1 SECTION TRENCHING AND BACKFILLING PART 1 GENERAL 1.01 SECTION INCLUDES A. This WORK shall consist of all labor, equipment, and materials necessary for excavation, trenching, and backfilling for utility lines and other related WORK RELATED SECTIONS A. The following is a list of SPECIFICATIONS which may be related to this section: 1.03 REFERENCES 1. Section , Temporary Environmental Controls 2. Section , Excavation and Fill. 3. Section , Dewatering. 4. Section , Erosion and Sedimentation Control. A. The following is a list of standards which may be referenced in this section: 1.04 SUBMITTALS 1. ASTM International (ASTM): a. D698, Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort ( ft-lbf/ft 3 (600 kn-m/m 3 )). b. D4253, Standard Test Methods for Maximum Index Density and Unit Weight of Soils Using a Vibratory Table. 2. Colorado Department of Transportation (CDOT). 3. Occupational Safety and Health Administration (OSHA). A. Submit certification that bedding and pipe zone material meets SPECIFICATION. PART 2 PRODUCTS 2.01 MATERIALS A. Muck Excavation: 1. Muck excavation shall also include the replacement of excavated muck with uniformly graded rock ranging from three-quarter (3/4) inch to one and one-half (1-1/2) inches or as required by ENGINEER
2 2. ENGINEER shall determine which type of aggregate or other material shall be used after observing the specific site conditions. B. Bedding and Pipe Zone Materials: 1. Well-Graded Sand: Sieve Size Total Percent Passing by Weight ⅜ - inch 100 No No No No No No Squeegee Sand: Sieve Size Total Percent Passing by Weight ⅜ - inch 100 No CDOT #67: C. Backfill: Sieve Size Total Percent Passing by Weight 1 inch 100 ¾ - inch ⅜ - inch No No a. It shall be the responsibility of CONTRACTOR to locate material meeting the SPECIFICATIONS, to test its ability to consolidate to at least seventyfive percent (75%) relative density, and to secure approval of ENGINEER before such material is delivered to the PROJECT. b. Relative density shall be determined as stipulated in ASTM D Use only backfill for trenches which is free from rocks, large roots, other vegetation or organic matter, and frozen material
3 2. No rocks greater than three (3) inches in diameter shall be allowed. D. Cut-Off Walls: PART 3 EXECUTION 3.01 GENERAL 1. Clay Cut-Off Walls: More than fifty percent (50%) shall pass a No. 200 Sieve. The plasticity index shall be greater than twelve (12). 2. Controlled Low Strength Material Backfill: (Flo-Fill, See Section , Flowable Fill). A. The following procedures shall be followed by CONTRACTOR in sequencing the WORK: 1. No more than one hundred fifty (150) feet of trench shall be left open at any time. 2. The entire trench shall be backfilled to within fifty (50) feet of the open trench upon conclusion of each day s WORK. 3. The trench shall not be backfilled until the pipe installation is found acceptable by ENGINEER. 4. Trench shall be backfilled within one hundred (100) feet of the pipe installation at all times. 5. Clean-up shall be maintained within four hundred (400) feet of the trench excavation. B. Prior to placement in the trench, all pipes, fittings, and appurtenances shall be cleaned and examined for defects by CONTRACTOR. 1. If found defective, CONTRACTOR shall reject the defective pipe, fitting, or appurtenance. 2. CONTRACTOR shall advise ENGINEER of all defective materials. C. Surplus Excavation: 1. All surplus excavation shall be placed, in an orderly manner. 2. If material is stockpiled on private property, written permission shall be obtained from the property owner and provided to ENGINEER OBSTRUCTIONS AND DISPOSAL OF WASTE MATERIAL A. CONTRACTOR shall remove obstructions that do not require replacement from within the trench or adjacent areas such as tree roots, stumps, abandoned piling, buildings and concrete structures, frozen material, logs, and debris of all types without additional compensation
4 B. ENGINEER may, if requested, make changes in the trench alignment to avoid major obstructions, if such alignment changes can be made within the WORK limits without adversely affecting the intended function of the facility. C. Excavated materials unsuitable for backfill or not required for backfill shall be disposed of in accordance with local regulations TRENCH EXCAVATION A. All existing asphalt or concrete surfacing shall be saw cut vertically in a straight line, and removed from the job site prior to starting the trench excavation. This material shall not be used in any fill or backfill. B. Clearance: 1. The trench shall be excavated so that a minimum clearance of six (6) inches is maintained on each side of the pipe for proper placement and densification of the bedding or backfill material. 2. The maximum clearance measured at the spring line of the pipe shall be eighteen (18) inches regardless of the type of pipe, type of soil, depth of excavation, or the method of densifying the bedding and backfill. C. Except as otherwise dictated by construction conditions, the excavation shall be of such dimensions as to allow for the proper pipe installation and to permit the construction of the necessary pipe connections. D. Care shall be taken to ensure that the excavation does not extend below established grades. 1. If the excavation is made below such grades, the excess excavation shall be filled in with sand or graded gravel deposited in horizontal layers not more than six (6) inches in thickness after being compacted and shall be moistened as required to within two percent (2%) of the optimum moisture content required for compaction of that soil. 2. After being conditioned to have the required moisture content, the layers shall be compacted to the required density. E. CONTRACTOR shall stockpile excavated materials in a safe manner. Stockpiles shall be graded for proper drainage. F. CONTRACTOR shall place and grade the trench base to the proper grade ahead of pipe laying. The invert of the trench shall be compacted to provide a firm unyielding support along entire pipe length. G. Surplus excavation shall be disposed of by CONTRACTOR at CONTRACTOR s expense PROTECTION A. Sheeting and Shoring:
5 1. CONTRACTOR shall protect excavations by shoring, bracing, sheet piling, underpinning, or other methods required to prevent any excessive widening or sloughing of the trench which may be detrimental to human safety, to the pipe or appurtenances being installed, or to existing facilities or structures. 2. The latest requirements of OSHA shall be complied with at all times including trenching and confined space entry requirements. 3. CONTRACTOR shall be responsible for underpinning adjacent structures which may be damaged by excavation WORK, including service utilities and pipe chases. B. Weather and Frost: 1. CONTRACTOR shall protect bottom of excavations and soil adjacent to and beneath foundations from frost. 2. Do not place backfill, fill, or embankment on frozen surfaces. 3. Do not place frozen materials, snow, or ice in backfill, fill, or embankments. 4. Do not deposit, tamp, roll, or otherwise mechanically compact backfill in water. C. Drainage and Groundwater: 1. The excavation shall be graded to prevent surface water runoff into trench or excavation. 2. Maintain excavations and trenches free from water during construction. 3. Remove water encountered in trenches to the extent necessary to provide a firm subgrade, to permit joints to be made in the dry, and to prevent the entrance of water into the pipeline. 4. Divert surface runoff and use sumps, gravel blankets, well points, drain lines, or other means necessary to accomplish the above. 5. Maintain the excavation or trench free from water until the structure, or pipe to be installed therein, is completed to the extent that no damage from hydrostatic pressure, flotation, or other cause will result. 6. Prevent water from entering into previously constructed pipe. 7. Do not use the pipe under construction for dewatering FOUNDATIONS ON UNSTABLE SOILS A. If the bottom of the excavation is soft or unstable, and in the opinion of ENGINEER, cannot satisfactorily support the pipe or structure, a further depth and width shall be excavated and refilled to six (6) inches below grade with rock or other approved material, uniformly graded between three-quarter (3/4) inch and one and one-half (1-1/2) inches to provide a firm foundation for the pipe or structure. From six
6 3.06 PIPE BEDDING Revised 08/2015 (6) inches below grade to grade, the appropriate bedding material shall be placed to provide support for the pipe or structure. A. After completion of the trench excavation and proper preparation of the foundation, six (6) inches of bedding material shall be placed on the trench bottom for support under the pipe. B. Bell holes shall be dug deep enough to provide a minimum of two (2) inches of clearance between the bell and the bedding material. C. All pipes shall be installed in such a manner as to ensure full support of the pipe barrel over its entire length. D. After the pipe is adjusted for line and grade and the joint is made, the bedding material shall be carefully placed and tamped under the haunches of the pipe. E. For all types of pipe, the limits of bedding shall be as shown on the trench section details on the DRAWINGS. F. Bedding shall be compacted to seventy five percent (75%) relative density in accordance with ASTM D4253. Care shall be exercised to ensure sufficient tamping under the pipe to achieve uniform support BACKFILL AND COMPACTION A. All muck excavation, bedding, and pipe zone material shall be imported unless otherwise designated by OWNER s geotechnical engineer. B. Pipe: 1. The pipe trench shall be backfilled to the limits as shown on the DRAWINGS. 2. The backfill in all areas shall be compacted by vibrating, tamping, or a combination thereof to seventy five percent (75%) relative density for sand material as determined by the relative density of cohesionless soils test, ASTM D4253, or to ninety five percent (95%) of the Maximum Standard Proctor Density for cohesive soils as determined by ASTM D All backfill shall be brought up to equal height along each side of the pipe in such a manner as to avoid displacement. 4. Bedding shall be distributed in 6-inch (6") maximum lifts over the full width of the trench. 5. Wet, soft or frozen material, asphalt chunks, or other deleterious substances shall not be used for backfill. 6. If the excavated material is not suitable for backfill, as determined by ENGINEER, suitable material shall be hauled in and utilized and the rejected material hauled away and disposed of
7 7. Backfilling shall be conducted at all times in a manner to prevent damage to the pipe or its coating and shall be kept as close to the pipe laying operation as practical. 8. Backfilling procedures shall conform to the additional requirements, if any, of appropriate agencies or private right-of-way agreements. C. Unsurfaced Areas: All surface cuts shall be, as a minimum, restored to a condition equal to that prior to construction. D. Surfaced Areas: 1. All surface cuts shall be, as a minimum, restored to a condition equal to that prior to construction. 2. All gravel or paved streets shall be restored in accordance with the regulations and requirements of the agency having control or jurisdiction over the street, roadway, or right-of-way. E. Grassed or Landscaped Areas: 1. In landscaped or agricultural areas, topsoil, to a depth of twelve (12) inches, shall be removed from the area of general disturbance and stockpiled. 2. After installation of all pipelines, appurtenances and structures and completion of all backfill and compaction, the stockpiled topsoil shall be redistributed evenly over all disturbed areas. 3. Care should be taken to conform to the original ground contour or final grading plans FIELD QUALITY CONTROL A. In-place moisture density tests will be performed to ensure trench backfill complies with specified requirements. The following minimum tests will be performed. 1. Trench Bedding: One per two hundred (1 per 200) feet. 2. Backfill: One per two hundred (1 per 200) feet. B. Backfill Compaction Tests: 1. Backfill compaction tests will be performed until compaction meets or exceeds requirements. 2. The cost of passing tests will be paid by OWNER. 3. Costs associated with failing tests shall be paid by CONTRACTOR. C. Pipe bedding will be tested prior to placement of backfill. D. Testing of all bedding and backfill material will be done in compliance with Occupational Safety & Health Administration (OSHA) - Excavations
8 3.09 RESTORATION A. Scarify surface, reshape, and compact to required density completed or partially completed areas of WORK disturbed by subsequent construction operations or by adverse weather. B. Maintain and correct backfill, fill, and embankment settlement and make necessary repairs to pavement structures, seeding, and sodding which may be damaged as a result of settlement for the guarantee period. C. Such maintenance and correction may be performed by subcontract. D. Upon completion of the WORK, all plants, rubbish, unused materials, concrete forms, and other like material shall be removed from the job site. E. The site shall be left in a state of order and cleanliness. END OF SECTION
SECTION XXIII EXCAVATION AND BACKFILLING
SECTION XXIII EXCAVATION AND BACKFILLING This section includes guidelines for excavation and backfilling of utilities and structures. A. DEFINITIONS 1. Open areas: Those areas that do not include building
SECTION TRENCHING, BACKFILLING AND COMPACTING
SECTION 02221 TRENCHING, BACKFILLING AND COMPACTING PART 1 GENERAL 1.01 SUMMARY A. This section addresses excavation and trenching; including subsurface drainage, dewatering, preparation of subgrade, pipe
SECTION 31 20 00 EARTH MOVING
SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to
This section includes materials, installation and testing of earthwork for excavations, fills and embankments for structures and sites.
STANDARD SPECIFICATION SECTION 02200 EARTHWORK PART 1 - GENERAL 1.01 DESCRIPTION This section includes materials, installation and testing of earthwork for excavations, fills and embankments for structures
SECTION 6000 - EXCAVATION, TRENCHING AND BACKFILLING (Pipeline Construction)
SECTION 6000 - EXCAVATION, TRENCHING AND BACKFILLING (Pipeline Construction) 6001 SCOPE. This section covers excavation and trenching work and shall include the necessary clearing, grubbing, and preparation
SECTION 4 EXCAVATION, TRENCHING AND BACKFILLING 4.01 SCOPE OF WORK
4.01 SCOPE OF WORK The work covered by this section shall consist of furnishing all materials, equipment and labor for the excavating, trenching, backfilling, and bore and jack required to install or repair
CW EXCAVATION BEDDING AND BACKFILL TABLE OF CONTENTS
February 2005 DIVISION 3 - CW 2030 R7 CW 2030 - EXCAVATION BEDDING AND BACKFILL TABLE OF CONTENTS 1. DESCRIPTION...1 1.1 General...1 1.2 Definitions...1 1.3 Referenced Standard Construction Specifications...1
TABLE OF CONTENTS SECTION 200 UNDERGROUND PIPE CONSTRUCTION
TABLE OF CONTENTS SECTION 200 UNDERGROUND PIPE CONSTRUCTION Starts on Page 200 EXCAVATION... 2 201 PIPE BEDDING... 3 202 LAYING OF PIPE... 4 203 COVER MATERIAL... 5 204 INSULATION... 6 205 BACKFILLING...
CITY OF FARGO SPECIFICATIONS FLOOD CONTROL LEVEES
FLOOD CONTROL LEVEES PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of furnishing all labor, material, accessories and equipment
The Manitoba Water Services Board SECTION
Page 1 of 10 Part 1 General 1.1 DESCRIPTION OF WORK.1 This work shall consist of the removal of all materials of whatever nature, necessary for the proper placement of structure foundations, the supply
SECTION RIPRAP, BOULDERS, SOIL RIPRAP, VOID-FILLED RIPRAP AND BEDDING. 1. Section , Temporary Environmental Controls
SECTION 31 37 00 RIPRAP, BOULDERS, SOIL RIPRAP, VOID-FILLED RIPRAP AND BEDDING PART 1 GENERAL 1.01 SECTION INCLUDES A. The WORK includes excavation, grading, and installation of riprap, boulders, soil
Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.
Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
SECTION LS 659 LANDSCAPE REPAIR
SECTION LS 659 LANDSCAPE REPAIR PART 1 GENERAL 1.1 SUMMARY A. This section includes the following: 1. Lawns: Topsoil and grass 2. Fertilizers and mulches 3. Hydroseed applications 4. Watering B. All grassed
The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11
Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;
SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)
Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks
SECTION 206 EXCAVATION FOR STRUCTURES
SECTION 206 EXCAVATION FOR STRUCTURES 206.1 Description. This work shall consist of the necessary excavation for the foundations of all structures, removal and disposal of all excavated material, backfilling
The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
CHAPTER GRADING, EXCAVATION AND FILL.
CHAPTER 23.105 GRADING, EXCAVATION AND FILL. Section 23.105.101 Purpose Section 23.105.102 Scope Section 23.105.103 Permits required Section 23.105.104 Hazards Section 23.105.105 Definitions Section 23.105.106
MDWASD 8/1999 SECTION 02315 TRENCHING AND BACKFILLING FOR PIPING SYSTEMS
PART 1 - GENERAL 1.01 WORK INCLUDED SECTION 02315 TRENCHING AND BACKFILLING FOR PIPING SYSTEMS A. The work included under this Section consists of excavating, backfilling and compaction as required for
1.1 SECTION INCLUDES.1 Materials and installation for asphalt concrete pavement for car park areas, driveways to buildings, and walks or play areas.
Issued 2005/06/01 Section 02742 Asphalt Concrete Pavement for Building Sites Page 1 of 8 PART 1 GENERAL 1.1 SECTION INCLUDES.1 Materials and installation for asphalt concrete pavement for car park areas,
SECTION TRENCH EXCAVATION AND BACKFILL
SECTION 312333 TRENCH EXCAVATION AND BACKFILL Scope : The work under this Section consists of furnishing all labor, equipment and materials and performing all operations in connection with any trench excavation
SECTION 02401 SHEETING, SHORING AND BRACING
SECTION 02401 SHEETING, SHORING AND BRACING This section should be edited to reflect soil conditions specific to the project site and the recommendations of a Geotechnical Engineer licensed in the State
SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE
SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. This section includes all labor, materials, equipment, and incidentals required and installation of Polyvinyl Chloride
SECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY
STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY Approved and adopted as Official Document Number 800576 this 10th day of December, 1980 Donald R. Boyd, P.E., Director Water
A. Related work in other sections of these Specifications includes but is not limited to:
PART 1 GENERAL 1.01 GENERAL Work includes but is not limited to the following: A. This work shall consist of one or more courses of plant mixed asphalt concrete placed on a prepared foundation or base
Section 205. ROADWAY EARTHWORK
205.02 Section 205. ROADWAY EARTHWORK 205.01. Description. This work consists of the following: A. Constructing earth grades by excavating soil or rock and placing embankments or fills; B. Salvaging and
C. Section 014510 TESTING LABORATORY SERVICE.
SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,
SECTION 15200 GRAVITY SANITARY SEWERS. A. Gravity sanitary sewers and appurtenances, including stacks and service connections.
SECTION 15200 GRAVITY SANITARY SEWERS PART 1 GENERAL.01 SCOPE A. Gravity sanitary sewers and appurtenances, including stacks and service connections..02 SUBMITTALS A. Conform to requirements of Section
ASPHALT CONCRETE PAVING
CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02743-1 PART 1 GENERAL 1.1 Related Work.1 All Division 1 Specification Sections.2 Section 01330 Submittals.3 Section 01450 Quality Control & Inspection.4
Storm Drainage and Sanitary Sewer Construction Detail and Technical Specifications Riprap, Boulders and Slope/Channel Protection
CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION Storm Drainage and Sanitary Sewer Construction Detail and Technical Specifications 12.0 Riprap, Boulders and Slope/Channel Protection
CITY OF TAMPA. PAVEMENT/RIGHT OF WAY RESTORATION REQUIREMENTS Rev. 2012
CITY OF TAMPA Bob Buckhorn, Mayor Transportation Division Pavement Options: PAVEMENT/RIGHT OF WAY RESTORATION REQUIREMENTS Rev. 2012 PAVEMENT BASE MATERIAL CONCRETE ASPHALT SURFACE FULL DEPTH ASHALT (*Classification)
Stormwater/Wetland Pond Construction Inspection Checklist
: Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials
CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS
December 2014 CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications...
3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.
The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:
SECTION 33 41 00 REINFORCED CONCRETE PIPE. A. The following is a list of SPECIFICATIONS, which may be related to this section:
SECTION 33 41 00 REINFORCED CONCRETE PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. This section includes construction of reinforced concrete pipe for storm drainage, culverts, and sanitary sewer, including
SECTION 308 PORTLAND CEMENT-TREATED BASES
SECTION 308 PORTLAND CEMENT-TREATED BASES SECTION 308.10 PORTLAND CEMENT-TREATED BASE, CENTRAL PLANT METHOD 308.11 Description. This work shall consist of constructing one or more courses of a mixture
WASHINGTON COUNTY SANITARY SERVICE LATERAL MATERIAL AND INSTALLATION GUIDE. Established By: THE BOARD OF COUNTY COMMISSIONERS WASHINGTON COUNTY, OHIO
WASHINGTON COUNTY SANITARY SERVICE LATERAL MATERIAL AND INSTALLATION GUIDE Established By: THE BOARD OF COUNTY COMMISSIONERS WASHINGTON COUNTY, OHIO Commissioners Mr. Timothy C. Irvine, President Ms. Cora
SECTION LAWN RESTORATION
SECTION 02400 PART 1 GENERAL 1.1 DESCRIPTION OF REQUIREMENTS A. The work in this section consists of furnishing all labor, material and equipment to replace and maintain all areas disturbed during construction
TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth
TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20
San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS
ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located
DESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
LS 2540 SEWER LATERALS AND INSPECTION TEES
LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal
SECTION 15062 POLYVINYL CHLORIDE GRAVITY SEWER PIPE AND FITTINGS
SECTION 15062 POLYVINYL CHLORIDE (PVC) GRAVITY SEWER PIPE AND FITTINGS PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for the manufacture and installation of polyvinyl chloride,
Class VI Local Roads (Reprinted from Saline County Master Street Plan)
Before a new or existing road can be adopted by the county for maintenance, the road must meet the following minimum requirements in accordance to the Saline County Master Street Plan (Ordinance 88-32
Specification Gravel/ Bitumen/ Asphalt Driveways
Specification Gravel/ Bitumen/ Asphalt Driveways Contents 1 Scope of Works... 1 2 General... 2 3 Traffic Control... 2 4 Materials... 2 4.1 Sub-Grade Fill Material... 2 4.2 Crushed Limestone... 2 4.3 Gravel...
PASCO COUNTY ENGINEERING SERVICES DEPARTMENT TESTING SPECIFICATIONS FOR CONSTRUCTION OF ROADS, STORM DRAINAGE, AND UTILITIES
PASCO COUNTY ENGINEERING SERVICES DEPARTMENT TESTING SPECIFICATIONS FOR CONSTRUCTION OF ROADS, STORM DRAINAGE, AND UTILITIES OCTOBER 2006 BOARD OF COUNTY COMMISSIONERS: STEVE SIMON, CHAIRMAN ANN HILDEBRAND,
SECTION EROSION AND SEDIMENTATION CONTROL
SECTION 31 25 00 EROSION AND SEDIMENTATION CONTROL PART 1 GENERAL 1.01 SECTION INCLUDES A. This WORK shall consist of temporary measures needed to control erosion and water pollution. These temporary measures
Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS
TABLE OF CONTENTS 2.18 CONCRETE AND/OR CORRUGATED STEEL STORM SEWER... 1 2.18.1 GENERAL... 1 2.18.2 MATERIALS... 1 2.18.2.1 Storm Sewer Pipe... 1 2.18.2.2 Cement Mortar... 1 2.18.2.3 Granular Materials...
TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER
TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER I. Scope of Work Work done under this item shall consist of the construction, reconstruction, or alteration of a one-course Portland
Methods of Compaction
CHAPTER V Mechanical Modification Methods of Compaction Laboratory Procedure Shallow Surface Compaction Deep Compaction Techniques Hydromechanical Compaction 1 SOIL COMPACTION It is the most obvious and
Specification Guidelines: Allan Block Modular Retaining Wall Systems
Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. At the engineer of record's
STANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS
STANDARD SPECIFICATIONS SECTION 02950 PAVEMENT REQUIREMENTS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for removing, replacing and providing new paving for roads, driveways, parking
INDEX. Sec. No. Items Page Nos.
INDEX Sec. No. Items Page Nos. 1. General............... GWM- 2 2. Method of Construction............... GWM- 2 3. Basis of Payment............... GWM- 2 4. Material Testing............... GWM- 3 5. Excavation...............
CHAPTER 4 INSTALLATION OF PIPE AND TESTING OF PIPE BACKFILL
CHAPTER 4 INSTALLATION OF PIPE AND TESTING OF PIPE BACKFILL Why talk about pipe in a Soils and Aggregate School? Pipe-soil interaction is critical to successful performance of system Treatment of soils
SPECIFICATION FOR SEGMENTAL RETAINING WALL SYSTEMS
SPECIFICATION FOR SEGMENTAL RETAINING WALL SYSTEMS PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing segmental retaining wall (SRW) units to the lines and grades designated on
Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL
155 E. Front Street (rear) Lititz, PA 17543 Phone (717) 625-1930 Fax (717) 625-1931 Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL CONSTRUCTION SPECIFICATIONS AND DETAILS
SECTION FURNISHED TOPSOIL. 1. Protection of the environment; Section
02813-1 of 5 SECTION 02813 FURNISHED TOPSOIL 02813.01 GENERAL A. Description Furnished topsoil shall include, but not necessarily be limited to, preparation of surfaces to be covered with topsoil, furnishing,
Section 02317 EXCAVATION AND BACKFILL FOR UTILITIES
Section 02317 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Excavation, trenching, foundation, embedment, and backfill for installation of utilities, including manholes and other pipeline structures. 1.02
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit
A. Drawings, General Provisions of the Contract and Division-1 Specifications sections, apply to this section.
PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings, General Provisions of the Contract and Division-1 Specifications sections, apply to this section. 1.2 WORK IN THIS SECTION A. Section includes: 1. Soil
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...
STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES
CITY OF PETALUMA STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES AUGUST 1999 Revised 10/98 City of Petaluma Petaluma, California STORM DRAIN INSTALLATION DETAIL
ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application.
ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. Article II provides rules governing the allowable connection to the City POTW and the construction and inspection of
The following general requirements will be met for all planter box installations:
Greenville County Technical Specification for: U-LID-02 PLANTER BOX 1.0 Planter Box 1.1 Description Planter boxes are designed to capture and temporarily store storm water runoff. Planter Boxes are intended
SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS
SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS PART 1: GENERAL 1.01 SECTION INCLUDES A. Abandonment in place, by cutting and capping, of existing sewers, junction structures, manholes, service lines, and
Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES
Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices
CONSTRUCTION PERMIT REQUIREMENTS
CONSTRUCTION PERMIT REQUIREMENTS Any work to be done in the City right-of-way (ROW), in a utility easement, and certain work on private property, requires an Engineering Inspection Permit from the Department
SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS
1 SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS TABLE OF CONTENTS I. Introduction II. General Information and Requirements A. Applying for Sewer connection B. Excavation C. Cutting Concrete and Asphalt
Section 3 Specification 3.2 Aggregate Production and Stockpiling TABLE OF CONTENTS
TABLE OF CONTENTS 3.2 AGGREGATE PRODUCTION AND STOCKPILING... 1 3.2.1 GENERAL... 1 3.2.2 MATERIALS... 1 3.2.3 PRODUCTION... 1 3.2.3.1 General... 1 3.2.3.2 Quality Control... 3 3.2.3.2.1 General... 3 3.2.3.2.2
CITY ENGINEERS ASSOCIATION OF MINNESOTA
CITY ENGINEERS ASSOCIATION OF MINNESOTA STANDARD SPECIFICATIONS 2600 Trench Excavation and Backfill/Surface Restoration 2611 Water Main and Service Line Installation 2621 Sanitary Sewer and Storm Sewer
CHAPTER 9 STORM DRAINAGE
CHAPTER 9 STORM DRAINAGE Section Page 9.01 General...1 9.02 Design Standards...1 9.03 Construction Stormwater Pollution Prevention...2 9.04 Department of Ecology Stormwater Permits...4 9.05 Maintenance
SECTION 33 11 00.19 ABANDONMENT OF WATER MAINS. A. Conform to requirements of Section 01 33 00 - Submittals.
SECTION 33 11 00.19 ABANDONMENT OF WATER MAINS PART 1: GENERAL 1.01 SCOPE A. Abandonment in place, by cutting and capping, of existing water mains, hydrants, service lines, and valves. B. Abandonment in
SECTION 02221 SELECTIVE DEMOLITION
SECTION 02221 PART 1 -GENERAL 1.01 DESCRIPTION This section includes all material, labor, machinery and supervision required to demolish and remove the following items where applicable and as noted on
SECTION Description of Work. The extent of landscape development work is shown on the Drawings and in schedules.
SECTION 2720 SEEDING, SODDING AND TOPSOIL 1.00 GENERAL 1.01 Scope. Work to be performed under this section shall include furnishing all labor, equipment, materials and miscellaneous items necessary to
SECTION 609 PAVED DRAINAGE SECTION CONCRETE CURB, GUTTER AND PAVED DITCH.
SECTION 609 PAVED DRAINAGE SECTION 609.10 CONCRETE CURB, GUTTER AND PAVED DITCH. 609.10.1 Description. This work shall consist of constructing curb, gutter or combination curb and gutter and paved ditches
SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST
SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST For permanent structures per Delaware SCS Pond Code 378 and Delaware Sediment and Stormwater Regulations KEY PROJECT INFORMATION Item meets standard
ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION
ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS for (PVC) SANITARY SEWER MAIN CONSTRUCTION VI(A).1 General VI(A).2 Materials and Equipment VI(A).3 Installation of Sanitary Sewer Mains VI(A).4 Laying of
512 UTILITIES. A. General
512 UTILITIES A. General 1. Any Utility s use of county rights-of-way will be coordinated with the primary purpose of the rights-of-way which is to provide safe, efficient, and convenient passage for motor
SECTION SOIL, FILL, BACKFILL, CU STRUCTURAL SOIL, CONSTRUCTION & DEMOLITION DEBRIS REMOVAL. A. Section Construction Waste Management
SECTION 02316 SOIL, FILL, BACKFILL, CU STRUCTURAL SOIL, CONSTRUCTION & DEMOLITION DEBRIS REMOVAL PART 1 - GENERAL 1.1 Related Sections: A. Section 01524 Construction Waste Management B. Section 02318 Acceptance
Single Family Residential Erosion and Sediment Control Standards
July 2011 Planning and Development Services Single Family Residential Erosion and Sediment Control Standards This booklet contains standard plans and procedures appropriate for typical residential building
CITY OF LETHBRIDGE SECTION CONSTRUCTION SPECIFICATIONS Page 1 of 5 TOPSOIL AND FINISH GRADING
CONSTRUCTION SPECIFICATIONS Page 1 of 5 1.0 GENERAL 1.1 Material Supplied by Contractor/Developer.1 Contractor Developer will supply topsoil delivered to job site. 1.2 Related Work.1 Preparation to subgrade
Standard Specification K105 Water Reticulation
Standard Specification K105 Water Reticulation INDEX K105.1 SCOPE OF WORK 3 K105.2 STANDARDS 3 K105.3 MATERIALS 3 K105.3.1 Pipes and Fittings 3 K105.3.2 Storage and Handling 4 K105.3.3 Bedding and Haunching
SECTION AGGREGATE BASE COURSE
SECTION 32 11 23 AGGREGATE BASE COURSE PART 1 - GENERAL 1.01 SECTION INCLUDES A. Aggregate base material. B. Installation standards. C. Spreading of material. D. Compacting. E. Field quality control. 1.02
CITY OF NEEDLES SEPTIC SYSTEM REQUIREMENTS
CITY OF NEEDLES SEPTIC SYSTEM REQUIREMENTS Area of Disposal Fields and Seepage Pits The minimum effective absorption area in disposal fields in square feet (m²) and in seepage pits in square feet (m²)
SECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
ITEM 247 FLEXIBLE BASE Description. Construct a foundation course composed of flexible base.
ITEM 247 FLEXIBLE BASE 247.1. Description. Construct a foundation course composed of flexible base. 247.2. Materials. Furnish uncontaminated materials of uniform quality that meet the requirements of the
Instructions for the Installation of Driveway Entrances
Instructions for the Installation of Driveway Entrances 1 Step 1 - Permits Complete the Work Within Highway Right-of-Way Permit. A representative from the Department of Transportation and Infrastructure
Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems
Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems The septic tank-absorption field sewage treatment system is composed of two major elements; the
Lined Swale (LS) Runoff Conveyance
Lined Swale (LS) Practice Description A lined swale is a constructed channel with a permanent lining designed to carry concentrated runoff to a stable outlet. This practice applies to the following sites:
Temporary Erosion Control and Job Site Management for Memorandum of Understanding Partners
Temporary Erosion Control and Job Site Management for Memorandum of Understanding Partners Introduction Standard Condition Silt Fence, Wattles, and Inlet Protection Tree & Vegetation Protection Dewatering
CONCRETE SEGMENTAL RETAINING WALL SYSTEM
CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Vintage TM unit segmental retaining wall (SRW)
Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
City of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
Topsoiling (TSG) Site Preparation. The depth of topsoil may be quite variable. On severely eroded sites it may be nonexistent.
Topsoiling (TSG) Practice Description Topsoiling is the removal of a desirable soil surface, referred to as topsoil, at a site prior to construction and using it on areas to be vegetated. Topsoiling a
CONCRETE SEGMENTAL RETAINING WALL SYSTEM
CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Classic 8 with PCS unit segmental retaining wall
Jonathan Dickinson State Park Technical Specifications Table of Contents
ATTACHMENT A Jonathan Dickinson State Park Technical Specifications Table of Contents SECTION DESCRIPTION PAGES DIVISION 1: GENERAL REQUIREMENTS 01010 Summary of Work 2 DIVISION 2: SITE WORK 02050 Demolition