Risiko-/barrierestyring og standarder for funksjonell sikkerhet

Size: px
Start display at page:

Download "Risiko-/barrierestyring og standarder for funksjonell sikkerhet"

Transcription

1 Risiko-/barrierestyring og standarder for funksjonell sikkerhet Eksempler på risiko- og barrierestyring sammen med IEC61508/IEC61511/OLF070s i livsløpsfasene Gjermund Våge

2 Innhold Risikoanalyse og barrierestyring SIL i design SIL i drift Konklusjon 2

3 Setting the scene- Major accident History has taught us that major accidents are controlled by other mechanisms compared to the ones controlling occupational accidents

4 Setting the scene- Major accident History has taught us that major accidents are controlled by other mechanisms compared to the ones controlling occupational accidents Personal safety management Prosess safety management

5 What the O&G & Process Industry both has and has not achieved O&G industry has attained a step change improvement in occupational safety Graph shows factor of 3 better in last 10 years - But: Process Safety is not the same as Occupational Safety USA and EU Process Industry - Neither EU nor USA has demonstrated significant improvements for onshore major accidents - (EU = MARS database, USA = RMP* database) Different oil and chemical operating companies Trendline North Sea major accident safety has improved - No major disaster since introduction of Safety Case legislation in UK / risk based in Norway - (leaks have occurred, but none escalated) Reducing trend in major hydrocarbon leaks - However, recent performance may suggest a floor has been reached 10x improvement In past 13 years 5

6 Vision Step Change Improvement for Major Accidents The Industry HAS already attained 10x improvement in Occupational Health DNV believes major accidents can also be reduced 10x but with different tools 1. Revised regulatory regime: Blend of Prescriptive and Performance-based regulations 2. Address technical, human and organizational factors: Key lessons from past accidents 3. Enhanced risk management approach: Addressing Risks, Controls and Conditions 4. Clear roles and responsibilities: Defined and clear to all 5. Shared performance monitoring: Information is readily available and shared to all This is practically and economically feasible - Methods described are in use with O&G companies somewhere but not fully integrated - North Sea further down the path, but not there yet either, maybe x3 improvement 6

7 Major Accident Risk Management (ISO 31000) Managing major accident with focus on - Management Commitment - Safety barrier management - Organisational learning - individual risk understanding - Incident and accident investigation - Safety culture - Risk treatment and ALARP..as an integrated part of corporate governance!

8 As Low As Reasonably Practicable (ALARP) Regulations, requirements, etc ALARP region NB! Operator must demonstrate ALARP Risk unacceptable Risk accepted only if further risk reducing measures is impracticle to implement or the costs are grossly disproportionate to the benefit Risk acceptable

9 Swiss Cheese Model Major Accident Emergency response E.g. escape, evacuation HAZARD Mitigate E.g. drainage, fire protection Detect E.g. fire & gas detection, control systems Prevent E.g. design, maintenance, procedures, competence

10 10

11 Examples of performance standards Layout and arrangement Structural integrity Fire and Gas detection System Emergency Shutdown System Ignition Source Control Ventilation Control of spills (Open drain system) Active fire protection Passive fire protection PA, alarm & emergency communication systems Escape and evacuation Blowdown System Process safety Barrier to prevent loss of Containment Barrier to prevent Ship collisions Rescue and safety equipment Non-physical barriers Emergency Power / Emergency Lighting 11

12 Example: bow-tie model and performance standards 12 -

13 Accidents Occur when Barriers become Degraded Texas City event explained in barrier failure format Macondo event explained in barrier failure format The causes of barrier degradation can be complex: Technical Human Organizational 13

14 Performance Standards Content The specific requirements for each Barrier Function will be described in a Performance Standard (PS). The PSs are developed and structured based on the guidance given in driven by the need to maintain reliable safety barriers and meet the operational requirements. The main elements of a PS include the following: Function - The functional criteria will include appropriate definition of requirements to the relevant functional parameters of the particular barrier; i.e. the essential duties that the system/function is expected to perform (ref. ISO 13702). Integrity - The integrity criteria will include appropriate definition of and requirements to the relevant reliability and availability parameters of the particular barrier; e.g. probability of failure on demand, failure rates, demand rates, test frequencies, deterioration of system components, environmental impairment etc. (ref. ISO 13702). Survivability - Criteria determining how a barrier will remain functional after a major incident, i.e. under the emergency conditions that may be present when it is required to operate (ref. ISO 13702) Management Criteria for checking if the systems are adequately maintained operated and managed. I.e. verifying that competence and training are adequate and that the procedures are relevant and cover the necessary subjects. 14

15 Barrier elements Technical barrier elements Organizational barrier elements Operational barrier elements Containment Competence Design and arrangement Fire detection Communication Maintenance Ventilation/HVAC Work practice Operations and activities Gas detection Procedures/ Routines Modifications ESD Work environment Changes/ MOC Ignition Source control Man / machine Deviation handling Drainage Control, check and verify Work processes Flare and relief Emergency power Inergen/ water mist/ foam/ deluge Passive fire protection Documentation Resources, Capacity Work load / Time 15

16 Barrier Management Framework (Strategy) Context Regulations/ Best practice/ Requirements Safety Strategy isk Management Procedure HAZID DESIGN Risk Analysis/Safety Studies QRA Other risk assessments Barrier Management Process Define Barriers Specify Performance Requirements Define Performance Indicators BowTie Establish Test & Verification Programme Daily Operations WP meetings HSE Directives, Work Instructions and procedures Updated Risk Picture OPERATION Control and Monitor Maintenance, Test and Inspection Test Results Performance Indicators Non-Conformity Continuous Improvement Administration Management of Changes Communication Competence Communicate Based on S-001 Technical Safety and PSA Presentation 16

17 Safety Lifecycle Concept 1-5 ANALYSIS Safety Requirement Specification (SRS) SIL Allocation Required SIL 6-13 REALIZATION OPERATION SIL requirements during operation Slide 17

18 Barrier Management Strategy At any given time, the condition, functionality and importance of the barriers should be known by relevant personnel. In addition, continuous improvement and identified actions should be implemented with the purpose of ensuring necessary barrier functionality, integrity and survivability. This is achieved through: Link to Risk Analysis: Hazards identified for each installation (that could escalate to Major Accidents) must be managed in order to minimise the risk to personnel, environment and assets to a level As low as reasonable practicable (ALARP). This is done through implementation of barriers, and by following the structured risk management process described in this document; establish performance standards for the identified important barrier functions. Design: The barriers are to be designed, commissioned, used and maintained to ensure that the barrier function will safeguard personnel, environment and the asset in a lifecycle perspective. Communication: The Performance Standards and current barrier status must be communicated to all involved parties, giving the necessary understanding as to why barrier functions have been established and which performance requirements that are covered by the barrier systems. Modifications and Change Management: For new projects and major modifications, the choice of safety strategy should be made at an early stage when it is still possible to optimise the design, to minimise the hazards and take due credit for these features. This approach will achieve full integration of prevention, protection and mitigation of all hazards. Monitor and Control: Throughout the lifetime of the installation, a process will be in place to monitor the status and condition of the barriers. The results will be communicated to the relevant personnel to ensure (.) 18

19 Performance Standard Example Performance Standard for Active fire fighting Performance standard Regulation Performance Requirement Reference Function F1 Fire water (FW) supply - Pumps Requirement Reference No. Requirement (detailed) Codes, standards and internal requirements Checklist Activity Id Activity description Technical Operational/Organizational Frequency Acceptance criteria Activity type COSL reference for activity Responsible unit FW supply system shall meet the worst case FW demand identified for the DSHAs NMD 227/84, 6.3 F1.1 Each fire pump system shall have the capacity to individually deliver 13.1 barg, for three monitors at the bridge/helideck (scenario 6 in AWONO 2779). AWONO 2779, 4.1 NMD 227/84, 6.3 CP F Flow and pressure tests shall be performed annually for both pumps. Today there is now flow test. COSL is considering to bring in 3rd party for doing flow and pressure tests annually. - Running tests for the pumps and electrical motors shall be performed at regular intervals (identify frequency) The following planned maintenance activities shall be performed for the pumps: - Bi-weekly testing of pressure in operational mode (starting up of pumps) and checking of pressure on PC (reading on the Kongsberg central). - Checking the condition of the pump filters (3 month interval suggested). - 5-yearly overhaul (opening and inspection) of the pumps (external requirement, needs to be implemented). The following planned maintenance activities shall be performed for the motors: - Planned maintenance on the motors every 3 months. - Yearly lubrication of bearings and general PM routines for the motor. - A condition evaluation by a 3rd party need to be implemented for the motors (frequency need to be determined). N/A Bi-weekly Every 3 months Yearly Every 5 years Testing and inspection. Motor: DE013 & DE015 Pumps: PA021 Technical department - Engine room operator F1.2 The fire main pressure shall in no place be less than 7 bar at the greatest calculated consumption NMD 227/84, 6.3 CP F1.2.1 Valve and pressure test shall be performed annually. - This activity is not peformed today. COSL is considering to hire in a 3rd party to perform the testing. N/A Yearly Testing Technical department - Engine room operator FW pumps shall be triggered automatically at demand (loss of pressure). In addition, sufficient NMD 227/84, 6 F1.3 indications on whether the FW pumps are activated or not should be delivered to all relevant areas. Duty pump shall start automatically during the following events: - F&G system confirmation of a fire - Loss of pressure in the ring main (set point of 4.5 bar) Indications on whether the FW pumps are activated or not shall be delivered to all relevant areas. AWONO 83433, 6.1 AWONO 17580, CP F Test shall be performed for the pressure control valve (frequency). - Tests of the electric pressure transmitters connected to the FW pumps (one transmitter for each pump) shall be performed annually. - Test of logic between F&G system and FW pumps shall be performed annually. - This is not in place today and need to be established. - Indications on whether the FW pumps are activated or not shall be inspected for all relevant areas. N/A Yearly Testing and inspection. IX011 (transmitters) IRUV (Flame detectors) BE011 (F&G) Technical department - Electrician Shall be possible to manually activate FW pumps F1.4 Manual activation of FW pumps ahall be possible from the following locations: - The F&G operator station - Wheel house, ECR, Drillers cabin and Tool pusher - Vicinity of FW pumps AWONO 83433, 6.1 AWONO 17580, CP F Test of manual release shall be performed for all station/locations every 3 months. Locations/stations include: F&G operator station Four matrix panels Locally at FW pump Helideck and lifeboat station OJT/procedure need to be established/identified for this function by the fire teams. Potential ref. doc. (from BowTie): OJT DM#65041 DM#33267 DM#19508 DM#33281 DM#35108 Every 3 months Testing and training. Marine department 19

20 Monitoring Barriers Knowledge of the status of Barriers is key: Formal focused in-depth reviews excellent, but infrequent - TTS (e.g. Statoil) 5 yearly - Audits 3 yearly - Planned Inspections 1 year Barrier Status a to f Lessons learned from Incident investigations excellent AND high frequency - BSCAT approach every incident / near miss means some barriers failed / degraded - For many facilities this is 100+ events / year - Collect statistics and root causes Cause Barriers Barrier Failure Root Causes 20

21 Operational Risk Barrier Management and Communication Clear demonstration of a sufficient range and diversity of barriers - Bow Ties show number and quality of barriers: prevention and mitigation - Use for regular training and special operations - Adaptive barrier status changes dynamically need to know current status - Safety Plan improvement actions closed barriers stronger - Incidents / near misses some barriers failed in use - Maintenance / Inspection some barriers are degraded or out of service Clear Visual Model Updated, Live, Communicated 21

22 Konklusjoner Introduksjon av IEC61508, IEC 61511, OLF gl. 070 og PDS forum har dreid industriens fokus fra komponenter til sikkerhetsfunksjoner bedret pålitelighet av sikkerhetsfunksjoner som gjerne leveres av flere underleverandører i noen grad bidratt til bedre design løsninger Nye utfordringer for IEC61508, IEC 61511, OLF gl. 070 og PDS forum ta en klarere posisjon innen barriere styring klargjøre og utdype forholdet melding risikoanalyse (QRA) og funksjonell sikkerhet bidra til at antagelser som gjøres i RA og SIL analyser i design fasen følges opp i driftsfasen. bidra til at SIL krav som etableres for sikkerhetsfunksjoner i design fasen følges opp i driftsfasen gjennom en innretnings levetid 22

23 Safeguarding life, property and the environment 23

Goliat Barrier Management

Goliat Barrier Management Goliat Barrier Management ESRA Norge; March 25, 2015 www.eninorge.com Eni: Ole Rekdal Safetec: Helene Ness Hansen PL 229 Goliat Location and Partnership License awarded in 1997 Present licensees Eni Norge

More information

Defining and operationalizing the barrier concept

Defining and operationalizing the barrier concept The human contribution Sondre Øie Introduction Sondre Øie - Human Factors & risk management consultant at DNV Topics & focus in this presentation - What is a barrier? - Operationalization - The human contribution

More information

Ageing and life extension

Ageing and life extension Ageing and life extension April 7th workshop Background NPD recommended NORSOK AGn to start developing guidelines for life extension (2000). NPD initiated a PhD study on ageing and life extension of offshore

More information

The SPE Foundation through member donations and a contribution from Offshore Europe

The SPE Foundation through member donations and a contribution from Offshore Europe Primary funding is provided by The SPE Foundation through member donations and a contribution from Offshore Europe The Society is grateful to those companies that allow their professionals to serve as

More information

HSE information sheet. Fire and explosion hazards in offshore gas turbines. Offshore Information Sheet No. 10/2008

HSE information sheet. Fire and explosion hazards in offshore gas turbines. Offshore Information Sheet No. 10/2008 HSE information sheet Fire and explosion hazards in offshore gas turbines Offshore Information Sheet No. 10/2008 Contents Introduction.. 2 Background of gas turbine incidents in the UK offshore sector...2

More information

Safety Integrity Level (SIL) Studies Germanischer Lloyd Service/Product Description

Safety Integrity Level (SIL) Studies Germanischer Lloyd Service/Product Description Safety & Risk Management Services Safety Integrity Level (SIL) Studies Germanischer Lloyd Service/Product Description Germanischer Lloyd Service/Product Description Safety Integrity Level (SIL) Studies

More information

DET NORSKE VERITAS TM

DET NORSKE VERITAS TM DET NORSKE VERITAS TM APPENDIX B HAZID REPORT NO./DNV REG NO.: 2013-4091 / 17TLT29-5 REV 1, 11.06.2013 DET NORSKE VERITAS Table of Contents Page 1 BACKGROUND AND SCOPE OF WORK... 2 2 METHODOLOGY... 4 3

More information

On-Site Risk Management Audit Checklist for Program Level 3 Process

On-Site Risk Management Audit Checklist for Program Level 3 Process On-Site Risk Management Audit Checklist for Program Level 3 Process Auditor name: Date: I. Facility Information: Facility name: Facility location: County: Contact name: RMP Facility I.D. Phone Number:

More information

Guidance note. Risk Assessment. Core concepts. N-04300-GN0165 Revision 4 December 2012

Guidance note. Risk Assessment. Core concepts. N-04300-GN0165 Revision 4 December 2012 Guidance note N-04300-GN0165 Revision 4 December 2012 Risk Assessment Core concepts The operator of an offshore facility must conduct a detailed and systematic formal safety assessment, which includes

More information

Integrated Barrier Analysis in Operational Risk Assessment in Offshore Petroleum Operations

Integrated Barrier Analysis in Operational Risk Assessment in Offshore Petroleum Operations Integrated Barrier Analysis in Operational Risk Assessment in Offshore Petroleum Operations Jan Erik Vinnem Preventor/Stavanger University College, Bryne, Norway Terje Aven Stavanger University College,

More information

RECOMMENDED GUIDELINES FOR THE APPLICATION OF IEC 61508 AND IEC 61511 IN THE PETROLEUM ACTIVITIES ON THE NORWEGIAN CONTINENTAL SHELF

RECOMMENDED GUIDELINES FOR THE APPLICATION OF IEC 61508 AND IEC 61511 IN THE PETROLEUM ACTIVITIES ON THE NORWEGIAN CONTINENTAL SHELF RECOMMENDED GUIDELINES FOR THE APPLICATION OF IEC 61508 AND IEC 61511 IN THE PETROLEUM ACTIVITIES ON THE NORWEGIAN CONTINENTAL SHELF No.: 070 Date effective: 1.02.2001 Revision no.: 01 Date revised: NA

More information

Risktec Training Catalogue 2016

Risktec Training Catalogue 2016 Risktec Training Catalogue 2016 Asset Integrity Risk Management The purpose of the course is to provide an in-depth understanding of the ways to manage major incident risk throughout the asset lifecycle,

More information

Safety Integrity Level (SIL) Assessment as key element within the plant design

Safety Integrity Level (SIL) Assessment as key element within the plant design Safety Integrity Level (SIL) Assessment as key element within the plant design Tobias WALK ILF Consulting Engineers GmbH Germany Abstract Special attention has to be provide to safety instrumented functions

More information

DANISH ENERGY AGENCY S GUIDELINES ON SAFETY- AND HEALTH RELATED CONDITIONS ON OFFSHORE INSTALLATIIONS, ETC. HEALTH & SAFETY CASES

DANISH ENERGY AGENCY S GUIDELINES ON SAFETY- AND HEALTH RELATED CONDITIONS ON OFFSHORE INSTALLATIIONS, ETC. HEALTH & SAFETY CASES DANISH ENERGY AGENCY S GUIDELINES ON SAFETY- AND HEALTH RELATED CONDITIONS ON OFFSHORE INSTALLATIIONS, ETC. HEALTH & SAFETY CASES REV. 0 December 2012 TABLE OF CONTENT TABLE OF CONTENT... 2 DOCUMENT CONTROL...

More information

NORSOK STANDARD Z-013 Rev. 2, 2001-09-01. Risk and emergency preparedness analysis

NORSOK STANDARD Z-013 Rev. 2, 2001-09-01. Risk and emergency preparedness analysis NORSOK STANDARD Z-013 Rev. 2, 2001-09-01 Risk and emergency preparedness analysis This NORSOK standard is developed by NTS with broad industry participation. Please note that whilst every effort has been

More information

Hazard Operability Studies (HAZOP) Germanischer Lloyd Service/Product Description

Hazard Operability Studies (HAZOP) Germanischer Lloyd Service/Product Description Safety & Risk Management Services Hazard Operability Studies (HAZOP) Germanischer Lloyd Service/Product Description Germanischer Lloyd Service/Product Description Hazard Operability Studies (HAZOP) Contents

More information

HEALTH, SAFETY, ENVIRONMENT AND COMMUNITY MANAGEMENT STANDARDS. OCTOBER 2011- ISSUE No 01. Doc No: HSEC MS 001

HEALTH, SAFETY, ENVIRONMENT AND COMMUNITY MANAGEMENT STANDARDS. OCTOBER 2011- ISSUE No 01. Doc No: HSEC MS 001 HEALTH, SAFETY, ENVIRONMENT AND COMMUNITY MANAGEMENT S OCTOBER 2011- ISSUE No 01 Doc No: MS 001 Introduction Celtique Energie is in the business of exploring for oil and gas in proven basins in Europe.

More information

Refleksjoner rundt alvorlige hendelser i petroleumsindustrien i et risikostyringsperspektiv

Refleksjoner rundt alvorlige hendelser i petroleumsindustrien i et risikostyringsperspektiv Refleksjoner rundt alvorlige hendelser i petroleumsindustrien i et risikostyringsperspektiv Presentasjon i Tekna-uken 2012 Professor II Jan Erik Vinnem Universitetet i Stavanger jev@preventor.no Overview

More information

Asset integrity process safety management Involving the workforce

Asset integrity process safety management Involving the workforce Shell Global Solutions Asset integrity process safety management Involving the workforce Task Force ZERO Annual Safety Conference Esbjerg, Denmark, March 2010 Diederick Bax, Shell Global Solutions International

More information

Liberty Mutual Insurance RISK ENGINEERING PROCEDURE. REP 07 Incident Planning For external use

Liberty Mutual Insurance RISK ENGINEERING PROCEDURE. REP 07 Incident Planning For external use Liberty Mutual Insurance RISK ENGINEERING PROCEDURE REP 07 Incident Planning For external use Risk Engineering Procedure Incident Planning CONTENTS Page PURPOSE... 3 BACKGROUND... 4 INCIDENT PLANNING PREPARATION...

More information

Advanced Safety Barrier Management with Inclusion of Human and Organizational Aspects

Advanced Safety Barrier Management with Inclusion of Human and Organizational Aspects 331 A publication of CHEMICAL ENGINEERING TRANSACTIONS VOL. 31, 2013 Guest Editors: Eddy De Rademaeker, Bruno Fabiano, Simberto Senni Buratti Copyright 2013, AIDIC Servizi S.r.l., ISBN 978-88-95608-22-8;

More information

TITLE THE ROLE OF TECHNICAL AUTHORITY IN MANAGING ASSET INTEGRITY

TITLE THE ROLE OF TECHNICAL AUTHORITY IN MANAGING ASSET INTEGRITY TITLE THE ROLE OF TECHNICAL AUTHORITY IN MANAGING ASSET INTEGRITY By EMMANUEL MBATA B.Tech. Physics/Electronics Technology A dissertation submitted in partial fulfilment of the requirements of the award

More information

Integrating Performance Standards into an Asset Management System

Integrating Performance Standards into an Asset Management System Integrating Performance Standards into an Asset Management System Leveraging ISO 55000 in the Oil and Gas Industry By Mike Poland, CMRP, CRL 4360 Corporate Road Charleston, SC 29405-7445 843.744.7110 www.lce.com

More information

APPLICATION OF IEC 61508 AND IEC 61511 IN THE NORWEGIAN PETROLEUM INDUSTRY

APPLICATION OF IEC 61508 AND IEC 61511 IN THE NORWEGIAN PETROLEUM INDUSTRY 1 of 159 APPLICATION OF IEC 61508 AND IEC 61511 IN THE NORWEGIAN PETROLEUM INDUSTRY 2 of 159 Table of content FOREWORD...5 1 INTRODUCTION...6 1.1 SCOPE AND PURPOSE OF DOCUMENT...6 1.2 RISK REDUCTION, SIS

More information

Basic Fundamentals Of Safety Instrumented Systems

Basic Fundamentals Of Safety Instrumented Systems September 2005 DVC6000 SIS Training Course 1 Basic Fundamentals Of Safety Instrumented Systems Overview Definitions of basic terms Basics of safety and layers of protection Basics of Safety Instrumented

More information

International Association of Oil & Gas Producers Asset integrity the key to managing major incident risks. Report No.

International Association of Oil & Gas Producers Asset integrity the key to managing major incident risks. Report No. International Association of Oil & Gas Producers Asset integrity the key to managing major incident risks Report No. 415 December 2008 Purpose and target audience OGP s Managing Major Incident Risks Task

More information

A Renewed Life Cycle Approach to FPSO by DNV

A Renewed Life Cycle Approach to FPSO by DNV A Renewed Life Cycle Approach to FPSO by DNV 2011 FPSO JIP Forum Kenneth Vareide, Director of Operations Life Cycle Approach to FPSO: Some Key Success Criteria Newbuilding Project vs. Operation Integrated

More information

Shell s Health, Safety and Environment (HSE) management system (see Figure 11-1) provides the framework for managing all aspects of the development.

Shell s Health, Safety and Environment (HSE) management system (see Figure 11-1) provides the framework for managing all aspects of the development. Section 11.1 APPLICATION FOR APPROVAL OF THE DEVELOPMENT PLAN FOR NIGLINTGAK FIELD PROJECT DESCRIPTION INTRODUCTION 11.1.1 HSE MANAGEMENT SYSTEM Shell s Health, Safety and Environment (HSE) management

More information

HAZARDOUS MATERIALS MANAGEMENT ISSUE 2

HAZARDOUS MATERIALS MANAGEMENT ISSUE 2 CONTENTS PAGE 1 AIM 2 2 APPLICATION 2 3 DEFINITIONS 2 4 REASON FOR INCLUSION 2 5 REQUIREMENTS 3 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM AND PROCEDURAL REQUIREMENTS 5 8 PEOPLE REQUIREMENTS 7 APPENDIX

More information

Principles for barrier management in the petroleum industry

Principles for barrier management in the petroleum industry 2013 Principles for barrier management in the petroleum industry PSA 29.01.2013 Foreword Barrier management is about ensuring, on a systematic and continuous basis, that barriers are relevant, effective

More information

Eksplosjonsrisiko, værbeskyttelse og optimalisering av design

Eksplosjonsrisiko, værbeskyttelse og optimalisering av design OIL & GAS Eksplosjonsrisiko, værbeskyttelse og optimalisering av design HMS utfordringer i Nordområdene Arbeidsseminar 4 Asmund Huser 20 May 2014 1 DNV GL 2013 20 May 2014 SAFER, SMARTER, GREENER Content

More information

Brochure. Hazard identification and risk assessment For the hazardous process industries

Brochure. Hazard identification and risk assessment For the hazardous process industries Brochure Hazard identification and risk assessment For the hazardous process industries Overview Delivering excellent process safety performance is a given for any operating company in the hazardous process

More information

Petroleum and natural gas industries Well integrity standard

Petroleum and natural gas industries Well integrity standard Petroleum and natural gas industries Well integrity standard ISO 16530-1 Well integrity Lifecycle Governance 2015 BSEE Domestic and International Standards Workshop Houston May 8 th 2015 Presenter Paul

More information

Jonathan Wilson. Sector Manager (Health & Safety)

Jonathan Wilson. Sector Manager (Health & Safety) Jonathan Wilson Sector Manager (Health & Safety) OHSAS 18001:2007 Making Life Easier For Health & Safety Managers Workshop Agenda 1. Introduction 2. Why Manage Health & Safety 3. OHSAS 18001 and OHSMS

More information

OFFSHORE OIL & GAS SECTOR STRATEGY 2014 TO 2017

OFFSHORE OIL & GAS SECTOR STRATEGY 2014 TO 2017 STRATEGIC CONTEXT OFFSHORE OIL & GAS SECTOR STRATEGY 2014 TO 2017 1 This strategy sets out how HSE s Energy Division will regulate health and safety of the offshore oil and gas industry operating on the

More information

Integrated management systems Ship operating companies

Integrated management systems Ship operating companies Integrated management systems Ship operating companies Safety, Quality, Environment and Occupational Health and Safety DNV Maritime Preamble Organisations of all kinds are increasingly concerned about

More information

1 What is the purpose of this document?

1 What is the purpose of this document? Executive Summary Comparing the Oil and Gas Drilling Regulatory Regimes of the, the, the U.K,, and 1 What is the purpose of this document? The National Energy Board (NEB) regulates offshore oil and gas

More information

DNVGL-CP-0393 Edition December 2015

DNVGL-CP-0393 Edition December 2015 CLASS PROGRAMME Type approval DNVGL-CP-0393 Edition December 2015 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD

More information

Gas Detector System, Portable/Fixed Oxygen Analysis and Gas Detection Equipment

Gas Detector System, Portable/Fixed Oxygen Analysis and Gas Detection Equipment STANDARD FOR CERTIFICATION No. 2.9 TYPE APPROVAL PROGRAMME NO. 7-473.30/31 / MED A.1/3.30/54 Gas Detector System, Portable/Fixed Oxygen Analysis and Gas Detection Equipment SEPTEMBER 2011 The content of

More information

Internal Audit Checklist

Internal Audit Checklist Internal Audit Checklist 4.2 Policy Verify required elements Verify management commitment Verify available to the public Verify implementation by tracing links back to policy statement Check review/revisions

More information

DNV GL Assessment Checklist ISO 9001:2015

DNV GL Assessment Checklist ISO 9001:2015 DNV GL Assessment Checklist ISO 9001:2015 Rev 0 - December 2015 4 Context of the Organization No. Question Proc. Ref. Comments 4.1 Understanding the Organization and its context 1 Has the organization

More information

Safety Management System Manual Guidebook

Safety Management System Manual Guidebook Safety Management System Manual Guidebook Developed by: Commandant (G-MSO-2) U.S. Coast Guard Table of Contents Chapter 1: Introduction 1 Chapter 2: Safety and Environmental Protection Policy 3 Chapter

More information

Safety Requirements Specification Guideline

Safety Requirements Specification Guideline Safety Requirements Specification Comments on this report are gratefully received by Johan Hedberg at SP Swedish National Testing and Research Institute mailto:johan.hedberg@sp.se -1- Summary Safety Requirement

More information

Introducing and Managing Process Safety Key Performance Indicators (KPIs)

Introducing and Managing Process Safety Key Performance Indicators (KPIs) Introducing and Managing Process Safety Key Performance Indicators (KPIs) Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same

More information

COMAH Competent Authority

COMAH Competent Authority OMH ompetent uthority Inspection of Electrical, ontrol and Instrumentation Systems at OMH Establishments (Operational elivery Guide) Page 1 of 23 Introduction 1 This elivery Guide (G) describes how the

More information

RISK ASSESSMENT AND USE OF RISK ACCEPTANCE CRITERIA FOR THE REGULATION OF DANGEROUS SUBSTANCES

RISK ASSESSMENT AND USE OF RISK ACCEPTANCE CRITERIA FOR THE REGULATION OF DANGEROUS SUBSTANCES RISK ASSESSMENT AND USE OF RISK ACCEPTANCE CRITERIA FOR THE REGULATION OF DANGEROUS SUBSTANCES Eivind Okstad and Per Hokstad SINTEF Industrial Management, Dept. of Safety and Reliability, N-7465 Trondheim,

More information

Lessons from Offshore Accidents

Lessons from Offshore Accidents Lessons from Offshore Accidents Tekna Prosessikkerhet, Bergen 2007-11-27 Jon Erik Pettersvold/DNV Energy With extracts from Petrobras Presentation June 2001 Source: www.petrobras.com.br Lessons from Offshore

More information

GUIDELINES FOR THE CONDUCT OF OIL, GAS & PETROCHEMICAL RISK ENGINEERING SURVEYS

GUIDELINES FOR THE CONDUCT OF OIL, GAS & PETROCHEMICAL RISK ENGINEERING SURVEYS GUIDELINES FOR THE CONDUCT OF OIL, GAS & PETROCHEMICAL RISK ENGINEERING SURVEYS Developed by: Ron Jarvis Andy Goddard Swiss Re, London Talbot Syndicate, London Contributions made by the London market engineers

More information

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE Describe the existing or proposed measures, including emergency procedures, to minimise the impact on the environment of an accidental emission or spillage.

More information

1.1.4 The findings from Fire Risk Assessment must be incorporated into the FRAMS Action Plan to manage fire safety at each premise.

1.1.4 The findings from Fire Risk Assessment must be incorporated into the FRAMS Action Plan to manage fire safety at each premise. Fire Safety Policy 1.1 Policy Statement of Intent 1.1.1 Under the current UK Legislation (In England and Wales, the Regulatory Reform (Fire Safety) Order 2005, Fire (Scotland) Act 2005, Fire and Rescue

More information

14th Turkmenistan International Oil & Gas Conference 2009

14th Turkmenistan International Oil & Gas Conference 2009 14th Turkmenistan International Oil & Gas Conference 2009 Matteo Marnoni HSE & SD Manager Burren Resources Petroleum Ltd 17-19 November 2009 Ashgabat, Turkmenistan Burun Cheleken 1900 s Kotur Tepe Barsa

More information

Who is ABS Consulting?

Who is ABS Consulting? THESIS OVERVIEW Who is ABS Consulting? Global Safety, Risk, Integrity Management and Inspection Services Company Serving the Oil & Gas, Petrochemical, Maritime, Power Generation, Commercial, Government

More information

TÜV Rheinland Functional Safety Engineer Certificate (Process Hazard & Risk Analysis)

TÜV Rheinland Functional Safety Engineer Certificate (Process Hazard & Risk Analysis) TÜV Rheinland Functional Safety Engineer Certificate (Process Hazard & Risk Analysis) Controlling risks within major hazard enterprises requires a robust process safety management (PSM) system and the

More information

PPG SUPPLIER DEVELOPMENT ASSESSMENT

PPG SUPPLIER DEVELOPMENT ASSESSMENT Supplier: Address: Products: Assessment Date: Assessment Team: Certification: Supplier Contacts Position E-mail Phone General Comments: Assessment Results Summary Sections Non-conformity Action Point Quality

More information

IWMC 2015, Amsterdam, October 28-29, 2015 Practical experience from actual water mist installations. What can be learnt?

IWMC 2015, Amsterdam, October 28-29, 2015 Practical experience from actual water mist installations. What can be learnt? IWMC 2015, Amsterdam, October 28-29, 2015 Practical experience from actual water mist installations. What can be learnt? Magnus Arvidson Fire Research SP Technical Research Institute of Sweden magnus.arvidson@sp.se

More information

INTEGRATED MANAGEMENT SYSTEM MANUAL IMS. Based on ISO 9001:2008 and ISO 14001:2004 Standards

INTEGRATED MANAGEMENT SYSTEM MANUAL IMS. Based on ISO 9001:2008 and ISO 14001:2004 Standards INTEGRATED MANAGEMENT SYSTEM MANUAL IMS Based on ISO 9001:2008 and ISO 14001:2004 Standards Approved by Robert Melani Issue Date 30 December 2009 Issued To Management Representative Controlled Y N Copy

More information

Total Solutions Provider CAPABILITY PROFILE. www.tycofireuae.com QATAR UNITED ARAB EMIRATES OMAN

Total Solutions Provider CAPABILITY PROFILE. www.tycofireuae.com QATAR UNITED ARAB EMIRATES OMAN Total Solutions Provider CAPABILITY PROFILE www.tycofireuae.com QATAR UNITED ARAB EMIRATES OMAN INDEX Company Profile Mission Statement Nature of Business Manpower Details Locations Service & Maintenance

More information

KP4: AGEING & LIFE EXTENSION (ALE) INSPECTION PROGRAMME 1 YEAR ON

KP4: AGEING & LIFE EXTENSION (ALE) INSPECTION PROGRAMME 1 YEAR ON KP4: AGEING & LIFE EXTENSION (ALE) INSPECTION PROGRAMME 1 YEAR ON PRESENTATION OUTLINE What is KP4? What have we achieved so far? Supporting activities; external events, web page, network and technical

More information

E-navigation, process, results, status and delivery

E-navigation, process, results, status and delivery E-navigation, process, results, status and delivery Chile, October 2013 John Erik Hagen, Regional Director NCA Coordinator of IMO Correspondence Group on e-navigation Shipping moves into the digital world

More information

TRAINING AND SAFETY FOR AD

TRAINING AND SAFETY FOR AD @adbiogas #UKADBiogas TRAINING AND SAFETY FOR AD KEVIN THROWER BIOTECHNOLOGY BUSINESS MANAGER NATIONAL SKILLS ACADEMY DAY TWO, 4 TH JULY 12.00 13.00 Process Safety Leadership for the Anaerobic Digestion

More information

Process Safety & Barrier Management. Lessons from major hazard industries

Process Safety & Barrier Management. Lessons from major hazard industries Process Safety & Barrier Management Lessons from major hazard industries Engineers Ireland, Fire & Safety Division Conference. Robert Sherman, Principal Consultant, MMI. email: rsherman@mmiengineering.com

More information

NORSOK STANDARD RISK AND EMERGENCY PREPAREDNESS ANALYSIS

NORSOK STANDARD RISK AND EMERGENCY PREPAREDNESS ANALYSIS NORSOK STANDARD RISK AND EMERGENCY PREPAREDNESS ANALYSIS Z-013 Rev.1, March 1998 This NORSOK standard is developed by NTS with broad industry assistance. Please note that whilst every effort has been made

More information

U.S. Chemical Safety and Hazard Investigation Board

U.S. Chemical Safety and Hazard Investigation Board Rick Engler Board Member Christine Baker, Director Office of the Director Department of Industrial Relations 1515 Clay Street, 17th Floor Oakland, CA 94612 June 22, 2015 Dear Director Baker: Thank you

More information

Elevator Malfunction Anyone Going Down?

Elevator Malfunction Anyone Going Down? Elevator Malfunction Anyone Going Down? Lessons Learned Volume 04 Issue 41 2004 USW Purpose Elevator Malfunction - Anyone Going Down? To conduct a small group lessons learned activity to share information

More information

Master Class. Electrical and Instrumentation (E &I) Engineering for Oil and Gas Facilities

Master Class. Electrical and Instrumentation (E &I) Engineering for Oil and Gas Facilities Master Class Electrical and Instrumentation (E &I) Engineering for Oil and Gas Facilities What you will learn: Skills and competencies in E&I oil and gas engineering Knowledge of the latest technologies

More information

Acknowledgements. Process Safety Code Task Force 06. Faisal Malallah TF Leader EQUATE Petrochemical Co. Vijay Kumar Member EQUATE Petrochemical Co.

Acknowledgements. Process Safety Code Task Force 06. Faisal Malallah TF Leader EQUATE Petrochemical Co. Vijay Kumar Member EQUATE Petrochemical Co. PROCESS SAFETY CODE Document Number : GPCA-RC-C06 Original Issue: June 15, 2011 Re-issue Date: / / Approval: Dr. Abdul Wahab Al-Sadoun Revision Number: 00 Prepared / Reviewed by: Task Force 01 Ownership:

More information

Correspondence between ISO 9001:2008 and 14001:2004, OHSAS 18001:2007, ISM and the SeaBird Management System

Correspondence between ISO 9001:2008 and 14001:2004, OHSAS 18001:2007, ISM and the SeaBird Management System Correspondence between ISO 9001:2008 and 14001:2004, OHSAS 18001:2007, ISM and the SeaBird Management System Introduction (title Introduction Introduction Preamble Introduction General 0.1 --- --- ---

More information

Norsk Olje og gass Selbusjøen 21.5.2014. www.eninorge.com

Norsk Olje og gass Selbusjøen 21.5.2014. www.eninorge.com Norsk Olje og gass Selbusjøen 21.5.2014 www.eninorge.com Innholdet i presentasjonen Goliat værdata Goliat innretningen valg av løsninger Risikostyring i arktiske strøk Lysarkene er hovedsakelig skrevet

More information

Asset Integrity - Process Safety Management

Asset Integrity - Process Safety Management Asset Integrity - Process Safety Management Commit to Process Safety Understand Hazards & Risks Manage Risk Learn from experience Process safety culture Compliance with standards Process safety competency

More information

To Mary Kay O'Connor Process Safety Center Home Page To Program details for Day 1 To Program details for Day 2

To Mary Kay O'Connor Process Safety Center Home Page To Program details for Day 1 To Program details for Day 2 To Mary Kay O'Connor Process Safety Center Home Page To Program details for Day 1 To Program details for Day 2 Using Incident Investigations as a Program Assessment Tool Michael L. Marshall, PE, CSP U.S.

More information

From WorldWide to Arctic, challenges and risk

From WorldWide to Arctic, challenges and risk Resource exploration under extreme Arctic conditions Morten Mejlænder-Larsen, Director Arctic Operations Content Challenges Arctic Risk Class Rules and Notations today International Rules and Notations

More information

Holistic Approach to Barrier Integrity: Managing an Effective Safeguarding Strategy. San Burnett

Holistic Approach to Barrier Integrity: Managing an Effective Safeguarding Strategy. San Burnett Holistic Approach to Barrier Integrity: Managing an Effective Safeguarding Strategy San Burnett Holistic Approach to Barrier Integrity Managing an Effective Safeguarding Strategy San Burnett Principal

More information

Elements Elements describe the essential outcomes.

Elements Elements describe the essential outcomes. AURETU005 Application Competency Field Unit Sector Elements Elements describe the essential outcomes. Retrofit and modify air conditioning and HVAC systems This unit describes the performance outcomes

More information

PROJECT DESIGN DELIVERABLES SEQUENCE (PDD)

PROJECT DESIGN DELIVERABLES SEQUENCE (PDD) PROJECT DESIGN DELIVERABLES SEQUENCE (PDD) INTRODUCTION There are several reasons which lead to delay in project completion, out of all, one main reason is delay in deliverable processing i.e., submission

More information

Quality & Safety Manual

Quality & Safety Manual Purpose: This Quality & Safety Manual is intended to clarify and document the Quality and Health & Safety policies of GGS Oil and Gas Systems and to describe how the organization organizes its activities

More information

13. FPSO Operational Problems Don Smith, OGP

13. FPSO Operational Problems Don Smith, OGP OGP Marine Risks Workshop Proceedings 13. FPSO Operational Problems Don Smith, OGP FPSO Operational Problems Don Smith OGP Analysis of Accident Statistics for Floating Monohull and Fixed Installations

More information

An inventory of hazardous materials used in your workplace will prove useful.

An inventory of hazardous materials used in your workplace will prove useful. Introduction Fire Protection is an organized approach designed to prevent fires. In the event of a fire, a fire protection program will help prevent or minimize personal injuries, losses, and harm to the

More information

Aberdeen Drilling Consultants Presentation on Asset Integrity and The ADC TRAMS System

Aberdeen Drilling Consultants Presentation on Asset Integrity and The ADC TRAMS System Aberdeen Drilling Consultants Presentation on Asset Integrity and The ADC TRAMS System Presented by: Douglas G Hay, Managing Director, Aberdeen Drilling Consultants Overview TRAMS Overview Asset Integrity

More information

risk management and assessment for business Practical HSE Risk Management An Introduction to the Bow-tie Method

risk management and assessment for business Practical HSE Risk Management An Introduction to the Bow-tie Method Risktec Solutions risk management and assessment for business Practical HSE Risk Management An Introduction to the Bow-tie Method Presentation to the International Conference for Achieving Health & Safety

More information

For inspection purposes only.

For inspection purposes only. Emergency Response and Accident Prevention Procedures PURPOSE This provides a description of the plans for the Management of Emergencies in accordance with the Emergency Plan (Ref 1.). Separate procedures

More information

SAFETY and HEALTH MANAGEMENT STANDARDS

SAFETY and HEALTH MANAGEMENT STANDARDS SAFETY and HEALTH STANDARDS The Verve Energy Occupational Safety and Health Management Standards have been designed to: Meet the Recognised Industry Practices & Standards and AS/NZS 4801 Table of Contents

More information

Performance Indicators in major hazard industries An Offshore Regulator s perspective - Ian Whewell

Performance Indicators in major hazard industries An Offshore Regulator s perspective - Ian Whewell Performance Indicators in major hazard industries An Offshore Regulator s perspective - Ian Whewell Background Much has been written about indicators of health and safety performance and a great deal of

More information

Fire Risk Assessment Safety Checklist

Fire Risk Assessment Safety Checklist Fire Risk Assessment Safety Checklist This checklist has been prepared to help you comply with The Regulatory Reform Fire Safety Order 2005 What is the Regulatory Reform (Fire Safety) Order 2005? The Regulatory

More information

Human Factors in Design and Construction Regulatory Perspective

Human Factors in Design and Construction Regulatory Perspective Further needs in the Area of management systems Safety culture, leadership and preoperational stages of nuclear projects Human Factors in Design and Construction Regulatory Perspective Technical Meeting,

More information

Row Manufacturing Inc. Quality Manual ISO 9001:2008

Row Manufacturing Inc. Quality Manual ISO 9001:2008 Row Manufacturing Inc. Quality Manual ISO 9001:2008 Row Manufacturing 210 Durham Drive Athens, Alabama 35611 Phone:256.232.4151 Fax:256.232.4133 Page 2 of 33 This Page intentionally left Blank Page 3 of

More information

Risk Based Asset Management

Risk Based Asset Management Document number Risk Based Asset Management turning policy into operational excellence Dave Oesterholt DNV GL Oil & Gas - Groningen Office, NL Monday, 2 December 2013 Location Groningen, NL: Gas Consulting

More information

BS5839 Part 1:2002 Overview

BS5839 Part 1:2002 Overview BS5839 Part 1:2002 Overview 1 Contents Introduction So why is the current standard being revised? The brief for the new standard Changes to structure of current Standard Enhanced certification of Fire

More information

BEST PRACTICE FOR THE DESIGN AND OPERATION OF HIGH HAZARD SITES

BEST PRACTICE FOR THE DESIGN AND OPERATION OF HIGH HAZARD SITES BEST PRACTICE FOR THE DESIGN AND OPERATION OF HIGH HAZARD SITES Lyn Fernie and Jo Fearnley AK EHS & Risk, Aker Kvaerner Engineering Services Ltd, Ashmore House, Stockton on Tees, TS18 3RE. The idea of

More information

CRM Inspection Experience & Lessons Learned

CRM Inspection Experience & Lessons Learned CRM Inspection Experience & Lessons Learned Ken Yoss, Control Center Manager Chevron Pipe Line Company (CPL) CPL s Opportunity Align with Control Center Vision Enhance pipeline safety by strengthening

More information

Application of IEC 61508 and IEC 61511 in the Norwegian Petroleum Industry

Application of IEC 61508 and IEC 61511 in the Norwegian Petroleum Industry Application of IEC 61508 and IEC 61511 in the Norwegian Petroleum Industry Lars Bodsberg Research Director SINTEF, Trondheim, Norway lars.bodsberg@sintef.no http://www.sintef.no/ 30 November 2005 Delft,

More information

MSC/Circ.1002 26 June 2001 GUIDELINES ON ALTERNATIVE DESIGN AND ARRANGEMENTS FOR FIRE SAFETY

MSC/Circ.1002 26 June 2001 GUIDELINES ON ALTERNATIVE DESIGN AND ARRANGEMENTS FOR FIRE SAFETY INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 Telex: 23588 IMOLDN G IMO E Ref. MSC/Circ.1002 26 June 2001 GUIDELINES ON ALTERNATIVE

More information

Bellingham Control System Cyber Security Case Study

Bellingham Control System Cyber Security Case Study Bellingham Control System Cyber Security Case Study Marshall Abrams Joe Weiss Presented at at 2007 Annual Computer Security Applications Conference Case Study Synopsis Examine actual control system cyber

More information

DEEPWATER HORIZON. Summary report

DEEPWATER HORIZON. Summary report 1 Summary report DEEPWATER HORIZON Lessons learned and follow-up A Norwegian Oil Industry Association (OLF) report with contributions from the Norwegian Clean Seas Association for Operating Companies (NOFO)

More information

2. Safety, Health, Environment and Quality Management System (SHEQ-MS)

2. Safety, Health, Environment and Quality Management System (SHEQ-MS) 2. Safety, Health, Environment and Quality Management System (SHEQ-MS) 2.1 Overview of the SHEQ-MS The SHEQ-MS provides a framework for the system that will be used by Gunns to ensure the pulp mill project

More information

c. As mandated by law, facilities must obtain and maintain valid zoning permits as well as permits for intended use.

c. As mandated by law, facilities must obtain and maintain valid zoning permits as well as permits for intended use. Walmart Standards for Suppliers Section 7. Health and Safety 7. Health and Safety Suppliers must provide workers with a safe and healthy work environment. Suppliers must take proactive measures to prevent

More information

Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1

Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1 Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1 Nuclear Power in Pakistan Nuclear Power Plants Capacity (MWe) Year of Commissioning In

More information

Ir. NOORAZMAN BIN SOUD. Deputy Director Petroleum Safety Division

Ir. NOORAZMAN BIN SOUD. Deputy Director Petroleum Safety Division Ir. NOORAZMAN BIN SOUD Deputy Director Petroleum Safety Division 1 OUTLINES Introduction of DOSH Classification of CIMAH 1996 What is ERP? Objectives of ERP Why need ERP? Types of ERP Onsite ERP Components

More information

Quality, Environmental, Health and Safety Manual Toshiba International Corporation

Quality, Environmental, Health and Safety Manual Toshiba International Corporation Quality, Environmental, Health and Safety Manual Toshiba International Corporation Doc. No. QEHS 001 Rev. 19 (12/12) Title: Prepared By: Revision No.: Table of Contents and Cross Reference Ken Mori/Homer

More information

SUPPORTING THE RAIL INDUSTRY UNIQUE SOLUTIONS FOR UNIQUE SITUATIONS WWW.SGS.COM/RAIL

SUPPORTING THE RAIL INDUSTRY UNIQUE SOLUTIONS FOR UNIQUE SITUATIONS WWW.SGS.COM/RAIL SUPPORTING THE RAIL INDUSTRY UNIQUE SOLUTIONS FOR UNIQUE SITUATIONS WWW.SGS.COM/RAIL OUR UNIQUE SOLUTION TO YOUR UNIQUE SITUATION SGS is recognised as the global benchmark for quality and integrity. We

More information

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN FUCHS LUBRICANTS (AUSTRALASIA) PTY LTD 2 HOLLAND STREET WICKHAM NSW POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN ENVIRONMENTAL PROTECTION LICENCE No.10181 Pubic Version DOC REF:ENV228 ISSUE:1 DATE:21.11.13

More information