1 Lead Project: H Parish: East Baton Rouge Routes: LA 37 Description: LA 37 at Central Thruway Type Const: GRADING, DRAIN STRUCT, SEWER FORCE MAINS, CLASS II BC, SUPERPAVE ACP, PCCP, TRAFFIC SIGNALIZATION, CONCRETE GIRDER SPAN AND PRECAST CONCRETE SPAN BRIDGES, AND RELATED WORK; ADDITIVE ALTERNATE 1, SEWER FORCE MAINS. Estimated Construction Cost: $7,843, Rank License Bidder Construction Bid Jb James Construction Llc $7,571, James Construction Group LLC $7,731, Gilchrist Construction Co. LLC $7,750, Command Construction Industries LLC $9,276, Industrial Enterprises, Inc. $9,995, Line Number Item Number Item Description Quantity Unit of Measure Jb James Construction Llc James Construction Group LLC Gilchrist Construction Co. LLC Command Construction Industries LLC Clearing and Grubbing 1 LUMP 200, , , , , , , , Removal of Structures and Obstructions 1 LUMP 10, , , , , , , , Removal of Bridge (Sta ; 18'x20') 1 EACH 4, , , , , , , , Removal of Bridge (Sta ; 76'x43' Precast Slab Span on Timber Piles) 1 EACH 30, , , , , , , , Removal of Building (42'x18' Building on Concrete Slab) 1 EACH , , , , Removal of Building (60' x 60' Metal Building on Concrete Slab) 1 EACH , , , , Removal of Concrete Walks and Drives 1,861 SQYD , , , , Removal of Guard Rail 322 LNFT , , , , Removal of Surfacing and Stablized Base 8,715 SQYD , , , , General Excavation 6,126 CUYD , , , , Drainage Excavation 15,693 CUYD , , , , Embankment 23,266 CUYD , , , , Nonplastic Embankment (Stone) CUYD , , , , Temporary Hay or Straw Bales 100 EACH , , , , Temporary Sediment Check Dams (Hay) 7 EACH , , , Temporary Sediment Check Dams (Stone) 8 EACH , , , , Temporary Silt Fencing 1,940 LNFT , , , , Temporary Stone Construction Entrance 3 EACH 2, , , , , , , , Class II Base Course (4" Thick) (Stone or Recycled Portland Cement Concrete) 30,366.7 SQYD , , , , Class II Base Course (5" Thick) (Stone or Recycled Portland Cement 2,985.4 SQYD , , , ,839.40

2 Concrete, or Blended Calcium Sulfate) (Stone or Recycled Portland Cement Concrete Only) Class II Base Course (8 1/2" Thick) (Soil Cement) 34,978.6 SQYD , , , , Lime Treatment (Type E) TON , , , , Aggregate Surface Course (Net Section) CUYD , , , , Traffic Maintenance Aggregate (Vehicular Measurement) 2,000 CUYD , , , , Superpave Asphaltic Concrete 2,581.9 TON , , , , Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 15.8 TON , , , , Portland Cement Concrete Pavement (10" Thick) 24,250.4 SQYD ,091, ,212, ,091, ,091, Portland Cement Concrete Pavement (10" Thick) (Crossovers & Turnouts) 1,584.7 SQYD , , , , Portland Cement Concrete Pavement Coring 20 EACH , , , , Cross Drain Pipe (60" RCP) 273 LNFT , , , , Storm Drain Pipe (15" RCP/PP) 468 LNFT , , , , Storm Drain Pipe (18" RCP/PP) 220 LNFT , , , , Storm Drain Pipe (24" RCP/PP) 664 LNFT , , , , Storm Drain Pipe (48" RCP/PP) 178 LNFT , , , , Storm Drain Pipe (Outfall) (18" PP or 24" CMP) 20 LNFT , , Storm Drain Pipe (Outfall) (24" PP or 30" CMP) 36 LNFT , , , , Storm Drain Pipe (Outfall) (36" PP or 42" CMP) 121 LNFT , , , , Storm Drain Pipe (Outfall) (48" PP or 54" CMP) 28 LNFT , , , , Storm Drain Pipe Arch (24" Equiv. RCPA) 45 LNFT , , , , Storm Drain Pipe Arch (36" Equiv. RCPA) 381 LNFT , , , , Storm Drain Pipe Arch (48" Equiv. RCPA) 577 LNFT , , , , Side Drain Pipe (18" RCP/PP/CMP) 485 LNFT , , , , Side Drain Pipe (24" RCP/PP/CMP) 88 LNFT , , , , Side Drain Pipe (Erosion) (18" PP/CMP) 40 LNFT , , , , Side Drain Pipe (Bridge Drains) (18" PP/CMP) 4 LNFT , Manholes (R-CB-11) 1 EACH 4, , , , , , , , Manholes (R-CB-11 MOD) 2 EACH 4, , , , , , , , Manholes (R-CB-36) 4 EACH 3, , , , , , , , Catch Basins (CB-01) 9 EACH 2, , , , , , , , Catch Basins (CB-02) 3 EACH 3, , , , , , , , Catch Basins (CB-06) 12 EACH 4, , , , , , , , Catch Basins (CB-07) 3 EACH 3, , , , , , , , Catch Basins (CB-08) 2 EACH 5, , , , , , , , Perforated Pipe Underdrains 1,700 LNFT , , , , Blocked Out Guard Rail 56.3 LNFT , , , , Guard Rail Transitions (Double Thrie Beam) 25 LNFT , , , , Guard Rail End Treatment (Flared) 1 EACH 2, , , , , , , , Barbed Wire Fence 40 LNFT Combination Mesh & Barbed Wire Fence 286 LNFT , , , , Single Swinging Driveway Gates 4 EACH , , , , Rebuilt Fence 294 LNFT , , , , Concrete Drive (6" Thick) 1,441.7 SQYD , , , ,085.00

3 Incidental Concrete Paving (4" Thick) 8.9 SQYD , , Concrete Curb (Barrier) LNFT , , , , Concrete Curb (Mountable) 3,222.9 LNFT , , , , Right-of-Way Monument 13 EACH , , , , Right-of-Way Monument Witness Post 13 EACH , , , , Riprap (55 lb, 18" Thick) 2,280 SQYD , , , , Geotextile Fabric 2,280 SQYD , , , , Flexible Revetment 146 SQYD , , , , Temporary Signs and Barricades 1 LUMP 45, , , , , , , , Temporary Pavement Markings (Solid Line) (4" Width) MILE , , , , Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) MILE 10, , , , , , , , Mulch (Vegetative) 2.44 TON , , , , , Seeding 1,000 LB , , , , Fertilizer 2,000 LB , , , , Erosion Control System (Slope Protection) (Type A) 2,652 SQYD , , , , Project Site Laboratory 1 EACH 20, , , , , , , , Temporary Detour Roads 4,710.3 SQYD , , , , Temporary Detour Bridging 120 LNFT 1, , , , , , , , Bedding Material CUYD , , , , Mobilization 1 LUMP 750, , , , , , , , Sign (Type A) 93 SQFT , , , , Object Marker Assembly (Type 3) 4 EACH Reflectorized Raised Pavement Markers 1,070 EACH , , , , Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 682 LNFT , , , , Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) MILE 2, , , , , , , , Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) MILE 6, , , , , , , , Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) (10'/30') MILE , , , , Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) (3'/6') 0.32 MILE 3, , , , , Plastic Pavement Legends and Symbols (Arrow - Left Turn) 19 EACH , , , , Plastic Pavement Legends and Symbols (Arrow - Right Turn) 3 EACH Plastic Pavement Legends and Symbols (Arrow - Merge) 2 EACH Plastic Pavement Legends and Symbols (ONLY) 3 EACH Removal of Existing Markings 0.1 MILE 5, , , , , Mailboxes 15 EACH , Mailbox Supports (Single) 15 EACH , , , , Trenching and Backfilling 1,285 LNFT , , , , Jacked or Bored Conduit (2" HPDE, Sch 80) 375 LNFT , , , , Jacked or Bored Conduit (3" HPDE, Sch 80) 525 LNFT , , , , Signal Support (50' Single Mast Arm) 2 EACH 15, , , , , , , , Signal Support (60' Single Mast Arm) 2 EACH 20, , , , , , , , Signal Heads (3 Section, 12" Led Lens, R, Y, G) 8 EACH , , , , Signal Heads (3 Section, 12" Led Lens, R, LT. Y, LT. G) 4 EACH , , , , Signal Heads (5 Section, 12" Led Lens, R, LT. Y, Y, LT. G, G) 2 EACH 1, , , , , , , ,600.00

4 Signal Heads (5 Section, 12" Led Lens, R, Y, RT. Y, G, RT. G) 3 EACH 1, , , , , , , , Signal Service (Pedestal Required) 1 EACH 1, , , , , , , , Sig Cntrlr (TS-2, Type 2)(Type 6E Cabinet)(Furnish & Install) 1 EACH 40, , , , , , , , Loop Detector 365 LNFT , , , , Underground Junction Box (Type E) 8 EACH , , , , Underground Junction Box (Type F) 4 EACH , , , , Underground Junction Box (Type H) 1 EACH 1, , , , , , , , Conduit (1" HDPE, Schedule 80) 920 LNFT , , Conduit (2" HDPE, Schedule 80) 665 LNFT , , , , Conduit (3" HDPE, Schedule 80) 90 LNFT Conductor (2c, Loop Lead in, imsa 50-2, #19 awg, Twisted Pair) 2,905 LNFT , , , , Conductor (2c, #6 awg) 860 LNFT , , , , Conductor (3c, 6 gauge / #6 awg) 300 LNFT , , , , Conductor (3c, #14 awg) 1,350 LNFT , , , , Cable (6C Signal) 215 LNFT Cable (10C Signal) 2,335 LNFT , , , , Construction Layout 1 LUMP 180, , , , , , , , Sanitary Sewer Pipe (8") 692 LNFT , , , , Temporary Sheeting 1 LUMP 55, , , , , , , , Precast Concrete Piles (24") 4,793 LNFT , , , , Treated Timber Piles (Noncoastal Treatment) 600 LNFT , , , , Precast Concrete Test Piles (24") 1 EACH 30, , , , , , , , Loading Test Piles 1 EACH 20, , , , , , , , Reloading Test Piles 1 EACH , , , , , , Redriving Test Piles 1 EACH , , , , , , Loading Permanent Piles 1 EACH , , , , Dynamic Monitoring 1 EACH 1, , , , , , , , Class A Concrete (Box Culvert Headwalls) CUYD 1, , , , , , , Class A Concrete (Bents) CUYD , , , , Class AA Concrete CUYD , , , , , Precast-Prestressed Concrete Girder (Type Quad Beam) 3,326.6 LNFT , , , , Bridge Superstructure and Substructure 2 SPAN 18, , , , , , , , Strip Seal Joints LNFT , , , , Reinforced Concrete Box Culverts (4' x 4') 332 LNFT , , , , Deformed Reinforcing Steel 166,719 LB , , , , Structural Metalwork 1 LUMP 20, , , , , , , , Concrete Railing (Standard Barrier) 480 LNFT , , , , Concrete Approach Slabs SQYD , , , , NS Saw Cutting Asphaltic Concrete Pavement 8,000 INLF , , , , NS Saw Cutting Portland Cement Concrete Pavement 8,000 INLF , , , , NS Video Detection Cabinet Components 1 EACH 7, , , , , , , , NS Video Detection Camera 4 EACH 3, , , , , , , , NS Video Detection Training 1 LUMP

5 0149 NS Dynamic Analysis 1 EACH 1, , , , , , , , NS Vibration Monitoring 50 EACH , , , , NS-P Limestone Bedding and Backfill 50 CUYD , , , , NS-P Sand Backfill 100 CUYD , , , , NS-P Select Material for Backfill 200 CUYD , , , , NS-P Unrestrained Joint Ductile Iron Sewer Force Main (12" dia) 208 LNFT , , , , NS-P Restrained Joint Ductile Iron Sewer Force Main (12" diameter) 60 LNFT , , , , NS-P Remove Force Main 1 LUMP 5, , , , , , , , NS-P Fittings 1,000 LB , , , , NS-P Air Release/Vacuum Valve 1 EACH 8, , , , , , , , NS-P Force Main Tie-In (12" diameter) 2 EACH 3, , , , , , , , SUBTOTAL GENERAL 7,497,613 7,659,657 7,624,353 9,219,781 Alternate DA NS-P Unrestrained Joint Ductile Iron Sewer Force Main (14" dia) 188 LNFT , , , , NS-P Restrained Joint Ductile Iron Sewer Force Main (14" diameter) 80 LNFT , , , , NS-P Fittings 2,600 LB , , , , SUBTOTAL ALT DA1 73, , , , CONTRACTOR TOTAL 7,571, ,731, ,750, ,276, Line Number Item Number Item Description Quantity Unit of Measure Industrial Enterprises, Inc Clearing and Grubbing 1 LUMP 150, , Removal of Structures and Obstructions 1 LUMP 25, , Removal of Bridge (Sta ; 18'x20') 1 EACH 1, , Removal of Bridge (Sta ; 76'x43' Precast Slab Span on Timber Piles) 1 EACH 42, , Removal of Building (42'x18' Building on Concrete Slab) 1 EACH 3, , Removal of Building (60' x 60' Metal Building on Concrete Slab) 1 EACH 7, , Removal of Concrete Walks and Drives 1,861 SQYD , Removal of Guard Rail 322 LNFT , Removal of Surfacing and Stablized Base 8,715 SQYD , General Excavation 6,126 CUYD , Drainage Excavation 15,693 CUYD , Embankment 23,266 CUYD , Nonplastic Embankment (Stone) CUYD , Temporary Hay or Straw Bales 100 EACH , Temporary Sediment Check Dams (Hay) 7 EACH

6 Temporary Sediment Check Dams (Stone) 8 EACH , Temporary Silt Fencing 1,940 LNFT , Temporary Stone Construction Entrance 3 EACH 1, , Class II Base Course (4" Thick) (Stone or Recycled Portland Cement Concrete) 30,366.7 SQYD , Class II Base Course (5" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) (Stone or Recycled Portland Cement Concrete Only) 2,985.4 SQYD , Class II Base Course (8 1/2" Thick) (Soil Cement) 34,978.6 SQYD , Lime Treatment (Type E) TON , Aggregate Surface Course (Net Section) CUYD , Traffic Maintenance Aggregate (Vehicular Measurement) 2,000 CUYD , Superpave Asphaltic Concrete 2,581.9 TON , Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 15.8 TON , Portland Cement Concrete Pavement (10" Thick) 24,250.4 SQYD ,901, Portland Cement Concrete Pavement (10" Thick) (Crossovers & Turnouts) 1,584.7 SQYD , Portland Cement Concrete Pavement Coring 20 EACH , Cross Drain Pipe (60" RCP) 273 LNFT , Storm Drain Pipe (15" RCP/PP) 468 LNFT , Storm Drain Pipe (18" RCP/PP) 220 LNFT , Storm Drain Pipe (24" RCP/PP) 664 LNFT , Storm Drain Pipe (48" RCP/PP) 178 LNFT , Storm Drain Pipe (Outfall) (18" PP or 24" CMP) 20 LNFT , Storm Drain Pipe (Outfall) (24" PP or 30" CMP) 36 LNFT , Storm Drain Pipe (Outfall) (36" PP or 42" CMP) 121 LNFT , Storm Drain Pipe (Outfall) (48" PP or 54" CMP) 28 LNFT , Storm Drain Pipe Arch (24" Equiv. RCPA) 45 LNFT , Storm Drain Pipe Arch (36" Equiv. RCPA) 381 LNFT , Storm Drain Pipe Arch (48" Equiv. RCPA) 577 LNFT , Side Drain Pipe (18" RCP/PP/CMP) 485 LNFT , Side Drain Pipe (24" RCP/PP/CMP) 88 LNFT , Side Drain Pipe (Erosion) (18" PP/CMP) 40 LNFT , Side Drain Pipe (Bridge Drains) (18" PP/CMP) 4 LNFT Manholes (R-CB-11) 1 EACH 3, , Manholes (R-CB-11 MOD) 2 EACH 4, , Manholes (R-CB-36) 4 EACH 2, , Catch Basins (CB-01) 9 EACH 2, , Catch Basins (CB-02) 3 EACH 3, , Catch Basins (CB-06) 12 EACH 5, , Catch Basins (CB-07) 3 EACH 5, , Catch Basins (CB-08) 2 EACH 8, , Perforated Pipe Underdrains 1,700 LNFT , Blocked Out Guard Rail 56.3 LNFT , Guard Rail Transitions (Double Thrie Beam) 25 LNFT , Guard Rail End Treatment (Flared) 1 EACH 2, , Barbed Wire Fence 40 LNFT

7 Combination Mesh & Barbed Wire Fence 286 LNFT , Single Swinging Driveway Gates 4 EACH , Rebuilt Fence 294 LNFT , Concrete Drive (6" Thick) 1,441.7 SQYD , Incidental Concrete Paving (4" Thick) 8.9 SQYD Concrete Curb (Barrier) LNFT , Concrete Curb (Mountable) 3,222.9 LNFT , Right-of-Way Monument 13 EACH , Right-of-Way Monument Witness Post 13 EACH , Riprap (55 lb, 18" Thick) 2,280 SQYD , Geotextile Fabric 2,280 SQYD , Flexible Revetment 146 SQYD , Temporary Signs and Barricades 1 LUMP 91, , Temporary Pavement Markings (Solid Line) (4" Width) MILE , Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) MILE 10, , Mulch (Vegetative) 2.44 TON , Seeding 1,000 LB , Fertilizer 2,000 LB , Erosion Control System (Slope Protection) (Type A) 2,652 SQYD , Project Site Laboratory 1 EACH 9, , Temporary Detour Roads 4,710.3 SQYD , Temporary Detour Bridging 120 LNFT 1, , Bedding Material CUYD , Mobilization 1 LUMP 731, , Sign (Type A) 93 SQFT , Object Marker Assembly (Type 3) 4 EACH Reflectorized Raised Pavement Markers 1,070 EACH , Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 682 LNFT , Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) MILE 2, , Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) MILE 7, , Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) (10'/30') MILE , Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) (3'/6') 0.32 MILE 3, , Plastic Pavement Legends and Symbols (Arrow - Left Turn) 19 EACH , Plastic Pavement Legends and Symbols (Arrow - Right Turn) 3 EACH Plastic Pavement Legends and Symbols (Arrow - Merge) 2 EACH Plastic Pavement Legends and Symbols (ONLY) 3 EACH Removal of Existing Markings 0.1 MILE 5, Mailboxes 15 EACH Mailbox Supports (Single) 15 EACH , Trenching and Backfilling 1,285 LNFT , Jacked or Bored Conduit (2" HPDE, Sch 80) 375 LNFT , Jacked or Bored Conduit (3" HPDE, Sch 80) 525 LNFT , Signal Support (50' Single Mast Arm) 2 EACH 12, ,827.96

8 Signal Support (60' Single Mast Arm) 2 EACH 14, , Signal Heads (3 Section, 12" Led Lens, R, Y, G) 8 EACH , Signal Heads (3 Section, 12" Led Lens, R, LT. Y, LT. G) 4 EACH , Signal Heads (5 Section, 12" Led Lens, R, LT. Y, Y, LT. G, G) 2 EACH 1, , Signal Heads (5 Section, 12" Led Lens, R, Y, RT. Y, G, RT. G) 3 EACH 1, , Signal Service (Pedestal Required) 1 EACH 1, , Sig Cntrlr (TS-2, Type 2)(Type 6E Cabinet)(Furnish & Install) 1 EACH 47, , Loop Detector 365 LNFT , Underground Junction Box (Type E) 8 EACH , Underground Junction Box (Type F) 4 EACH , Underground Junction Box (Type H) 1 EACH Conduit (1" HDPE, Schedule 80) 920 LNFT , Conduit (2" HDPE, Schedule 80) 665 LNFT , Conduit (3" HDPE, Schedule 80) 90 LNFT Conductor (2c, Loop Lead in, imsa 50-2, #19 awg, Twisted Pair) 2,905 LNFT , Conductor (2c, #6 awg) 860 LNFT , Conductor (3c, 6 gauge / #6 awg) 300 LNFT , Conductor (3c, #14 awg) 1,350 LNFT , Cable (6C Signal) 215 LNFT Cable (10C Signal) 2,335 LNFT , Construction Layout 1 LUMP 135, , Sanitary Sewer Pipe (8") 692 LNFT , Temporary Sheeting 1 LUMP 78, , Precast Concrete Piles (24") 4,793 LNFT , Treated Timber Piles (Noncoastal Treatment) 600 LNFT , Precast Concrete Test Piles (24") 1 EACH 52, , Loading Test Piles 1 EACH Reloading Test Piles 1 EACH Redriving Test Piles 1 EACH Loading Permanent Piles 1 EACH Dynamic Monitoring 1 EACH 1, , Class A Concrete (Box Culvert Headwalls) CUYD 2, , Class A Concrete (Bents) CUYD 1, , Class AA Concrete CUYD , Precast-Prestressed Concrete Girder (Type Quad Beam) 3,326.6 LNFT , Bridge Superstructure and Substructure 2 SPAN 20, , Strip Seal Joints LNFT , Reinforced Concrete Box Culverts (4' x 4') 332 LNFT , Deformed Reinforcing Steel 166,719 LB , Structural Metalwork 1 LUMP 28, , Concrete Railing (Standard Barrier) 480 LNFT , Concrete Approach Slabs SQYD , NS Saw Cutting Asphaltic Concrete Pavement 8,000 INLF ,760.00

9 0145 NS Saw Cutting Portland Cement Concrete Pavement 8,000 INLF , NS Video Detection Cabinet Components 1 EACH 8, , NS Video Detection Camera 4 EACH 2, , NS Video Detection Training 1 LUMP NS Dynamic Analysis 1 EACH 1, , NS Vibration Monitoring 50 EACH , NS-P Limestone Bedding and Backfill 50 CUYD , NS-P Sand Backfill 100 CUYD , NS-P Select Material for Backfill 200 CUYD , NS-P Unrestrained Joint Ductile Iron Sewer Force Main (12" dia) 208 LNFT , NS-P Restrained Joint Ductile Iron Sewer Force Main (12" diameter) 60 LNFT , NS-P Remove Force Main 1 LUMP 1, , NS-P Fittings 1,000 LB , NS-P Air Release/Vacuum Valve 1 EACH 7, , NS-P Force Main Tie-In (12" diameter) 2 EACH 3, , SUBTOTAL GENERAL 9,928,087 Alternate DA NS-P Unrestrained Joint Ductile Iron Sewer Force Main (14" dia) 188 LNFT , NS-P Restrained Joint Ductile Iron Sewer Force Main (14" diameter) 80 LNFT , NS-P Fittings 2,600 LB , SUBTOTAL ALT DA1 67, CONTRACTOR TOTAL 9,995,498.60

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 11/22/13 PAGE : VENDOR RANKING

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 11/22/13 PAGE : VENDOR RANKING PAGE : 998-1 VENDOR RANKING CONTRACT TIME : 390 Working Days (available days) CONTRACT DESCRIPTION : BIRMINGHAM PROJECT(S) : APD-1602(551) for constructing the Grade, Drain, Partial Base & Pave, Bridge

More information

MWA SPLOST (Projects C F) Bid Math Check. Project C F, I, & L Bid Results (for MWA).xlsx.xls Worksheet: "Projects C F Bid Math Check" 1/8

MWA SPLOST (Projects C F) Bid Math Check. Project C F, I, & L Bid Results (for MWA).xlsx.xls Worksheet: Projects C F Bid Math Check 1/8 SPLOST Drainage Projects Package 2013-1 Project C: Hillcrest Avenue (Hillcrest Boulevard -to- Dillon Branch) Project D: Main Street Project E: Riverside Drive (at Railroad) Project F: Riverside Drive (at

More information

MINNESOTA DEPARTMENT OF TRANSPORTATION ESTIMATED PRODUCTION RATES FOR COMPUTING CONTRACT TIME

MINNESOTA DEPARTMENT OF TRANSPORTATION ESTIMATED PRODUCTION RATES FOR COMPUTING CONTRACT TIME SET-UP AND MOBILIZATION MOBILIZATION LS 1-3 Days CONTRACTOR SURVEY LS 1-3 Days REMOVALS CONCRETE PAVEMENT SQ YD 1000-4000 BITUMINOUS SURFACE SQ YD 8000-12000 CLEAR AND GRUBBING ACRE/DAY 2-4 CLEAR AND GRUBBING

More information

FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES

FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES NAICS CODE Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway (includes 300, 320, 327, 330, 334, 336, 337, 338) Application of prime and tack coats, leveling surfaces and

More information

FDOT Specifications List

FDOT Specifications List FDOT Specifications List TABLE OF CONTENTS DIVISION II CONSTRUCTION DETAILS CLEARING CONSTRUCTION SITE 110 Clearing and Grubbing... 152 EARTHWORK AND RELATED OPERATIONS 120 Excavation and Embankment...

More information

FDOT DBE CERTIFICATION SPECIALTY/NAICS CODE SHEET WITH CAP SIZES

FDOT DBE CERTIFICATION SPECIALTY/NAICS CODE SHEET WITH CAP SIZES FDOT DBE CERTIFICATION SPECIALTY/ SHEET WITH CAP SIZES Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway $ 22.41 Application of prime and tack coats, leveling surfaces and

More information

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial

More information

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets Los Angeles County Department Of Public Works Land Development Division Bond Calculation Sheets Effective July 1, 2015 COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS LAND DEVELOPMENT DIVISION ROADS COST

More information

ESTIMATE OF QUANTITIES ESTIMATE OF QUANTITIES ITEM NUMBER DESCRIPTION UNIT QUANTITY ITEM NUMBER DESCRIPTION UNIT QUANTITY 201.06 CLEARING AND GRUBBING LS 1.0 402.376922 PAVEMENT DENSITY QUALITY ADJUSTMENT

More information

CITY OF WINTER GARDEN CONSTRUCTION SERVICES LABOR, EQUIPMENT, AND MATERIALS BID FORM MOBILIZATION/DEMOBILIZATION

CITY OF WINTER GARDEN CONSTRUCTION SERVICES LABOR, EQUIPMENT, AND MATERIALS BID FORM MOBILIZATION/DEMOBILIZATION 1 2 3 4 < 100K Work Order > 100K Work Order < 100K Work Order > 100K Work Order % of Work Order % of Work Order % of Work Order % of Work Order 5 1 Each/Day Type I Barricade 6 1 Each/Day Type II Barricade

More information

TYPICAL SECTION - 24'/28' STRIP PAVING TYPICAL SECTION - 24'/28' GRAVEL STREET TYPICAL SECTIONS FOR 24'/28' STRIP PAVING AND GRAVEL STREETS

TYPICAL SECTION - 24'/28' STRIP PAVING TYPICAL SECTION - 24'/28' GRAVEL STREET TYPICAL SECTIONS FOR 24'/28' STRIP PAVING AND GRAVEL STREETS TYPICAL SECTION - 24'/28' STRIP PAVING TYPICAL SECTION - 24'/28' GRAVEL STREET TYPICAL SECTIONS FOR 24'/28' STRIP PAVING AND GRAVEL STREETS PAVEMENT WIDTH (B) PAVEMENT (C) LIP C&G (D) F.L. C&G (E) BACK

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION

STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION 2009 Edition Written And Promulgated By Public Works Standards, Inc. Published By Division of BNi Publications, Inc. 990 Park Center Drive, Suite E, Vista,

More information

Counties: November 19, :00 PM. Contract Time: AD - 65 Days

Counties: November 19, :00 PM. Contract Time: AD - 65 Days 12/9/201 Place Of Letting: Vendor Ranking Page: 1 65 511165 November 19, 201 1:00 PM Topeka, KS. LOCATION IS K-58 BR.NO.(00) 3.73 MI E OF S US-75 JCT OVER NEOSHO RIVER DRAINAGE IN COUNTY. NET LENGTH IS

More information

A. Structures Quantity Item Price Cost @ $3,500 EA

A. Structures Quantity Item Price Cost @ $3,500 EA PRINCE WILLIAM COUNTY Department of Development Services Land Development Division UNIT PRICE LIST (Performance Bonds, Landscaping Escrows, and Siltation & Erosion Control Escrows) Revised: November 17,

More information

Tabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14

Tabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14 Solcitation No: DTFH71-14-B-00008 Division: Eastern Federal Lands State: DC County: Federal Land: 1 out of 9 Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date:

More information

Unit Price Averages Reports

Unit Price Averages Reports Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation

More information

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW NOTICE TO CONTRACTORS CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW The Nebraska Department of Roads will receive sealed bids in

More information

UNIT PRICE LIST January 2009

UNIT PRICE LIST January 2009 UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only

More information

BIDDER 1 BIDDER 2 DIGIOIA-SUBURBAN EXCAVATING LLC ANTHONY ALLEGA CEMENT CONTRACTOR INC ROYALTON RD 5585 CANAL RD

BIDDER 1 BIDDER 2 DIGIOIA-SUBURBAN EXCAVATING LLC ANTHONY ALLEGA CEMENT CONTRACTOR INC ROYALTON RD 5585 CANAL RD AWARDED PROJECT PROJECT NO. 070219 PID. 14940 LAK-283-9.43 E040(432) TYPE: MAJOR RECONSTRUCTION LETTING: 05/23/07 COMPLETION DATE: 09/30/08 OHIO DEPARTMENT OF TRANSPORTATION JAMES G. BEASLEY, DIRECTOR

More information

UNIT PRICE LIST ITEM UNIT UNIT PRICE STREETS & DRAINAGE CURB & GUTTER/SIDEWALKS/HANDICAP RAMPS

UNIT PRICE LIST ITEM UNIT UNIT PRICE STREETS & DRAINAGE CURB & GUTTER/SIDEWALKS/HANDICAP RAMPS STREETS & DRAINAGE CURB & GUTTER/SIDEWALKS/HANDICAP RAMPS CG-2/3 LF $12.75 CG-5 LF $15.00 CG-6 LF $18.00 CG-7 EA $3,133.50 CG-7A (STONE) SY $10.00 CG-8 EA $6,500.00 CG-9/10 EA $6,200.00 CG-11 EA $6,900.00

More information

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates

More information

WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued)

WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued) BIDDER'S PROPOSAL (continued) Item Estimated No. Description Quantity Unit Unit Cost Total Cost BASE BID 1 Traffic Control 1 LS $ $ 2 Construction Area Signs 1 LS $ $ 3 Excavation Safety 1 LS $ $ 4 Reset

More information

LETTING : CALL : 015 COUNTIES : BIG STONE SWIFT

LETTING : CALL : 015 COUNTIES : BIG STONE SWIFT S T A T E O F M I N N E S O T A PAGE : -1 NUMBER OF DAYS: 30 BRIDGE COUNT : 0 CONTRACT DESCRIPTION : GRADING, BITUMINOUS MILL & OVERLAY AND GUARDRAIL CONTRACT LOCATION: LOCATED ON TH 7 FROM 638 FT NORTHWEST

More information

SECTION 02563 SANITARY SEWER FORCE MAINS

SECTION 02563 SANITARY SEWER FORCE MAINS SECTION 02563 SANITARY SEWER FORCE MAINS 1.0 GENERAL A. Description Sanitary sewer force main installation shall include, but not necessarily be limited to, furnishing and installing pressure rated pipe,

More information

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation 644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING

More information

SECTION 4 EXCAVATION, TRENCHING AND BACKFILLING 4.01 SCOPE OF WORK

SECTION 4 EXCAVATION, TRENCHING AND BACKFILLING 4.01 SCOPE OF WORK 4.01 SCOPE OF WORK The work covered by this section shall consist of furnishing all materials, equipment and labor for the excavating, trenching, backfilling, and bore and jack required to install or repair

More information

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 CITY OF SAN ANTONIO Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 (010) FORMAL INVITATION FOR BIDS (IFB) to CONTRACT 2016-2017 TASK ORDER CONTRACT

More information

CHAPTER 9 STORM DRAINAGE

CHAPTER 9 STORM DRAINAGE CHAPTER 9 STORM DRAINAGE Section Page 9.01 General...1 9.02 Design Standards...1 9.03 Construction Stormwater Pollution Prevention...2 9.04 Department of Ecology Stormwater Permits...4 9.05 Maintenance

More information

City of Shelbyville Site Inspection Checklist

City of Shelbyville Site Inspection Checklist City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather

More information

VDOT 2001 Road and Bridge Standards Section 100 - Drainage Items

VDOT 2001 Road and Bridge Standards Section 100 - Drainage Items VDOT 2001 Road and Bridge s Page Title EW-1 EW-1A 101.01 Endwall for Pipe Culverts 12" - 36" Circular and 23" X 14" - 53" X 34" Elliptical Pipes EW-1PC EW-1APC 101.02 Precast Endwall for Pipe Culverts

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts SECTION 00300 BID FORM S For additions and deletions to the Contract, the following unit prices shall be applicable for the specific items listed. Unit Prices shall be complete, in place including required

More information

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development

More information

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or

More information

Public Works Construction Detail

Public Works Construction Detail Public Works Construction Detail Table or Contents Miscellaneous 1M-1 General Notes, Sht. 1 of 3 1M-2 General Notes, Sht. 2 of 3 1M-3 General Notes, Sht. 3 of 3 2M NRH Project Sign 3M Trench Embedment

More information

FY08 SEWER POINT REPAIRS BID TABULATION

FY08 SEWER POINT REPAIRS BID TABULATION 6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

Plan Preparation Guide. Chapter 9

Plan Preparation Guide. Chapter 9 Plan Preparation Guide Chapter 9 Drainage Structures R.C. Box Culverts Ditches - Gutters - Curbs Section Description Page 1 Plans for Hydrology 9-1 2 Catch Basin Types and Uses 9-2 3 Drop Inlet Types and

More information

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development

More information

TABLE OF CONTENTS SECTION 300 STORM SEWER

TABLE OF CONTENTS SECTION 300 STORM SEWER TABLE OF CONTENTS SECTION 300 STORM SEWER Starts on Page 300 GENERAL... 2 301 MATERIALS... 2 302 CONSTRUCTION PROCEDURES... 5 303 TESTING... 5 304 ABANDONMENT OF EXISTING STORM SEWER FACILITIES... 6 305

More information

ADDENDUM NO. 2. This Addendum shall form part of the Contract Documents.

ADDENDUM NO. 2. This Addendum shall form part of the Contract Documents. FO-153 Date: January 16, 2015 To: Bidders for Norfolk County Bid No. PW-E-15-62 Robinson Street Reconstruction Queen Street to Talbot Street From: Jeff Demeulemeester, Engineering Programs Supervisor,

More information

Stormwater/Wetland Pond Construction Inspection Checklist

Stormwater/Wetland Pond Construction Inspection Checklist : Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials

More information

volume of concrete occupied by the drain pipe in a cast-in-place structure or structure extension.

volume of concrete occupied by the drain pipe in a cast-in-place structure or structure extension. 715.01 430 volume of concrete occupied by the drain pipe in a cast-in-place structure or structure extension. No additional payment will be made for the repair or replacement of existing concrete damaged

More information

UNIT PRICE LIST (09/30/2012) DIVISION I -EARTHWORK

UNIT PRICE LIST (09/30/2012) DIVISION I -EARTHWORK LIST (09/30/2012) DIVISION I -EARTHWORK 100.1 MOBILIZATION L.S. - 11% 100.2 INSURANCE & BOND L.S. - 3% 101.1 PREPARING RIGHT OF WAY L.S. - 4% 102.1 OBLITERATING ABANDONED STREET ( < 25,000 S.Y.) S.Y. 6

More information

Section 600 Incidental Construction

Section 600 Incidental Construction Table of Contents 1. Pipe Culverts... 600-1 A. Endwalls, Inlets, Manholes, and Spring Boxes... 600-5 2. Grade Adjustment of Existing Miscellaneous Structures... 600-8 3. Rebuilt Miscellaneous Structures...

More information

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS 2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS GENERAL 10/16/2008 The listed average unit prices are based on the

More information

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20

More information

CHAPTER 4 INSTALLATION OF PIPE AND TESTING OF PIPE BACKFILL

CHAPTER 4 INSTALLATION OF PIPE AND TESTING OF PIPE BACKFILL CHAPTER 4 INSTALLATION OF PIPE AND TESTING OF PIPE BACKFILL Why talk about pipe in a Soils and Aggregate School? Pipe-soil interaction is critical to successful performance of system Treatment of soils

More information

SECTION 15200 GRAVITY SANITARY SEWERS. A. Gravity sanitary sewers and appurtenances, including stacks and service connections.

SECTION 15200 GRAVITY SANITARY SEWERS. A. Gravity sanitary sewers and appurtenances, including stacks and service connections. SECTION 15200 GRAVITY SANITARY SEWERS PART 1 GENERAL.01 SCOPE A. Gravity sanitary sewers and appurtenances, including stacks and service connections..02 SUBMITTALS A. Conform to requirements of Section

More information

CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW)

CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW) CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW) January, 2013 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS DRAINAGE STRUCTURES DRN-01 Corrugated metal pipe drop inlet DNR-02 Storm Drain

More information

SECTION EROSION AND SEDIMENTATION CONTROL

SECTION EROSION AND SEDIMENTATION CONTROL SECTION 31 25 00 EROSION AND SEDIMENTATION CONTROL PART 1 GENERAL 1.01 SECTION INCLUDES A. This WORK shall consist of temporary measures needed to control erosion and water pollution. These temporary measures

More information

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids Bids Open: 2 pm Date: Wednesday, March 4, 2015 BASE BID SCHEDULE 1 - Rudell Road Reconstruction Project NO. CODE CONTRACT PROJECT No. B3-0470 and C4-0069 COUNTY'S ESTIMATE 1 All American Asphalt Corona,

More information

Section 2100-Trenching and Tunneling

Section 2100-Trenching and Tunneling SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial

More information

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR ESTABLISHING CONSTRUCTION CONTRACT DURATION July 2010 DISCLAIMER: The following documentation as a whole was derived from Federal Highway Administration

More information

Quiz Questions and Answers for the. ODOT Highway Plan Reading Manual

Quiz Questions and Answers for the. ODOT Highway Plan Reading Manual Quiz Questions and Answers for the ODOT Highway Plan Reading Manual QUIZ 1 1. What is the complete project identification (CRS) for the project plans used in this course? WAR-48-21.05 2. The Right of

More information

DEPARTMENT OF DEVELOPMENT SERVICES Development Services Center 215 W. Hickory Street Denton, Texas voice: (940)

DEPARTMENT OF DEVELOPMENT SERVICES Development Services Center 215 W. Hickory Street Denton, Texas voice: (940) Property Information: Project Name: Parcel(s) Tax ID# (Required): Project Address (Location): Total Acres: Previous Project Number (If Applicable): Existing Zoning: # of Existing Lots: # of Existing Units:

More information

STANDARD DRAWINGS TABLE OF CONTENTS

STANDARD DRAWINGS TABLE OF CONTENTS STANDARD DRAWINGS TABLE OF CONTENTS Intelligent Transportation System Standards Typical ITS Corridor Layout Typical ITS Intersection Layout w/hub IP Viewing Device N48T Fiber Pull Box Miscellaneous Facilities

More information

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing

More information

The unit costs are based on the trend line of the 3 low bids for the average quantity.

The unit costs are based on the trend line of the 3 low bids for the average quantity. Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally

More information

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT

More information

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST For permanent structures per Delaware SCS Pond Code 378 and Delaware Sediment and Stormwater Regulations KEY PROJECT INFORMATION Item meets standard

More information

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Storm Sewer Trenchless Upgrade Alternatives and Recommendations Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for

More information

DIVISION 4300 STORM DRAINAGE

DIVISION 4300 STORM DRAINAGE DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES

More information

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix F RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 4400 South Street - Piping and Collection

More information

STANDARD SPECIFICATIONS & CONSTRUCTION DETAILS MANUAL SECTION 5 - STORM DRAINAGE. 5.01 Design

STANDARD SPECIFICATIONS & CONSTRUCTION DETAILS MANUAL SECTION 5 - STORM DRAINAGE. 5.01 Design SECTION 5 - STORM DRAINAGE 5.01 Design Storm drainage facilities shall be designed in accordance with the goals and guidelines set forth in the Unified Development Ordinance. The goal shall be to collect

More information

1-D, Field Density Item Embankment For every 1500 cu.m. or fraction thereof:

1-D, Field Density Item Embankment For every 1500 cu.m. or fraction thereof: SCHEDULE OF GOVERNING ITEMS OF WORK OF THE DPWH STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS, 1998, (VOLUME II) PART C - EARTHWORK Item 100 - Clearing & Grubbing None Item 101 - Removal of

More information

Added on at a later date

Added on at a later date Line Item # SAP PO Cost ElemeWBS Description PAC Orig Amount Variance 1 39,. 52114 EKA.8.1.5.1.323 6185 13 323 PAVEMENT LOCAL 323 39,.. 2 9,7. 52114 EKA.8.1.5.1.324 6185 13 324 STRUCTURE LOCAL 324 9,7..

More information

Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY

Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY Policy: This policy will replace all previous policies regarding the selection of pipe material for cross drains, drive pipe, drop pipe, storm

More information

City of Doral 8300 NW 53 rd St. Doral, FL (305)

City of Doral 8300 NW 53 rd St. Doral, FL (305) City of Doral 8300 NW 53 rd St. Doral, FL 33166 (305) 593-6725 National Pollution Discharge Elimination System (NPDES) Construction Site Erosion and Sedimentation Control Introduction: The City of Doral

More information

Memorandum. PROJECT: Postmark Emergency Storm Repair Alternative Analysis

Memorandum. PROJECT: Postmark Emergency Storm Repair Alternative Analysis Memorandum CRW Engineering Group, LLC 3940 Arctic Blvd. Suite 300 Anchorage, AK 99503 (907) 562-3252 FAX 561-2273 TO: Mike Lee, P.E., Chief Engineer, ADOT/ANC FROM: Shane Blanchard, P.E. THRU: Mike Rabe,

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

OOCEA PROJECT NO ; CONTRACT NO S.R. 417/BOGGY CREEK ROAD INTERCHANGE

OOCEA PROJECT NO ; CONTRACT NO S.R. 417/BOGGY CREEK ROAD INTERCHANGE BID TABULATION - BID OPENING JULY 9, 2012, 1:30 PM. OPTION 1 - BID PLANS GLF Construction Corp. The Middlesex Corp. Hubbard Construction 101-1 MOBILIZATION 1 LS $5,600,000.00 $5,600,000.00 $7,035,000.00

More information

512 UTILITIES. A. General

512 UTILITIES. A. General 512 UTILITIES A. General 1. Any Utility s use of county rights-of-way will be coordinated with the primary purpose of the rights-of-way which is to provide safe, efficient, and convenient passage for motor

More information

Herbicide Application. Irrigation System (Only) Sanitary System Testing & Inspections

Herbicide Application. Irrigation System (Only) Sanitary System Testing & Inspections NAICS Code Work Description Work Item 115310 - Support Activities for Forestry 221310 Water Supply and Irrigation Systems 221320 - Sewage Treatment Facilities 236118 Residential Remodelers 236220 Commercial

More information

Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can

Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources

More information

Section 402. STORM SEWERS

Section 402. STORM SEWERS 402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide

More information

Date. Resubmit this form during the year if there are changes in your company ownership or financial standing.

Date. Resubmit this form during the year if there are changes in your company ownership or financial standing. COLORADO DEPARTMENT OF TRANSPORTATION CONTRACTOR PREQUALIFICATION STATEMENT (EXPERIENCE, EQUIPMENT AND FINANCIAL) Return to: Contracts & Market Analysis Prequalification Unit 4201 E. Arkansas,4th Floor

More information

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 400 SEWER AND WATER CONSTRUCTION

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 400 SEWER AND WATER CONSTRUCTION STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 400 SEWER AND WATER CONSTRUCTION Section Number Title 401 GENERAL 402 AMENDMENTS TO WSWS PART I - GENERAL CONDITIONS

More information

PLAN VIEW FOR LAKE OR MARSH FRONT VIEW FOR FLOTATION SILT CURTAIN

PLAN VIEW FOR LAKE OR MARSH FRONT VIEW FOR FLOTATION SILT CURTAIN OF WATERWAY PERIMETER CONTROL LESS THAN / THE STREAM/RIVER STEEL FENCE POST ANCHOR TO LAND (TYP.) / DEPTH OF WATER PLOTTED/REVISED:-OCT-0 WIDTH STREAM BANK TEMPORARY ROCK BERM BRIDGE ABUTMENT, CULVERT

More information

1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP

1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP 5 INDEX TO SHEETS. NOTES AND TYPICAL SECTIONS. H. R. SMITH RD.CULVERT.3 0/5 END BARRIER ACCESS ROAD REPAIR. KISSIMMEE RD. AT MORGAN HOLE CR. ROAD REPAIR.5 RANGE INFRASTRUCTURE REPAIR N 0 000' 3 0,000'

More information

No allowance will be made for classification of different types of material encountered.

No allowance will be made for classification of different types of material encountered. PROJECT : Repair/ Maintenance of Flood Control and Drainage Structures Along Butuan City Cagayan de Oro City Iligan City Road LOCATION : San Antonio, Jasaan, Misamis Oriental SUBJECT : General Notes and

More information

Portway Extensions Concept Development Study APPENDIX F PRELIMINARY CONSTRUCTION COST ESTIMATES

Portway Extensions Concept Development Study APPENDIX F PRELIMINARY CONSTRUCTION COST ESTIMATES Portway Extensions Concept Development Study Final Report APPENDIX F PRELIMINARY CONSTRUCTION COST ESTIMATES Portway Extensions Concept Development Study Final Report In advance of an economic impact analysis

More information

UNIFORM STANDARD DRAWINGS VOL I (Summary of Revisions) Effective 7/1/11

UNIFORM STANDARD DRAWINGS VOL I (Summary of Revisions) Effective 7/1/11 New Drawing Number 101-104 101 Symbols 105-106 105 Abbreviations UNIFORM STANDARD DRAWINGS VOL I SECTION 200 STREET IMPROVEMENTS 200 Pavement Structure Design Guideline Chart for Major Collector and Arterial

More information

SECTION 13 REPLACEMENT AND CLEANUP 13.01 SCOPE OF WORK

SECTION 13 REPLACEMENT AND CLEANUP 13.01 SCOPE OF WORK 13.01 SCOPE OF WORK Under this item, the Contractor will restore all lawns, trees, gardens, landscape plantings, sidewalks, ramps, trails, fences, commercial signs, water courses and sand, gravel, dirt,

More information

ADDENDUM NO. 2. Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT

ADDENDUM NO. 2. Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT ADDENDUM NO. 2 Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT Bridge No. 1460008 (existing) Bridge No. 06806 (new) TO ALL BIDDERS: Anchor Engineering

More information

SECTION EROSION AND SEDIMENTATION CONTROL

SECTION EROSION AND SEDIMENTATION CONTROL SECTION 312500 EROSION AND SEDIMENTATION CONTROL Scope : During construction, temporary and permanent protective structures and measures as detailed in the following paragraphs shall be implemented and

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

Legacy Trail Extension Feasibility Study. Preliminary Cost Estimate

Legacy Trail Extension Feasibility Study. Preliminary Cost Estimate Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5

More information

GUIDELINES FOR UTILITY INSTALLATIONS Part 2 Pipelines: Flammable and Non-Flammable Materials (Including Casings Containing Wires and Cables)

GUIDELINES FOR UTILITY INSTALLATIONS Part 2 Pipelines: Flammable and Non-Flammable Materials (Including Casings Containing Wires and Cables) Engineering Department SEPTEMBER, 2007 GUIDELINES FOR UTILITY INSTALLATIONS Part 2 Pipelines: Flammable and Non-Flammable Materials (Including Casings Containing Wires and Cables) General Requirements

More information

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant

More information

Single Family Residential Erosion and Sediment Control Standards

Single Family Residential Erosion and Sediment Control Standards July 2011 Planning and Development Services Single Family Residential Erosion and Sediment Control Standards This booklet contains standard plans and procedures appropriate for typical residential building

More information

S E C T I O N 9 0 5 -- P R O P O S A L (CONTINUED)

S E C T I O N 9 0 5 -- P R O P O S A L (CONTINUED) S E C T I O N 9 0 5 -- P R O P O S A L (CONTINUED) I (We) hereby certify by digital signature and electronic submission via Bid Express of the Section 905 proposal below, that all certifications, disclosures

More information

DALLAS WATER UTILITIES BID ITEM AND COST ESTIMATING MANUAL

DALLAS WATER UTILITIES BID ITEM AND COST ESTIMATING MANUAL DALLAS WATER UTILITIES BID ITEM AND COST ESTIMATING MANUAL Version History 6 th Edition May, 2003 7 th Edition April 5th, 2010 8 th Edition October 1 st, 2010 October 2011 Edition October 2011 Edition

More information

STANDARD PLANS FOR AIRFIELD IMPROVEMENTS

STANDARD PLANS FOR AIRFIELD IMPROVEMENTS STANDARD PLANS FOR AIRFIELD IMPROVEMENTS At The LOS ANGELES INTERNATIONAL AIRPORT In the City of Los Angeles, California 00.00 PLAN SET NUMBER TITLE 00.01 GENERAL NOTES - FENCE DETAIL A PUBLIC SIDE SECURE

More information

Temporary Erosion Control and Job Site Management for Memorandum of Understanding Partners

Temporary Erosion Control and Job Site Management for Memorandum of Understanding Partners Temporary Erosion Control and Job Site Management for Memorandum of Understanding Partners Introduction Standard Condition Silt Fence, Wattles, and Inlet Protection Tree & Vegetation Protection Dewatering

More information

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees. The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:

More information

CHAPTER 8. Roadway Standards

CHAPTER 8. Roadway Standards CHAPTER 8 Roadway Standards A. Introduction This chapter outlines the standards for all pavements and other roadway improvements, such as curb and gutter improvements, sidewalks, and driveway approaches

More information

SECTION 500 STORM DRAINAGE

SECTION 500 STORM DRAINAGE SECTION 500 STORM DRAINAGE 501 Design 502 Pipe Materials A. General B. Reinforced Concrete Pipe (RCP) 503 Materials - Storm Drainage Structures A. General B. Concrete Brick Masonry Units C. Precast Concrete

More information