1 BID TABULATION - BID OPENING JULY 9, 2012, 1:30 PM. OPTION 1 - BID PLANS GLF Construction Corp. The Middlesex Corp. Hubbard Construction MOBILIZATION 1 LS $5,600, $5,600, $7,035, $7,035, $8,500, $8,500, MAINTENANCE OF TRAFFIC 1 LS $1,500, $1,500, $1,700, $1,700, $3,160, $3,160, E1 MOT FOR ROADWAY REPAIR CONTINGENCY 250 HR $ $36, $ $47, $ $50, CHANGEABLE VARIABLE MESSAGE SIGN-TEMP 1,460 ED $14.00 $20, $11.00 $16, $10.71 $15, MOWING 1 LS $110, $110, $33, $33, $161, $161, EROSION CONTROL 1 LS $160, $160, $170, $170, $61, $61, FIELD OFFICE FOR CEI 720 ED $58.00 $41, $70.00 $50, $ $84, CLEARING & GRUBBING 1 LS $650, $650, $1,200, $1,200, $2,000, $2,000, REMOVAL OF EXISTING STRUCTURES 1 LS $75, $75, $45, $45, $250, $250, PAVEMENT REMOVAL OF EXISTING CONCRETE 1,015 SY $7.50 $7, $8.00 $8, $6.75 $6, EXCAVATION REGULAR 48,271 CY $4.00 $193, $5.75 $277, $1.31 $63, EMBANKMENT 1,130,349 CY $11.30 $12,772, $8.40 $9,494, $8.35 $9,438, STABILIZATION TYPE B 121,540 SY $2.75 $334, $2.75 $334, $1.65 $200, LIMEROCK BASE (BASE GROUP 2) (5" LBR 100) W/PRIME 13,954 SY $9.40 $131, $8.00 $111, $6.81 $95, LIMEROCK BASE (BASE GROUP 4) (6" LBR 100) W/PRIME 19,614 SY $9.60 $188, $9.00 $176, $7.49 $146, LIMEROCK BASE (BASE GROUP 11) (12" LBR 100) W/PRIME 71,577 SY $15.60 $1,116, $13.00 $930, $11.81 $845, MILLING EXISTING PAVEMENT ( 1" AVG DEPTH) 13,169 SY $3.00 $39, $0.85 $11, $2.53 $33, MILLING EXISTING PAVEMENT ( 1 3/4 " AVG DEPTH) 70,814 SY $1.75 $123, $0.85 $60, $1.20 $84, SUPERPAVE ASPHALTIC CONC, TRAFFIC C 11,838.4 TN $85.50 $1,012, $75.50 $893, $86.22 $1,020, E3 ROADWAY REPAIR CONTINGENCY 2,300.0 TN $57.00 $131, $65.00 $149, $ $308, SUPERPAVE ASPHALTIC CONCRETE TRAFFIC C (PG 76-22) 10,387.0 TN $ $1,111, $ $1,121, $ $1,154, ASPHALTIC CONCRETE FRICTION COURSE - INC BIT/(PG76-22), FC-5 5,463.5 TN $ $786, $ $718, $ $779, MISCELLANEOUS ASPHALTIC PAVEMENT 1,161.9 TN $ $141, $ $158, $ $140, CLASS II CONCRETE (SUPERSTRUCTURE) 7,611 CY $ $3,158, $ $3,082, $ $3,588, CLASS II CONCRETE (APPROACH SLABS) 687 CY $ $161, $ $164, $ $140, CLASS IV CONCRETE (SUBSTRUCTURE) 619 CY $ $386, $ $433, $ $443, CLASS IV CONCRETE (MASS-SUBSTRUCTURE) 6,736 CY $ $2,694, $ $2,957, $ $3,916, BRIDGE DECK GROOVING (DECK THICKNESS < 8.5") 474 SY $8.00 $3, $6.50 $3, $7.78 $3, BRIDGE DECK GROOVING (DECK THICKNESS > 8.5") 24,285 SY $6.50 $157, $6.50 $157, $6.85 $166, COMPOSITE NEOPRENE PADS 1,156 CF $0.01 $11.56 $1.00 $1, $ $296, REINFORCING STEEL (SUPERSTRUCTURE) 2,037,449 LB $0.75 $1,528, $0.77 $1,568, $0.62 $1,263, REINFORCING STEEL (SUBSTRUCTURE) 1,583,273 LB $0.75 $1,187, $0.85 $1,345, $0.67 $1,060, REINFORCING STEEL (APPROACH SLABS) 141,497 LB $0.75 $106, $0.80 $113, $0.63 $89, INLETS (DT BOT) (TYPE A) (<10') 2 EA $2, $4, $2, $5, $2, $5, INLETS (DT BOT) (TYPE D) (MODIFIED) (<10') 1 EA $8, $8, $7, $7, $8, $8, INLETS (DT BOT) (PARTIAL)(J-BOT)(< 10') 1 EA $3, $3, $2, $2, $2, $2, INLETS (DT BOT) (TYPE G) (<10') 8 EA $3, $31, $4, $32, $3, $31, INLETS (GUTTER) (TYPE S) (<10') 70 EA $3, $222, $2, $168, $3, $278, INLETS (GUTTER) (TYPE S) (>10') 7 EA $4, $31, $4, $34, $4, $29, INLETS (GUTTER) (TYPE S) (>10') (J-BOTTOM)(SPECIAL) 1 EA $13, $13, $6, $6, $12, $12, INLETS (BARRIER WALL) (<10') 18 EA $4, $73, $3, $54, $4, $76, INLETS (BARRIER WALL) (>10') 1 EA $4, $4, $4, $4, $6, $6, MANHOLES (P-8)(<10') 7 EA $2, $20, $2, $20, $2, $17, MANHOLES (P-8)(>10') 2 EA $3, $7, $4, $9, $5, $11, MANHOLES (J-8)(<10') 4 EA $3, $13, $3, $15, $2, $11, MANHOLES (J-8)(>10') 6 EA $4, $25, $3, $21, $3, $21, PIPE CULVERT BCCMP (ROUND) (18" GD) 303 LF $97.00 $29, $62.00 $18, $ $38, PIPE CULVERT DIP (ROUND) (16" SS) 78 LF $ $13, $ $12, $ $13, PIPE CULVERT RCP (ROUND) (UP TO 24") 15,373 LF $46.40 $713, $42.00 $645, $60.00 $922, PIPE CULVERT RCP (ROUND) (25" TO 36") 2,651 LF $ $348, $90.00 $238, $90.00 $238, PIPE CULVERT RCP (ROUND) (37" TO 48") 1,015 LF $ $140, $ $121, $ $131, PIPE CULVERT RCP (ROUND) (49" TO 60") 89 LF $ $16, $ $21, $ $22, PIPE CULVERT RCP (ROUND) (61" OR >) 420 LF $ $99, $ $107, $ $115, PIPE CULVERT RCP (ELIP) (19" X 30") 27 LF $96.00 $2, $80.00 $2, $ $3, U-ENDWALL WITH BAFFLES (1:6 SLOPE) (18") 3 EA $1, $5, $2, $6, $2, $6, U-ENDWALL WITH BAFFLES (1:6 SLOPE) (24") 2 EA $2, $4, $3, $6, $2, $5, U-ENDWALL WITH BAFFLES (1:4 SLOPE) (18") 3 EA $1, $4, $1, $5, $1, $5, U-ENDWALL WITH BAFFLES (1:4 SLOPE) (30") 1 EA $2, $2, $2, $2, $2, $2, U-ENDWALL WITH BAFFLES (1:2 SLOPE) (18") 4 EA $1, $5, $2, $9, $1, $7, U-ENDWALL WITH GRATE (1:4 SLOPE) (18") 2 EA $3, $6, $2, $4, $2, $5, MITERED END SECTION (OPTIONAL ROUND) (18" CD) 3 EA $1, $3, $ $2, $1, $3, MITERED END SECTION (OPTIONAL ROUND) (24" CD) 4 EA $2, $11, $1, $4, $1, $5, MITERED END SECTION (OPTIONAL ROUND) (30" CD) 1 EA $2, $2, $1, $1, $1, $1, MITERED END SECTION (OPTIONAL ROUND) (36" CD) 1 EA $6, $6, $1, $1, $2, $2, MITERED END SECTION (OPTIONAL ROUND) (42" CD) 2 EA $5, $10, $2, $4, $3, $7, MITERED END SECTION (OPTIONAL ROUND) (48" CD) 1 EA $4, $4, $2, $2, $3, $3, MITERED END SECTION (OPTIONAL ROUND) (54" CD) 2 EA $5, $11, $3, $7, $4, $9, MITERED END SECTION (OPTIONAL ROUND) (19"X30" CD) 1 EA $1, $1, $1, $1, $1, $1, VIDEO TAPING EXISTING DRAINAGE SYSTEM 39,000 LF $2.90 $113, $0.10 $3, $7.73 $301, PRESTRESSED BEAMS (TYPE V) 373 LF $ $61, $ $78, $ $57, PRESTRESSED BEAMS (TYPE VI) 2,093 LF $ $372, $ $460, $ $334, PRESTRESSED SOIL ANCHORS 29 EA $3, $110, $3, $92, $3, $102, PRESTRESSED CONCRETE PILING (24" SQ) 49,286 LF $72.00 $3,548, $84.00 $4,140, $42.00 $2,070, SHEET PILING, STEEL-(TEMPORARY-CRITICAL) 25,345 SF $15.00 $380, $19.00 $481, $14.56 $369,023.20

2 BID TABULATION - BID OPENING JULY 9, 2012, 1:30 PM. OPTION 1 - BID PLANS GLF Construction Corp. The Middlesex Corp. Hubbard Construction LOAD TEST DYNAMIC 33 EA $ $26, $1, $46, $2, $96, TEST PILES PRESTRESSED CONCRETE (24" SQ ) 4,183 LF $ $585, $ $773, $ $920, BRIDGE DECK EXPANSION JOINT (NEW CONSTR.-F&R) POUR JOINT 467 LF $17.50 $8, $34.00 $15, $73.50 $34, BRIDGE DECK EXPANSION JOINT (NEW CONSTRUCTION-F&I)STRIP SEAL 207 LF $ $50, $ $62, $ $140, BRIDGE DECK EXPANSION JOINT (NEW CONSTRUCTION-F&I) MODULAR 175 LF $ $140, $ $133, $ $119, PILES, POLYETHYLENE SHEETING 3,408 SY $5.50 $18, $2.00 $6, $0.96 $3, STRUCTURAL STEEL - NEW/WIDENING (LOW ALLOY) 11,899,209 LB $1.70 $20,228, $1.78 $21,180, $1.88 $22,370, MULTI ROTATIONAL BEARING ASSEMBLY - EXPANSION (F&I) 1 EA $6, $6, $6, $6, $12, $12, MULTI ROTATIONAL BEARING ASSEMBLY (F&I) (>= 2001 KIPS) 2 EA $16, $32, $7, $14, $12, $25, MULTI ROTATIONAL BEARING ASSEMBLY (F&I) 3 EA $7, $22, $11, $33, $12, $37, MULTI ROTATIONAL BEARING ASSEMBLY-EXPANSION (F&I)( KIPS) 8 EA $10, $85, $9, $76, $12, $100, MULTI ROTATIONAL BEARING ASSEMBLY-EXPANSION (F&I)(>= 2001 KIPS) 2 EA $28, $56, $24, $48, $12, $25, BRIDGE DRAIN PIPE 299 LF $ $52, $ $41, $ $44, BRIDGE DRAINS 4 EA $10, $40, $20, $80, $3, $14, SHOULDER GUTTER CONCRETE 15,701 LF $12.00 $188, $13.00 $204, $13.00 $204, CONCRETE CURB AND GUTTER, TYPE F 90 LF $17.40 $1, $13.00 $1, $ $13, BARRIER WALL, CONCRETE (MEDIAN) 1,864 LF $56.00 $104, $53.00 $98, $62.09 $115, CONCRETE TRAFFIC RAILINGS - BRIDGE (32" F-SHAPE) 6,242 LF $59.00 $368, $67.00 $418, $64.77 $404, CONCRETE TRAFFIC RAILINGS - BRIDGE (42" F SHAPE) 5,297 LF $75.00 $397, $87.00 $460, $87.41 $463, CONCRETE TRAFFIC RAILINGS - BRIDGE (32" F SHAPE MEDIAN) 200 LF $69.00 $13, $92.00 $18, $88.11 $17, CONCRETE TRAFFIC RAILING- RW. SYS. MOUNT W/ SLEEPER SLAB (32" F SHAPE) 1,985 LF $ $406, $ $367, $ $442, CONCRETE TRAFFIC RAILING- RW. SYS. MOUNT W/ SLEEPER SLAB (42" F SHAPE) 1,264 LF $ $278, $ $259, $ $312, BARRIER WALL, CONCRETE (RIGID SHOULDER) 2,568 LF $ $303, $1.00 $2, $ $375, CONCRETE SIDEWALK, 4"THICK 61 SY $35.70 $2, $28.00 $1, $26.00 $1, CONCRETE DITCH PAVT. REINFORCED, 4" 1,779 SY $33.70 $59, $40.00 $71, $42.00 $74, RIPRAP (RUBBLE) TN $ $89, $96.00 $62, $ $111, GUARDRAIL (ROADWAY) 20,613 LF $15.00 $309, $15.00 $309, $13.31 $274, GUARDRAIL REMOVAL 3,796 LF $2.00 $7, $1.30 $4, $1.00 $3, GUARDRAIL END ANCHORAGE ASSEMBLY (FLARED) (SRT-350 ONLY) 16 EA $1, $25, $1, $26, $1, $24, GUARDRAIL END ANCHORAGE ASSEMBLY (TYPE II) 16 EA $ $9, $ $7, $ $7, CRASH CUSHION - VEHICULAR IMPACT ATTENUATOR, QUADGUARD OR TAU 3 EA $21, $64, $17, $51, $16, $49, RETAINING WALLS SYSTEM- (PERMANENT) EXCLUDING SLEEPER 152,537 SF $26.25 $4,004, $27.00 $4,118, $26.46 $4,036, FENCING, TYPE B (4' HIGH)(BLACK VINYL) 2,205 LF $12.25 $27, $8.00 $17, $11.64 $25, FENCING, TYPE B (STD) 525 LF $11.30 $5, $13.00 $6, $9.52 $4, DIRECTIONAL BORE (LESS THAN 6") 1,630 LF $16.70 $27, $12.50 $20, $9.50 $15, DIRECTIONAL BORE (6" TO 12") 80 LF $33.00 $2, $51.00 $4, $29.40 $2, SIGN STRUCTURE PAINTING 4 EA $3, $13, $5, $20, $2, $10, PERFORMANCE TURF (SOD) 224,942 SY $2.20 $494, $1.60 $359, $1.50 $337, A-100 CONTINUOUS OPERATION OF EXISTING ITS DEVICES 1 LS $86, $86, $67, $67, $11, $11, GEOLOCATION OF ITS EQUIPMENT AND INFRASTRUCTURE 1 LS $16, $16, $17, $17, $6, $6, CONDUIT (F&I) (UNDERGROUND) 1,320 LF $3.75 $4, $5.50 $7, $5.15 $6, FIBER OPTIC CABLE INVENTORY 12 EA $ $2, $ $3, $ $3, FIBER OPTIC SPLICE HOUSING INVENTORY 6 EA $ $1, $ $1, $ $1, FIBER OPTIC CABLE (F&I) (12 FIBER) 4,513 LF $1.25 $5, $1.90 $8, $1.50 $6, FIBER OPTIC CABLE (F&I) (72 FIBER) 15,036 LF $1.80 $27, $2.50 $37, $2.09 $31, FIBER OPTIC FUSION SPLICE ENCLOSURE (72 SPLICE) 20 EA $ $16, $ $16, $ $12, A FIBER OPTIC FUSION SPLICE ENCLOSURE RE-ENTRY 3 EA $ $ $ $ $ $ FIBER OPTIC FUSION SPLICE 1,212 EA $37.00 $44, $34.00 $41, $29.29 $35, PULL JUNCTION BOXES (F&I) (PULL BOX) 11 EA $ $6, $ $5, $ $2, PULL BOX (F&I) (SMALL FIBER OPTIC) 5 EA $1, $6, $1, $5, $ $2, PULL BOX (F&I) (LARGE FIBER OPTIC) 4 EA $1, $6, $2, $8, $1, $5, FIBER OPTIC CONDUIT (2-1" HDPE/SDR II) (TRENCH) 1,635 LF $3.60 $5, $4.10 $6, $5.49 $8, FIBER OPTIC CONDUIT (8-1" HDPE/SDR II) (TRENCH OR PLOW) 9,806 LF $8.00 $78, $8.00 $78, $6.68 $65, FIBER OPTIC CONDUIT 6" BSP (8-1" HDPE/SDR II) (DIRECTIONAL BORE) 115 LF $61.25 $7, $62.00 $7, $68.60 $7, FIBER OPTIC 6" BSP SPLIT OUTER DUCT 2,460 LF $54.50 $134, $55.00 $135, $50.12 $123, FIBER OPTIC 6" BSP SPLIT OUTER DUCT W/CONDUIT 2-1" HDPE/SDR II, TRENCH 320 LF $50.00 $16, $52.00 $16, $8.90 $2, FIBER OPTIC 6" BSP SPLIT OUTER DUCT W/CONDUIT 8-1" HDPE/SDR II, TRENCH 460 LF $63.50 $29, $65.00 $29, $61.88 $28, FIBER OPTIC 4" PVC OUTER DUCT W/CONDUIT 4-1" HDPE/SDR II, TRENCH 35 LF $10.30 $ $11.00 $ $9.91 $ FIBER OPTIC 6" PVC OUTER DUCT W/CONDUIT 8-1" HDPE/SDR II, TRENCH 154 LF $30.00 $4, $29.00 $4, $12.94 $1, FIBER OPTIC 6" BRFG OUTER DUCT W/ CONDUIT 8-1" HDPE/SDR II, INSTALL ON 280 LF $51.00 $14, $52.00 $14, $89.04 $24, ELECTRICAL POWER SERVICE (F&I) (OVERHEAD) 1 AS $4, $4, $4, $4, $1, $1, ELECTRICAL SERVICE WIRE (F&I) 4,200 LF $1.45 $6, $1.50 $6, $4.20 $17, ELECTRICAL SERVICE DISCONNECT (F&I) (POLE) 3 EA $ $2, $ $1, $ $1, PRESTRESSED CONCRETE POLES (F&I) (TYPE P-II SERVICE POLE) 4 EA $ $3, $ $3, $ $1, DATA COLLECTION SENSORS (3 LANE) (F&I) 1 EA $11, $11, $13, $13, $9, $9, DATA COLLECTION SENSORS (5 LANES) (F&I) 1 EA $11, $11, $21, $21, $14, $14, DATA COLLECTION SENSORS (3 LANES) (RELOCATE) 1 EA $6, $6, $6, $6, $3, $3, TYPE 170 CABINET (F&I) (POLE-MOUNT) 3 EA $4, $14, $4, $14, $8, $25, CONTROLLER ACCESSORIES (F&I) (POWER REDUCTION ASSEMBLY) 2 EA $1, $3, $1, $3, $4, $9, GIGABIT ETHERNET FIELD SWITCH (F&I) 3 EA $1, $5, $1, $5, $1, $5, TERMINAL SERVER (F&I) 2 EA $ $1, $ $1, $1, $2, FIBER OPTIC PATCH PANEL (12 PORT) (F&I) 3 EA $1, $3, $1, $3, $1, $3, CUT-TO-LENGTH FIBER OPTIC JUMPERS (F&I) 12 EA $39.00 $ $40.00 $ $28.68 $ SYSTEM AUXILARIES (RELOCATE) (CCTV CAMERA ASSEMBLY) 1 EA $18, $18, $18, $18, $23, $23,548.00

3 BID TABULATION - BID OPENING JULY 9, 2012, 1:30 PM. OPTION 1 - BID PLANS GLF Construction Corp. The Middlesex Corp. Hubbard Construction UNINTERRUPTABLE POWER SUPPLY (F&I) 3 EA $1, $4, $1, $4, $2, $8, A REMOTE POWER MANAGER (F&I) 3 EA $ $1, $ $1, $ $2, CCTV FIELD ASSEMBLY (F&I) 1 EA $4, $4, $4, $4, $4, $4, CCTV EQUIPMENT ENCODER (F&I) 1 EA $3, $3, $3, $3, $1, $1, CCTV MAINTENANCE UNIT (F&I) 1 EA $1, $1, $1, $1, $2, $2, A CAMERA LOWERING SYSTEM (80' POLE) (F&I) 1 EA $46, $46, $46, $46, $54, $54, SINGLE POST SIGN (F&I) (LESS THAN 12 SF) 20 AS $ $7, $ $7, $ $8, SINGLE POST SIGN (F&I) (12-20 SF) 32 AS $1, $35, $1, $35, $1, $43, SINGLE POST SIGN (F&I) (21-30 SF) 5 AS $1, $7, $1, $8, $1, $8, SINGLE POST SIGN (F&I) (31+ SF) 3 AS $4, $13, $4, $13, $4, $14, SINGLE POST SIGN (RELOCATE) 1 AS $ $ $ $ $ $ SINGLE POST SIGN (REMOVE) 30 AS $ $3, $ $3, $1.00 $ MULTI-POST SIGN (50 OR LESS SF) 5 AS $3, $18, $3, $18, $3, $15, MULTI-POST SIGN ( SF) 1 AS $7, $7, $7, $7, $ $ MULTI-POST SIGN (REMOVE) 1 AS $ $ $ $ $ $ OVERHEAD TRUSS SPAN SIGN (F&I) (50 OR LESS) ( ) 1 AS $117, $117, $115, $115, $107, $107, OVERHEAD TRUSS SPAN SIGN (F&I) (51-100) ( ) 2 AS $150, $300, $150, $300, $142, $284, OVERHEAD TRUSS SPAN SIGN (F&I) (51-100) (> 700) 2 AS $230, $460, $225, $450, $220, $440, OVERHEAD TRUSS SPAN SIGN (F&I) ( ) ( ) 1 AS $222, $222, $218, $218, $211, $211, OVERHEAD TRUSS SPAN SIGN (REMOVE) 2 AS $5, $10, $5, $10, $5, $11, OVERHEAD TRUSS CANTILEVER SIGN (F&I) (30 OR LESS) ( ) 1 AS $48, $48, $48, $48, $42, $42, OVERHEAD TRUSS CANTILEVER SIGN (F&I) (31-40) (>300 ) 1 AS $79, $79, $78, $78, $73, $73, OVERHEAD TRUSS CANTILEVER SIGN (F&I) (41-50) (>300 ) 1 AS $95, $95, $94, $94, $89, $89, OVERHEAD TRUSS CANTILEVER SIGN (F&I) (OVER 50) ( ) 4 AS $83, $332, $82, $328, $75, $303, OVERHEAD TRUSS CANTILEVER SIGN (F&I) (OVER 50) ( ) 3 AS $97, $291, $95, $285, $94, $284, OVERHEAD TRUSS CANTILEVER SIGN (F&I) (OVER 50) (>300) 1 AS $112, $112, $110, $110, $105, $105, OVERHEAD TRUSS CANTILEVER SIGN (REMOVE) 5 AS $2, $12, $2, $12, $2, $14, SIGN PANEL (F&I) ( ) 4 EA $8, $32, $8, $32, $7, $29, SIGN PANEL (RELOCATE) ( ) 2 EA $9, $19, $9, $19, $4, $9, SIGN PANEL (F&I) (16-100) 2 EA $ $1, $ $1, $ $1, SIGN PANEL (REMOVE) 4 EA $ $1, $ $1, $ $2, R DMS SYSTEM (LED - 1 LINE) (RELOCATE) 1 EA $10, $10, $10, $10, $45, $45, DELINEATOR (FLEXIBLE TUBULAR) 167 EA $50.00 $8, $50.00 $8, $55.00 $9, RETRO-REFLECTIVE PAVEMENT MARKER 3,666 EA $3.90 $14, $2.80 $10, $2.70 $9, THERMOPLASTIC (STD.) (WHITE) (SOLID) (6") NM $5, $2, $4, $2, $4, $2, THERMOPLASTIC (STD.) (WHITE) (SOLID) (8") NM $6, $1, $6, $1, $6, $1, THERMOPLASTIC (STD.) (WHITE) (SOLID) (18") 604 LF $2.90 $1, $4.00 $2, $3.30 $1, THERMOPLASTIC (STD.) (WHITE) (SKIP) (6") GM $1, $ $1, $ $1, $ THERMOPLASTIC (STD.) (WHITE) (MESSAGE) 2 EA $ $ $ $ $ $ THERMOPLASTIC (STD.) (WHITE) (ARROWS) 4 EA $81.00 $ $75.00 $ $65.00 $ THERMOPLASTIC (STD.) (YELLOW) (SOLID) (6") NM $5, $2, $4, $2, $4, $2, PAVEMENT MARKING - PREFORMED TAPE (HP) (WHITE) (SOLID) (8") NM $33, $49, $24, $37, $24, $37, PAVEMENT MARKING - PREFORMED TAPE (HP) (WHITE) (SOLID) (12") 1,164 LF $12.10 $14, $8.00 $9, $7.80 $9, PAVEMENT MARKING - PREFORMED TAPE (HP) (WHITE) (SOLID) (18") 1,773 LF $13.75 $24, $11.50 $20, $11.35 $20, PAVEMENT MARKING - PREFORMED TAPE (HP) (WHITE) (SKIP) (3'-12') (12") GM $13, $29, $8, $18, $8, $18, PAVEMENT MARKING - PREFORMED TAPE (HP) (YELLOW) (SOLID) (6") NM $22, $168, $17, $127, $17, $127, PAVEMENT MARKING - PREFORMED TAPE (HP) (YELLOW) (SOLID) (8") 1,178 LF $6.15 $7, $5.00 $5, $4.75 $5, PAVEMENT MARKING - PREFORMED TAPE (HP) (YELLOW) (SOLID) (18") 260 LF $13.75 $3, $12.00 $3, $11.35 $2, PAVEMENT MARKING - PREFORMED TAPE (HP) (9" CONTRAST) (SOLID) (9") NM $28, $209, $27, $204, $27, $204, PAVEMENT MARKING - PREFORMED TAPE (HP) (9" CONTRAST) (SKIP) (10'-30') (9") GM $9, $61, $8, $56, $8, $56, PAVEMENT MARKING - PREFORMED TAPE (HP) (ALT. WHITE/BLACK) (SKIP 3'-3'-9) 668 LF $13.70 $9, $9.00 $6, $8.50 $5, LIGHTING CONDUCTORS (F&I, NO. 10 OR SMALLER) 2,580 LF $0.75 $1, $0.70 $1, $0.49 $1, LIGHTING CONDUCTORS (F&I, NO. 8 TO 6) 116,610 LF $1.00 $116, $1.00 $116, $0.84 $97, LIGHTING CONDUCTORS (F&I, NO. 4 TO 2) 131,307 LF $1.75 $229, $1.60 $210, $2.01 $263, LIGHTING CONDUIT (F&I- UNDERGROUND) 57,234 LF $2.75 $157, $2.75 $157, $2.65 $151, LIGHTING CONDUIT (F&I- SURFACE MOUNT) 60 LF $12.60 $ $13.00 $ $21.78 $1, LIGHT POLE COMP.(F&I, STANDARD,130MPH,45') 178 EA $4, $712, $4, $729, $3, $619, LIGHT POLE COMP.(F&I, STANDARD,130MPH,35') 113 EA $3, $350, $3, $350, $2, $308, LIGHT POLE COMP. (REMOVE) 16 EA $1, $22, $1, $22, $1, $19, LIGHT POLE COMP. (RELOCATE) 179 EA $ $55, $ $64, $ $77, LOAD CENTER (F&I, SECONDARY VOLTAGE) 3 EA $11, $33, $11, $33, $11, $34, LOAD CENTER (F&I, REWORK, SECONDARY VOLTAGE) 1 EA $72.00 $72.00 $72.00 $72.00 $ $ LOAD CENTER (REMOVE, SECONDARY VOLTAGE) 1 EA $ $ $ $ $ $ LUMINARE (F&I, UNDERDECK, WALL MOUNT) 8 EA $2, $18, $2, $17, $1, $10, LUMINARE (F&I, UNDERDECK, PENDANT HUNG) 24 EA $1, $36, $1, $43, $1, $39, LIGHTING PULL BOX (F&I, ROADSIDE) - MOULDED 402 EA $ $215, $ $249, $ $142, LIGHTING- INSIDE BOX GIRDER 1 LS $456, $456, $420, $420, $572, $572, POLE CABLE DISTRIBUTION SYSTEM (CONVENTIONAL) 291 EA $1, $407, $1, $392, $1, $382, POLE CABLE DISTRIBUTION SYSTEM (WALL MOUNTED) 53 EA $1, $74, $1, $71, $ $9, LIGHTING POLE COMPLETE (SINGLE ARM, WALL MT, ALUM, 45') 5 EA $2, $10, $2, $10, $1, $7, LIGHTING POLE COMPLETE (SINGLE ARM, WALL MT, ALUM, 35') 7 EA $2, $18, $2, $18, $1, $13, LIGHTING POLE COMPLETE (SINGLE ARM, BRIDGE MOUNT, AL, 35') 36 EA $2, $79, $2, $79, $1, $62, LIGHTING POLE COMPLETE (SINGLE ARM, BRIDGE MOUNT, AL, 45') 5 EA $2, $14, $2, $14, $2, $10, RAMP PLAZA- RAMP D-1 1 LS $820, $820, $1,000, $1,000, $1,051, $1,051,603.84

4 BID TABULATION - BID OPENING JULY 9, 2012, 1:30 PM. OPTION 1 - BID PLANS GLF Construction Corp. The Middlesex Corp. Hubbard Construction GANTRY- RAMP I 1 LS $210, $210, $300, $300, $313, $313, 'X4'X4' CONCRETE MANHOLE (F&I) 6 EA $3, $19, $3, $19, $4, $26, 'X6.5'X6.5' CONCRETE MANHOLE (F&I) 2 EA $4, $9, $5, $10, $5, $11, 'X6.5'X6.5' CONCRETE MANHOLE (DOGHOUSE) (F&I) 6 EA $4, $27, $5, $34, $5, $35, TUBULAR ROUTE MARKER 9 EA $68.00 $ $75.00 $ $ $1, ALLOWANCE FOR DISPUTES REVIEW BOARD N/A N/A $30, $30, $30, $30, WORK ORDER ALLOWANCE N/A N/A $300, $300, $300, $300, $78,664, $78,968, $83,998, Denotes Corrected Bid Amount

5 BID TABULATION - BID OPENING JULY 9, 2012, 1:30 PM. OPTION 4 - RAMP H AND RAMP I BRIDGES DESIGN-BUILD Astaldi Construction Corp. SEMA Construction Lane Construction MOBILIZATION 1 LS 5,456, $5,456, $ 6,000, $6,000, $7,150, $7,150, MAINTENANCE OF TRAFFIC 1 LS 1,221, $1,221, $ 250, $250, $2,000, $2,000, E1 MOT FOR ROADWAY REPAIR CONTINGENCY 250 HR $33, $ $37, $50.00 $12, CHANGEABLE VARIABLE MESSAGE SIGN-TEMP 1,460 ED $21, $ $20, $13.05 $19, MOWING 1 LS $53.76 $ 20, $20, $1.00 $ EROSION CONTROL 1 LS 170, $170, $ 50, $50, $200, $200, FIELD OFFICE FOR CEI 720 ED $81, $ $72, $50.00 $36, CLEARING & GRUBBING 1 LS 184, $184, $ 530, $530, $250, $250, REMOVAL OF EXISTING STRUCTURES 1 LS 36, $36, $ 50, $50, $34, $34, PAVEMENT REMOVAL OF EXISTING CONCRETE 1,015 SY $15, $ $30, $6.50 $6, EXCAVATION REGULAR 48,271 CY 1.43 $69, $ 3.00 $144, $4.60 $222, EMBANKMENT 1,130,349 CY 6.93 $7,833, $ 8.40 $9,494, $8.65 $9,777, STABILIZATION TYPE B 121,540 SY 3.25 $395, $ 2.25 $273, $1.00 $121, LIMEROCK BASE (BASE GROUP 2) (5" LBR 100) W/PRIME 13,954 SY 6.32 $88, $ 9.00 $125, $6.30 $87, LIMEROCK BASE (BASE GROUP 4) (6" LBR 100) W/PRIME 19,614 SY 7.25 $142, $ $196, $6.00 $117, LIMEROCK BASE (BASE GROUP 11) (12" LBR 100) W/PRIME 71,577 SY $921, $ $930, $9.50 $679, MILLING EXISTING PAVEMENT ( 1" AVG DEPTH) 13,169 SY 1.55 $20, $ 0.90 $11, $0.50 $6, MILLING EXISTING PAVEMENT ( 1 3/4 " AVG DEPTH) 70,814 SY 1.84 $130, $ 0.90 $63, $0.50 $35, SUPERPAVE ASPHALTIC CONC, TRAFFIC C 11,838.4 TN $976, $ $923, $80.00 $947, SUPERPAVE ASPHALTIC CONC, TRAFFIC C (PG 76-22) 10,387.0 TN $1,139, $ $1,142, $ $1,111, E3 ROADWAY REPAIR CONTINGENCY 2,300.0 TN $189, $ $154, $15.00 $34, ASPHALTIC CONCRETE FRICTION COURSE- INC BIT/ (PG 76-22), FC-5 5,463.5 TN $764, $ $737, $95.00 $519, MISCELLANEOUS ASPHALTIC PAVEMENT 1,161.9 TN $140, $ $162, $ $121, CLASS II CONCRETE (SUPERSTRUCTURE) 2,130 CY $774, $ $905, $ $788, CLASS II CONCRETE (APPROACH SLABS) 503 CY $95, $ $125, $ $120, CLASS IV CONCRETE (SUBSTRUCTURE) 411 CY $215, $ $205, $ $215, CLASS IV CONCRETE (MASS-SUBSTRUCTURE) 1,021 CY $362, $ $229, $ $510, BRIDGE DECK GROOVING (DECK THICKNESS < 8.5") 474 SY 9.12 $4, $ 8.00 $3, $5.85 $2, BRIDGE DECK GROOVING (DECK THICKNESS > 8.5") 6,366 SY 6.26 $39, $ 6.50 $41, $5.85 $37, COMPOSITE NEOPRENE PADS 17 CF $14, $ 1, $18, $1.00 $ REINFORCING STEEL (SUPERSTRUCTURE) 575,692 LB 0.59 $339, $ 0.75 $431, $0.65 $374, REINFORCING STEEL (SUBSTRUCTURE) 279,262 LB 0.64 $178, $ 0.70 $195, $0.65 $181, REINFORCING STEEL (APPROACH SLABS) 102,421 LB 0.59 $60, $ 0.65 $66, $0.65 $66, INLETS (DT BOT) (TYPE A) (<10') 2 EA 1, $3, $ 1, $3, $1, $3, INLETS (DT BOT) (TYPE D) (MODIFIED) (<10') 1 EA 7, $7, $ 9, $9, $5, $5, INLETS (DT BOT) (PARTIAL)(J-BOT)(< 10') 1 EA 2, $2, $ 3, $3, $6, $6, INLETS (DT BOT) (TYPE G) (<10') 8 EA 3, $31, $ 4, $34, $5, $40, INLETS (GUTTER) (TYPE S) (<10') 70 EA 2, $158, $ 2, $168, $1, $131, INLETS (GUTTER) (TYPE S) (>10') 7 EA 2, $19, $ 3, $23, $3, $21, INLETS (GUTTER) (TYPE S) (>10') (J-BOTTOM)(SPECIAL) 1 EA 7, $7, $ 4, $4, $5, $5, INLETS (BARRIER WALL) (<10') 18 EA 2, $47, $ 3, $54, $3, $67, INLETS (BARRIER WALL) (>10') 1 EA 3, $3, $ 5, $5, $3, $3, MANHOLES (P-8)(<10') 7 EA 1, $13, $ 2, $14, $1, $13, MANHOLES (P-8)(>10') 2 EA 3, $6, $ 2, $5, $3, $7, MANHOLES (J-8)(<10') 4 EA 3, $13, $ 3, $14, $4, $19, MANHOLES (J-8)(>10') 6 EA 4, $26, $ 2, $13, $4, $29, PIPE CULVERT BCCMP (ROUND) (18" GD) 303 LF $17, $ $9, $80.00 $24, PIPE CULVERT DIP (ROUND) (16" SS) 78 LF $22, $ $8, $ $9, PIPE CULVERT RCP (ROUND) (UP TO 24") 15,373 LF $513, $ $415, $45.00 $691, PIPE CULVERT RCP (ROUND) (25" TO 36") 2,651 LF $192, $ $124, $95.00 $251, PIPE CULVERT RCP (ROUND) (37" TO 48") 1,015 LF $113, $ $85, $ $126, PIPE CULVERT RCP (ROUND) (49" TO 60") 89 LF $21, $ $10, $ $20, PIPE CULVERT RCP (ROUND) (61" OR >) 420 LF $126, $ $100, $ $111, PIPE CULVERT RCP (ELIP) (19" X 30") 27 LF $1, $ $1, $ $3, U-ENDWALL WITH BAFFLES (1:6 SLOPE) (18") 3 EA 1, $4, $ 2, $6, $1, $4, U-ENDWALL WITH BAFFLES (1:6 SLOPE) (24") 2 EA 2, $4, $ 1, $3, $2, $4, U-ENDWALL WITH BAFFLES (1:4 SLOPE) (18") 3 EA 1, $3, $ 2, $6, $1, $3, U-ENDWALL WITH BAFFLES (1:4 SLOPE) (30") 1 EA 1, $1, $ 2, $2, $1, $1, U-ENDWALL WITH BAFFLES (1:2 SLOPE) (18") 4 EA 1, $6, $ 2, $8, $1, $6, U-ENDWALL WITH GRATE (1:4 SLOPE) (18") 2 EA 2, $5, $ 1, $3, $1, $3, MITERED END SECTION (OPTIONAL ROUND) (18" CD) 3 EA $2, $ $1, $1, $3, MITERED END SECTION (OPTIONAL ROUND) (24" CD) 4 EA $3, $ $2, $1, $4, MITERED END SECTION (OPTIONAL ROUND) (30" CD) 1 EA 1, $1, $ $ $1, $1, MITERED END SECTION (OPTIONAL ROUND) (36" CD) 1 EA 1, $1, $ 2, $2, $2, $2, MITERED END SECTION (OPTIONAL ROUND) (42" CD) 2 EA 1, $3, $ 3, $6, $2, $5, MITERED END SECTION (OPTIONAL ROUND) (48" CD) 1 EA 2, $2, $ 3, $3, $3, $3, MITERED END SECTION (OPTIONAL ROUND) (54" CD) 2 EA 4, $8, $ 4, $9, $5, $10, MITERED END SECTION (OPTIONAL ROUND) (19"X30" CD) 1 EA $ $ 1, $1, $1, $1, VIDEO TAPING EXISTING DRAINAGE SYSTEM 39,000 LF 0.54 $21, $ 1.00 $39, $0.50 $19, PRESTRESSED BEAMS (TYPE V) 373 LF $47, $ $96, $ $85, PRESTRESSED BEAMS (TYPE VI) 2,093 LF $341, $ $627, $ $477, PRESTRESSED SOIL ANCHORS 29 EA 4, $128, $ $2, $3, $100, PRESTRESSED CONCRETE PILING (24" SQ) 10,111 LF $797, $ $859, $60.00 $606, SHEET PILING, STEEL-(TEMPORARY-CRITICAL) 25,345 SF $843, $ 1.00 $25, $5.00 $126,725.00

6 BID TABULATION - BID OPENING JULY 9, 2012, 1:30 PM. OPTION 4 - RAMP H AND RAMP I BRIDGES DESIGN-BUILD Astaldi Construction Corp. SEMA Construction Lane Construction LOAD TEST DYNAMIC 9 EA 2, $24, $ 2, $18, $2, $22, TEST PILES PRESTRESSED CONCRETE (24" SQ ) 1,036 LF $91, $ $207, $ $119, BRIDGE DECK EXPANSION JOINT (NEW CONSTR.-F&R) POUR JOINT 467 LF $20, $ $14, $18.00 $8, BRIDGE DECK EXPANSION JOINT (NEW CONSTRUCTION-F&I)STRIP SEAL 41 LF $10, $ $5, $ $10, PILES, POLYETHYLENE SHEETING 2,560 SY 2.83 $7, $ 2.00 $5, $0.45 $1, STRUCTURAL STEEL - NEW/WIDENING (LOW ALLOY) 3,089,791 LB 1.88 $5,808, $ 1.25 $3,862, $1.62 $5,005, MULTI ROTATIONAL BEARING ASSEMBLY - EXPANSION (F&I) 1 EA 5, $5, $ 4, $4, $12, $12, MULTI ROTATIONAL BEARING ASSEMBLY (F&I) (>= 2001 KIPS) 2 EA 23, $46, $ 4, $8, $12, $25, MULTI ROTATIONAL BEARING ASSEMBLY (F&I) 3 EA 5, $17, $ 4, $12, $13, $39, MULTI ROTATIONAL BEARING ASSEMBLY-EXPANSION (F&I)( KIPS) 8 EA 8, $68, $ 4, $32, $13, $104, MULTI ROTATIONAL BEARING ASSEMBLY-EXPANSION (F&I)(>= 2001 KIPS) 2 EA 12, $25, $ 4, $8, $13, $26, SHOULDER GUTTER CONCRETE 15,701 LF $199, $ $251, $14.75 $231, CONCRETE CURB AND GUTTER, TYPE F 90 LF $1, $ $2, $12.00 $1, BARRIER WALL, CONCRETE (MEDIAN) 1,864 LF $81, $ $186, $51.14 $95, CONCRETE TRAFFIC RAILINGS - BRIDGE (32" F-SHAPE) 2,047 LF $131, $ $133, $51.14 $104, CONCRETE TRAFFIC RAILINGS - BRIDGE (42" F SHAPE) 978 LF $83, $ $80, $71.04 $69, CONCRETE TRAFFIC RAILINGS - BRIDGE (32" F SHAPE MEDIAN) 200 LF $17, $ $10, $63.18 $12, CONCRETE TRAFFIC RAILING- RW. SYS. MOUNT W/ SLEEPER SLAB (32" F SHAPE) 1,985 LF $355, $ $377, $ $208, CONCRETE TRAFFIC RAILING- RW. SYS. MOUNT W/ SLEEPER SLAB (42" F SHAPE) 1,264 LF $251, $ $265, $ $151, BARRIER WALL, CONCRETE (RIGID SHOULDER) 2,568 LF $300, $ $256, $75.00 $192, CONCRETE SIDEWALK, 4"THICK 61 SY $1, $ $1, $24.95 $1, CONCRETE DITCH PAVT. REINFORCED, 4" 1,779 SY $53, $ $80, $43.58 $77, RIPRAP (RUBBLE) TN $69, $ $123, $82.00 $53, GUARDRAIL (ROADWAY) 20,613 LF $405, $ $317, $13.25 $273, GUARDRAIL REMOVAL 3,796 LF 3.44 $13, $ 1.00 $3, $1.00 $3, GUARDRAIL END ANCHORAGE ASSEMBLY (FLARED) (SRT-350 ONLY) 16 EA 2, $37, $ 1, $25, $1, $24, GUARDRAIL END ANCHORAGE ASSEMBLY (TYPE II) 16 EA $11, $ $8, $ $7, CRASH CUSHION - VEHICULAR IMPACT ATTENUATOR, QUADGUARD OR TAU 3 EA 12, $38, $ 17, $51, $16, $49, RETAINING WALLS SYSTEM- (PERMANENT) EXCLUDING SLEEPER 152,537 SF $3,352, $ $3,203, $26.00 $3,965, FENCING, TYPE B (4' HIGH)(BLACK VINYL) 2,205 LF 9.82 $21, $ $29, $8.00 $17, FENCING, TYPE B (STD) 525 LF $7, $ $5, $10.00 $5, DIRECTIONAL BORE (LESS THAN 6") 1,630 LF $17, $ $26, $13.20 $21, DIRECTIONAL BORE (6" TO 12") 80 LF $2, $ $2, $47.00 $3, SIGN STRUCTURE PAINTING 4 EA 3, $15, $ 3, $13, $6, $24, PERFORMANCE TURF (SOD) 224,942 SY 1.50 $337, $ 3.00 $674, $1.45 $326, A-100 CONTINUOUS OPERATION OF EXISTING ITS DEVICES 1 LS 12, $12, $ 80, $80, $60, $60, GEOLOCATION OF ITS EQUIPMENT AND INFRASTRUCTURE 1 LS 7, $7, $ 15, $15, $15, $15, CONDUIT (F&I) (UNDERGROUND) 1,320 LF 5.75 $7, $ 3.60 $4, $4.61 $6, FIBER OPTIC CABLE INVENTORY 12 EA $3, $ $2, $ $2, FIBER OPTIC SPLICE HOUSING INVENTORY 6 EA $1, $ $1, $ $1, FIBER OPTIC CABLE (F&I) (12 FIBER) 4,513 LF 1.67 $7, $ 1.20 $5, $1.21 $5, FIBER OPTIC CABLE (F&I) (72 FIBER) 15,036 LF 2.33 $35, $ 1.70 $25, $1.77 $26, FIBER OPTIC FUSION SPLICE ENCLOSURE (72 SPLICE) 20 EA $14, $ $15, $ $16, A FIBER OPTIC FUSION SPLICE ENCLOSURE RE-ENTRY 3 EA $ $ $ $ $ FIBER OPTIC FUSION SPLICE 1,212 EA $39, $ $42, $35.00 $42, PULL JUNCTION BOXES (F&I) (PULL BOX) 11 EA $2, $ $5, $ $7, PULL BOX (F&I) (SMALL FIBER OPTIC) 5 EA $2, $ 1, $5, $1, $5, PULL BOX (F&I) (LARGE FIBER OPTIC) 4 EA 1, $5, $ 1, $6, $2, $8, FIBER OPTIC CONDUIT (2-1" HDPE/SDR II) (TRENCH) 1,635 LF 6.13 $10, $ 3.50 $5, $5.00 $8, FIBER OPTIC CONDUIT (8-1" HDPE/SDR II) (TRENCH OR PLOW) 9,806 LF 7.46 $73, $ 7.50 $73, $6.77 $66, FIBER OPTIC CONDUIT 6" BSP (8-1" HDPE/SDR II) (DIRECTIONAL BORE) 115 LF $8, $ $6, $52.00 $5, FIBER OPTIC 6" BSP SPLIT OUTER DUCT 2,460 LF $137, $ $127, $54.75 $134, FIBER OPTIC 6" BSP SPLIT OUTER DUCT W/CONDUIT 2-1" HDPE/SDR II, TRENCH 320 LF $22, $ $15, $50.50 $16, FIBER OPTIC 6" BSP SPLIT OUTER DUCT W/CONDUIT 8-1" HDPE/SDR II, TRENCH 460 LF 9.93 $4, $ $28, $52.50 $24, FIBER OPTIC 4" PVC OUTER DUCT W/CONDUIT 4-1" HDPE/SDR II, TRENCH 35 LF $ $ $ $10.10 $ FIBER OPTIC 6" PVC OUTER DUCT W/CONDUIT 8-1" HDPE/SDR II, TRENCH 154 LF $2, $ $4, $14.80 $2, FIBER OPTIC 6" BRFG OUTER DUCT W/ CONDUIT 8-1" HDPE/SDR II, INSTALL ON 280 LF $27, $ $13, $84.20 $23, ELECTRICAL POWER SERVICE (F&I) (OVERHEAD) 1 AS 1, $1, $ 3, $3, $2, $2, ELECTRICAL SERVICE WIRE (F&I) 4,200 LF 4.69 $19, $ 1.40 $5, $2.00 $8, ELECTRICAL SERVICE DISCONNECT (F&I) (POLE) 3 EA $2, $ $1, $ $2, PRESTRESSED CONCRETE POLES (F&I) (TYPE P-II SERVICE POLE) 4 EA $1, $ $3, $1, $6, DATA COLLECTION SENSORS (3 LANE) (F&I) 1 EA 10, $10, $ 10, $10, $19, $19, DATA COLLECTION SENSORS (5 LANES) (F&I) 1 EA 15, $15, $ 11, $11, $31, $31, DATA COLLECTION SENSORS (3 LANES) (RELOCATE) 1 EA 4, $4, $ 5, $5, $7, $7, TYPE 170 CABINET (F&I) (POLE-MOUNT) 3 EA 9, $28, $ 4, $13, $5, $15, CONTROLLER ACCESSORIES (F&I) (POWER REDUCTION ASSEMBLY) 2 EA 5, $10, $ 1, $3, $1, $3, GIGABIT ETHERNET FIELD SWITCH (F&I) 3 EA 2, $6, $ 1, $5, $1, $5, TERMINAL SERVER (F&I) 2 EA 1, $2, $ $1, $1, $2, FIBER OPTIC PATCH PANEL (12 PORT) (F&I) 3 EA 1, $3, $ 1, $3, $1, $3, CUT-TO-LENGTH FIBER OPTIC JUMPERS (F&I) 12 EA $ $ $ $40.00 $ SYSTEM AUXILARIES (RELOCATE) (CCTV CAMERA ASSEMBLY) 1 EA 26, $26, $ 18, $18, $13, $13, UNINTERRUPTABLE POWER SUPPLY (F&I) 3 EA 3, $9, $ 1, $4, $1, $4, A REMOTE POWER MANAGER (F&I) 3 EA 1, $3, $ $1, $ $1, CCTV FIELD ASSEMBLY (F&I) 1 EA 5, $5, $ 4, $4, $6, $6,860.00

7 BID TABULATION - BID OPENING JULY 9, 2012, 1:30 PM. OPTION 4 - RAMP H AND RAMP I BRIDGES DESIGN-BUILD Astaldi Construction Corp. SEMA Construction Lane Construction CCTV EQUIPMENT ENCODER (F&I) 1 EA 1, $1, $ 3, $3, $6, $6, CCTV MAINTENANCE UNIT (F&I) 1 EA 2, $2, $ 1, $1, $2, $2, A CAMERA LOWERING SYSTEM (80' POLE) (F&I) 1 EA 60, $60, $ 44, $44, $48, $48, SINGLE SIGN POST (F&I) (LESS THAN 12 SF) 20 AS $8, $ $7, $ $5, SINGLE SIGN POST (F&I) (12-20 SF) 32 AS 1, $42, $ 1, $35, $1, $47, SINGLE SIGN POST (F&I) (21-30 SF) 5 AS 1, $8, $ 1, $7, $3, $16, SINGLE SIGN POST (F&I) (31+ SF) 3 AS 4, $14, $ 4, $12, $3, $10, SINGLE SIGN POST (RELOCATE) 1 AS $ $ $ $ $ SINGLE SIGN POST (REMOVE) 30 AS 0.98 $29.40 $ $3, $ $8, MULTI-POST SIGN (50 OR LESS SF) 5 AS 3, $15, $ 3, $18, $4, $20, MULTI-POST SIGN ( SF) 1 AS 7, $7, $ 6, $6, $8, $8, MULTI-POST SIGN (REMOVE) 1 AS $ $ $ $1, $1, OVERHEAD TRUSS SPAN SIGN (F&I) (50 OR LESS) ( ) 1 AS 104, $104, $ 111, $111, $107, $107, OVERHEAD TRUSS SPAN SIGN (F&I) (51-100) ( ) 2 AS 139, $278, $ 144, $289, $139, $278, OVERHEAD TRUSS SIGN SPAN (F&I) (51-100) (> 700) 2 AS 215, $430, $ 221, $443, $225, $450, OVERHEAD TRUSS SPAN SIGN (F&I) ( ) ( ) 1 AS 206, $206, $ 213, $213, $215, $215, OVERHEAD TRUSS SPAN SIGN (REMOVE) 2 AS 5, $11, $ 5, $10, $6, $12, OVERHEAD TRUSS CANTILEVER SIGN (F&I) (30 OR LESS) ( ) 1 AS 41, $41, $ 46, $46, $47, $47, OVERHEAD TRUSS CANTILEVER SIGN (F&I) (31-40) (>300 ) 1 AS 71, $71, $ 76, $76, $79, $79, OVERHEAD TRUSS CANTILEVER SIGN (F&I) (41-50) (>300 ) 1 AS 87, $87, $ 91, $91, $94, $94, OVERHEAD TRUSS CANTILEVER SIGN (F&I) (OVER 50) ( ) 4 AS 74, $296, $ 79, $319, $79, $316, OVERHEAD TRUSS CANTILEVER SIGN (F&I) (OVER 50) ( ) 3 AS 92, $278, $ 93, $279, $95, $285, OVERHEAD TRUSS CANTILEVER SIGN (F&I) (OVER 50) (>300) 1 AS 103, $103, $ 107, $107, $110, $110, OVERHEAD TRUSS CANTILEVER SIGN (REMOVE) 5 AS 2, $13, $ 2, $11, $1, $8, SIGN PANEL (F&I) ( ) 4 EA 7, $28, $ 7, $31, $10, $40, SIGN PANEL (RELOCATE) ( ) 2 EA 4, $9, $ 9, $18, $1, $3, SIGN PANEL (F&I) (16-100) 2 EA $1, $ $1, $1, $2, SIGN PANEL (REMOVE) 4 EA $2, $ $1, $ $3, R DMS SYSTEM (LED - 1 LINE) (RELOCATE) 1 EA 8, $8, $ 9, $9, $9, $9, DELINEATOR (FLEXIBLE TUBULAR) 167 EA $8, $ $8, $87.00 $14, RETO-REFLECTIVE PAVEMENT MARKER 3,666 EA 2.61 $9, $ 3.30 $12, $3.25 $11, THERMOPLASTIC (STD.) (WHITE) (SOLID) (6") NM 4, $2, $ 5, $2, $5, $2, THERMOPLASTIC (STD.) (WHITE) (SOLID) (8") NM 6, $1, $ 7, $1, $7, $1, THERMOPLASTIC (STD.) (WHITE) (SOLID) (18") 604 LF 3.19 $1, $ 3.70 $2, $3.60 $2, THERMOPLASTIC (STD.) (WHITE) (SKIP) (6") GM 1, $ $ 2, $1, $2, $ THERMOPLASTIC (STD.) (WHITE) (MESSAGE) 2 EA $ $ $ $ $ THERMOPLASTIC (STD.) (WHITE) (ARROWS) 4 EA $ $ $ $ $ THERMOPLASTIC (STD.) (YELLOW) (SOLID) (6") NM 4, $2, $ 5, $2, $5, $2, PAVEMENT MARKING - PREFORMED TAPE (HP) (WHITE) (SOLID) (8") NM 23, $35, $ 30, $46, $30, $45, PAVEMENT MARKING - PREFORMED TAPE (HP) (WHITE) (SOLID) (12") 1,164 LF 7.55 $8, $ 7.50 $8, $7.50 $8, PAVEMENT MARKING - PREFORMED TAPE (HP) (WHITE) (SOLID) (18") 1,773 LF $19, $ $19, $11.00 $19, PVEMENT MARKING - PREFORMED TAPE (HP) (WHITE) (SKIP) (3'-12') (12") GM 8, $17, $ 10, $22, $10, $21, PAVEMENT MARKING - PREFORMED TAPE (HP) (YELLOW) (SOLID) (6") NM 16, $123, $ 19, $142, $18, $137, PAVEMENT MARKING - PREFORMED TAPE (HP) (YELLOW) (SOLID) (8") 1,178 LF 4.60 $5, $ 6.00 $7, $5.75 $6, PAVEMENT MARKING - PREFORMED TAPE (HP) (YELLOW) (SOLID) (18") 260 LF $2, $ $2, $11.00 $2, PAVEMENT MARKING - PREFORMED TAPE (HP) (9" CONTRAST) (SOLID) (9") NM 26, $197, $ 26, $198, $18, $137, PAVEMENT MARKING - PREFORMED TAPE (HP) (9" CONTRAST) (SKIP) (10'-30') (9") GM 7, $54, $ 8, $56, $8, $55, PAVEMENT MARKING - PREFORMED TAPE (HP) (ALT. WHITE/BLACK) (SKIP 3'-3'-9) 668 LF 8.23 $5, $ 7.00 $4, $7.00 $4, LIGHTING CONDUCTORS (F&I, NO. 10 OR SMALLER) 2,580 LF 0.88 $2, $ 0.70 $1, $1.00 $2, LIGHTING CONDUCTORS (F&I, NO. 8 TO 6) 116,610 LF 1.32 $153, $ 0.93 $108, $1.35 $157, LIGHTING CONDUCTORS (F&I, NO. 4 TO 2) 131,307 LF 1.96 $257, $ 1.55 $203, $2.00 $262, LIGHTING CONDUIT (F&I- UNDERGROUND) 57,234 LF 4.40 $251, $ 2.60 $148, $2.70 $154, LIGHTING CONDUIT (F&I- SURFACE MOUNT) 60 LF $1, $ $ $21.00 $1, LIGHT POLE COMP.(F&I, STANDARD,130MPH,45') 178 EA 4, $790, $ 3, $694, $3, $621, LIGHT POLE COMP.(F&I, STANDARD,130MPH,35') 113 EA 3, $407, $ 2, $327, $2, $309, LIGHT POLE COMP. (REMOVE) 16 EA 2, $37, $ 1, $20, $2, $38, LIGHT POLE COMP. (RELOCATE) 179 EA $78, $ $53, $ $80, LOAD CENTER (F&I, SECONDARY VOLTAGE) 3 EA 12, $38, $ 10, $32, $13, $39, LOAD CENTER (F&I, REWORK, SECONDARY VOLTAGE) 1 EA $ $ $69.00 $ $ LOAD CENTER (REMOVE, SECONDARY VOLTAGE) 1 EA $ $ $ $ $ LUMINARE (F&I, UNDERDECK, WALL MOUNT) 8 EA 1, $10, $ 2, $17, $1, $10, LUMINARE (F&I, UNDERDECK, PENDANT HUNG) 24 EA 1, $41, $ 1, $33, $1, $42, LIGHTING PULL BOX (F&I, ROADSIDE) - MOULDED 402 EA $361, $ $205, $ $361, LIGHTING- INSIDE BOX GIRDER 1 LS 752, $752, $ 128, $128, $250, $250, POLE CABLE DISTRIBUTION SYSTEM (CONVENTIONAL) 291 EA 1, $424, $ 1, $378, $1, $384, POLE CABLE DISTRIBUTION SYSTEM (WALL MOUNTED) 53 EA $20, $ 1, $68, $ $21, LIGHTING POLE COMPLETE (SINGLE ARM, WALL MT, ALUM, 45') 5 EA 3, $16, $ 1, $9, $3, $16, LIGHTING POLE COMPLETE (SINGLE ARM, WALL MT, ALUM, 35') 7 EA 3, $26, $ 2, $17, $3, $27, LIGHTING POLE COMPLETE (SINGLE ARM, BRIDGE MOUNT, AL, 35') 36 EA 2, $79, $ 2, $75, $2, $81, LIGHTING POLE COMPLETE (SINGLE ARM, BRIDGE MOUNT, AL, 45') 5 EA 2, $13, $ 2, $13, $2, $13, RAMP PLAZA- RAMP D-1 1 LS 808, $808, $ 600, $600, $900, $900, GANTRY- RAMP I 1 LS 999, $999, $ 150, $150, $285, $285, 'X4'X4' CONCRETE MANHOLE (F&I) 6 EA 4, $29, $ 3, $18, $5, $32, 'X6.5'X6.5' CONCRETE MANHOLE (F&I) 2 EA 6, $13, $ 4, $9, $7, $14,140.00

8 BID TABULATION - BID OPENING JULY 9, 2012, 1:30 PM. OPTION 4 - RAMP H AND RAMP I BRIDGES DESIGN-BUILD Astaldi Construction Corp. SEMA Construction Lane Construction 'X6.5'X6.5' CONCRETE MANHOLE (DOGHOUSE) (F&I) 6 EA 6, $40, $ 4, $26, $7, $47, TUBULAR ROUTE MARKER 9 EA $1, $ $ $86.00 $ RAMP H BRIDGE DESIGN BUILD 1 LS 12,332, $12,332, $ 18,000, $18,000, $15,800, $15,800, RAMP I BRIDGE DESIGN BUILD 1 LS 6,744, $6,744, $ 8,000, $8,000, $7,919, $7,919, ALLOWANCE FOR DISPUTES REVIEW BOARD N/A N/A $30, $30, $30, WORK ORDER ALLOWANCE N/A N/A $300, $300, $300, $65,919, $69,777, $71,690, Denotes Corrected Bid Amount

INVITATION TO BID OFFICE OF THE ORLANDO-ORANGE COUNTY EXPRESSWAY AUTHORITY ORLANDO, FLORIDA

INVITATION TO BID OFFICE OF THE ORLANDO-ORANGE COUNTY EXPRESSWAY AUTHORITY ORLANDO, FLORIDA INVITATION TO BID OFFICE OF THE ORLANDO-ORANGE COUNTY EXPRESSWAY AUTHORITY ORLANDO, FLORIDA Sealed Bids will be received in the office of the Orlando-Orange County Expressway Authority, 4974 ORL Tower

More information

MINNESOTA DEPARTMENT OF TRANSPORTATION ESTIMATED PRODUCTION RATES FOR COMPUTING CONTRACT TIME

MINNESOTA DEPARTMENT OF TRANSPORTATION ESTIMATED PRODUCTION RATES FOR COMPUTING CONTRACT TIME SET-UP AND MOBILIZATION MOBILIZATION LS 1-3 Days CONTRACTOR SURVEY LS 1-3 Days REMOVALS CONCRETE PAVEMENT SQ YD 1000-4000 BITUMINOUS SURFACE SQ YD 8000-12000 CLEAR AND GRUBBING ACRE/DAY 2-4 CLEAR AND GRUBBING

More information

MWA SPLOST (Projects C F) Bid Math Check. Project C F, I, & L Bid Results (for MWA).xlsx.xls Worksheet: "Projects C F Bid Math Check" 1/8

MWA SPLOST (Projects C F) Bid Math Check. Project C F, I, & L Bid Results (for MWA).xlsx.xls Worksheet: Projects C F Bid Math Check 1/8 SPLOST Drainage Projects Package 2013-1 Project C: Hillcrest Avenue (Hillcrest Boulevard -to- Dillon Branch) Project D: Main Street Project E: Riverside Drive (at Railroad) Project F: Riverside Drive (at

More information

The unit costs are based on the trend line of the 3 low bids for the average quantity.

The unit costs are based on the trend line of the 3 low bids for the average quantity. Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally

More information

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 11/22/13 PAGE : VENDOR RANKING

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 11/22/13 PAGE : VENDOR RANKING PAGE : 998-1 VENDOR RANKING CONTRACT TIME : 390 Working Days (available days) CONTRACT DESCRIPTION : BIRMINGHAM PROJECT(S) : APD-1602(551) for constructing the Grade, Drain, Partial Base & Pave, Bridge

More information

FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES

FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES NAICS CODE Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway (includes 300, 320, 327, 330, 334, 336, 337, 338) Application of prime and tack coats, leveling surfaces and

More information

FDOT Specifications List

FDOT Specifications List FDOT Specifications List TABLE OF CONTENTS DIVISION II CONSTRUCTION DETAILS CLEARING CONSTRUCTION SITE 110 Clearing and Grubbing... 152 EARTHWORK AND RELATED OPERATIONS 120 Excavation and Embankment...

More information

FDOT DBE CERTIFICATION SPECIALTY/NAICS CODE SHEET WITH CAP SIZES

FDOT DBE CERTIFICATION SPECIALTY/NAICS CODE SHEET WITH CAP SIZES FDOT DBE CERTIFICATION SPECIALTY/ SHEET WITH CAP SIZES Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway $ 22.41 Application of prime and tack coats, leveling surfaces and

More information

UNIT PRICE LIST January 2009

UNIT PRICE LIST January 2009 UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only

More information

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW NOTICE TO CONTRACTORS CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW The Nebraska Department of Roads will receive sealed bids in

More information

UNIT PRICE LIST ITEM UNIT UNIT PRICE STREETS & DRAINAGE CURB & GUTTER/SIDEWALKS/HANDICAP RAMPS

UNIT PRICE LIST ITEM UNIT UNIT PRICE STREETS & DRAINAGE CURB & GUTTER/SIDEWALKS/HANDICAP RAMPS STREETS & DRAINAGE CURB & GUTTER/SIDEWALKS/HANDICAP RAMPS CG-2/3 LF $12.75 CG-5 LF $15.00 CG-6 LF $18.00 CG-7 EA $3,133.50 CG-7A (STONE) SY $10.00 CG-8 EA $6,500.00 CG-9/10 EA $6,200.00 CG-11 EA $6,900.00

More information

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates

More information

Unit Price Averages Reports

Unit Price Averages Reports Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation

More information

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development

More information

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development

More information

Portway Extensions Concept Development Study APPENDIX F PRELIMINARY CONSTRUCTION COST ESTIMATES

Portway Extensions Concept Development Study APPENDIX F PRELIMINARY CONSTRUCTION COST ESTIMATES Portway Extensions Concept Development Study Final Report APPENDIX F PRELIMINARY CONSTRUCTION COST ESTIMATES Portway Extensions Concept Development Study Final Report In advance of an economic impact analysis

More information

Legacy Trail Extension Feasibility Study. Preliminary Cost Estimate

Legacy Trail Extension Feasibility Study. Preliminary Cost Estimate Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5

More information

- 1 - Jb James Construction Llc. Measure. Total Amount. Unit Price

- 1 - Jb James Construction Llc. Measure. Total Amount. Unit Price Lead Project: H.002303.6 Parish: East Baton Rouge Routes: LA 37 Description: LA 37 at Central Thruway Type Const: GRADING, DRAIN STRUCT, SEWER FORCE MAINS, CLASS II BC, SUPERPAVE ACP, PCCP, TRAFFIC SIGNALIZATION,

More information

ESTIMATE OF QUANTITIES ESTIMATE OF QUANTITIES ITEM NUMBER DESCRIPTION UNIT QUANTITY ITEM NUMBER DESCRIPTION UNIT QUANTITY 201.06 CLEARING AND GRUBBING LS 1.0 402.376922 PAVEMENT DENSITY QUALITY ADJUSTMENT

More information

Plan Preparation Guide. Chapter 9

Plan Preparation Guide. Chapter 9 Plan Preparation Guide Chapter 9 Drainage Structures R.C. Box Culverts Ditches - Gutters - Curbs Section Description Page 1 Plans for Hydrology 9-1 2 Catch Basin Types and Uses 9-2 3 Drop Inlet Types and

More information

A. Structures Quantity Item Price Cost @ $3,500 EA

A. Structures Quantity Item Price Cost @ $3,500 EA PRINCE WILLIAM COUNTY Department of Development Services Land Development Division UNIT PRICE LIST (Performance Bonds, Landscaping Escrows, and Siltation & Erosion Control Escrows) Revised: November 17,

More information

Chapter 22. Lump Sum Project Guidelines

Chapter 22. Lump Sum Project Guidelines Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11

More information

CITY OF WINTER GARDEN CONSTRUCTION SERVICES LABOR, EQUIPMENT, AND MATERIALS BID FORM MOBILIZATION/DEMOBILIZATION

CITY OF WINTER GARDEN CONSTRUCTION SERVICES LABOR, EQUIPMENT, AND MATERIALS BID FORM MOBILIZATION/DEMOBILIZATION 1 2 3 4 < 100K Work Order > 100K Work Order < 100K Work Order > 100K Work Order % of Work Order % of Work Order % of Work Order % of Work Order 5 1 Each/Day Type I Barricade 6 1 Each/Day Type II Barricade

More information

STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION

STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION 2009 Edition Written And Promulgated By Public Works Standards, Inc. Published By Division of BNi Publications, Inc. 990 Park Center Drive, Suite E, Vista,

More information

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF TRANSPORTATION BUREAU OF PROJECT DELIVERY

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF TRANSPORTATION BUREAU OF PROJECT DELIVERY GENERAL : CONTRACT DRAWING : 1. DESIGN SPECIFICATIONS: THE FOLLOWING ARE TO BE PLACED ON THE CONTRACT DRAWINGS WHEN REQUIRED: AND DESIGNED IN ACCORDANCE WITH THE AASHTO SPECIFICATIONS FOR HIGHWAY BRIDGES,

More information

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS 2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS GENERAL 10/16/2008 The listed average unit prices are based on the

More information

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets Los Angeles County Department Of Public Works Land Development Division Bond Calculation Sheets Effective July 1, 2015 COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS LAND DEVELOPMENT DIVISION ROADS COST

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids Bids Open: 2 pm Date: Wednesday, March 4, 2015 BASE BID SCHEDULE 1 - Rudell Road Reconstruction Project NO. CODE CONTRACT PROJECT No. B3-0470 and C4-0069 COUNTY'S ESTIMATE 1 All American Asphalt Corona,

More information

Figure 3 Pipe Cracking

Figure 3 Pipe Cracking The illustration shown below depicts the system analyzed. As-built drawings and survey information were not available; aerial photos and survey shots of inverts were used to determine the system s geometries.

More information

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial

More information

UNIT PRICE LIST (09/30/2012) DIVISION I -EARTHWORK

UNIT PRICE LIST (09/30/2012) DIVISION I -EARTHWORK LIST (09/30/2012) DIVISION I -EARTHWORK 100.1 MOBILIZATION L.S. - 11% 100.2 INSURANCE & BOND L.S. - 3% 101.1 PREPARING RIGHT OF WAY L.S. - 4% 102.1 OBLITERATING ABANDONED STREET ( < 25,000 S.Y.) S.Y. 6

More information

Florida Department of Transportation 605 Suwannee Street Tallahassee, FL 32399-0450

Florida Department of Transportation 605 Suwannee Street Tallahassee, FL 32399-0450 RICK SCOTT GOVERNOR Florida Department of Transportation 605 Suwannee Street Tallahassee, FL 32399-0450 JIM BOXOLD SECRETARY Tips for Professional Services Prequalification Resume Submission In an effort

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation 644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING

More information

FY08 SEWER POINT REPAIRS BID TABULATION

FY08 SEWER POINT REPAIRS BID TABULATION 6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "

More information

PLANS OF PROPOSED S.R. 429 (WEKIVA PARKWAY) N. OF PONKAN RD. TO N. OF KELLY PARK RD. ORANGE COUNTY OOCEA PROJECT NUMBER - 429-203

PLANS OF PROPOSED S.R. 429 (WEKIVA PARKWAY) N. OF PONKAN RD. TO N. OF KELLY PARK RD. ORANGE COUNTY OOCEA PROJECT NUMBER - 429-203 BEE LINE EXPRESSWAY CONTRACT #: 00085 0 CHIPLEY 75 95 FORT WALTON PENSACOLA BEACH PANAMA CITY TALLAHASSEE 0 JACKSONVILLE PLANS OF PROPOSED LAKE CITY 295 GAINESVILLE ST AUGUSTINE INDEX OF FIBER OPTIC NETWORK

More information

CHAPTER 14: GUARDRAIL and BARRIERS

CHAPTER 14: GUARDRAIL and BARRIERS CHAPTER 14: GUARDRAIL and BARRIERS If you have any questions regarding guardrail, end treatments and/or pay items included in your plan, please contact the Project Design Services Unit or the Design Standards

More information

I-66 Pavement Rehabilitation

I-66 Pavement Rehabilitation I-66 Pavement Rehabilitation Fall Asphalt Conference Richmond, VA David Shiells, P.E. Virginia Department of Transportation David White Superior Paving Corporation October 2, 2012 Project Location 2 Goal

More information

Paving Capitalization Work Categories and Treatments

Paving Capitalization Work Categories and Treatments Statement of ODOT Infrastructure Capitalization Policy Government Accounting Standards Board (GASB) 34 requires public agencies to capitalize infrastructure assets on their financial statements for periods

More information

UTILITY CONSTRUCTION WITHIN HIGHWAY RIGHTS-OF-WAY

UTILITY CONSTRUCTION WITHIN HIGHWAY RIGHTS-OF-WAY CHAPTER VI UTILITY CONSTRUCTION WITHIN HIGHWAY RIGHTS-OF-WAY Section 1. General. (a) There are certain areas within the highway right-of-way that should be kept clear of utility facilities due to the hazard

More information

BID TABULATION Fiber Optic Cable Materials Bid #0111-147 March 16, 2011 at 11:00 am CDT

BID TABULATION Fiber Optic Cable Materials Bid #0111-147 March 16, 2011 at 11:00 am CDT 1 251,200 LF 2 HDPE-SDR 13.5 with pull tape Unit Price $0.5679 $0.527 $0.593 $0.630 Extended Price $142,656.48 $0.00 $132,382.40 $148,961.60 $158,256.00 2 251,200 LF 2 HDPE-SDR 13.5 without pull tape Unit

More information

Florida Avenue Crossing

Florida Avenue Crossing Florida Avenue Crossing Prepared for: Arapahoe County Open Spaces On behalf of the High Line Canal Working Group 6934 South Lima Street, Suite A Centennial, CO 80112 Prepared by: Felsburg Holt & Ullevig

More information

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR ESTABLISHING CONSTRUCTION CONTRACT DURATION July 2010 DISCLAIMER: The following documentation as a whole was derived from Federal Highway Administration

More information

LETTING : CALL : 015 COUNTIES : BIG STONE SWIFT

LETTING : CALL : 015 COUNTIES : BIG STONE SWIFT S T A T E O F M I N N E S O T A PAGE : -1 NUMBER OF DAYS: 30 BRIDGE COUNT : 0 CONTRACT DESCRIPTION : GRADING, BITUMINOUS MILL & OVERLAY AND GUARDRAIL CONTRACT LOCATION: LOCATED ON TH 7 FROM 638 FT NORTHWEST

More information

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix F RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 4400 South Street - Piping and Collection

More information

Tabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14

Tabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14 Solcitation No: DTFH71-14-B-00008 Division: Eastern Federal Lands State: DC County: Federal Land: 1 out of 9 Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date:

More information

GUARDRAIL CHECKLIST. (most of this information can be found in the Design Scene)

GUARDRAIL CHECKLIST. (most of this information can be found in the Design Scene) GUARDRAIL CHECKLIST (most of this information can be found in the Design Scene) - When Salvaging Guardrail you need to pay attention to the pay item and what is actually being salvaged. (see other section

More information

1-D, Field Density Item Embankment For every 1500 cu.m. or fraction thereof:

1-D, Field Density Item Embankment For every 1500 cu.m. or fraction thereof: SCHEDULE OF GOVERNING ITEMS OF WORK OF THE DPWH STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS, 1998, (VOLUME II) PART C - EARTHWORK Item 100 - Clearing & Grubbing None Item 101 - Removal of

More information

Tabulation of Bids. Grand Region

Tabulation of Bids. Grand Region Call Number: 022 Contract ID: 41024-118885 Project(s): IM 1641(025) Letting Date: February 05, 2016 Region(s): Grand Region Counties: Kent County Contract Time: 10/31/16 COMPLETION DATE Contract Description:

More information

Date. Resubmit this form during the year if there are changes in your company ownership or financial standing.

Date. Resubmit this form during the year if there are changes in your company ownership or financial standing. COLORADO DEPARTMENT OF TRANSPORTATION CONTRACTOR PREQUALIFICATION STATEMENT (EXPERIENCE, EQUIPMENT AND FINANCIAL) Return to: Contracts & Market Analysis Prequalification Unit 4201 E. Arkansas,4th Floor

More information

TEXAS DEPARTMENT OF TRANSPORTATION TECHNICAL PROVISIONS FOR SH 99 GRAND PARKWAY SEGMENTS H, I-1 AND I-2

TEXAS DEPARTMENT OF TRANSPORTATION TECHNICAL PROVISIONS FOR SH 99 GRAND PARKWAY SEGMENTS H, I-1 AND I-2 TEXAS EPARTMENT OF TRANSPORTATION FOR SH 99 GRAN PARKWAY SEGMENTS H, I-1 AN I-2 ATTAHMENT 21-1 TOLL SYSTEMS RESPONSIILITY MATRIX APRIL 30, 2015 LEGEN Toll s Responsibility Matrix Work escription oordination

More information

Pavement Type Selection Report

Pavement Type Selection Report Pavement Type Selection Report Segment 1: West of CR 532 (Osceola/Polk County Line) to West of SR 528 (Beachline Expressway) Osceola County (92130) and Orange County (75280) July 18, 2014 HNTB Corporation

More information

EXECUTIVE SUMMARY CHAPTER 6

EXECUTIVE SUMMARY CHAPTER 6 EXECUTIVE SUMMARY CHAPTER 6 This Bridge Development Report was prepared to document the decision process and recommendations for constructing a bridge carrying Maitland Boulevard (eastbound) over I-4 as

More information

BID SOLICITATION NOTICE District 1 FLORIDA DEPARTMENT OF TRANSPORTATION CONSTRUCTION AND MAINTENANCE PROGRAMS

BID SOLICITATION NOTICE District 1 FLORIDA DEPARTMENT OF TRANSPORTATION CONSTRUCTION AND MAINTENANCE PROGRAMS BID SOLICITATION NOTICE District 1 FLORIDA DEPARTMENT OF TRANSPORTATION CONSTRUCTION AND MAINTENANCE PROGRAMS Bartow, FL June 21, 2016 Advertisement No. 1 All bids must be completed using Expedite Bid

More information

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS TABLE OF CONTENTS I. RULES AND REGULATIONS A. TABLE OF CONTENTS... 2 B. TERMS AND DEFINITIONS... 3 C. DEVELOPER S/CONTRACTOR S RESPONSIBILITIES...

More information

Underground Structures Standards (UGS)

Underground Structures Standards (UGS) SOUTHERN CALIFORNIA EDISON TRANSMISSION AND DISTRIBUTION BUSINESS UNIT Underground Structures s () 2009 FIRST QUARTER ISSUE January 30, 2009 Contact Digalert (811) 48 Hours Prior to Excavating This document

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts SECTION 00300 BID FORM S For additions and deletions to the Contract, the following unit prices shall be applicable for the specific items listed. Unit Prices shall be complete, in place including required

More information

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 CITY OF SAN ANTONIO Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 (010) FORMAL INVITATION FOR BIDS (IFB) to CONTRACT 2016-2017 TASK ORDER CONTRACT

More information

REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING

REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING Revised October, 2013 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 REQUIRED DRAWINGS... 3 2.1 Site Plan... 3

More information

UNIFORM STANDARD DRAWINGS VOL I (Summary of Revisions) Effective 7/1/11

UNIFORM STANDARD DRAWINGS VOL I (Summary of Revisions) Effective 7/1/11 New Drawing Number 101-104 101 Symbols 105-106 105 Abbreviations UNIFORM STANDARD DRAWINGS VOL I SECTION 200 STREET IMPROVEMENTS 200 Pavement Structure Design Guideline Chart for Major Collector and Arterial

More information

FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1

FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1 FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1 4. STRUCTURAL ANALYSIS AND EVALUATION The analysis of bridges and structures is a mixture of science and engineering judgment. In most cases, use simple models with

More information

The following MMCD Standard Detail Drawings are to be used or replaced as indicated below:

The following MMCD Standard Detail Drawings are to be used or replaced as indicated below: City of Victoria Supplementary Specifications Schedule B to Subdivision and Development Servicing Bylaw No. 12-042 3. The following MMCD Standard Detail Drawings are to be used or replaced as indicated

More information

Texas Department of Transportation Highway Safety Improvement Program (HSIP) Work Codes Table. Revised 10/01/2015

Texas Department of Transportation Highway Safety Improvement Program (HSIP) Work Codes Table. Revised 10/01/2015 Texas Department of Transportation Highway Safety Improvement Program (HSIP) Work Codes Table Revised 10/01/2015 HSIP Work Codes Table This document contains a current and complete listing of work codes

More information

SECTION 4 EXCAVATION, TRENCHING AND BACKFILLING 4.01 SCOPE OF WORK

SECTION 4 EXCAVATION, TRENCHING AND BACKFILLING 4.01 SCOPE OF WORK 4.01 SCOPE OF WORK The work covered by this section shall consist of furnishing all materials, equipment and labor for the excavating, trenching, backfilling, and bore and jack required to install or repair

More information

Herbicide Application. Irrigation System (Only) Sanitary System Testing & Inspections

Herbicide Application. Irrigation System (Only) Sanitary System Testing & Inspections NAICS Code Work Description Work Item 115310 - Support Activities for Forestry 221310 Water Supply and Irrigation Systems 221320 - Sewage Treatment Facilities 236118 Residential Remodelers 236220 Commercial

More information

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E.

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E. Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir Presented By: Doug Stachler, P.E. Project Organization Owner Delaware County Engineers Office Design Consultant CH2M HILL Contractor Double

More information

BID PROPOSAL: ANNUAL GUARDRAIL CONTRACT - PALM BEACH COUNTY PROJECT #

BID PROPOSAL: ANNUAL GUARDRAIL CONTRACT - PALM BEACH COUNTY PROJECT # 1 Emergency Response, Less Than 6 Hours 5 EA $ 850.00 $ 825.00 $ 750.00 $ 3,750.00 $ 900.00 $ 4,500.00 2 Emergency Response, 6 Hours to 24 Hours 10 EA $ 500.00 $ 500.00 $ 500.00 $ 5,000.00 $ 500.00 $ 5,000.00

More information

EXPANDING THE USE OF PRECAST CONCRETE IN TEXAS BRIDGES

EXPANDING THE USE OF PRECAST CONCRETE IN TEXAS BRIDGES EXPANDING THE USE OF PRECAST CONCRETE IN TEXAS BRIDGES Graham Bettis, P.E. TxDOT Bridge Division Construction & Maintenance Just the Facts Total Number of On-System Bridges (Excluding Culverts): 21,686

More information

Preliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006

Preliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006 Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006 1.0 Background and Repair and Rehabilitation Recommendation Clay County has contracted Camp Dresser & McKee Inc. (CDM)

More information

CIVIL BREADTH Exam Specifications

CIVIL BREADTH Exam Specifications NCEES Principles and Practice of Engineering Examination CIVIL BREADTH and TRANSPORTATION DEPTH Exam Specifications Effective Beginning with the April 2015 Examinations The civil exam is a breadth and

More information

2015 ODOT Bridge Design Conference May 12, 2014. DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement.

2015 ODOT Bridge Design Conference May 12, 2014. DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement. 2015 ODOT Bridge Design Conference May 12, 2014 DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement Mary Ann Triska 2015 HDR, all rights reserved. Presentation Outline Project

More information

GUIDELINES - SITE PLAN APPLICATION DRAWINGS

GUIDELINES - SITE PLAN APPLICATION DRAWINGS GUIDELINES - SITE PLAN APPLICATION DRAWINGS GENERAL PLAN REQUIEMENTS All measurements must be in metric Plan scale is to be a standard scale and to suit project requirements. A scale of 1:200 to 1:400.

More information

CITYPLEX TOWERS BOILER INSTALLATION ORU RFP-1138

CITYPLEX TOWERS BOILER INSTALLATION ORU RFP-1138 ALTERNATE No. 2 BFS LOCATION: Locate BFS North of B-3 on new house-keeping pad. HOUSE KEEPING PAD and DRAIN CONNECTIONS: Furnish house-keeping pad for new boilers B-2 and B-3 including trench drains to

More information

BIDDER 1 BIDDER 2 DIGIOIA-SUBURBAN EXCAVATING LLC ANTHONY ALLEGA CEMENT CONTRACTOR INC ROYALTON RD 5585 CANAL RD

BIDDER 1 BIDDER 2 DIGIOIA-SUBURBAN EXCAVATING LLC ANTHONY ALLEGA CEMENT CONTRACTOR INC ROYALTON RD 5585 CANAL RD AWARDED PROJECT PROJECT NO. 070219 PID. 14940 LAK-283-9.43 E040(432) TYPE: MAJOR RECONSTRUCTION LETTING: 05/23/07 COMPLETION DATE: 09/30/08 OHIO DEPARTMENT OF TRANSPORTATION JAMES G. BEASLEY, DIRECTOR

More information

Special Specification 6033 Computerized Transportation Management System

Special Specification 6033 Computerized Transportation Management System 6033 Special Specification 6033 Computerized Transportation Management System 1. DESCRIPTION Relocate computerized transportation management system (CTMS) equipment as shown on the plans and as described

More information

STANDARD DRAWINGS TABLE OF CONTENTS

STANDARD DRAWINGS TABLE OF CONTENTS STANDARD DRAWINGS TABLE OF CONTENTS Intelligent Transportation System Standards Typical ITS Corridor Layout Typical ITS Intersection Layout w/hub IP Viewing Device N48T Fiber Pull Box Miscellaneous Facilities

More information

3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch.

3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch. To Prospective Bidders: CITY OF TOLEDO, OHIO PARKSIDE AREA SSO ELIMINATION PHASE 2 GRAVITY RELIEF SEWER NO. 2011 Addendum No. 2 December 8, 2011 Information disclosed and/or questions raised since issuing

More information

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT

More information

RHODE ISLAND TURNPIKE AND BRIDGE AUTHORITY NEWPORT/PELL BRIDGE APRIL 1, 2014 TEN YEAR RENEWAL AND REPLACEMENT PLAN (IN 2013 DOLLARS)

RHODE ISLAND TURNPIKE AND BRIDGE AUTHORITY NEWPORT/PELL BRIDGE APRIL 1, 2014 TEN YEAR RENEWAL AND REPLACEMENT PLAN (IN 2013 DOLLARS) APRIL, 04 TEN YEAR RENEWAL AND REPLACEMENT PLAN (IN 03 DOLLARS) 3/8/04 July 03- June 04 July 04- June 05 July 05- June 06 July 06- June 07 July 07- June 08 July 08- June 09 July 09- June 00 July 00- June

More information

11 Guardrail. W-Beam Guardrail Pre-Installation Inspection During Installation Basis for Use. Modified Guardrail. End Treatments and Transitions

11 Guardrail. W-Beam Guardrail Pre-Installation Inspection During Installation Basis for Use. Modified Guardrail. End Treatments and Transitions 11 Guardrail W-Beam Guardrail Pre-Installation Inspection During Installation Basis for Use Modified Guardrail End Treatments and Transitions Footings and Anchors Impact Attenuators Measurement and Payment

More information

VDOT 2001 Road and Bridge Standards Section 1300 - Traffic Control Devices

VDOT 2001 Road and Bridge Standards Section 1300 - Traffic Control Devices VDOT 2001 Road and Bridge s Page Title CF-1 1301.01 CF-2 1301.02 CF-3 1301.03 CTE-1 1301.04 CTE-2,3 1301.05 Controller Cabinet Foundation and Conduit Placement Details Control Center Cabinet Foundation

More information

Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs -

Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs - Project Information Existing Conditions Cracked and settled pavement. Structural failure within the asphalt pavement section. Anticipated Project Elements Reconstruction of all asphalt pavement on US Route

More information

512 UTILITIES. A. General

512 UTILITIES. A. General 512 UTILITIES A. General 1. Any Utility s use of county rights-of-way will be coordinated with the primary purpose of the rights-of-way which is to provide safe, efficient, and convenient passage for motor

More information

Ontario Electrical Safety Code - Info Sheet

Ontario Electrical Safety Code - Info Sheet Ontario Electrical Safety Code - Info Sheet The following are the Code requirements and explanatory material for buried electrical wiring that are applicable to most residential applications. 12-012 Underground

More information

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables Engineering Department SEPTEMBER, 2007 GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables General Requirements This section applies to all public and private utilities,

More information

Addendum Number 1 Request for Bids #15-004 BUD BENDER PARK REHABILITATION PROJECT City Project No. CB 1302

Addendum Number 1 Request for Bids #15-004 BUD BENDER PARK REHABILITATION PROJECT City Project No. CB 1302 Addendum Number 1 Request for Bids #15-004 City Project CB 1302 To all prospective bidders under specifications for Request for Bids #15-004, the Bud Bender Park Rehabilitation Project, City Project CB

More information

May 29, 2015. The Department of Roads has scheduled a bid letting to be held in this office June 25, 2015 at 1:30 PM

May 29, 2015. The Department of Roads has scheduled a bid letting to be held in this office June 25, 2015 at 1:30 PM May 29, 2015 TO ALL CONCERNED: The Department of Roads has scheduled a bid letting to be held in this office June 25, 2015 at 1:30 PM The Notice to Contractors includes: 1. Website Information 2. Notice

More information

SECTION 02221 SELECTIVE DEMOLITION

SECTION 02221 SELECTIVE DEMOLITION SECTION 02221 PART 1 -GENERAL 1.01 DESCRIPTION This section includes all material, labor, machinery and supervision required to demolish and remove the following items where applicable and as noted on

More information

2nd Saw Cut (See Note 2) 1st Saw Cut (See Note 2) Match Existing Surface Treatment If Surface is HMAC, 2" Thick HMAC Overlay Required.

2nd Saw Cut (See Note 2) 1st Saw Cut (See Note 2) Match Existing Surface Treatment If Surface is HMAC, 2 Thick HMAC Overlay Required. 2nd Saw Cut (See Note 2) #4 Bars at 18" on Center Each Way 12" 1st Saw Cut (See Note 2) Match Existing Surface Treatment If Surface is HMAC, 2" Thick HMAC Overlay Required 4,000 psi, 6 Sack Concrete Cap

More information

Final Report FHWA/IN/JTRP-2004/11. Determination of INDOT Highway Construction Production Rates and Estimation of Contract Times

Final Report FHWA/IN/JTRP-2004/11. Determination of INDOT Highway Construction Production Rates and Estimation of Contract Times Final Report FHWA/IN/JTRP-2004/11 Determination of INDOT Highway Construction Production Rates and Estimation of Contract Times By Yi Jiang, Ph.D., P.E. Department of Building Construction Management Purdue

More information

Chapter 19 EXPANSION JOINTS NDOT STRUCTURES MANUAL

Chapter 19 EXPANSION JOINTS NDOT STRUCTURES MANUAL Chapter 19 EXPANSION JOINTS NDOT STRUCTURES MANUAL September 2008 Table of Contents Section Page 19.1 GENERAL... 19-1 19.1.1 Overview... 19-1 19.1.2 Estimation of General Design Thermal Movement, Δ T...

More information

City of Waupun. Public Works Department 201 E. Main St. Waupun, WI (920)

City of Waupun. Public Works Department 201 E. Main St. Waupun, WI (920) 1 STORM WATER MANAGEMENT PERMIT INFORMATION...2 2 SUBMITTAL CHECKLIST...3 3 PROJECT SUMMARY SHEET...4 4 PLAN SHEET CHECKLIST...6 5 GENERAL DESIGN REQUIREMENTS CHECKLIST...8 6 WET POND SUMMARY SHEET...11

More information

Appendix A - Cost Estimate Spreadsheet

Appendix A - Cost Estimate Spreadsheet CCTV Camera, PTZ Per Each $18,500 $1,250 12 $33,500 Closed circuit television (CCTV) camera with pan, tilt, zoom (PTZ) functionality in a dome enclosure. CCTV Camera, Fixed Per Each $14,000 $1,250 12 $29,000

More information

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage:

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage: Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016 * Garage construction requires permits (electrical, building) * Permits must be applied for at the time. * Dial

More information

Transportation Asset Inventory. Marsha K. Mays, P.E. Chris Kinsey, P.E. Planning Conference October 8, 2014

Transportation Asset Inventory. Marsha K. Mays, P.E. Chris Kinsey, P.E. Planning Conference October 8, 2014 Transportation Asset Inventory Marsha K. Mays, P.E. Chris Kinsey, P.E. Planning Conference October 8, 2014 What is ERP? Enterprise Resource Planning System Also Known as Basically the Modernization and

More information

CHAPTER 11 STRUCTURES TABLE OF CONTENTS

CHAPTER 11 STRUCTURES TABLE OF CONTENTS CHAPTER 11 STRUCTURES TABLE OF CONTENTS Section Title Page 11.1 General... 11-1 11.1.1 Design Standards...11-1 A. List of Structural Standards to be Followed...11-1 11.1.2 Borings and Soils Tests...11-1

More information

CD i -STREETS- Detail #

CD i -STREETS- Detail # -STREETS- Detail # 3000 Vertical Curb, Gutter and Sidewalk 3010 Low-Profile Curb, Gutter and Sidewalk 3020 Rolled Curb, Gutter and Sidewalk 3030 Separated Sidewalk, Curb & Gutter 3040 Sidewalk Staged Construction

More information

ARTICLE 3. RESIDENTIAL

ARTICLE 3. RESIDENTIAL RESIDENTIAL ARTICLE 3. RESIDENTIAL SEC. 3.1 AVAILABLE RESIDENTIAL ELECTRIC SERVICE (including mobile homes and four unit dwellings and smaller) Single-phase, 60 hertz, 120/240 volts, three-wire. SEC. 3.2

More information

AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding

AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding A Guide for California Developers of Com m ercial Property This guide consists of

More information