2 1997 Offshore Action Plan Five offshore areas were pointed out Feasibility studies were made A demonstration project should be erected on each site A vision of 4,000 MW of offshore wind power in

3 Key Figures for Offshore Wind Farms (1997) Installed capacity Full-load hours (net) Investment per MW Capital costs per kwh O&M costs per kwh Læsø MW 3380 hours/year DKK 11.7 million DKK 0.28 DKK 0.08 Horns Rev MW 3530 hours/year DKK 11.7 million DKK 0.27 DKK 0.08 Total costs per kwh DKK 0.36 DKK

4 1998 Decrees The Danish Minister of Energy announced decrees Elsam/Eltra must build a farm at Horns Rev Elkraft must build a farm at Nysted 4

5 1998 Dividing the Decree Elsam as a production company - builds the offshore wind farm and the internal offshore network Eltra as a transmission company - builds the offshore platform and the transmission grid The borderline is the secondary side of the platform transformer 5

6 1998 Dividing the Decree Eltra s motive for owning offshore networks: - cables above 100 kv were needed - to integrate the offshore grid into the overall system - to secure equal access to offshore platforms 6

7 7

8 Evaluation Offshore wind farms may replace onshore wind turbines in the future High utilisation time (>50% higher than onshore) Connection to the transmission grid (150 kv or 400 kv) As a result, Eltra and Elkraft initiated work on specifications for connecting wind farms to the transmission grid 8

9 Specifications - Philosophy to ensure the properties essential for the power system operation as regards security of supply, reliability and power quality in the short as well in the long run to ensure certain abilities in the wind farm for use at operation of the power system to transform the wind turbine into a wind power station 9

10 1999 Specification Rules Were Introduced Power and power control Frequencies Reative power compensation Voltage quality Stability requirements Protection Communication to/from the wind farm Verification and tests 10

11 How to Connect Horns Rev? 11

12 How to Connect Horns Rev? 12

13 How to Connect Horns Rev? 13

14 How to Connect Horns Rev? 14

15 How to Connect Horns Rev? 15

16 How to Connect Horns Rev? 16

17 How to Connect Horns Rev? 17

18 How to Connect Horns Rev? Gasrør Karlsgårde Endrup Lykkegård havmølleparker á ca. 150 MW område for udbygning af havmøller område hvor det ikke er muligt at lægge kabel Militærtskydeterræn km Råstofindvindningslokaliteter 18

19 How to Connect Horns Rev? 19

20 Conclusions Specifications for connecting wind farms to the transmission grid were made Integration of further offshore wind farms into the grid was considered The wind farm was commissioned on July 1, 2002 Now it is time for following up! 20

Future Offshore Wind Power Sites -2025

Future Offshore Wind Power Sites -2025 Danish Energy Authorithy Amaliegade 44 DK-1256 Copenhagen K Tel 33 92 67 00 Fax 33 11 47 43 CVR-nr: 59 77 87 14 ens@ens.dk www.ens.dk Rubrik Verdana Bold 18 punkt Underrubrik Verdana 18 punkt Brødtekst

More information

Grid connection of near shore wind farms

Grid connection of near shore wind farms Grid connection of near shore wind farms methods, preconditions and results Rene Starup 5. Marts 2015 1 Topics Methods Preconditions Technical and socio-economic analysis 5. Marts 2015 2 60, 150 and 400

More information

Grid requirements with scattered load balancing and an open electricity market Poul Alberg Østergaard * Aalborg University

Grid requirements with scattered load balancing and an open electricity market Poul Alberg Østergaard * Aalborg University Grid requirements with scattered load balancing and an open electricity market Poul Alberg Østergaard * Aalborg University Abstract Denmark is in a situation with many scattered sources of electricity,

More information

Power fluctuations from large offshore wind farms

Power fluctuations from large offshore wind farms Power fluctuations from large offshore wind farms Poul Sørensen Wind Energy Systems (VES) Wind Energy Division Project was funded by Energinet.dk PSO 2004-6506 Geographical spreading 2 Wind turbine sites

More information

System Protection Schemes in Eastern Denmark

System Protection Schemes in Eastern Denmark System Protection Schemes in Eastern Denmark Joana Rasmussen COWI A/S, Energy Department System Protection Schemes in Eastern Denmark 1.Advanced system protection schemes are investigated and perspectives

More information

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment March 20, 2009 Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment Table of Contents:

More information

Why wind power works for Denmark

Why wind power works for Denmark Proceedings of ICE Civil Engineering 158 May 25 Pages 66 72 Paper 13663 Keywords electrical engineering & distribution; power stations (non-fossil fuel); weather Why wind power works for Denmark Hugh Sharman

More information

Energinet.dk and the Danish Energy System

Energinet.dk and the Danish Energy System Energinet.dk and the Danish Energy System South African delegation Fredericia, 22 October 2015 Peter Jørgensen, Vice President 22 October 2015 Energinet.dk and the Danish Energy System 1 Agenda Introduction

More information

QUALITY CONTROL Prepared: V. van Gastel / team TenneT Reviewed: M. Müller 23.06.2015 Approved: F. Wester 23.06.2015 1. BACKGROUND MATERIAL...

QUALITY CONTROL Prepared: V. van Gastel / team TenneT Reviewed: M. Müller 23.06.2015 Approved: F. Wester 23.06.2015 1. BACKGROUND MATERIAL... POSITION PAPER STAKE HOLDER CONSULTATION PROCESS OFFSHORE GRID NL Type: Position paper Work stream Technical Topic: T.2 Number of J-Tubes Filename ONL 15-060-T2_ J tubes_ bays_pp_v2 Version 3 - Public

More information

Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems

Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems DTI Centre for Distributed Generation and Sustainable Electrical Energy Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems Predrag Djapic and Goran Strbac Annex 25: Grid Integration

More information

Siemens presents new DC grid connection for offshore wind farms Siemens AG 2015 All rights reserved. siemens.com/grid-access-solutions

Siemens presents new DC grid connection for offshore wind farms Siemens AG 2015 All rights reserved. siemens.com/grid-access-solutions Higher cost efficiency in Wind Power Transmission Siemens presents new DC grid connection for offshore wind farms siemens.com/grid-access-solutions is leading in offshore grid access To date Siemens has

More information

ACCELERATING GREEN ENERGY TOWARDS 2020. The Danish Energy Agreement of March 2012

ACCELERATING GREEN ENERGY TOWARDS 2020. The Danish Energy Agreement of March 2012 ACCELERATING GREEN ENERGY TOWARDS The Danish Energy Agreement of March 2012 The most ambitious energy plan of the world In March 2012 a historic new Energy Agreement was reached in Denmark. The Agreement

More information

Product brochure Multi Functional Switchgear PASS M00 72.5 kv Flexible and compact switchgear solutions for windfarms

Product brochure Multi Functional Switchgear PASS M00 72.5 kv Flexible and compact switchgear solutions for windfarms Product brochure Multi Functional Switchgear PASS M00 72.5 kv Flexible and compact switchgear solutions for windfarms The future of Wind Farms As offshore wind farms move towards deploying higher capacity

More information

Viking Link Interconnector

Viking Link Interconnector Viking Link Interconnector Public information event for Bicker Parish Why we re here today We re here today to introduce the Viking Link project, to explain what we want to build and to answer any questions

More information

Network Interconnection of Offshore Wind

Network Interconnection of Offshore Wind Network Interconnection of Offshore Wind Prepared for REOLTEC Carlos Aguirre Madrid, December 3rd Experience you can trust. Introducing KEMA A trusted independent partner providing advise throughout the

More information

Cable action plan. 132-150 kv grids March 2009

Cable action plan. 132-150 kv grids March 2009 Cable action plan 132-150 kv grids March 2009 Table of contents 1. Summary of the cable action plan 3 2. Introduction 7 3. Planning scenarios 8 4. Existing overhead lines 8 4.1 Economically optimal dismantling

More information

Optimization of the coupled grid connection of offshore wind farms

Optimization of the coupled grid connection of offshore wind farms Optimization of the coupled grid connection of offshore wind farms Dirk Schoenmakers Graduation project at Evelop Netherlands BV Technical University of Eindhoven September 2008 Supervisors: TU Eindhoven

More information

How To Run A Power Station In Danesborg

How To Run A Power Station In Danesborg Presentation of Energinet.dk April 2008 1 Presentation of Energinet.dk Agenda 10:00 12:00 Welcome and presentation of Energinet.dk /Peter Jørgensen Wind integration - challenges /Antje Orths R&D in environment-friendly

More information

egrid Calculation of electrical grid connections for WTGs

egrid Calculation of electrical grid connections for WTGs Function egrid performs a full steady state calculation of radial electrical grid systems. For design, optimisation and documentation of the grid connection of both a single wind turbine generator (WTG)

More information

Final Report Volume 0

Final Report Volume 0 Contract No. JOR3-CT95-0089 Page 1 of 16 COST OPTIMIZING OF LARGE-SCALE OFFSHORE WIND FARMS Final Report Volume 0 SK Power Company i/s by ELKRAFT A.m.b.A./SEAS A.m.b.A. Contract No. JOR3-CT95-0089 PUBLISHABLE

More information

Who are we? *Based on an average annual domestic household electricity consumption of 4,700KWh (DECC).

Who are we? *Based on an average annual domestic household electricity consumption of 4,700KWh (DECC). Who are we? We re one of the world s leading power and gas companies. Here in the UK, we supply energy to more than 5 million customers, generate enough electricity for around 8 million homes and employ

More information

HEAT PUMPS AS A LINK BETWEEN INDUSTRY AND DISTRICT HEATING

HEAT PUMPS AS A LINK BETWEEN INDUSTRY AND DISTRICT HEATING HEAT PUMPS AS A LINK BETWEEN INDUSTRY AND DISTRICT HEATING Jesper Koch Head of Development and Analysis Green Energy Association / Danish District Heat Association jko@danskfjernvarme.dk GREEN ENERGY IS

More information

Context: significant penetration of DG = increased risks for system security

Context: significant penetration of DG = increased risks for system security Distributed Generation: towards an effective contribution to power system security IEEE Tampa GM 2007: Panel on Impact of Dispersed Generation on Power System structure & security Bruno Meyer Outline Context:

More information

Renewable Energy Grid Integration

Renewable Energy Grid Integration Renewable Energy Grid Integration Jian Sun Professor and Director Grid Integration Issues Cost, Reliability & Efficiency of Grid Interface Grid Congestion, Weak Grids Variability of Renewable Production

More information

Requirements for Offshore Grid Connections. in the. Grid of TenneT TSO GmbH

Requirements for Offshore Grid Connections. in the. Grid of TenneT TSO GmbH Requirements for Offshore Grid Connections in the Grid of TenneT TSO GmbH Bernecker Straße 70, 95448 Bayreuth Updated: 21 December 2012 1/10 Requirements for Offshore Grid Connections in the Grid of TenneT

More information

Polish Offshore Grid SA

Polish Offshore Grid SA OFFSHORE GRID DEVELOPMENT 1 Offshore wind farm development in selected European countries Country Installed capacity by the end of 2010 [MW] Approved projects [MW] 2020 targets [MW] UK 1.341 2.591 13.000

More information

HVDC Technology for Large Scale Offshore Wind Connections

HVDC Technology for Large Scale Offshore Wind Connections HVDC Technology for Large Scale Offshore Wind Connections Nandan Mahimkar, Gunnar Persson,Claes Westerlind, ABB AB, SE-771 80, Ludvika, Sweden, nandan.mahimkar@in.abb.com, gunnar.persson@se.abb.com,claes.westerlind@se.abb.com,

More information

Adapting and calibration of existing wake models to meet the conditions inside offshore wind farms.

Adapting and calibration of existing wake models to meet the conditions inside offshore wind farms. Adapting and calibration of existing wake models to meet the conditions inside offshore wind farms. Page 1 Adapting and calibration of existing wake models to meet the conditions inside offshore wind farms.

More information

Offshore Wind: some of the Engineering Challenges Ahead

Offshore Wind: some of the Engineering Challenges Ahead Offshore Wind: some of the Engineering Challenges Ahead David Infield CDT in Wind Energy Systems Institute of Energy and Environment University of Strathclyde International context (from IPCC report) Greenhouse

More information

Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems

Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems Centre for Sustainable Electricity and Distributed Generation Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems Predrag Djapic and Goran Strbac July 2008 FUNDED BY BERR URN 08/1144

More information

Figure 1: The existing 12 300 kw turbines with the Avedøre power plant, source [3].

Figure 1: The existing 12 300 kw turbines with the Avedøre power plant, source [3]. HVIDOVRE OFFSHORE WIND FARM Hans Christian Sørensen SPOK ApS / Hvidovre Vindmøllelaug I/S, Blegdamsvej 4, DK 2200, Copenhagen N, Denmark, E-mail: consult@spok.dk, Phone: +45 35360219/+45 28110219, Fax:

More information

The Status of the Wind Power Market in Egypt. Dr. Walid El-Khattam Ain Shams University (Cairo, Egypt) The Egyptian Electricity Regulator (EgyptERA)

The Status of the Wind Power Market in Egypt. Dr. Walid El-Khattam Ain Shams University (Cairo, Egypt) The Egyptian Electricity Regulator (EgyptERA) The Status of the Wind Power Market in Egypt Dr. Walid El-Khattam Ain Shams University (Cairo, Egypt) The Egyptian Electricity Regulator (EgyptERA) Berlin, June 11 th, 2013 1 Contents Key Challenges for

More information

POWER TRANSMISSION FROM OFFSHORE WIND FARMS

POWER TRANSMISSION FROM OFFSHORE WIND FARMS POWER TRNSMISSION FROM OFFSHORE WIND FRMS Thorsten Völker University of pplied Sciences Bremerhaven Germany BSTRCT The future for wind power generation in Germany is offshore wind energy. The preferred

More information

Følgegruppe for Styring & Regulering. Den danske SmartGrids gruppe. Jeanette Møller Jørgensen Forskningskoordinator, Energinet.dk JMJ@energinet.

Følgegruppe for Styring & Regulering. Den danske SmartGrids gruppe. Jeanette Møller Jørgensen Forskningskoordinator, Energinet.dk JMJ@energinet. Følgegruppe for Styring & Regulering Den danske SmartGrids gruppe Jeanette Møller Jørgensen Forskningskoordinator, Energinet.dk JMJ@energinet.dk The Danish Agenda The long term vision is a non-carbon society

More information

Skyrocketing Electricity Cost in Denmark

Skyrocketing Electricity Cost in Denmark 1 Skyrocketing Electricity Cost in Denmark There is a lot of evidence that electricity for households is more expensive in Denmark than anywhere else in the EU. However, most of the household price is

More information

Grid Connected Energy Storage for Residential, Commercial & Industrial Use - An Australian Perspective

Grid Connected Energy Storage for Residential, Commercial & Industrial Use - An Australian Perspective IEA Storage Workshop February 2013 Grid Connected Energy Storage for Residential, Commercial & Industrial Use - An Australian Perspective Tony Vassallo Faculty of Engineering & Information Technologies

More information

Medium-voltage cables for reliable windpark infrastructure

Medium-voltage cables for reliable windpark infrastructure Medium-voltage cables for reliable windpark infrastructure exans, worldwide leader in cables and cabling systems As a global expert in cables and cabling systems, Nexans brings an extensive range of advanced

More information

Preliminary Information Memorandum. Thanet Offshore Transmission Assets. July 2009

Preliminary Information Memorandum. Thanet Offshore Transmission Assets. July 2009 Preliminary Information Memorandum Thanet Offshore Transmission Assets July 2009 SUMMARY In April 2009 Ofgem distributed a teaser document, UK Offshore Transmission Investment Opportunity, to investors

More information

Green or black windpower? Salzburg 30 August 2011

Green or black windpower? Salzburg 30 August 2011 Green or black windpower? Salzburg 30 August 2011 Frede Hvelplund Aalborg Universitet Department of Development and Planning Ownership and marketconstruction I. Ownership construction ( Ownership for efficient

More information

Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid

Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid Pakistan Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid Final Report: Executive Summary - November 2015 for USAID Energy Policy

More information

Translating ecological research results into wind farm practice The Danish experience. Niels-Erik Clausen. 2 Risø DTU

Translating ecological research results into wind farm practice The Danish experience. Niels-Erik Clausen. 2 Risø DTU Translating ecological research results into wind farm practice The Danish experience Niels-Erik Clausen We@Sea Conference, Den Helder Holland 12-13 February 2009 Outline The Danish offshore monitoring

More information

Life Cycle Assessment of offshore and onshore sited wind farms.

Life Cycle Assessment of offshore and onshore sited wind farms. Note 20 October 2004 Elsam Engineering A/S Our ref. HHA/AAH/AWK Project no. T012063 Page 1 of 54 Verified: AWK Approved: HHA Life Cycle Assessment of offshore and onshore sited wind farms. This report

More information

Dutch wind energy strength

Dutch wind energy strength Dutch wind energy strength Chris Westra (senior consultant ECN) (general manager We@Sea) www.we-at-sea.org www.ecn.nl www.haveneilandopzee.nl 2010 The start in 1972 here we are now: 2010 Drivers for offshore

More information

Case Study 5 Use of Wind Turbine Technology

Case Study 5 Use of Wind Turbine Technology Case Study 5 Use of Wind Turbine Technology 1. Context Hong Kong relies on an adequate and reliable electricity supply for its economic development. Our electricity needs are met by the two electricity

More information

Smart Grid and Renewable Energy Grid Integration. Jian Sun, Professor and Director Department of ECSE & Center for Future Energy Systems

Smart Grid and Renewable Energy Grid Integration. Jian Sun, Professor and Director Department of ECSE & Center for Future Energy Systems Smart Grid and Renewable Energy Grid Integration Jian Sun, Professor and Director Department of ECSE & Center for Future Energy Systems 1 How Smart Can We Make This Grid? 2 Smart Grid Drivers Need to Use

More information

COWI offshore wind marine engineering services

COWI offshore wind marine engineering services COWI offshore wind marine engineering services 2 COWI expertise COWI is a highly versatile and multidisciplinary company. We provide services within engineering, environment and economics and operate worldwide

More information

The Electricity Supply Bill 1

The Electricity Supply Bill 1 Bill no. 234 Folketinget (Danish Parliament) 1998-99 Unauthorised translation 30 June 1999 Submitted on 29 April 1999 by the Minister for Environment and Energy (Svend Auken) Adopted by Folketinget on

More information

Wind Turbine Operation in Power Systems and Grid Connection Requirements

Wind Turbine Operation in Power Systems and Grid Connection Requirements Wind Turbine Operation in Power Systems and Grid Connection Requirements A. Sudrià 1, M. Chindris 2, A. Sumper 1, G. Gross 1 and F. Ferrer 1 1 Centre for Technological Innovation in Static Converters and

More information

Offshore Wind China 2010 Bergen, 15th March 2010. Olivier Angoulevant Nexans Norway AS

Offshore Wind China 2010 Bergen, 15th March 2010. Olivier Angoulevant Nexans Norway AS Offshore Wind China 2010 Bergen, 15th March 2010 Olivier Angoulevant Nexans Norway AS At the core of performance At the core of performance : a worldwide leader Worldwide leader in cables, cabling systems

More information

2012 San Francisco Colloquium

2012 San Francisco Colloquium 2012 San Francisco Colloquium http : //www.cigre.org Advances in voltage source converter (VSC) technologies B4-6 500 kv VSC Transmission System for lines and cables B. JACOBSON, B. WESTMAN, M. P. BAHRMAN*

More information

Offshore Wind Energy Status and Future Prospects

Offshore Wind Energy Status and Future Prospects SDU Symposium August 18 2009 Offshore Wind Energy Status and Future Prospects Morten Holmager Offshore Center Danmark The copyright of this entire presentation vests by Offshore Center Danmark. All rights

More information

2012 San Francisco Colloquium

2012 San Francisco Colloquium 2012 San Francisco Colloquium http : //www.cigre.org HVDC and Power Electronic Systems for Overhead Line and Insulated Cable Applications B4-8 Trans Bay Cable A Breakthrough of VSC Multilevel Converters

More information

Modern Power Systems for Smart Energy Society

Modern Power Systems for Smart Energy Society Modern Power Systems for Smart Energy Society Zhe CHEN Professor, PhD Email: zch@et.aau.dk Website: http://homes.et.aau.dk/zch http://www.et.aau.dk 1 Contents Energy background in Denmark Challenges to

More information

Hybrid and electric Vehicles: Activities in Denmark

Hybrid and electric Vehicles: Activities in Denmark Hybrid and electric Vehicles: Activities in Denmark IA-HEV Task 1 meeting November 4, 2015 Michael Rask, Danish Energy Agency Highlights The Danish case New government, new priorities Grant schemes end

More information

FACT SHEET. BSES, Delhi - Distribution Network. Power Systems Consultancy from ABB

FACT SHEET. BSES, Delhi - Distribution Network. Power Systems Consultancy from ABB BSES, Delhi - Distribution Network improve power quality System design for optimal techno-economic distribution network based on current and future load forecast Analysis of existing sub-transmission and

More information

What Matters for Successful Integration of Distributed Generation

What Matters for Successful Integration of Distributed Generation What Matters for Successful Integration of Distributed Generation Thomas Ackermann Energynautics GmbH, Germany t.ackermann@energynautics.com Expert User of DIgSILENT PowerFactory for Power Systems Studies

More information

EUROPASS DIPLOMA SUPPLEMENT

EUROPASS DIPLOMA SUPPLEMENT EUROPASS DIPLOMA SUPPLEMENT TITLE OF THE DIPLOMA Técnico Superior en Energías Renovables TRANSLATED TITLE OF THE DIPLOMA (EN) (1) Higher Technician in Renewable Energy Sources --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

More information

Magnus Callavik, ABB Power Systems, HVDC, 721 64 Västerås, Sweden Phone: +46(0)21323226. e-mail: magnus.callavik@se.abb.com

Magnus Callavik, ABB Power Systems, HVDC, 721 64 Västerås, Sweden Phone: +46(0)21323226. e-mail: magnus.callavik@se.abb.com HVDC GRIDS FOR OFFSHORE AND ONSHORE TRANSMISSION Magnus Callavik, ABB Power Systems, HVDC, 721 64 Västerås, Sweden Phone: +46(0)21323226. e-mail: magnus.callavik@se.abb.com SUMMARY The objective with this

More information

Offshore Wind in Germany

Offshore Wind in Germany Offshore Wind in Germany Lessons to be learned voor NL ir. Han van Asten, Programma manager TenneT Den Haag, KIVI NIRIA, 'Wind op Zee = Winst voor Nederland', 20 sep 2012 KIVI NIRIA Wind op Zee = Winst

More information

Resource Planning Opportunities

Resource Planning Opportunities Resource Planning Opportunities A Manitoba Hydro Perspective for the Planning Advisory Committee April 27, 2011 Dan Prowse Manitoba Hydro April 27, 2011 Coordinating Sector 1 It s Time to Model Flexible

More information

Dansk Offshore Netværk, Lindø Industripark, 21. April 2015 The Road to Below 10 ct /kwh

Dansk Offshore Netværk, Lindø Industripark, 21. April 2015 The Road to Below 10 ct /kwh Dansk Offshore Netværk, Lindø Industripark, 21. April 2015 The Road to Below 10 ct /kwh, Head of Cost of Energy Siemens AG, Wind Power and Renewables Answers for energy. Introduction Siemens Wind Power

More information

WIND ENERGY - THE FACTS PART III THE ECONOMICS OF WIND POWER

WIND ENERGY - THE FACTS PART III THE ECONOMICS OF WIND POWER WIND ENERGY - THE FACTS PART III THE ECONOMICS OF WIND POWER Acknowledgements Part III was compiled by Poul Erik Morthorst of Risǿ DTU National Laboratory, Technical University of Denmark; Hans Auer of

More information

Brochure Introducing HVDC

Brochure Introducing HVDC Brochure Introducing HVDC ABB and HVDC The world s first commercial high-voltage direct current (HVDC) link, situated between the Swedish mainland and the island Gotland, was delivered by ABB already in

More information

6 Oktober 2010... KIVI Niria congres Offshore Wind De uitdaging. Eneco wind. Ernst van Zuijlen

6 Oktober 2010... KIVI Niria congres Offshore Wind De uitdaging. Eneco wind. Ernst van Zuijlen 6 Oktober 2010... KIVI Niria congres Offshore Wind De uitdaging Eneco wind Ernst van Zuijlen Eneco Targets... Maximise the use of renewable energy 2012: 25% of electricity produced sustainable (50% wind)

More information

Power Generation. Lilian Macleod Power Supply Manager National Grid

Power Generation. Lilian Macleod Power Supply Manager National Grid Power Generation Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. This text box and image can

More information

EVN SMART GRID PLAN. Technical and Operational Dept., Vietnam Electricity Nguyễn Hải Hà Hanh@evn.com.vn

EVN SMART GRID PLAN. Technical and Operational Dept., Vietnam Electricity Nguyễn Hải Hà Hanh@evn.com.vn EVN SMART GRID PLAN Technical and Operational Dept., Vietnam Electricity Nguyễn Hải Hà Hanh@evn.com.vn Frankfurt, 14 th November 2013 1 Content 1. Introduction of Vietnam Electricity (EVN) 2. EVN Smart

More information

Midroc SWPTC. Big Glenn and Göteborg Wind Lab Ola Carlson. Stockholm 20130820

Midroc SWPTC. Big Glenn and Göteborg Wind Lab Ola Carlson. Stockholm 20130820 Midroc SWPTC Big Glenn and Göteborg Wind Lab Ola Carlson Stockholm 20130820 Torque measurements with constant and variabel speed Measurements from Chalmers test wind turbine 1986 Constant speed Variabel

More information

Electricity market drivers

Electricity market drivers Daniel Assandri Head of Power Systems ABB (China) Ltd Electricity market drivers March 2008 Global T&D Market Drivers ABB Power Systems division - slide # 2 ABB s view on and market drivers The Americas

More information

RENEWABLES INTEGRATION IN TURKISH POWER SYSTEM

RENEWABLES INTEGRATION IN TURKISH POWER SYSTEM RENEWABLES INTEGRATION IN TURKISH POWER SYSTEM Kazim SENOCAK Electrical Engineer Research, Planning & Coordination Department TURKISH ELECTRICITY TRANSMISSION CORPORATION () www.teias.gov.tr MAIN RESPONSIBILITIES

More information

Voltage Source HVDC Overview Mike Barnes Tony Beddard

Voltage Source HVDC Overview Mike Barnes Tony Beddard Voltage Source HVDC Overview Mike Barnes Tony Beddard Note: This is a version with images removed which have copyrighted other than from the University of Manchester, for web publication. Should a conference

More information

www.orient-cables.com

www.orient-cables.com AC subsea power cables(ac SPC) 35 kv and below Submarine Optical Composite Power Cable 110kV Submarine Power Cable Composite with FO 220kV Submarine Power Cable Composite with FO 500kV Submarine Power

More information

Wind Farm Zone. Offshore wind energy. in the Netherlands. Project & Site Description. # Borssele

Wind Farm Zone. Offshore wind energy. in the Netherlands. Project & Site Description. # Borssele # Borssele Offshore wind energy Wind Farm Zone in the Netherlands Project & Site Description The roadmap from 1,000 to 4,500 MW offshore wind capacity >> Sustainable. Agricultural. Innovative. International.

More information

Who is National Grid?

Who is National Grid? Who is National Grid? National Grid is a leading international energy infrastructure business In the UK, our business includes electricity and gas transmission networks and gas distribution networks. We

More information

Getting smart(er) in Offshore Wind O&M

Getting smart(er) in Offshore Wind O&M Getting smart(er) in Offshore Wind O&M 26-9-2014 Prof.dr. Gerard J.W. van Bussel Leerstoel Windenergie Faculteit Luchtvaart- en Ruimtevaarttechniek Delft University of Technology Challenge the future Inhoud

More information

Offshore Forum. How can we optimise off/onshore cost and operation? 28 May 2014

Offshore Forum. How can we optimise off/onshore cost and operation? 28 May 2014 Offshore Forum How can we optimise off/onshore cost and operation? 28 May 2014 Doc. No. 14/06209-11 28 May 2014 Offshore Forum 1 Introduction Søren Juel Hansen sjh@energinet.dk Tel: (+45) 23 33 87 44 28

More information

Offshore Wind Development

Offshore Wind Development 1 Danish Experiences from Offshore Wind Danish Experiences from Offshore Wind Development Danish Experiences from Offshore Wind 2 TABLE OF CONTENTS 1. INTRODUCTION 3 1.2 KEY LEARNINGS 4 2. HISTORY AND

More information

Tidal Energy. Wind Energy. Transmission & Distribution Network. Offshore Substation. Onshore Substation. Tidal Stream Energy.

Tidal Energy. Wind Energy. Transmission & Distribution Network. Offshore Substation. Onshore Substation. Tidal Stream Energy. Offshore Renewables Tidal Energy Transmission & Distribution Network Offshore Substation Wind Energy Onshore Substation Tidal Stream Energy Consumer Atkins in Offshore Renewables The offshore wind journey

More information

General Validation Test Program for Wind Power Plants Connected to the Hydro-Québec Transmission System

General Validation Test Program for Wind Power Plants Connected to the Hydro-Québec Transmission System General Validation Test Program for Wind Power Plants Connected to the Hydro-Québec Transmission System Direction Planification des actifs et expertise de transport February 2011 TABLE OF CONTENTS 1. CONDUCTING

More information

OFFSHORE WIND ENERGY IS GETTING CHEAPER

OFFSHORE WIND ENERGY IS GETTING CHEAPER OFFSHORE WIND ENERGY IS GETTING CHEAPER Market foresight and scale drive the cost down Dansk Energi, January 14, 2016 Sune Strøm, Manager, Regulatory Affairs Wind Power Offshore wind is closing in on the

More information

Danish Society for Naval Architecture and Marine Engineering, Danish Maritime Society, The Transport Innovation Network & Danish Wind Energy Group

Danish Society for Naval Architecture and Marine Engineering, Danish Maritime Society, The Transport Innovation Network & Danish Wind Energy Group O&M of Offshore Wind Turbines Experiences and Future Challenges 1-day Conference, 30 April 2012 in Copenhagen Niels Agner Jensen Sr. Project Manager, Team Lead, DONG Energy Wind Power, Maritime & Vessel

More information

STENSEA. Stored Energy in Sea. The Feasibility of an Underwater Pumped Hydro Storage System. Dr. Andreas Garg Christoph Lay Robert Füllmann

STENSEA. Stored Energy in Sea. The Feasibility of an Underwater Pumped Hydro Storage System. Dr. Andreas Garg Christoph Lay Robert Füllmann STENSEA Stored Energy in Sea The Feasibility of an Underwater Pumped Hydro Storage System Presentation IRES, 12 November 2012 Dr. Andreas Garg Christoph Lay Robert Füllmann 1 Market Status Quo and Forecasts

More information

HVDC Light Cables. Submarine and land power cables

HVDC Light Cables. Submarine and land power cables HV Light Cables Submarine and land s The HV Light s to offshore platform The light and robust HV Light s can be laid with very cost effecient methods HV Light System HV Light is a transmission system in

More information

To conclude with recommendations for a second project phase, where one or more demonstration storage systems will be tested experimentally.

To conclude with recommendations for a second project phase, where one or more demonstration storage systems will be tested experimentally. Electricity Storage for Short Term Power System Service Forskel 10426 Allan Schrøder Pedersen Materials Research Division Risø - DTU Aim of the project To evaluate and compare technically and economically

More information

Fuld Skolerapport for Søhusskolen, i Odense kommune, for skoleår 2013/2014 for klassetrin(ene) 9. med reference Tilsvarende klassetrin i kommunen

Fuld Skolerapport for Søhusskolen, i Odense kommune, for skoleår 2013/2014 for klassetrin(ene) 9. med reference Tilsvarende klassetrin i kommunen Side 1 af 41 Side 2 af 41 Side 3 af 41 Side 4 af 41 Side 5 af 41 Side 6 af 41 Side 7 af 41 Side 8 af 41 Side 9 af 41 Side 10 af 41 Side 11 af 41 Side 12 af 41 Side 13 af 41 Side 14 af 41 Side 15 af 41

More information

Fuld Skolerapport for Hunderupskolen, i Odense kommune, for skoleår 2013/2014 for klassetrin(ene) 7. med reference Tilsvarende klassetrin i kommunen

Fuld Skolerapport for Hunderupskolen, i Odense kommune, for skoleår 2013/2014 for klassetrin(ene) 7. med reference Tilsvarende klassetrin i kommunen Side 1 af 43 Side 2 af 43 Side 3 af 43 Side 4 af 43 Side 5 af 43 Side 6 af 43 Side 7 af 43 Side 8 af 43 Side 9 af 43 Side 10 af 43 Side 11 af 43 Side 12 af 43 Side 13 af 43 Side 14 af 43 Side 15 af 43

More information

CLASS. Customer Load Active System Services

CLASS. Customer Load Active System Services CLASS Customer Load Active System Services 1 Customer Load Active System Services Offer new services and choice for the future Maximise use of existing assets Delivering value to customers Innovative solutions

More information

INSTALLATION and LOGISTICS of OFFSHORE WIND FARMS

INSTALLATION and LOGISTICS of OFFSHORE WIND FARMS POWER Offshore Summer School 2006 INSTALLATION and LOGISTICS of OFFSHORE WIND FARMS Gerard van Bussel The Netherlands Offshore transport and installation vessels Semi Submersible Sheer leg crane Ship type

More information

Hub North Netværksarrangement d. 14. Juni 2011

Hub North Netværksarrangement d. 14. Juni 2011 Hub North Netværksarrangement d. 14. Juni 2011 Jan Bisgaard Envision Global Innovation Centre Silkeborg, Denmark Agenda: 1. Presenting (Jan Bisgaard) 2. Company profile 3. Strategies 4. Product road map

More information

Passion for Offshore. Wind Power & Renewables Division Market Unit Offshore

Passion for Offshore. Wind Power & Renewables Division Market Unit Offshore Wind Power & Renewables Division Market Unit Offshore Passion for Offshore - Frank Zimmermann, Head of Sales - 5 th British Chamber Conference on Renewable Energy, Hamburg, siemens.com/answers Siemens

More information

Alternative Investments The PensionDanmark Way. March 26 th 2015 The Danish Securities Dealers Association CEO Torben Möger Pedersen

Alternative Investments The PensionDanmark Way. March 26 th 2015 The Danish Securities Dealers Association CEO Torben Möger Pedersen Alternative Investments The PensionDanmark Way March 26 th 2015 The Danish Securities Dealers Association CEO Torben Möger Pedersen PensionDanmark at a Glance 660,000 members Member profile by industry:

More information

G8 - Contracts for Difference Metering

G8 - Contracts for Difference Metering PUBLIC G8 - Contracts for Difference Metering EMRS Guidance EMR Settlement Limited Version 1.0 12 October 2015 CONTENTS Change Amendment Record...4 1. Introduction...5 2. Purpose...5 3. What is the Electrical

More information

Electrical Collection and Transmission Systems for Offshore Wind Power

Electrical Collection and Transmission Systems for Offshore Wind Power National Renewable Energy Laboratory Innovation for Our Energy Future A national laboratory of the U.S. Department of Energy Office of Energy Efficiency & Renewable Energy Electrical Collection and Transmission

More information

Germany, Spain, Denmark European wind energy leaders. Examples of rational use of energy resources, to face a challenging future

Germany, Spain, Denmark European wind energy leaders. Examples of rational use of energy resources, to face a challenging future Germany, Spain, Denmark European wind energy leaders Examples of rational use of energy resources, to face a challenging future PWEA CONFERENCE 22 May 2012 Warsaw, Poland Roberto Pierantoni Head of Wind

More information

Advanced Electricity Storage Technologies Program. Smart Energy Storage (Trading as Ecoult) Final Public Report

Advanced Electricity Storage Technologies Program. Smart Energy Storage (Trading as Ecoult) Final Public Report Advanced Electricity Storage Technologies Program Smart Energy Storage (Trading as Ecoult) Final Public Report Introduction Ecoult, working with CSIRO as its principal subcontractor, was provided $1,825,440

More information

Power output of offshore wind farms in relation to atmospheric stability Laurens Alblas BSc

Power output of offshore wind farms in relation to atmospheric stability Laurens Alblas BSc Power output of offshore wind farms in relation to atmospheric stability Laurens Alblas BSc Photo: Vestas Wind Systems A/S 1 1. Introduction Background Atmospheric stability is known to influence wind

More information

Modelling of wind power fluctuations and forecast errors. Prof. Poul Sørensen Wind Power Integration and Control Wind Energy Systems

Modelling of wind power fluctuations and forecast errors. Prof. Poul Sørensen Wind Power Integration and Control Wind Energy Systems Modelling of wind power fluctuations and forecast errors Prof. Poul Sørensen Wind Power Integration and Control Wind Energy Systems Modelling of wind power fluctuations Simulation tool: CorWind Based on

More information

TenneT. Stakeholder engagement and Consultation Process OWFs. Day 1 ONL 15-162. Michiel Müller / Rob van der Hage

TenneT. Stakeholder engagement and Consultation Process OWFs. Day 1 ONL 15-162. Michiel Müller / Rob van der Hage TenneT ONL 15-162 Stakeholder engagement and Consultation Process OWFs Day 1 Expert Meeting, 15-16.04.2015, Arnhem Michiel Müller / Rob van der Hage Stay tuned. Safety first! Voor uw en onze veiligheid

More information

Project description. Power Electronics for Reliable and Energy efficient Renewable Energy Systems

Project description. Power Electronics for Reliable and Energy efficient Renewable Energy Systems Project description Title: Power Electronics for Reliable and Energy efficient Renewable Energy Systems OBJECTIVES Principal objective Provide competence and decision basis for enabling reliable and energy

More information

The Delft Offshore Wind Turbine Concept (DOT)

The Delft Offshore Wind Turbine Concept (DOT) December 2009 The Delft Offshore Wind Turbine Concept (DOT) A hydraulic solution for offshore wind energy Antonio Jarquín Laguna Delft University of Technology Challenge the future Table of Contents Current

More information

English text only DIRECTORATE FOR FINANCIAL AND ENTERPRISE AFFAIRS COMPETITION COMMITTEE ANNUAL REPORT ON COMPETITION POLICY DEVELOPMENTS IN DENMARK

English text only DIRECTORATE FOR FINANCIAL AND ENTERPRISE AFFAIRS COMPETITION COMMITTEE ANNUAL REPORT ON COMPETITION POLICY DEVELOPMENTS IN DENMARK Unclassified DAF/COMP(2005)18/05 DAF/COMP(2005)18/05 Unclassified Organisation de Coopération et de Développement Economiques Organisation for Economic Co-operation and Development 26-May-2005 English

More information