Fukushima, Chronologie eines Unfalls
|
|
- Anis Wilson
- 7 years ago
- Views:
Transcription
1 Fukushima, Struktur des Vortrags Ablauf des Reaktorunfalls Technische Maßnahmen für die Zukunft Radiologie An Land Zu Wasser
2 Reaktordesign
3 Reaktordesign
4 Reaktordesign
5 Reaktordesign
6 Reaktordesign
7 Reaktortypen
8 Reaktordesign
9 Reaktordesign
10
11
12
13 Unit Power (MWe /MWth) Type of Reactor / / / /2381 BWR-3 BWR-4 BWR-4 BWR-4 Status at time of EQ In service auto shutdown In service auto shutdown In service auto shutdown Outage Core and fuel integrity Damaged Damaged Damaged No fuel in the Reactor RPV & RCS integrity RPV temperature decreasing RPV temperature stable RPV temperature stable Containment integrity No information Damage suspected Damage suspected Not applicable due to outage plant status AC Power AC power available - power to instrumentation Lighting to Central Control Room AC power available power to instrumentation Lighting to Central Control Room AC power available power to instrumentation Lighting to Central Control Room AC power available power to instrumentation Lighting to Central Control Room Building Severe damage Slight damage Severe damage Severe damage Water level of RPV Around half of Fuel is uncovered Around half of Fuel is uncovered Around half of Fuel is uncovered Pressure of RPV Slowly increasing Stable Stable CV Pressure Drywell Stable Stable Stable Water injection to RPV Injection of freshwater via mobile electric pump with off-site power Injection of freshwater via mobile electric pump with off-site power Injection of freshwater via mobile electric pump with off-site power Water injection to CV No information No information No information Spent Fuel Pool Status Fresh water injection by concrete pump truck Freshwater injection to the Fuel Pool Cooling Line Freshwater injection via Fuel Pool Cooling Line and Periodic spraying Not applicable due to outage plant status Fresh water injection by concrete pump truck
14
15
16 Unit Power (MWe /MWth) Type of Reactor / / / /2381 BWR-3 BWR-4 BWR-4 BWR-4 Status at time of EQ In service auto shutdown In service auto shutdown In service auto shutdown Outage Core and fuel integrity Damaged Damaged Damaged No fuel in the Reactor RPV & RCS integrity RPV temperature decreasing RPV temperature stable RPV temperature stable Containment integrity No information Damage suspected Damage suspected Not applicable due to outage plant status AC Power AC power available - power to instrumentation Lighting to Central Control Room AC power available power to instrumentation Lighting to Central Control Room AC power available power to instrumentation Lighting to Central Control Room AC power available power to instrumentation Lighting to Central Control Room Building Severe damage Slight damage Severe damage Severe damage Water level of RPV Around half of Fuel is uncovered Around half of Fuel is uncovered Around half of Fuel is uncovered Pressure of RPV Slowly increasing Stable Stable CV Pressure Drywell Stable Stable Stable Water injection to RPV Injection of freshwater via mobile electric pump with off-site power Injection of freshwater via mobile electric pump with off-site power Injection of freshwater via mobile electric pump with off-site power Water injection to CV No information No information No information Spent Fuel Pool Status Fresh water injection by concrete pump truck Freshwater injection to the Fuel Pool Cooling Line Freshwater injection via Fuel Pool Cooling Line and Periodic spraying Not applicable due to outage plant status Fresh water injection by concrete pump truck
17 Unit Power (MWe /MWth) Type of Reactor / / / /2381 BWR-3 BWR-4 BWR-4 BWR-4 Status at time of EQ In service auto shutdown In service auto shutdown In service auto shutdown Outage Core and fuel integrity Damaged Damaged Damaged No fuel in the Reactor RPV & RCS integrity RPV temperature decreasing RPV temperature stable RPV temperature stable Containment integrity No information Damage suspected Damage suspected Not applicable due to outage plant status AC Power AC power available - power to instrumentation Lighting to Central Control Room AC power available power to instrumentation Lighting to Central Control Room AC power available power to instrumentation Lighting to Central Control Room AC power available power to instrumentation Lighting to Central Control Room Building Severe damage Slight damage Severe damage Severe damage Water level of RPV Around half of Fuel is uncovered Around half of Fuel is uncovered Around half of Fuel is uncovered Pressure of RPV Slowly increasing Stable Stable CV Pressure Drywell Stable Stable Stable Water injection to RPV Injection of freshwater via mobile electric pump with off-site power Injection of freshwater via mobile electric pump with off-site power Injection of freshwater via mobile electric pump with off-site power Water injection to CV No information No information No information Spent Fuel Pool Status Fresh water injection by concrete pump truck Freshwater injection to the Fuel Pool Cooling Line Freshwater injection via Fuel Pool Cooling Line and Periodic spraying Not applicable due to outage plant status Fresh water injection by concrete pump truck
18
19
20
21 Unit Power (MWe /MWth) Type of Reactor / / / /2381 BWR-3 BWR-4 BWR-4 BWR-4 Status at time of EQ In service auto shutdown In service auto shutdown In service auto shutdown Outage Core and fuel integrity Damaged Damaged Damaged No fuel in the Reactor RPV & RCS integrity RPV temperature decreasing RPV temperature stable RPV temperature stable Containment integrity No information Damage suspected Damage suspected Not applicable due to outage plant status AC Power AC power available - power to instrumentation Lighting to Central Control Room AC power available power to instrumentation Lighting to Central Control Room AC power available power to instrumentation Lighting to Central Control Room AC power available power to instrumentation Lighting to Central Control Room Building Severe damage Slight damage Severe damage Severe damage Water level of RPV Around half of Fuel is uncovered Around half of Fuel is uncovered Around half of Fuel is uncovered Pressure of RPV Slowly increasing Stable Stable CV Pressure Drywell Stable Stable Stable Water injection to RPV Injection of freshwater via mobile electric pump with off-site power Injection of freshwater via mobile electric pump with off-site power Injection of freshwater via mobile electric pump with off-site power Water injection to CV No information No information No information Spent Fuel Pool Status Fresh water injection by concrete pump truck Freshwater injection to the Fuel Pool Cooling Line Freshwater injection via Fuel Pool Cooling Line and Periodic spraying Not applicable due to outage plant status Fresh water injection by concrete pump truck
22
23 P 2 0,2 0,2 =6, t ( T 0 +t ) P0 [ ]
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51 Unit Power (MWe /MWth) Type of Reactor / / / /2381 BWR-3 BWR-4 BWR-4 BWR-4 Status at time of EQ In service auto shutdown In service auto shutdown In service auto shutdown Outage Core and fuel integrity Damaged Damaged Damaged No fuel in the Reactor RPV & RCS integrity RPV temperature decreasing RPV temperature stable RPV temperature stable Containment integrity No information Damage suspected Damage suspected Not applicable due to outage plant status AC Power AC power available - power to instrumentation Lighting to Central Control Room AC power available power to instrumentation Lighting to Central Control Room AC power available power to instrumentation Lighting to Central Control Room AC power available power to instrumentation Lighting to Central Control Room Building Severe damage Slight damage Severe damage Severe damage Water level of RPV Around half of Fuel is uncovered Around half of Fuel is uncovered Around half of Fuel is uncovered Pressure of RPV Slowly increasing Stable Stable CV Pressure Drywell Stable Stable Stable Water injection to RPV Injection of freshwater via mobile electric pump with off-site power Injection of freshwater via mobile electric pump with off-site power Injection of freshwater via mobile electric pump with off-site power Water injection to CV No information No information No information Spent Fuel Pool Status Fresh water injection by concrete pump truck Freshwater injection to the Fuel Pool Cooling Line Freshwater injection via Fuel Pool Cooling Line and Periodic spraying Not applicable due to outage plant status Fresh water injection by concrete pump truck
52 Maßnahmen
53 Maßnahmen
54 Radiologie 0.1 µsv Background
55 Radiologie
56 Radiologie Food Monitoring 19 March to 3 May, MHLW Proben aus 18 Präfekturen 2239 Proben (91%): unter der Regulierungen Fukushima 222 samples (9 %): über den Regulierungen hauptsächlich Gemüse: Aus 6 Präfekturen (Chiba, Fukushima, Gunma, Ibaraki, Tochigi, Tokyo) Gunma Saitama Tokyo 0 0 Hyogo Kyoto 0 0 0
57 Radiologie
58 Radiologie
59 Radiologie
60 Radiologie
61 Radiologie Nur 3 Proben liegen über den festgelegten Werten für Cs-134 und Cs-137. Nur Sandaale
62 Radiologie
63 Radiologie
64 Maßnahmen
65 Unit Power (MWe /MWth) Type of Reactor / / / /2381 BWR-3 BWR-4 BWR-4 BWR-4 Status at time of EQ In service auto shutdown In service auto shutdown In service auto shutdown Outage Core and fuel integrity Damaged Damaged Damaged No fuel in the Reactor RPV & RCS integrity RPV temperature decreasing RPV temperature stable RPV temperature stable Containment integrity No information Damage suspected Damage suspected Not applicable due to outage plant status AC Power AC power available - power to instrumentation Lighting to Central Control Room AC power available power to instrumentation Lighting to Central Control Room AC power available power to instrumentation Lighting to Central Control Room AC power available power to instrumentation Lighting to Central Control Room Building Severe damage Slight damage Severe damage Severe damage Water level of RPV Around half of Fuel is uncovered Around half of Fuel is uncovered Around half of Fuel is uncovered Pressure of RPV Slowly increasing Stable Stable CV Pressure Drywell Stable Stable Stable Water injection to RPV Injection of freshwater via mobile electric pump with off-site power Injection of freshwater via mobile electric pump with off-site power Injection of freshwater via mobile electric pump with off-site power Water injection to CV No information No information No information Spent Fuel Pool Status Fresh water injection by concrete pump truck Freshwater injection to the Fuel Pool Cooling Line Freshwater injection via Fuel Pool Cooling Line and Periodic spraying Not applicable due to outage plant status Fresh water injection by concrete pump truck
66 Maßnahmen
67 Quellen IAEA JAIF VBG AREVA ATI TEPCO SIROCCO
Fukushima 2011. Fukushima Daiichi accident. Nuclear fission. Distribution of energy. Fission product distribution. Nuclear fuel
Fukushima 2011 Safety of Nuclear Power Plants Earthquake and Tsunami Accident initiators and progression Jan Leen Kloosterman Delft University of Technology 1 2 Nuclear fission Distribution of energy radioactive
More informationMay 23, 2011 Tokyo Electric Power Company
Analysis and evaluation of the operation record and accident record of Fukushima Daiichi Nuclear Power Station at the time of Tohoku-Chihou-Taiheiyou-Oki-Earthquake (summary) May 23, 2011 Tokyo Electric
More informationIV. Occurrence and Progress of Accidents in Fukushima Nuclear Power Stations and Other Facilities
IV. Occurrence and Progress of Accidents in Fukushima Nuclear Power Stations and Other Facilities 1. Outline of Fukushima Nuclear Power Stations (1) Fukushima Daiichi Nuclear Power Station Fukushima Daiichi
More informationFebruary 19, 2014. Senior Fellow, Nuclear Energy Systems & Services Division Power Systems Company
JAPAN-U.S. DECOMISSIONING AND REMEDIATION FUKUSHIMA RECOVERY FORUM February 19, 2014 Senior Fellow, Nuclear Energy Systems & Services Division Power Systems Company Toshiba global formation Information
More informationBoiling Water Reactor Systems
Boiling Water (BWR) s This chapter will discuss the purposes of some of the major systems and components associated with a boiling water reactor (BWR) in the generation of electrical power. USNRC Technical
More informationRoadmap towards Restoration from the Accident at Fukushima Daiichi Nuclear Power Station, TEPCO. Progress Status
Appendix 1-2 Roadmap towards Restoration from the Accident at Fukushima Daiichi Nuclear Power Station, TEPCO Progress Status July 19 th, 2011 Nuclear Emergency Response Headquarters Government-TEPCO Integrated
More informationSpecial Report on the Nuclear Accident at the Fukushima Daiichi Nuclear Power Station
Special Report INPO 11-005 November 2011 Special Report on the Nuclear Accident at the Fukushima Daiichi Nuclear Power Station Revision 0 OPEN DISTRIBUTION Open Distribution: Copyright 2011 by the Institute
More informationIAEA INTERNATIONAL FACT FINDING EXPERT MISSION OF THE NUCLEAR ACCIDENT FOLLOWING THE GREAT EAST JAPAN EARTHQUAKE AND TSUNAMI
IAEA INTERNATIONAL FACT FINDING EXPERT MISSION OF THE NUCLEAR ACCIDENT FOLLOWING THE GREAT EAST JAPAN EARTHQUAKE AND TSUNAMI Tokyo, Fukushima Dai-ichi NPP, Fukushima Dai-ni NPP and Tokai NPP, Japan 24
More informationIAEA INTERNATIONAL FACT FINDING EXPERT MISSION OF THE FUKUSHIMA DAI-ICHI NPP ACCIDENT FOLLOWING THE GREAT EAST JAPAN EARTHQUAKE AND TSUNAMI
Original English MISSION REPORT THE GREAT EAST JAPAN EARTHQUAKE EXPERT MISSION IAEA INTERNATIONAL FACT FINDING EXPERT MISSION OF THE FUKUSHIMA DAI-ICHI NPP ACCIDENT FOLLOWING THE GREAT EAST JAPAN EARTHQUAKE
More informationFukushima & Three Mile Island Reactor Accidents: Recovery, Cleanup, Lessons, & Future
Fukushima & Three Mile Island Reactor Accidents: Recovery, Cleanup, Lessons, & Future Foundation For Nuclear Studies Congressional Briefing May 18, 2012 Lake H. Barrett Lake@Lbarrett.com Disclaimer: Fukushima
More informationEMERGENCY PREPAREDNESS FREQUENTLY ASKED QUESTION (EPFAQ) NEI 99 01 REVISIONS 4 THROUGH 6; NUMARC/NESP 007
EPFAQ Number: 2015 001 DATE ACCEPTED 20 Apr 15 ORIGINATOR DAVID YOUNG ORGANIZATION Nuclear Energy Institute (NEI) PHONE # 202 739 8016 RELEVANT GUIDANCE: NEI 99 01 REVISIONS 4 THROUGH 6; NUMARC/NESP 007
More informationGreat East Japan Earthquake and the seismic damage to the NPSs
Great East Japan Earthquake and the seismic damage to the NPSs As of 15:30 July 3rd, 2011 (JST) Ministry of Economy, Trade and industry Earthquake and automatic shut-down of nuclear reactors The Great
More informationAPPENDIX C. Accident Cleanup
APPENDIX C Accident Cleanup NOTE: All sections in this appendix relate to the Fukushima Daiichi nuclear power station. I. CHALLENGES TO WATER CLEANUP ON-SITE I.A. Challenges and Current Conditions The
More informationSOLVING REACTOR WATER CLEAN-UP SYSTEM ANOMALIES USING RELAP5 MOD3.3
11 th International Conference on Nuclear Engineering Tokyo, JAPAN, April 20-23, 2003 ICONE11-36149 SOLVING REACTOR WATER CLEAN-UP SYSTEM ANOMALIES USING RELAP5 MOD3.3 Joseph S. Miller EDA, Inc 6397 True
More informationThe integrity evaluation of the reactor building at unit4 in the Fukushima Daiichi nuclear power station
The integrity evaluation of the reactor building at unit4 in the Fukushima Daiichi nuclear power station May 2012 Government and TEPCO s Mid-to Long Term Countermeasure Meeting Management Council Outline
More informationDevelopment Study of Nuclear Power Plants for the 21st Century
Development Study of Nuclear Power Plants for the 21st Century Hitachi Review Vol. 50 (2001), No. 3 61 Kumiaki Moriya Masaya Ohtsuka Motoo Aoyama, D.Eng. Masayoshi Matsuura OVERVIEW: Making use of nuclear
More informationJuly 30, 2012 Nuclear Emergency Response Headquarters Government-TEPCO Med-and-long Term Response Council
Supplementary Document 1 Research and Development Road Map for Decommissioning Units 1 4 at TEPCO's Fukushima Daiichi Nuclear Power Plant July 30, 2012 Nuclear Emergency Response Headquarters Government-TEPCO
More informationStudy of In-Data Centre Backup Offices for Banks
Study of In-Data Centre Backup Offices for Banks CRITIS 2013 in Amsterdam Yasutake Sayanagi Nagoya Institute of Technology 1 Agenda 1. Mission statement of the Banks in Japan 2. The trigger event review
More informationDynamic Behavior of BWR
Massachusetts Institute of Technology Department of Nuclear Science and Engineering 22.06 Engineering of Nuclear Systems Dynamic Behavior of BWR 1 The control system of the BWR controls the reactor pressure,
More informationSeismic Damage Information (the 231st Release) (As of 14:00 August 16, 2011)
Extract August 16, 2011 Nuclear and Industrial Safety Agency Seismic Damage Information (the 231st Release) (As of 14:00 August 16, 2011) The Nuclear and Industrial Safety Agency (NISA) confirmed the current
More informationThe number of policy holders has exceeded 100,000 individuals. Highly acceptance by the child-raising generations mainly 20s and 30s
February 26, 2013 Haruaki Deguchi, President/Founder LIFENET INSURANCE COMPANY (Securities Code: 7157, TSE Mothers) The number of policy holders has exceeded 100,000 individuals Highly acceptance by the
More informationNuclear Power Plant & Systems David Downing / Kenneth Green. WSP Parsons Brinckerhoff / Sargent & Lundy TUESDAY, 6 OCTOBER 2015
Nuclear Power Plant & Systems David Downing / Kenneth Green WSP Parsons Brinckerhoff / Sargent & Lundy TUESDAY, 6 OCTOBER 2015 The Brief To develop whole-of-life cost estimates for the development of nuclear
More informationSAFETY EVALUATION OF INDIAN NUCLEAR POWER PLANTS. BWRs AT TARAPUR ATOMIC POWER STATION (TAPS-1&2)
A1 SAFETY EVALUATION OF INDIAN NUCLEAR POWER PLANTS BWRs AT TARAPUR ATOMIC POWER STATION (TAPS-1&2) A1 SAFETY EVALUATION OF INDIAN NUCLEAR POWER PLANTS BWRs AT TARAPUR ATOMIC POWER STATION (TAPS-1&2) 1.0
More informationFukushima Nuclear Disaster
Mark Holt Specialist in Energy Policy Richard J. Campbell Specialist in Energy Policy Mary Beth Nikitin Specialist in Nonproliferation January 18, 2012 CRS Report for Congress Prepared for Members and
More information10 Nuclear Power Reactors Figure 10.1
10 Nuclear Power Reactors Figure 10.1 89 10.1 What is a Nuclear Power Station? The purpose of a power station is to generate electricity safely reliably and economically. Figure 10.1 is the schematic of
More informationThe Price-Anderson Act and the Three Mile Island Accident
The Price-Anderson Act and the Three Mile Island Accident OECD/NEA Workshop Nuclear Damages, Liability Issues, and Compensation Schemes Overview Overview of Nuclear Liability in U.S. Three Mile Island
More informationStatus on Spanish Regulations and Industry. actions related to Filtered Containment. Venting Systems (FCVS)
Status on Spanish Regulations and Industry actions related to Filtered Containment Venting Systems (FCVS) Sara González Systems Engineering Department Consejo de Seguridad Nuclear, Spain Technical Meeting
More information15 April 2015 Nuclear Regulation Authority, Japan. 1. Overview
Evaluation of the report of the Tokyo Electric Power Company regarding the leakage from the double strainer differential manometer for the water transfer pipes of the desalination system at Fukushima Daiichi
More informationBuilding New Generation Nuclear Plants Worldwide : AREVA's Experience
Building New Generation Nuclear Plants Worldwide : AREVA's Experience Philippe Guay Senior Vice President, New Builds Offers AREVA 37 th WNA Symposium 12-14 September 2012 LONDON Projects status The value
More informationAREVA, an unparalleled experience in building nuclear reactors
AREVA, an unparalleled experience in building nuclear reactors Frank APEL Senior Vice President Sales Central Europe and Nordic Countries AREVA, International Commercial Organisation 9 th Annual European
More informationThe ABWR Project at Shimane-3, Japan
CASE STUDIES ON PROJECT AND LOGISTICS MANAGEMENT IN NUCLEAR NEW BUILT The ABWR Project at Shimane-3, Japan Sang-Baik Kim, Jan-Horst Keppler OECD Nuclear Energy Agency, Nuclear Development Division OECD
More informationNuclear power plant systems, structures and components and their safety classification. 1 General 3. 2 Safety classes 3. 3 Classification criteria 3
GUIDE 26 June 2000 YVL 2.1 Nuclear power plant systems, structures and components and their safety classification 1 General 3 2 Safety classes 3 3 Classification criteria 3 4 Assigning systems to safety
More informationThe Realities of Disaster Recovery: How the Japan Data Center Council is Successfully Operating in the Aftermath of the Earthquake
Data Center Dynamics in San Francisco June 2011 The Realities of Disaster Recovery: How the Japan Data Center Council is Successfully Operating in the Aftermath of the Earthquake June 30, 2011 ATSUSHI
More informationA PROCESS-INHERENT, ULTIMATE-SAFETY (PIUS), BOILING-WATER REACTOR
A PROCESS-INHERENT, ULTIMATE-SAFETY (PIUS), BOILING-WATER REACTOR Charles W. Forsberg Oak Ridge National Laboratory* P.O. Box X Oak Ridge, Tennessee 37831 (615) 574-6783 Summary fcr 1985 American Nuclear
More informationNew nuclear project financing Warsaw, June 26, 2013 p. 1
New nuclear project financing Warsaw, June 26, 2013 p. 1 The EPR design: a reference technology Loïc ELOY Director of New Builds Offers Poland Platts Conference Warsaw, 26 June 2013 EPR reactor design
More informationI n d e p e n d e n t T e c h n i c a l E v a l u a t i o n a n d R e v i e w Fukushima Daiichi Nuclear Accident First considerations
I n d e p e n d e n t T e c h n i c a l E v a l u a t i o n a n d R e v i e w Fukushima Daiichi Nuclear Accident First considerations Preliminary Report May 2011 Fukushima Daiichi Nuclear Accident Preliminary
More informationIAEA Training Course on Safety Assessment of NPPs to Assist Decision Making. System Analysis. Lecturer. Workshop Information IAEA Workshop
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making System Analysis Lecturer Lesson Lesson IV IV 3_2.3 3_2.3 Workshop Information IAEA Workshop City, XX XX - City -XX, Country Month,
More informationReactor imaging technology for fuel debris detection by cosmic ray muon
Reactor imaging technology for fuel debris detection by cosmic ray muon Measurement status report in Unit-1 March 19, 2015 Tokyo Electric Power Company Correction In line 9 of page 11 there was a error
More informationLessons Learned from the Nuclear Accident at the Fukushima Daiichi Nuclear Power Station
Special Report INPO 11-005 Addendum August 2012 Lessons Learned from the Nuclear Accident at the Fukushima Daiichi Nuclear Power Station Revision 0 OPEN DISTRIBUTION Open Distribution: Copyright 2012 by
More informationFukushima Daiichi Accident Study (Status as of April 2012)
SANDIA REPORT SAND2012-6173 Unlimited Release Printed August 2012 Fukushima Daiichi Accident Study (Status as of April 2012) Randall Gauntt, Donald Kalinich, Jeff Cardoni, Jesse Phillips, Andrew Goldmann,
More informationPublic SUMMARY OF EU STRESS TEST FOR LOVIISA NUCLEAR POWER PLANT
1 (8) SUMMARY OF EU STRESS TEST FOR LOVIISA NUCLEAR POWER PLANT 1 LOVIISA NUCLEAR POWER PLANT Loviisa town is located approximately 90 km eastwards from Helsinki at the coast of Gulf of Finland. Loviisa
More informationAREVA Advanced nuclear power plants
AREVA Advanced nuclear power plants Bernard Bastide AREVA Brazil and South America VP University of Rio de Janeiro III Semana da Engenharia Nuclear UFRJ August 2013 AREVA presentation AREVA EPR projects
More informationU.S. EPR Design Overview
U.S. EPR Design Overview Brian A. McIntyre U.S. EPR Design Certification Project Manager WM2009 Conference March 4, 2009 The EPR Story 1989: Agreement between Framatome and Siemens on development of common
More informationReport. November 2013
Report A comparison of U.S. and Japanese regulatory requirements in effect at the time of the Fukushima accident November 2013 Page 1 EXECUTIVE SUMMARY In the Staff Requirements Memo (SRM) to SECY-12-0110
More information7.1 General 5 7.2 Events resulting in pressure increase 5
GUIDE YVL 2.4 / 24 Ma r ch 2006 Primary and secondary circuit pressure control at a nuclear power plant 1 Ge n e r a l 3 2 General design requirements 3 3 Pressure regulation 4 4 Overpressure protection
More informationHEALTH & SAFETY EXECUTIVE NUCLEAR DIRECTORATE ASSESSMENT REPORT. New Reactor Build. EDF/AREVA EPR Step 2 PSA Assessment
HEALTH & SAFETY EXECUTIVE NUCLEAR DIRECTORATE ASSESSMENT REPORT New Reactor Build EDF/AREVA EPR Step 2 PSA Assessment HM Nuclear Installations Inspectorate Redgrave Court Merton Road Bootle Merseyside
More informationOutlook for RWE s nuclear operations. Prof. Dr. Gerd Jäger London, 16 January 2012
Outlook for RWE s nuclear operations Prof. Dr. Gerd Jäger London, 16 January 2012 Overview of German nuclear power plants Power plant Net capacity MW Commercial commissioning Shutdown German nuclear power
More information(2) Action taken at the main control rooms a. General
IV. Accident response at TEPCO's Fukushima Dai-ichi NPS 1. Situation and response from the time the earthquake hit until the arrival of the tsunami (from approximately 14:46 to 15:35 on March 11, 2011)
More informationNuclear Regulation for SMR in India Current Perspectives
Licensing and Safety Issues for Small and Mediumsized Reactors (SMRs) 29 July 2 August 2013 IAEA Headquarters, Vienna, Austria Nuclear Regulation for SMR in India Current Perspectives Dr. A. Ramakrishna,
More informationUNITED STATES NUCLEAR REGULATORY COMMISSION ADVISORY COMMITTEE ON REACTOR SAFEGUARDS WASHINGTON, DC 20555-0001. July 17, 2012
UNITED STATES NUCLEAR REGULATORY COMMISSION ADVISORY COMMITTEE ON REACTOR SAFEGUARDS WASHINGTON, DC 20555-0001 July 17, 2012 Mr. R. W. Borchardt Executive Director for Operations U.S. Nuclear Regulatory
More informationBoiling Water Reactor Simulator with Active Safety Systems
Boiling Water Reactor Simulator with Active Safety Systems User Manual October 2009 INTERNATIONAL ATOMIC ENERGY AGENCY, 2009 The originating Section of this publication in the IAEA was: Nuclear Power Technology
More informationXA0302230 EVALUATION OF TRAINING ACTIVITIES IN ARGENTINA
XA0302230 EVALUATION OF TRAINING ACTIVITIES IN ARGENTINA Alejandro D. SANDA ATUCHANPP ARGENTINA I came from Argentina. Do you know where Argentina is? Argentina is in South America, below Brazil. The area
More informationU.S. Operators Perspective on Nuclear Liability
U.S. Operators Perspective on Nuclear Liability OECD/NEA Workshop Nuclear Damages, Liability Issues, and Compensation Schemes Overview Overview of Nuclear Liability in the U.S. Nuclear Liability in Practice
More information2013 TEPCO ILLUSTRATED
2013 TEPCO ILLUSTRATED TEPCO ILLUSTRATED is an English translation of the Japanese original. If there are discrepancies between the translation and the original, the latter shall prevail. - CONTENTS -
More information11- Benefits due to Power Generation
IEA Hydropower Implementing Agreement Annex VIII - Hydropower Good Practices: Environmental Mitigation Measures and Benefits Case Study 11-02: Benefits due to Power Generation Large Scale Pumped Storage
More informationIntroductions: Dr. Stephen P. Schultz
Introductions: Dr. Stephen P. Schultz Vienna, Austria 1 3 September 2015 Work Experience Current Member Advisory Committee on Reactor Safeguards, U.S. Nuclear Regulatory Commission, 12/2011 Chair, Fukushima
More informationSAFETY EVALUATION OF. INDIAN NUCLEAR POWER PLANTS PHWRs AT MADRAS ATOMIC POWER STATION (MAPS)
A3 SAFETY EVALUATION OF INDIAN NUCLEAR POWER PLANTS PHWRs AT MADRAS ATOMIC POWER STATION (MAPS) A3:0 A3 SAFETY EVALUATION OF INDIAN NUCLEAR POWER PLANTS PHWRs AT MADRAS ATOMIC POWER STATION (MAPS) 1.0
More informationOperating Performance: Accident Management: Severe Accident Management Programs for Nuclear Reactors REGDOC-2.3.2
Operating Performance: Accident Management: Severe Accident Management Programs for Nuclear Reactors REGDOC-2.3.2 September 2013 Accident Management: Severe Accident Regulatory Document REGDOC-2.3.2 Canadian
More informationBelgian Stress tests specifications Applicable to power reactors 17 May 2011
Belgian Stress tests specifications Applicable to power reactors 17 May 2011 Introduction Considering the accident at the Fukushima nuclear power plant in Japan, the European Council of March 24 th and
More informationThe 1250 MWe Boiling Water Reactor
The 1250 MWe Boiling Water Reactor Gundremmingen B+C, operating since 1984 and 1985 3 The need to secure long-term energy supplies, stabilize energy costs and combat global warming, argues in favor of
More informationSummary Report of Basic Survey on Wage Structure (starting salary)
Summary Report of Basic Survey on Wage Structure (starting ) 2011 Contents Outline of Survey Page 1 Definitions Page 3 Summary of Results 1. Starting by school career Page 4 2. Starting by enterprise size
More informationPhysics and Engineering of the EPR
Physics and Engineering of the EPR Keith Ardron UK Licensing Manager, UK Presentation to IOP Nuclear Industry Group Birchwood Park, Warrington UK, November 10 2010 EPRs in UK EPR is Generation 3+ PWR design
More informationHoltec International. Multi-Purpose Canisters for Long-Term Interim Storage. June 17, 2015. Rick Springman, Ph.D. Director of International Projects
Holtec International Multi-Purpose Canisters for Long-Term Interim Storage June 17, 2015 Rick Springman, Ph.D. Director of International Projects Dry Storage & Transport Projects Wet Storage Projects 1
More informationTechnical Meeting on the Implications of the Fukushima Daiichi Accident on the Safety of Fuel Cycle Facilities. IAEA Headquarters Vienna, Austria
1 J7-TM-44883 Technical Meeting on the Implications of the Fukushima Daiichi Accident on the Safety of Fuel Cycle Facilities IAEA Headquarters Vienna, Austria 1 5 July 2013 INFORMATION SHEET 1. Background
More informationDamage of Fukushima Nuclear Accident and a new compensation scheme
Damage of Fukushima Nuclear Accident and a new compensation scheme Kenichi Oshima College of International Relations, Ritsumeikan University SPRU, University of Sussex k-oshima@cj8.so-net.ne.jp 1 Contents
More informationAP1000 Overview. 2011 Westinghouse Electric Company LLC - All Rights Reserved
AP1000 Overview AP1000 is a registered trademark in the United States of Westinghouse Electric Company LLC, its subsidiaries and/or its affiliates. This mark may also be used and/or registered in other
More informationEMERGENCY-RESPONSE CAPACITY OF LIFELINES AFTER WIDE-AREA EARTHQUAKE DISASTERS
Proceedings of the International Symposium on Engineering Lessons Learned from the 211 Great East Japan Earthquake, March 1-4, 212, Tokyo, Japan EMERGENCY-RESPONSE CAPACITY OF LIFELINES AFTER WIDE-AREA
More informationThe Fukushima Nuclear Accident and Crisis Management
The Fukushima Nuclear Accident and Crisis Management Lessons for Japan-U.S. Alliance Cooperation September, 2012 The Sasakawa Peace Foundation Foreword This report is the culmination of a research project
More informationDecommissioning situation of Nuclear Power Plant in Japan
Decommissioning situation of Nuclear Power Plant in Japan April, 2015 The Japan Atomic Power Co. The Kansai Electric Power Co., Inc. General Description 1 Operational years of commercial NPP in Japan 40
More informationANCILLARY SERVICES SUPPLIED TO THE GRID: THE CASE OF THISVI CCGT POWER PLANT (GREECE)
Claudio Cavandoli, Alessandro Crippa EDISON S.p.A., Engineering Department ANCILLARY SERVICES SUPPLIED TO THE GRID: THE CASE OF THISVI CCGT POWER PLANT (GREECE) 1 ANCILLARY SERVICES SUPPLIED TO THE GRID:
More informationTeollisuuden Voima Oyj - General Presentation January 2009. Ilkka Mikkola Senior Adviser (Former Fuel Manager) Teollisuuden Voima Oyj
Teollisuuden Voima Oyj - General Presentation January 2009 Ilkka Mikkola Senior Adviser (Former Fuel Manager) Teollisuuden Voima Oyj Nuclear Power Plants in Finland in 2008 Olkiluoto OL1 BWR 860 MW 1978
More informationNuclear Design Practices and the Case of Loviisa 3
Nuclear Design Practices and the Case of Loviisa 3 Harri Tuomisto Fortum Power, Finland Third Nuclear Power School, 20-22 October 2010, Gdańsk, Poland 22 October 2010 Harri Tuomisto 1 Objectives The objective
More informationLife Insurance Fact Book (2014)
Life Insurance Fact Book (214) The Life Insurance Association of Japan Introduction The Life Insurance Fact Book summarizes key performance indicators of life insurance companies operating in Japan. We
More informationBoiling Water Reactor Power Plant
Boiling Water Reactor Power Plant This material was, for a purpose to be used in a nuclear education, compiled comprehensively with a caution on appropriateness and neutrality of information, based on
More informationCritical Review of the Swedish Stress Tests Report
1 Critical Review of the Swedish Stress Tests Report Oda Becker September 2012 1 Introduction... 2 2 Weaknesses the Swedish Stress Test Described... 3 2.1 Earthquake... 3 2.2 Flooding... 4 2.3 Extreme
More informationThe EPR design: the European reference
The EPR design: the European reference Jean-Bernard Ville Executive Vice-President, New Builds June 25 th, London 1 EPR Design safety 2 EPR project delivery 3 A partnership-based approach Platts 7 th European
More informationOrder No. EA-12-051 RS-13-031
Exelon Generation Order No. EA-12-051 RS-13-031 February 28,2013 u.s. Nuclear Regulatory Commission AnN: Document Control Desk Washington, DC 20555-0001 LaSalle County Station, Units 1 and 2 Facility Operating
More informationRENCEE SAFETY MARIES
IAEA MINISTE ERIAL CONFE RENCEE ON NUCLEAR SAFETY Vienna,, 20 24 June 2011 CHAIRPERSONS SUMM MARIES 1 The attached texts are the Chairpersons summaries of the main proposals that emerged from the Working
More informationIntroduction to Nuclear Fuel Cycle and Advanced Nuclear Fuels
Introduction to Nuclear Fuel Cycle and Advanced Nuclear Fuels Jon Carmack Deputy National Technical Director Fuel Cycle Technology Advanced Fuels Program February 27, 2011 The Evolution of Nuclear Power
More informationTVO and Nuclear Waste Management at Olkiluoto. Corporate Adviser
Olkiluoto, 28 October 2008 TVO and Nuclear Waste Management at Olkiluoto Corporate Adviser Nuclear Power Plants in Finland Olkiluoto OL1 BWR 860 MW 1979 OL2 BWR 860 MW 1982 Population 5.3 million Power
More informationRadiological objectives and severe accident mitigation strategy for the generation II PWRs in France in the framework of PLE
IAEA-CN-194-027 Radiological objectives and severe accident mitigation strategy for the generation II PWRs in France in the framework of PLE G. Cenerino, M. Dubreuil, E. Raimond, F. Pichereau Institut
More informationPreparation for fuel removal from the spent fuel pool in Unit 3 reactor building at Fukushima Daiichi Nuclear Power Station
Preparation for fuel removal from the spent fuel pool in Unit 3 reactor building at Fukushima Daiichi uclear Power Station Demonstration of fuel handling machine and crane January 18, 2016 Tokyo Electric
More informationA Reviewof AkkuyuNPP Project in Turkey After Fukushima Daiichi Accident
A Reviewof AkkuyuNPP Project in Turkey After Fukushima Daiichi Accident The Technical Meeting onevaluation Methodology of the Status of National Nuclear Infrastructure Development and Integrated Nuclear
More informationHYBRID COMBINED CYCLE POWER PLANT
International Conference Nuclear Energy for New Europe 2002 Kranjska Gora, Slovenia, September 9-12, 2002 www.drustvo-js.si/gora2002 HYBRID COMBINED CYCLE POWER PLANT KÁROLY VESZELY Szmolnyica sétány 14/5,
More informationAnnual Report 2011 Year ended March 31, 2011
Annual Report 2011 Year ended March 31, 2011 The Tokyo Electric Power Company Profile/Contents Profile The Tokyo Electric Power Company, Incorporated (TEPCO) was established in 1951 to supply electric
More informationPlant-specific safety review (RSK-SÜ) of German nuclear power plants in the light of the events in Fukushima-1 (Japan)
Note: This is a translation of Chapter 1 of the RSK statement entitled Anlagenspezifische Sicherheitsüberprüfung (RSK-SÜ) deutscher Kernkraftwerke unter Berücksichtigung der Ereignisse in Fukushima-I (Japan).
More informationJune 27, 2014. Scott C. Flanders, Director Division of Site Safety and Environmental Analysis Office of New Reactors
June 27, 2014 MEMORANDUM TO: Timothy J. McGinty, Director Division of Safety Systems Office of Nuclear Reactor Regulation Scott C. Flanders, Director Division of Site Safety and Environmental Analysis
More informationAP1000 Technology: Passive & Proven
AP1000 Technology: Passive & Proven The Right Fit for Brazil Jeff Benjamin Senior Vice President Nuclear Power Plants (NPP) AP1000 is a trademark or registered trademark of Westinghouse Electric Company
More informationNuclear Power Plant Electrical Power Supply System Requirements
1 Nuclear Power Plant Electrical Power Supply System Requirements Željko Jurković, Krško NPP, zeljko.jurkovic@nek.si Abstract Various regulations and standards require from electrical power system of the
More informationEDUCATION AND TRAINING OF OPERATORS AND MAINTENANCE STAFF AT COMMERCIAL NUCLEAR POWER STATIONS IN JAPAN
IAEA-CN-73/42 EDUCATION AND TRAINING OF OPERATORS AND MAINTENANCE STAFF AT COMMERCIAL NUCLEAR POWER STATIONS IN JAPAN M.TAKAHASHI Chubu Electric Power Co., Inc. XA9847813 H. KATAOKA Kansai Electric Power
More informationIAEA Action Plan on Nuclear Safety 1
IAEA Action Plan on Nuclear Safety 1 In June 2011 a Ministerial Conference on Nuclear Safety was convened to direct, under the leading role of the IAEA, the process of learning and acting upon lessons
More informationCFD Topics at the US Nuclear Regulatory Commission. Christopher Boyd, Ghani Zigh Office of Nuclear Regulatory Research June 2008
CFD Topics at the US Nuclear Regulatory Commission Christopher Boyd, Ghani Zigh Office of Nuclear Regulatory Research June 2008 Overview Computational Fluid Dynamics (CFD) is playing an ever increasing
More information( 1 ) Overview of Safety Measures ( 2 ) Overview of Measures for Attaining Greater Safety and Reliability
Contents 1 Effort for New Regulatory Requirements ( 1 ) Overview of a Gist of New Regulatory Requirements in Nuclear Regulation Authority ( 2 ) Major Requirements of a Gist of New Regulatory Requirements
More informationEU S TRESS TEST SWISS NA TIONAL REPORT
ARTHQUAKESICEGERMANYMINIMUMTECH- ICALSAFE TYREQUIREMENTSCZECHREPUB ICMUEHLEBERGSLOVAKRE PUBLICCOMPA ATIVECRITERIAFLOODINGNUCLEARACCID NTINFUKUSHIMABELGIUMNATURALDISAS- ERSEXTREMECOLDEXTREMEHEATDAMA- INGEFFECTSGOESGENSNOWEUWIDETEST-
More informationJapan s current Nuclear Energy Policy
Japan s current Nuclear Energy Policy Hirobumi Kayama Agency for Natural Resources and Energy, METI December, 2014 Evaluation and Policy Timeframe of Nuclear Power
More informationBWR Description Jacopo Buongiorno Associate Professor of Nuclear Science and Engineering
BWR Description Jacopo Buongiorno Associate Professor of Nuclear Science and Engineering 22.06: Engineering of Nuclear Systems 1 Boiling Water Reactor (BWR) Public domain image by US NRC. 2 The BWR is
More informationFire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1
Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1 Nuclear Power in Pakistan Nuclear Power Plants Capacity (MWe) Year of Commissioning In
More informationUpdate on Japan s Nuclear Energy Development and Spent Fuel Management Plans and Options
2013 Spent Fuel and Reduction of Radiological Risk after Fukushima and Deep Borehole and Spent Fuel in East Asia WORKING GROUP MEETING May 28 30, 2013 1 Update on Japan s Nuclear Energy Development and
More informationActivities of Nuclear Damage Compensation & Decommissioning Facilitation Corporation (NDF) Yasuharu Igarashi
Nuclear Damage Compensation and Decommissioning Facilitation Corporation Activities of Nuclear Damage Compensation & Decommissioning Facilitation Corporation (NDF) June 3, 2015 Yasuharu Igarashi Executive
More information