1 150, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/07/ CONTRACT ID: PROJECT: STP 2015(702) CONTRACT: AWARD : $8,162, PROJECTED : $8,312, ADJ. PROJECTED : $8,462, CONTRACT: CONTRACTOR: H. H. HOWARD & SONS, INC. HIGHWAY: SH 77 DISTRICT NAME: Atlanta COUNTY: CASS AREA ENGINEER: Kenneth Icenhower AREA NUMBER: 055 ESTIMATE NUMBER: 0010 LETTING DATE: 03/06/2015 ESTIMATE PAID: AWARD DATE: 03/26/2015 ESTIMATE PERIOD: 06/01/2016 to 06/30/2016 NOTICE TO PROCEED DATE: 05/21/2015 ESTIMATE TYPE: PROG WORK BEGIN DATE: 10/05/2015 % COMPLETE: ACCEPTED DATE: 00/00/0000 % TIME USED: PHYSICAL WORK COMPLETION DATE: 00/00/0000 % RETAINAGE: 0.00 RECAPITULATION TOTAL PREV THIS ESTIMATE EARNINGS $3,269, $2,527, PARTICIPATING NON-PARTICIPATING $3,269, $2,527, RETAINAGE LIQUIDATED DAMAGES INCENTIVE DISINCENTIVE OTHER ADJUSTMENTS $741, $741, PAID TO CONTRACTOR $3,269, $2,527, $741, CONTRACT ADJUSTMENTS THIS ESTIMATE ADJUSTMENTS THIS ESTIMATE ADJUSTMENT : ADJUSTMENT : REMARKS: ADJUSTMENT : ADJUSTMENT : REMARKS: ***There are no Contract Adjustments for this estimate*** ***There are no Line Item Adjustments for this estimate*** CERTIFIED AS CORRECT AND ONE COPY HAS BEEN GIVEN TO THE CONTRACTOR AREA/PROJECT ENGINEER DATE

2 CONTRACTOR'S ESTIMATE PACKAGE Page 2 of 10 CONTRACT TIME STATEMENT WORK BEGIN DATE: 10/05/2015 ASSESSED LIQ DAMAGES: 0 TIME CHARGES BEGIN: 09/19/2015 LIQ DAMAGE RATE: $1, DAYS: 370 LIQUIDATED DAMAGES: 0 C. O. ADJUSTED DAYS: 0 DAYS AT CURRENT DAYS: 370 PER DAY $1, DAYS CHARGED : 107 TOTAL: PHYSICAL WORK COMPLETE: 00/00/0000 DAILY BREAKDOWN Date Days or Days Charged Days Credited 06/01/ TOO WET 06/02/ TOO WET 06/03/ TOO WET 06/04/ SATURDAY 06/05/ SUNDAY 06/06/ /07/ /08/ /09/ /10/ /11/ SATURDAY 06/12/ SUNDAY 06/13/ RAIN 06/14/ /15/ /16/ /17/ /18/ SATURDAY 06/19/ SUNDAY 06/20/ /21/ /22/ /23/ /24/ /25/ SATURDAY 06/26/ SUNDAY 06/27/ /28/ /29/ /30/ Diary Adjustment Date Days or PERIOD SUMMARY Days Charged Days Credited RAIN 1 SATURDAY 4 SUNDAY 4 TOO WET 3

3 CONTRACTOR'S ESTIMATE PACKAGE Page 3 of 10 WORK PERFORMED THIS PERIOD PROJECT STP 2015(702) CONTROL CATEGORY 001 ROADWAY QTY THIS ESTIMATE PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date EXCAVATION (CHANNEL) CY $ EXCAVATION (ROADWAY) CY , $13, , , BLOCK SODDING SY , $88, , , VEGETATIVE WATERING MG $3, , CEMENT TON $26, , CEMENT TREAT (SUBGRADE) (8") SY , $26, , , PRIME COAT & BLOTTER (MC-30) GAL , $16, , , D-GR HMA TY-C PG64-22 TON , $309, , , D-GR HMA TY-D PG70-22 TON , $200, , , CL A CONC (CURB OUTLET)(TY II) EA 1, $3, RIPRAP (CONC)(4 IN) CY $22, RC PIPE (CL III)(24 IN) LF $4, , , SET (TY II) (24 IN) (RCP) (6: 1) (P) EA $5, REMOV STR (PIPE) LF $ , , BARRICADES, SIGNS AND TRAFFIC HANDLING MO $ ROCK FILTER DAMS (INSTALL) (TY 3) LF $1, TEMP SEDMT CONT FENCE (REMOVE) LF , $1, , , CONC CURB & GUTTER (TY II) LF $6, , , ELIM EXT PAV MRK & MRKS (4") LF $ , , MATERIAL ON HAND DOL , $10, , SUPP DESCR added by co 2 TOTAL EARNINGS THIS ESTIMATE $741,735.57

4 CONTRACTOR'S ESTIMATE PACKAGE Page 4 of 10 CONTRACT S PROJECT CATEGORY STP 2015(702) CONTROL ROADWAY SUPP NET CO $ PREPARING ROW STA 4, , PREPARING ROW (TREE) (6" TO 24" DIA) EA PREPARING ROW(TREE)(24" TO 36" DIA.) EA REMOVING CONC (RIPRAP) SY , EXCAVATION (CHANNEL) CY EMBANKMENT (FINAL)(DENS CONT)(TY C) CY , , , REMOVING CONC (MEDIANS) SY , REMOVING CONC (DRIVEWAYS) SY , , , REMOVING CONC (CURB OR CURB & GUTTER) LF , , REMOV STAB BASE AND AH PAV (0"-12") SY , , , EXCAVATION (ROADWAY) CY , , , BLOCK SODDING SY , , , BROADCAST SEED (TEMP) (WARM) SY , , , BROADCAST SEED (TEMP) (COOL) SY , , , SOIL RETENTION BLANKETS (CL 1) (TY D) SY , , , VEGETATIVE WATERING MG , , LIME(HYD,COM OR QK)(SLRY)OR QK(DRY) TON , Added by co LIME TRT (EXST MATL)(8") SY , , , added by co CEMENT TON , , CEMENT TREAT (SUBGRADE) (8") SY , , , PRIME COAT & BLOTTER (MC-30) GAL , , , AH (TIER I) GAL , , , AGGR(TY-B GR-3 SAC-A) CY , AGGR(TY-PB GR-4 SAC-A) CY , D-GR HMA TY-C PG64-22 TON , , , D-GR HMA TY-D PG70-22 TON , , , CUT & RESTORING PAV SY , TRENCH EXCAVATION PROTECTION LF , CL A CONC (CURB OUTLET)(TY I) EA 1, , CL A CONC (CURB OUTLET)(TY II) EA 1, , RIPRAP (CONC)(4 IN) CY , CONC BOX CULV (4 FT X 3 FT) LF , CONC BOX CULV (6 FT X 4 FT) LF , RC PIPE (CL III)(18 IN) LF , , , RC PIPE (CL III)(24 IN) LF , , , RC PIPE (CL III)(30 IN) LF , RC PIPE (CL III)(36 IN) LF , JCTBOX(COMPL)(PJB)(8FTX8FT) EA 7, , MANH (COMPL)(PRM)(48IN) EA 2, , INLET (COMPL)(PCO)(5FT)(NONE) EA 3, , INLET (COMPL)(PCO)(5FT)(LEFT) EA 3, ,100.00

5 CONTRACTOR'S ESTIMATE PACKAGE Page 5 of 10 CATEGORY 001 ROADWAY SUPP NET CO $ INLET (COMPL)(PCO)(5FT)(RIGHT) EA 3, , INLET (COMPL)(PCO)(5FT)(BOTH) EA 4, , WINGWALL (FW - 0) (HW=4 FT) EA 6, , WINGWALL (FW - 0) (HW=5 FT) EA 7, , WINGWALL (PW - 1) (HW=8 FT) EA 17, , SET (TY II) (24 IN) (RCP) (6: 1) (P) EA , SET (TY II) (30 IN) (RCP) (6: 1) (C) EA 1, , PIPE (PVC) (SCH 40) (8 IN) LF REMOV STR (PIPE) LF , , , MOBILIZATION LS 550, , BARRICADES, SIGNS AND TRAFFIC HANDLING MO , ROCK FILTER DAMS (INSTALL) (TY 2) LF , ROCK FILTER DAMS (INSTALL) (TY 3) LF , TEMP SEDMT CONT FENCE (INSTALL) LF , , , TEMP SEDMT CONT FENCE (REMOVE) LF , , , CONSTRUCTING DETOURS SY , , , CONC CURB & GUTTER (TY II) LF , , , DRIVEWAYS (CONC) SY , , , DRIVEWAYS (ACP) SY , REMOVE METAL BEAM GUARD FENCE LF , GUARDRAIL END TREATMENT (REMOVE) EA REMOVE RD IL ASM (TRANS-BASE) EA WK ZN PAV MRK NON-REMOV (W)4"(DOT) LF WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF , , , WK ZN PAV MRK NON-REMOV (W)24"(SLD) LF WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF , , , REFL PAV MRKR TY II-A-A EA , ELIM EXT PAV MRK & MRKS (4") LF , , , REMOVE TRAFFIC SIGNAL EA 1, , MATERIAL ON HAND DOL , , added by co 2 CATEGORY 002 CONTRACTOR FORCE ACCOUNT WORK Category Subtotal $3,254, SUPP NET CO $ FORCE ACCT-EROSION CONTROL MAINTENANCE DOL , , , Category Subtotal $15, PROJECT STP 2015(702) CONTROL CATEGORY 001 ROADWAY SUPP NET CO ($) OBLITERATING ABANDONED ROAD STA

6 CONTRACTOR'S ESTIMATE PACKAGE Page 6 of BACKFILL (TY B) STA PLANT MATERIAL (65 GAL) (TREE) EA PLANT MAINTENANCE MO 2, PRODUCTION PAYMENT ADJUSTMENT DOL , PLACEMENT PAYMENT ADJUSTMENT DOL , RIDE PAYMENT ADJUSTMENT ( 341) DOL , DRILL SHAFT (RDWY ILL POLE) (30 IN) LF DRILL SHAFT (TRF SIG POLE) (30 IN) LF DRILL SHAFT (TRF SIG POLE) (36 IN) LF DRILL SHAFT (TRF SIG POLE) (48 IN) LF CL A CONC (SEAL) CY RIPRAP (MOW STRIP)(5 IN) CY INLET (COMPL)(MEDIAN) EA 2, HEADWALL (CH - FW - 30) (DIA= 30 IN) EA 7, added by co SET (TY II) (36 IN) (RCP) (4: 1) (C) EA 2, added by co REMOV STR (HEADWALL) EA added by co ROCK FILTER DAMS (REMOVE) LF TURNOUTS (ACP) SY MTL W-BEAM GD FEN (TIM POST) LF , MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 1, GUARDRAIL END TREATMENT (INSTALL) EA 2, MAILBOX INSTALL-S (TWW-POST) TY 4 EA MAILBOX INSTALL-D (TWW-POST) TY 4 EA IN RD IL (TY SA) 50T-10 (400W EQ) LED EA 3, CONDT (PVC) (SCH 40) (2") LF , CONDT (PVC) (SCH 40) (2") (BORE) LF , CONDT (PVC) (SCH 40) (3") LF CONDT (PVC) (SCH 40) (3") (BORE) LF ELEC CONDR (NO.12) INSULATED LF ELEC CONDR (NO.8) BARE LF , ELEC CONDR (NO.8) INSULATED LF , , ELEC CONDR (NO.6) BARE LF , ELEC CONDR (NO.6) INSULATED LF ELEC CONDR (NO.2) INSULATED LF , TRAY CABLE (3 CONDR) (12 AWG) LF GROUND BOX TY A (122311)W/APRON EA GROUND BOX TY D (162922) EA GROUND BOX TY D (162922)W/APRON EA ELC SRV TY A 240/ (SS)SS(E)PS(U) EA 5, ELC SRV TY D 120/ (NS)AL(E)PS(U) EA 3, CONTRACTOR FORCE ACCOUNT 1 DOL ALUMINUM SIGNS (TY O) SF IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA IN SM RD SN SUP&AM TY10BWG(1)SA(T-EXAL) EA IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA IN SM RD SN SUP&AM TYS80(1)SA(T-EXAL) EA IN SM RD SN SUP&AM TYS80(1)SA(U) EA IN SM RD SN SUP&AM TYTWT(1)WS(P) EA IN SM RD SN SUP&AM TYTWT(1)WS(T) EA

7 CONTRACTOR'S ESTIMATE PACKAGE Page 7 of REMOVE SM RD SN SUP&AM EA INSTL DEL ASSM (D-SW)SZ 1(FLX)GF2(BI) EA INSTL DEL ASSM (D-SW)SZ (BRF)CTB EA INSTL OM ASSM (OM-2Z)(FLX)GND EA REMOVE DELIN & OBJECT MARKER ASSMS EA WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA WK ZN PAV MRK REMOV (W)4"(SLD) LF , WK ZN PAV MRK REMOV (Y)4"(SLD) LF , WK ZN PAV MRK SHT TERM (TAB)TY W EA REFL PAV MRK TY I (W)4"(DOT)(100MIL) LF REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF , PREFAB PAV MRK TY C (W) (24") (SLD) LF PREFAB PAV MRK TY C (W) (ARROW) EA PREFAB PAV MRK TY C (W) (WORD) EA REFL PAV MRKR TY I-C EA INSTALL HWY TRF SIG (FLASH BEACON) EA 1, INSTALL HWY TRF SIG (ISOLATED) EA 8, VEH SIG SEC (12")LED(GRN) EA VEH SIG SEC (12")LED(GRN ARW) EA VEH SIG SEC (12")LED(YEL) EA VEH SIG SEC (12")LED(YEL ARW) EA VEH SIG SEC (12")LED(RED) EA BACK PLATE (12")(1 SEC) EA BACK PLATE (12")(2 SEC) EA BACK PLATE (12")(3 SEC) EA BACK PLATE (12")(4 SEC) EA TRF SIG CBL (TY A)(12 AWG)(3 CONDR) LF , , TRF SIG CBL (TY A)(12 AWG)(5 CONDR) LF , TRF SIG CBL (TY A)(12 AWG)(7 CONDR) LF INS TRF SIG PL AM (S)STR(TY D)LUM EA 5, INS TRF SIG PL AM(S)1 ARM(32') EA 4, INS TRF SIG PL AM(S)1 ARM(40')LUM EA 6, INS TRF SIG PL AM(S)1 ARM(44') EA 5, INS TRF SIG PL AM(S)1 ARM(48')LUM EA 7, added by co INS TRF SIG PL AM(S)1 ARM(60')LUM EA 15, INS TRF SIG PL AM(S)1 ARM(60')LUM EA 17, added by co PORTABLE CHANGEABLE MESSAGE SIGN DAY 7, VIVDS SET-UP SYSTEM EA 1, VIVDS COMMUNICATION CABLE (COAXIAL) LF , BBU SYSTEM (EXTERNAL BATT CABINET) EA 6, LED BLANK-OUT SIGN ASSEMBLY EA 3, HPPM W/RET REQ TY I(W)4"(BRK)(100MIL) LF , HPPM W/RET REQ TY I(W)4"(SLD)(100MIL) LF , HPPM W/RET REQ TY I(Y)6"(BRK)(100MIL) LF , HPPM W/RET REQ TY I(Y)4"(SLD)(100MIL) LF , Category Subtotal 0.00

8 CONTRACTOR'S ESTIMATE PACKAGE Page 8 of 10 CATEGORY 003 CONTRACTOR FORCE ACCOUNT WORK SUPP NET CO ($) FORCE ACCOUNT - SAFETY CONTINGENCY DOL , Category Subtotal 0.00 TOTAL EARNINGS THIS CONTRACT $3,269,617.93

9 CONTRACTOR'S ESTIMATE PACKAGE Page 9 of 10 CONSTRUCTION ESTIMATE COMBINED ($) PREPARING ROW STA 4, , PREPARING ROW (TREE) (6" TO 24" DIA) EA PREPARING ROW(TREE)(24" TO 36" DIA.) EA REMOVING CONC (RIPRAP) SY , REMOVING CONC (MEDIANS) SY , REMOVING CONC (DRIVEWAYS) SY , , , REMOVING CONC (CURB OR CURB & GUTTER) LF , , REMOV STAB BASE AND AH PAV (0"-12") SY , , , EXCAVATION (ROADWAY) CY , , , EXCAVATION (CHANNEL) CY EMBANKMENT (FINAL)(DENS CONT)(TY C) CY , , , BLOCK SODDING SY , , , BROADCAST SEED (TEMP) (WARM) SY , , , BROADCAST SEED (TEMP) (COOL) SY , , , SOIL RETENTION BLANKETS (CL 1) (TY D) SY , , , VEGETATIVE WATERING MG , , LIME(HYD,COM OR QK)(SLRY)OR QK(DRY) TON , Added by co LIME TRT (EXST MATL)(8") SY , , added by co CEMENT TON , , CEMENT TREAT (SUBGRADE) (8") SY , , , PRIME COAT & BLOTTER (MC-30) GAL , , , AH (TIER I) GAL , , , AGGR(TY-B GR-3 SAC-A) CY , AGGR(TY-PB GR-4 SAC-A) CY , D-GR HMA TY-C PG64-22 TON , , , D-GR HMA TY-D PG70-22 TON , , , CUT & RESTORING PAV SY , TRENCH EXCAVATION PROTECTION LF , CL A CONC (CURB OUTLET)(TY I) EA 1, , CL A CONC (CURB OUTLET)(TY II) EA 1, , RIPRAP (CONC)(4 IN) CY , CONC BOX CULV (4 FT X 3 FT) LF , CONC BOX CULV (6 FT X 4 FT) LF , RC PIPE (CL III)(18 IN) LF , , , RC PIPE (CL III)(24 IN) LF , , , RC PIPE (CL III)(30 IN) LF , RC PIPE (CL III)(36 IN) LF , MANH (COMPL)(PRM)(48IN) EA 2, , JCTBOX(COMPL)(PJB)(8FTX8FT) EA 7, , INLET (COMPL)(PCO)(5FT)(NONE) EA 3, , INLET (COMPL)(PCO)(5FT)(LEFT) EA 3, ,100.00

10 CONTRACTOR'S ESTIMATE PACKAGE Page 10 of INLET (COMPL)(PCO)(5FT)(RIGHT) EA 3, , INLET (COMPL)(PCO)(5FT)(BOTH) EA 4, , WINGWALL (FW - 0) (HW=4 FT) EA 6, , WINGWALL (FW - 0) (HW=5 FT) EA 7, , WINGWALL (PW - 1) (HW=8 FT) EA 17, , SET (TY II) (24 IN) (RCP) (6: 1) (P) EA , SET (TY II) (30 IN) (RCP) (6: 1) (C) EA 1, , PIPE (PVC) (SCH 40) (8 IN) LF REMOV STR (PIPE) LF , , , MOBILIZATION LS 550, , BARRICADES, SIGNS AND TRAFFIC HANDLING MO , ROCK FILTER DAMS (INSTALL) (TY 2) LF , ROCK FILTER DAMS (INSTALL) (TY 3) LF , TEMP SEDMT CONT FENCE (INSTALL) LF , , , TEMP SEDMT CONT FENCE (REMOVE) LF , , , CONSTRUCTING DETOURS SY , , , CONC CURB & GUTTER (TY II) LF , , , DRIVEWAYS (CONC) SY , , , DRIVEWAYS (ACP) SY , REMOVE METAL BEAM GUARD FENCE LF , GUARDRAIL END TREATMENT (REMOVE) EA REMOVE RD IL ASM (TRANS-BASE) EA WK ZN PAV MRK NON-REMOV (W)4"(DOT) LF WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF , , , WK ZN PAV MRK NON-REMOV (W)24"(SLD) LF WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF , , , REFL PAV MRKR TY II-A-A EA , ELIM EXT PAV MRK & MRKS (4") LF , , , REMOVE TRAFFIC SIGNAL EA 1, , MATERIAL ON HAND DOL , , added by co FORCE ACCT-EROSION CONTROL MAINTENANCE DOL , , , TOTAL EARNINGS $3,269,617.93

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/08/15 HIGHWAY: COUNTY: 05/06/2014 05/29/2014 ESTIMATE PERIOD: 00/00/0000 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/08/15 HIGHWAY: COUNTY: 05/06/2014 05/29/2014 ESTIMATE PERIOD: 00/00/0000 % TIME USED: 9,557.33 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/08/15 81 CONTRACT ID: 091329046 PROJECT: BR 2012(430) CONTRACT: 05143024 AWARD : $639,216.42 PROJECTED : $643,216.42 ADJ. PROJECTED : $652,773.75

More information

UNIT PRICE LIST (09/30/2012) DIVISION I -EARTHWORK

UNIT PRICE LIST (09/30/2012) DIVISION I -EARTHWORK LIST (09/30/2012) DIVISION I -EARTHWORK 100.1 MOBILIZATION L.S. - 11% 100.2 INSURANCE & BOND L.S. - 3% 101.1 PREPARING RIGHT OF WAY L.S. - 4% 102.1 OBLITERATING ABANDONED STREET ( < 25,000 S.Y.) S.Y. 6

More information

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW NOTICE TO CONTRACTORS CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW The Nebraska Department of Roads will receive sealed bids in

More information

Unit Price Averages Reports

Unit Price Averages Reports Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation

More information

INVITATION TO BID OFFICE OF THE ORLANDO-ORANGE COUNTY EXPRESSWAY AUTHORITY ORLANDO, FLORIDA

INVITATION TO BID OFFICE OF THE ORLANDO-ORANGE COUNTY EXPRESSWAY AUTHORITY ORLANDO, FLORIDA INVITATION TO BID OFFICE OF THE ORLANDO-ORANGE COUNTY EXPRESSWAY AUTHORITY ORLANDO, FLORIDA Sealed Bids will be received in the office of the Orlando-Orange County Expressway Authority, 4974 ORL Tower

More information

A. Structures Quantity Item Price Cost @ $3,500 EA

A. Structures Quantity Item Price Cost @ $3,500 EA PRINCE WILLIAM COUNTY Department of Development Services Land Development Division UNIT PRICE LIST (Performance Bonds, Landscaping Escrows, and Siltation & Erosion Control Escrows) Revised: November 17,

More information

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates

More information

Item No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount

Item No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount Engineer's Estimate DiPaolo Company 4350 DiPaolo Center Glenview, IL 60025 Stark Excavating, Inc. 1805 W. Washington Street Bloomington, IL 61701 Rowe Construction 1523 N. Cottage Avenue Bloomington, IL

More information

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial

More information

Legacy Trail Extension Feasibility Study. Preliminary Cost Estimate

Legacy Trail Extension Feasibility Study. Preliminary Cost Estimate Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5

More information

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix F RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 4400 South Street - Piping and Collection

More information

The unit costs are based on the trend line of the 3 low bids for the average quantity.

The unit costs are based on the trend line of the 3 low bids for the average quantity. Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids Bids Open: 2 pm Date: Wednesday, March 4, 2015 BASE BID SCHEDULE 1 - Rudell Road Reconstruction Project NO. CODE CONTRACT PROJECT No. B3-0470 and C4-0069 COUNTY'S ESTIMATE 1 All American Asphalt Corona,

More information

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS Appendix D RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: Riverdale Road - Rumbi Grill -

More information

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR ESTABLISHING CONSTRUCTION CONTRACT DURATION July 2010 DISCLAIMER: The following documentation as a whole was derived from Federal Highway Administration

More information

FY08 SEWER POINT REPAIRS BID TABULATION

FY08 SEWER POINT REPAIRS BID TABULATION 6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "

More information

UNIT PRICE LIST January 2009

UNIT PRICE LIST January 2009 UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only

More information

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation 644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING

More information

FDOT Specifications List

FDOT Specifications List FDOT Specifications List TABLE OF CONTENTS DIVISION II CONSTRUCTION DETAILS CLEARING CONSTRUCTION SITE 110 Clearing and Grubbing... 152 EARTHWORK AND RELATED OPERATIONS 120 Excavation and Embankment...

More information

FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES

FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES NAICS CODE Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway (includes 300, 320, 327, 330, 334, 336, 337, 338) Application of prime and tack coats, leveling surfaces and

More information

Bidding and Contract Requirements:

Bidding and Contract Requirements: CITY OF LAREDO, TEXAS WATER UTILITIES DEPARTMENT 24-INCH TRANSMISSION MAIN ADDENDUM 7 June 10, 2016 To Bidder of Record: The following changes, additions, and/or deletions are hereby made a part of the

More information

How To Build A Road In A Townhouse

How To Build A Road In A Townhouse FDOT DBE CERTIFICATION SPECIALTY/ SHEET WITH CAP SIZES Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway $ 22.41 Application of prime and tack coats, leveling surfaces and

More information

May 29, 2015. The Department of Roads has scheduled a bid letting to be held in this office June 25, 2015 at 1:30 PM

May 29, 2015. The Department of Roads has scheduled a bid letting to be held in this office June 25, 2015 at 1:30 PM May 29, 2015 TO ALL CONCERNED: The Department of Roads has scheduled a bid letting to be held in this office June 25, 2015 at 1:30 PM The Notice to Contractors includes: 1. Website Information 2. Notice

More information

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 CITY OF SAN ANTONIO Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 (010) FORMAL INVITATION FOR BIDS (IFB) to CONTRACT 2016-2017 TASK ORDER CONTRACT

More information

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS 2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS GENERAL 10/16/2008 The listed average unit prices are based on the

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST For permanent structures per Delaware SCS Pond Code 378 and Delaware Sediment and Stormwater Regulations KEY PROJECT INFORMATION Item meets standard

More information

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets Los Angeles County Department Of Public Works Land Development Division Bond Calculation Sheets Effective July 1, 2015 COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS LAND DEVELOPMENT DIVISION ROADS COST

More information

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development

More information

Special Specification 7021 Water Main and Sewer Line Replacements

Special Specification 7021 Water Main and Sewer Line Replacements Special Specification 7021 Water Main and Sewer Line Replacements 1. DESCRIPTION Furnish, install, or replace water pipe, water valves, water meters and boxes, water service connections, fire hydrant assemblies,

More information

ADDENDUM NO. 2. Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT

ADDENDUM NO. 2. Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT ADDENDUM NO. 2 Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT Bridge No. 1460008 (existing) Bridge No. 06806 (new) TO ALL BIDDERS: Anchor Engineering

More information

MONETARY GUARANTY PROCEDURE PACKAGE FREDERICK COUNTY, VIRGINIA

MONETARY GUARANTY PROCEDURE PACKAGE FREDERICK COUNTY, VIRGINIA MONETARY GUARANTY PROCEDURE PACKAGE FREDERICK COUNTY, VIRGINIA Department of Planning and Development 107 North Kent Street, Suite 202 Winchester, Virginia 22601 Phone: (540) 665-5651 Fax: (540) 665-6395

More information

WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued)

WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued) BIDDER'S PROPOSAL (continued) Item Estimated No. Description Quantity Unit Unit Cost Total Cost BASE BID 1 Traffic Control 1 LS $ $ 2 Construction Area Signs 1 LS $ $ 3 Excavation Safety 1 LS $ $ 4 Reset

More information

CONSTRUCTION COST MODELS

CONSTRUCTION COST MODELS CONSTRUCTION COST MODELS Prepared by: The New England Environmental Finance Center For the Maine Department of Transportation Office of Environmental Planning November 1, 2010 The following are a series

More information

Chapter 22. Lump Sum Project Guidelines

Chapter 22. Lump Sum Project Guidelines Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11

More information

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts SECTION 00300 BID FORM S For additions and deletions to the Contract, the following unit prices shall be applicable for the specific items listed. Unit Prices shall be complete, in place including required

More information

Date. Resubmit this form during the year if there are changes in your company ownership or financial standing.

Date. Resubmit this form during the year if there are changes in your company ownership or financial standing. COLORADO DEPARTMENT OF TRANSPORTATION CONTRACTOR PREQUALIFICATION STATEMENT (EXPERIENCE, EQUIPMENT AND FINANCIAL) Return to: Contracts & Market Analysis Prequalification Unit 4201 E. Arkansas,4th Floor

More information

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development

More information

Preliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006

Preliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006 Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006 1.0 Background and Repair and Rehabilitation Recommendation Clay County has contracted Camp Dresser & McKee Inc. (CDM)

More information

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices

More information

Stormwater/Wetland Pond Construction Inspection Checklist

Stormwater/Wetland Pond Construction Inspection Checklist : Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials

More information

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT

More information

Figure 3 Pipe Cracking

Figure 3 Pipe Cracking The illustration shown below depicts the system analyzed. As-built drawings and survey information were not available; aerial photos and survey shots of inverts were used to determine the system s geometries.

More information

Helen Mercury Mine EE/CA OPINION OF PROBABLE COST

Helen Mercury Mine EE/CA OPINION OF PROBABLE COST G Cost Estimates Helen Mercury Mine EE/CA Alternative 2: Limited Action 3 Minor Road Improvements 4 Clear & Grub diversion channel areas 5 Surveying 6 Cleanup & Demobilization 7 Pull back of material 8

More information

CHAPTER 14: GUARDRAIL and BARRIERS

CHAPTER 14: GUARDRAIL and BARRIERS CHAPTER 14: GUARDRAIL and BARRIERS If you have any questions regarding guardrail, end treatments and/or pay items included in your plan, please contact the Project Design Services Unit or the Design Standards

More information

Exhibit A Scope of Work

Exhibit A Scope of Work Exhibit A Scope of Work The agreement for S.P. 3116-142 (T.H. 169-Cross Range Expressway) includes final design plans for a 1.55 mile length of a 2 lane to 4 lane expansion project located 0.66 miles SW

More information

Modem. Backplane For Lanes 1 To 4 *

Modem. Backplane For Lanes 1 To 4 * Speed/Classification Unit And Modem Furnished Separately 3.0 Note: Bracket shall be fabricated of.090-0.125 inch thick aluminum. Dimensions may vary depending on the manufacturer of the J1 receptacle being

More information

INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS

INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS DATE OF LETTING: October 03, 2007 TIME OF LETTING: 10:00 AM EASTERN DST Sealed proposals for certain highway improvements as described

More information

IN ACCORDANCE WITH THE APPLICABLE STATUTES OF THE STATE OF ILLINOIS AND ORDINANCES OF THE VILLAGE OF WHEELING, NOTICE IS HEREBY GIVEN THAT

IN ACCORDANCE WITH THE APPLICABLE STATUTES OF THE STATE OF ILLINOIS AND ORDINANCES OF THE VILLAGE OF WHEELING, NOTICE IS HEREBY GIVEN THAT PUBLIC NOTICE IN ACCORDANCE WITH THE APPLICABLE STATUTES OF THE STATE OF ILLINOIS AND ORDINANCES OF THE VILLAGE OF WHEELING, NOTICE IS HEREBY GIVEN THAT THE SPECIAL MEETING OF THE PRESIDENT AND BOARD OF

More information

CONSTRUCTION OF PERIMETER FENCE - COMMERCIAL AND T&D OFFICE COMPOUND, ONVERWAGT

CONSTRUCTION OF PERIMETER FENCE - COMMERCIAL AND T&D OFFICE COMPOUND, ONVERWAGT BILL Nr1 - PRELIMINARIES 1.0 PRELIMINARY PARTICULARS CONSTRUCTION OF PERIMETER FENCE - COMMERCIAL 1.1 Funding The funding shall be provided by the Guyana Power & light Inc., of 40 Main street, North Cummingsburg,

More information

SPECIFICATIONS FOR SANITARY SEWER LINE REPLACEMENT IN PIONEER PARK. City of Des Peres, Missouri. 12325 Manchester Road. Des Peres, Missouri 63131

SPECIFICATIONS FOR SANITARY SEWER LINE REPLACEMENT IN PIONEER PARK. City of Des Peres, Missouri. 12325 Manchester Road. Des Peres, Missouri 63131 SPECIFICATIONS FOR SANITARY SEWER LINE REPLACEMENT IN PIONEER PARK City of Des Peres, Missouri 12325 Manchester Road Des Peres, Missouri 63131 Prepared by City Engineer March 2011 INVITATION TO BID SANITARY

More information

2014 Inlet Rehab Project II Various Locations

2014 Inlet Rehab Project II Various Locations 2014 Inlet Rehab Project II Various Locations in the City of Sioux Falls, South Dakota Bid Request No. 14-1078 Prepared by: Engineering Division 224 West 9 th Street Sioux Falls, SD 57104 TABLE OF CONTENTS

More information

Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices

Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices Amy H. Brennan (440) 975-3870 www.crwp.org abrennan@crwp.org Chagrin River Watershed Partners Formed

More information

CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW)

CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW) CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW) January, 2013 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS DRAINAGE STRUCTURES DRN-01 Corrugated metal pipe drop inlet DNR-02 Storm Drain

More information

STATE OF MISSOURI HIGHWAYS and TRANSPORTATION COMMISSION JEFFERSON CITY, MISSOURI CONSTRUCTING OR IMPROVING CONTRACT I.D.

STATE OF MISSOURI HIGHWAYS and TRANSPORTATION COMMISSION JEFFERSON CITY, MISSOURI CONSTRUCTING OR IMPROVING CONTRACT I.D. STATE OF MISSOURI HIGHWAYS and TRANSPORTATION COMMISSION JEFFERSON CITY, MISSOURI CONSTRUCTING OR IMPROVING CONTRACT I.D. 160624-C05 THIS JOB SHALL BE CONSTRUCTED UNDER FEDERAL PROJECT NUMBER(S): I-35-1

More information

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 Section Subsection Name Date Modification Division 1 All subsections General Provisions

More information

Work Breakdown Structure Element Dictionary. Final Design

Work Breakdown Structure Element Dictionary. Final Design Initiation FD 4.1 Initiation encompasses deliverables associated with the development, implementation and control of the project s schedule, budget and scope. The lead office develops these project parameters

More information

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE The following template may be used as a general guide for development of a Stormwater Pollution Prevention Plan (SWPPP) for construction activities.

More information

City of Shelbyville Site Inspection Checklist

City of Shelbyville Site Inspection Checklist City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather

More information

FIBER-OPTIC CABLE PLAN CHECK

FIBER-OPTIC CABLE PLAN CHECK Engineering Division 201 North Broadway, Escondido, CA 92025 (760) 839-4651, FAX (760) 839-4597 FIBER-OPTIC CABLE PLAN CHECK To: Date: Project: Project No. Address: Check No. Attn: Via: The attached plans

More information

ADDENDUM NO. 1. Manchester Boston Regional Airport, City of Manchester, NH

ADDENDUM NO. 1. Manchester Boston Regional Airport, City of Manchester, NH Hoyle, Tanner Project No. 093145 ADDENDUM NO. 1 Manchester Boston Regional Airport, City of Manchester, NH Construct Relocated Roadway Airport Service Rd. Outside Runway Object Free Area (ROFA); Construct

More information

Observatory Street Improvements Project

Observatory Street Improvements Project ADDENDUM No. 1 ITB No. 4425 Observatory Street Improvements Project Due: March 3, 2016, 2:00 P.M. The following changes, additions, and/or deletions shall be made to the Invitation to Bid for Observatory

More information

SUBDIVISION ROAD CONSTRUCTION AND INSPECTION PROCEDURES

SUBDIVISION ROAD CONSTRUCTION AND INSPECTION PROCEDURES BOARD OF COUNTY COMMISSIONERS ST. MARY S COUNTY LEONARDTOWN, MARYLAND SUBDIVISION ROAD CONSTRUCTION AND INSPECTION PROCEDURES APRIL, 1991 AMENDED: JUNE, 2002 DEPARTMENT OF PUBLIC WORKS & TRANSPORTATION

More information

1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP

1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP 5 INDEX TO SHEETS. NOTES AND TYPICAL SECTIONS. H. R. SMITH RD.CULVERT.3 0/5 END BARRIER ACCESS ROAD REPAIR. KISSIMMEE RD. AT MORGAN HOLE CR. ROAD REPAIR.5 RANGE INFRASTRUCTURE REPAIR N 0 000' 3 0,000'

More information

CID STREET INFRASTRUCTURE ASSESSMENT

CID STREET INFRASTRUCTURE ASSESSMENT ABSTRACT An evaluation of the street infrastructure in Foxberry Estates Phase 1, including pavement condition, verification of construction techniques, and subgrade quality. Recommendations and costs for

More information

SECTION 02401 SHEETING, SHORING AND BRACING

SECTION 02401 SHEETING, SHORING AND BRACING SECTION 02401 SHEETING, SHORING AND BRACING This section should be edited to reflect soil conditions specific to the project site and the recommendations of a Geotechnical Engineer licensed in the State

More information

City of Hilshire Village Pine Creek Ln Reconstruction

City of Hilshire Village Pine Creek Ln Reconstruction City of Hilshire Village Pine Creek Ln Reconstruction OVERVIEW The City will be soliciting bids for the Pine Creek Reconstruction Project with construction scheduled to begin in January 2015. This project

More information

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or

More information

HIGH TENSION CABLE BARRIER

HIGH TENSION CABLE BARRIER Special Provision September 11, 2006 SECTION 02845 S HIGH TENSION CABLE BARRIER PART 1 GENERAL 1.1 SECTION INCLUDES A. Cable barrier materials and installation procedures. 1.2 RELATED SECTIONS A. Section

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS

Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS 1 Proposal & Plans Received? 2 Review Proposal, highlight important facts. Know proposal well to be able to find answers quickly.

More information

LINDEN PARK PH. 11 PROJECT NO. 53B22353 SHEET NO. D-5 DETAIL TYPICAL SECTION CITY OF MADISON SIDEWALK COMPLETION DETAILS ROW VAR. 9"-12" ORIGINATOR: CITY OF MADISON, STREETS DIVISION REV. DATE: PLOT NAME:

More information

Project Performance Review Summary

Project Performance Review Summary Rev. March 2009 Standard Specifications 2007 Project Performance Review Summary SC File No. FAP No. County Prime Contractor Date Route RCE Overall Project Evaluation Summary Adjusted Project Score Adjusted

More information

Lodge Grass Creek Add-on Project Overview

Lodge Grass Creek Add-on Project Overview Crow Tribal Water Rights Settlement Act of 2010 Rehabilitation and Improvement of the Crow Irrigation Project 189 Heritage Road Crow Agency, MT 59022 1 Lodge Grass 1 Headworks Project Description: The

More information

VDOT 2001 Road and Bridge Standards Section 100 - Drainage Items

VDOT 2001 Road and Bridge Standards Section 100 - Drainage Items VDOT 2001 Road and Bridge s Page Title EW-1 EW-1A 101.01 Endwall for Pipe Culverts 12" - 36" Circular and 23" X 14" - 53" X 34" Elliptical Pipes EW-1PC EW-1APC 101.02 Precast Endwall for Pipe Culverts

More information

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2016

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2016 SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2016 102.5 Bid Deposits The City of Madison bid deposit form is required for all bids unless a Biennial Bid Bond is on file or check deposit is used.

More information

11 Guardrail. W-Beam Guardrail Pre-Installation Inspection During Installation Basis for Use. Modified Guardrail. End Treatments and Transitions

11 Guardrail. W-Beam Guardrail Pre-Installation Inspection During Installation Basis for Use. Modified Guardrail. End Treatments and Transitions 11 Guardrail W-Beam Guardrail Pre-Installation Inspection During Installation Basis for Use Modified Guardrail End Treatments and Transitions Footings and Anchors Impact Attenuators Measurement and Payment

More information

Session 3: Guardrail Design and Sitespecific. Considerations

Session 3: Guardrail Design and Sitespecific. Considerations FHWA Roadway Departure Technology Transfer Roadside Safety Systems Installer Training : Guardrail Design and Sitespecific Installation Considerations 3-1 Course Topics Session 2 Testing Requirements and

More information

Employee Training Plan Farm A

Employee Training Plan Farm A Employee Training Plan Farm A Table of Contents Training Goals, Objectives, Activities Page Requirements, Standards, Procedures and Practices Training Content Nutrient Management Odor Management Runoff

More information

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works Planned Public Works Projects in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works Planned Projects in Marina Del Rey Waterline Projects Phase II Phase III Roadway Projects Admiralty

More information

February 4, 2016. Estimate

February 4, 2016. Estimate Wrentham, MA February 4, 2016 Architect: Turowski2 Architecture, Inc. P.O. Box 1290 313 Wareham Road Marion, MA 02738 (508) 758-9777 Cost Estimator: Miyakoda Consulting 300 Black Mallard Road Bridgewater,

More information

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer

More information

CITY OF NAPLES PURCHASING DIVISION CITY HALL, 735 8 TH STREET SOUTH NAPLES, FLORIDA 34102 PH: 239-213-7100 FX: 239-213-7105 ADDENDUM NUMBER 1

CITY OF NAPLES PURCHASING DIVISION CITY HALL, 735 8 TH STREET SOUTH NAPLES, FLORIDA 34102 PH: 239-213-7100 FX: 239-213-7105 ADDENDUM NUMBER 1 CITY OF NAPLES PURCHASING DIVISION CITY HALL, 735 8 TH STREET SOUTH NAPLES, FLORIDA 34102 PH: 239-213-7100 FX: 239-213-7105 ADDENDUM NUMBER 1 NOTIFICATION DATE: BID TITLE: BID NUMBER: BID OPENING DATE

More information

Section 600 Incidental Construction

Section 600 Incidental Construction Table of Contents 1. Pipe Culverts... 600-1 A. Endwalls, Inlets, Manholes, and Spring Boxes... 600-5 2. Grade Adjustment of Existing Miscellaneous Structures... 600-8 3. Rebuilt Miscellaneous Structures...

More information

Tabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14

Tabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14 Solcitation No: DTFH71-14-B-00008 Division: Eastern Federal Lands State: DC County: Federal Land: 1 out of 9 Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date:

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

SECTION 4Aggegate Subbase

SECTION 4Aggegate Subbase The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages

More information

RED RIVER DIVERSION FARGO MOORHEAD METRO FLOOD RISK MANAGEMENT PROJECT, FEASIBILITY STUDY, PHASE 4

RED RIVER DIVERSION FARGO MOORHEAD METRO FLOOD RISK MANAGEMENT PROJECT, FEASIBILITY STUDY, PHASE 4 RED RIVER DIVERSION FARGO MOORHEAD METRO FLOOD RISK MANAGEMENT PROJECT, FEASIBILITY STUDY, PHASE 4 APPENDIX G COST ESTIMATES EXHIBIT J RAILROAD BRIDGE QUANTITIES Report for the US Army Corps of Engineers,

More information

Indianapolis Midfield Terminal Thermal Utility Construction

Indianapolis Midfield Terminal Thermal Utility Construction Indianapolis Midfield Terminal Thermal Utility Construction CGCU Background Public Charitable Trust is managed only for the benefit of customers and the community 266,000 customers 3,700 Miles of Gas Distribution

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

LS 2540 SEWER LATERALS AND INSPECTION TEES

LS 2540 SEWER LATERALS AND INSPECTION TEES LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal

More information

TS 813 GROUNDING AND BONDING TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET GROUNDING

TS 813 GROUNDING AND BONDING TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET GROUNDING TORONTO TRANSPORTATION January 2012 TS 813 GROUNDING AND BONDING TABLE OF CONTENTS 1. DRAWINGS TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET

More information

City of West Chicago Community Development Department 475 Main Street, West Chicago, IL 60185 Phone: (630) 293-2200 x 131 / Fax: (630) 293-1257

City of West Chicago Community Development Department 475 Main Street, West Chicago, IL 60185 Phone: (630) 293-2200 x 131 / Fax: (630) 293-1257 City of West Chicago Community Development Department 475 Main Street, West Chicago, IL 60185 Phone: (630) 293-2200 x 131 / Fax: (630) 293-1257 APPLICATION FOR DEMOLITION PERMIT Permit Number: Date Received:

More information

CD i -STREETS- Detail #

CD i -STREETS- Detail # -STREETS- Detail # 3000 Vertical Curb, Gutter and Sidewalk 3010 Low-Profile Curb, Gutter and Sidewalk 3020 Rolled Curb, Gutter and Sidewalk 3030 Separated Sidewalk, Curb & Gutter 3040 Sidewalk Staged Construction

More information

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY Approved and adopted as Official Document Number 800576 this 10th day of December, 1980 Donald R. Boyd, P.E., Director Water

More information

PIPELINE / WIRE LINE PROCESS INSTRUCTIONS

PIPELINE / WIRE LINE PROCESS INSTRUCTIONS PIPELINE / WIRE LINE PROCESS INSTRUCTIONS Licensing Process: 1. Once the application package is received by Jones Lang LaSalle Brokerage, Inc. (JLL), the application and drawing will be forwarded to the

More information

Date Prepared: 11-3-09 By: Wastewater Best Practices Subgroup Final Document: 12-3-09

Date Prepared: 11-3-09 By: Wastewater Best Practices Subgroup Final Document: 12-3-09 Date Prepared: 11-3-09 By: Wastewater Best Practices Subgroup Final Document: 12-3-09 SAMPLE SANITARY SEWER OVERFLOW RESPONSE S.O.P. TABLE OF CONTENTS SECTION 1: PURPOSE SECTION 2: SPILL RESPONSE SECTION

More information

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL. STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill

More information

Roadway Cost Per Centerline Mile Revised June 2014

Roadway Cost Per Centerline Mile Revised June 2014 Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743

More information

DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VIRGINIA 23219-2000

DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VIRGINIA 23219-2000 Charles A. Kilpatrick, P.E. Commissioner February 10, 2016 DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VIRGINIA 23219-2000 Order No.: J13 Project: (NFO)0081-080-864,B657-B662 FHWA: ACSTP-PM02(412)

More information