1 S T A T E O F M I N N E S O T A PAGE : -1 NUMBER OF DAYS: 30 BRIDGE COUNT : 0 CONTRACT DESCRIPTION : GRADING, BITUMINOUS MILL & OVERLAY AND GUARDRAIL CONTRACT LOCATION: LOCATED ON TH 7 FROM 638 FT NORTHWEST OF JCT TH 75 TO 100 FT EAST OF JCT TH 119 & 59 IN APPLETON RECOMMENDATION: AWARD TO LOW BIDDER I, THE UNDERSIGNED CERTIFY THAT THIS ABSTRACT IS A CORRECT TABULATION OF ALL BIDS RECEIVED ON THIS (THESE) PROJECT(S): THAT THE LEGAL REQUIREMENTS RELATING TO COMPETITIVE BIDDING ON PUBLIC PROJECTS HAVE BEEN COMPLIED WITH: THAT SAID BIDS WERE OPENED IN PUBLIC AND AWARD HAS BEEN MADE TO THE LOWEST RESPONSIBLE BIDDER. APPROVED: STATE AID OR CONSTRUCTION ENGR ASST. DIV. DIRECTOR, OPERATIONS TOTAL % OVER % OVER RANK VENDOR NO./NAME BID LOW BID EST EST- ENGINEER'S ESTIMATE $ 4,460, % % 1 C320 CENTRAL SPECIALTIES INC $ 3,973, % % 2 D420 DUININCK BROTHERS INC $ 4,042, % % 3 B410 BITUMINOUS PAVING INC $ 4,424, % % 4 K0037 KNIFE RIVER CORPORATION - NORTH CENTRAL $ 4,576, % % SECTION 0001 BITUMINOUS MILL & OVERLAY ETC /00010 LUMP MOBILIZATION / EACH FIELD OFFICE TYPE D
2 p\lcp8b.tmp: Page 2 PAGE : / EACH FIELD LABORATORY TYPE D /00010 LUMP MAINT AND RESTORATION OF HAUL ROADS / L F REMOVE PIPE CULVERTS / L F REMOVE CURB AND GUTTER / S Y REMOVE BITUMINOUS PAVEMENT / S Y REMOVE BITUMINOUS SHOULDER PAVEMENT / EACH REMOVE PIPE APRON / L F SAWING BITUMINOUS PAVEMENT (FULL DEPTH) / L F SALVAGE PIPE CULVERT / EACH SALVAGE PIPE APRON /00010 LUMP DEWATERING / L F SHOULDER EXCAVATION / S Y GEOTEXTILE FABRIC TYPE V / C Y EXCAVATION - COMMON / C Y EXCAVATION - SUBGRADE / C Y COMMON EMBANKMENT (CV) / C Y SELECT GRANULAR EMBANKMENT (CV) / HOUR CRAWLER MOUNTED BACKHOE
3 p\lcp8b.tmp: Page 3 PAGE : / C Y AGGREGATE BASE (CV) CLASS / C Y AGGREGATE SHOULDERING (LV) CLASS / S Y MILL BITUMINOUS SURFACE (2.0") / S Y MILL BITUMINOUS SURFACE (3.0") / EACH MILLED RUMBLE STRIPS / TON TYPE SP 12.5 WEARING COURSE MIXTURE (3, B) / C Y AGGREGATE BEDDING (CV) / L F " CS PIPE CULVERT / L F " CS PIPE CULVERT / L F " RC PIPE CULVERT / L F " RC PIPE CULVERT / L F " RC PIPE CULVERT / EACH " GS PIPE APRON / EACH " CS SAFETY APRON & GRATE DESIGN / EACH " RC SAFETY APRON & GRATE DESIGN / EACH " CS SAFETY APRON / EACH " CS SAFETY APRON
4 p\lcp8b.tmp: Page 4 PAGE : / EACH " CS SAFETY APRON / EACH " RC SAFETY APRON / EACH " RC SAFETY APRON / EACH " RC SAFETY APRON / L F INSTALL PIPE CULVERT / EACH INSTALL PIPE APRON / EACH CLEAN PIPE CULVERT / EACH " SAFETY APRON / EACH " SAFETY APRON / L F " PIPE CULVERT / L F " PIPE CULVERT / C Y RANDOM RIPRAP CLASS III / L F CONCRETE CURB & GUTTER DESIGN B / EACH MAIL BOX SUPPORT / L F TRAFFIC BARRIER DESIGN / EACH ANCHORAGE ASSEMBLY-CABLE /00010 LUMP TRAFFIC CONTROL / L F SILT FENCE, TYPE MACHINE SLICED
5 p\lcp8b.tmp: Page 5 PAGE : / L F TEMPORARY DITCH CHECK TYPE / L F TEMPORARY DITCH CHECK TYPE /00010 LUMP EROSION CONTROL SUPERVISOR / ACRE SEEDING / LB SEED MIXTURE / LB SEED MIXTURE / LB SEED MIXTURE / TON MULCH MATERIAL TYPE / ACRE DISK ANCHORING / S Y EROSION CONTROL BLANKETS CATEGORY / S Y EROSION CONTROL BLANKETS CATEGORY / LB FERTILIZER TYPE / LB FERTILIZER TYPE / LB HYDRAULIC SOIL STABILIZER TYPE / ACRE RAPID STABILIZATION METHOD / L F INTERIM PAVEMENT MARKING / EACH PAVEMENT MESSAGE (RIGHT ARROW) POLY PREFORM-GROUND IN
6 p\lcp8b.tmp: Page 6 PAGE : / EACH PAVEMENT MESSAGE (STOP AHEAD) POLY PREFORM-GROUND IN / L F " STOP LINE WHITE-POLY PREFORM (GROUND IN) / L F " SOLID LINE WHITE-EPOXY / L F " DOTTED LINE WHITE-EPOXY / L F " SOLID LINE YELLOW-EPOXY / L F " BROKEN LINE YELLOW-EPOXY SECTION TOTALS $ 4,460, $ 3,973, $ 4,042, CONTRACT TOTALS $ 4,460, $ 3,973, $ 4,042,540.24
7 p\lcp8b.tmp: Page 7 PAGE : -7 ( 3 ) B410 ( 4 ) K0037 ( ) BITUMINOUS PAVING INC KNIFE RIVER CORPORATION - NO SECTION 0001 BITUMINOUS MILL & OVERLAY ETC /00010 LUMP MOBILIZATION / EACH FIELD OFFICE TYPE D / EACH FIELD LABORATORY TYPE D /00010 LUMP MAINT AND RESTORATION OF HAUL ROADS / L F REMOVE PIPE CULVERTS / L F REMOVE CURB AND GUTTER / S Y REMOVE BITUMINOUS PAVEMENT / S Y REMOVE BITUMINOUS SHOULDER PAVEMENT / EACH REMOVE PIPE APRON / L F SAWING BITUMINOUS PAVEMENT (FULL DEPTH) / L F SALVAGE PIPE CULVERT / EACH SALVAGE PIPE APRON /00010 LUMP DEWATERING / L F SHOULDER EXCAVATION / S Y GEOTEXTILE FABRIC TYPE V / C Y EXCAVATION - COMMON / C Y EXCAVATION - SUBGRADE
8 p\lcp8b.tmp: Page 8 PAGE : -8 ( 3 ) B410 ( 4 ) K0037 ( ) BITUMINOUS PAVING INC KNIFE RIVER CORPORATION - NO / C Y COMMON EMBANKMENT (CV) / C Y SELECT GRANULAR EMBANKMENT (CV) / HOUR CRAWLER MOUNTED BACKHOE / C Y AGGREGATE BASE (CV) CLASS / C Y AGGREGATE SHOULDERING (LV) CLASS / S Y MILL BITUMINOUS SURFACE (2.0") / S Y MILL BITUMINOUS SURFACE (3.0") / EACH MILLED RUMBLE STRIPS / TON TYPE SP 12.5 WEARING COURSE MIXTURE (3, B) / C Y AGGREGATE BEDDING (CV) / L F " CS PIPE CULVERT / L F " CS PIPE CULVERT / L F " RC PIPE CULVERT / L F " RC PIPE CULVERT / L F " RC PIPE CULVERT / EACH " GS PIPE APRON / EACH " CS SAFETY APRON & GRATE DESIGN 3148
9 p\lcp8b.tmp: Page 9 PAGE : -9 ( 3 ) B410 ( 4 ) K0037 ( ) BITUMINOUS PAVING INC KNIFE RIVER CORPORATION - NO / EACH " RC SAFETY APRON & GRATE DESIGN / EACH " CS SAFETY APRON / EACH " CS SAFETY APRON / EACH " CS SAFETY APRON / EACH " RC SAFETY APRON / EACH " RC SAFETY APRON / EACH " RC SAFETY APRON / L F INSTALL PIPE CULVERT / EACH INSTALL PIPE APRON / EACH CLEAN PIPE CULVERT / EACH " SAFETY APRON / EACH " SAFETY APRON / L F " PIPE CULVERT / L F " PIPE CULVERT / C Y RANDOM RIPRAP CLASS III / L F CONCRETE CURB & GUTTER DESIGN B / EACH MAIL BOX SUPPORT / L F TRAFFIC BARRIER DESIGN 8331
10 p\lcp8b.tmp: Page 10 PAGE : -10 ( 3 ) B410 ( 4 ) K0037 ( ) BITUMINOUS PAVING INC KNIFE RIVER CORPORATION - NO / EACH ANCHORAGE ASSEMBLY-CABLE /00010 LUMP TRAFFIC CONTROL / L F SILT FENCE, TYPE MACHINE SLICED / L F TEMPORARY DITCH CHECK TYPE / L F TEMPORARY DITCH CHECK TYPE /00010 LUMP EROSION CONTROL SUPERVISOR / ACRE SEEDING / LB SEED MIXTURE / LB SEED MIXTURE / LB SEED MIXTURE / TON MULCH MATERIAL TYPE / ACRE DISK ANCHORING / S Y EROSION CONTROL BLANKETS CATEGORY / S Y EROSION CONTROL BLANKETS CATEGORY / LB FERTILIZER TYPE / LB FERTILIZER TYPE / LB HYDRAULIC SOIL STABILIZER TYPE / ACRE RAPID STABILIZATION METHOD 2
11 p\lcp8b.tmp: Page 11 PAGE : -11 ( 3 ) B410 ( 4 ) K0037 ( ) BITUMINOUS PAVING INC KNIFE RIVER CORPORATION - NO / L F INTERIM PAVEMENT MARKING / EACH PAVEMENT MESSAGE (RIGHT ARROW) POLY PREFORM-GROUND IN / EACH PAVEMENT MESSAGE (STOP AHEAD) POLY PREFORM-GROUND IN / L F " STOP LINE WHITE-POLY PREFORM (GROUND IN) / L F " SOLID LINE WHITE-EPOXY / L F " DOTTED LINE WHITE-EPOXY / L F " SOLID LINE YELLOW-EPOXY / L F " BROKEN LINE YELLOW-EPOXY SECTION TOTALS $ 4,424, $ 4,576, $ CONTRACT TOTALS $ 4,424, $ 4,576, $
NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW
NOTICE TO CONTRACTORS CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW The Nebraska Department of Roads will receive sealed bids in
More informationUnit Price Averages Reports
Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation
More informationVILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL
VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial
More informationTabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14
Solcitation No: DTFH71-14-B-00008 Division: Eastern Federal Lands State: DC County: Federal Land: 1 out of 9 Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date:
More informationExhibit A Scope of Work
Exhibit A Scope of Work The agreement for S.P. 3116-142 (T.H. 169-Cross Range Expressway) includes final design plans for a 1.55 mile length of a 2 lane to 4 lane expansion project located 0.66 miles SW
More informationCity of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
More informationFDOT Specifications List
FDOT Specifications List TABLE OF CONTENTS DIVISION II CONSTRUCTION DETAILS CLEARING CONSTRUCTION SITE 110 Clearing and Grubbing... 152 EARTHWORK AND RELATED OPERATIONS 120 Excavation and Embankment...
More informationSECTION 13 REPLACEMENT AND CLEANUP 13.01 SCOPE OF WORK
13.01 SCOPE OF WORK Under this item, the Contractor will restore all lawns, trees, gardens, landscape plantings, sidewalks, ramps, trails, fences, commercial signs, water courses and sand, gravel, dirt,
More informationOhio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES
Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices
More informationIndex. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
More informationLand Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
More informationLump Sum Estimating: Discovery and Simulation
Lump Sum Estimating: Discovery and Simulation Brian Wasserman, Principal Investigator Center for Transportation Research and Innovation Minnesota State University, Mankato June 2012 Research Project Final
More informationA. Structures Quantity Item Price Cost @ $3,500 EA
PRINCE WILLIAM COUNTY Department of Development Services Land Development Division UNIT PRICE LIST (Performance Bonds, Landscaping Escrows, and Siltation & Erosion Control Escrows) Revised: November 17,
More informationPLAN VIEW FOR LAKE OR MARSH FRONT VIEW FOR FLOTATION SILT CURTAIN
OF WATERWAY PERIMETER CONTROL LESS THAN / THE STREAM/RIVER STEEL FENCE POST ANCHOR TO LAND (TYP.) / DEPTH OF WATER PLOTTED/REVISED:-OCT-0 WIDTH STREAM BANK TEMPORARY ROCK BERM BRIDGE ABUTMENT, CULVERT
More informationCOLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project
More informationFDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES
NAICS CODE Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway (includes 300, 320, 327, 330, 334, 336, 337, 338) Application of prime and tack coats, leveling surfaces and
More informationSITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)
More informationOutlet stabilization structure
Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural
More informationFY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation
644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING
More informationFLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR
FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR ESTABLISHING CONSTRUCTION CONTRACT DURATION July 2010 DISCLAIMER: The following documentation as a whole was derived from Federal Highway Administration
More informationLocal Road Assessment and Improvement Drainage Manual
Local Road Assessment and Improvement Drainage Manual Donald Walker, T.I.C. Director, author Lynn Entine, Entine & Associates, editor Susan Kummer, Artifax, design Transportation Information Center University
More informationCONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS FOR
PH 231.946.5874 FAX 231.946.3703 WWW.gourdiefraser.com CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS FOR Little Traverse Bay Bands of Odawa Indians Nine Mile Point Boat Launch Hayes Township, Charlevoix
More informationBUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS
Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development
More informationThe Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11
Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;
More informationDate. Resubmit this form during the year if there are changes in your company ownership or financial standing.
COLORADO DEPARTMENT OF TRANSPORTATION CONTRACTOR PREQUALIFICATION STATEMENT (EXPERIENCE, EQUIPMENT AND FINANCIAL) Return to: Contracts & Market Analysis Prequalification Unit 4201 E. Arkansas,4th Floor
More informationCONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE The following template may be used as a general guide for development of a Stormwater Pollution Prevention Plan (SWPPP) for construction activities.
More informationHow To Build A Road In A Townhouse
FDOT DBE CERTIFICATION SPECIALTY/ SHEET WITH CAP SIZES Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway $ 22.41 Application of prime and tack coats, leveling surfaces and
More informationDivision 2 Section 32 14 13.19 Section 02795
Note: The text must be edited to suit specific project requirements. It should be reviewed by a qualified civil or geotechnical engineer, or landscape architect familiar with the site conditions. Edit
More informationTable 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
More informationPermeable Pavement Construction Guide
Permeable Pavement Construction Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems that reduce
More informationBUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS
Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development
More informationFY08 SEWER POINT REPAIRS BID TABULATION
6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "
More informationADDENDUM NO. 2. Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT
ADDENDUM NO. 2 Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT Bridge No. 1460008 (existing) Bridge No. 06806 (new) TO ALL BIDDERS: Anchor Engineering
More informationCHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1
CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm
More informationConstruction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources
More informationHelen Mercury Mine EE/CA OPINION OF PROBABLE COST
G Cost Estimates Helen Mercury Mine EE/CA Alternative 2: Limited Action 3 Minor Road Improvements 4 Clear & Grub diversion channel areas 5 Surveying 6 Cleanup & Demobilization 7 Pull back of material 8
More informationErosion and Storm Water Management Unit Mail Stop 620 395 John Ireland Blvd. St. Paul, MN 55155
Minnesota Department of Transportation Office of Environmental Stewardship Erosion and Storm Water Management Unit Mail Stop 620 395 John Ireland Blvd. St. Paul, MN 55155 Memo Office Tel:651-366-3629 Fax:651-366-3603
More informationDemo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts
SECTION 00300 BID FORM S For additions and deletions to the Contract, the following unit prices shall be applicable for the specific items listed. Unit Prices shall be complete, in place including required
More informationSUBDIVISION ROAD CONSTRUCTION AND INSPECTION PROCEDURES
BOARD OF COUNTY COMMISSIONERS ST. MARY S COUNTY LEONARDTOWN, MARYLAND SUBDIVISION ROAD CONSTRUCTION AND INSPECTION PROCEDURES APRIL, 1991 AMENDED: JUNE, 2002 DEPARTMENT OF PUBLIC WORKS & TRANSPORTATION
More informationSECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
More informationDIVISION 200 - EARTHWORK SECTION 201 - CLEARING RIGHT-OF-WAY
DIVISION 200 - EARTHWORK SECTION 201 - CLEARING RIGHT-OF-WAY 201.01 Description This work shall consist of clear cutting, selective clearing and thinning, tree trimming, removing single trees, including
More informationSITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific
More informationCHAPTER 14: GUARDRAIL and BARRIERS
CHAPTER 14: GUARDRAIL and BARRIERS If you have any questions regarding guardrail, end treatments and/or pay items included in your plan, please contact the Project Design Services Unit or the Design Standards
More informationCW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS
December 2014 CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications...
More informationSAMPLE COPY. Stormwater Pollution Prevention Plan. A site map must be developed and must contain, at a minimum, the following information:
Stormwater Pollution Prevention Plan "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure
More informationCity of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014
City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 Section Subsection Name Date Modification Division 1 All subsections General Provisions
More informationVehicle Tracking Pad
Stormwater Quality Best Management Practices Construction Sites s When to use: Where construction vehicles leave active construction areas onto surfaces where runoff is not checked by sediment controls
More informationErosion and Storm Water Management Unit Mail Stop 620 395 John Ireland Blvd. St. Paul, MN 55155
Minnesota Department of Transportation Office of Environmental Stewardship Erosion and Storm Water Management Unit Mail Stop 620 395 John Ireland Blvd. St. Paul, MN 55155 Memo Office Tel:651-366-3629 Fax:651-366-3603
More informationSection 600 Incidental Construction
Table of Contents 1. Pipe Culverts... 600-1 A. Endwalls, Inlets, Manholes, and Spring Boxes... 600-5 2. Grade Adjustment of Existing Miscellaneous Structures... 600-8 3. Rebuilt Miscellaneous Structures...
More informationVDOT 2001 Road and Bridge Standards Section 100 - Drainage Items
VDOT 2001 Road and Bridge s Page Title EW-1 EW-1A 101.01 Endwall for Pipe Culverts 12" - 36" Circular and 23" X 14" - 53" X 34" Elliptical Pipes EW-1PC EW-1APC 101.02 Precast Endwall for Pipe Culverts
More informationStorm Drain Inlet Protection - IP
Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior
More informationINVITATION TO BID OFFICE OF THE ORLANDO-ORANGE COUNTY EXPRESSWAY AUTHORITY ORLANDO, FLORIDA
INVITATION TO BID OFFICE OF THE ORLANDO-ORANGE COUNTY EXPRESSWAY AUTHORITY ORLANDO, FLORIDA Sealed Bids will be received in the office of the Orlando-Orange County Expressway Authority, 4974 ORL Tower
More information2014 Inlet Rehab Project II Various Locations
2014 Inlet Rehab Project II Various Locations in the City of Sioux Falls, South Dakota Bid Request No. 14-1078 Prepared by: Engineering Division 224 West 9 th Street Sioux Falls, SD 57104 TABLE OF CONTENTS
More information1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP
5 INDEX TO SHEETS. NOTES AND TYPICAL SECTIONS. H. R. SMITH RD.CULVERT.3 0/5 END BARRIER ACCESS ROAD REPAIR. KISSIMMEE RD. AT MORGAN HOLE CR. ROAD REPAIR.5 RANGE INFRASTRUCTURE REPAIR N 0 000' 3 0,000'
More informationStorm Drain Inlet Protection for Construction Sites (1060)
Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain
More informationSECTION 4Aggegate Subbase
The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages
More informationStormwater/Wetland Pond Construction Inspection Checklist
: Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials
More informationSECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
More informationSTRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
More informationThe unit costs are based on the trend line of the 3 low bids for the average quantity.
Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally
More informationDESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
More informationChapter 22. Lump Sum Project Guidelines
Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11
More informationSTANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall
More informationCITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03
CITY OF SAN ANTONIO Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 (010) FORMAL INVITATION FOR BIDS (IFB) to CONTRACT 2016-2017 TASK ORDER CONTRACT
More informationTobique Employment & Training
APPENDICES 3 Tobique Employment & Training Flood Mitigation July 30, 2012 Overview This proposal outlines the work required and budget for flood mitigation measures on Tobique First Nation which is required
More information3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch.
To Prospective Bidders: CITY OF TOLEDO, OHIO PARKSIDE AREA SSO ELIMINATION PHASE 2 GRAVITY RELIEF SEWER NO. 2011 Addendum No. 2 December 8, 2011 Information disclosed and/or questions raised since issuing
More informationStorm Drain Inlet Protection for Construction Sites (1060)
Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain
More informationDescription Quantity Cost Total Cost
APPENDIX: ITEMIZED CONSTRUCTION COST ESTIMATE Description Quantity Cost Total Cost 1 CASCADE FALLS 1a Existing Cascade Falls Upgrades Structural Repairs - Steps, Railing, Walls, Pool Lump Sum $500,000
More informationMay 29, 2015. The Department of Roads has scheduled a bid letting to be held in this office June 25, 2015 at 1:30 PM
May 29, 2015 TO ALL CONCERNED: The Department of Roads has scheduled a bid letting to be held in this office June 25, 2015 at 1:30 PM The Notice to Contractors includes: 1. Website Information 2. Notice
More informationBuyer: Daniels, Joan E Phone (248)858-5481. Fax: (248)858-1677 Email: danielsj@oakgov.com
PROPOSAL FORM L. BROOKS PATTERSON - OAKLAND COUNTY EXECUTIVE OAKLAND COUNTY PURCHASING DIVISION PROPOSAL COVER SHEET Contact Information: Oakland County Purchasing Division Building 41 West - Lower Level
More informationSECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
More informationSECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or
More informationUNIT PRICE LIST January 2009
UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only
More informationWILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued)
BIDDER'S PROPOSAL (continued) Item Estimated No. Description Quantity Unit Unit Cost Total Cost BASE BID 1 Traffic Control 1 LS $ $ 2 Construction Area Signs 1 LS $ $ 3 Excavation Safety 1 LS $ $ 4 Reset
More informationChapter 5: Drainage, Ditches, and Culverts
Chapter 5: Drainage, Ditches, and Culverts chapter contents Characteristics of Good Drainage 82 Elements of Good Surface Drainage 82 Crown 82 Shoulders 82 Slope 82 Ditches 83 Culverts 83 Inlets 83 Optimal
More informationSTATE OF MISSOURI HIGHWAYS and TRANSPORTATION COMMISSION JEFFERSON CITY, MISSOURI CONSTRUCTING OR IMPROVING CONTRACT I.D.
STATE OF MISSOURI HIGHWAYS and TRANSPORTATION COMMISSION JEFFERSON CITY, MISSOURI CONSTRUCTING OR IMPROVING CONTRACT I.D. 160624-C05 THIS JOB SHALL BE CONSTRUCTED UNDER FEDERAL PROJECT NUMBER(S): I-35-1
More informationChapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling
7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling Asphalt Pavements 7-7 Chapter 7 Pavement Rehabilitation Pavement rehabilitation can be accomplished
More informationCompost-Based Stormwater Best Management Practices Using Compost to Improve Stormwater Management and Erosion Control On Roadsides
Compost-Based Stormwater Best Management Practices Using Compost to Improve Stormwater Management and Erosion Control On Roadsides Chris Newman US EPA Region 5 Chicago, IL Compost-Based BMPs Compost-based
More informationState of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
More informationMinimizes sediment and debris from entering storm drains that lead to waterways and watercourses.
4.5-p DRAIN INLET PROTECTION Alternative Names: DI protection, Drop Inlet Protection DESCRIPTION Storm drain inlet (DI) protection slows and ponds stormwater, and filters sediment and debris before it
More informationCOST EFFECTIVE ROAD MAINTENANCE MARCH 2015
COST EFFECTIVE ROAD MAINTENANCE MARCH 2015 According to the University of New Hampshire technology transfer Center the goal of a Road Surface Management Plan should be the following: Maximize Return on
More informationPROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS
C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates
More informationGuidelines for Fiber Optic Cable Permits
Guidelines for Fiber Optic Cable Permits NOVA District (Fairfax/Arlington) Permits www.virginiadot.org/business/fairfax-permits-main.asp Email: NOVAFairfaxPermits@VDOT.Virginia.gov 14685 Avion Parkway
More informationSECTION 3.3 - PAVEMENT DESIGN
SECTION 3.3-3.3.1 GENERAL 3.3.2 SUBSURFACE DRAINAGE 3.3.3 DETERMINATION OF DESIGN TRAFFIC 3.3.4 SUBGRADE EVALUATION 3.3.5 PAVEMENT THICKNESS 3.3.5.1 GRANULAR PAVEMENTS WITH THIN BITUMINOUS SURFACING 3.3.5.2
More informationSECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) Note: This guide specification for U.S. applications describes construction of permeable interlocking concrete
More informationTABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth
TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20
More informationLos Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets
Los Angeles County Department Of Public Works Land Development Division Bond Calculation Sheets Effective July 1, 2015 COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS LAND DEVELOPMENT DIVISION ROADS COST
More informationStorm Drain Inlet Protection
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category
More informationRural Road Maintenance Handbook Module 16 Rural Road Maintenance Cost Estimate
After fulfilling Module 16, you will be able to: Understand the structure of cost estimating sheets and the steps to establish a cost estimate for rural road maintenance Establish cost estimate Self -
More informationStorm Drain Inlet Protection
Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description Applications Installation and Implementation Requirements Devices installed at storm drain inlets to detain and/or
More informationChapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile
Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality
More informationCity of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting
More informationAcceptance Codes APPENDIX - A. Acceptance Criteria
1111 Receipt of a satisfactory Test Report from WSDOT Materials Laboratory is required indicating the lot (or lots) or batch of material meets the requirement of the specifications under which it is listed.
More informationBMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.
BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems
More informationSE-10 STORM DRAIN INLET PROTECTION. Objectives
STORM DRAIN INLET PROTECTION SE-10 Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Waste and Materials Management -
More informationMDWASD 8/1999 SECTION 02315 TRENCHING AND BACKFILLING FOR PIPING SYSTEMS
PART 1 - GENERAL 1.01 WORK INCLUDED SECTION 02315 TRENCHING AND BACKFILLING FOR PIPING SYSTEMS A. The work included under this Section consists of excavating, backfilling and compaction as required for
More informationSECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) Note: This guide specification for U.S. applications describes construction of permeable interlocking concrete
More informationSEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST
SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST For permanent structures per Delaware SCS Pond Code 378 and Delaware Sediment and Stormwater Regulations KEY PROJECT INFORMATION Item meets standard
More informationProject Performance Review Summary
Rev. March 2009 Standard Specifications 2007 Project Performance Review Summary SC File No. FAP No. County Prime Contractor Date Route RCE Overall Project Evaluation Summary Adjusted Project Score Adjusted
More informationCHAPTER 7 DRAINAGE OF PAVEMENTS
CHAPTER 7 DRAINAGE OF PAVEMENTS 7-1. Drainage control Adequate drainage of surface and ground water is one of the most important considerations in the design, construction, and maintenance of roads, railroads,