Platts 3 rd Annual Midstream Development & Management Conference - Houston, Texas Rodney L. Waller Senior Vice President May 21, 2010 Platts 3 rd Annual Midstream Development & Management Conference l

More information

Negotiating Pipeline Easements

Negotiating Pipeline Easements FACT SHEET Ohio State University Extension, 2120 Fyffe Road, Columbus, OH 43210 Introduction Shale Oil and Gas Development Fact Sheet Series Negotiating Pipeline Easements Peggy Kirk Hall Director, OSU

More information

IMPORTANT NOTICE ABOUT UPCOMING RATE CHANGES

IMPORTANT NOTICE ABOUT UPCOMING RATE CHANGES IMPORTANT NOTICE ABOUT UPCOMING RATE CHANGES For the last 50 years, Vermont Gas has maintained competitive and affordable rates for its 50,000 customers. As we work to expand our services to more Vermont

More information

Key programs and relevant studies

Key programs and relevant studies ALASKA DEPARTMENT OF NATURAL RESOURCES Key programs and relevant studies The Alaska Department of Natural Resources manages Alaska's surface and subsurface resources, except for fish and game. This includes

More information

5-Minute Refresher: RENEWABLE ENERGY

5-Minute Refresher: RENEWABLE ENERGY 5-Minute Refresher: RENEWABLE ENERGY Renewable Energy Key Ideas Renewable energy is a source of energy that can be used and replenished naturally in a relatively short period of time. Non renewable energy

More information

Electric system improvements near you South and West of Edmonton Area Transmission Development

Electric system improvements near you South and West of Edmonton Area Transmission Development Electric system improvements near you South and West of Edmonton Area Transmission Development SAUNDERS LAKE SUBSTATION AND TRANSMISSION LINES January 2014 Volume 2 PLEASE NOTE: We want to inform you that

More information

Solar Energy Engineering, Consulting & Permitting Services

Solar Energy Engineering, Consulting & Permitting Services Page 1 of 5 Solar Energy Engineering, Consulting & Permitting Services Atlantic Design Engineers, Inc. (Atlantic) is a multi-disciplinary consulting firm providing professional services since 1987 in civil

More information

Food, Fiber and Natural Resource Literacy All About State Trust Lands. Colorado State Board of Land Commissioners, also known as the State Land Board.

Food, Fiber and Natural Resource Literacy All About State Trust Lands. Colorado State Board of Land Commissioners, also known as the State Land Board. Colorado Reader AG IN THE CLASSROOM HELPING THE NEXT GENERATION UNDERSTAND THEIR CONNECTION TO AGRICULTURE COLORADO FOUNDATION FOR AGRICULTURE - GROWINGYOURFUTURE.COM Millions of Acres of Land Food, Fiber

More information

On-Farm Solar Energy Generation. Susan E. Craft, Executive Director State Agriculture Development Committee

On-Farm Solar Energy Generation. Susan E. Craft, Executive Director State Agriculture Development Committee On-Farm Solar Energy Generation Susan E. Craft, Executive Director State Agriculture Development Committee P.L. 2009, c. 213 Defines the extent of solar, wind and biomass energy generation that is considered

More information

Office of Energy Projects Energy Infrastructure Update For February 2014

Office of Energy Projects Energy Infrastructure Update For February 2014 For February 24 Natural Gas Highlights CIG received authorization to place into service the remaining facilities to its High Plains 23 Expansion Project which will provide 225 MMcf/d of capacity to its

More information

Corridor Goals and Objectives

Corridor Goals and Objectives Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty

More information

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24 Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge

More information

Pipelines & The City

Pipelines & The City Pipelines & The City Purpose of Discussion Pipeline Authority to Use or Cross City Streets Authorized Activities of City Condemnation What Entities in Texas are Authorized by Law to Operate Gas Pipelines?

More information

TEMPORARY WORKSPACE AGREEMENT

TEMPORARY WORKSPACE AGREEMENT W.O. No: 621209 Line: Phoenix Lateral Tract No: YA-019.47.2.WS TEMPORARY WORKSPACE AGREEMENT The undersigned Yavapai County ( Grantor, whether one or more) being the owner of, or having an interest in,

More information

Transcontinental Gas Pipe Line Company, LLC Rate Schedule S-2 Tracking Filing

Transcontinental Gas Pipe Line Company, LLC Rate Schedule S-2 Tracking Filing Gas Pipeline Transco 2800 Post Oak Boulevard (77056) P.O. Box 1396 Houston, Texas 77251-1396 713/215-4060 November 20, 2009 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

More information

People Are Asking Us About the Rover Pipeline Project

People Are Asking Us About the Rover Pipeline Project People Are Asking Us About the Rover Pipeline Project Thank you for your interest in the Rover Pipeline Project. We are committed to addressing questions from the community, landowners and other interested

More information

Center for Sustainable Business Growth

Center for Sustainable Business Growth Center for Sustainable Business Growth Progress Report; December 2014 Bridgeport Eco-Technology Park The south and west ends of Bridgeport, where the Eco-Technology Park resides, have been the home of

More information

Hudson Yards Redevelopment. Discussion of Property Acquisition and Relocation

Hudson Yards Redevelopment. Discussion of Property Acquisition and Relocation Hudson Yards Redevelopment Discussion of Property cquisition and Relocation Note: This document is for informational purposes only and is not intended to be, and should not be relied upon as, a comprehensive

More information

Inquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations with Companies Seeking Easements

Inquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations with Companies Seeking Easements Inquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations As a property owner, you should make a decision about granting an easement based on the same level of information available

More information

As stewards of the land, farmers must protect the quality of our environment and conserve the natural resources that sustain it by implementing

As stewards of the land, farmers must protect the quality of our environment and conserve the natural resources that sustain it by implementing N A T U R A L R E S O U R C E C O N S E R V A T I O N As stewards of the land, farmers must protect the quality of our environment and conserve the natural resources that sustain it by implementing conservation

More information

The Economic Impact of Dominion Capital Expenditure Projects

The Economic Impact of Dominion Capital Expenditure Projects The Economic Impact of Dominion Capital Expenditure Projects Prepared for Dominion Virginia Power October 22, 2015 1309 E Cary Street, Richmond, VA 23219 1025 Huron Road East, Cleveland, OH 44115 chmuraecon.com

More information

REG signs agreement with three biodiesel plants to consolidate

REG signs agreement with three biodiesel plants to consolidate REG signs agreement with three biodiesel plants to consolidate Biodiesel industry leader to acquire 105 MGY of additional capacity in Iowa and Illinois to meet diesel market demand AMES, Iowa (May 11,

More information

Re: Comments on Constitution Pipeline DEIS Application Docket No. CP13-499

Re: Comments on Constitution Pipeline DEIS Application Docket No. CP13-499 JAMES BRYAN BACON, ESQ., P.C. Attorney and Counselor at Law P.O. Box 575 New Paltz, New York 12561 (845) 419-2338 April 7, 2014 Kimberly D. Bose, Secretary Nathaniel J. Davis, Sr., Deputy Secretary Federal

More information

3.1.8 Utilities and Service Systems

3.1.8 Utilities and Service Systems 3.1.8 Utilities and Service Systems This section discusses potential impacts to utilities and service systems, including water, wastewater, and solid waste hauling and disposal, resulting from the implementation

More information

MILLENNIUM PIPELINE NEW YORK S ENERGY BACKBONE Existing Benefits and Expansion Opportunities

MILLENNIUM PIPELINE NEW YORK S ENERGY BACKBONE Existing Benefits and Expansion Opportunities MILLENNIUM PIPELINE NEW YORK S ENERGY BACKBONE Existing Benefits and Expansion Opportunities New York is the fourth largest natural gas consuming state in the nation... Overview New York State is highly

More information

Estate Forex Trading in Ohio, Not So Bad

Estate Forex Trading in Ohio, Not So Bad BENEFITS AND OBSTACLES IN WQT Indianapolis, IN August 27, 2009 CTIC Water Quality Trading Workshop George W. Kelly Capital Financing provided for over 50 mitigation projects Structured to carry the long

More information

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN 1 AUGUST 2011 LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN KEY ELEMENTS OF THE PLAN: 1. Replace the existing unsafe Ragged Mountain dam with a new dam and raise the reservoir pool level initially

More information

MACOMB TOWNSHIP PLANNING COMMISSION MEETING MINUTES AND PUBLIC HEARING TUESDAY, May 5, 2009 PAGE 1 OF 8

MACOMB TOWNSHIP PLANNING COMMISSION MEETING MINUTES AND PUBLIC HEARING TUESDAY, May 5, 2009 PAGE 1 OF 8 PAGE 1 OF 8 LOCATION: PRESENT: ABSENT: ALSO PRESENT: MACOMB TOWNSHIP MEETING CHAMBERS 54111 BROUGHTON ROAD MACOMB, MI 48042 EDWARD GALLAGHER, CHAIRMAN DEAN AUSILIO, VICE CHAIRMAN MICHAEL D. KOEHS, SECRETARY

More information

Casper Wind Power Project Using Our Land Wisely

Casper Wind Power Project Using Our Land Wisely Casper Wind Power Project Using Our Land Wisely Chevron Global Power Company The solutions are not either/or. It s not a choice between more drilling or more efficiency. It s not a choice between coal

More information

Lane Community College

Lane Community College Lane Community College Long Range Planning 11 May 2011 Board Update The Urban Design Lab, University of Oregon Lane Community College 2 Planning & Design Process 3 Planning Process Phase 1: Visioning Workshops

More information

University of Denver, MBA, Business Administration, 1973 Regis University, BS, Business Administration, 1972

University of Denver, MBA, Business Administration, 1973 Regis University, BS, Business Administration, 1972 Resume of Michael J. McFadden MICHAEL J. MCFADDEN AREAS OF QUALIFICATION Rates, regulatory affairs, strategic planning, electric and gas utility operations, corporate finance, financial analysis, asset

More information

ROVER PIPELINE LLC. Rover Pipeline Project. RESOURCE REPORT 5 Socioeconomics. FERC Docket No. CP15- -000

ROVER PIPELINE LLC. Rover Pipeline Project. RESOURCE REPORT 5 Socioeconomics. FERC Docket No. CP15- -000 ROVER PIPELINE LLC Rover Pipeline Project RESOURCE REPORT 5 Socioeconomics FERC Docket No. CP15- -000 February 2015 Section TABLE OF CONTENTS ROVER PIPELINE PROJECT 5.0 SOCIOECONOMICS... 5-1 5.1 EXISTING

More information

The Rights of Landowners Under Wisconsin Eminent Domain Law. Procedures Under sec. 32.06 Wisconsin Statutes

The Rights of Landowners Under Wisconsin Eminent Domain Law. Procedures Under sec. 32.06 Wisconsin Statutes The Rights of Landowners Under Wisconsin Eminent Domain Law Procedures Under sec. 32.06 Wisconsin Statutes FOREWORD This pamphlet is published by the Wisconsin Department of Commerce in cooperation with

More information

Solar Siting in New Jersey

Solar Siting in New Jersey Solar Siting in New Jersey Background Document Sustainable Jersey 7/1/2012 This document is intended to frame the issues around siting of large commercial solar siting as a prelude to developing best practices

More information

CHECKLIST FOR FILING AN APPLICATION FOR A GROUND AND/OR SURFACE WATER WITHDRAWAL PROJECT IN THE DELAWARE RIVER BASIN

CHECKLIST FOR FILING AN APPLICATION FOR A GROUND AND/OR SURFACE WATER WITHDRAWAL PROJECT IN THE DELAWARE RIVER BASIN CHECKLIST FOR FILING AN APPLICATION FOR A GROUND AND/OR SURFACE WATER WITHDRAWAL PROJECT IN THE DELAWARE RIVER BASIN PLEASE COMPLETE CHECKLIST AND ENCLOSE WITH THE APPLICATION. If you need assistance,

More information

The Colts Neck Farmland Preservation Bulletin Winter/Spring 2011

The Colts Neck Farmland Preservation Bulletin Winter/Spring 2011 The Colts Neck Farmland Preservation Bulletin Winter/Spring 2011 Published by the Colts Neck Farmland Preservation And Open Space Committee FORWARD: Richard Malinowski Chairperson 732-834-0088 Edward Eastman

More information

Carol Calabresa, Chair Land Preservation and Acquisition Committee. S. Michael Rummel, Chair Finance and Administrative Committee

Carol Calabresa, Chair Land Preservation and Acquisition Committee. S. Michael Rummel, Chair Finance and Administrative Committee Date: January 4, 2016 Memo to: Carol Calabresa, Chair Land Preservation and Acquisition Committee S. Michael Rummel, Chair Finance and Administrative Committee From: Subject: Alex Ty Kovach Executive Director

More information

131 FERC 61,119 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER DENYING REHEARING. Issued May 6, 2010

131 FERC 61,119 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER DENYING REHEARING. Issued May 6, 2010 131 FERC 61,119 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer, Philip D. Moeller, and John R. Norris. Florida Gas Transmission

More information

Part of Your Community Important Safety Information. TransCanada - Bison Pipeline

Part of Your Community Important Safety Information. TransCanada - Bison Pipeline Part of Your Community Important Safety Information TransCanada - Bison Pipeline Public Safety Information Pipeline Safety is Everybody s Business This brochure contains important safety information about

More information

Pendleton Solar Energy Centre COMMUNITY ENGAGEMENT PLAN

Pendleton Solar Energy Centre COMMUNITY ENGAGEMENT PLAN Pendleton Solar Energy Centre COMMUNITY ENGAGEMENT PLAN Large Renewable Procurement (LRP) I PENDLETON SOLAR ENERGY CENTRE 844.553-3336 PendletonSolar@edf-en.ca www.pendletonsolar.ca Table of Contents 1.

More information

When ODOT Needs Your Property

When ODOT Needs Your Property When ODOT Needs Your Property Foreword The State of Ohio is engaged in a continuous program of improving its transportation systems. Often this improvement process involves the purchase of land so that

More information

Pipeline Regulatory and Environmental Permits

Pipeline Regulatory and Environmental Permits Chapter 3 Pipeline Regulatory and Environmental Permits William E. Bauer Chapter Outline Introduction 57 3.1 Regulation of Interstate Pipelines 58 3.1.1 FERC-Regulated Natural Gas Pipelines 58 3.1.2 FERC-Regulated

More information

Multiple sources of energy will be available, giving the consumer choices. A Higher Percentage of Energy will come from renewable energy sources

Multiple sources of energy will be available, giving the consumer choices. A Higher Percentage of Energy will come from renewable energy sources Editor s comments: Numbers in parentheses indicate the number of duplicate or extremely similar comments made. The headings are editor s best attempt to draft vision statements reflecting the participants

More information

Democratic and Republican Positions on Environmental Issues. Edward H. Klevans, Professor and Department Head Emeritus of Nuclear Engineering

Democratic and Republican Positions on Environmental Issues. Edward H. Klevans, Professor and Department Head Emeritus of Nuclear Engineering Democratic and Republican Positions on Environmental Issues Edward H. Klevans, Professor and Department Head Emeritus of Nuclear Engineering Issue: Climate Change Democratic Position The Democratic Platform

More information

Western Pipelines. Greg Ruben, Director, EPNG Marketing Greg Gettman, Manager, Business Development November 1-2, 2011

Western Pipelines. Greg Ruben, Director, EPNG Marketing Greg Gettman, Manager, Business Development November 1-2, 2011 Western Pipelines www.elpaso.com NYSE:EP Greg Ruben, Director, EPNG Marketing Greg Gettman, Manager, Business Development November 1-2, 2011 D E P E N D A B L E N A T U R A L G A S El Paso Corporation

More information

Do-Now. 1.) Get out notebook.

Do-Now. 1.) Get out notebook. Do-Now 1.) Get out notebook. 2.) Answer the following questions on the first clean sheet in your notebook. 1.) What are renewable resources? 2.) What are nonrenewable resources? Alternative Sources of

More information

Conservation Tax Credit Regulations Chapter 391-1-6 A-1 RULES OF GEORGIA DEPARTMENT OF NATURAL RESOURCES CHAPTER 391-1-6

Conservation Tax Credit Regulations Chapter 391-1-6 A-1 RULES OF GEORGIA DEPARTMENT OF NATURAL RESOURCES CHAPTER 391-1-6 Conservation Tax Credit Regulations Chapter 391-1-6 A-1 RULES OF GEORGIA DEPARTMENT OF NATURAL RESOURCES CHAPTER 391-1-6 GEORGIA CONSERVATION TAX CREDIT PROGRAM TABLE OF CONTENTS 391-1-6-.01 Purpose and

More information

Natural Gas Pipelines

Natural Gas Pipelines Natural Gas Pipelines Excerpt from Report 2 of the Pennsylvania Energy Impacts Assessment December 16, 2011 Authors: Nels Johnson, Tamara Gagnolet, Rachel Ralls, and Jessica Stevens The Nature Conservancy

More information

Committee on Natural Resources Rob Bishop, Chairman Markup Memorandum

Committee on Natural Resources Rob Bishop, Chairman Markup Memorandum Committee on Natural Resources Rob Bishop, Chairman Markup Memorandum January 29, 2016 To: From: Markup: All Natural Resources Committee Members Majority Committee Staff, Terry Camp Subcommittee on Federal

More information

Understanding Natural Gas Pipeline Infrastructure and Impacts DAVE MESSERSMITH MARCELLUS EDUCATION TEAM

Understanding Natural Gas Pipeline Infrastructure and Impacts DAVE MESSERSMITH MARCELLUS EDUCATION TEAM Understanding Natural Gas Pipeline Infrastructure and Impacts DAVE MESSERSMITH MARCELLUS EDUCATION TEAM Pipeline Infrastructure & Impacts Pipeline Background Pipeline Construction Pipeline-Related Infrastructure

More information