1 -30, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/07/ CONTRACT ID: : STP 1502(241)HES CONTRACT: AWARD : $6,111, ED : $6,243, ADJ. ED : $6,213, CONTRACT: CONTRACTOR: REXCO CONSTRUCTION SERVICES, INC. HIGHWAY: SH 239 DISTRICT NAME: Corpus Christi COUNTY: REFUGIO AREA ENGINEER: Charles Benavidez, P.E. AREA NUMBER: 058 ESTIMATE NUMBER: 0011 LETTING DATE: 06/03/2015 ESTIMATE PAID: AWARD DATE: 06/25/2015 ESTIMATE PERIOD: 06/01/2016 to 06/30/2016 NOTICE TO PROCEED DATE: 07/16/2015 ESTIMATE TYPE: PROG WORK BEGIN DATE: 10/19/2015 % COMPLETE: ACCEPTED DATE: 00/00/0000 % TIME USED: PHYSICAL WORK COMPLETION DATE: 00/00/0000 % RETAINAGE: RECAPITULATION TOTAL PREV THIS ESTIMATE EARNINGS $3,472, $3,023, PARTICIPATING $3,125, $2,720, NON-PARTICIPATING $347, $302, RETAINAGE LIQUIDATED DAMAGES INCENTIVE DISINCENTIVE OTHER ADJUSTMENTS $449, $404, $44, PAID TO CONTRACTOR $3,472, $3,023, $449, CONTRACT ADJUSTMENTS THIS ESTIMATE ADJUSTMENTS THIS ESTIMATE ADJUSTMENT : ADJUSTMENT : REMARKS: ADJUSTMENT : ADJUSTMENT : REMARKS: ***There are no Contract Adjustments for this estimate*** ***There are no Line Item Adjustments for this estimate*** CERTIFIED AS CORRECT AND ONE COPY HAS BEEN GIVEN TO THE CONTRACTOR AREA/ ENGINEER DATE

2 CONTRACTOR'S ESTIMATE PACKAGE Page 2 of 10 CONTRACT TIME STATEMENT WORK BEGIN DATE: 10/19/2015 ASSESSED LIQ DAMAGES: 0 TIME CHARGES BEGIN: 08/16/2015 LIQ DAMAGE RATE: $1, DAYS: 176 LIQUIDATED DAMAGES: 0 C. O. ADJUSTED DAYS: 12 DAYS AT CURRENT DAYS: 188 PER DAY $1, DAYS CHARGED : 136 TOTAL: PHYSICAL WORK COMPLETE: 00/00/0000 DAILY BREAKDOWN Date Days or Days Charged Days Credited 06/01/ TOO WET 06/02/ TOO WET 06/03/ RAIN 06/04/ SATURDAY 06/05/ SUNDAY 06/06/ TOO WET 06/07/ TOO WET 06/08/ RAIN 06/09/ RAIN 06/10/ /11/ SATURDAY 06/12/ SUNDAY 06/13/ /14/ /15/ /16/ /17/ /18/ SATURDAY 06/19/ SUNDAY 06/20/ /21/ /22/ /23/ /24/ /25/ SATURDAY 06/26/ SUNDAY 06/27/ /28/ /29/ /30/ Diary Adjustment Date Days or PERIOD SUMMARY Days Charged Days Credited RAIN 3 SATURDAY 4 SUNDAY 4 TOO WET 4

3 CONTRACTOR'S ESTIMATE PACKAGE Page 3 of 10 WORK PERFORMED THIS PERIOD STP 1502(241)HES CONTROL CATEGORY 001 ROADWAY S QTY THIS ESTIMATE PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date BIODEG EROSN CONT LOGS (INSTL) (18") LF $ BIODEG EROSN CONT LOGS (REMOVE) LF $ UNIQUE CHANGE ORDER 1 DOL $3, ,10 2, UNIQUE CHANGE ORDER 2 DOL $7, ,10 3, STP 1502(242)HES CONTROL CATEGORY 001 ROADWAY S QTY THIS ESTIMATE PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date PREPARING ROW STA $9, SUBGRADE WIDENING (DENS CONT) STA $50, BACKFILL (TY A OR B) STA $16, FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) CY , $211, , , CEMENT TON $27, CEMENT TREAT (EXIST MATL) (6") SY , $35, ,96 52, PRIME COAT (MULTI OPTION) GAL , $7, , , AH (MULTI OPTION) GAL , $14, , , AGGR (MULTI OPTION) CY $20, , , BIODEG EROSN CONT LOGS (INSTL) (18") LF $ BIODEG EROSN CONT LOGS (REMOVE) LF $ WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA $ , STP 1502(243)HES CONTROL CATEGORY 001 ROADWAY S QTY THIS ESTIMATE PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date BACKFILL (TY A OR B) STA $4, PRIME COAT (MULTI OPTION) GAL $2, , , AH (MULTI OPTION) GAL ,150 $15, , , AGGR (MULTI OPTION) CY $20, BARRICADES, SIGNS AND TRAFFIC HANDLING MO 1, $1, WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA $1, STP 1502(244)HES CONTROL CATEGORY 001 ROADWAY S QTY THIS ESTIMATE PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date BIODEG EROSN CONT LOGS (INSTL) (18") LF $ BIODEG EROSN CONT LOGS (REMOVE) LF $

4 CONTRACTOR'S ESTIMATE PACKAGE Page 4 of 10 TOTAL EARNINGS THIS ESTIMATE $449,504.72

5 CONTRACTOR'S ESTIMATE PACKAGE Page 5 of 10 CONTRACT S CATEGORY STP 1502(241)HES CONTROL ROADWAY S SUPP $ PREPARING ROW STA , SUBGRADE WIDENING (DENS CONT) STA , BACKFILL (TY A OR B) STA , FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) CY , , , , CEMENT TON , CO# CEMENT TREAT (EXIST MATL) (6") SY , , , CO# PRIME COAT (MULTI OPTION) GAL , , , AH (MULTI OPTION) GAL , , , AGGR (MULTI OPTION) CY , , MOBILIZATION LS 274, , BARRICADES, SIGNS AND TRAFFIC HANDLING MO 1, , BIODEG EROSN CONT LOGS (INSTL) (12") LF BIODEG EROSN CONT LOGS (INSTL) (18") LF , BIODEG EROSN CONT LOGS (REMOVE) LF WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA , , , PORTABLE CHANGEABLE MESSAGE SIGN DAY , UNIQUE CHANGE ORDER 1 DOL ,100 2, , CO#1 BASE REMOVAL (CY) UNIQUE CHANGE ORDER 2 DOL ,100 3, , CO#1 REPLACING BASE (CY) CATEGORY STP 1502(242)HES CONTROL ROADWAY S Category Subtotal $1,407, SUPP $ PREPARING ROW STA , SUBGRADE WIDENING (DENS CONT) STA , BACKFILL (TY A OR B) STA , FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) CY , , , , CEMENT TON , CO# CEMENT TREAT (EXIST MATL) (6") SY ,960 52, , CO# PRIME COAT (MULTI OPTION) GAL , , , AH (MULTI OPTION) GAL , ,58 44, AGGR (MULTI OPTION) CY , , , SET (TY II) (18 IN) (RCP) (3: 1) (C) EA 1, , SET (TY II) (24 IN) (RCP) (3: 1) (C) EA 1, , SET (TY II) (30 IN) (RCP) (3: 1) (C) EA 2, ,027.20

6 CONTRACTOR'S ESTIMATE PACKAGE Page 6 of 10 CATEGORY 001 ROADWAY S SUPP $ MOBILIZATION LS 274, , BARRICADES, SIGNS AND TRAFFIC HANDLING MO 1, , BIODEG EROSN CONT LOGS (INSTL) (12") LF BIODEG EROSN CONT LOGS (INSTL) (18") LF , BIODEG EROSN CONT LOGS (REMOVE) LF WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA , PORTABLE CHANGEABLE MESSAGE SIGN DAY , CATEGORY STP 1502(243)HES CONTROL ROADWAY S Category Subtotal $1,642, SUPP $ PREPARING ROW STA , SUBGRADE WIDENING (DENS CONT) STA , BACKFILL (TY A OR B) STA , FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) CY , , , CEMENT TON , CO# CEMENT TREAT (EXIST MATL) (6") SY ,950 7, , CO# PRIME COAT (MULTI OPTION) GAL , , , AH (MULTI OPTION) GAL , ,35 19, AGGR (MULTI OPTION) CY , SET (TY II) (18 IN) (RCP) (3: 1) (C) EA 1, , SET (TY II) (24 IN) (RCP) (3: 1) (C) EA 1, , MOBILIZATION LS 274, , BARRICADES, SIGNS AND TRAFFIC HANDLING MO 1, , BIODEG EROSN CONT LOGS (INSTL) (12") LF BIODEG EROSN CONT LOGS (INSTL) (18") LF WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA , CATEGORY STP 1502(244)HES CONTROL ROADWAY S Category Subtotal $275, SUPP $ SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C) EA 3, , MOBILIZATION LS 274, , BIODEG EROSN CONT LOGS (INSTL) (18") LF BIODEG EROSN CONT LOGS (REMOVE) LF UNIQUE CHANGE ORDER 1 DOL CO#2 PIPE RUNNERS Category Subtotal $146,989.66

7 CONTRACTOR'S ESTIMATE PACKAGE Page 7 of 10 STP 1502(241)HES CONTROL CATEGORY 001 ROADWAY S SUPP ($) D-GR HMA TY-D SAC-B PG64-22 TON , FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") SY , INSTL OM ASSM (OM-2Z)(FLX)GND EA WK ZN PAV MRK SHT TERM RMV (Y)(4") LF , RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) LF , RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL) LF , RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) LF , PREFAB PAV MRK TY C (W) (24") (SLD) LF REFL PAV MRKR TY II-A-A EA MATERIAL ON HAND DOL , PAYMENT ADJUSTMENT-POS DOL , PAYMENT ADJUSTMENT-NEG DOL , CONTRACTOR FORCE ACCOUNT 1 DOL CONTRACTOR FORCE ACCOUNT 2 DOL PRODUCTION PAYMENT ADJUSTMENT DOL , PRODUCTION PAYMENT ADJUSTMENT DOL PLACEMENT PAYMENT ADJUSTMENT DOL , PLACEMENT PAYMENT ADJUSTMENT DOL RIDE PAYMENT ADJUSTMENT ( 341) DOL , RIDE PAYMENT ADJUSTMENT ( 341) DOL FORCE ACCT-EROSION CONTROL MAINTENANCE DOL FORCE ACCOUNT - SAFETY CONTINGENCY DOL Category Subtotal STP 1502(242)HES CONTROL CATEGORY 001 ROADWAY S SUPP ($) D-GR HMA TY-D SAC-B PG64-22 TON , FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") SY , INSTL OM ASSM (OM-2Z)(FLX)GND EA WK ZN PAV MRK SHT TERM RMV (Y)(4") LF , RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) LF , RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL) LF , RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) LF , PREFAB PAV MRK TY C (W) (24") (SLD) LF REFL PAV MRKR TY II-A-A EA

8 CONTRACTOR'S ESTIMATE PACKAGE Page 8 of MATERIAL ON HAND DOL , CONTRACTOR FORCE ACCOUNT 1 DOL CONTRACTOR FORCE ACCOUNT 2 DOL PRODUCTION PAYMENT ADJUSTMENT DOL , PRODUCTION PAYMENT ADJUSTMENT DOL PLACEMENT PAYMENT ADJUSTMENT DOL , PLACEMENT PAYMENT ADJUSTMENT DOL RIDE PAYMENT ADJUSTMENT ( 341) DOL , RIDE PAYMENT ADJUSTMENT ( 341) DOL Category Subtotal STP 1502(243)HES CONTROL CATEGORY 001 ROADWAY S SUPP ($) D-GR HMA TY-D SAC-B PG64-22 TON , BIODEG EROSN CONT LOGS (REMOVE) LF INSTL OM ASSM (OM-2Z)(FLX)GND EA WK ZN PAV MRK SHT TERM RMV (Y)(4") LF , RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) LF , RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL) LF RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) LF , REFL PAV MRKR TY II-A-A EA PORTABLE CHANGEABLE MESSAGE SIGN DAY MATERIAL ON HAND DOL , CONTRACTOR FORCE ACCOUNT 1 DOL CONTRACTOR FORCE ACCOUNT 2 DOL PRODUCTION PAYMENT ADJUSTMENT DOL , PRODUCTION PAYMENT ADJUSTMENT DOL PLACEMENT PAYMENT ADJUSTMENT DOL , PLACEMENT PAYMENT ADJUSTMENT DOL RIDE PAYMENT ADJUSTMENT ( 341) DOL RIDE PAYMENT ADJUSTMENT ( 341) DOL Category Subtotal STP 1502(244)HES CONTROL

9 CONTRACTOR'S ESTIMATE PACKAGE Page 9 of 10 CATEGORY 001 ROADWAY S SUPP ($) PREPARING ROW STA SUBGRADE WIDENING (DENS CONT) STA BACKFILL (TY A OR B) STA FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) CY , PRIME COAT (MULTI OPTION) GAL , AH (MULTI OPTION) GAL , AGGR (MULTI OPTION) CY D-GR HMA TY-D SAC-B PG64-22 TON , FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") SY SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C) EA 6, BARRICADES, SIGNS AND TRAFFIC HANDLING MO 1, BIODEG EROSN CONT LOGS (INSTL) (12") LF INSTL OM ASSM (OM-2Z)(FLX)GND EA WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA WK ZN PAV MRK SHT TERM RMV (Y)(4") LF , RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) LF , RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL) LF , REFL PAV MRKR TY II-A-A EA PORTABLE CHANGEABLE MESSAGE SIGN DAY MATERIAL ON HAND DOL , CONTRACTOR FORCE ACCOUNT 1 DOL CONTRACTOR FORCE ACCOUNT 2 DOL PRODUCTION PAYMENT ADJUSTMENT DOL , PRODUCTION PAYMENT ADJUSTMENT DOL PLACEMENT PAYMENT ADJUSTMENT DOL , PLACEMENT PAYMENT ADJUSTMENT DOL RIDE PAYMENT ADJUSTMENT ( 341) DOL , RIDE PAYMENT ADJUSTMENT ( 341) DOL Category Subtotal TOTAL EARNINGS THIS CONTRACT $3,472,573.57

10 CONTRACTOR'S ESTIMATE PACKAGE Page 10 of 10 CONSTRUCTION ESTIMATE COMBINED ($) PREPARING ROW STA , SUBGRADE WIDENING (DENS CONT) STA , BACKFILL (TY A OR B) STA , FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) CY , , ,460, CEMENT TON , CEMENT TREAT (EXIST MATL) (6") SY , , PRIME COAT (MULTI OPTION) GAL , , , AH (MULTI OPTION) GAL , , , AGGR (MULTI OPTION) CY , , , SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C) EA 3, , SET (TY II) (18 IN) (RCP) (3: 1) (C) EA 1, , SET (TY II) (24 IN) (RCP) (3: 1) (C) EA 1, , SET (TY II) (30 IN) (RCP) (3: 1) (C) EA 2, , MOBILIZATION LS 274, , BARRICADES, SIGNS AND TRAFFIC HANDLING MO 1, , BIODEG EROSN CONT LOGS (INSTL) (12") LF , BIODEG EROSN CONT LOGS (INSTL) (18") LF , BIODEG EROSN CONT LOGS (REMOVE) LF WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA ,57 2, , PORTABLE CHANGEABLE MESSAGE SIGN DAY , UNIQUE CHANGE ORDER 1 DOL UNIQUE CHANGE ORDER 1 DOL , , UNIQUE CHANGE ORDER 2 DOL , , TOTAL EARNINGS $3,472,573.57

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/08/15 HIGHWAY: COUNTY: 05/06/2014 05/29/2014 ESTIMATE PERIOD: 00/00/0000 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/08/15 HIGHWAY: COUNTY: 05/06/2014 05/29/2014 ESTIMATE PERIOD: 00/00/0000 % TIME USED: 9,557.33 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/08/15 81 CONTRACT ID: 091329046 PROJECT: BR 2012(430) CONTRACT: 05143024 AWARD : $639,216.42 PROJECTED : $643,216.42 ADJ. PROJECTED : $652,773.75

More information

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS Appendix D RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: Riverdale Road - Rumbi Grill -

More information

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix F RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 4400 South Street - Piping and Collection

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids Bids Open: 2 pm Date: Wednesday, March 4, 2015 BASE BID SCHEDULE 1 - Rudell Road Reconstruction Project NO. CODE CONTRACT PROJECT No. B3-0470 and C4-0069 COUNTY'S ESTIMATE 1 All American Asphalt Corona,

More information

One positive experience I've had in the last 24 hours: Exercise today:

One positive experience I've had in the last 24 hours: Exercise today: Name - Day 1 of 21 Sunday, June 29, 2014 3:34 PM journal template Page 1 Name - Day 1 of 21 Sunday, June 29, 2014 3:34 PM journal template Page 2 Name - Day 2 of 21 2:27 PM journal template Page 3 Name

More information

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates

More information

ADDENDUM NO. 2. Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT

ADDENDUM NO. 2. Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT ADDENDUM NO. 2 Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT Bridge No. 1460008 (existing) Bridge No. 06806 (new) TO ALL BIDDERS: Anchor Engineering

More information

Item No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount

Item No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount Engineer's Estimate DiPaolo Company 4350 DiPaolo Center Glenview, IL 60025 Stark Excavating, Inc. 1805 W. Washington Street Bloomington, IL 61701 Rowe Construction 1523 N. Cottage Avenue Bloomington, IL

More information

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Storm Sewer Trenchless Upgrade Alternatives and Recommendations Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for

More information

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial

More information

Bituminous Paving and Construction

Bituminous Paving and Construction JOHN OKOREN, CHAIRMAN LORNE HAASE, VICE-CHAIRMAN 85 WEST HIGHWAY M-115 HAROLD FALON, MEMBER BOON, MICHIGAN 49618 ALAN D. COOPER, MANAGER PHONE 231-775-9731 ANDREA HERMAN, FINANCE AND BUSINESS MANAGER FAX

More information

2014 Inlet Rehab Project II Various Locations

2014 Inlet Rehab Project II Various Locations 2014 Inlet Rehab Project II Various Locations in the City of Sioux Falls, South Dakota Bid Request No. 14-1078 Prepared by: Engineering Division 224 West 9 th Street Sioux Falls, SD 57104 TABLE OF CONTENTS

More information

County Wide Chip Seal

County Wide Chip Seal LORNE HAASE, CHAIRMAN JOHN OKOREN, VICE-CHAIRMAN 85 WEST HIGHWAY M-115 HAROLD FALAN, MEMBER BOON, MICHIGAN 49618 ALAN D. COOPER, MANAGER PHONE 231-775-9731 ANDREA HERMAN, FINANCE AND BUSINESS MANAGER FAX

More information

Bidding and Contract Requirements:

Bidding and Contract Requirements: CITY OF LAREDO, TEXAS WATER UTILITIES DEPARTMENT 24-INCH TRANSMISSION MAIN ADDENDUM 7 June 10, 2016 To Bidder of Record: The following changes, additions, and/or deletions are hereby made a part of the

More information

Preliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006

Preliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006 Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006 1.0 Background and Repair and Rehabilitation Recommendation Clay County has contracted Camp Dresser & McKee Inc. (CDM)

More information

SPECIFICATIONS FOR SANITARY SEWER LINE REPLACEMENT IN PIONEER PARK. City of Des Peres, Missouri. 12325 Manchester Road. Des Peres, Missouri 63131

SPECIFICATIONS FOR SANITARY SEWER LINE REPLACEMENT IN PIONEER PARK. City of Des Peres, Missouri. 12325 Manchester Road. Des Peres, Missouri 63131 SPECIFICATIONS FOR SANITARY SEWER LINE REPLACEMENT IN PIONEER PARK City of Des Peres, Missouri 12325 Manchester Road Des Peres, Missouri 63131 Prepared by City Engineer March 2011 INVITATION TO BID SANITARY

More information

CITY OF COOS BAY CITY COUNCIL Agenda Staff Report

CITY OF COOS BAY CITY COUNCIL Agenda Staff Report CITY OF COOS BAY CITY COUNCIL Agenda Staff Report MEETING DATE August 4, 2015 AGENDA ITEM NUMBER TO: Mayor Shoji and City Councilors FROM: Aaron Real, Engineering Technician THROUGH: Jim Hossley, Public

More information

WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued)

WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued) BIDDER'S PROPOSAL (continued) Item Estimated No. Description Quantity Unit Unit Cost Total Cost BASE BID 1 Traffic Control 1 LS $ $ 2 Construction Area Signs 1 LS $ $ 3 Excavation Safety 1 LS $ $ 4 Reset

More information

FY08 SEWER POINT REPAIRS BID TABULATION

FY08 SEWER POINT REPAIRS BID TABULATION 6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "

More information

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW NOTICE TO CONTRACTORS CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW The Nebraska Department of Roads will receive sealed bids in

More information

ADVERTISEMENT FOR BIDDERS

ADVERTISEMENT FOR BIDDERS ADVERTISEMENT FOR BIDDERS Sealed Bids will be received by the City of Lookout Mountain, Georgia, 1214 Lulu Lake Road, Lookout Mountain, Georgia 30103, Attention: Brad Haven, City Manager until: for the

More information

CONSTRUCTION COST ESTIMATES

CONSTRUCTION COST ESTIMATES Chapter 8 CONSTRUCTION COST ESTIMATES SCDOT BRIDGE DESIGN MANUAL April 2006 Table of Contents Section Page 8.1 PROGRAMMING ESTIMATES...8-1 8.1.1 Bridge Replacement Projects...8-1 8.1.2 Other Projects...8-1

More information

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR ESTABLISHING CONSTRUCTION CONTRACT DURATION July 2010 DISCLAIMER: The following documentation as a whole was derived from Federal Highway Administration

More information

CID STREET INFRASTRUCTURE ASSESSMENT

CID STREET INFRASTRUCTURE ASSESSMENT ABSTRACT An evaluation of the street infrastructure in Foxberry Estates Phase 1, including pavement condition, verification of construction techniques, and subgrade quality. Recommendations and costs for

More information

Figure 3 Pipe Cracking

Figure 3 Pipe Cracking The illustration shown below depicts the system analyzed. As-built drawings and survey information were not available; aerial photos and survey shots of inverts were used to determine the system s geometries.

More information

MEMORANDUM GEOFF ENGLISH, PUBLIC WORKS DIRECTOR MIKE LINN, ASSISTANT CITY ENGINEER

MEMORANDUM GEOFF ENGLISH, PUBLIC WORKS DIRECTOR MIKE LINN, ASSISTANT CITY ENGINEER MEMORANDUM TO: FROM: BY: SUBJECT: CITY COUNCIL GEOFF ENGLISH, PUBLIC WORKS DIRECTOR MIKE LINN, ASSISTANT CITY ENGINEER CONSIDERATION OF AN AWARD OF CONTRACT TO D-KAL ENGINEERING, INC. FOR THE CROWN TERRACE

More information

Legacy Trail Extension Feasibility Study. Preliminary Cost Estimate

Legacy Trail Extension Feasibility Study. Preliminary Cost Estimate Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5

More information

CONSTRUCTION COST MODELS

CONSTRUCTION COST MODELS CONSTRUCTION COST MODELS Prepared by: The New England Environmental Finance Center For the Maine Department of Transportation Office of Environmental Planning November 1, 2010 The following are a series

More information

STATE OF MISSOURI HIGHWAYS and TRANSPORTATION COMMISSION JEFFERSON CITY, MISSOURI CONSTRUCTING OR IMPROVING CONTRACT I.D.

STATE OF MISSOURI HIGHWAYS and TRANSPORTATION COMMISSION JEFFERSON CITY, MISSOURI CONSTRUCTING OR IMPROVING CONTRACT I.D. STATE OF MISSOURI HIGHWAYS and TRANSPORTATION COMMISSION JEFFERSON CITY, MISSOURI CONSTRUCTING OR IMPROVING CONTRACT I.D. 160624-C05 THIS JOB SHALL BE CONSTRUCTED UNDER FEDERAL PROJECT NUMBER(S): I-35-1

More information

RFP 16005 - ALTERNATE #1 SECURITY SYSTEMS Page 1 of 13

RFP 16005 - ALTERNATE #1 SECURITY SYSTEMS Page 1 of 13 ADDENDUM NO. 1 REQUEST FOR PROPOSALS (RFP) 16005 SECUITY SYSTEMS NORTH CENTRAL WEST VIRGINIA ADVANCED TECHNOLOGY CENTER September 8, 2015 A. CLARIFICATIONS AND MODIFICATIONS TO THE RFP 1. This Addendum

More information

Asphaltic Wedge Paving

Asphaltic Wedge Paving OFFICIAL NOTICE ADVERTISEMENT FOR BIDS Notice is hereby given by the Town of Oregon, Dane County, Wisconsin, will receive sealed bids for Road Construction as listed in this request until 4:00 P.M., Local

More information

ADDENDUM NO. 1. Manchester Boston Regional Airport, City of Manchester, NH

ADDENDUM NO. 1. Manchester Boston Regional Airport, City of Manchester, NH Hoyle, Tanner Project No. 093145 ADDENDUM NO. 1 Manchester Boston Regional Airport, City of Manchester, NH Construct Relocated Roadway Airport Service Rd. Outside Runway Object Free Area (ROFA); Construct

More information

LOUISIANA LOCAL ROAD SAFETY PROGRAM. Local Road Safety Improvement Projects

LOUISIANA LOCAL ROAD SAFETY PROGRAM. Local Road Safety Improvement Projects LOUISIANA LOCAL ROAD SAFETY PROGRAM Local Road Safety Improvement Projects Louisiana Local Road Safety Program Project Application 2015 Louisiana Department of Transportation and Development 2015 APPLICATION

More information

VIDEO INSPECTION AND LASER DEFLECTION TESTING FOR POST CONSTRUCTION QC/QA SPECIFICATIONS AND MAINTENANCE INSPECTIONS

VIDEO INSPECTION AND LASER DEFLECTION TESTING FOR POST CONSTRUCTION QC/QA SPECIFICATIONS AND MAINTENANCE INSPECTIONS VIDEO INSPECTION AND LASER DEFLECTION TESTING FOR POST CONSTRUCTION QC/QA SPECIFICATIONS AND MAINTENANCE INSPECTIONS BY JOHN FLECKENSTEIN PIPELINE AND DRAINAGE CONSULTANTS INTRODUCTION History Of Post

More information

Date. Resubmit this form during the year if there are changes in your company ownership or financial standing.

Date. Resubmit this form during the year if there are changes in your company ownership or financial standing. COLORADO DEPARTMENT OF TRANSPORTATION CONTRACTOR PREQUALIFICATION STATEMENT (EXPERIENCE, EQUIPMENT AND FINANCIAL) Return to: Contracts & Market Analysis Prequalification Unit 4201 E. Arkansas,4th Floor

More information

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS 2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS GENERAL 10/16/2008 The listed average unit prices are based on the

More information

The unit costs are based on the trend line of the 3 low bids for the average quantity.

The unit costs are based on the trend line of the 3 low bids for the average quantity. Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally

More information

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 CITY OF SAN ANTONIO Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 (010) FORMAL INVITATION FOR BIDS (IFB) to CONTRACT 2016-2017 TASK ORDER CONTRACT

More information

How to Do a Water & Sewer System Inventory - Capital Improvements Plan

How to Do a Water & Sewer System Inventory - Capital Improvements Plan Table of Contents Background, Objective and Method... 2 Capital Outlay - Water System... 3 Capital Outlay - Sewer System... 4 Summary... 4 Water Exhibit... 5 Sewer Exhibit....6 w w w. c a v a n a u g h

More information

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation 644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING

More information

Helen Mercury Mine EE/CA OPINION OF PROBABLE COST

Helen Mercury Mine EE/CA OPINION OF PROBABLE COST G Cost Estimates Helen Mercury Mine EE/CA Alternative 2: Limited Action 3 Minor Road Improvements 4 Clear & Grub diversion channel areas 5 Surveying 6 Cleanup & Demobilization 7 Pull back of material 8

More information

Fly Ash Slurry Injection (FASI) of Bituminous Thermal Cracks

Fly Ash Slurry Injection (FASI) of Bituminous Thermal Cracks Fly Ash Slurry Injection (FASI) of Bituminous Thermal Cracks Schedule What is Fly Ash Slurry Injection (FASI) Thermal Cracks and Why They Depress Pavement Rehab Strategies Special Provisions Upcoming Projects

More information

Special Specification 7021 Water Main and Sewer Line Replacements

Special Specification 7021 Water Main and Sewer Line Replacements Special Specification 7021 Water Main and Sewer Line Replacements 1. DESCRIPTION Furnish, install, or replace water pipe, water valves, water meters and boxes, water service connections, fire hydrant assemblies,

More information

DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VIRGINIA 23219-2000

DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VIRGINIA 23219-2000 Charles A. Kilpatrick, P.E. Commissioner February 10, 2016 DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VIRGINIA 23219-2000 Order No.: J13 Project: (NFO)0081-080-864,B657-B662 FHWA: ACSTP-PM02(412)

More information

UNIT PRICE LIST (09/30/2012) DIVISION I -EARTHWORK

UNIT PRICE LIST (09/30/2012) DIVISION I -EARTHWORK LIST (09/30/2012) DIVISION I -EARTHWORK 100.1 MOBILIZATION L.S. - 11% 100.2 INSURANCE & BOND L.S. - 3% 101.1 PREPARING RIGHT OF WAY L.S. - 4% 102.1 OBLITERATING ABANDONED STREET ( < 25,000 S.Y.) S.Y. 6

More information

Thin Whitetopping Application at Williamsburg Regional Airport and Other Thin Whitetopping Airport Applications.

Thin Whitetopping Application at Williamsburg Regional Airport and Other Thin Whitetopping Airport Applications. Thin Whitetopping Application at Williamsburg Regional Airport and Other Thin Whitetopping Airport Applications. Author: Gary L. Mitchell, P.E. Director Airports, American Concrete Pavement Association

More information

PROPOSAL MARION TOWNSHIP HENRY COUNTY, OHIO TOWNSHIP ROAD IMPROVEMENTS

PROPOSAL MARION TOWNSHIP HENRY COUNTY, OHIO TOWNSHIP ROAD IMPROVEMENTS PROPOSAL MARION TOWNSHIP HENRY COUNTY, OHIO TOWNSHIP ROAD IMPROVEMENTS Kenneth Busch, Trustee Thomas Mangas, Trustee R. Scott Schwiebert, Trustee Deborah Glore, Fiscal Officer LETTING - April 14, 2009

More information

SUBDIVISION ROAD CONSTRUCTION AND INSPECTION PROCEDURES

SUBDIVISION ROAD CONSTRUCTION AND INSPECTION PROCEDURES BOARD OF COUNTY COMMISSIONERS ST. MARY S COUNTY LEONARDTOWN, MARYLAND SUBDIVISION ROAD CONSTRUCTION AND INSPECTION PROCEDURES APRIL, 1991 AMENDED: JUNE, 2002 DEPARTMENT OF PUBLIC WORKS & TRANSPORTATION

More information

SUPPLEMENTAL SPECIFICATIONS CROSS SLOPE VERIFICATION:

SUPPLEMENTAL SPECIFICATIONS CROSS SLOPE VERIFICATION: September 22, 2009 Updated November 16, 2009 SUPPLEMENTAL SPECIFICATIONS CROSS SLOPE VERIFICATION: 1. DESCRIPTION: The cross slopes of the roadway are to be constructed as detailed in the plans and within

More information

Case Studies - Concrete Overlays

Case Studies - Concrete Overlays Case Studies - Concrete Overlays Lessons Learned - Concrete Overlays Purdue Road School March 6, 2013 Today s Topic 1. Overlays 2. New Full-depth 3. Pervious 4. Roller Compacted 5. Full Depth Patching

More information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES. Part I: Proposal Information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES. Part I: Proposal Information REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES Part I: Proposal Information A. General Information The Berwick Area School District is soliciting proposals for construction management services

More information

IN ACCORDANCE WITH THE APPLICABLE STATUTES OF THE STATE OF ILLINOIS AND ORDINANCES OF THE VILLAGE OF WHEELING, NOTICE IS HEREBY GIVEN THAT

IN ACCORDANCE WITH THE APPLICABLE STATUTES OF THE STATE OF ILLINOIS AND ORDINANCES OF THE VILLAGE OF WHEELING, NOTICE IS HEREBY GIVEN THAT PUBLIC NOTICE IN ACCORDANCE WITH THE APPLICABLE STATUTES OF THE STATE OF ILLINOIS AND ORDINANCES OF THE VILLAGE OF WHEELING, NOTICE IS HEREBY GIVEN THAT THE SPECIAL MEETING OF THE PRESIDENT AND BOARD OF

More information

Review of 01310 Schedule Specification Requirements District SAP/WBS breakdown Asset template Cost & Resource Loading Stored Material Costs

Review of 01310 Schedule Specification Requirements District SAP/WBS breakdown Asset template Cost & Resource Loading Stored Material Costs Agenda Topics: 1. Oracle/Primavera buyout Within the last year, Oracle bought Primavera. Primavera support has been tailored to Oracle s standard. stead of initially speaking to a support representative,

More information

CONSTRUCTION OF PERIMETER FENCE - COMMERCIAL AND T&D OFFICE COMPOUND, ONVERWAGT

CONSTRUCTION OF PERIMETER FENCE - COMMERCIAL AND T&D OFFICE COMPOUND, ONVERWAGT BILL Nr1 - PRELIMINARIES 1.0 PRELIMINARY PARTICULARS CONSTRUCTION OF PERIMETER FENCE - COMMERCIAL 1.1 Funding The funding shall be provided by the Guyana Power & light Inc., of 40 Main street, North Cummingsburg,

More information

Pavement Type Selection Report

Pavement Type Selection Report Pavement Type Selection Report Segment 1: West of CR 532 (Osceola/Polk County Line) to West of SR 528 (Beachline Expressway) Osceola County (92130) and Orange County (75280) July 18, 2014 HNTB Corporation

More information

Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS

Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS 1 Proposal & Plans Received? 2 Review Proposal, highlight important facts. Know proposal well to be able to find answers quickly.

More information

Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting

Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting MnDOT Contract No. 1003249 General Project Overview This work is located along Trunk Highway (TH) 23, for State Project (SP) 7305-124.

More information

Tabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14

Tabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14 Solcitation No: DTFH71-14-B-00008 Division: Eastern Federal Lands State: DC County: Federal Land: 1 out of 9 Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date:

More information

Maryland Work Zone Accidents Comparison 1994-2003 May 2005

Maryland Work Zone Accidents Comparison 1994-2003 May 2005 Maryland Work Zone Accidents Comparison 1994-23 May 25 Traffic Safety Analysis Division Office of Traffic and Safety Maryland State Highway Administration 7491 Connelley Drive Hanover, Maryland 2176-171

More information

February 4, 2016. Estimate

February 4, 2016. Estimate Wrentham, MA February 4, 2016 Architect: Turowski2 Architecture, Inc. P.O. Box 1290 313 Wareham Road Marion, MA 02738 (508) 758-9777 Cost Estimator: Miyakoda Consulting 300 Black Mallard Road Bridgewater,

More information

Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES

Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES 11.5.1 Purpose To provide a uniform procedure for determining that the last structural layer meets the applicable straightedge

More information

Observatory Street Improvements Project

Observatory Street Improvements Project ADDENDUM No. 1 ITB No. 4425 Observatory Street Improvements Project Due: March 3, 2016, 2:00 P.M. The following changes, additions, and/or deletions shall be made to the Invitation to Bid for Observatory

More information

RICHMOND METROPOLITAN AUTHORITY RICHMOND EXPRESSWAY SYSTEM DECK REHABILITATION 2014 NORTHBOUND POWHITE OVER THE JAMES RIVER **********

RICHMOND METROPOLITAN AUTHORITY RICHMOND EXPRESSWAY SYSTEM DECK REHABILITATION 2014 NORTHBOUND POWHITE OVER THE JAMES RIVER ********** RICHMOND METROPOLITAN AUTHORITY RICHMOND EXPRESSWAY SYSTEM DECK REHABILITATION 2014 NORTHBOUND POWHITE OVER THE JAMES RIVER ********** February 11, 2014 DESCRIPTION The Invitation to Bid and Very High

More information

3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch.

3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch. To Prospective Bidders: CITY OF TOLEDO, OHIO PARKSIDE AREA SSO ELIMINATION PHASE 2 GRAVITY RELIEF SEWER NO. 2011 Addendum No. 2 December 8, 2011 Information disclosed and/or questions raised since issuing

More information

The project completion date has not been impacted by the work in this potential change item.

The project completion date has not been impacted by the work in this potential change item. 10:40 AM March 24, 2010 Mr. Travis Wilson Horst, Terrill & Karst Architects, P.A. 9300 West 110th Street, Suite 150 Overland Park, KS 66210 Re: Anthony Elementary School Additions & Alterations J. E. Dunn

More information

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices

More information

Jackson Gulch Outlet Canal Rehabilitation Project

Jackson Gulch Outlet Canal Rehabilitation Project Jackson Gulch Outlet Canal Rehabilitation Project Preliminary Budgetary Estimate for Rehabilitation February 2004 Prepared for the Mancos Water Conservancy District Jackson Gulch Reservoir 42888 County

More information

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions. SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings

More information

Request for Proposal: Network Switches

Request for Proposal: Network Switches Request for Proposal: Network Switches January 12, 2015 Seward Public Schools 410 South Street Seward, NE 68434 Erate Identifier: Category Two RFP Network Switches 1 Table of Contents Overview...3 1.1

More information

INVITATION TO BID OFFICE OF THE ORLANDO-ORANGE COUNTY EXPRESSWAY AUTHORITY ORLANDO, FLORIDA

INVITATION TO BID OFFICE OF THE ORLANDO-ORANGE COUNTY EXPRESSWAY AUTHORITY ORLANDO, FLORIDA INVITATION TO BID OFFICE OF THE ORLANDO-ORANGE COUNTY EXPRESSWAY AUTHORITY ORLANDO, FLORIDA Sealed Bids will be received in the office of the Orlando-Orange County Expressway Authority, 4974 ORL Tower

More information

A. Structures Quantity Item Price Cost @ $3,500 EA

A. Structures Quantity Item Price Cost @ $3,500 EA PRINCE WILLIAM COUNTY Department of Development Services Land Development Division UNIT PRICE LIST (Performance Bonds, Landscaping Escrows, and Siltation & Erosion Control Escrows) Revised: November 17,

More information

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

Construction Management Program

Construction Management Program Use and Limitation: The Sponsor may use this document as a guide in preparing a construction management program for their specific project. Sponsors and Consultants are cautioned that the provision of

More information

Pulverizing & Milling Asphalt Pavement Quote.

Pulverizing & Milling Asphalt Pavement Quote. February 6, 2015 RE: 2015 Pulverizing and Milling Asphalt Pavement To whom it may concern: You are invited to submit sealed quotations on furnishing and delivery for the 2015 Pulverizing & Milling Asphalt

More information

Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005

Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005 Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005 Purpose The purpose of this review is to capture for technical deployment the most advanced

More information

REQUEST FOR PROPOSAL. for CONSTRUCTION MANAGEMENT SERVICES. for the ENCINA WASTEWATER AUTHORITY FY 2015 MAJOR PLANT REHABILITATION PROJECT

REQUEST FOR PROPOSAL. for CONSTRUCTION MANAGEMENT SERVICES. for the ENCINA WASTEWATER AUTHORITY FY 2015 MAJOR PLANT REHABILITATION PROJECT REQUEST FOR PROPOSAL for CONSTRUCTION MANAGEMENT SERVICES for the ENCINA WASTEWATER AUTHORITY FY 2015 MAJOR PLANT REHABILITATION PROJECT Ref: Admin.15 12265c September 23, 2015 Proposals Due November 2,

More information

Work Breakdown Structure Element Dictionary Construction

Work Breakdown Structure Element Dictionary Construction Initiation CON 5.1 Initiation encompasses deliverables associated with the development, implementation and control of the project s schedule, budget and scope, including the solicitation for a contractor

More information

Invoice. Subtotal. Balance Due. Sample Corporation c/o Property Manager Anywhere Avenue, North York, ON. Total. www.rainbowintl.me

Invoice. Subtotal. Balance Due. Sample Corporation c/o Property Manager Anywhere Avenue, North York, ON. Total. www.rainbowintl.me Rainbow International Carpet Care & Restoration Specialists (North York) Invoice 711197 Invoice To Work Location Sample Corporation c/o Property Manager Anywhere Avenue, North York, ON Sample Corporation

More information

Technical Memorandum Cost Criteria for 2010 System Capacity Plan

Technical Memorandum Cost Criteria for 2010 System Capacity Plan 2010 SASD SEWER SYSTEM CAPACITY PLAN UPDATE Technical Memorandum Cost Criteria for 2010 System Capacity Plan PREPARED BY: My Huynh DATE: September 13, 2011 REVIEWED BY: Sonny Lunde INTRODUCTION This Technical

More information

BID NOTICE. Bids may be delivered or mailed to the Administration Office at the above address. TRAFFIC LINES AND MARKINGS

BID NOTICE. Bids may be delivered or mailed to the Administration Office at the above address. TRAFFIC LINES AND MARKINGS BID NOTICE Sealed proposals will be received by the Board of Supervisors of the TOWNSHIP OF WEST BRADFORD, 1385 Campus Drive, Downingtown, Chester County, Pennsylvania 19335 until 12:00 Noon on Monday,

More information

Scottsdale Road Improvements, Phase 1

Scottsdale Road Improvements, Phase 1 CITY AUDITOR'S OFFICE Scottsdale Road Improvements, Phase 1 October 30, 2015 AUDIT REPORT NO. 1509 CITY COUNCIL Mayor W.J. Jim Lane Suzanne Klapp Virginia Korte Kathy Littlefield Linda Milhaven Guy Phillips

More information

Analyzing The Bread & Butter Benefits of Sewer Main Pipebursting. Matt Werth General Manager PM Construction

Analyzing The Bread & Butter Benefits of Sewer Main Pipebursting. Matt Werth General Manager PM Construction Analyzing The Bread & Butter Benefits of Sewer Main Pipebursting Matt Werth General Manager PM Construction Pipebursting is the answer to many very difficult rehabilitation needs where there are almost

More information

QUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park

QUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park QUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park The purpose of this program is to provide assurance that the materials incorporated into the construction projects are in conformance with the contract

More information

COUNTY OF LOS ANGELES

COUNTY OF LOS ANGELES COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS To Enrich Lives Through Effective and Caring Service DONALD L. WOLFE, Director 900 SOUTH FREMONT AVENUE ALHAMBRA, CALIFORNIA 91803-1331 Telephone: (626)

More information

Section 300 Base Courses

Section 300 Base Courses Table of Contents 1. Importance of Base Courses... 300-1 2. Types of Bases... 300-3 A. Cement Treated Permeable Base Course... 300-3 B. Bituminous Concrete Base Courses... 300-6 C. Superpave Asphalt HMA

More information

SECTION 31 20 00 EARTH MOVING

SECTION 31 20 00 EARTH MOVING SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to

More information

Unit Price Averages Reports

Unit Price Averages Reports Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation

More information

DOCUMENTED QUOTES State of Colorado University of Northern Colorado Notice Number: UNC-224-10

DOCUMENTED QUOTES State of Colorado University of Northern Colorado Notice Number: UNC-224-10 DOCUMENTED QUOTES State of Colorado Notice Number: UNC-224-10 Project No: A-1182 Project Title: J Lot Crackfill, Sealcoat & Striping - Summer 2010 Estimated Construction Cost: $30,000 *ARRA Funding?: No

More information

APPENDIX K Capital Costs Methodology Report

APPENDIX K Capital Costs Methodology Report APPENDIX K Capital Costs Methodology Report September 2013 Capital Cost Estimating Report Table of Contents 1.0 Information... 5 1.1 Introduction... 5 1.2 Purpose and Goal... 5 2.0 Description of Project...

More information

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets Los Angeles County Department Of Public Works Land Development Division Bond Calculation Sheets Effective July 1, 2015 COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS LAND DEVELOPMENT DIVISION ROADS COST

More information

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0

More information

Summary Statement of Work

Summary Statement of Work Exhibit A PennDOT District 2-0 Tree Work Specifications for a Specialized / Expandable Arboriculture Complement Summary Statement of Work I. DESCRIPTION A. This statement of work is in addition to the

More information

Bridge Structural Rehabilitation Using FRP Laminates

Bridge Structural Rehabilitation Using FRP Laminates Bridge Structural Rehabilitation Using FRP Laminates South Santiam River Quartzville Road, Linn County Linn County Road Department 2011 Cooperative Partnerships Making Linn County a Better Place to Live

More information

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report Facility Attachment F Campus Capital Needs Sales Surtax Funded Detail Report Facilities Services 2700 Judge Fran Jamieson Way Viera, Florida 32940-6601 Condition Code Estimate Bayside High 2.30 $2,567,194

More information

APPENDIX A BID FORM ITB #201433

APPENDIX A BID FORM ITB #201433 APPENDIX A BID FORM ITB #201433 (a) (b) (c) The Contractor shall fill out the table below of rates that will be charged for work completed under this Contract. This Bid Table shall be included within the

More information

2014/2015 PAVING PROJECT MILLING AND PATCHING BID DOCUMENTS JASPER COUNTY, GEORGIA

2014/2015 PAVING PROJECT MILLING AND PATCHING BID DOCUMENTS JASPER COUNTY, GEORGIA 2014/2015 PAVING PROJECT MILLING AND PATCHING BID DOCUMENTS JASPER COUNTY, GEORGIA Issued on January 7, 2015 1 ADVERTISEMENT FOR BIDS 2014/2015 ROADWAY PATCHING PROJECT JASPER COUNTY, GEORGIA Separate,

More information

UNIT PRICE LIST January 2009

UNIT PRICE LIST January 2009 UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only

More information

DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION MATERIALS CONSTRUCTION REQUIREMENTS

DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION MATERIALS CONSTRUCTION REQUIREMENTS 304.06 DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION 304.01 This work consists of furnishing and placing one or more courses of aggregate and additives, if required, on a prepared subgrade.