INDUSTRIAL PARTICIPATION/OFFSET

Size: px
Start display at page:

Download "INDUSTRIAL PARTICIPATION/OFFSET"

Transcription

1 Republic of Turkey Ministry of National Defence Undersecretariat for Defence Industries (SSM) INDUSTRIAL PARTICIPATION/OFFSET GUIDELINE SSM-YN-022 Rev.:0 April 2011

2 TABLE OF CONTENTS 1. Objective Scope Definitions and Abbreviations General Principles Determination of IP/O Principles in RFP Preparation and Submission of IP/O Proposal Evaluation of IP/O Proposals IP/O Contract Industrialization Plan Escalation Liquidated Damages for Delay Pre-Approval Principles Crediting Principles Transfers of Excess IP/O Credits Temporary Crediting Principles Pre-Crediting Principles APPENDICES

3 1. Objective The objective of this Industrial Participation / Offset Guideline (hereinafter this Guideline ) is to inform public and those concerned of the procedures and principles relevant to the Industrial Participation / Offset (IP/O) activities executed by the Undersecretariat for Defence Industries (hereinafter SSM ). 2. Scope 2.1. The principles in this Guideline covers the IP/O activities under the Projects executed by SSM and the IP/O activities assigned to the SSM The regulations in this Guideline will be applied to the IP/O activities within the scope of the IP/O Contracts that had been signed before the publication of this Guideline, unless these regulations are in contradiction with the terms and conditions involved in mentioned IP/O Contracts In the projects that the relevant RFP had been issued before the date this Guideline becomes effective, the IP/O Contract will be signed according to the terms and conditions stated within the RFP without being obliged to the terms in this Guideline. However, if approved by SSM, mentioned projects could be subject to the terms of this Guideline by publishing an addendum and changing the RFP. 3. Definitions and Abbreviations 3.1. Definitions In this Guideline, following definitions will be used within the given context: Category-A IP/O Category-B IP/O Activities, to be conducted by Turkish industry within the scope of Procurement Contract, of which the details stated in the Industrialization Plan located in the appendix of the IP/O Contract and with a proven fulfillment by supporting documents within the related Program Period. Product/service export within the fields of defence, homeland security and aerospace industries. 3

4 Category-C IP/O For Foreign Contractor Except the ones within Category A IP/O, Foreign Contractor s following activities in field of defence, homeland security and aerospace industry, a) Technological Cooperation Development of a genuine product and technology, bring in design, development, production, test, etc. capabilities and providing necessary equipment, hardware, software, training, documentation, etc. for this purpose. b) Investment Excluding the takeover of an existing company, direct foreign investments within the scope of establishment of brand new companies or partnership with existing companies, In line with the approval of SSM, the equipment, hardware and software provided to the SMEs, training and research institutions in Turkey. Domestic Contractor s contributions including equipment, hardware, software, service or financial support to the training and R&D studies conducted by industrial enterprises, training and research institutions in Turkey in the fields of defence, homeland security and aerospace industries. Contractor Bidder Crediting Crediting Report Natural and legal personalities who are liable to SSM for all activities within the scope of IP/O liability. Natural and legal personalities that make an IP/O bid within the scope of the project. The reduction of the Contractor s liability involved in IP/O Contract by the achieved IP/O amount in terms of the Crediting Principles article of this Guideline. The related report involved in IP/O Contract. 4

5 Domestic Contractor Domestic Net Added Value (DNAV) Natural and legal personalities under Turkish nationality who are liable to SSM for all activities within the scope of IP/O liability. In the invoice of a product and/or a service, the aggregate of a) The costs of all raw material, supplies, product, service, manpower, etc. obtained from domestic market, b) Overhead costs excluding administrative expenses (travel, accomodation, consulting services, postal services, etc.) c) The profits made by domestic companies and relevant taxes that may occur during the production of the mentioned product and/or service. Eligible Party For Foreign Contractor; a) Contractor b) The sub-contractors under the Procurement Contract c) Provided that being approved by SSM, other foreign companies proposed by Contractor For Domestic Contractor; a) Contractor b) The sub-contractors under the Procurement Contract Foreign Contractor Industrialization Plan IP/O Contract IP/O Letter of Guarantee Natural and legal personalities under foreign nationality who are liable to SSM for all activities within the scope of IP/O liability. The plan, which will be prepared as an attachment to the IP/O Contract and elaborates the details of Contractor s liabilities towards Category A activities within the IP/O Contract. The Contract, signed with the Contractor referring to the Procurement Agreement, determining the terms and conditions regarding the realization of the Contractor s IP/O obligations. Letter of Guarantee submitted to SSM by Contractor within the scope of IP/O Contract 5

6 IP/O Liability Term IP/O Report Technology Development Liability Pre-Approval Pre-Crediting Prior Market Procurement Contract The duration between the advance payment and 2 (two) years after the date which the latest product/service delivery will be made within the framework of Procurement Contract, excluding the warranty period. The report that is submitted by Contractor to SSM at the end of every Program Period, defined as in the IP/O Contract. The liability of the Contractor within the scope of the development project that aims to develop technology based system, subsystem and component in collaboration with the SMEs and university/research institutes, in order to constitute an input to the final product or product roadmap that will be produced within the framework of the Project. Written approval required to be obtained by the Contractor from SSM according to the Pre-Approval Principles article of this Guideline, in order for the planned IP/O activities to be valid. Preservation of the crediting corresponding to the achieved IP/O activities in accordance with this Guideline s Pre-Crediting Principles article, in order to be counted towards the possible future IP/O liabilities of a company which is a Contractor, Bidder or does not have a IP/O liability to SSM. The countries that the relevant product/service to be exported for the first time. The procurement contract signed in terms of Project by SSM. 6

7 Program Period For the IP/O Contracts which the IP/O Liability Period is up to 2 (two) years, the duration from the date that advance payment within the framework of Procurement Contract is made on the Contractor until the date that IP/O Liability Period is expired. For the IP/O Contracts which the IP/O Liability Term is greater than 2 (two) years, every 12 (twelve) months period from the date that advance payment within the framework of Procurement Contract is made on the Contractor. Project Request for Proposal Small and Middle Sized Enterprises (SME) Supplier Company Supplier Company / SME Work Share All procurement and industrialization activities executed by SSM based on the authorization from Defence Industry Executive Committee. The documents and appendices consist in Part I and Part II, which includes administrative, financial, legal, technical, tactical and logistics requests related with the bid initialized within the scope of the Project. Economical units where the number of employees is below 250 (two hundred and fifty) and whom annual net sales revenue or financial balance-sheet not exceeding 25 (twenty five) Million Turkish Liras. All domestic companies involved in the Project except the ones that SSM particularly stated in the RFP whose direct works will not be considered as Supplier Company / SME Work Share within the scope of the project. Within the scope of the project; the Category-A IP/O activities accomplished by all domestic companies involved in the Project; except their own-achieved activities of Contractor Domestic Sub-Contractors that SSM particularly stated in the RFP who will not be considered as Supplier Company 7

8 Temporary Crediting Undersecretariat Undersecretary The crediting, which is intended for achievement of an IP/O activity planned by the Contractor within a Program Period and granted in terms of Temporary Crediting Principles article stated in this Guideline to be converted into permanent credit later. Undersecretariat for Defence Industries. Undersecretary for Defence Industries Abbreviations In this Guideline, following abbreviations will be used within the given context: SME MoND IP/O RFP DNAV Small and Medium Sized Enterprises Ministry of National Defence Industrial Participation/Offset Request For Proposal Domestic Net Added Value 4. General Principles 4.1. For all Projects within the scope of this Guideline, an IP/O Contract shall be signed with and IP/O liability acquired from the relevant Contractor SSM may also sign separate IP/O Contract(s) with the other foreign Sub- Contractors involved in the Project. In these conditions, the IP/O liabilities involved in the mentioned IP/O Contracts will be deducted from the Contractor s IP/O liability For the purchases from another government with the methods of Foreign Military Sales (FMS) and etc., SSM and the foreign contractors who sign a contract with the foreign country will be cosignatory for IP/O Contract(s) constructed within the scope of the terms and conditions of this Guideline. Mentioned IP/O Contract(s) shall be signed before the signing of procurement agreement (Letter of Agreement, etc.) by the foreign country and SSM, or before the first payment made by SSM within the scope of the Project. 8

9 4.4. The Contractor shall not impose any financial burden on SSM, while performing its IP/O Liability Products and services supplied by the Contractor under other bids / purchases / projects which are being executed by SSM and/or other governmental agencies shall not be counted towards the IP/O liability defined in this IP/O Contract Activities that are accomplished within the scope of Technology Development Liability by the Contractor will not be considered as IP/O activities If the Procurement Contract value is increased or decreased for any reason, the value of the total IP/O liability of the Contractor will also increase or decrease proportionally In order to support the Turkish companies in the international markets, the swap of the IP/O liabilities of domestic companies to a foreign country as a result of the product/service exports in the fields of defence, homeland security and aerospace with the IP/O liabilities of the Contractor settled in the related country to SSM will be conducted under the conditions of the domestic company s written application, the evaluation of SSM and the approval of Undersecretary if evaluated as convenient. 5. Determination of IP/O Principles in RFP 5.1. IP/O liability percentage, not being lower than 70% (seventy percent) of the Procurement Contract value in any case, will be determined by SSM with taking the attributes of the Project into account and will be stated in the RFP In order to meet the required IP/O liability percentages stated in the RFP it shall be requested from the Bidders to propose IP/O in the fields of Category-A, Category-B and Category-C The Category-A, Category-B and Category-C IP/O liability percentages, which constitute the IP/O liability, may be separately determined and stated in the RFP by SSM. In addition, Bidders may be asked in the RFP to perform an IP/O activity defined by the SSM in the fields of Category-B and/or Category-C, and this shall be scored in the evaluation process Supplier Company / SME Work Share liability, which is not to be lower than 30% (thirty percent) of the Category-A IP/O liability, will be determined by SSM with taking the attributes of the Project into account and will be stated in the related RFP. Minimum 15% (fifteen percent) of Category-A IP/O liability will be accomplished by 9

10 SMEs. For Domestic Contractors, if the Contractor itself is an SME, the works executed directly by the Contractor shall also be considered the Supplier Company / SME Work Share. 6. Preparation and Submission of IP/O Proposal 6.1. The Bidder s IP/O proposal shall be prepared in accordance with the principles stated in the RFP, including the IP/O Contract and the annexes which are provided to the Bidder in the annex to the RFP, and the other information and documents required in the RFP, and shall be submitted to the SSM together with the response to the RFP but in a separate file and inside a sealed envelope The blanks in the IP/O Contract located in RFP shall be filled by Bidder and every page of IP/O Contract shall be initialed and sealed by the authorized representative of Bidder The related annexes of IP/O Contract shall be prepared by the Contractor in accordance with the content and format stated in RFP in correct and complete way and every page shall be initialed and sealed by the authorized representative of Bidder. 7. Evaluation of IP/O Proposals 7.1. General evaluation of the proposals that are submitted by Bidder to SSM will be made in line with the formula stated below: Score = 0.50 (T) (I) (E) where T: Technical Score, I : IP/O Score, E: Administrative/Economical Score IP/O score will be calculated in line with the formula stated below: IP/O Score (I) = 0.65 (P A ) (P B ) (P C ) where P A : Category-A IP/O Score P B : Category-B IP/O Score P C : Category-C IP/O Score 10

11 7.3. Evaluation of Category-A IP/O Proposal Category-A IP/O proposal submitted within the context of Industrialization Plan by the Bidder will be evaluated by preparing a criteria tree within the framework of the articles in Industrialization Plan, where the coefficients are determined by IP/O Evaluation Sub-Committee with taking the attributes of the Project into account Calculation of Category-B IP/O Score P B = R B / (1+ D B / T B ) where R B : D B : T B : Ratio of Category-B IP/O liability over Contract value Weighted average fulfillment duration of Category-B IP/O liability (Sum of multiplication of every Program Period s number and Category-B IP/O liability amount within related Program Period over total Category-B IP/O liability) Duration that the Category-B IP/O liability is fulfilled 7.5. Calculation of Category-B IP/O Score P C = R C / (1+ D C / T C ) where R B : D B : T B : Ratio of Category-C IP/O liability over Contract value Weighted average fulfillment duration of Category-C IP/O liability (Sum of multiplication of every Program Period s number and Category-C IP/O liability amount within related Program Period over total Category-C IP/O liability) Duration that the Category-C IP/O liability is fulfilled 7.6. Bidder who cannot meet IP/O liability percentage requirements defined in the RFP by SSM or Supplier Company / SME Work Share liability percentage requirements shall receive zero points in IP/O proposal evaluation. 11

12 7.7. IP/O proposal of Bidder who does not accept, or partially / conditionally accepts the terms and conditions stated in the IP/O Contract and its appendices shall not be evaluated. 8. IP/O Contract 8.1. IP/O liabilities of the Contractor will be accomplished within the frame of the IP/O Contract s terms and principles. The language of the IP/O Contract shall be in Turkish and the appendices, except the ones accepted by SSM, shall be Turkish After the IP/O Contract becomes effective, there shall not be any IP/O liability transfer between the categories stated in the IP/O contract Contractor shall provide IP/O Letter of Guarantee to Undersecretariat which corresponds to 6% (six percent) of IP/O liability. The validity term of IP/O Letter of Guarantee shall be at least 1 (one) year longer than IP/O Liability Period. All expenses related with the IP/O Letter of Guarantee shall be covered by Contractor SSM has right to convert IP/O Letter of Guarantee into cash in order to collect the claims and save as income as a punitive condition in case of dissolution of IP/O Contract. 9. Industrialization Plan 9.1. Contractor shall fulfill IP/O liability in Category-A in line with the Industrialization Plan stated in the appendix of IP/O Contract Bidder shall fill the Industrialization Plan, which is in the appendix of IP/O Contract, in correct and complete manner within the context and format stated in RFP by SSM. The proposals which are not corrected or completed in spite of SSM s written notification shall not be evaluated In case of any IP/O activity stated in Industrialization Plan cannot be achieved on time in complete or partially due to the reasons related with the Contractor, by keeping the total IP/O liability in the IP/O Contract unchanged, the Contractor shall define a new IP/O activity instead of the unrealized activity and this new IP/O activity shall be proposed to SSM for Pre-Approval In case of any IP/O activity stated in Industrialization Plan cannot be achieved on time completely or partially due to the reasons not related with the Contractor, the Contractor shall provide the reasoning of the failure with supporting information and documents such as manufacturer company statements, technical reports, etc. to 12

13 SSM. SSM will evaluate the evidences provided; in case of the reasoning of the Contractor is accepted, then the failed IP/O activity shall be removed from Industrialization Plan In case of a change is made in the Procurement Contract which may affect the IP/O activities anticipated in Industrialization Plan, mentioned change shall be reflected to Industrialization Plan by the Contractor under the condition of SSM approval Contractor s indication of potential IP/O activities planned to achieve in the Industrialization Plan does not mean Pre-Approval request for these IP/O activities. Separate Pre-Approval processes shall be completed for each and every IP/O activity Supplier Company / SMEs suggested in Industrialization Plan prepared by Contractor shall be registered to SSM Defence Industry Portal. 10. Escalation In case the Procurement Contract is subject to escalation, then escalation shall also be applied to IP/O liabilities in ratios and conditions defined in Procurement Contract. 11. Liquidated Damages for Delay The accomplishment status of Contractor s Category-A, Category-B and Category- C IP/O liabilities, which are stated in IP/O Contract, will be evaluated by SSM at the end of each relevant Program Period At the end of every Program Period, if Contractor cannot fulfill the IP/O activities that are expected to be achieved within the related Program Period in line with the duration and conditions stated in the IP/O Contract; In case the IP/O activities are not fulfilled, as a penalty sanction, Contractor shall pay an amount of 6% (six percent) of the IP/O commitments to SSM account within 30 (thirty) days upon the written request of SSM. In case the subject penalty is not paid within 30 (thirty) days upon SSM s written request penalty amount shall be deducted from the payments to be made to the Contractor under Procurement Contract and/or other contracts if available and/or withdrawn from the Contractor s Letter(s) of Guarantee into cash in order to collect the claim. 13

14 11.4. Contractor s IP/O liabilities that are not accomplished will be escalated at a constant ratio (LIBOR+2, EURIBOR+2, etc.) and added to theip/o liabilities of the following Program Period At the end of last Program Period, accomplishment status of Contractor s Category- A, Category-B and Category-C IP/O liabilities and Supplier Company / SME Work Share liabilities will be evaluated by SSM If there are Category-A, Category-B and Category-C IP/O liabilities and Supplier Company / SME Work Share liabilities of the Contractor that are not fulfilled in line with the conditions stated in the IP/O Contract within the IP/O Liability Period; SSM will notify the Contractor in writing and negotiations shall be initialized within 30 (thirty) days between SSM and the Contractor in the subject of how and when the unfulfilled IP/O liability shall be fulfilled In case of not reaching an agreement within 30 (thirty) days or if Contractor cannot accomplish the IP/O liabilities in spite of the presence of an agreement, in addition to the fine accrued within the context of Article 11.3, Contractor shall pay an additional fine with an amount of 6% (six percent) of the unfulfilled IP/O liability as a penalty. If the penalty is not paid within 30 (thirty) days upon the written request of SSM, SSM will withdraw the mentioned amount of penalty from the payments to the Contractor within the context of Procurement Contract and/or other contracts if available and/or will convert the Contractor s Letter(s) of Guarantee into cash in order to collect the claim The application of penalty sanctions, shall not terminate the responsibility of Contractor to fulfill the IP/O liability, mentioned liability shall proceed as defined below: (If Contractor currently has another IP/O liability) Mentioned IP/O liability shall primarily be consolidated with the liabilities within the context of another present IP/O Contract(s) in the way that SSM approves. In this case, Contractor shall accrue the current IP/O Letter of Guarantee or offer a new IP/O Letter of Guarantee (If Contractor currently does not have another IP/O liability) Unfulfilled IP/O liability shall be consolidated with the future IP/O liabilities in the way that SSM approves. In this case, Contractor shall accrue IP/O Letter of 14

15 Guarantee according to the supplemented IP/O liability or a new IP/O Letter of Guarantee shall be offered at that time. 12. Pre-Approval Principles There will be no need to receive a separate Pre-Approval for the Category-A IP/O activities which are executed in the way that are stated in the IP/O Contract. If there will be a change in the information stated in the IP/O Contract such as content, schedule, eligible party, value, etc. or if any uncertain information in the IP/O Contract such as content, schedule, eligible party, value, etc. becomes certain, then Pre-Approval application shall be made Prior to any official procedure initialization, any contract, agreement, purchase order, etc. signing intended for the execution of a planned Category-B and Category-C type IP/O activities, a written Pre-Approval application shall be made by the Contractor to SSM for each IP/O activity In the Pre-Approval application document of the Contractor, related with the planned IP/O activity, the information and relevant documents in the Pre-Approval Request Table located in the Appendix-C shall be provided to SSM Pre-Approval request will be evaluated by SSM in a way of documented coordination with relevant parties. If the Pre-Approval evaluation result will not be notified to Contractor in a written form within 90 (ninety) days, this shall mean that the application is rejected Pre-approvals may be limited by SSM in the aspects of duration, value, company, country, product, etc The activities executed without receiving a written Pre-Approval from SSM will not be accepted and credited as IP/O despite being in accordance with the other principles stated in this Guideline and/or relevant IP/O Contract. 13. Crediting Principles The IP/O activities executed by receiving a Pre-Approval from SSM will be credited with the Contractor s written application in the context of the below principles: General Principles Crediting of accomplished IP/O activities will be granted in accordance with the frame of reference and conditions stated in the Pre-Approval 15

16 granted by SSM for the mentioned IP/O activities and by using the corresponding multipliers given in Appendix-A Table of IP/O Multipliers Within the framework of Table of IP/O Multipliers, the maximum multiplier that SSM can grant to an IP/O activity will be 8 (eight) Except the technoparks, the export and technological collaboration / investment activities conducted by the companies settled in Free Trade Areas will be credited with a lower multiplier up to -2 (minus two) than the ones given in Appendix-A Table of IP/O Multipliers The administrative expenses (travel, accomodation, consulting services, etc.) of Contractor when accomplishing the IP/O liabilities shall not be credited as IP/O activity Verification of DNAV amounts in accomplished IP/O activities will be done by SSM. For this purpose, all information, documents, etc. requested by SSM will be provided and/or opened for use by Contractor. SSM may request an investigation of the documents, which are provided by the Contractor and used in verification of DNAV, from an independent auditing firm at Contractor s expense Category-A Crediting Principles Category-A activities that are accomplished in the scope of IP/O liabilities are credited on DNAV basis The multiplier used in crediting of IP/O activities within the scope of Category-A shall be applied as; 2 (two) for the design and engineering works accomplished by SMEs, 1 (one) for all other works The crediting of Category-A IP/O activities will be granted by Contractor s submission of the relevant Crediting Report and approval of SSM at the end of each Program Period Category-B Crediting Principles Category-B activities accomplished within the scope of IP/O liabilities shall be credited on DNAV basis. 16

17 For all IP/O activities excluding the products / services mentioned in the Table of IP/O Multipliers, the multiplier will be determined by SSM The parts of an export product / service that are accomplished by SMEs will be credited by increasing the multiplier of the corresponding product / service in the Table of IP/O Multipliers by 1 (one) The crediting of Category-B IP/O activities will be granted by Contractor s submission of the relevant Crediting Report to SSM at the successful fulfillment of every IP/O activity and the approval of SSM In case of the export of the developed / manufactured Product in the context of the Procurement Contract by Domestic Contractor within the scope of Category-B IP/O liability, an additional time may be granted to relevant Domestic Contractor by SSM In case of provision of the products / services, which are developed within the Projects conducted by SSM or developed by the abilities acquired within the Projects, to civil public procurements and investments by Domestic Contractors, the provision in question may be counted, as import substitution, toward the Category-B IP/O liability of the relevant Contractor with a multiplier defined by and following the approval of SSM Category-C Crediting Principles Crediting of Category-C IP/O liability for Foreign Contractor will be granted in accordance with the following terms and principles: In the course of crediting the IP/O activities within Category-C context, the real market value and/or precedent value of the acquired technology or the investment will be taken as reference. This reference value will be determined by SSM and/or by enterprises approved as eligible by SSM. Only the parts of the mentioned activity that are fulfilled by Contractor will be credited By using technology and/or investments acquired by the relevant domestic company within Category-C context, Contractor shall accomplish product / service export with an amount not lower than parts of the mentioned technology and/or investments fulfilled by Contractor. Executed export will 17

18 be separately credited in accordance with the article of Category-B Crediting Principles For the IP/O activities within the context of Category-C, Temporary Crediting Principles defined in Article 15 will be applied None of the supportive items such as documents, technical drawing, training, etc. that are expected to be provided by Contractor for fulfillment of a product / service export within the context of Category-B will be credited as IP/O activity in Category-C context. For a technological collaboration to be considered as an IP/O activity within Category-C context, it is necessary that the relevant domestic company shall acquire ability from the Contractor such as this ability is not related with the product / service that is planned to be exported and can be used in execution of other products / services Export guarantee within the context of Article may not be required as long as a specified technological collaboration, investment and/or R&D support fulfillment, in line with the requirements and priorities specified by SSM, is required from the Contractor Technology acquisitions and investments achieved within Category-C context cannot be transferred to third-parties, cannot be withdrawn, cannot be made unavailable or the user rights of these items cannot be revoked. Otherwise, relevant Category-C credit will be aborted For crediting of investments within Category-C context as IP/O, after receiving Pre-Approval from SSM, Work Registration Form shall be filled at Trade Registration Office within Local Chamber of Commerce and a copy of this form shall be provided to SSM The crediting of Category-C IP/O activities will be granted by Contractor s submission of the relevant Crediting Report to SSM following the successful fulfillment of every IP/O activity and the approval of SSM For Domestic Contractor, crediting of Category-C IP/O liability will be granted by SSM in line with the terms and principles stated in IP/O Contract. 18

19 14. Transfers of Excess IP/O Credits Transfers within the Scope of Same IP/O Contract Excess IP/O credit accomplished by Contractor above the liability of an IP/O category may be transferred to unfulfilledunfulfilled liabilities of other categories within the same IP/O Contract, under the circumstances of Contractor s written request at the end of each Program Period, the approval of SSM and below conditions Excess IP/O credit accomplished within Category-A context, a) Can be transferred to unfulfilled liabilities within Category-B context with multiplying 0,5. b) Cannot be transferred to unfulfilled liabilities within Category-C context Excess IP/O credit accomplished within Category-B context, a) Cannot be transferred to unfulfilled liabilities within Category-A context. b) Cannot be transferred to unfulfilled liabilities within Category-C context Excess IP/O credit accomplished within Category-C context, a) Cannot be transferred to unfulfilled liabilities within Category-A context. b) Can be transferred to unfulfilled liabilities within Category-B context with multiplier 0,5, unless exceeding 20% (twenty percent) of the total liability within Category-B context Transfers of Same Contractor within the Scope of Other IP/O Contracts Excess IP/O credit accomplished by Contractor above the liability of an IP/O category may be transferred to unfulfilled liabilities of another IP/O Contract, for which the same Contractor is a cosignatory, under the circumstances of Contractor s written request at the end of each Program Term, approval of SSM and below conditions Excess IP/O credit accomplished within Category-A context, 19

20 a) Cannot be transferred to unfulfilled liabilities within Category-A context. b) Can be transferred to unfulfilled liabilities within Category-B context with multiplying 0,5, c) Cannot be transferred to unfulfilled liabilities within Category-C context Excess IP/O credit accomplished within Category-B context, a) Cannot be transferred to unfulfilled liabilities within Category-A context. b) Can be transferred to unfulfilled liabilities within Category-B context without any change. c) Cannot be transferred to unfulfilled liabilities within Category-C context Excess IP/O credit accomplished within Category-C context, a) Cannot be transferred to unfulfilled liabilities within Category-A context. b) Can be transferred to unfulfilled liabilities within Category-B context with multiplying 0,5, unless exceeding 20% (twenty percent) of the total liability within Category-B context. c) Can be transferred to unfulfilled liabilities within Category-C context directly without any change Transfers of Distinct Contractors within the Scope of IP/O Contracts Excess IP/O credit accomplished by Contractor (transmitting) above the liability of an IP/O category may be transferred to unfulfilled IP/O liabilities of another Contractor under the circumstances of Contractor s written request at the end of every Program Term, approval of SSM and below conditions Excess IP/O credit accomplished within Category-A context, a) Cannot be transferred to unfulfilled liabilities within Category-A context. b) Can be transferred to unfulfilled liabilities within Category-B context with multiplying 0,5, 20

21 c) Cannot be transferred to unfulfilled liabilities within Category-C context Excess IP/O credit accomplished within Category-B context, a) Cannot be transferred to unfulfilled liabilities within Category-A context. b) Can be transferred to unfulfilled liabilities within Category-B context with multiplying 0,5, unless exceeding 20% (twenty percent) of the total liability within Category-B context. c) Cannot be transferred to unfulfilled liabilities within Category-C context Excess IP/O credit accomplished within Category-C context, a) Cannot be transferred to unfulfilled liabilities within Category-A context. b) Can be transferred to unfulfilled liabilities within Category-B context with multiplying 0,5, unless exceeding 20% (twenty percent) of the total liability within Category-B context. c) Can be transferred to unfulfilled liabilities within Category-C context directly without any change During transfer procedure, the IP/O credit value calculated in accordance with the IP/O Contract, which the excess IP/O occurs within, will be taken as reference IP/O credit to be transferred cannot be used for the payment of the recipient Contractor s IP/O penalty that is accrued within 1 (one) year following the date of the application for transfer. 15. Temporary Crediting Principles Category-A Temporary Crediting will not be granted for the activities within Category-A context Category-B For the Contractor s success in execution of an IP/O activity within Category-B context which received a Pre-Approval from SSM, Temporary Crediting may be requested from SSM provided that, 21

22 a) The Contractor releases a purchase order to the domestic company and/or signs a written agreement and/or sub-contracting agreement that includes purchasing orders with the domestic company, which will be beneficiary from the IP/O activity, b) The Contractor makes an advance payment to the domestic company which will be beneficiary from the IP/O activity, c) Export permission is acquired from MoND given that the product / service which is to be exported is subject to export permission Mentioned requests will be interpreted by SSM with taking the features, schedule of the IP/O activity and Program Period stated in IP/O Contract into account and the Contractor will be notified from the result by a formal letter The liquidated damages for delay that may be accrued regarding of the part of the Contractor s IP/O liability in the mentioned category that corresponds to the Temporary Crediting amount will be suspended during the validity term of the Temporary Crediting Under the circumstance that the predicted IP/O activity has not been accomplished at all within the validity term determined by SSM, suspended liquidated damages for delay shall be charged to the Contractor Under the circumstance that the predicted IP/O activity has not been accomplished completely within the validity term determined by SSM, the part that corresponds to the unfulfilled segments of suspended liquidated damages for delay shall be charged to the Contractor Category-C Contractor may request Temporary Crediting from SSM after the accomplishment of an IP/O activity, within Category-C context that has received a Pre-Approval from SSM, in the following way: a) Submission of a copy of the relevant page of Turkish Trade Registry Gazette for Capital Investment, b) Submission of invoice for Investment and Customs Declaration Form in case of the arrival of machine, equipment from foreign countries, 22

23 c) Verification of first product for technological collaboration Mentioned requests will be interpreted by SSM with taking the features, schedule of the IP/O activity and Program Period stated in IP/O Contract into account and the result will be notified in a written form to the Contractor As the Contractor accomplishes the export liability within the context of Article , Temporary Crediting with the amount of accomplished export without any multiplier will be converted to permanent crediting with relevant multiplier The validity period of Temporary Crediting is determined by SSM with taking the attributes of IP/O activity and the period of the related IP/O Contract into account In case the committed export is not realized, Temporary Crediting granted for technological collaboration and/or investment within Category Ccontext is cancelled. In case the committed export has been realized partially then, Temporary Crediting that corresponds to the amount of the unfulfilled part of committed export is cancelled. In both cases, penalties that corresponds to the cancelled Temporary Crediting will be applied. 16. Pre-Crediting Principles For the IP/O activities which will be accomplished by acquiring a Pre-Approval within Category-B and Category-C context by a company that does not have an IP/O liability towards SSM already, Pre-Crediting, which is to be counted for possible IP/O liabilities of the mentioned company towards SSM in the future will be granted upon the mentioned company s written request For the excess IP/O activities within Category-B and/or Category-C context that have been accomplished by a Contractor, which has an IP/O liability towards SSM already, Pre-Crediting, which is to be counted for possible IP/O liabilities of the mentioned company towards SSM in the future, will be granted upon the mentioned company s written request If an IP/O Contract is signed by the mentioned company or a new IP/O Contract is signed by the mentioned contractor, under the condition of applying until the end of the first Program Term, mentioned Pre-Crediting will be converted to permanent crediting in line with the below conditions: 23

24 IP/O Credit within Category-B context; a) Cannot be counted instead of the liabilities within Category-A context. b) Can be counted instead of unfulfilled liabilities within Category-B context directly without any change. c) Cannot be counted instead of the liabilities within Category-C context IP/O Credit within Category-C context, a) Cannot be counted instead of the liabilities within Category-A context. b) Can be counted instead of unfulfilled liabilities within Category-B context with multiplying 0,5, unless exceeding 20% (twenty percent) of the total liability within Category-B context. c) Can be counted instead of unfulfilled liabilities within Category-C context directly without any change The Pre-Crediting related to an IP/O activity will be valid for 5 (five) years following the successful accomplishment of the mentioned IP/O activity. The Pre-Crediting that is not converted to permanent crediting within this period will be cancelled. APPENDICES APPENDIX-A: Table of IP/O Multipliers APPENDIX-B: Industrialization Plan APPENDIX-C: Pre-Approval Request Table APPENDIX-D: Category-B IP/O Crediting Report Format APPENDIX-E: Category-C IP/O Crediting Report Format 24

25 APPENDIX-A TABLE OF IP/O MULTIPLIERS CATEGORY-A TABLE A: INDUSTRIAL PARTICIPATION ITEM The design and engineering activities executed by SMEs MULTIPLIER 2 All other Category-A IP/O Activities 1 CATEGORY-B TABLE B1: PLATFORM EXPORT PLATFORM MULTIPLIER Land Platforms 4 Naval Platforms 4 Air Platforms 5 Rockets / Missiles 5 Satellite Systems 5 Other The SME work share within the exported product/service or export from SME Export to the Prior Market TBD by SSM Will be added + 1 to the above multiplier Will be added + 1 to the above multiplier 25

26 TABLE B2: SYSTEM EXPORT / EXPORT OF SERVICE FOR SYSTEM SYSTEM / SUBSYSTEM / COMPONENT MULTIPLIER Structural Components 2 Mechanical / Hydraulic / Pneumatic Systems 3 Electrical/Electronic Systems 3 Software 3 Weapon and Ammunition 3 Power/Impulse/Motor/Transmission Systems 3 Command Control/Information Systems 3 Electronic Warfare Systems 3 Simulators 3 Other The SME work share within the exported product/service or export from SME Export to the Prior Market TBD by SSM Will be added + 1 to the above multiplier Will be added + 1 to the above multiplier CATEGORY-C TABLE C1: TECHNOLOGICAL COLLABORATION MULTIPLIER Within the fields of defence, homeland security and aerospace industries, enabling technology/ability related with the following topics: Network Based Warfare Command Control/Information Management Systems Software Electronic Warfare Missile Guidance and Control

27 Sensor Systems System Integration Satellite and Space Technologies Within the fields of defence, homeland security and aerospace industries, enabling technology/ability related other than the topics listed in the first item Enabling technology/ability that is requested particularly by SSM TABLE C2: INVESTMENT Direct foreign investments within the scope of establishing brand new companies in the fields of defence, homeland security and aerospace industries The equipment, hardware and software provided to the universities, training and research institutions in Turkey in the fields of defence, homeland security and aerospace industries MULTIPLIER 4 3 TABLE C3: R&D SUPPORT The equipment, hardware, software, service or financial support provided to the training and R&D studies conducted by industrial enterprises, training and research institutions in Turkey in the fields of defence, homeland security and aerospace industries MULTIPLIER 5 27

28 APPENDIX-B INDUSTRIALIZATION PLAN 1. SCOPE 2. APPLICABLE DOCUMENTS 3. PROJECT MODEL The detailed explanation and schematics of Project Model within the frame defined in RFP 4. INDUSTRIALIZATION POLICY Predicted Supplier Company / SME selection and usage policies of the company within the scope of the Project 5. TABLE OF WORK SHARE Work breakdown structure and the list of foreign and domestic companies who will accomplish every work packages presented in WBS by also including the framework defined in RFP 6. LOCAL INDUSTRY PARTICIPATION Each work package listed in Table of Work Share will be defined in detail in line with the below areas: 6.1. DESIGN AND DEVELOPMENT TASKS The definition of hardware / software configuration items, sub-systems, systems, etc. that will be designed and developed by local industry and the development costs of each item (as a percentage of proposal amount) 6.2. OTHER ENGINEERING TASKS The definition of other engineering tasks and the development costs of these items (as a percentage of proposal amount) 6.3. MANUFACTURING TASKS The definition of hardware / software configuration items, sub-systems, systems, etc. that will be manufactured / coded by local industry and the costs of these items (as a percentage of proposal amount) 6.4. QUALIFICATION, CERTIFICATION, TEST AND VERIFICATION TASKS Qualification, certification, test and verification tasks accomplished by local industry abilities and the costs of each item (as a percentage of proposal amount) 6.5. LOGISTIC SUPPORT TASKS 28

29 Logistic support activities that will be accomplished or participated by local industry within the scope of Procurement Contract and the costs of each item (as a percentage of proposal amount) 6.6. PROJECT MANAGEMENT AND SYSTEM ENGINEERING Number of staff that will work within the scope of administrative tasks such as project management, system engineering, etc. accomplished by local industry within the scope of the Project, man-hour calculations, costs (as a percentage of proposal amount) 6.7. QUALITY MANAGEMENT Number of staff that will work within the scope of quality management within the scope of the Project, man-hour calculations, costs (as a percentage of proposal amount) 6.8. OTHER Tasks other than the ones listed above accomplished by local industry and costs of each item (as a percentage of proposal amount) 7. SUPPLIER COMPANY / SME WORK SHARE PLANNING 7.1. SUPPLIER COMPANY WORK SHARE The information given for Article will be given in detail for the supplier companies which are not SMEs SME WORK SHARE The information given for Article will be given in detail for SMEs. 8. R&D ACTIVITIES (If applicable) Suggested R&D projects and the universities, research institutes and industrial organizations expected to be participated the projects 9. TECHNOLOGY AND ABILITY ACQUISITION 9.1. EXISTING TECHNOLOGY, ABILITY AND INFRASTRUCTURE WILL BE USED IN PROJECT Existing technology, ability and infrastructure that will be used by local industry within the scope of the Project 9.2. NEW ABILITY AND TECHNOLOGY ACQUISITION WITHIN THE SCOPE OF THE PROJECT New abilities and technologies that will be acquired by local industry within the scope of the Project, the methods of acquisition and costs (real monetary values) - Technical Data Package 29

30 - Production Data Package - Training - Technical Support - License Transfer - Others 9.3. ADDITIONAL INVESTMENTS WITHIN THE SCOPE OF THE PROJECT New investments made by local industry within the scope of the Project, devices, toolkits, workbenches, etc. and the costs of these items (real monetary values) 10. ADDITIONAL SALES AND EXPORT OPPORTUNITIES Additional sales and export opportunities that may arise owing to the tasks accomplished by local industry within the scope of the Project and estimated costs 11. OTHER SUBJECTS SUGGESTED BY CONTRACTOR ANNEX-A: Category-A IP/O Work Share Table ANNEX-B: Category-B and Category-C IP/O Activities 30

31 APPENDIX-B INDUSTRIALIZATION PLAN ANNEX-A CATEGORY-A IP/O WORK SHARE TABLE NO WORK PACKAGE QUALIFICATION OF WORK (Items Under Article 6 of Industrialization Plan) COMPANY TO ACHIEVE TASK RATIO OF COST OF TASK OVER PROPOSAL AMOUNT DNAV AMOUNT NOTES CONTRACTOR 1 CONTRACTOR 2 CONTRACTOR 3 CONTRACTOR DOMESTIC SUB-CONTRACTORS (NOT SME) 1 2 DOMESTIC SUB-CONTRACTORS (SME) 1 2 DOMESTIC RESEARCH INSTITUTES / UNIVERSITIES 1 2 FOREIGN SUB-CONTRACTORS 1 2 ANNEX-B POTENTIAL CATEGORY-B AND CATEGORY-C IP/O ACTIVITIES DEFINITION OF WORK CATEGORY BENEFICIARY COMPANY ESTIMATED DURATION ESTIMATED COST TOTAL 31

32 APPENDIX-C PRE-APPROVAL REQUEST TABLE PRE-APPROVAL APPLICATION FORM Related IP/O Contract, Signature and Effectivity Date IP/O Contractor Company / Institution / Enterprise That Will Achieve IP/O Activity Scope and Attributes of IP/O Activity (Summary) Category of IP/O Activity Local Company / Institution / Enterprise That Will Benefit IP/O Activity and Contact Info Estimated Cost of IP/O Activity Estimated DNAV Ratio Requested Multiplier Reasoning for Multiplier Estimated Requested IP/O Crediting Amount Estimated Duration for IP/O Activity to Be Accomplished Pre-Approval Validity Period Other Information (If Available) ANNEX-A: Detailed Information Related With the Planned IP/O Activity ANNEX-B: Other Supporting Documents 32

33 APPENDIX-D CATEGORY-B IP/O CREDITING REPORT FORMAT PRE-APPROVAL APPLICATION FORM Related IP/O Contract, Signature and Effectivity Date IP/O Contractor SSM Pre-Approval Document Date and Number (If Available) Eligible Party Performing the IP/O Activity Scope and Attributes of IP/O Activity (Summary) IP/O Liability Ratios and Amounts (Category-A,B,C) Supplier Company / SME Work Share Liability Ratios and Amounts Local Company / Institution / Enterprise That Will Benefit IP/O Activity and Contact Info Cost of IP/O Activity DNAV Ratio Multiplier Requested IP/O Crediting Amount Duration for IP/O Activity to Be Accomplished Other Information (If Available) ANNEX-A: Category-B IP/O DNAV Table ANNEX-B: Copies of Invoices ANNEX-C: Customs Declaration Form ANNEX-D: Bank Receipt for Payments ANNEX-E: Other Supporting Documents 33

34 APPENDIX-D CATEGORY-B IP/O CREDITING REPORT FORMAT ANNEX-A CATEGORY-B IP/O DNAV TABLE TABLE-1 NO INVOICE NUMBER PRODUCT NAME EXPORTING COMPANY EXPORTED COUNTRY / COMPANY INVOICE DATE INVOICE AMOUNT INVOICE DNAV RATIO (%) DNAV AMOUNT TABLE-2 TABLE 1 NUMBER PRODUCT CODE PRODUCT DEFINITION PRODUCT BREAKDOWN Labor Hour Labor Prices WITHIN COMPANY Labor Cost Material Other OUTSIDE COMPANY, DOMESTIC Labor Cost Material Other Labor Cost IMPORT Material Other TOTAL GRAND TOTAL 34

35 APPENDIX-E CATEGORY-C IP/O CREDITING REPORT FORMAT PRE-APPROVAL APPLICATION FORM Related IP/O Contract, Signature and Effectivity Date IP/O Contractor SSM Pre-Approval Document Date and Number (If Available) Eligible Party Performing the IP/O Activity Scope and Attributes of IP/O Activity (Summary) IP/O Liability Ratios and Amounts (Category-A,B,C) Supplier Company / SME Work Share Liability Ratios and Amounts Local Company / Institution / Enterprise That Will Benefit IP/O Activity and Contact Info Cost of IP/O Activity Multiplier Requested IP/O Crediting Amount Duration for IP/O Activity to Be Accomplished Other Information (If Available) ANNEX-A: Detailed Information Related With the Category-C IP/O Activity ANNEX-B: Other Supporting Documents 35

Industrial Co-operation Contract [FRAMEWORK]

Industrial Co-operation Contract [FRAMEWORK] Case DRAFT Industrial Cooperation Contract [FRAMEWORK] Article 1: Parties to the contract 1.1. The Danish Business Authority (DBA), Company Registration no.: 10150817 Dahlerups Pakhus Langelinie Allé 17

More information

REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER

REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER RFP #2016-02 REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES FOR SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER RELEASE DATE: January 29, 2016 DUE DATE: February

More information

Invitation to Bid and Instructions to Bidders (This is Phase I of the project please note on any Bid that it Applies to Phase I only) May 1, 2015

Invitation to Bid and Instructions to Bidders (This is Phase I of the project please note on any Bid that it Applies to Phase I only) May 1, 2015 Invitation to Bid and Instructions to Bidders (This is Phase I of the project please note on any Bid that it Applies to Phase I only) May 1, 2015 For PROJECT : Renovation and Repair of Atlanta Jewish Academy

More information

Industrial Co-operation Contract [ACQUISITION]

Industrial Co-operation Contract [ACQUISITION] Case DRAFT Industrial Co-operation Contract [ACQUISITION] Article 1: Parties to the contract 1.1. The Danish Business Authority (DBA) Dahlerups Pakhus Langelinie Allé 17 DK 2100 Copenhagen Denmark And

More information

Project Management Procedures

Project Management Procedures 1201 Main Street, Suite 1600 Columbia, South Carolina 29201 Project Management Procedures Start Up The grant becomes effective upon return of one copy of the grant award executed by the Chief Executive

More information

STANDARD PROCUREMENT PREQUALIFICATION DOCUMENT. (Works, Heavy Equipment, Supply and Installation Contracts)

STANDARD PROCUREMENT PREQUALIFICATION DOCUMENT. (Works, Heavy Equipment, Supply and Installation Contracts) STANDARD PROCUREMENT PREQUALIFICATION DOCUMENT (Works, Heavy Equipment, Supply and Installation Contracts) Table of Contents Page INTRODUCTION 3 SECTION I - Invitation for prequalification... 4 SECTION

More information

FRAME CONTRACT REGARDING THE PAYMENT SERVICES (RETAIL CUSTOMERS)

FRAME CONTRACT REGARDING THE PAYMENT SERVICES (RETAIL CUSTOMERS) FRAME CONTRACT REGARDING THE PAYMENT SERVICES (RETAIL CUSTOMERS) to be provided by Our Bank within the frame of provisions of the Law No. 6493 on Payment and Security Settlement Systems and E-Money Insutitions

More information

a. Proposals shall be submitted in a sealed envelope and addressed as follows:

a. Proposals shall be submitted in a sealed envelope and addressed as follows: 1 CITY OF ATCHISON REQUEST FOR QUALIFICATIONS & PROPOSAL HVAC SERVICES JANUARY 1, 2014 THROUGH DECEMBER 31, 2014 DUE: DECEMBER 10, 2013 10:00 A.M. The City of Atchison (City) invites interested and qualified

More information

CHAPTER I I. Formation of a limited liability company CHAPTER I. GENERAL PROVISIONS

CHAPTER I I. Formation of a limited liability company CHAPTER I. GENERAL PROVISIONS Law of the Republic of Kazakhstan dated April 22, 1998 220-I On limited liability companies and additional liability companies (with alterations and amendments as of 29.12.2014) CHAPTER I. General provisions

More information

LAW NO: 5549 ON PREVENTION OF LAUNDERING PROCEEDS OF CRIME

LAW NO: 5549 ON PREVENTION OF LAUNDERING PROCEEDS OF CRIME LAW NO: 5549 ON PREVENTION OF LAUNDERING PROCEEDS OF CRIME (Adopted on 11/10/2006 and published in the Official Gazette dated 18/10/2006 with the number 26323) CHAPTER ONE Purpose and Definitions Objective

More information

TERMS AND CONDITIONS OF CASH TRANSACTIONS IN DOMESTIC TRANSACTIONS AT PKO BP SA BANK

TERMS AND CONDITIONS OF CASH TRANSACTIONS IN DOMESTIC TRANSACTIONS AT PKO BP SA BANK TERMS AND CONDITIONS OF CASH TRANSACTIONS IN DOMESTIC TRANSACTIONS AT PKO BP SA BANK TABLE OF CONTENTS Section 1... 1 GENERAL PROVISIONS... 1 I. Acceptance and execution of the payment order by the Bank...

More information

Law on the Takeover of Joint Stock Companies

Law on the Takeover of Joint Stock Companies Law on the Takeover of Joint Stock Companies CONSOLIDATED TEXT Law on the Takeover of Joint Stock Companies ("Official Gazette of the Republic of Macedonia" no.4/2002, 37/2002 and 36/2007) I. GENERAL PROVISIONS

More information

Sealed bids will be received by the City of Dearborn, at the Office of the Purchasing

Sealed bids will be received by the City of Dearborn, at the Office of the Purchasing CITY OF DEARBORN ADVERTISEMENT FOR NATURAL GAS PROVIDER TO THE CITY OF DEARBORN, MICHIGAN Sealed bids will be received by the City of Dearborn, at the Office of the Purchasing Agent, 2951 Greenfield, Dearborn,

More information

SECTION ONE. Purpose and Scope, Basis and Definitions

SECTION ONE. Purpose and Scope, Basis and Definitions From the Banking Regulation and Supervision Agency: REGULATION ON THE ESTABLISHMENT AND OPERATING PRINCIPLES OF ASSET MANAGEMENT COMPANIES (Published in the Official Gazette Number 26333 dated November

More information

GALVESTON COUNTY HEALTH DISTRICT. Request For Proposal Health Insurance Broker Services RFP 15-011

GALVESTON COUNTY HEALTH DISTRICT. Request For Proposal Health Insurance Broker Services RFP 15-011 GALVESTON COUNTY HEALTH DISTRICT Request For Proposal Health Insurance Broker Services RFP 15-011 INTRODUCTION The Galveston County Health District (GCHD) is requesting Proposals for health insurance broker

More information

CITY OF COMMERCE CITY BID BOND

CITY OF COMMERCE CITY BID BOND BID BOND Know all men by these presents, that as principal, and, as Surety, are held and firmly bound unto the City of Commerce City, Colorado (hereinafter called City ), in the penal sum of dollars ($

More information

STRATFORD BOARD OF EDUCATION 111 WARWICK ROAD STRATFORD, NEW JERSEY 08084. INSURANCE BROKER of RECORD EMPLOYEE HEALTH BENEFITS

STRATFORD BOARD OF EDUCATION 111 WARWICK ROAD STRATFORD, NEW JERSEY 08084. INSURANCE BROKER of RECORD EMPLOYEE HEALTH BENEFITS STRATFORD BOARD OF EDUCATION 111 WARWICK ROAD STRATFORD, NEW JERSEY 08084 INSURANCE BROKER of RECORD EMPLOYEE HEALTH BENEFITS A. PURPOSE: The Stratford Board of Education is seeking proposals through the

More information

Handling Procedures of Japanese Government Bond Over-the-Counter Transaction Clearing Business Rules

Handling Procedures of Japanese Government Bond Over-the-Counter Transaction Clearing Business Rules Over-the-Counter Transaction Clearing Business Rules (Article 1 Purpose) These Rules set forth the matters which are to be prescribed by JSCC pursuant to the Japanese Government Bond (hereinafter referred

More information

a. Proposals shall be submitted in a sealed envelope and addressed as follows:

a. Proposals shall be submitted in a sealed envelope and addressed as follows: 1 CITY OF ATCHISON REQUEST FOR QUALIFICATIONS & PROPOSAL PLUMBING SERVICES JANUARY 1, 2014 THROUGH DECEMBER 31, 2014 DUE: DECEMBER 10, 2013 10:00 A.M. The City of Atchison (City) invites interested and

More information

THE WORLD BANK. Disbursement Guidelines For Projects

THE WORLD BANK. Disbursement Guidelines For Projects THE WORLD BANK Disbursement Guidelines For Projects MAY 2006 WORLD BANK DISBURSEMENT GUIDELINES FOR PROJECTS LOAN DEPARTMENT May 1, 2006 Copyright 2006 The International Bank for Reconstruction and Development/

More information

REQUEST FOR QUOTATIONS

REQUEST FOR QUOTATIONS ROMANIA NATIONAL AGENCY FOR FISCAL ADMINISTRATION REVENUE ADMINISTRATION MODERNIZATION PROJECT REQUEST FOR QUOTATIONS FOR PROJECT MANAGEMENT SOFTWARE RAMP/9 Country: ROMANIA Name of the Project: Revenue

More information

City of Dallas Specifications for Sewer Camera Maintenance & Repair Services with Parts BM1308

City of Dallas Specifications for Sewer Camera Maintenance & Repair Services with Parts BM1308 City of Dallas Specifications for Sewer Camera Maintenance & Repair Services with Parts BM1308 PURPOSE: The purpose for this specification is to establish a 36 month service contract for maintenance and

More information

REGULATION ON ESTABLISHMENT AND WORKING PRINCIPLES OF INSURANCE COMPANIES AND REINSURANCE COMPANIES

REGULATION ON ESTABLISHMENT AND WORKING PRINCIPLES OF INSURANCE COMPANIES AND REINSURANCE COMPANIES REGULATION ON ESTABLISHMENT AND WORKING PRINCIPLES OF INSURANCE COMPANIES AND REINSURANCE COMPANIES Official Gazette of Publication:.08.007 66 Issued By: Prime Ministry (Undersecretariat of Treasury) PART

More information

Attachment A Terms and Conditions RFX No. 3000005987 TITLE: Quality Control Standards DHH Office of Public Health

Attachment A Terms and Conditions RFX No. 3000005987 TITLE: Quality Control Standards DHH Office of Public Health Bidder: Bid delivery instructions for State Procurement: Bidders are hereby advised that the U.S. Postal Service does not make deliveries to our physical location: Bids may be mailed through the U.S. Postal

More information

North American Development Bank. Model Prequalification Document: Prequalification of Contractors

North American Development Bank. Model Prequalification Document: Prequalification of Contractors North American Development Bank Model Prequalification Document: Prequalification of Contractors 2 Preface Procurement under projects financed by the North American Development Bank (the Bank), is carried

More information

OBJECTIVE To establish procedures for administration of construction manager agreements, including negotiation, contracting and payments.

OBJECTIVE To establish procedures for administration of construction manager agreements, including negotiation, contracting and payments. OP-B-11-D2 ADMINISTRATION OF CONSTRUCTION MANAGER AGREEMENTS SPECIFIC AUTHORITY Sections 240.209(3)(p), 1001.74, 1013.46, F. S. OBJECTIVE To establish procedures for administration of construction manager

More information

Rules for fixing WIBOR and WIBID reference rates

Rules for fixing WIBOR and WIBID reference rates Rules for fixing WIBOR and WIBID reference rates 1. Definitions and interpretation 1.1 Definitions Unless the content or context implies otherwise, the terms and expressions used in these Rules have the

More information

CHAPTER 7 PUBLIC PURCHASES, PURCHASE OF LAND OR STRUCTURES AND INVENTORY OF FIXED ASSETS

CHAPTER 7 PUBLIC PURCHASES, PURCHASE OF LAND OR STRUCTURES AND INVENTORY OF FIXED ASSETS 7-1 CHAPTER 7 PUBLIC PURCHASES, PURCHASE OF LAND OR STRUCTURES AND INVENTORY OF FIXED ASSETS The "Public Purchasing Law" applies to every expenditure of public funds by a governmental body, unless specifically

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS PLYMOUTH-CANTON COMMUNITY SCHOOLS REQUEST FOR PROPOSALS Assignment of Rights to Wireless Telecommunication Lease, Tower and/or Tower Management Agreement Plymouth-Canton Community Schools E.J. McClendon

More information

SAMPLE REQUEST FOR PROPOSALS TEMPLATE

SAMPLE REQUEST FOR PROPOSALS TEMPLATE SAMPLE REQUEST FOR PROPOSALS TEMPLATE Request for Proposals (RFP) For: [Title of RFP Project] Note: This sample is for a fabrication type of RFP. [RFP ID #] Issued: [Date] Submission deadline: [Time/Date]

More information

STATUTORY INSTRUMENTS 2012 No. _

STATUTORY INSTRUMENTS 2012 No. _ STATUTORY INSTRUMENTS 2012 No. _ THE ELECTRONIC SIGNATURES REGULATIONS 2012 ARRANGEMENT OF REGULATIONS Regulation PART I-PRELIMINARY 1. Title. 2. Interpretation PART II - LICENSING AND RECOGNITION OF CERTIFICATION

More information

PIERCE COUNTY LIBRARY SYSTEM. REQUEST FOR PROPOSAL (RFP) for. Telephone Service (Analog Phone Service)

PIERCE COUNTY LIBRARY SYSTEM. REQUEST FOR PROPOSAL (RFP) for. Telephone Service (Analog Phone Service) PIERCE COUNTY LIBRARY SYSTEM REQUEST FOR PROPOSAL (RFP) for Telephone Service (Analog Phone Service) TABLE OF CONTENTS Part 1: Introduction & RFP Timeline... 1 Part 2: General Instructions and Conditions;

More information

CONTRACTOR PREQUALIFICATION REQUIREMENTS GENERAL CONTRACTORS, MECHANICAL/PLUMBING SUBCONTRACTORS & ELECTRICAL SUBCONTRACTORS FOR THE

CONTRACTOR PREQUALIFICATION REQUIREMENTS GENERAL CONTRACTORS, MECHANICAL/PLUMBING SUBCONTRACTORS & ELECTRICAL SUBCONTRACTORS FOR THE CONTRACTOR PREQUALIFICATION REQUIREMENTS GENERAL CONTRACTORS, MECHANICAL/PLUMBING SUBCONTRACTORS & ELECTRICAL SUBCONTRACTORS FOR THE SANTEE SCHOOL DISTRICT 1 .......... 2 1. Effective January 1 st, 2014,

More information

Requirements for Local Procurement in Borrowing Countries. 1

Requirements for Local Procurement in Borrowing Countries. 1 Requirements for Local Procurement in Borrowing Countries. 1 General Aspects 1. Scope of the regulatory framework The procurement regulatory framework should preferably address all government contracts

More information

TERMS & CONDITIONS FOR THE REPAIR AND MAINTENANCE CONTRACT

TERMS & CONDITIONS FOR THE REPAIR AND MAINTENANCE CONTRACT 1. Tenders are invited from the firm, duly registered with the Income Tax & Sales Tax Departments. Tender will be made according to PPRA Rules 2014. 2. Firm will submit profile of infrastructure, workshop

More information

MINISTER OF FINANCE OF THE REPUBLIC OF INDONESIA COPY REGULATION OF THE MINISTER OF FINANCE OF THE REPUBLIC OF INDONESIA NUMBER 159/PMK.

MINISTER OF FINANCE OF THE REPUBLIC OF INDONESIA COPY REGULATION OF THE MINISTER OF FINANCE OF THE REPUBLIC OF INDONESIA NUMBER 159/PMK. COPY REGULATION OF THE MINISTER OF FINANCE NUMBER 159/PMK.010/2015 REGARDING GRANTING OF CORPORATE INCOME TAX REDUCTION FACILITY BY THE GRACE OF GOD ALMIGHTY THE MINISTER OF FINANCE, Considering : a. whereas

More information

CDO WORKFORCE INVESTMENT BOARD. REPLACES CDO Workforce Investment Board Procurement Policy, dated 9/30/05

CDO WORKFORCE INVESTMENT BOARD. REPLACES CDO Workforce Investment Board Procurement Policy, dated 9/30/05 CDO WORKFORCE INVESTMENT BOARD POLICY #07-03: Local Procurement of Goods and Services DATE: November 14, 2007 APPLIES TO: Use of WIA Title I-B funds REPLACES CDO Workforce Investment Board Procurement

More information

SUPPLIER PREQUALIFICATION QUESTIONNAIRE FORM

SUPPLIER PREQUALIFICATION QUESTIONNAIRE FORM SUPPLIER PREQUALIFICATION QUESTIONNAIRE FORM BRIEF This Supplier Pre Qualification Questionnaire is provided for the following project types of ALARGAN PROJECTS: 1) Supply of Construction Materials 2)

More information

REQUEST FOR PROPOSALS FOR LANDSCAPE ARCHITECTURAL SERVICES TOWN OF AVON, CONNECTICUT

REQUEST FOR PROPOSALS FOR LANDSCAPE ARCHITECTURAL SERVICES TOWN OF AVON, CONNECTICUT REQUEST FOR PROPOSALS FOR LANDSCAPE ARCHITECTURAL SERVICES TOWN OF AVON, CONNECTICUT The Town of Avon is seeking written responses to a Request for Proposal (RFP) for services of a landscape architect

More information

From the Official Gazette, no. 85, of 13-4-2010 MINISTRY FOR CULTURAL ASSETS AND ACTIVITIES

From the Official Gazette, no. 85, of 13-4-2010 MINISTRY FOR CULTURAL ASSETS AND ACTIVITIES From the Official Gazette, no. 85, of 13-4-2010 MINISTRY FOR CULTURAL ASSETS AND ACTIVITIES DECREE, 21 January 2010 Provisions for application of tax credits conceded to companies not belonging to the

More information

GENERAL TERMS & CONDITIONS

GENERAL TERMS & CONDITIONS GENERAL COMMERCIAL TERMS & CONDITIONS in case of deliveries in the non-eu 1 GENERAL TERMS & CONDITIONS The Order Confirmation and the General Terms & Conditions (GCT&C) regulate the relationship of the

More information

LAW OF MONGOLIA ON ELECTRONIC SIGNATURE

LAW OF MONGOLIA ON ELECTRONIC SIGNATURE LAW OF MONGOLIA ON ELECTRONIC SIGNATURE December 15, 2011 Ulaanbaatar CHAPTER ONE GENERAL PROVISIONS Article 1. Purpose of the law 1.1 The purpose of this Law is to determine the legal base of using electronic

More information

RULES ON CREDIT RESOURCES CLEARING AND SETTLEMENT

RULES ON CREDIT RESOURCES CLEARING AND SETTLEMENT Registered With the Central Bank of Armenia Arthur Javadyan, Chairman, 2012 NASDAQ OMX ARMENIA OPEN JOINT STOCK COMPANY RULES ON CREDIT RESOURCES CLEARING AND SETTLEMENT Article 1. Definitions 1) Whenever

More information

REQUEST FOR PROPOSALS FOR PINE GROVE ELEMENTARY SCHOOL PLAYGROUND REPLACEMENT PROJECT TOWN OF AVON, CONNECTICUT

REQUEST FOR PROPOSALS FOR PINE GROVE ELEMENTARY SCHOOL PLAYGROUND REPLACEMENT PROJECT TOWN OF AVON, CONNECTICUT REQUEST FOR PROPOSALS FOR PINE GROVE ELEMENTARY SCHOOL PLAYGROUND REPLACEMENT PROJECT TOWN OF AVON, CONNECTICUT The Town of Avon and Avon Board of Education are seeking written responses to a Request for

More information

HADDON TOWNSHIP BOARD OF EDUCATION 500 RHOADS AVENUE WESTMONT, NJ 08108 REQUEST FOR PROPOSAL

HADDON TOWNSHIP BOARD OF EDUCATION 500 RHOADS AVENUE WESTMONT, NJ 08108 REQUEST FOR PROPOSAL HADDON TOWNSHIP BOARD OF EDUCATION 500 RHOADS AVENUE WESTMONT, NJ 08108 REQUEST FOR PROPOSAL A. PURPOSE: The Haddon Township Board of Education is seeking proposals from qualified respondents as follows:

More information

Page 1 of 12 Document Effective Date Solicitation Terms & Conditions 08/08/2008 Purchase Order Terms and Conditions 01/01/2009 Special Provisions 01/01/2009 STATE OF COLORADO SOLICITATION INSTRUCTIONS/

More information

City of Plano Municipal Center 1520 Avenue K # 370 Plano, TX 75074

City of Plano Municipal Center 1520 Avenue K # 370 Plano, TX 75074 Suppliers Guide This guide is intended to give a brief insight into the City procurement process. The City's basic procurement philosophy is that competitive participation of the business community is

More information

NEW JERSEY ELECTRICITY SUPPLIER LICENSE NUMBER PSEL 0016

NEW JERSEY ELECTRICITY SUPPLIER LICENSE NUMBER PSEL 0016 TERMS & CONDITIONS NEW JERSEY ELECTRICITY SUPPLIER LICENSE NUMBER PSEL 0016 Purchase of Electric Generation Service Constellation NewEnergy, Inc. ("Constellation") agrees to sell, and you agree to buy,

More information

BANKA SOCIETE GENERALE ALBANIA

BANKA SOCIETE GENERALE ALBANIA BANKA SOCIETE GENERALE ALBANIA Request for Proposals (RFP) for: Maintenance works for Bank's premises Issued on December 29 th, 2015 Deadline for Response: January 14 th, 2016 12:00 CET 1 Objective of

More information

LAW ON ELECTRONIC TRANSACTIONS

LAW ON ELECTRONIC TRANSACTIONS Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity National Assembly No 20/NA Vientiane Capital, Date: 7 December 2012 (Unofficial Translation) LAW ON ELECTRONIC TRANSACTIONS

More information

ELECTRONIC SIGNATURE LAW INTERNAL ORDER. PART ONE General Provisions

ELECTRONIC SIGNATURE LAW INTERNAL ORDER. PART ONE General Provisions ELECTRONIC SIGNATURE LAW INTERNAL ORDER Article 1. Short Name PART ONE General Provisions Article 2. Article 3. Article 4. Definitions Purpose Scope PART TWO Secure Electronic Signature, Tools for Creating

More information

Civil Servant and Teacher Insurance Act

Civil Servant and Teacher Insurance Act Civil Servant and Teacher Insurance Act Article 1 This Act is enacted in order to provide security of the lives of civil servants and teachers, and to process the insurance of civil servants and teachers

More information

NEGAUNEE PUBLIC SCHOOLS. REQUEST for PROPOSALS ENERGY SAVING CAPITAL IMPROVEMENT PROJECTS. On a PERFORMANCE CONTRACTING BASIS

NEGAUNEE PUBLIC SCHOOLS. REQUEST for PROPOSALS ENERGY SAVING CAPITAL IMPROVEMENT PROJECTS. On a PERFORMANCE CONTRACTING BASIS NEGAUNEE PUBLIC SCHOOLS REQUEST for PROPOSALS ENERGY SAVING CAPITAL IMPROVEMENT PROJECTS On a PERFORMANCE CONTRACTING BASIS July 26, 2010 NOTICE IS HEREBY GIVEN THAT THE BOARD OF EDUCATION OF NEGAUNEE

More information

[This translation is provided for guidance. The governing text is the Arabic text.] Form of Consultancy Engineering Services Contract (Design)

[This translation is provided for guidance. The governing text is the Arabic text.] Form of Consultancy Engineering Services Contract (Design) [This translation is provided for guidance. The governing text is the Arabic text.] Form of Consultancy Engineering Services Contract (Design) Section One Contract - Basic Document It has been agreed in

More information

Supplement No. 5 published with Gazette No. 15 of 20th July, 2009. MUTUAL FUNDS LAW. (2009 Revision)

Supplement No. 5 published with Gazette No. 15 of 20th July, 2009. MUTUAL FUNDS LAW. (2009 Revision) Supplement No. 5 published with Gazette No. 15 of 20th July, 2009. Mutual Funds Law (2009 Revision) MUTUAL FUNDS LAW (2009 Revision) Law 13 of 1993 consolidated with Laws 18 of 1993, 16 of 1996 (part),

More information

Attachment A Terms and Conditions

Attachment A Terms and Conditions Bidder: BID DELIVERY INSTRUCTIONS FOR STATE PROCUREMENT: BIDDERS ARE HEREBY ADVISED THAT THE U.S. POSTAL SERVICE DOES NOT MAKE DELIVERIES TO OUR PHYSICAL LOCATION: BIDS MAY BE MAILED THROUGH THE U.S. POSTAL

More information

STATE OF MAINE DEPARTMENT OF EDUCATION RFP # 201205322 PAYROLL SERVICES FOR TEMPORARY RESOURCES

STATE OF MAINE DEPARTMENT OF EDUCATION RFP # 201205322 PAYROLL SERVICES FOR TEMPORARY RESOURCES STATE OF MAINE DEPARTMENT OF EDUCATION RFP # 201205322 PAYROLL SERVICES FOR TEMPORARY RESOURCES RFP Coordinator: Jeff Mao, Learning Technology Policy Director Department of Education 23 State House Station

More information

General Terms and Conditions Standard Chartered Credit Card

General Terms and Conditions Standard Chartered Credit Card General Terms and Conditions Standard Chartered Credit Card ARTICLE 1: DEFINITION 1.1 Standard Chartered Bank: is a banking institution incorporated under the laws of England, in this case acting through

More information

Attachment A Master Terms and Conditions Page 1 of 5 RFX No. 3000005998 TITLE: 3M Petrifilm Products DHH-Office of Public Health

Attachment A Master Terms and Conditions Page 1 of 5 RFX No. 3000005998 TITLE: 3M Petrifilm Products DHH-Office of Public Health Attachment A Master Terms and Conditions Page 1 of 5 Bidder: BID DELIVERY INSTRUCTIONS FOR STATE PROCUREMENT: Fax quotations may be submitted either: Via Fax to: (225) 342-9756 or Delivered by hand or

More information

Performance Bond. Business):

Performance Bond. Business): Performance Bond CONTRACTOR (Name and Address): (Name and Address of Principal Place of Business): OWNER (Name and Address): City of Cedar Rapids City Clerk, 101 First Street SE Cedar Rapids, IA 52401

More information

REPUBLIC OF BULGARIA NATIONAL ASSEMBLY TAX PROCEDURE ACT. Promulgated State Gazette No. 61/16.07.1993. Amended SG No. 20/1996.

REPUBLIC OF BULGARIA NATIONAL ASSEMBLY TAX PROCEDURE ACT. Promulgated State Gazette No. 61/16.07.1993. Amended SG No. 20/1996. REPUBLIC OF BULGARIA NATIONAL ASSEMBLY TAX PROCEDURE ACT Promulgated State Gazette No. 61/16.07.1993 Amended SG No. 20/1996 Chapter One GENERAL PROVISIONS Article 1 This Act shall regulate the tax registration

More information

CAYMAN ISLANDS. Supplement No. 1 published with Gazette No. 22 of 22nd October, 2012. MUTUAL FUNDS LAW (2012 REVISION)

CAYMAN ISLANDS. Supplement No. 1 published with Gazette No. 22 of 22nd October, 2012. MUTUAL FUNDS LAW (2012 REVISION) CAYMAN ISLANDS Supplement No. 1 published with Gazette No. 22 of 22nd October, 2012. MUTUAL FUNDS LAW (2012 REVISION) Law 13 of 1993 consolidated with Laws 18 of 1993, 16 of 1996 (part), 9 of 1998, 4 of

More information

This rule was filed as 13 NMAC 9.3. LIFE INSURANCE AND ANNUITIES VARIABLE ANNUITY CONTRACTS

This rule was filed as 13 NMAC 9.3. LIFE INSURANCE AND ANNUITIES VARIABLE ANNUITY CONTRACTS This rule was filed as 13 NMAC 9.3. TITLE 13 CHAPTER 9 PART 3 INSURANCE LIFE INSURANCE AND ANNUITIES VARIABLE ANNUITY CONTRACTS 13.9.3.1 ISSUING AGENCY: New Mexico State Corporation Commission [Public

More information

Prequalification Document for Procurement of Works

Prequalification Document for Procurement of Works STANDARD PROCUREMENT DOCUMENT Prequalification Document for Procurement of Works Caribbean Development Bank September 2007 ii Foreword This Standard Procurement Document Prequalification Document for Procurement

More information

Presentation by BSI on the main changes to the IATF ISO/TS 16949 certification scheme

Presentation by BSI on the main changes to the IATF ISO/TS 16949 certification scheme Presentation by BSI on the main changes to the IATF ISO/TS 16949 certification scheme ISO/TS 16949 IATF Scheme rules 4 th edition areas that impact BSI Clients Copyright 2014 BSI. All rights reserved.

More information

General Terms of Public Procurement in Service Contracts JYSE 2014 SERVICES

General Terms of Public Procurement in Service Contracts JYSE 2014 SERVICES General Terms of Public Procurement in Service Contracts January 2015 Contents Introduction...3 Issues to be observed in applying...5 General Terms of Public Procurement in Service Contracts ()...9 1 Definitions...9

More information

LAW ON PROVIDING FAST MONEY TRANSFER SERVICES (unofficial fair copy) 1 I. GENERAL PROVISIONS

LAW ON PROVIDING FAST MONEY TRANSFER SERVICES (unofficial fair copy) 1 I. GENERAL PROVISIONS LAW ON PROVIDING FAST MONEY TRANSFER SERVICES (unofficial fair copy) 1 I. GENERAL PROVISIONS Article 1 This Law shall regulate the manner and the terms and conditions for providing fast money transfer

More information

Swedbank, AB payment services provision conditions

Swedbank, AB payment services provision conditions Swedbank, AB payment services provision conditions 1. TERMS 1.1. Terms used in these Swedbank, AB Payment Services Provision Regulations have the following meanings: 1.1.1. Personal Data means any information

More information

3/5/2014. Section 3 Handbook Presque Isle County Home Improvement Program

3/5/2014. Section 3 Handbook Presque Isle County Home Improvement Program 3/5/2014 Section 3 Handbook Presque Isle County Home Improvement Program Section 3 Handbook Presque Isle County Home Improvement Program Introduction Section 3 is the legislative directive from the U.S.

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL RFP ISSUE DATE: September 26 th, 2001 TITLE: RFP NUMBER: San José State University Website Redesign F-WR00001181-AL PURCHASING OFFICE CONTACT: DEPARTMENT OFFICIAL: Alex Lebedeff, Mary

More information

STANDARD PRE-QUALIFICATION DOCUMENT FOR THE PROCUREMENT OF WORKS (MAJOR CONTRACTS)

STANDARD PRE-QUALIFICATION DOCUMENT FOR THE PROCUREMENT OF WORKS (MAJOR CONTRACTS) STANDARD PRE-QUALIFICATION DOCUMENT FOR THE PROCUREMENT OF WORKS (MAJOR CONTRACTS) Pre-qualification Ref: Issue Date: [Insert Title of Project] [Insert Reference] [Insert Date] Public Procurement Authority

More information

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness ---------------- Law No. 21/2012/QH13 Hanoi, November 20, 2012 LAW

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness ---------------- Law No. 21/2012/QH13 Hanoi, November 20, 2012 LAW THE NATIONAL ASSEMBLY -------- SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness ---------------- Law No. 21/2012/QH13 Hanoi, November 20, 2012 LAW AMENDING AND SUPPLEMENTING A NUMBER OF

More information

International Peace Support Training Centre Westwood Park P O Box 24232-00502 Karen, Kenya

International Peace Support Training Centre Westwood Park P O Box 24232-00502 Karen, Kenya International Peace Support Training Centre Westwood Park P O Box 24232-00502 Karen, Kenya PRE-QUALIFICATION TENDER NO. IPSTC/PREQ/2014/2015/043 FOR PROVISION OF PLUMBING SERVICES FOR 2014/2015 July, 2014

More information

Section IV. Bidding Forms

Section IV. Bidding Forms Section IV. Bidding Forms Bid Submission Sheet Table of Forms Appendix to Bid Table A. Local Currency Table B. Foreign Currency (FC) Table C. Summary of Payment Currencies Bill of Quantities - Example

More information

GENERAL TERMS AND CONDITIONS FOR SAP CLOUD SERVICES ( GTC )

GENERAL TERMS AND CONDITIONS FOR SAP CLOUD SERVICES ( GTC ) GENERAL TERMS AND CONDITIONS FOR SAP CLOUD SERVICES ( GTC ) 1. DEFINITIONS Commonly used capitalized terms are defined in the Glossary at the end of the document. 2. USAGE RIGHTS AND RESTRICTIONS 2.1 Grant

More information

CHAPTER 69-05.2-12 PERFORMANCE BONDS - LIABILITY INSURANCE

CHAPTER 69-05.2-12 PERFORMANCE BONDS - LIABILITY INSURANCE CHAPTER 69-05.2-12 PERFORMANCE BONDS - LIABILITY INSURANCE Section 69-05.2-12-01 Performance Bond - General Requirements 69-05.2-12-02 Performance Bond - Form of the Performance Bond 69-05.2-12-03 Performance

More information

Contracting for Services

Contracting for Services Contracting for Services A National State Auditors Association Best Practices Document Published by the National State Auditors Association Copyright 2003 by the National State Auditors Association. All

More information

ATTACHMENT A. Ozarks Technical Community College Pre-Established Criteria for Construction Management and Design Build Construction Projects

ATTACHMENT A. Ozarks Technical Community College Pre-Established Criteria for Construction Management and Design Build Construction Projects Ozarks Technical Community College Pre-Established Criteria for Construction Management and Design Build Construction Projects Pursuant to Revised Statute of Missouri Section 8.250(3), Ozarks Technical

More information

Annex 4 Operational Certification Procedures. Rule 1 Definitions

Annex 4 Operational Certification Procedures. Rule 1 Definitions Annex 4 Operational Certification Procedures Rule 1 Definitions For the purposes of this Annex, the term: (a) competent governmental authority means the authority that, according to the laws and regulations

More information

Request for Quote Number: 2015-06-PRC Baseball Diamond Backstop Re-Fence

Request for Quote Number: 2015-06-PRC Baseball Diamond Backstop Re-Fence Request for Quote Number: 2015-06-PRC Baseball Diamond Backstop Re-Fence Sealed request for quotes will be received by Brian Tocheri, CAO/Clerk at 341 10 th St. Hanover, Ontario, N4N 1P5 until 2:00 pm,

More information

Release 3.2 Oct 2009.

Release 3.2 Oct 2009. This document contains the terms and conditions of the Linix Ltd support services contract. All support and consultancy advice given by Linix Ltd to our customers is covered by the terms of this contract.

More information

Request for Proposal (RFP) Reference No: AUAF-RFP-15-001. Issue Date: April 10, 2016. Deadline: April 20, 2016 10:00 AM. Project:

Request for Proposal (RFP) Reference No: AUAF-RFP-15-001. Issue Date: April 10, 2016. Deadline: April 20, 2016 10:00 AM. Project: Request for Proposal (RFP) Reference No: AUAF-RFP-15-001 Issue Date: April 10, 2016 Deadline: April 20, 2016 10:00 AM Project: Provision of Internet Service 80/80 Mbps Internet Bandwidth with 1:1 Ratio

More information

GENERAL SALES CONDITIONS POS SERVICE HOLLAND BV (Pty Ltd, Dutch Company Status)

GENERAL SALES CONDITIONS POS SERVICE HOLLAND BV (Pty Ltd, Dutch Company Status) GENERAL SALES CONDITIONS POS SERVICE HOLLAND BV (Pty Ltd, Dutch Company Status) 1. Definitions 1.1 In these general conditions it is understood under: Supplier: Customer: Pos Service Holland BV (Pty Ltd,

More information

CITY OF CHILLICOTHE REQUEST FOR PROPOSALS

CITY OF CHILLICOTHE REQUEST FOR PROPOSALS CITY OF CHILLICOTHE REQUEST FOR PROPOSALS The City of Chillicothe is accepting sealed proposals for a Financial and Payroll software system for the Chillicothe Auditor s office. Proposal Must Be Sealed,

More information

City of Powell Request for Proposals for a Total Compensation Survey

City of Powell Request for Proposals for a Total Compensation Survey City of Powell Request for Proposals for a Total Compensation Survey Section I The City of Powell is soliciting proposals from qualified consulting firms, experienced in the development of a job evaluation

More information

SelfScore Cardholder Agreement for Cards issued by Celtic Bank

SelfScore Cardholder Agreement for Cards issued by Celtic Bank SelfScore Cardholder Agreement for Cards issued by Celtic Bank SelfScore has partnered with Celtic Bank (together referred to as "us," "we," "our," or the like), Utah industrial member FDIC, to offer this

More information

INSTRUCTIONS TO BIDDERS

INSTRUCTIONS TO BIDDERS CAMPUS PLANNING, DESIGN & CONSTRUCTION Sixth Avenue and Grant Street PO Box 172760 Bozeman, Montana 59717-2760 Phone: (406) 994-5413 Fax: (406) 994-5665 INSTRUCTIONS TO BIDDERS 1. Table of Contents Provided

More information

How To Pay Off A Loan From A Bank

How To Pay Off A Loan From A Bank International Bank for Reconstruction and Development General Conditions for Loans Dated March 12, 2012 Table of Contents ARTICLE I Introductory Provisions... 1 Section 1.01. Application of General Conditions...

More information

QUOTATION DOCUMENTS TERMS AND CONDITIONS OF AGREEMENT

QUOTATION DOCUMENTS TERMS AND CONDITIONS OF AGREEMENT Page 1 of 5 INTERPRETATION QUOTATION DOCUMENTS TERMS AND CONDITIONS OF AGREEMENT FOR THE SUPPLY AND DELIVERY OF FOODSTUFF OR AMENITIES ITEM(S) FOR THE PERIOD SPECIFIED IN THE AWARD LETTER In these Terms

More information

INVITATION TO TENDER SUPPY, INSTALLATION AND TRAINING ON THE USAGE OF COMPUTER ASSISTED AUDIT TOOLS & TECHNIQUES (CAAT) TENDER No.

INVITATION TO TENDER SUPPY, INSTALLATION AND TRAINING ON THE USAGE OF COMPUTER ASSISTED AUDIT TOOLS & TECHNIQUES (CAAT) TENDER No. INVITATION TO TENDER SUPPY, INSTALLATION AND TRAINING ON THE USAGE OF COMPUTER ASSISTED AUDIT TOOLS & TECHNIQUES (CAAT) TENDER No. CS/28-01-13/1 January 2013 (Readvertised February 2013) Introduction The

More information

Upgrades requiring quotes at this time: Upgraded district MDF core electronics as specified.

Upgrades requiring quotes at this time: Upgraded district MDF core electronics as specified. E-RATE Year 18 (2015-2016) Network Switches - Core (HESD_SWITCH15B) Hanford Elementary School District Posted February 11, 2015 Deadline for Submission of Questions March 10, 2015 Bid Response Due March

More information

1. Technical Offer Submission Sheet

1. Technical Offer Submission Sheet 8. Sample Forms SUMMARY Sample Form No. 1: 1. TECHNICAL OFFER SUBMISSION SHEET... 3 Sample Form No. 2: 2. PRICE OFFER SUBMISSION SHEET... 5 Sample Form No. 3: 3. BID SECURITY... 6 Sample Form No. 4: 4.

More information

Service agreement. This Agreement (this Agreement ) has been concluded on by and between on the one hand

Service agreement. This Agreement (this Agreement ) has been concluded on by and between on the one hand Service agreement This Agreement (this Agreement ) has been concluded on by and between on the one hand Hotspot System Ltd. Registered seat: Andrássy út 76, Budapest, H-1062, Hungary Tax ID: 13983981-2-42

More information

Request for Proposals to Design, Build, Finance, Operate and Maintain North Commuter Parkway and Traffic Bridge Project City of Saskatoon

Request for Proposals to Design, Build, Finance, Operate and Maintain North Commuter Parkway and Traffic Bridge Project City of Saskatoon Request for Proposals to Design, Build, Finance, Operate and Maintain North Commuter Parkway and Traffic Bridge Project City of Saskatoon () Request for Proposals TABLE OF CONTENTS SECTION 1 INTRODUCTION...

More information

TENDER DOCUMENTS PROCUREMENT OF GOODS PRICE QUOTATIONS. Public Procurement Board. Accra, Ghana

TENDER DOCUMENTS PROCUREMENT OF GOODS PRICE QUOTATIONS. Public Procurement Board. Accra, Ghana TENDER DOCUMENTS PROCUREMENT OF GOODS PRICE QUOTATIONS Public Procurement Board Accra, Ghana October 2003 i Table Contents Table Contents... i Introduction and Instructions... 1 Section I. Invitation for

More information

DEPARTMENT OF HEALTH CARE FINANCE

DEPARTMENT OF HEALTH CARE FINANCE DEPARTMENT OF HEALTH CARE FINANCE Dear Provider: Enclosed is the District of Columbia Medicaid provider enrollment application solely used for providers, who request to be considered for the Adult Substance

More information

PREQUALIFICATION DOCUMENT FOR PROVISION OF WEBSITE HOSTING AND MAINTENANCE SERVICES - TENDER NO KENAS NO/19/2013/2015

PREQUALIFICATION DOCUMENT FOR PROVISION OF WEBSITE HOSTING AND MAINTENANCE SERVICES - TENDER NO KENAS NO/19/2013/2015 PREQUALIFICATION DOCUMENT FOR PROVISION OF WEBSITE HOSTING AND MAINTENANCE SERVICES - TENDER NO KENAS NO/19/2013/201 KENYA ACCREDITATION SERVICE P.O BOX 47400-00100 NAIROBI KENYA Tel: 0787 39 679 or 072

More information

Exhibit 1 to Part 3 Project-Specific Terms

Exhibit 1 to Part 3 Project-Specific Terms Exhibit 1 to Part 3 Project-Specific Terms (Date of Standard Exhibit 1 to Part 3: July 2013) This Exhibit 1 to Part 3 (2013 Lump Sum Design-Build Agreement Between Department and Design-Builder) contains

More information

REQUEST FOR PROPOSALS FOR Franchise Fees, Sales and Use Tax Audits

REQUEST FOR PROPOSALS FOR Franchise Fees, Sales and Use Tax Audits REQUEST FOR PROPOSALS FOR Franchise Fees, Sales and Use Tax Audits The City of Louisville, Colorado is accepting proposals for the purpose of performing sales and use tax, and franchise fee compliance

More information

How To Do Business With Omaha Public Schools

How To Do Business With Omaha Public Schools O PS How To Do Business With Omaha Public Schools SCHOOL Business Services Department Purchasing Division 3215 Cuming Street Omaha, Nebraska 68131-2024 Phone (402) 557-2214 Introduction This pamphlet

More information