UNESCO - EOLSS SAMPLE CHAPTER

Size: px
Start display at page:

Download "UNESCO - EOLSS SAMPLE CHAPTER"

Transcription

1 OFFSHORE DRILLING AND PRODUCTION EQUIPMENT S. Tanaka Professor Emeritus, The University of Tokyo, Tokyo, Japan Y. Okada General Manager, Japan Oil Engineering Co., Ltd., Tokyo, Japan Y. Ichikawa General Manager, Japan Drilling Co., Ltd., Tokyo, Japan Keywords: Offshore, rotary drilling, offshore drilling rig, jack-up, semisubmersible, drillship, offshore oil and gas production, platform, FPSO, subsea production systems. Contents 1. Introduction 2. Outline of Rotary Drilling Method 3. Offshore Drilling Structures and Equipments 4. Offshore Oil/Gas Production Systems Glossary Bibliography Biographical Sketches To cite this chapter Summary World consumption of primary energy in 1999 was estimated at million tons oil equivalent. Oil and natural gas accounted for about 65% of the world energy supply. Offshore areas produced % of the oil and gas supply. Oil and natural gas are brought to the surface from underground reservoirs through wells that have been drilled and completed to produce these fluids safely and economically. Fundamental technology of drilling, completion and production of oil and gas is common to onshore and offshore areas. But environmental conditions of a field affect facilities and engineering works of the field. This chapter covers the basics of rotary drilling technology, recent progress of drilling engineering, characteristics of various offshore drilling rigs, and types of offshore production systems. The offshore production system adopted to develop a field extends its influence on the drilling and completion method of the field. 1. Introduction The chapter describes mainly the present situation of offshore drilling and production of oil and natural gas. The first section is devoted for an outline of the rotary drilling method, as oil and gas wells onshore and offshore are drilled by the method. A hole made by a drilling bit is called a well. The objective of making the well is to

2 produce underground fluids such as fresh water, brine, crude oil, natural gas and geothermal fluids, and to study properties of deeply situated formations. The Middle East area and China are said to have had wells producing water or natural gas even in the era before Christ. By the year 1200, wells 450 m deep were drilled in China by a spring-pole drilling method. The principle of the method is to generate percussion by dropping heavy tools on the bottom of the hole. The spring-pole drilling method was the predecessor of a cable drilling method that had been used till after 1970s. Hand-powered rotary devices were introduced to make geothermal wells in Italy and water wells in France in early 1800s. Machine-powered rotary devices and circulation systems were introduced by the late 1850 s. In 1901, the Lucas gusher at Spindletop oil field, the United States of America, was successfully drilled and completed by the rotary drilling method with circulation of fluid that consisted of water and clay. The first cementing job to shut off water was carried out in The use of bentonite as an ingredient of drilling fluid began in 1935 and has contributed to improve mud properties. Three-cutter rock bits equipped with jet nozzles were introduced to clean the bottom-hole of cuttings around The technology of directional drilling has made great progress to the level of extended reach drilling (ERD) and horizontal wells through the development of down-hole mud motors and measurement-while-drilling tools (MWD). Over-water drilling from a pier extended from seashore was carried out in the late 1890 s. Drilling and production of oil in the location where the land was out of sight was accomplished offshore Louisiana, the United States of America, in 6 m of water in The well was drilled from a tender-assisted platform system. Four basic types of mobile offshore drilling rigs were developed not long after drilling the first offshore well: the submersible rig in 1949, the ship-shaped rig in 1953, the jack-up rig in 1954, and the semisubmersible rig in Drill ships and semisubmersible rigs are called floaters. These structures float during operations. Floaters are equipped with unique facilities that are not used in onshore operations: the marine riser, the motion compensation, and the stationkeeping system. The dynamic positioning system (DPS) was introduced for deep-sea operations in The scientific research well SG-3 in Russia reached the depth of m in 1988, and has had the depth record ever since. The deepest exploration drilling for hydrocarbons was carried out to the depth of 9583 m in the United States of America in As for offshore wells, a hydrocarbon exploration well was drilled offshore Brazil in 2965 m of water in A production well was completed with a subsea completion system offshore Brazil in 1852 m of water in The offshore technology is steadily in progress toward deeper and deeper seas to search and produce subsea resources for the future welfare of the world. 2. Outline of Rotary Drilling Method The rotary drilling method is usually applied to make deep wells. In the rotary drilling a bit breaks down rocks at the bottom of the hole by scraping and crushing actions. The bit

3 is rotated through a drill stem by a rotary table on a rig floor. Figure 1: Diagrammatic View of Rotary Drilling Rig (Modified from Rabia H. (1985). Oilwell Drilling Engineering, Principles and Practice, Graham & Trotman) A diagrammatic view of the rotary drilling rig is shown in Figure 1. The left side of the figure shows main surface equipment. The substructure indicated by 3 is constructed on the ground as the foundation to support the derrick floor G on which the derrick 1, rotary table H, and drawworks M are placed. The monkey board (or platform) 2 is a working floor to handle pipes. The heavy materials such as the drill stem and casing are lowered into or lifted up from the hole by a hoisting system composed of the drawworks M, drilling line 4, crown block A, traveling block B, and the hook C. A circulation system of drilling fluid consists of the suction pits P, pumps Q, surface piping, standpipe, rotary hose (or kelly hose) F, and swivel D which is connected to the kelly E, and directed lines show the flow path of the drilling fluid. In the figure main power sources are the diesel engines N, and the power is transmitted to the rotary table, drawworks and pumps by the main transmission system O. The rotary table is driven by the drive J. Sometimes electric motors are used to drive the relevant machines. A driller controls the machines from the console by the drawworks and conducts the drilling operations. In the right side of the Figure 1 showing the cross-section of the derrick floor R and the hole, blowout preventers (BOPs) S and T are mounted on the top of the wellhead

4 connected to the surface casing V. It is the primary function of the BOPs to safely confine fluids suddenly entering into the hole out of formations, and to bleed them off from the hole through the outlets U in a controlled manner. The drill stem is composed of the kelly E, the drill pipe X, and drill collars Y. The bit Z is attached at the lower end of the drill collars. The components of the drill stem are made of steel pipes. The drilling fluid is circulated down to the bit through the drill stem, and up to the surface through the annular space between the drill stem and the borehole or casing. The drilling fluid returned to the surface flows into the return line L, and then to the shale shaker K to separate cuttings and fluid. The fluid falls into the suction pit P to be circulated again The casing consists of lengths of steel pipe being joined to another. A number of strings of casing are set in the well. The purposes of casing are to protect fresh-water sands, to prevent drilling problems such as heaving formations and high-pressure zones, and finally to provide a means of production of oil and gas if the well is productive. The annular space between the casing and the borehole should be filled with cement W to support the casing and prevent the flow of underground fluids up to the surface and/or into the fresh-water zones. Conductor casing is the largest-diameter casing used to protect the surface soils. The next smaller-diameter casing is the surface casing V. Its main function is to protect fresh-water zones. Intermediate strings of casing are set to case the long open section of the hole or the zones causing trouble. The last string of casing is the production casing that is set immediately above, or through, the production formations The main functions of the rotary drilling rig are as follows: Penetrating operations. The bit breaks down rock at the bottom-hole by the rotation under the weight. The rotating force of the rotary table is transmitted through the drill stem to the bit. Some portion of the weight of drill collars is applied to the bit as the bit weight to push the bit against the rock. Hoisting operations. The drill stem with the bit is lowered and lifted by the hoisting system. The casing is also handled by the hoisting system. Conditioning and circulating the drilling fluids by the circulation system. Preventing the formation fluids from entering into the wellbore and controlling them. The International Association of Drilling Contractors (IADC) classifies the bits used in the rotary drilling as follows: Roller bits (or roller-cone bits). Steel tooth bits. Insert bits (or tungsten carbide insert bits). (b) Fixed cutter drill bits. PDC bits (PDC: polycrystalline diamond compacts) TSP bits (TSP: thermally stable polycrystalline) Natural diamond bits

5 Three types of bits are shown in Figure 2. Figure 2: Three Types of Bits Used in Rotary Drilling A: steel tooth bit, B: insert bit, and C: fishtail PDC bit. (From Drill Bit Catalog 1995 Hughes Christensen Reproduced Courtesy of Hughes Christensen Company) The IADC bit classification system provides conventional methods for categorizing roller bits by three digits, and fixed cutter drill bits by four characters. The choice of bits depends upon properties of the formations, and drilling techniques (see Drilling Machines). The drilling fluids, conventionally simply called as muds, have lots of important functions in the rotary drilling. Main functions are as follows: Removal of cuttings from the bottom of the hole to the surface. Cuttings are separated from the mud at the shale shaker. These cuttings and samples of the mud are analyzed to study geological properties of the rocks penetrated, and to find out the indication of oil and gas in the formations. Controlling hydraulic pressure in the hole by adjusting the density of the mud to prevent collapse of the wall of the borehole, and to contain formation fluids in the formations.

6 Cooling and lubricating the bit and the drill stem. The drilling fluids are composed of base fluids, clay minerals, chemicals, and inert solids. Their base fluids classify them as follows: water-base muds, oil-base muds, air or gas drilling. Bentonite, a kind of clay, is preferred to make up water-base muds. A small quantity of chemicals adds in the mud to control the viscosity and filtration properties. Inert solids such as barite are mixed in the mud to adjust the density. In the conventional system of the rotary drilling, the rotary table rotates the drill stem, but the down-hole mud motor and the top drive device are applied to rotate the bit in the directional and horizontal well drilling, or to improve operations in the vertical well drilling. The technical advancement of the measurement-while-drilling tools (MWD) and the logging-while-drilling tools (LWD) has contributed to the almost real-time acquisition of the down-hole information. Owing to these tools it has become easy to drill directional and horizontal wells. Directional wells with long horizontal departure are called extended-reach-drilling (ERD) wells. The definition of an extended reach well is a well with a measured depth to true vertical depth ratio greater than 2.0. An ERD well in the united Kingdom drilled in 1999 to access offshore reserves from onshore had a record of a departure of m with a measured depth of m and approximately 1600 m true vertical depth. A definition of a horizontal well is a well with a hole section exceeding an inclination of 85 degrees. The adoption of the directional wells, extended-reach wells, horizontal wells, and the multilateral wells has a share in the economical development of oil and gas fields. Figure3 is an example of horizontal wells in the North Sea. Figure 4 shows various types of multilateral wells. Figure 3: Examples of Horizontal Wells in the North Sea (From Blikra H., Drevdal K.E., & Aarrestad T.V. (1994). Extended Reach, Horizontal and

7 Complex Design Wells: Challenges, Achievements and Cost-benefits, Vol.2, Exploration, Production, and Reserves, Proc. of the 14 th World Petroleum Congress, John Wiley & Sons. Reproduced Courtesy of World Petroleum Congress) Figure 4: Various Types of Advanced Wells (From Renard G., & Delamaide E. (1998). Complex Well Architecture IOR and Heavy Oils, Vol. Production, Proc. of the 15 th World Petroleum Congress, John Wiley & Sons. Reproduced Courtesy of World Petroleum Congress) There are two basic types of down-hole mud motors; one is a turbine type (turbodrill), and the other is a positive displacement type (PDM). Figure 5 is an illustration of a multi-lobe (5/6) rotor/stator configuration type of the positive displacement motor. The motor is designed primarily for the directional performance drilling motor, but can also be used for straight-hole drilling. The top drive drilling system is suspended from the swivel, moves up and down together with it, and rotates directly the drill stem by electric or hydraulic motors. In the MWD and LWD systems, sensors are set within the drill collars just above the bit. In the MWD, the hole direction and inclination are measured, and the downhole weight and torque on the bit are included in a modified type of the tool. In the LWD, the formation resistivity and natural gamma ray are measured. The term MWD is often used as a synonym for the term LWD. Data measured at the downhole are transmitted to the surface in a real-time mode by coded mud pulses sending up inside of the drill stem or the annular space. Some sophisticated data transmission systems consist of electromagnetic wave propagation through the earth, or sonic wave propagation through the drill stem.

8 Figure 5: Diagram of Multi-Lobe Mud Motor (From the General catalog, Eastman Christensen TM Reproduced Courtesy of Baker Hughes INTEQ) Figure 6 is an illustration of a positive mud pulse system of the MWD system. In the right side of Figure 6, a MWD tool A is enlarged. In the left side of the Figure 6, positive mud pulses B move up through the drill stem to a pressure detector C at the surface. In the MWD tool measured data are converted into binary signals by an electronics package. The binary data control movement of a valve actuator to produce positive pulses of the

9 mud in the drill stem. Figure 6: Positive Mud Pulse System of MWD (Modified from Busking B.E. (1979). Developments in Drilling Technology, Vol. 3, Production, Proc. of 10 th World Petroleum Congress, Heyden & Son Ltd. Reproduced Courtesy of World Petroleum Congress) 3. Offshore Drilling Structures 3.1. Technical Features of Offshore Drilling Offshore drilling needs a floating or bottom-supported rig. Offshore drilling rigs have drilling equipment to conduct all the functions similar to the land drilling rigs and have facilities peculiar to offshore operations. Because of the location remote from infrastructure, offshore rigs also carry on board a number of service systems such as cementing, geophysical logging, and so on. In addition, there are lots of specific services on board such as ROV, divers, meteorological measurements, helicopter, etc. Accommodations and catering for crews working for 24 hours are required on the rig. All these factors make offshore rigs complex and sophisticated, and therefore offshore drilling costs are higher than land drilling costs for similar depth wells. There are two main categories of drilling rig structures used offshore: Mobile bottom- supported and floating rigs Stationary production structures used exclusively for development wells The first category of mobile structures includes the following rigs:

10 Jack-up rigs Submersible rigs (swamp barges) Anchor-stationed or dynamically positioned semisubmersible rigs Anchor-stationed or dynamically positioned drillships Drilling structures used for developing offshore fields from stationary platforms are of two types: Self-contained platforms Tender or jack-up assisted platforms or well-protector jackets The large production platform equips a complete set of drilling equipment, and is called as self-contained platform, which is described later in the Section 4 of the chapter. The small platform has a space only to accommodate derrick and drawworks, so a kind of tender assists the work, which is described later in the section. There is a guideline to choose roughly the type of offshore drilling rigs according to water depth and conditions of sea state and winds: - Water depth less than 25 m: submersible rigs (swamp barges) - Water depth less than 50 m and calm sea: tender or jack-up assisted platforms - Water depth less than 400 m and mild sea: self-contained platforms - Water depth from 15 m to 150 m: jack-up rigs - Water depth from 20 m to 2000 m: anchored drillships or semisubmersible rigs - Water depth from 500 m to 3000 m: drillships or semisubmersible rigs with dynamic positioning system - Isolated area with icebergs: drillships with dynamic positioning system - Severe sea conditions: semisubmersible rigs or new generation drillships 3.2. Mobile Bottom-supported Rigs Jack-up Drilling Rigs (Jack-up Rigs, Self-elevating Drilling Rigs) Jack-up drilling rigs are used in water depth that typically ranges from 15 to 100 m with a maximum depth of 150 m. A hull of the jack-up drilling rig is typically constructed in a triangular shape with 3 legs, and in a few cases in rectangular or other shapes. A jack-up rig is moderately stable when floating on its hull with its legs up. A jack-up rig is moved by being towed by a tugboat or is transported by a heavy lift carrier from one drilling location to another, and then jacked above the sea surface on tubular or derrick legs. During towing, the legs are raised so that just a few feet protrude below the hull. When moving a jack-up rig, it is necessary to ensure that weather conditions (sea states and winds) do not exceed the allowable operating parameters established for each jack-up rig design.

11 Figure 7: Jack-Up Drilling Rig with Triangular Shape and 3 Legs (JDC Hakuryu 8) (Reproduced Courtesy of Japan Drilling Co.) There are two basic leg configurations of jack-up rigs: Independent-leg type for relatively firm seabed: Each independent leg has a spud can on the end. The leg penetrates soil below the mud line, i.e. the sea bottom. The penetration depends on the composition of the soil and the shape of spud can. Mat-supported type for soft seabed: Legs is connected with a mat. The mat rests on the seabed to stably support the rig. The type is used on flat sea-bottom in water depth of up to 50 m. The penetration is slight. Legs of the independent-leg type of jack-up rigs are either vertical or tilted slightly outward to provide stability when the hull is raised out of the water. Each leg typically consists of three to six vertical members called chords. The vertical members (chords) are attached by cross members (k-braces) and form interconnected truss members. Each of the chords has a gear rack that runs the full length of the leg. The legs are raised and lowered with electric motors mounted to the main deck of the hull, which drive a number of pinion gears attached to each of the leg chord gear racks. Once the rig arrives at the drilling location, the legs are lowered to the sea floor and the hull is raised (jacked) out of the water. The hull is jacked up (elevated) at a speed that ranges from 0.3 to 1 m/min.

12 Prior to raising the hull to the safe working height above the ocean waves, it is required to preload the legs that penetrate the ocean sediments. It is necessary for the sediments that the legs are pushing against to support the weight of the jack-up hull and also the additional drilling equipment placed on the rig during drilling operations and certain drilling loads. If the sediments are not dense enough to support these loads, one or more of the jack-up legs may suddenly/rapidly push (punch) through the sea floor sediments. A leg punch through can severely damage the legs and hull, thus jeopardizing the safety of the rig. Once the preloading operation is complete, the hull can be raised to the desired height above the ocean waves. The height of the hull above the sea surface is called the air gap. The air gap depends on the expected height of the waves and also the height of the production platform if drilling a well on a production platform. Depending on the design of the rig, there is a slot either in the hull to allow the wellhead to be positioned under the rig floor, or the rig floor and support structure (substructure) can be extended/slid-out (cantilevered) from the side of the hull to the desired drilling position. Once the rig is placed in operating position, drilling process is carried out in a way similar to land operations after the outer casing and surface BOP is installed Submersible Drilling Rigs (Submersible Rigs, Swamp Barges) Figure 8: Submersible Drilling Rig (Noble FriRodli) (Reproduced Courtesy of Noble Drilling Corporation)

13 Submersible drilling rigs consist of upper and lower hulls connected by a network of posts or beams. The drilling equipment and living quarters are installed on the upper hull deck. The lower hull has the buoyancy capacity to float and support the upper hull and equipment. When water is pumped into the lower hull, the rig submerges and rests on the seabed to provide a working place for the drilling. Movement and drilling operations proceed as that of the jack-up rig. Most submerged rigs are used only shallow waters of 8 to 10 meters. Ship-shaped submersible rigs are also used, which are called swamp barges. Swamp barges have operated in swamp and marsh areas in Nigeria, Indonesia, and the southern part of United States of America. An arctic mobile drilling unit having conical, sloping-side structure belongs to the submersible type Tender-Assisted Platforms and Tenders In regions where the weather conditions are not harsh, it is possible to use lower cost fixed platforms that are designed to support only the derrick and the drawworks. The tender anchored alongside the platform contains drilling equipment such as pumps and tubular goods, and accommodation for personnel. A catwalk connects the platform and the tender. Figure 9: Platform (left) and Semisubmersible Tender (right) (Atwood Oceanics SEAHAWK) (Reproduced Courtesy of Atwood Oceanics, Inc.) If weather conditions (wind, swell, and current) become too harsh, the drilling operations must be shut down due to excessive motion of the tender. The tender platforms are used in Gulf of Guinea and the Persian Gulf waters where good weather conditions prevail,

14 resulting in low downtime less than 2% of total operation time Floating Offshore Drilling Rigs (Floaters) Technologies Required by Floaters In water depths greater than 100 m, floaters are commonly used. Drillships and semisubmersible rigs are classified as floaters. Drilling operations with floaters require peculiar technologies that are not used in the operations of mobile bottom-supported drilling rigs. They are stationkeeping system, marine riser system, and drillstring motion compensator. These systems are shown in Figure 10 in a case of semisubmersible rig with an anchor-mooring system. Figure 10: Outline of Drilling System of Semisubmersible Rig (Modified from Sekiyukaihatsu Gijutsu no Shiori (1 st edition). Reproduced Courtesy of Japan Petroleum Development Association)

15 Wind and current forces push a floater away from the location directly above the subsea wellhead. Waves raise and fall the floater. The technology has developed to overcome these effects caused by weather conditions. An adequate stationkeeping system is necessary to keep a floater within acceptable limits above the subsea wellhead. One of the methods is an anchor mooring system consisting of mooring lines (chains, wire ropes or a combination of chains and wire ropes) and anchors that is shown in Figure 10. It is important to arrange the mooring-system according to environmental conditions prevailing at the location. The other is DPS, which is the acronym of dynamic positioning system. The vessel has several thrusters under the bottom of it. Computers onboard manipulate the thrusters automatically. Acoustic positioning beacons are located around the subsea wellhead, and send the signals to the vessel. And/or the vessel receives position signals from satellites. The computers analyze the signals, and command movement of the thrusters to keep the vessel's position within acceptable limits. The marine riser system consists of riser pipe, riser tensioners, and ancillaries. The riser pipe is connected to the top of subsea BOP, and is pulled up by the riser tensioner system onboard to keep vertical configuration. The riser pipe serves as a conduit for returning mud to the surface from the hole, and as a guide for running drill stem and casing from the floater to the hole under the seafloor. Figure 11: Crown Mounted Type of Heave Compensator

16 (Reproduced Courtesy of National Oilwell - Kristiansand) The motion compensator is a device to maintain constant weight on the bit during drilling operation in spite of oscillation of the floater due to wave motion. One of the devices is a bumper sub. The bumper sub is used as a component of a drill string, and is placed near the top of the drill collars. A mandrel composing an upper portion of the bumper sub slides in and out of a body of the bumper sub like a telescope in response to the heave of the rig, and this telescopic action of the bumper sub keeps the bit stable on the bottom-hole. The bumper sub is able to transmit the torque from the drill stem to the drill collars to rotate the bit. Other device is a heave compensator. The heave compensator is placed in the derrick. There are two types of the heave compensator. One is a crown mounted heave compensator shown in Figure 11, and the other is an in-line compensator that is hung below the traveling block in the derrick shown in Figure 10. Both systems use either hydraulic or pneumatic cylinders that act as springs supporting the drill stem load, and allow the top of the drill stem to remain stationary, as the rig heaves up and down Drillships The first drillship was introduced in offshore services in 1953, and the dynamic positioning system was equipped in drillships in Drillships are shown in Figure 12. Figure 12: The Larger is a Drillship with Dual-Activity Drilling System (TSF Discoverer Enterprise), and the Smaller is a Previous Generation Drillship (TSF Discoverer 534) Alongside with a Supply Boat; (Reproduced Courtesy of Transocean Inc.) Drillships contain all of the equipment and material needed to drill and complete the well. An opening called a moon pool is equipped in the center of the ship from the main deck to the water. Drilling assembly, riser pipe, wellhead equipment, and so forth are lowered through the moon pool to the sea floor.

17 New generation drillships built in 1990s have the capacity to drill wells in the waters up to 3000 meters. These ships have production test facilities and oil storage tanks in addition to the usual drilling equipment. To improve the efficiency of deepwater operations with the aim of economic advantages, the PROPRIETARY dual-activity drilling system OF TRANSOCEAN INC. is shown in the larger drillship in Figure 12. The dual-activity rigs have two sets of drilling equipment such as mud pumps, drawworks, top drives, and mud treatment system. When a hole is drilled by the first drilling system, the second drilling system is used for making up casing and tubing strings in advance, and so on. Although the dual-activity system in the deepwater drillship is in the early stage of deployment, it is readily recognized that the system can save significant time and cost of drilling operations Semisubmersible Drilling Rig Semisubmersible drilling rigs, which are simply called as semisubmersibles, jointed in the drilling fleet in Semisubmersibles have submerged pontoons (lower hulls) that are interconnected to the drilling deck by vertical columns as shown in Figure 10 and Figure 13. Figure 13: Semisubmersible Drilling Rig (JDC Hakuryu 3) (Reproduced Courtesy of Japan Drilling Co.) The lower hulls provide improved stability for the vessel. Also, the open area between the

18 vertical columns of semisubmersibles provides a reduced area on which the environment can act. In drilling operations, the lower hulls are submerged in the water about half-length of the column, but do not rest on the seabed. When a semisubmersible moves to a new location, the lower hulls float on the sea surface. Semisubmersible rigs are towed by boats, and some rigs have self-propelled capacity. On drilling site to keep the position, the anchors usually moor semisubmersibles, but the dynamic positioning systems are used by new generation semisubmersibles. Drilling equipments, mud systems, living quarters and so forth are placed on the deck, and ballast tanks, thrusters, sea water pumps are equipped in the lower hulls. Semisubmersibles have minimum structures exposed to wave actions. So semisubmersibles provide more stable station for the drilling operations, and are able to operate in harsher environmental conditions as compared with drillships. The main disadvantage of semisubmersibles is that variable deck loading capacity required for storing drilling materials is limited by the structure. In the late 1970s, semisubmersibles had the capability to operate in 500 m water depth using an anchor system. In the late 1990s, the drilling operation capability of semisubmersibles increased to over 1800 meters water depth. Hoisting capacity and variable deck loading capacity are factors restricting the water depth capability of semisubmersibles Location Surveys for Offshore Drilling The offshore environment has a much more significant influence on drilling operations than the onshore environment. It is necessary to carry out a suite of location surveys before starting drilling operations in order to obtain data such as weather forecast during drilling operations, bathymetric map around the location, current profiles, properties of the sea bottom soil, topography of the sea bottom, and shallow geological hazards. The surveys will cover at least area a kilometer square centered on the proposed location. The survey companies analyze and evaluate the data to present reports that are used to prepare the mooring plan and the casing design for a top hole, and so forth. The minimum requirement of the survey includes following instruments: sparkers, sub-bottom profilers, side-scan sonars, fathometers, and gravity corers. Wind and current measurements for several months would be carried out at a proposed location about one year ago before operations. In critical areas, surveys in consideration of the culture, the archaeological and biological background are required. 4. Offshore Oil/Gas Production Systems 4.1. Brief History of Offshore Production Systems History of offshore petroleum production dates back to the end of the 19th century, when oil wells were drilled from piers constructed along the Californian coast of the United States of America. Geologically continental shelf is considered to be the extension of continental land and it was quite natural to pursue the extension of onshore oil accumulation down to sea bottom. These Californian wells were the first attempt of this

19 hunt. If hunt for petroleum, i.e. oil and natural gas, was extended from onshore to offshore, so was the use of equipment employed for its production. Petroleum production and field processing equipment typically includes wells to safely bring oil and gas from underground formation to surface, separation equipment to separate gas, oil and associated water, some means of transporting the products to market such as pressure booster (pump/compressor) and pipelines. In the majority of offshore fields these pieces of equipment used are essentially the same as those used in onshore fields. In order to bring the equipment to offshore environment, some sort of supporting structure is needed to keep them above water, namely, offshore platforms. The above Californian piers were in this sense the first offshore platforms for petroleum production. Bottom-supported platforms have been in use ever since, though material to build them changed from wood to steel and concrete. These platforms, whilst good in that they can provide working environment probably closest to that onshore, have problems of sharply increasing cost with increasing water depth and long lead time for construction. To counter these problems, the petroleum industry came up with floating platforms in the 1970s. These include semisubmersibles, a natural functional extension of their sisters in the MODU fleet, ship-shaped floating production storage and offloading systems (FPSOs) and tension leg platforms (TLPs). More variations were added in later years. If these platforms are one way of coping with the offshore environment, enabling equipment intended for onshore application to be used there more or less as it is, the other way is to make the equipment capable of functioning in underwater environment and put it on the seabed, that is, a subsea production system. The first production equipment that was put completely underwater was a well, a gas well completed on the bottom of Lake Erie in United States of America in Although this well used completion equipment for onshore use without modification, one designed specifically for subsea application was subsequently developed. To date there have been more than 1000 wells worldwide drilled and completed subsea. The advancement of subsea technology meanwhile has led to development of other kinds of equipment tailored for subsea application, namely, manifolds to collect/divert produced and service fluids to desired flow paths, multi-phase pumps that can boost the pressure of the mixture of gas and liquid and gas/liquid separators, all with associated controls equipment. Today these platforms and subsea systems are applied in various combinations, each aimed at best suiting the particular environment in which they operate. These are offering the petroleum industry many options to choose from for production systems. However, research and development still continue to tap oil and gas in still deeper water and still harsher environment Various Types of Offshore Platforms Bottom-supported Platforms The most widely used platforms are so-called template platforms. This type of platform, Figure14, usually consists of jacket, piles and deck. The jacket is fixed to sea bottom by

20 means of piles and they together support the deck load. The deck is the topside structure of the platform and houses most of the equipment. The jacket is fabricated from steel tubulars at a yard, transported on and launched at the site from a barge, upended, lowered to the sea bottom and piled. The deck is usually divided into several modules, which are individually fabricated at a yard or shipyard, transported on a barge to the site where the jacket is already installed, lifted and fixed onto the jacket. Figure 14: Template Platform (Reproduced Courtesy of Offshore Iwaki Petroleum Company, Ltd.) Yard space and launch barge size available at the time of the project limit the jacket size. Cognac platform jacket installed in 312 m of water in the Gulf of Mexico in 1977 to 1978 was fabricated in three pieces and they were sequentially lowered to and connected together on the seabed, because there was no barge large enough to transport it in one piece at that time. Size of the individual deck module is greatly influenced by the lifting capacity of the crane vessel available. Attractiveness of less number of heavier lifts in terms of cost and other aspects has encouraged construction of heavy lifting vessels and those with twin cranes with several thousand ton lifting capacity are available. Function of this type of platform can vary from simple well protection to combined drilling and production with all the necessary equipment to drill wells and process and transport the

21 produced fluid. Storage function is not normally provided. This type has found application in water as deep as 411 m in the Gulf of Mexico. As the water depth increases, maintaining stiffness to rigidly resist the overturning moment as the template platforms do becomes prohibitively expensive. The alternative is structures that have much longer sway period than that of high-energy storm waves, avoiding resonance of structures with these waves. This type of platforms is called compliant towers and has been applied in water depths in excess of 500 m. Another type of bottom-supported structure is the gravity platforms, Figure15. They derive required stability from their own weight. The substructure is usually built from concrete in deep, protected water near shore such as fjord and firth. Deck is usually built in one piece, brought on a barge or barges over to and then mated with almost completely submerged substructure. The completely assembled platform is then towed to the installation site and ballasted down to seafloor. Because of this unique way of construction, geographical locations to which this type is applicable are limited. Only a few applications can be found in the world except in the North Sea, where Norwegian fjords and Scottish firths provide ideal construction sites. This type is inevitably massive and suitable for self-contained drilling and production role. Storage capability can be easily incorporated, making this type suitable for situations where pipeline transportation is not readily available. Figure 15: Gravity Platform (From Ager-Hanssen H., & Medley E.J (1979): Main Considerations in Development of StatfJord Field, Volume of Production, Proc. of the 10 th World Petroleum Congress.

22 Floating Platforms Reproduced Courtesy of World Petroleum Congress) Though the bottom-founded platforms provide stable working environment, they typically have the drawbacks of long lead time and cost tendency quite sensitive to water depth. A solution to these problems has been the floating platforms moored to the seafloor. An additional advantage is seen in ease of relocating and reusing them after a field is depleted. This type was pioneered by a semisubmersible platform converted from an MODU in the mid 1970s. Quite a number of conversions were made particularly in the early days of this type of platforms so that fields could be brought into production quickly, improving project economics. Units intended for deep-water applications are mostly purpose-built so that they can satisfy the demanding conditions of such applications. Mooring is usually by eight to twelve point catenaries. Motion of the platform does not allow wells to be completed on the deck. So they are usually completed subsea and produced fluid is brought to the processing equipment aboard the platform by means of pipeline and riser, Figure 16. Riser is one of the technical focal points and flexible pipes are widely used for this application. Disadvantages of this type can be summarized as limited payload capacity and lack of storage capability. Figure 16: Semisubmersible Platform (Reproduced Courtesy of Norsk Hydro ASA) Another type of floating platform having relatively long history of application is the

23 floating production storage and offloading system (FPSO). They are ship-shaped platform either with or without propulsion capability, Figure 17. First application was made in the late 1970s and it was a converted ocean-going tanker. Converted or purpose-built, FPSOs have a large payload and storage capacity making them suitable for application in isolated locations where pipeline transportation cannot be an option. Single point mooring is the most widely used station-keeping means, where the platform is allowed to weathervane around the mooring mechanism. Multi-point moorings have been applied in relatively benign environment such as West Africa and the Gulf of Suez. Like semisubmersibles wells are completed at separate locations, either subsea or on separate platforms. Figure 17: Floating Production Storage and Offloading System (Reproduced Courtesy of Norske Stats Oljeselskap a.s. (STATOIL)) One of the floating platforms specifically developed for deep-water application is the tension leg platform (TLP), Figure 18. Except for the very first application that appeared in the mid 1980s, platforms of this type are in water depths in excess of 500 m and the deepest application is in more than 1200 m of water. TLP is essentially a semisubmersible attached to the seabed by vertical members called tendons, which are usually made of steel tubulars and tensioned by excess buoyancy of the platform hull. Tendons are pinned to the seabed directly or indirectly by piles. Motion characteristics of the TLP allows wells to be completed on its deck, a big advantage because wells are one of the most important and expensive components of a petroleum production system and ease of access to them is a matter of prime concern in field development planning.

24 Figure 18: Tension Leg Platform (Reproduced Courtesy of ConocoPhillips Norge) The most recent species of floating platform is the spar platform, or deep-draft caisson vessel (DDCV). As its name indicates, it has a deeply submerged, spar-shaped hull and a deck structure. The platform is moored to the seabed by means of catenary or taut mooring. This type of structure was first applied as a storage and loading buoy in the North Sea in the mid 1970s. Application for the drilling and production role came into reality in the latter half of the 1990s in the Gulf of Mexico, and three spar production systems are operated there as of A platform of this type has been built in 1463 m of water. Like TLP it is possible to put Christmas trees of wells on the platform deck, and like FPSO, oil storage capability can be incorporated in the hull, making this type attractive at isolated deep water locations Subsea Production Systems Subsea-completed wells were initially envisaged by many as an unavoidable evil for deep-water production. As their reliability improved and confidence was gained on them, they have found increasing use even in the water depth range of bottom-supported platforms. Reservoirs discovered close to existing infrastructures or parts of producing

25 reservoirs too far away to reach from existing platforms are typically developed utilizing subsea wells tied back to the host platforms, providing economical means of field development. Also exploratory wells, typically plugged and abandoned after a short period of test not so long ago, are completed subsea and put into production for some months using drilling vessels equipped with temporary production facilities or purpose-built well test vessels, providing valuable reservoir data for subsequent field development planning Subsea Christmas Trees Subsea trees are, like land trees, primary means of flow control for subsea wells and consist of series of valves and sometimes a flow control device (choke) along the flow path of produced fluid with associated controls equipment, Figure 19. Although trees in early days of subsea development relied heavily on diver assistance in installation and operation, the trend is toward less reliance and remotely operated connectors, valves and chokes by means of hydraulics are used extensively. They are installed by drilling rigs using guidelines established between a pre-installed guide base structure and a rig for positioning and orientating. For deep waters where use of guidelines is not practical, guidelineless system is available. Figure19: Subsea Christmas Tree (From API RP 17A Recommended Practice for Design and Operation of Subsea Production Systems, Second Edition, Reproduced Courtesy of the American Petroleum Institute.)

26 Where it is desirable to drill a number of wells from one location, a well template is sometimes used, Figure 20. A template is a steel structure that provides structural support and appropriate spacing to wells. As the drilling rig can move from one well position to another only by adjusting anchor lines, use of template can bring savings in drilling cost. Figure 20: Well Template (From API RP 17A Recommended Practice for Design and Operation of Subsea Production Systems, Second Edition, Reproduced Courtesy of the American Petroleum Institute.) Subsea Manifolds A manifold consists of appropriately arranged valves and pipings with associated controls equipment and a structure to support these components. It allows produced fluid to be commingled or diverted and injection fluids to be distributed to desired flow paths. With a

27 subsea manifold, number of flowlines and injection lines between wells and host platform can be reduced substantially, saving large amount of investment. Disadvantage is added complexity in not-easily-accessible subsea environment with implications on maintenance cost. A manifold can be a stand-alone component or built into a well template, Figure 21. Figure 21: Subsea Manifold Mounted on Well Template (From API RP 17A Recommended Practice for Design and Operation of Subsea Production Systems, Second Edition, Reproduced Courtesy of the American Petroleum Institute.) Subsea Boosting and Processing Wells, templates and manifolds have been successfully applied subsea. The next candidates for subsea application are multi-phase pressure boosters and fluid separators. The idea behind the multi-phase pressure booster, or multi-phase pump, is that if pressure boosting can be done at the subsea wells, a platform long distance away can be their host, widening the possible range of step-out development. More ambitiously, produced fluid could be sent directly onshore, eliminating the need for host platform altogether. Difficulties in boosting pressure of multi-phase fluid with widely fluctuating void fraction have prompted some to take a different approach, that is, to separate produced fluid into different phases and then boost the pressure. Another application of the subsea

28 separation technology being considered is to separate produced water at the wells and re-inject it underground for disposal, saving energy to transport unnecessary water to surface. The subsea boosting concept has been considered since the early 1980s and the subsea separation concept a little later. Both technologies have come to the stage of field-testing prototype equipment, but are yet to be applied on commercial basis Subsea Control System In order to ensure safe and efficient operation of the subsea production systems, their various components such as valves, chokes and connectors must be properly controlled. Also it is often desirable to have feedback from these components and other instrumentation indicating various process parameters such as downhole/wellhead pressures and temperatures and fluid flow rate and diagnostic parameters of the control system itself. Control systems currently employed utilize hydraulics and often electronics to differing degrees. Of these most commonly used is the electro-hydraulic multiplexed system. The system requires hydraulic power supplied from the host platform to actuate control devices. Coded signals for operating these field devices and data signals from field instruments to the host platform are transmitted through an electrical cable. Electric power is usually supplied through a separate cable, but superposition of data signals on the power cable has been successfully tried. Research is underway for developing an all-electric control system, which will eliminate the need for hydraulic link between the subsea system and host platform altogether, leading to further cost reduction Prospect of Offshore Production System The technology for offshore development has been commercial technology all along. Every time oil was found in such an environment where the offshore petroleum industry had had no previous experience, new technology was developed to cope with it and commercially produce oil there. In pursuing this goal, the balance between safety, reliability, economics and, increasingly, environmental considerations has never been forgotten. The North Sea developments of the 1970s and the deep-water developments in the Gulf of Mexico and Brazil of the 1990s were probably the two epoch-making eras in the history of this industry. The North Sea-type platforms with huge payload capacity to accommodate all required functions on a single structure, sometimes with built-in or separate storage capacity, made it possible to develop fields in remote, isolated areas. Implications of the advancement of deep-water technology are obvious. The twenty first century will see this process continuing, at probably a slow but steady pace. The North Sea activities have already spread to the Atlantic Frontier (west of Shetland) to the west and the Norwegian Sea to the north. The water depth record of both subsea completion and platform installation has exceeded 1800 m and developments in more than 2000 m water depths are being planned. Also somewhat specialty technology

Offshore Structures. Offshore Drilling Equipment

Offshore Structures. Offshore Drilling Equipment Offshore Structures Offshore Drilling Equipment The drill string is lowered through a conduit (riser). The drill string consists of a drill bit, drill collar and drill pipe. Drill pipe sections are added

More information

International Legal Regime of Offshore Structures- Environmental Concerns By Violeta S. Radovich

International Legal Regime of Offshore Structures- Environmental Concerns By Violeta S. Radovich International Legal Regime of Offshore Structures- Environmental Concerns By Violeta S. Radovich I. Introduction. Preliminary Questions To begin with the study of this subject, we shall pose the following

More information

Oil and Gas Offshore. www.shell.com/us/alaska

Oil and Gas Offshore. www.shell.com/us/alaska 3 C H A P T E R T h r e e : Oil and Gas Offshore Production www.shell.com/us/alaska Planning Piltun-Astokhskoye B a fixed production platform 7.5 miles off Sakhalin Island in 105 waters (2007). When exploration

More information

Platform Technologies for Offshore Renewable Energy Conversion Diego Vannucci, RINA

Platform Technologies for Offshore Renewable Energy Conversion Diego Vannucci, RINA Platform Technologies for Offshore Renewable Energy Conversion Diego Vannucci, RINA Objectives DON T RE-INVENT THE WHEEL! Oil & Gas Industry has been developing offshore technology for 100 years., is there

More information

Hurricanes and the Offshore oil and Natural Gas Industry

Hurricanes and the Offshore oil and Natural Gas Industry Every year, hurricanes of varying strength lay siege to America s coasts. The images of wind-battered buildings and flooded lands are well-known - 2004 and 2005 were particularly destructive seasons. The

More information

The Use of Coatings for Corrosion Control on Offshore Oil Structures. J. Peter Ault, P.E. Consultant Ocean City, NJ

The Use of Coatings for Corrosion Control on Offshore Oil Structures. J. Peter Ault, P.E. Consultant Ocean City, NJ The Use of Coatings for Corrosion Control on Offshore Oil Structures J. Peter Ault, P.E. Consultant Ocean City, NJ Protective coatings are ubiquitous on offshore oil structures. As with most situations,

More information

Introduction. The following is an outline of the contents of this paper: Definition of Artificial Lift Page 2. How an Oil Well is Produced Page 2

Introduction. The following is an outline of the contents of this paper: Definition of Artificial Lift Page 2. How an Oil Well is Produced Page 2 Introduction Canadian Oilwell Systems Company and it s subsidiaries are suppliers of oil well Electric Submersible Pumping systems (ESPs). Such pumps are used to lift oil from oil wells so that the oil

More information

PETROLEUM PRODUCTION MASTERCLASSES

PETROLEUM PRODUCTION MASTERCLASSES PETROLEUM PRODUCTION MASTERCLASSES New For 2010! One Date Only Limited Places Available Book Now! Offshore Safety & Risk Management for the Oil Industry & Gas Industry 21st and 22nd of February 2011, New

More information

Total Subsea Solutions

Total Subsea Solutions Total Subsea Solutions Total Subsea Solutions Developing new energy reserves, managing, and improving producing fields means an unprecedented number of technical challenges. In partnership with our customers,

More information

MEK4450. Templates & Manifolds. 29 August 2012. 05 Templates and Manifolds. This module will cover:

MEK4450. Templates & Manifolds. 29 August 2012. 05 Templates and Manifolds. This module will cover: 29 MEK4450 05 Templates and Manifolds Templates & Manifolds This module will cover: Applicable Codes and Standards Templates - Purpose of a template Manifolds - Purpose of a manifold Foundations 2 1 29

More information

Monobuckets and the competitiveness versus monopiles and jacket structures.

Monobuckets and the competitiveness versus monopiles and jacket structures. Monobuckets and the competitiveness versus monopiles and jacket structures. Lars Bo Ibsen, Aalborg University, Professor. Foundation concepts for offshore Wind Turbines The Universal Foundation Carbon

More information

Manual: Nearshore CPT Testing NEARSHORE CONE PENETRATION TESTING (TOP PUSH TECHNIQUE)

Manual: Nearshore CPT Testing NEARSHORE CONE PENETRATION TESTING (TOP PUSH TECHNIQUE) Manual: Nearshore CPT Testing NEARSHORE CONE PENETRATION TESTING (TOP PUSH TECHNIQUE) Nearshore CPT is not as difficult as it might seem. Most CPT companies do already have most of the necessary equipment

More information

MERMAID FLEET PROFILE SUBSEA SERVICES

MERMAID FLEET PROFILE SUBSEA SERVICES 010 Mermaid Maritime Public Company Limited MERMAID ENDURER (Built in 2010) The DSV Mermaid Endurer is a Norwegian purpose-built DP2 dive support and light construction vessel, specially designed for operations

More information

Maersk Resilient. Maximised drilling efficiency and uptime. Optimised for concurrent activities

Maersk Resilient. Maximised drilling efficiency and uptime. Optimised for concurrent activities Maersk Resilient Maximised drilling efficiency and uptime Optimised for concurrent activities Maersk Resilient TYPE MSC CJ50-X100 MC, 350 ft jack-up drilling rig BUILT Keppel FELS, 2008 CLASS American

More information

Introduction to Subsea Production System

Introduction to Subsea Production System Introduction to Subsea Production System 04 Xmas Tree Systems Bjørn Søgård Xmas Tree Systems This module will cover: Main codes for XT equipment XT Principles and functions Typical schematic Main types

More information

GENERAL OCEAN TOW RECOMMENDATIONS FOR JACKUP DRILLING UNITS International Association of Drilling Contractors (I.A.D.C.) February 13, 1991

GENERAL OCEAN TOW RECOMMENDATIONS FOR JACKUP DRILLING UNITS International Association of Drilling Contractors (I.A.D.C.) February 13, 1991 GENERAL OCEAN TOW RECOMMENDATIONS FOR JACKUP DRILLING UNITS International Association of Drilling Contractors (I.A.D.C.) February 13, 1991 Manning 1. Manning should comply with U.S. Coast Guard regulations

More information

OFFSHORE FIELD DEVELOPMENT

OFFSHORE FIELD DEVELOPMENT OFFSHORE FIELD DEVELOPMENT OPTIONS & STRATEGY By: Nguyen Ngoc Hoan M.Sc of Petroleum Engineering Hoannn@pidc.com.vn PRESENTATION CONTENT Field Development Consideration Field Development Options & Strategy

More information

creating progress for the future

creating progress for the future CREATING PROGRESS OFFSHORE creating progress for the future CREATING PROGRESS SCANAOFFSHORE Scana Offshore group of companies will be present at the OTD in Stavanger, October 23-24 2013. The companies

More information

HPHT CAPPING STACKS AND NEW TECHNOLOGY FOR SUBSEA WELL CONTROL. December 3, 2014 Presenter: Mike Cargol

HPHT CAPPING STACKS AND NEW TECHNOLOGY FOR SUBSEA WELL CONTROL. December 3, 2014 Presenter: Mike Cargol HPHT CAPPING STACKS AND NEW TECHNOLOGY FOR SUBSEA WELL CONTROL December 3, 2014 Presenter: Mike Cargol Agenda Development Update HPHT Capping Stack Mudline Closure Device Divert and Flow System Well Kill

More information

OWPST & Titan 200 & UK Offshore

OWPST & Titan 200 & UK Offshore OWPST & Titan 200 & UK Offshore A look at the Company, our Product and the Technology being applied in the UK Offshore Market Introduction Douglas Hines CEO/President Offshore Wind Power Systems of Texas

More information

Subsea Drilling Systems

Subsea Drilling Systems Subsea Drilling Systems 2 Reliable, cost-effective solutions for offshore drilling... FMC Technologies Subsea Drilling Systems lead the industry with reliable and cost-effective drilling solutions which

More information

skirt Appendix A Mechanical Containment and Cleanup Technologies Containment Booms

skirt Appendix A Mechanical Containment and Cleanup Technologies Containment Booms Appendix A Mechanical Containment and Cleanup Technologies Containment Booms Oil spill containment barriers or booms are floating devices generally resembling short curtains that restrict an oil slick

More information

Module No. # 02. Impact of oil and gas industry on marine environment

Module No. # 02. Impact of oil and gas industry on marine environment Health, Safety and Environmental Management in Petroleum and offshore Engineering Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras Module No. # 02 Lecture

More information

Helping Our Customers Achieve Superior Results. Offshore Handling Equipment

Helping Our Customers Achieve Superior Results. Offshore Handling Equipment Helping Our Customers Achieve Superior Results Offshore Handling Equipment Offshore Handling Equipment Product Jack-Up Semi / Drillship Derrick Top Drive / Dolly Retract Drawworks Torque Wrench Drilling

More information

The Blocks and Drilling Line

The Blocks and Drilling Line rotary drilling series Unit I, Lesson 5 The Blocks and Drilling Line Third Edition, Revised By L. D. Davis Published by PETROLEUM EXTENSION SERVICE The University of Texas at Austin Division of Continuing

More information

An Introduction to Oil and Gas Well Servicing

An Introduction to Oil and Gas Well Servicing An Introduction to Oil and Gas Well Servicing Educational Material from the IOM 3 Oil and Gas Division The global network for the materials cycle Introduction The Institute of Materials, Minerals & Mining

More information

Structural concepts for minimum facility platforms for Marginal field development in western offshore, India

Structural concepts for minimum facility platforms for Marginal field development in western offshore, India Structural concepts for minimum facility platforms for Marginal field development in western offshore, India A collaborative project By IIT Madras and IEOT,ONGC 24 April 2007 1 Outline Conventional Wellhead

More information

Facilities Pori construction yard

Facilities Pori construction yard Facilities Pori construction yard Technip Offshore Finland, a key asset in the Atlantic basin Technip at a glance Technip is a world leader in project management, engineering and construction for the oil

More information

COMPARISON OF DRILLING TECHNOLOGIES BETWEEN TOP DRIVE AND ROTARY TABLE IN GEOTHERMAL FIELDS: A CASE STUDY OF OLKARIA GEOTHERMAL FIELDS.

COMPARISON OF DRILLING TECHNOLOGIES BETWEEN TOP DRIVE AND ROTARY TABLE IN GEOTHERMAL FIELDS: A CASE STUDY OF OLKARIA GEOTHERMAL FIELDS. Proceedings 5 th African Rift geothermal Conference Arusha, Tanzania, 29-31 October 2014 COMPARISON OF DRILLING TECHNOLOGIES BETWEEN TOP DRIVE AND ROTARY TABLE IN GEOTHERMAL FIELDS: A CASE STUDY OF OLKARIA

More information

AFRREV STECH An International Journal of Science and Technology Bahir Dar, Ethiopia. Vol.1 (1) January-March, 2012: 174-190 ISSN: 2225-8612

AFRREV STECH An International Journal of Science and Technology Bahir Dar, Ethiopia. Vol.1 (1) January-March, 2012: 174-190 ISSN: 2225-8612 AFRREV STECH An International Journal of Science and Technology Bahir Dar, Ethiopia Vol.1 (1) January-March, 2012: 174-190 ISSN: 2225-8612 Comprehensive Approach to Oil Well Drilling Cost Estimation Anyadiegwu,

More information

Certificate Programs in. Program Requirements

Certificate Programs in. Program Requirements IHRDC Online Certificate Programs in OIL AND GAS MANAGEMENT Program Requirements IHRDC 535 Boylston Street Boston, MA 02116 Tel: 1-617-536-0202 Email: certificate@ihrdc.com Copyright International Human

More information

SHIPS AND OFFSHORE STRUCTURES Offshore Structure Design And Construction Paul A Frieze OFFSHORE STRUCTURE DESIGN AND CONSTRUCTION

SHIPS AND OFFSHORE STRUCTURES Offshore Structure Design And Construction Paul A Frieze OFFSHORE STRUCTURE DESIGN AND CONSTRUCTION OFFSHORE STRUCTURE DESIGN AND CONSTRUCTION Paul A Frieze PAFA Consulting Engineers, UK Keywords: Jacket structures, topsides, design, construction, metocean, geotechnical, loads, load combinations, piling,

More information

Drilling Rigs and Well Technology. RAPID RIGS AND WELL TECHNOLOGY Cairn India Limited.

Drilling Rigs and Well Technology. RAPID RIGS AND WELL TECHNOLOGY Cairn India Limited. Drilling Rigs and Well Technology RAPID RIGS AND WELL TECHNOLOGY. 2 3 Cairn India has adopted an innovative approach for its onshore drilling program using state-of-the-art custom made Rapid Rig technology

More information

ARCTIC S SEMI-SUBMERSIBLE DRILLING UNIT HUISMAN PRODUCT BROCHURE

ARCTIC S SEMI-SUBMERSIBLE DRILLING UNIT HUISMAN PRODUCT BROCHURE ARCTIC S SEMI-SUBMERSIBLE DRILLING UNIT HUISMAN PRODUCT BROCHURE RCTIC S SEMI-SUBMERSIBLE DRILLING UNIT 1. DESCRIPTION 1.1 Unit general The Huisman designed Arctic S allows to operate at different drafts

More information

Communication Links for Offshore Platforms. A User s Guide to Troposcatter Communications

Communication Links for Offshore Platforms. A User s Guide to Troposcatter Communications Communication Links for Offshore Platforms A User s Guide to Troposcatter Communications 1.0 INTRODUCTION Offshore platforms, whether for coastal defense systems, environmental monitoring, pipe line operations,

More information

Competitive Edge through System Engineering

Competitive Edge through System Engineering Competitive Edge through System Engineering KBD Forum 6-7 March 2013 Tore Halvorsen FMC Technologies 0 Floating Production Partial Subsea Processing Subsea Systems today: the enabler for deepwater developments

More information

GEOTHERMAL DRILLING ABSTRACT

GEOTHERMAL DRILLING ABSTRACT Presented at Short Course V on Conceptual Modelling of Geothermal Systems, organized by UNU-GTP and LaGeo, in Santa Tecla, El Salvador, February 24 - March 2, 2013. GEOTHERMAL TRAINING PROGRAMME LaGeo

More information

GAS WELL/WATER WELL SUBSURFACE CONTAMINATION

GAS WELL/WATER WELL SUBSURFACE CONTAMINATION GAS WELL/WATER WELL SUBSURFACE CONTAMINATION Rick Railsback Professional Geoscientist CURA Environmental & Emergency Services rick@curaes.com And ye shall know the truth and the truth shall make you free.

More information

AN OVERVIEW OF OFFSHORE OIL AND GAS EXPLORATION AND PRODUCTION ACTIVITIES

AN OVERVIEW OF OFFSHORE OIL AND GAS EXPLORATION AND PRODUCTION ACTIVITIES Department of Trade and Industry AN OVERVIEW OF OFFSHORE OIL AND GAS EXPLORATION AND PRODUCTION ACTIVITIES AUGUST 2001 hartleyanderson@ha-an.demon.co.uk CONTENTS 1 INTRODUCTION... 3 1.1 Purpose... 3 1.2

More information

DRILLING PRODUCTS AND EXPERIENCE

DRILLING PRODUCTS AND EXPERIENCE DRILLING PRODUCTS AND EXPERIENCE 2012 Drilling Products and Experience page 2 / 27 TABLE OF CONTENTS 1 INTRODUCTION 2 PRODUCT - MODULAR DRILLING RIG 3 PRODUCT - JACKUP DRILLING PACKAGE 4 PRODUCT - P TANK

More information

BS PROGRAM IN PETROLEUM ENGINEERING (VERSION 2010) Course Descriptions

BS PROGRAM IN PETROLEUM ENGINEERING (VERSION 2010) Course Descriptions BS PROGRAM IN PETROLEUM ENGINEERING (VERSION 2010) Course Descriptions PETE201 Introduction to Petroleum Engineering (Core) (1-0-1) The course's main goal is to provide the student with an overview of

More information

AADE-07-NTCE-30. Underwater Seafloor Drilling Rig Adel Sheshtawy, AADE, USDR Inc.

AADE-07-NTCE-30. Underwater Seafloor Drilling Rig Adel Sheshtawy, AADE, USDR Inc. AADE-07-NTCE-30 Underwater Seafloor Drilling Rig Adel Sheshtawy, AADE, USDR Inc. Copyright 2007, AADE This paper was prepared for presentation at the 2007 AADE National Technical Conference and Exhibition

More information

THE BALTIC SEA OFFSHORE PROJECTS

THE BALTIC SEA OFFSHORE PROJECTS OFFSHORE PROJECTS OFFSHORE PROJECTS 3 OFFSHORE PROJECTS The start of LUKOIL's offshore operations dates back to 1999, when the Company started exploratory drilling with its in-house ASTRA selfelevating

More information

Overturning Stability of Offshore Wind Power Substructure with Bucket Foundation

Overturning Stability of Offshore Wind Power Substructure with Bucket Foundation Website: www.ijetae.com (ISSN 2250-2459, ISO 9001:2008 Certified Journal, Volume 5, Issue 10, October 2015) Overturning Stability of Offshore Wind Power Substructure with Bucket Foundation Young-Jun You

More information

HMIS Top Drive System

HMIS Top Drive System System Description HMIS Top Drive System 250TON HMIS 475HP DOCUMENT NAME: 880025 REV 2 SYSTEM DESCRIPTION COPYRIGHT AND DISCLAIMER Tesco Corporation ("TESCO") has made every effort to ensure that this

More information

HOW HYDRAULIC TRUCK CRANES WORK

HOW HYDRAULIC TRUCK CRANES WORK HOW HYDRAULIC TRUCK CRANES WORK Heavy rains spawned by Hurricane Danny flooded many parts of Charlotte, NC. Flood waters rose so quickly in Little Sugar Creek that the underpinnings of a train trestle

More information

This document, and more, is available for download from Martin's Marine Engineering Page - www.dieselduck.net

This document, and more, is available for download from Martin's Marine Engineering Page - www.dieselduck.net You may have heard the news in the last two days about the Deepwater Horizon drilling rig which caught fire, burned for two days, then sank in 5,000 ft of water in the Gulf of Mexico. There are still 11

More information

How To Build A Kingkong Production System

How To Build A Kingkong Production System MOSAIC Certified Mariner Energy, Inc./Agip Petroleum King Kong Development Cameron MOSAIC Systems for the King Kong Field Development King Kong Development The King Kong Deepwater Gulf of Mexico Development

More information

Grassroots Drilling. A History and Look Ahead. David Wennerstrom. ICOTA Roundtable October 2005 Canadian Chapter

Grassroots Drilling. A History and Look Ahead. David Wennerstrom. ICOTA Roundtable October 2005 Canadian Chapter Grassroots Drilling A History and Look Ahead David Wennerstrom ICOTA Roundtable October 2005 Canadian Chapter In the past 10 years CTD rigs have come to dominate much of the shallow gas drilling market

More information

Case Study of Emergency Disconnect Sequence in the Gulf of Mexico

Case Study of Emergency Disconnect Sequence in the Gulf of Mexico Case Study of Emergency Disconnect Sequence in the Gulf of Mexico Trent Fleece Subsea BOP Operations Team Lead May 8, 2015 Case Study of Emergency Disconnect Sequence in Gulf of Mexico Industry Standards

More information

TECHNICAL INFORMATION

TECHNICAL INFORMATION Page: 1/6 This checklist recognizes the major accident hazards found by experience of previous HAZID studies. It is not intended to be totally exhaustive and feedback from users should be incorporated

More information

WELL COMMANDER Versatile multi-cycle ball-activated drilling valve for mitigating downhole hazards

WELL COMMANDER Versatile multi-cycle ball-activated drilling valve for mitigating downhole hazards WELL COMMANDER Versatile multi-cycle ball-activated drilling valve for mitigating downhole hazards Note: Operating instructions updated July 2014 WELL COMMANDER: Versatile multicycle ball-activated drilling

More information

OIL AND GAS. www.shell.us/alaska

OIL AND GAS. www.shell.us/alaska 2 C H A P T E R t w o : OIL AND GAS Offshore Exploration www.shell.us/alaska Offshore Exploration Understanding how oil and gas* are formed gives us important information for the first stage of petroleum

More information

Recommended Practices Associated with Hydraulic Fracturing Operations

Recommended Practices Associated with Hydraulic Fracturing Operations Recommended Practices Associated with Hydraulic Fracturing Operations API standards program includes best-practices for hydraulic fracturing which include: Proper well construction and integrity Zonal

More information

Top Drive Service Loops. Conventional, Enhanced and Superior Solutions for Drilling Applications

Top Drive Service Loops. Conventional, Enhanced and Superior Solutions for Drilling Applications Top Drive Service Loops Conventional, Enhanced and Superior Solutions for Drilling Applications Linking the future As the worldwide leader in the cable industry, Prysmian Group believes in the effective,

More information

Fundamentals of Drilling Course Outline

Fundamentals of Drilling Course Outline Fundamentals of Drilling Course Outline (1)Basics of Rotary Drilling (2)Rotary (1) Operations/Coring Basics of Rotary Drilling (3)Directional -Rotary Drilling Process (4)Fishing-Bit (5)Casing/Cementing

More information

The New Technology Frontier: Moving Oil and Gas Production to the Seabed. By: Allen Rentcome and Rick McLin, Rockwell Automation

The New Technology Frontier: Moving Oil and Gas Production to the Seabed. By: Allen Rentcome and Rick McLin, Rockwell Automation The New Technology Frontier: Moving Oil and Gas Production to the Seabed By: Allen Rentcome and Rick McLin, Rockwell Automation The New Technology Frontier: Moving Oil and Gas Production to the Seabed

More information

Technip Offshore Finland

Technip Offshore Finland Facilities Technip Offshore Finland Construction yard Technip Profile A world leader in engineering, project management and technologies, serving the oil & gas industry for more than 50 years A regular

More information

Understanding Well Construction and Surface Footprint

Understanding Well Construction and Surface Footprint Understanding Well Construction and Surface Footprint Well Construction Timeline Well Site Planning & Preparation Drilling Stage 1: Planning and Preparation Acquire Surface Lease Agreement Determination

More information

TBA 100 A Performance Study of the New Generation 100-ton Advanced Technology Rig. Maximilian Trombitas, Product Manager Bauer Deep Drilling GmbH

TBA 100 A Performance Study of the New Generation 100-ton Advanced Technology Rig. Maximilian Trombitas, Product Manager Bauer Deep Drilling GmbH TBA 100 A Performance Study of the New Generation 100-ton Advanced Technology Rig Maximilian Trombitas, Product Manager Bauer Deep Drilling GmbH Outline Field study Lessons learned Rig design changes Mechanization

More information

Rogaland på Børs August 30 th 2010

Rogaland på Børs August 30 th 2010 BADGER EXPLORER ASA Rig-less Exploration - A Game Changer Rogaland på Børs August 30 th 2010 Kjell Erik Drevdal, CEO, ked@bxpl.com, +47 916 43 552 www.bxpl.com 1 Badger Explorer ASAs History Company established

More information

Developing Ocean Energy in Ireland. Belmullet Wave Energy Test Site

Developing Ocean Energy in Ireland. Belmullet Wave Energy Test Site Developing Ocean Energy in Ireland Belmullet Wave Energy Test Site Where does our energy come from? Most of the energy we use in Ireland comes from fossil fuels such as oil, coal, peat and gas. We burn

More information

AUTOMATIC TANK CLEANING (ATC) LITE On-the-fly automatic tank cleaning and recycling technology

AUTOMATIC TANK CLEANING (ATC) LITE On-the-fly automatic tank cleaning and recycling technology AUTOMATIC TANK CLEANING (ATC) LITE On-the-fly automatic tank cleaning and recycling technology ATC Lite: Permanent or mobile option for safe and continuous onshore, offshore tank cleaning applications

More information

Deepwater Horizon Oil Spill. BP 2010 Gulf of Mexico Oil Spill

Deepwater Horizon Oil Spill. BP 2010 Gulf of Mexico Oil Spill Deepwater Horizon Oil Spill BP 2010 Gulf of Mexico Oil Spill Sean Edward Paquette Rensselaer Polytechnic Institute Hartford, Connecticut MANE 6960H01 (Air and Water Pollution Prevention and Control Engineering)

More information

INSTALLATION and LOGISTICS of OFFSHORE WIND FARMS

INSTALLATION and LOGISTICS of OFFSHORE WIND FARMS POWER Offshore Summer School 2006 INSTALLATION and LOGISTICS of OFFSHORE WIND FARMS Gerard van Bussel The Netherlands Offshore transport and installation vessels Semi Submersible Sheer leg crane Ship type

More information

Woods Hole Group, Inc. Oceanography and Measurement Systems Division INTEGRATED REAL-TIME MONITORING SYSTEM

Woods Hole Group, Inc. Oceanography and Measurement Systems Division INTEGRATED REAL-TIME MONITORING SYSTEM Woods Hole Group, Inc. INTEGRATED REAL-TIME MONITORING SYSTEM Woods Hole Group, Inc. (WHG) has developed the Integrated Real-time Monitoring System (IRMS) as a general-purpose data acquisition and telemetry

More information

An Overview of Design, Analysis, Construction and Installation of Offshore Petroleum Platforms Suitable for Cyprus Oil/Gas Fields

An Overview of Design, Analysis, Construction and Installation of Offshore Petroleum Platforms Suitable for Cyprus Oil/Gas Fields K. Sadeghi, GAU J. Soc. & Appl. Sci., 2(4), 1-16, 2007 An Overview of Design, Analysis, Construction and Installation of Offshore Petroleum Platforms Suitable for Cyprus Oil/Gas Fields Kabir Sadeghi 1

More information

Operations in the Arctic areas? New challenges: Exploration Development Production

Operations in the Arctic areas? New challenges: Exploration Development Production Operations in the Arctic areas? New challenges: Exploration Development Production The oil and gas cycle Life cycle of oil and gas (time) 1) 2) 3) 4) 5) 6) Activity In-house study and get licenses: Find

More information

Permanent Reservoir Monitoring (PRM) System Installation: The Installers Perspective

Permanent Reservoir Monitoring (PRM) System Installation: The Installers Perspective Permanent Reservoir Monitoring (PRM) System Installation: The Installers Perspective Introduction Global Marine Systems Limited (Global Marine) has a vast wealth of knowledge in designing planning and

More information

Contents. 1. PROFILE p2. 2. SERVICES 2.1 Offshore Support Services p 4 Offshore support p 6 ROV operations p 8

Contents. 1. PROFILE p2. 2. SERVICES 2.1 Offshore Support Services p 4 Offshore support p 6 ROV operations p 8 OCTOBER 2013 22 Contents 1. PROFILE p2 2. SERVICES 2.1 Offshore Support Services p 4 Offshore support p 6 ROV operations p 8 2.2 Hydrographic & Geophysical services p 10 Bathymetric surveys p 12 High resolution

More information

G IN IN M ED G ER M B SU

G IN IN M ED G ER M B SU SUBMERGED MINING MINING SMD s mining business stream is committed to developing solutions for the submerged mining industry. As the world s leading subsea trenching equipment supplier SMD can provide unrivalled

More information

INTRODUCTION OF KEY STAFF

INTRODUCTION OF KEY STAFF INTRODUCTION OF KEY STAFF COMPANY OVERVIEW: Zentech, Inc. is a Houston based marine engineering, naval architecture and design software consulting firm specializing in the offshore oil & gas and the renewable

More information

Subsea wellhead systems. Advanced solutions for extreme conditions

Subsea wellhead systems. Advanced solutions for extreme conditions Subsea wellhead systems Advanced solutions for extreme conditions Subsea wellhead systems As offshore drilling pushes past 10,000-foot water depths and 30,000- foot wells, pressure increases exponentially

More information

installation, operations & maintenance

installation, operations & maintenance installation, operations & maintenance Contents Introduction... 2 The offshore wind opportunity... 2 Innovation in offshore wind... 2 The cost of offshore wind projects... 2 Offshore wind foundation, turbine

More information

Horizon Survey and Geotechnical Companies

Horizon Survey and Geotechnical Companies Oil & Gas Directory Middle East - 2013 147 Horizon Survey and Geotechnical Companies Corporate P r ofile OUR PEDIGREE Horizon provides comprehensive survey and geotechnical services to the offshore industry

More information

Breaking new ground in subsea excavation and trenching. www.agr.com

Breaking new ground in subsea excavation and trenching. www.agr.com Breaking new ground in subsea excavation and trenching. www.agr.com and the people to make it happen AGR Subsea has a wealth of experience in solving subsea challenges, from rock removal to BOP recovery,

More information

Electric heat tracing

Electric heat tracing PIPELINE DESIGN Figure 1. Shorter, more complex piping at a process plant. Electric heat tracing Neil Malone, Heat Trace, UK, discusses electric heat tracing of long pipelines. In considering electric

More information

PRESS KIT IVAR AASEN DET NORSKE OLJESELSKAP ASA

PRESS KIT IVAR AASEN DET NORSKE OLJESELSKAP ASA PRESS KIT IVAR AASEN DET NORSKE OLJESELSKAP ASA Table of content 1. INTRODUCTION... 2 1.1. Purpose of document... 2 1.2. Det norske oljeselskap... 2 1.3. HSE... 2 2. ABOUT THE IVAR AASEN FIELD... 2 2.1.

More information

Windfarm Installation Barge. a novel approach to installing foundations in offshore wind

Windfarm Installation Barge. a novel approach to installing foundations in offshore wind Windfarm Installation Barge a novel approach to installing foundations in offshore wind North Sea Offshore Cranes and Lifting Conference in Aberdeen by Paal Strømstad (paal.stromstad@ingenium.no) April

More information

Fossil Energy Study Guide: Oil

Fossil Energy Study Guide: Oil Petroleum or crude oil is a fossil fuel that is found in large quantities beneath the Earth s surface and is often used as a fuel or raw material in the chemical industry. It is a smelly, yellow-to-black

More information

The concepts developed in this standard include the following: Oceans cover about 70% of the surface of the Earth.

The concepts developed in this standard include the following: Oceans cover about 70% of the surface of the Earth. Name Date Grade 5 SOL 5.6 Review Oceans Made by SOLpass - www.solpass.org solpass100@comcast.net Reproduction is permitted for SOLpass subscribers only. The concepts developed in this standard include

More information

Subsea processing. Oslo 8. September 2011 Håvard Eidsmoen, Statoil 2011-08-11

Subsea processing. Oslo 8. September 2011 Håvard Eidsmoen, Statoil 2011-08-11 Subsea processing Oslo 8. September 2011 Håvard Eidsmoen, Statoil Content Introduction/Motivation Why subsea processing? Overview of technologies, applications and examples Boosting Separation Compression

More information

By Chris Gorman, PE M.ASCE PROBLEM:

By Chris Gorman, PE M.ASCE PROBLEM: Improving Bridge Inspection, Scour Monitoring and Infrastructure Management for DOTs using the Echoscope - A true 3D, High-Definition and Real-Time imaging tool. PROBLEM: By Chris Gorman, PE M.ASCE Preserving

More information

The Dalian Developer A new approach to oil spill response

The Dalian Developer A new approach to oil spill response The Dalian Developer A new approach to oil spill response Presenter: Jim O Sullivan, Vice President Technip USA National Ocean Industries Association Scottsdale, Arizona, October 18, 2012 Contents Introduction

More information

High Power Laser for Rock Drilling

High Power Laser for Rock Drilling High Power Laser for Rock Drilling Mark S. Zediker, Brian O. Faircloth, Daryl L. Grubb, Sharath K. Kolachalam, Sam N. Schroit, Charles C. Rinzler, William C. Gray, Jason D. Fraze, Ryan Norton, Ryan McKay

More information

AUTOMATIC HYDRAULIC DRILLING RIGS HH Series HH Series hydraulic hoist series The drilling industry is actively involved in developing new technologies to solve common problems, such as increasing safety

More information

Vertical Pumps for the Oil & Gas Industry

Vertical Pumps for the Oil & Gas Industry Vertical Pumps for the Oil & Gas Industry ITT API Expert ITT Commitment ITT is committed to the Oil and Gas market, which is the largest segment of our business. We have been investing in technology to

More information

Söderströmtunnel: immersion in downtown Stockholm, Sweden

Söderströmtunnel: immersion in downtown Stockholm, Sweden Söderströmtunnel: immersion in downtown Stockholm, Sweden J. Glückert Dipl.-Ing, Züblin Ground Engineering, Stuttgart, Germany N.H.J. Vink MSe, M. Reijm BSc, P.T. van Westendorp BSc Strukton Immersion

More information

An Overview of Seabed Surveys (High resolution Geophysical Site Surveys)

An Overview of Seabed Surveys (High resolution Geophysical Site Surveys) An Overview of Seabed Surveys (High resolution Geophysical Site Surveys) Anna Fulop Chief Geoscientist Fugro Survey Limited 22 April 2015 Agenda Introduction Site survey - purpose and requirements Principles,

More information

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections Materials Standard shapes W sections, C channels, Structural T, Angles, Pipes, Tubes, Rods and Plates Fabricated members, Built-up sections Adding plates to beam flanges, Stiffeners to beam webs Built

More information

Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since.

Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since. Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since. Liftech is the structural review engineer of record for most

More information

Description. ACTIVITY GROUP Advertising A-6-002. Air- Conditioning related services A-6-001. Architecture A-4-001. Aviation

Description. ACTIVITY GROUP Advertising A-6-002. Air- Conditioning related services A-6-001. Architecture A-4-001. Aviation CODE A-1-001 A-2-001 A-3-001 A-4-001 A-5-001 A-5-002 A-6-001 A-6-002 A-7-001 A-7-002 A-7-003 A-7-004 A-7-005 A-7-006 A-7-007 A-7-008 A-7-009 A-7-010 A-7-011 A-8-001 A-8-002 A-9-001 ACTIVITY GROUP Advertising

More information

AN INNOVATIVE SOLUTION FOR FIXED OFFSHORE LNG REGASIFICATION TERMINALS

AN INNOVATIVE SOLUTION FOR FIXED OFFSHORE LNG REGASIFICATION TERMINALS AN INNOVATIVE SOLUTION FOR FIXED OFFSHORE LNG REGASIFICATION TERMINALS Augusto Bulte Project Manager Foster Wheeler C/Gabriel García Márquez 2 Las Rozas 28232 Madrid (Spain) ABSTRACT Several developments

More information

12/08/2015. Introduction to Subsea Production Systems. Module structure. 08 Production Control Systems. August 2015

12/08/2015. Introduction to Subsea Production Systems. Module structure. 08 Production Control Systems. August 2015 OIL & GAS Introduction to Subsea Production Systems 08 Production Control Systems August 2015 DNV GL 2013 2015 August 2015 SAFER, SMARTER, GREENER Module structure Section 1 Introduction to control systems

More information

Hydraulic Marine Machinery

Hydraulic Marine Machinery Hydraulic Marine Machinery PRECISION MACHINERY COMPANY Tokyo Head Office World Trade Center Bldg., 4-1, Hamamatsu-cho 2-chome, Minato-ku, Tokyo 105-6116, Japan Phone: 81-3-3435-6862 Fax: 81-3-3435-2023

More information

Setting a Global Standard. www.dril-quip.com. SingleBore Subsea Completion System

Setting a Global Standard. www.dril-quip.com. SingleBore Subsea Completion System Setting a Global Standard www.dril-quip.com SingleBore Subsea Completion System Dril-quip s Vertical Tree Surface Tree Tubing or Drill Pipe Running String Offshore, Time is Money. Dril-quip s SingleBore

More information

Oil and Gas Terms. Anticline: An arch of stratified rock layers that may form a trap for hydrocarbons.

Oil and Gas Terms. Anticline: An arch of stratified rock layers that may form a trap for hydrocarbons. Oil and Gas Terms American Petroleum Institute (API): The API is the trade organization for the oil and gas industry, which establishes standards governing industry operations, safety and the manufacturing

More information

KNUD E. HANSEN A/S. Design of Wind Turbine Installation Vessel Pacific Orca for Swire Blue Ocean

KNUD E. HANSEN A/S. Design of Wind Turbine Installation Vessel Pacific Orca for Swire Blue Ocean Design of Wind Turbine Installation Vessel Pacific Orca for Swire Blue Ocean 1 Design of Wind Turbine Installation Vessel Pacific Orca for Swire Blue Ocean An introduction to the technical aspects of the

More information

DRILLING METHODS. The material below reviews the range of hole making and hole clearing approaches in common use in the drilling industry.

DRILLING METHODS. The material below reviews the range of hole making and hole clearing approaches in common use in the drilling industry. DRILLING METHODS This continuing education unit reviews drilling methods common to drillers, with an emphasis on water well drilling methods. For completeness mention is made of methods or tools used in

More information

DecisionSpace Well Engineering Software

DecisionSpace Well Engineering Software DATA SHEET DecisionSpace Well Engineering Software DecisionSpace Drilling & Completions Key features Configure the right tools to drill any type of well Dramatically simple to use, complete complex fluids

More information