Americans with Disabilities Act Transition Plan for Curb Ramps and Sidewalks

Size: px
Start display at page:

Download "Americans with Disabilities Act Transition Plan for Curb Ramps and Sidewalks"

Transcription

1 Americans with Disabilities Act Transition Plan for Curb Ramps and Sidewalks Updates and Revisions City and County of San Francisco Department of Public Works In collaboration with The Mayor s Office on Disability

2 INTRODUCTION 2 Goals and Objectives 2 Transition Plan History and Overview 3 I. LEGAL REQUIREMENTS 4 Legal Requirements Federal 4 Legal Requirements State 4 Legal Requirements San Francisco 5 II. IDENTIFIED OBSTACLES TO THE PUBLIC RIGHT OF WAY 6 Curb Ramps 6 Identified Barriers Curb Ramp Evaluation Factors 7 Scope of Work - Curb Ramp Findings 8 Sidewalks 9 Identified Barriers - Sidewalk Evaluation Factors 10 Scope of Work Sidewalk Findings 10 III. METHODS TO REMOVE OBSTACLES- POLICIES & PRIORITIES 14 Curb Ramps 14 Barrier Removal - ADA Transition Plan Priorities 14 Public Complaint Process 16 New Construction 16 Defenses 17 Sidewalks 18 Barrier Removal - Sidewalk Inspection and Repair Program (SIRP) 18 Public Complaint Process 20 New Construction 21 Defenses 23 IV. SCHEDULE 24 Curb Ramps; 10 Year Capital Plan Schedule 24 Sidewalks; 25 Year SIRP Plan Schedule 25 V. RESPONSIBLE INDIVIDUAL 25 VI. PUBLIC INPUT 25 Page 1 of 27

3 s of the City and County of San Francisco Introduction Goals and Objectives The goal of the Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps and Sidewalks of the City and County of San Francisco (CCSF) is to ensure that the City creates accessible paths of travel in the public right of way for people with disabilities. San Francisco City government has made a significant and long-term commitment to improving the accessibility of the public right of way. The Department of Public Works (DPW) has been the primary leader in these efforts, with collaboration and funding from the Mayor s Office on Disability (MOD) in prioritizing and funding curb ramp construction under the s. This Transition Plan describes CCSF s existing policies and programs to enhance accessibility in the public right of way. Both the s, as well as the ADA Transition Plan for Facilities, have received significant funding and commitments from the City s 10 Year Capital Plan. As explained below, the ADA Transition Plan for Curb Ramps and Sidewalks incorporates both a funding commitment and a prioritization matrix that seek aggressively to remove barriers in the public right of way. Funding for the s is not the only means by which the City s public rights of way are made more accessible. In addition to construction funded under the ADA Transition Plan, CCSF has three additional means by which curb ramps and sidewalks are created and upgraded. Capital Projects for New Construction: Work that involves creating new public right-of-way will provide accessible features in the project area that meets current design standards. Capital Projects for Alterations: Work that under the ADA would be considered an alteration of existing public right-of-way will provide new and upgrade existing accessible features in the project area to meet current design standards. Maintenance and Repair Projects and Programs: Work that specifically addresses spot areas that are limited to normal maintenance and repairs in the public right-of-way will maintain accessibility of the public right-of-way. Page 2 of 27

4 The programs, standards, policies, and procedures that the Department of Public Works presents herein collectively form a comprehensive program that incorporates accessibility in a timely manner into public rights-of-way throughout the City. Transition Plan History and Overview The Curb Ramp and Sidewalk Program of the Department of Public Works is the result of coordinated efforts from several Bureaus within DPW, primarily: Engineering, Architecture, Street Use & Mapping, Construction Management, Building Repair, and Urban Forestry. The City began installing curb ramps in the early 1970 s. Since then, other governmental, public and private entities have also installed curb ramps. For example, utility companies are required by way of permit requirements through DPW s Bureau of Street Use and Mapping to install curb ramps when altering a street corner, and major construction projects have been required to install curb ramps in the areas of construction. DPW developed the first formal Curb Ramp Program in 1989 in response to federal and state requirements effective at that time. DPW created the first DPW Curb Ramp Transition Plan in FY , and a follow up 5-year plan in As priorities and funding sources evolve, the City periodically updates its ADA Transition Plans. The ADA Transition Plan was updated in 2004 and is updated and revised with this 2008 version. This ADA Curb Ramp and Sidewalk Transition Plan reflects current policies and programs already in place to enhance accessibility in the public right of way. Note: More detailed documentation with specific City regulations, policies and schematics are available from the ADA Coordinator of the Department of Public Works. Page 3 of 27

5 I. Legal Requirements Legal Requirements Federal The federal statute known as the Americans with Disabilities Act (ADA), enacted on July 26, 1990, provides comprehensive civil rights protections to persons with disabilities in the areas of employment, state and local government services, access to public accommodations, transportation, and telecommunications. Title II of the ADA specifically refers to state and local government programs, services and activities. Title II of the ADA (28 CFR Section (d)) requires that state and local entities develop a Transition Plan specific to curb ramps: If a public entity has responsibility or authority over streets, roads, or walkways, its transition plan shall include a schedule for providing curb ramps or other sloped areas where pedestrian walks cross curbs, giving priority to walkways serving entities covered by the Act, including State and local government offices and facilities, transportation, places of public accommodation, and employers, followed by walkways serving other areas. (3) The plan shall, at a minimum -- (i) Identify physical obstacles in the public entity's facilities that limit the accessibility of its programs or activities to individuals with disabilities; (ii) Describe in detail the methods that will be used to make the facilities accessible; (iii) Specify the schedule for taking the steps necessary to achieve compliance with this section and, if the time period of the transition plan is longer than one year, identify steps that will be taken during each year of the transition period; and (iv) Indicate the official responsible for implementation of the plan. In 2002, the United States Court of Appeals for the Ninth Circuit, whose jurisdiction includes California, held for the first time that sidewalks constitute a service, program or activity of a city, and sidewalks are therefore subject to the ADA's program accessibility regulations. Barden v. City of Sacramento, 292 F.3d 1073 (9th Cir. 2002). Before the Barden decision, the law was unclear whether municipalities' transition plans should address barrier removal from sidewalks. Legal Requirements State The Unruh Civil Rights Act, California Civil Code sections , and the California Building Code, Code of California Regulations, Title 24 Part 2, [hereafter referred to as Page 4 of 27

6 Title 24] complement federal law, and govern the City s obligations to provide access to its facilities and programs. Legal Requirements San Francisco The City and County of San Francisco has adopted the new California Building Code (CBC), which includes access requirements, under CBC Regulations Title 24, Part 2 Volumes 1 and 2. In this Transition Plan, we will refer to these requirements as Title 24. In addition, the San Francisco Public Works Code incorporates several policies that directly affect accessibility in the public right-of-way. Among them are policies that regulate the use of sidewalk displays, and sidewalk tables and chairs. Construction projects in or otherwise affecting the public right-of-way are required to provide accessible barricades and scaffolding and maintain an accessible path of travel along and around such sites. This Transition Plan cites these policies in the relevant sections below. Page 5 of 27

7 II. Identified Obstacles to the Public Right of Way The City has used a two-prong approach to pro-actively identify and assess obstacles in the public right of way. For curb ramps, the DPW has created a detailed curb ramp database. Survey teams have visited more than 29,000 intersections and documented whether a curb ramp is needed, whether one is in place, and the condition of the curb ramps that are already built. The information in this database provides the primary basis for the City s estimates of need and spending, as well as the types of obstacles in existing curb ramps. For sidewalks, the City has used a sampling method. In 2005, a statistically significant sample of sidewalks was surveyed in order to assess the type, severity and cost of sidewalk barriers in various neighborhoods. On the basis of this information, the City has in Fiscal Year begun a systematic sidewalk assessment and repair program, to proactively identify and remedy defects and barriers in the City s sidewalks. This program supplements an existing process that receives and responds to individual complaints of sidewalk obstacles and defects. For both curb ramps and sidewalks, the City also receives complaints from residents and visitors. These complaints are given the highest priority in the City s plan to remove obstacles in the public right of way. This section of the s will discuss each of these programs separately. Curb Ramps The Department of Public Works has undertaken an exhaustive review of its intersections and curb ramps. It has developed a GIS map and database of curb ramp conditions citywide, evaluating not only whether a curb ramp exists at the site, but also whether a curb ramp is needed and the condition of the curb ramp. This data is updated periodically and is instrumental in mapping and identifying priority locations for upcoming curb ramp projects. In this way, the City systematically identifies obstacles in the public rights of way, as part of a dynamically updated facility maintenance and management system rather than a snapshot of conditions frozen in time. The condition of various physical attributes is used to develop a relative ranking of priority locations. Additionally, the geographic distribution of curb ramp priority needs can be evaluated, such as priority locations including government facilities and transportation facilities. Page 6 of 27

8 Identified Barriers Curb Ramp Evaluation Factors In evaluating the accessibility of existing curb ramps we consider the following factors: CURB RAMPS EVALUATION FACTORS EVALUATION FACTORS Curb Ramp Slope Slopes 1:12 (8.33%) or less. Slopes greater than 1:12, but not greater than 1:10 (10%). Slopes greater than 1:10 (10%). Curb Ramp Cross- Slopes Max 2% (Americans with Disabilities Act Accessibility Guidelines (ADAAG) and Title 24) Curb Ramp Width At least 4 feet in width (excluding flared sides) (Title 24) Upper Landing Location within Crosswalk Lip at bottom of ramp/gutter pan Detectable Warnings 1 At least 4 feet deep x ramp width; max slope of 2% each way (Title 24 and ADAAG) Ramp wholly within the crosswalk markings (Title 24) (excluding flared sides). Ramp flushed with road surface; no bump or lip. Title 24 previously required a ½ inch high beveled lip at bottom of curb ramps. Lip-too-high criteria was collected in 2000 survey. (Lips greater than ½ inch.) Truncated domes extend 36 inches minimum in the direction of travel and the full width of the curb ramp (excluding flared sides) 1 Detectable Warnings: The ADAAG defines a detectable warning as a standardized surface feature built in or applied to walking surfaces or other elements to warn visually impaired people of hazards on a circulation path. The most common design for detectable warnings is a strip of yellow truncated domes. Detectable warnings act to alert visually impaired pedestrians to potential hazards -- such as traffic just as stop signs and curbs would to sighted individuals. City policy calls for installation of detectable warnings on all new curb ramps and within any project area involving alterations to the public right-of way. Page 7 of 27

9 Curb Ramp contrast with Curb ramp finish contrasts with the adjacent sidewalk. Sidewalk Curb Ramp Surface Acceptable surface condition. Condition Flared Side Slope Sides sloped over 1:10 (10%). Curb Ramp Orientation Curb ramp aligned parallel with the crosswalk served. Scope of Work - Curb Ramp Findings The City has a total of approximately 7,200 intersections (as of October 9, 2007). Of these, many are not four way intersections, and some do not allow pedestrian crossings at all potential locations. This is primarily due to pedestrian safety considerations at high speed or high volume roadways. DPW policy is to build one curb ramp at each end of each crosswalk. However, due to the aforementioned traffic considerations and to topographical or other physical and legal constraints, two curb ramps are not always feasible at each street corner (curb return). As a result, the citywide average is 1.82 potential curb ramp locations per curb return. Based on the existing data from surveyed intersections, the City has constructed curb ramps in close to half of the pedestrian crossing locations. However, many of the oldest curb ramps have sufficient numbers of deficiencies (according to the criteria above) that they are a priority for reconstruction. (For example, all curb ramps with a slope greater than 10% are considered priorities for reconstruction, regardless of whether all other features are code compliant.) As a conservative estimate, the City currently has more than 10,800 curb ramps that are considered safe and useable. (This is based on surveyed locations that have met most of the Evaluation Factors in the survey.) However, there are over 8,700 curb ramps that are candidates reconstruction. The biggest unknown in this arena are the more than 17,000 potential curb ramps sites that have yet to be surveyed. For purposes of cost and timeline estimates, the City has assumed that most of these locations lack useable new curb ramps. This is an extremely conservative approach. As the locations are surveyed, the actual number of pedestrian crossing sites lacking useable curb ramps is likely to be significantly less. Page 8 of 27

10 The following table summarizes the current information from the curb ramp database: No. of Category curb ramps All potential sites for curb ramps in the City 46,498 Estimated number of useable curb ramps to serve pedestrian crossings 43,127 Locations with no pedestrian crossing, or curb ramp infeasible 3,470 Curb ramps constructed in city known from surveys 19,579 Existing curb ramps that are safe and useable according to survey criteria 10,865 Existing curb ramps that are a priority for reconstruction 8,714 Surveyed pedestrian crossings lacking curb ramps 6,247 Total known curb ramp sites for construction or reconstruction 14,961 Unsurveyed locations - 17,202 Estimated number of unsurveyed locations that will not need a curb ramp 1,268 Possible number of unsurveyed locations that will need a curb ramp 15,919 Database Note: The curb ramp database is quite large and could not feasibly be included in the text of this ADA Curb Ramp and Sidewalk Transition Plan. The databases may be made available for public inspection by advance request through the office of the DPW ADA / Disability Access Coordinator, 30 Van Ness Avenue, San Francisco, CA Telephone: (415) , TTY: (415) , Fax: (415) A two week advance notice is requested. Sidewalks In the year 2005 the DPW undertook a program to survey and collect data regarding the condition and status of sidewalks. The method chosen to do this was to sample a statistically significant number of sidewalks by street segments, distributed randomly city wide. The goal of this program was to perform a citywide sidewalk conditions survey to assess and record representative locations in need of repairs or other maintenance in order for the sidewalks to be accessible to persons with disabilities. DPW then placed the collected data into a database. DPW has used this data to develop an overall estimate of the scope of the issue as well as develop broad cost forecasts. DPW has established a Sidewalk Assessment and Repair Program, an ongoing facility Page 9 of 27

11 maintenance & management process whereby the city's sidewalks are systematically evaluated, work areas are prioritized, and needed work is forecast. Identified Barriers - Sidewalk Evaluation Factors The Sidewalk Survey Team surveyed 450 blocks for damage that might restrict the pedestrian access for disabled citizens. In conducting its survey of City sidewalks, the Department of Public Works used specific criteria to evaluate the frequency (and cost) of barriers to access. The City noted all sidewalk deficiencies that would interfere with the public right of way. Surveyors used the following criteria to document barriers: Cracking of sidewalk surface (including sidewalk flags, curb, and utility covers) deeper and/or wider than 0.5 Less than 4 of accessible pedestrian pathway Less than 4 of clearance for entrance to public bus shelters Greater than 0.5 vertical or horizontal displacement/upheaval of sidewalk surface (including sidewalk flags, curb, and utility covers) Missing tree grates Missing utility covers Greater than 2.5% horizontal or vertical slope across the path of travel Less than 8 of vertical clearance The sidewalk survey team surveyed 450 blocks chosen at random from the 13,792 DPW accepted blocks in San Francisco. These 450 blocks were evenly distributed amongst the City s 11 districts, and excluded paper streets, parks, private parking, unpaved right of ways, and streets at Hunter s point, Treasure Island, and Yerba Buena. The data collected from this randomly selected sample set was then used to extrapolate a cost estimate for the entire city. Scope of Work Sidewalk Findings The survey team found many instances of potential barriers to people with disabilities in the public right of way. By far the most common barrier that the surveyors encountered was the general category of sidewalk damage. In terms of reported incidents of barriers, the generic sidewalk damage accounted for 52% of incidents. Sidewalk upheaval, or uneven sidewalk was a less frequent, though still significant finding, comprising 15% of the items cited. Trees posed a significant issue as well, with a missing tree grate or empty tree pit accounting for 20% of the incidences cited. Page 10 of 27

12 (The survey does not reveal whether some trees that did not have grates nonetheless had other detectable barriers that would warn pedestrians without creating a barrier to the path of travel.) The survey findings are summarized below: Sidewalk Deficiency Survey Findings # incidents % incidents sidewalk damage / depression % missing tree grate % sidewalk upheaval/uneven sidewalk % curb damage 566 8% missing or damaged utility cover 255 4% excessive x-slope 56 1% empty tree pit 91 1% excessive y-slope 22 0% Method of Cost Estimation: Sidewalk damage, uneven sidewalks, excessive x-slope, excessive y-slope, and sidewalk upheaval were quantified by the number of flags damaged or affected. Curb damage was quantified by the number of curb segments affected. Deficiencies such as damaged or missing utility covers were classified by utility cover size and utility agency. Lastly, vertical and horizontal clearance issues were physically measured. The citywide cost estimate was developed based on several factors. Each deficiency was assigned the following dollar amount: Item Replace 1 flag of sidewalk Replace 1 segment of curb Replace 1 sewage vent cover Replace/Install 1 tree grate Damaged utility cover (small) Damaged utility cover (medium) Damaged utility cover (large) Empty tree pit (assume 1 flag) Page 11 of 27 Cost $100/flg $12/linear ft. $40/ea $2,500/ea $100/ea $200/ea $300/ea $100/ea

13 Based on the above line item estimations a cost estimate of $6,255, was assessed for the 450 sample set (see ADA Deficiency Survey for details). 2 The team was then able to extrapolate a total cost estimate for the City of San Francisco. This estimate was then categorized into 4 major liabilities groups, based on the number of properties surveyed belonging to various government entities and private parties, ie. city government, state government, federal government and private owners. 3 Given the small proportion of City sidewalks adjacent to City property, the direect cost to the City is relatively low. 4 Given the division between government owned properties and privately owned properties, the vast majority of the work and costs will be born by private property owners. 2 The city-wide estimate was developed based on dollars/center line foot of streets. In other words, the total cost for the 450 streets was divided amongst the centerline foot measurement of the 450 street sample set. $6,255, = 450 l n n= 1 6,255, = $ / centerline ft The $ /centerline ft was then multiplied by the centerline length of all DPW accepted streets. $ ,792 l n n= 1 = $ e8 = $250,434,000 The cost estimate was also calculated based on the ratio between the center line length of the 450 sample set of streets to the center line length of all active streets with roughly the same result. It should be noted however, that 74 of the 450 randomly selected streets required one-sided surveillance (See One-Sided Streets attachment). Meaning that either by a function of CNN number assignment or due to the fact that the one side of the street had no pedestrian pathway, the team only surveyed one side of the street. In addition, it should also be noted that for the purposes of cost estimation, the team assumed a uniform size of sidewalk flags and curb segments. The effect of these assumptions on the overall cost estimation is likely immaterial. However, if a more accurate cost estimate were calculated, it should take these facts into consideration. 3 In accordance with the memorandum title General Field Policies and Procedures: Inspection of Private Sidewalks section 7.601, the City of San Francisco assigns responsibility for sidewalk maintenance to the fronting property owner(s). The property owner is not responsible for the repair of the sidewalk fronting his or her property in the following instances: When the damage is caused by City maintained trees When the damage is in the corner return When the damage is related to a utility facility 4 Depending on the cost factor attributed to tree grates, the cost estimate for CCSF ranges between $10 - $20 million city-wide. Page 12 of 27

14 Database Note: The sidewalk database is quite large and could not feasibly be included in the text of this ADA Curb Ramp and Sidewalk Transition Plan. The databases may be made available for public inspection by advance request through the office of the DPW ADA / Disability Access Coordinator, 30 Van Ness Avenue, San Francisco, CA Telephone: (415) , TTY: (415) , Fax: (415) A two week advance notice is requested. Page 13 of 27

15 III. Methods to Remove Obstacles- Policies & Priorities The City and County of San Francisco employs a range of approaches in removing obstacles on sidewalks and at street corners, including: proactively identifying and eliminating the barrier, responding to public complaints, ensuring the correct design and build-out in new construction. This section of the ADA Transition Plan will review City policies for barrier removal focusing on the approaches used by the Department of Public Works. Curb Ramps The City constructs the majority of its curb ramps through two projects, 1) the ADA Transition Plan for Curb Ramps program, and 2) the Street Resurfacing Program. Additional sources of curb ramp construction are primarily in connection with Traffic Signal upgrades and private construction that touches a street corner. Barrier Removal - ADA Transition Plan Priorities The ADA Transition Plan priorities closely follow the guidelines in the regulations. The matrix on the following page shows the priorities. The highest priorities are those in the boxes shaded green. Curb ramps that have a poor condition score, and corners with no curb ramps are the highest priority. Within those two rows on the matrix, the locations that are the highest priority are those that have been identified by people with disabilities as being necessary for their path of travel (Public Requests or Complaints), and curb ramps serving key amenities (civic centers, transportation, and public accommodations) are the next priorities. Once locations with curb ramps that have poor scores, or no curb ramps at all have been addressed, the City will address locations that are the subject of Public Requests or complaints that have only one ramp, but two directional ramps could feasibly fit. After that, ramps where construction poses extreme difficulty, either because of physical constraints, or legal complications. (Locations with privately owned subsidewalk basements have posed such a legal complication.) Lowest priority The last and lowest priority for replacement are those ramps built to code at the time they were built, and that remain safe and usable, even if not up to current design standards. Normally, DPW will upgrade those curb ramps only when that area undergoes an alteration or remodeling. CCSF includes these curb ramps in its Transition Plan, notwithstanding that there is no legal obligation to do so. DPW Order No. 169,270 - Curb Ramp Installations Priority. Page 14 of 27

16 The ADA Transition Plan Priorities for Curb Ramps are summarized in the matrix below. Those areas shaded in green are the areas of highest priority. DPW Curb Ramp Priority Matrix for Barrier-Removal Projects. ADA (d)(2) Geospatial Proximity Priorities A B C D E SFDPW Order 169,270 Curb Ramp Installation Priorities (Condition) Priority Description Locations of Citizen Complaints / Requests (ADA Title II Program Access) Locations Serving Government Offices & Public Facilities Locations Serving Transportation Locations Serving Places of Public Accommodation, Employers Locations Serving Other Areas Nonconforming Curb Ramp or Landing / Poor condition score No Curb Ramp Yet Constructed Single or Non- Directional Curb Ramp, Two Can Fit A1 B1 C1 D1 E1 A2 B2 C2 D2 E2 A3 B3 C3 D3 E3 4 Extremely Difficult Physical or Legal Constraints A4 B4 C4 D4 E4 5 Curb Ramp Does Not Meet Current Standards, Good condition score A5 B5 C5 D5 E5 Page 15 of 27

17 Public Complaint Process The public complaint process is an integral part of the Transition Plan for curb ramps. Public complaints or requests drive the majority of the construction and renovation in the City s annual curb ramp plan. With the addition of the new 311 Center, any member of the public can call 311 and register a complaint or request regarding curb ramps. Within DPW, the ADA Coordinator is the central point to take and evaluate requests. Curb Ramps - Complaint Process: The DPW Office of the ADA / Disability Access Coordinator (DAC) acts as the central clearinghouse for curb ramp complaints and requests. Citizens with disabilities requiring curb ramps are encouraged to contact the office directly via 311. Complaints and requests received by other departments or the various DPW Bureaus are routed to the DAC office. This central complaint procedure ensures that the specific needs of each individual are accurately understood and recorded. The issue and specific locations are then entered into a log and the matter referred to the appropriate City agency for inspection and possible action. The referred agency then replies with its findings to the DAC s office, which then issues and keeps record of a formal response to the complainant / requestor. New Construction Not all curb ramps are constructed in the City via the Transition Plan. New Construction and Street Resurfacing also provide significant numbers of new curb ramps. DPW has several policies to ensure that new construction follows clear standards to maximize the accessibility of the City s public right of way. Curb Ramp Standards: DPW has developed a series of curb ramp standards and alternates, organized in a decreasing order of preference and accessibility. It is the intent of these standards to achieve the highest level of compliance with the standards for new construction that are technically feasible in any given location. In the vast majority of locations, this will include curb ramps with a 1:12 slope. However, a specific provision in ADAAG allows curb ramps to slope up to 10% if existing space limitations prohibit the use of 1:12 slopes. Accordingly this principal is reflected in the DPW Curb Ramp Priority Matrix as well. Curb Ramp Program to provide fully accessible routes within an area: It is DPW practice to aggregate various curb ramp locations in an area in order to create as much economy of scale as possible when constructing new or upgrading existing curb ramps. Additionally, when a curb ramp is constructed at one end of a crosswalk, DPW also constructs a curb ramp at the other end. Accordingly, the crosswalk is viewed as the basic element for planning and the entire intersection may be evaluated for upgrade work to take advantage of mobilized design and construction resources. Page 16 of 27

18 By focusing the work in this way, the interconnectivity of elements along a given path of travel is assured. Additionally, the funds and personnel allocated to the work are used in the most efficient manner possible by this type of project streamlining. Bids to do the work will likely be lower than otherwise possible due to the ability of the builders to better control the work in more focused areas with respect to project planning and traffic control. Curb Ramps; Better Streets Plan Policies and design standards that maximize accessibility and universal design components into future improvements in the public right-of-way: - Please see item in Sidewalks Section; Better Streets Plan below for an overview of this program. Maintenance of Accessible Features: Curb Ramps; Temporary Barriers Policy of barricades and alternate circulation routes for construction or maintenance work: In order to maintain an accessible path of travel while curb ramps are being constructed, the Department of Public Works has developed standards applicable to all such construction within the City. The following policies ensure the maintenance of accessible features and alternative accessible routes during construction: DPW Order No. 162,882 Placement of Scaffolding; DPW Order No. 167,840 Placement of Barricades; Defenses Technically infeasible Under some conditions, the City will be limited in its ability, or completely unable, to provide curb ramps because of the existing physical or site restraints. For example, clear space at the top of the ramp is obstructed by a building, or the slope of a hill is so extreme as to prevent a reasonable slope for a ramp in both directions. Under these circumstances, the City may invoke the defense that a curb ramp is technically infeasible or structurally impractical. Program Access Given a program as broad and comprehensive as a curb ramp program, the City will follow the concept of Program Access under Title II of the ADA. As described in Title 28 of the Code of Federal Regulations, Section (a) (also referred to as the ADA Rules), Program Access does not necessarily require a public entity to make each of its existing facilities accessible to and usable by individuals with disabilities, as long as the program as a whole is accessible. Under this concept, the City may choose not to install curb ramps at some locations (or to install them as a lower priority later), as long as a reasonable path of travel is available even without those curb ramps. Page 17 of 27

19 Sidewalks CCSF has implemented a three-pronged approach to improve the accessibility of its sidewalks: proactive barrier identification and removal, response to public complaints, and new construction standards. Barrier Removal - Sidewalk Inspection and Repair Program (SIRP) Until 2005, DPW addressed sidewalk barriers primarily through responses to public complaints and through a modest inspection unit. After the 2005 sidewalk barrier sampling, the City instituted a Sidewalk Inspection and Repair Program (SIRP) to expand its capacity to address barriers in the public right of way more proactively. The Sidewalk Inspection and Repair Program (SIRP) was instituted in This program inspects all sidewalks on a 25 year cycle. The inspection schedule is prioritized by pedestrian usage. The SIRP program informs all responsible parties (both public and private property owners) of sidewalk damage and the Department then coordinates repairs in a short time frame to increase efficiency and improve pedestrian safety. Priorities for Inspection and Repair: When developing an operational model for the Program, DPW staff researched sidewalk use levels in order to prioritize how sidewalks would be prioritized for repair. Because comprehensive pedestrian use data was not available, staff used several indirect community elements in order to estimate levels of pedestrian usage. The community elements include: Commercial Zoned Districts as defined by the Planning Department MUNI Routes Sidewalks within 500 feet of a School, Public Facility, Hospital, or Senior Center Population Density as defined in the 2000 Census The SIRP program prioritizes areas in accordance with the locations in Title II of the ADA: priority to walkways serving entities covered by the Act, including State and local government offices and facilities, transportation, public accommodations and employers, followed by walkways serving other areas. Those sidewalks identified with the greatest number of community elements are inspected and repaired first. This Table provides a numerical breakdown of the number of sidewalks in each of the described categories. Page 18 of 27

20 Priority Commercial districts muni Near a School, Hospital, Senior Ctr Public Fac. Pop. High Pop. Mid Pop. Low Count 1 x x x x 55 2 x x x x x x x x x x x 0 5 x x x 3 6 x x x 31 7 x x x 9 8 x x x 71 9 x x x x x 0 11 x x 0 12 x x x x x x x x x x x x x 0 17 x x x x x x 4 20 x x x x x 0 23 x x 453 Other 726 Total 5321 Those areas that are not in commercial districts, near a Muni line, or near a public facility are primarily residential (and designated in lines 22, 23, and 24. The blocks in the Other category are primarily industrial. The SIRP program addresses curb ramps that are damaged. If there is a curb ramp that is not damaged but does not meet all current codes, the program will not upgrade the curb ramp. The Program is designed to work on City blocks that have met the aforementioned criteria for high pedestrian usage. Therefore, adjacent blocks that do not rise to the same level of pedestrian usage are not inspected and repaired until all higher criteria blocks have been completed. Therefore, completing paths of travel for adjoining blocks will not be addressed without identifying other available resources. Page 19 of 27

21 In order to address this issue, staff must schedule work in advance and seek alternative funds to complete accessible routes on adjoining blocks. Staff will work to identify existing programs to maximize the improvement of accessible routes within the areas addressed by the SIRP. Sidewalks Existing Conditions Priorities Matrix Priority Description Geospatial Proximity Priorities A B C D E Locations of Citizen Complaints / Requests (ADA Title II Program Access) Locations Serving Government Offices & Public Facilities Locations Serving Transportation Locations Serving Places of Public Accommodation, Employers Locations Serving Other Areas 1 Potholes or Large Cracks in Pavement A1 B1 C1 D1 E1 2 Greater than 2.5% cross-slope across the path of travel A2 B2 C2 D2 E2 Public Complaint Process The DPW Office of the ADA / Disability Access Coordinator (DAC) acts as the central clearinghouse for sidewalk complaints and requests. Citizens with disabilities requiring accessible sidewalks are encouraged to contact the office directly or via 311. Complaints and requests received by other departments or the various DPW Bureaus are to be routed to the DAC office. This is in order that the specific needs of each individual may be accurately understood and recorded. The issue and specific locations are then entered into a log and the matter referred to the appropriate City agency for inspection and possible action. The referred agency is then to reply with its Page 20 of 27

22 findings to the DAC s office, which will then issue and keep record of a formal response to the complainant / requestor. Once a complaint is received, DPW sends an inspector to the site. If an inspection finds that a sidewalk needs repair, the Inspector issues a Notice to Repair (NTR) to the property owner, allowing the owner time to repair the defect independently. If the owner does not provide the repair, DPW will repair the sidewalk and bill the owner. For sidewalk repairs that are not the responsibility of private property owners (e.g. a public entity, or a business such as Pacific Gas & Electric), DPW follows a similar process, but the notice that is issued is called an X In an average 12 month period, a combined total of 1646 Notices to Repair are sent to homeowners and 1025 X-1104 s to other City Bureaus to address these defects. The numbers of NTRs and X-1104 s increased in 2006 indicating the condition of City Sidewalks and a rise in citizen activism. Complaints are the priority action as reflected in the Complaint Response. 83% of all complaints are now investigated within 1 7 days. The remaining 17% are reviewed in no more than 30 days. The reduction of response time is due to Bureau prioritization and improved coordination between Inspection Services and the Administrative Staff. The introduction of a computerized logging system created a record of all complaints and facilitated routing to the District Inspector through an automatically assigned zip code number. New Construction The DPW Permit Division reviews proposed work in the public right-of-way (PROW) and regulates intended work through a variety of permits. The use of the PROW for construction to special events is generally regulated through two types of permits Street Space and Temporary Occupancy. The latter primarily regulates nonconstruction activities. The permits are reviewed for appropriateness before issuance in order to ensure access is maintained and conflicts are avoided. Construction in the PROW is regulated through Street Improvement, Encroachment, Street Use, and Excavation permits. These permits are reviewed for compliance with the City s Standard Specifications, the Public Works Code and State and Federal laws. Construction of the PROW must be conducted in accordance with the Standard Specifications and adhere to all applicable regulations. Encroachments onto the PROW from private property are reviewed for appropriateness and accessibility of the PROW. Street Improvement: BSM inspects all construction work in the Right of Way that is not performed by a DPW or private Utility Contractor. (Those inspections are conducted by the Utility Inspectors, another BSM group.) An important function of Street Improvement is to Page 21 of 27

23 insure that developments on private property comply to the Public Works Code and California T-24 Accessibility Requirements where the project interfaces with the Public R.O.W. The Street Improvement Section consists of 3 (three) Inspectors and one (1) Senior Inspector. Site inspections may be demanding. Other services provided by Street Improvement is the preconstruction site meeting, review of all construction trailers and debris boxes placed in the street related to private construction. Better Streets Plan Policies and design standards that maximize accessibility and universal design components into future improvements in the public right-of-way: The Better Streets Plan will create a unified set of standards, guidelines, and implementation strategies to govern how the City designs, builds, and maintains public streets and rights-of-way. The Better Streets Plan process brings together staff of multiple City agencies, including DPW, to comprehensively plan for streets. The Plan will seek to balance the needs of all street users, with a particular focus on the pedestrian environment and how streets can be used as public space. The Plan will reflect the understanding that the pedestrian environment is about much more than just transportation that streets serve a multitude of social, recreational and ecological needs that must be considered when deciding on the most appropriate design. The Better Streets Plan will consist of two primary elements: the Streetscape Master Plan (SMP), and the Pedestrian Transportation Master Plan (PMP). These two elements will consist of independent technical content; however, they will conduct joint outreach, and be combined into a single final plan. It is envisioned that the Better Streets Plan will result in improved mobility for all San Franciscans. Among the elements and physical qualities that are stated goals and objectives are: Develop an inclusive process and public outreach for planning, design and construction of infrastructure projects. Design streets to ensure safe crossings for seniors, children, and persons with disabilities. Streets will be designed to facilitate safe, accessible, and convenient connections among major nodes, hubs, destinations, transit centers, and major land use and activity centers. Commercial streets will be designed for ease of use and access to destinations for all populations, particularly those with visual or mobility impairments. Create a citywide pedestrian network that will help to connect activity centers, and identify and remedy gaps in pedestrian accessibility to destinations. Page 22 of 27

24 More detailed information regarding the Better Streets Plan is available at: Maintenance of Accessible Features: The ADA requires the maintenance of accessible features as well as program accessibility in general. The California Building Code requires temporary measures and construction to be accessible. Accordingly, these principles are reflected in DPW Order No. 162,882 Placement of Scaffolding, DPW Order No. 167,840 Placement of Barricades, DPW Order No. 162,240 Tables and Chairs in Public Sidewalks. The Bureau of Street-Use and Mapping issues Display Merchandise and Tables & Chairs Permit in keeping with the San Francisco Public Works Code. Inspections are the purview of Commercial District Unit. All commercial permits are subject to annual renewal and inspection. Defenses In addition to the standard defenses outlined under Curb Ramps above, technical infeasibility and program access, CCSF recognizes the following specific exception for sidewalks. Sidewalks; Standards to accept existing conditions: The California Building Code, unlike the ADAAG, contains a specific exception for sidewalk cross-slope due to existing conditions that pose an unreasonable hardship. This may be due to right-of-way restrictions, natural barriers, or other existing conditions. This exception allows for cross-slopes of up to ½ inch per foot (4.17%) for distances typically not to exceed 20 feet. The state code also allows the sidewalk width to be reduced to as little as 36 inches (the same as the ADAAG minimum) if existing conditions create an unreasonable hardship. DPW allows the sidewalk and level landing cross-slope up to 4.17 % accordingly where existing conditions make it necessary to do so. There are many locations where existing conditions do not allow full compliance with the minimum standards or the provided exceptions. In such cases the DPW Bureau of Street Use and Mapping may issue a minor or major encroachment permit for nonstandard work in the sidewalks in order to achieve accessibility. For example, projecting entry ramps at building entrances into the sidewalk is sometimes necessary. In such cases DPW works in conjunction with the Department of Building Inspection to allow such practices in accordance with related SF DBI Administrative Bulletins. Page 23 of 27

25 IV. Schedule for Implementation Curb Ramps; 10 Year Capital Plan Schedule The City s 10 Year Capital Plan has incorporated funding for curb ramp construction in each year. The Curb Ramp Transition Plan receives funds through Prop K Sales Tax, through the federal TDA program, and primarily through the General Fund via the Mayor s Office on Disability. In addition, the Capital Plan has budgeted for an increase in street resurfacing, which also provides new curb ramps along the routes that are resurfaced. Additional curb ramps are provided as well through Parking and Traffic s Signal Projects, and a few major construction projects that are both publicly or privately funded. The chart below illustrates the estimated numbers of curb ramps to be constructed via each source of funding over a ten year period. Curb Ramp Funding Source / Implemented By FY FY FY FY FY FY FY FY FY FY Totals Prop. K (1/2% Sales Tax)+TDA Projects / DPW Roadway Paving / Resurfacing Projects / DPW ,258 Mayor's Office on Disability / DPW ,383 Traffic Signal Projects / DPW & Other Private Parties / Private contractors ,000 Totals ,516 Page 24 of 27

26 Sidewalks; 25 Year SIRP Plan Schedule The 25-year Sidewalk Assessment and Repair Plan, beginning in FY , funds and builds sidewalk improvements and repairs so that sidewalks will not be a barrier in any portion of the City. As a new program, the plan may be subject to re-assessment. Cost to the City for the work over the 25 year program is estimated to be on the order of $20 million, or less than $1 million per year. V. Responsible Individual The official responsible for implementation of the City s ADA Transition Plan for Curb Ramps and Sidewalks is: Ed Reiskin Director of Public Works 1 Dr. Carlton B. Goodlett Place City Hall, Room 348 San Francisco, CA Telephone: (415) Fax: (415) TTY: (415) Web site: www. sfdpw.org VI. Public Input The City has in preceding Transition Plans and will continue with this plan to make available to applicants, residents, and other interested parties information regarding this Transition Plan. The City will provide opportunities for individuals to comment on this Transition Plan by submitting comments and making specific recommendations. Public hearings of the Mayor s Disability Council are one of the primary forums for public input on the plan. More information on the Mayor s Disability Council is available at: A copy of the Draft Transition Plan will be made available for public review during the formal citizen review period. Page 25 of 27

27 After formal adoption of this plan the City will maintain on file for at least 3 years the names of persons consulted with respect to this draft plan, opinion surveys and other comments submitted, and a description of plan modifications subsequently made. The Better Streets Plan began public outreach in the summer of 2007, which includes information on the ADA Transition Plan. The outreach has been structured in three rounds in order to focus public involvement around specific topics at each stage of the planning process: Round 1: What are Streets (including sidewalks) for? Round 2: What are Priority Improvements? Round 3: How do we Implement the Plan? All three rounds involve outreach designed to bring a diverse group of San Franciscans together and to reach out to those with specific needs. Outreach to underserved populations and those difficult to reach is a main focus of the outreach component. Outreach tailored specifically to gain input from persons with disabilities in included in this process. More information on the Better Streets Plan is available at: Page 26 of 27

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN December 21, 2009 Public Works Department 171 N. Ross Street, Suite 200 Auburn,

More information

PUBLIC RIGHT-OF-WAY ACCESSIBILITY TRANSITION PLAN

PUBLIC RIGHT-OF-WAY ACCESSIBILITY TRANSITION PLAN PUBLIC RIGHT-OF-WAY ACCESSIBILITY TRANSITION PLAN FOR THE VILLAGE OF HUNTLEY, ILLINOIS 2015 Contents Introduction 1 Purpose 1 Officials Responsible for Implementation 2 Public Notice 2 Grievance Procedure

More information

ADA POST INSPECTION CHECKLIST. Job No. Route County Location

ADA POST INSPECTION CHECKLIST. Job No. Route County Location ADA POST INSPECTION CHECKLIST Job No. Route County Location SIDEWALKS All sidewalks constructed within the project limits are ADA compliant. Sidewalks are 5 or greater in width. Exception, existing sidewalks

More information

Designing Pedestrian Facilities for Accessibility. ADA Compliance Training. Local Programs Engineer FHWA NJ Division

Designing Pedestrian Facilities for Accessibility. ADA Compliance Training. Local Programs Engineer FHWA NJ Division Keith et P. Skilton Local Programs Engineer FHWA NJ Division 840 Bear Tavern Road, Suite 310 West Trenton, NJ 08628 Phone: 609-637-4203 Fax: 609-538-4919 keith.skilton@dot.gov Note: Pictures may depict

More information

VERTICAL SPEED CONTROL DEVICES

VERTICAL SPEED CONTROL DEVICES H-3.8 VERTICAL SPEED CONTROL DEVICES GENERAL 1. Description This standard identifies minimum requirements that shall be met for all Vertical Speed Control Devices in the design and construction of elements

More information

Bellevue s ADA Sidewalk and Curb Ramp Compliance Program

Bellevue s ADA Sidewalk and Curb Ramp Compliance Program Page 6 Bellevue s ADA Sidewalk and Curb Ramp Compliance Program By: Franz Loewenherz, Senior Transportation Planner, City of Bellevue, Washington Phone: (425) 452-4077; E-mail: floewenherz@bellevuewa.gov

More information

Residential Driveway Installation Requirements. Table of Contents

Residential Driveway Installation Requirements. Table of Contents Residential Driveway Installation Requirements Table of Contents Residential Driveway Requirements Sidewalk Construction Specifications for Residential Properties Hold Harmless Agreement for Residential

More information

City of Los Angeles. Presentation on Sidewalk Vending. June 18, 2015

City of Los Angeles. Presentation on Sidewalk Vending. June 18, 2015 City of Los Angeles Presentation on Sidewalk Vending 1 June 18, 2015 Background Motion (Price-Huizar-Buscaino) Economic Development Committee Meeting (May 13, 2014) First Status Report: Initial Community

More information

Topic 2 11/28/2012 Blocks & Street Network

Topic 2 11/28/2012 Blocks & Street Network TOPIC 2 Blocks & Street Network Implementation Note: 1. Some recommendations are summarized in the tables herein. For complete recommendation language, please see the. 2. Recommendations referenced in

More information

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24 Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge

More information

Road Repaving and Street Safety Bond Quarterly Status Report presented to the Citizens General Obligation Bond Oversight Committee As of March 2016

Road Repaving and Street Safety Bond Quarterly Status Report presented to the Citizens General Obligation Bond Oversight Committee As of March 2016 Road Repaving and Street Safety Bond Quarterly Status Report presented to the Citizens General Obligation Bond Oversight Committee As of March 2016 Overview of RRSS Bond Scope and Budget (including accountability

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES

TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES Background One of the most critical public services provided by a community is the community s transportation system. An effective

More information

CENTRAL BUSINESS DISTRICT STREETSCAPE AND IMPROVEMENT GUIDELINES

CENTRAL BUSINESS DISTRICT STREETSCAPE AND IMPROVEMENT GUIDELINES CENTRAL BUSINESS DISTRICT STREETSCAPE AND IMPROVEMENT GUIDELINES I. INTRODUCTION In May 1990, the Town Council accepted a report from the Commercial Plan Committee that included a recommendation to develop

More information

CITY OF OAKLAND Mayor's Commission on Persons with Disabilities (MCPD) Monday June 11, 2007

CITY OF OAKLAND Mayor's Commission on Persons with Disabilities (MCPD) Monday June 11, 2007 CITY OF OAKLAND Mayor's Commission on Persons with Disabilities (MCPD) Monday June 11, 2007 MINUTES I. Called to order at 1:20 p.m. II. III. IV. Roll Call Quorum: No See Exhibit A Public Comments Reverend

More information

ORDER NO. 176,707 (Revised)

ORDER NO. 176,707 (Revised) City and County of San Francisco Phone: (415) 554-6920 Fax: (415) 554-6944 TDD: (415) 554-6900 http://www.sfdpw.com Department of Public Works Office of the Director City Hall, Room 348 1 Dr. Carlton B.

More information

In 2005, the City of Pasadena, CA, USA, with the support of consultants,

In 2005, the City of Pasadena, CA, USA, with the support of consultants, Creating a Citywide Safe Routes to School Program: Pasadena, CA, USA s Step-by-Step Approach In 2005, the City of Pasadena, CA, USA, initiated development of a comprehensive Safe Routes to School Program.

More information

City of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address

City of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address City of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address July 005 Prepared by DMCG Disability Management Consulting Group L.L.C. 801 Jonquil Place Columbia, MO 650 In

More information

28.0 Development Permit Area #2 (Neighbourhood District)

28.0 Development Permit Area #2 (Neighbourhood District) 28.0 Development Permit Area #2 (Neighbourhood District) Goals and Objectives To provide a guide for infill and new development in the Neighbourhood District. To outline the nature, form and character

More information

SIDEWALK SIGNS AND DISPLAYS 08.20.14 CREATED FOR DOWNTOWN COMMISSION

SIDEWALK SIGNS AND DISPLAYS 08.20.14 CREATED FOR DOWNTOWN COMMISSION SIDEWALK SIGNS AND DISPLAYS 08.20.14 CREATED FOR DOWNTOWN COMMISSION PURPOSE Resolution No. 20140417-054 Activate Urban Streetscape By: Allowing Businesses Flexibility Product Marketing Beautify Shopping

More information

Atlanta 2015 Infrastructure Bond

Atlanta 2015 Infrastructure Bond Investing in a commitment today to meet the infrastructure challenges of the future. Richard Mendoza, Public Works James Shelby, Planning & Community Development July 2014 Key Events June 2014: Public

More information

RESIDENTIAL DRIVEWAYS

RESIDENTIAL DRIVEWAYS RESIDENTIAL DRIVEWAYS If you have specific questions or want to confirm your plans, our staff is available to assist in person, by telephone, or by e-mail. City of St. Petersburg Division of Development

More information

ORDINANCE 2005-09 NOW, THEREFORE, BE IT ORDAINED BY THE CITY OF BRENTWOOD, TENNESSEE, AS FOLLOWS:

ORDINANCE 2005-09 NOW, THEREFORE, BE IT ORDAINED BY THE CITY OF BRENTWOOD, TENNESSEE, AS FOLLOWS: ORDINANCE 2005-09 AN ORDINANCE OF THE CITY OF BRENTWOOD, TENNESSEE PROVIDING THAT THE CODE OF ORDINANCES OF THE CITY OF BRENTWOOD BE AMENDED BY REVISING SECTION 78-10, PROVIDING FOR MINIMUM STANDARDS FOR

More information

ADA Transition Plan Update, January 2012

ADA Transition Plan Update, January 2012 ADA Transition Plan Update, January 2012 Introduction July 2010, the Council issued a Proclamation of Recommitment to the Americans with Disabilities Act of 1990 which prohibits: Prohibits discrimination

More information

FIBER-OPTIC CABLE PLAN CHECK

FIBER-OPTIC CABLE PLAN CHECK Engineering Division 201 North Broadway, Escondido, CA 92025 (760) 839-4651, FAX (760) 839-4597 FIBER-OPTIC CABLE PLAN CHECK To: Date: Project: Project No. Address: Check No. Attn: Via: The attached plans

More information

Walkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps

More information

Assessing Paved Trails for Compliance with Standards and Best Practices

Assessing Paved Trails for Compliance with Standards and Best Practices Assessing Paved Trails for Compliance with Standards and Best Practices Session Presenters: Kristin Maravilla, Planner/Designer Masters in Landscape Architecture (UC Berkeley) Masters in City and Regional

More information

American Public Works Association. Utility and Public Right-of-Way Committee. Report on Right-of-Way Permit Fees

American Public Works Association. Utility and Public Right-of-Way Committee. Report on Right-of-Way Permit Fees American Public Works Association Utility and Public Right-of-Way Committee Report on Right-of-Way Permit Fees 1 A survey of road cut or right-of-way opening fees for various government agencies, municipalities,

More information

Section 801 Driveway Access Onto Public Right-of-Ways

Section 801 Driveway Access Onto Public Right-of-Ways Section 801:00 Section 801 Driveway Access Onto Public Right-of-Ways Section 801:00. Definitions. The following words and terms, when used in this Article, shall have the following meanings, unless the

More information

PLEASE PRINT. Job Name: Job # City File No. SIDEWALK; DRIVEWAY APPROACH; CURB & GUTTER; PEDESTRIAN RAMP; STREET LIGHT; PLANTER STRIP;

PLEASE PRINT. Job Name: Job # City File No. SIDEWALK; DRIVEWAY APPROACH; CURB & GUTTER; PEDESTRIAN RAMP; STREET LIGHT; PLANTER STRIP; City of Santa Rosa ENCROACHMENT PERMIT APPLICATION Application#: Inspector: Liability Ins: WComp. Ins: FOR OFFICE USE ONLY NOTE: YOUR APPLICATION CANNOT BE PROCESSED WITHOUT COMPLETE INFORMATION IN AREAS

More information

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS ENGINEERING DESIGN GUIDELINES for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS City of Birmingham Department of Planning, Engineering and Permits Engineering Division Office of the City Engineer 2008 TABLE

More information

PEDESTRIAN SAFETY AND LAWS IN PENNSYLVANIA

PEDESTRIAN SAFETY AND LAWS IN PENNSYLVANIA PEDESTRIAN SAFETY AND LAWS IN PENNSYLVANIA Gary N. Modi, P.E., Chief Safety Management Division Bureau of Highway Safety & Traffic Engineering & Christopher A. Drda, P.E., Chief Consultant Agreement Section

More information

ORDINANCE NO. 2013 -

ORDINANCE NO. 2013 - ORDINANCE NO. 2013 - AN ORDINANCE OF BREVARD COUNTY, FLORIDA AMENDING CHAPTER 62, LAND DEVELOPMENT REGULATIONS SECTION 62-2891, LOT DRAINAGE, AND CHAPTER 22 BUILDINGS AND BUILDING REGULATIONS, SECTION

More information

Lincoln Downtown Master Plan Update

Lincoln Downtown Master Plan Update Lincoln Downtown Master Plan Update Table of Contents Executive Summary........................................... 1 Complete Streets Framework.................................... 3 Promenade Creating

More information

Goals & Objectives. Chapter 9. Transportation

Goals & Objectives. Chapter 9. Transportation Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system

More information

CHAPTER 8 CIVIL DESIGN

CHAPTER 8 CIVIL DESIGN CHAPTER 8 CIVIL DESIGN A. GENERAL This Chapter includes standards and design considerations for other civil engineering design in structural, drainage and utilities. Design considerations for electrical

More information

Designing Pedestrian Facilities for Accessibility

Designing Pedestrian Facilities for Accessibility Designing Pedestrian Facilities for Accessibility Module1 Course Title Module Title Facilitator(s) Jodi Petersen FHWA WA Division Civil Rights Program Manager 360-534-9325 Jodi.petersen@dot.gov Peter Eun

More information

Compliance Guide. For Title III of the Americans with Disabilities Act

Compliance Guide. For Title III of the Americans with Disabilities Act Compliance Guide For Title III of the Americans with Disabilities Act The use of the term ADA Compliant herein is a description of a class of product designs and is not intended as a substitute for your

More information

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580

More information

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application):

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application): Transportation Assessment and Management Study Guidelines for Consultants INTRODUCTION This document is intended to provide guidelines for transportation consultants who produce Transportation reports

More information

Public infrastructure often decays invisibly, and we are shocked when a bridge

Public infrastructure often decays invisibly, and we are shocked when a bridge Fixing Broken Sidewalks B Y D O N A L D S H O U P Property has its duties as well as its rights. Thomas Drummond Public infrastructure often decays invisibly, and we are shocked when a bridge gives way

More information

TYPES OF PROPERTIES ARE INCLUDED WITHIN THE T3 TRANSECT DESIGNATION?

TYPES OF PROPERTIES ARE INCLUDED WITHIN THE T3 TRANSECT DESIGNATION? WHAT TYPES OF PROPERTIES ARE INCLUDED WITHIN THE T3 TRANSECT DESIGNATION? The T3 Transect designation under Miami 21 is equivalent to the single-family and duplex residential categories that exist in today

More information

Permit No. Permit Fee: $295.00. Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: E-mail Address:

Permit No. Permit Fee: $295.00. Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: E-mail Address: City of Woodland Park Internet Service Provider (IPS) Permit for Installation of Telecommunication Infrastructure within City Owned Rights-of-Way (up to five locations per single permit) Permit No. Permit

More information

Application Package for License for Sidewalk Dining Adjacent to Eating Establishment

Application Package for License for Sidewalk Dining Adjacent to Eating Establishment Application Package for License for Sidewalk Dining Adjacent to Eating Establishment Community & Economic Development Department Planning Division T :: 831.648.3190 F :: 831.648.3184 www.ci.pg.ca.us/cedd

More information

ASSESSMENT OF LANDCAPE PROVISIONS FOR PROPOSED PLAN CHANGE 1. Inner Business Zone. Outer Business Zone PALMERSTON NORTH CITY COUNCIL

ASSESSMENT OF LANDCAPE PROVISIONS FOR PROPOSED PLAN CHANGE 1. Inner Business Zone. Outer Business Zone PALMERSTON NORTH CITY COUNCIL A division of Hudson Group Ltd ASSESSMENT OF LANDCAPE PROVISIONS FOR PROPOSED PLAN CHANGE 1 Inner Business Zone Outer Business Zone PALMERSTON NORTH CITY COUNCIL 1 2 A division of Hudson Group Ltd Prepared

More information

RENO SPARKS BICYCLE & PEDESTRIAN. Plan. ADA Transition Plan. October 2011

RENO SPARKS BICYCLE & PEDESTRIAN. Plan. ADA Transition Plan. October 2011 RENO SPARKS BICYCLE & PEDESTRIAN Plan ADA Transition Plan October 2011 TABLE OF CONTENTS Purpose... 1 Federal ADA Requirements... 2 Existing Conditions... 3 Public Outreach... 3 Data Collection... 6 Existing

More information

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0

More information

Appendix E Transportation System and Demand Management Programs, and Emerging Technologies

Appendix E Transportation System and Demand Management Programs, and Emerging Technologies Appendix E Transportation System and Demand Management Programs, and Emerging Technologies Appendix Contents Transportation System Management Program Transportation Demand Management Program Regional Parking

More information

Parklet FAQs. Each parklet has a sign on it clearly indicating that it is a public space.

Parklet FAQs. Each parklet has a sign on it clearly indicating that it is a public space. ParkletFAQs BackgroundandGeneralInformation Whatisaparklet? A parklet is a small public sidewalk extension, usually extending two parking space lengths, that uses non permanent materials (e.g., it is not

More information

ISSUE BRIEF. Understanding the Hospital Planning, Design, and Construction Process. Introduction. Background. Phase 1: Project Definition and Planning

ISSUE BRIEF. Understanding the Hospital Planning, Design, and Construction Process. Introduction. Background. Phase 1: Project Definition and Planning Understanding the Hospital Planning, Design, and Construction Process Introduction California s acute care hospitals are an essential health care resource that serve a wide range of patients during times

More information

IN THE CITY COUNCIL OF THE CITY OF LIVERMORE, CALIFORNIA A RESOLUTION TO APPROVE A COMPLETE STREETS POLICY

IN THE CITY COUNCIL OF THE CITY OF LIVERMORE, CALIFORNIA A RESOLUTION TO APPROVE A COMPLETE STREETS POLICY IN THE CITY COUNCIL OF THE CITY OF LIVERMORE, CALIFORNIA A RESOLUTION TO APPROVE A COMPLETE STREETS POLICY The term " Complete Streets" describes a comprehensive, integrated transportation network with

More information

How To Improve Safety

How To Improve Safety Collision Diagrams Collision diagrams are used to display and identify similar accident patterns. They provide information on the type and number of accidents; including conditions such as time of day,

More information

1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road.

1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road. SECTION 6: REQUIREMENTS FOR A DRIVEWAY CONNECTION A. Required information. The application shall be accompanied by a sketch of the proposed driveway which at a minimum shall indicate: 1. Geometric information

More information

TITLE XV: LAND USAGE 150. BUILDING CODE 151. FLOOD DAMAGE PREVENTION 153. SUBDIVISION REGULATIONS 154. ZONING CODE

TITLE XV: LAND USAGE 150. BUILDING CODE 151. FLOOD DAMAGE PREVENTION 153. SUBDIVISION REGULATIONS 154. ZONING CODE TITLE XV: LAND USAGE Chapter 150. BUILDING CODE 151. FLOOD DAMAGE PREVENTION 152. MOBILE HOMES AND TRAILER PARKS 153. SUBDIVISION REGULATIONS 154. ZONING CODE 2001 S-7 1 2 Middletown - Land Usage CHAPTER

More information

B. Improve the appearance and character of areas surrounding new development.

B. Improve the appearance and character of areas surrounding new development. Chapter 4.3: Landscape Regulations Sections: 4.301 Purposes 4.302 Applicability 4.303 General Provisions 4.304 Landscape Maintenance 4.301 Purposes The purposes of these regulations are to: A. Promote

More information

CHAPTER 2 PAVEMENT MANAGEMENT SYSTEM

CHAPTER 2 PAVEMENT MANAGEMENT SYSTEM CHAPTER 2 PAVEMENT MANAGEMENT SYSTEM 2.1. INTRODUCTION TO PAVEMENT MANAGEMENT The ability of a pavement system to serve a society is largely a function of planning. Planning is the intersection between

More information

TOWN OF FORT MYERS BEACH CAPITAL IMPROVEMENT PLAN DRAFT BUDGET

TOWN OF FORT MYERS BEACH CAPITAL IMPROVEMENT PLAN DRAFT BUDGET TOWN OF FORT MYERS BEACH CAPITAL IMPROVEMENT PLAN DRAFT BUDGET FISCAL YEAR 2005/2006 TRANSPORTATION SOURCE OF FUNDS: Beginning fund balance and anticipated revenue. Over the course of the past fiscal years

More information

Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis

Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis Transportation & Mobility projects that meet the following criteria: enhances regional mobility; supports public transit;

More information

ORDINANCE NO. 4521 THE CITY COUNCIL OF ALEXANDRIA HEREBY ORDAINS:

ORDINANCE NO. 4521 THE CITY COUNCIL OF ALEXANDRIA HEREBY ORDAINS: ORDINANCE NO. 4521 AN ORDINANCE to amend and reordain Section 6-800 (KING STREET OUTDOOR DINING OVERLAY ZONE), of Article VI (SPECIAL AND OVERLAY ZONES), of the City of Alexandria Zoning Ordinance, in

More information

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet City of Colleyville Community Development Department Site/Landscape Plan Application Packet Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning

More information

Division 51-4.400. Yard, Lot, and Space Regulations.

Division 51-4.400. Yard, Lot, and Space Regulations. Division 51-4.400. Yard, Lot, and Space Regulations. SEC. 51-4.401. MINIMUM FRONT YARD. (a) General provisions. (1) Required front yards must be open and unobstructed except for fences. Except as otherwise

More information

REGULATIONS FOR CELLULAR ANTENNA TOWERS AND CELLULAR TELECOMMUNICATIONS SERVICES

REGULATIONS FOR CELLULAR ANTENNA TOWERS AND CELLULAR TELECOMMUNICATIONS SERVICES REGULATIONS FOR CELLULAR ANTENNA TOWERS AND CELLULAR TELECOMMUNICATIONS SERVICES Joint City-County Planning Commission of Barren County, Kentucky 126 East Public Square City Hall Glasgow, KY 42141 A. PURPOSE:

More information

KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS

KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS I. GENERAL The following policy shall apply when the intent of the project is to

More information

LAKE SHORE DRIVE CTA RED LINE BROADWAY SHERIDAN FOSTER ARGYLE. Pedestrian Access Advisory Committee. April 25, 2014

LAKE SHORE DRIVE CTA RED LINE BROADWAY SHERIDAN FOSTER ARGYLE. Pedestrian Access Advisory Committee. April 25, 2014 FOSTER LAKE SHORE DRIVE CTA RED LINE BROADWAY SHERIDAN ARGYLE ARGYLE STREET STREETSCAPE - S-1-323 Pedestrian Access Advisory Committee BROADWAY ARGYLE CTA RED LINE WINTHROP KENMORE SHERIDAN Broadway -

More information

Saskatchewan Human Rights Commission Accessibility Rights of Persons with Disabilities Building Standards

Saskatchewan Human Rights Commission Accessibility Rights of Persons with Disabilities Building Standards Saskatchewan Human Rights Commission Accessibility Rights of Persons with Disabilities Building Standards Introduction Canada ratified The United Nations Convention on the Rights of Persons with Disabilities

More information

Evaluation of the Shared-Use Arrow

Evaluation of the Shared-Use Arrow Evaluation of the Shared-Use Arrow Table of Contents Page Evaluation of the Shared-Use ARROW Background... 1 ARROW Design... 1 ARROW Placement... 2 Wayne E. Pein William W. Hunter J. Richard Stewart Report

More information

HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES

HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES Approved 6/26/01 HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES All new, modified and/or changed use access(es) onto county roads shall be subject to the access and corridor protection guidelines

More information

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION. Americans with Disabilities Act (ADA) Transition Plan

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION. Americans with Disabilities Act (ADA) Transition Plan SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION Americans with Disabilities Act (ADA) Transition Plan December 2014 SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION Notice Under the Americans with Disabilities

More information

ADA Checklist for Polling Places

ADA Checklist for Polling Places U.S. Department of Justice Civil Rights Division Disability Rights Section Americans with Disabilities Act ADA Checklist for Polling Places February 2004 Reproduction Reproduction of this document is encouraged.

More information

SECTION 5 DRAFTING STANDARDS

SECTION 5 DRAFTING STANDARDS SECTION 5 DRAFTING STANDARDS 1 SECTION FIVE TABLE OF CONTENTS Description Page TABLE OF CONTENTS... 5-2 GENERAL... 5-3 DRAFTING STANDARDS... 5-5 DRAFTING MINIMUM REQUIREMENTS HANDOUT... 5-8 2 GENERAL 1.

More information

ROAD SAFETY GUIDELINES FOR TAH ROAD INFRASTRUCTURE SAFETY MANAGEMENT

ROAD SAFETY GUIDELINES FOR TAH ROAD INFRASTRUCTURE SAFETY MANAGEMENT I. GENERAL ROAD SAFETY GUIDELINES FOR TAH ROAD INFRASTRUCTURE SAFETY MANAGEMENT ANNEX III B i. The setting up and implementing of appropriate management procedures is an essential tool for improving the

More information

CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR

CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA RSTP Funds Joint Application FOR Tinker Creek Pedestrian Bridge: Tinker Creek and Glade Creek Greenways Connection Date: September 15, 2014 RSTP Project Profile

More information

COURTING YOUR BICYCLE AND PEDESTRIAN FACILITIES... FROM A FORENSIC ENGINEERING AND PLANNING PERSPECTIVE

COURTING YOUR BICYCLE AND PEDESTRIAN FACILITIES... FROM A FORENSIC ENGINEERING AND PLANNING PERSPECTIVE COURTING YOUR BICYCLE AND PEDESTRIAN FACILITIES... FROM A FORENSIC ENGINEERING AND PLANNING PERSPECTIVE 1 PRESENTED BY: J.M. TEAGUE ENGINEERING, PLLC 2 OBJECTIVES 1. What is Transportation Forensic Engineering

More information

Draft Non Transportation Performance Measures Including Related Qualitative Assessment of Example Sections

Draft Non Transportation Performance Measures Including Related Qualitative Assessment of Example Sections Draft Non Transportation Performance Measures Including Related Qualitative Assessment of Example Sections Phil Erickson Community Design + Architecture Mike Johnson HDR Engineering CTF Charrette Approach

More information

CHAPTER 11: PEDESTRIAN SIGNS AND SIGNALS

CHAPTER 11: PEDESTRIAN SIGNS AND SIGNALS CHAPTER 11: PEDESTRIAN SIGNS AND SIGNALS Traffic signs and signals should be useful for all pedestrians. It is essential to provide signals that are phased and timed to allow senior citizens, children,

More information

NOTICE OF A TYPE Ix DECISION ON A PROPOSAL IN YOUR NEIGHBORHOOD

NOTICE OF A TYPE Ix DECISION ON A PROPOSAL IN YOUR NEIGHBORHOOD Date: June 29, 2016 To: From: Interested Person Susan Ellis, Land Use Services 503-823-5361 / susan.ellis@portlandoregon.gov NOTICE OF A TYPE Ix DECISION ON A PROPOSAL IN YOUR NEIGHBORHOOD The Bureau of

More information

9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015

9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Kunzman Associates, Inc. 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Prepared by: Bryan Crawford Carl Ballard,

More information

The emergency provisions affect the following Building Code sections:

The emergency provisions affect the following Building Code sections: On August 1, 2012 new emergency chapter 11B code provisions became effective. Attached are copies of the emergency express terms and the applicable figures. The new requirements are underlined and deleted

More information

Capital Improvement Program: Public Input and the Need for a Multi-year Plan

Capital Improvement Program: Public Input and the Need for a Multi-year Plan Attachment 1 OFFICE OF THE INDEPENDENT BUDGET ANALYST REPORT Date Issued: September 21, 2012 IBA Report Number: 12-39 Budget and Finance Committee Docket Date: September 26, 2012 Item Number: 8 OVERVIEW

More information

American Academy of Physical Medicine and Rehabilitation Site Survey Report

American Academy of Physical Medicine and Rehabilitation Site Survey Report American Academy of Physical Medicine and Rehabilitation Site Survey Report Introduction and Background In early 2013, the Contract Meeting Manager for the American Academy of Physical Medicine and Rehabilitation

More information

The New York City Sidewalk Law

The New York City Sidewalk Law HARLEYSVILLE RISK SERVICES Your Partner in Preventing Losses SM The New York City Sidewalk Law Know your responsibilities and take action THE NEW YORK CITY SIDEWALK LAW 2 The New York City Sidewalk Law

More information

APPENDIX G. California Coastal Commission & Conservancy Accessibility Standards

APPENDIX G. California Coastal Commission & Conservancy Accessibility Standards APPENDIX G California Coastal Commission & Conservancy Accessibility Standards STANDARDS AND RECOMMENDATIONS FOR ACCESSWAY LOCATION AND DEVELOPMENT These standards provide guidelines for the location,

More information

Solar Access: Recommendations for the City and County of Denver

Solar Access: Recommendations for the City and County of Denver Solar Access: Recommendations for the City and County of Denver Prepared for the City and County of Denver, Colorado Prepared by Hannah Muller, U.S. Department of Energy Solar Energy Technologies Program

More information

0.0 Curb Radii Guidelines Version 1.0.2

0.0 Curb Radii Guidelines Version 1.0.2 Background In early 2014, Transportation Services initiated a review of the Division's design guidelines and standards to move our organization in a direction consistent with the transportation departments

More information

Guidelines for Fiber Optic Cable Permits

Guidelines for Fiber Optic Cable Permits Guidelines for Fiber Optic Cable Permits NOVA District (Fairfax/Arlington) Permits www.virginiadot.org/business/fairfax-permits-main.asp Email: NOVAFairfaxPermits@VDOT.Virginia.gov 14685 Avion Parkway

More information

ELECTRONIC HEALTH RECORDS AND WRITING SURFACES

ELECTRONIC HEALTH RECORDS AND WRITING SURFACES ELECTRONIC HEALTH RECORDS AND WRITING SURFACES Author: Bill Zellmer AIA, CASp Issue Date: January 9, 2015 Sutter Health - Physical Access Compliance Sutter PAC Group Revisions: May 8, 2015 Barrier Interpretation

More information

ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES

ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES How to Get Started ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES Design Elements Selecting appropriate design treatments for school neighborhoods creates environments that address the needs of all

More information

BULLETIN NO. 6. Car-Share Requirements and Guidelines for Car-Share Spaces ZONING ADMINISTRATOR. 1. Car-share Basics PURPOSE: OVERVIEW:

BULLETIN NO. 6. Car-Share Requirements and Guidelines for Car-Share Spaces ZONING ADMINISTRATOR. 1. Car-share Basics PURPOSE: OVERVIEW: Car-Share Requirements and Guidelines for Car-Share Spaces Section 307 of the City Planning Code mandates the Zoning Administrator to issue and adopt such rules, regulations and interpretations as are

More information

Best Practice For Selecting Bus Stop Locations

Best Practice For Selecting Bus Stop Locations Best Practice For Selecting Bus Stop Locations There is no perfect school bus stop, because it is impossible to eliminate all potential hazards, but guidelines and training are still necessary to ensure

More information

CITY OF YORBA LINDA P.O. BOX 87014 CALIFORNIA 92885-8714

CITY OF YORBA LINDA P.O. BOX 87014 CALIFORNIA 92885-8714 CITY OF YORBA LINDA P.O. BOX 87014 CALIFORNIA 92885-8714 BUILDING DIVISION (714) 961-7120 Single Family Residential New Construction, Additions & Alterations Submittal Requirements Required agency approvals

More information

Common ADA Errors and Omissions in New Construction and Alterations

Common ADA Errors and Omissions in New Construction and Alterations U.S. Department of Justice Civil Rights Division Disability Rights Section Common ADA Errors and Omissions in New Construction and Alterations Introduction The ADA requires that new construction and alterations

More information

Concept Design Synopsis

Concept Design Synopsis Washington Headquarters Services Facilities Services Directorate The Pentagon Electric Upgrade (Substation No. 2) Concept Design Synopsis September 4, 2014 Prepared for Consultations with VA SHPO, ACHP,

More information

TOWN OF NEW HAVEN ROAD PLAN

TOWN OF NEW HAVEN ROAD PLAN 1 TOWN OF NEW HAVEN ROAD PLAN BACKGROUND The Town of New Haven, Vermont consists of 42 square miles of land and a population of approximately 1400 people. At the start of the 21 st century, it is served

More information

Trenching and Excavation Safety

Trenching and Excavation Safety 1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines related to excavation and trenching in pipeline construction activities. These guidelines are applicable to the locating, marking

More information

CHAPTER 62-624 MUNICIPAL SEPARATE STORM SEWER SYSTEMS

CHAPTER 62-624 MUNICIPAL SEPARATE STORM SEWER SYSTEMS CHAPTER 62-624 MUNICIPAL SEPARATE STORM SEWER SYSTEMS 62-624.100 Policy and Purpose. 62-624.200 Definitions. 62-624.300 General Provisions. 62-624.310 General Conditions, Individual Permits. 62-624.400

More information

Downtown Tampa Transportation Vision

Downtown Tampa Transportation Vision Downtown Tampa Transportation Vision Executive Summary August 1, 2006 Hillsborough County Metropolitan Planning Organization County Center, 18 th Floor Tampa, Florida 33602 813-272-5940 www.hillsboroughmpo.org

More information

BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.

BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project. Smart Transportation Smart Transportation is a key concept for the Paoli Roadway Improvement Project. PennDOT s Smart Transportation Guidebook (2008) outlines a comprehensive approach to transportation

More information

September 8, 2015. VIA EMAIL (councilmember.huizar@lacity.org)

September 8, 2015. VIA EMAIL (councilmember.huizar@lacity.org) www.dlanc.com P.O. Box # 13096 Los Angeles, CA 90013-0096 Patti Berman, President Russell Chan, VP Administration Anastasia Johnson, VP Outreach & Communication Quinn Tang, Treasurer Stephen León Kane,

More information

Accessibility and Universal Design. Presented by Jack D. Humburg Boley Centers, Inc.

Accessibility and Universal Design. Presented by Jack D. Humburg Boley Centers, Inc. Accessibility and Universal Design Presented by Jack D. Humburg Boley Centers, Inc. 1 Jack Humburg Director of Housing Development Director of ADA Services Fair Housing Education and Outreach Consultant

More information

Township of Georgian Bluffs POLICY USE OF UNOPENED ROAD ALLOWANCES

Township of Georgian Bluffs POLICY USE OF UNOPENED ROAD ALLOWANCES Township of Georgian Bluffs POLICY USE OF UNOPENED ROAD ALLOWANCES 1.0 Background An unopened road allowance as defined by the Municipal Act is a public highway that has not been opened and assumed for

More information