California. American Recovery and Reinvestment Act. 146 DoD Projects ($ 81.1M) Completed or Under Way by August 31, 2009

Save this PDF as:
 WORD  PNG  TXT  JPG

Size: px
Start display at page:

Download "California. American Recovery and Reinvestment Act. 146 DoD Projects ($ 81.1M) Completed or Under Way by August 31, 2009"

Transcription

1 California American Recovery and Reinvestment Act 146 DoD Projects ($ 81.1M) Completed or Under Way by August 31, 2009 Project Title Component Installation Repair Barracks Building 264-Repair Walls, Floors, Ceilings, Latrines, Electric. Repair Barracks Building 98-Repair Walls, Floors, Ceilings, Latrines, Electric. Army Fort Irwin 3,100 Army Fort Irwin 1,800 Repair Chilled/Hot Loop Feed System Ph 3 Army Fort Irwin 1,200 Repair Shoulders Truck-By-Pass Phase 4 Army Fort Irwin 975 Repair Athletic Center Buildings 324, 327, 328, 337, 338- Repairs to Finishes, HVAC, Walls, Floors, Etc. Army Fort Irwin 880 Construct Additional Perimeter Lights Asp - Phase 3 Army Fort Irwin 676 Repair Street Lights & Install Solar Street Lights for Cantonment Area Army Fort Irwin 650 Repair Billets and Latrine/Shower Reserve Component Army Fort Irwin 526 Repair HVAC Units - Augmentee Barracks Army Fort Irwin 490 Repair Roof, Building 361, Recreation Center Army Fort Irwin 350 Repair Street Lights & Install Solar Street Lights for Cantonment Area - Phase 2 Army Fort Irwin 350 Repair HVAC, Building 361, Recreation Center Army Fort Irwin 300 California 1 June 8, 2009

2 Repair of Teen Building/Middle School Army Fort Irwin 300 Construct Parking Lot Lights Building 940 Army Fort Irwin 250 Repair Kitchen Ventilation System Building 1317 Army Fort Irwin 125 Repair Infant Playground Area Army Fort Irwin 50 Repair Pre-School Playground Area Army Fort Irwin 50 Design & Construct Access Control Point at Franklin Gate Army Presidio of Monterey 747 Design & Construct Access Control Point at Bolio Gate Army Presidio of Monterey 747 Design & Construct Information Ctr at High Street Army Presidio of Monterey 745 Construct Information Center, Taylor Street Gate Army Presidio of Monterey 670 Remove Inactive Communication Lines, base-wide Army Presidio of Monterey 590 Replace Windows Barracks Building 622 Army Presidio of Monterey 550 Replace Barracks Failing HVAC Systems, Barracks Buildings 647, 650, 651, Replace Worn Carpet in Barracks 651, Health and Safety (VOLAR) Army Presidio of Monterey 484 Army Presidio of Monterey 356 Replace Worn Carpet in Barracks 652, Health and Safety Army Presidio of Monterey 356 Repair Unsafe/Failed Access Roads and Paved Areas, C Company, 9th Signal Command Army Presidio of Monterey 350 California 2 June 8, 2009

3 Asbestos Mitigate and Abatement Army Presidio of Monterey 300 Replace Deteriorating and Leaking Water Lines Servicing DLI Classrooms Construct Sidewalk to Access DLI Classrooms, Health and Safety Army Presidio of Monterey 300 Army Presidio of Monterey 259 Repair Natural Gas Systems Army Presidio of Monterey 251 Install/Modernize Exterior Lighting for Barracks Areas, 800 and 600 Series Replace Failing Water Laterals Supporting Classroom Buildings Army Presidio of Monterey 159 Army Presidio of Monterey 98 Replace Failing HVAC System Cpac Building 277 Army Presidio of Monterey 82 Install Required Safety Components in Communication Closets: Emergency Lighting, Emergency Shut Off Switches, Fire Suppression and Temperature Controls. Army Presidio of Monterey 72 Install Fire Sprinkler Heads, DLI Classrooms, Building 611 Army Presidio of Monterey 57 Repair Corroded Ext Surfaces, Building 840 Army Presidio of Monterey 51 Install Turnstile at Taylor Gate Army Presidio of Monterey 50 Repair Deteriorated Floor, Building 630, Ed Center Army Presidio of Monterey 28 Inspect and Repair Warehouse Valves Army Sierra Army Depot 2,000 Minor Repairs to Warehouses Army Sierra Army Depot 500 Repair Fencing at Various Locations Army Sierra Army Depot 500 California 3 June 8, 2009

4 Repair Roofs Buildings 671 & 672 Army Sierra Army Depot 500 Repair Various Warehouse Doors Army Sierra Army Depot 500 Various Repairs to Enlisted Barracks. Windows, Stucco, Paint Army Sierra Army Depot 200 HVAC/Elec Upgrade/Window Replacement & Latrines Window Replacement 4000 Area Window Replacement 5000 Area Sub Panel Replacements for WWII Barracks Upgrade Building Energy Management System Building Replace Water Main From Well C4A to C5A Upgrade Building Systems Building Gas Line Replacement Water Well Repair Waterline From S-1 to 5000 Area Upgrade Building Systems Building Building 6023 (Victory Theater) Siding Inglewood FMS 714 MTC-H Camp Roberts 1,930 MTC-H Camp Roberts 1,930 MTC-H Camp Roberts 1,552 MTC-H Camp Roberts 1,525 MTC-H Camp Roberts 1,328 MTC-H Camp Roberts 1,112 MTC-H Camp Roberts 929 MTC-H Camp Roberts 710 MTC-H Camp Roberts 661 MTC-H Camp Roberts 547 MTC-H Camp Roberts 305 California 4 June 8, 2009

5 Upgrade Building Systems Building 6023 Tank N-1 Erosion Repair Tank S-1 Erosion Repair Project Title Component Installation Renovation (Roof, HVAC, Int & Ext Paint, Breakroom) MTC-H Camp Roberts 284 MTC-H Camp Roberts 263 MTC-H Camp Roberts 106 Salinas Field Maintenance Shop 1,500 Replace Metal Roof, Bachelor Quarters Building, SCI Navy Naval Base Coronado 720 Repair and Modernize 13 Living Units Bachelor Quarters, Building 554 Replace Roof Mounted Boilers, Bachelor Quarters 3144 and Bachelor Quarters 3150 Navy Naval Base Point Loma 848 Navy Naval Station San Diego 885 Replace Inverter for 750KW Solar array Navy Naval Station San Diego (Naval Base Coronado) 910 Repair Chief Naval Aviation & Technical Training Buildings Marine Corps Marine Corps Air Station Camp Pendleton 1,429 Repair Gas Pipe 31 Area Marine Corps Marine Corps Base Camp Pendleton 1,596 Repair Taxiway Shoulders- Full Depth Ph 2 Air Force Beale AFB 500 Construct Canopies North Gate Air Force Edwards AFB 669 Construct Curbs and Gutters Coliseum Drive Air Force Edwards AFB 354 Repair Lighting, Research Engineering B1643 Air Force Edwards AFB 300 Repair Lighting Hangar B1623 Air Force Edwards AFB 252 California 5 June 8, 2009

6 Repair Parking Lot, Military Mail Distribution B3502 Air Force Edwards AFB 231 Construct Sewer Line, Contractors Row Air Force Edwards AFB 226 Repair Lighting Test Operations B1199 Air Force Edwards AFB 164 Maintain Roof House B1019 Air Force Edwards AFB 91 Construct Concrete Pad for Civil Engineer Transmission Hi-Line Air Force Edwards AFB 22 Repair Perimeter Fence, Parade Field Section, Ft. Mac. Air Force Fort MacArthur Family Housing Annex 1,055 Repair Fort Macarthur Fencing, North-East Section. Air Force Fort MacArthur Family Housing Annex 700 Slope Evaluation (North-East), Fort Macarthur. Air Force Fort MacArthur Family Housing Annex 485 Repair Airman's Community Center, Phase-2, B/403, Fort Macarthur. Air Force Fort MacArthur Family Housing Annex 442 Design HVAC System, B/425, Fort Macarthur. Air Force Fort MacArthur Family Housing Annex 67 Repair Pedestrian Gate, East Fence Air Force Fort MacArthur Family Housing Annex 48 Repair Upgrade Pedestrian Gate, 30th Street, Fort Macarthur. Air Force Fort MacArthur Family Housing Annex 48 Repair Carpet, B/37, Airman's Attic, 1st Floor, Ft. Mac. Air Force Fort MacArthur Family Housing Annex 23 Add Energy Reductions, HVAC Controls Air Force Los Angeles AFB 592 Repair Perimeter Fencing, Photo Voltaic Lighting. Air Force Los Angeles AFB 335 California 6 June 8, 2009

7 Repair Domestic Water Main Valves Air Force Los Angeles AFB 57 Repair Fire Protection Water Main Valves Air Force Los Angeles AFB 57 Repair Reclaimed Water Main Valves Air Force Los Angeles AFB 57 Repair Fire Alarm System, B/286, Fitness Center. Air Force Los Angeles AFB 54 Add Pedestrian Gate, B/261, Douglas Street Air Force Los Angeles AFB 48 Repair & Replace 600 Ramp Spot 607 Air Force Travis AFB 883 Repair Dormitory Building 1304 Air Force Travis AFB 807 Antiterrorism Perimeter Vehicle Denial Fencing Air Force Travis AFB 753 Repair Gas Mains, Main Gate to Skymaster Drive Air Force Travis AFB 592 Repair Gas Mains, 1200 Area and First Street Air Force Travis AFB 581 Repair Gas Mains, Broadway to Windward Air Force Travis AFB 570 Repair Gas Mains, Skymaster to Broadway Air Force Travis AFB 570 Repair Gas Mains, Main Gate Air Force Travis AFB 538 Install Fire Suppression System Air Force Travis AFB 296 Repair Fire Sprinkler Sys, B-1205 Air Force Travis AFB 269 California 7 June 8, 2009

8 Replace Roll-Up Door With Vault Door Air Force Travis AFB 54 Replace Reservoir 3, Fac #1518 Air Force Travis Water System Annex No 1 2,751 Corrosion Control, Range Launch Facilities Air Force Vandenberg AFB 1,723 Repair Range Facilities Launch Operations Support Center Repair Backlog Plus Up Air Force Vandenberg AFB 1,346 Repair California Blvd, Hwy 1 to Utah Ave Air Force Vandenberg AFB 1,326 Repair and Exercise Water Valves Basewide Air Force Vandenberg AFB 1,075 Repair 13th Street From Iceland Ave to California Blvd Air Force Vandenberg AFB 856 Repair Runway Shoulders Air Force Vandenberg AFB 854 Repair CRAC Units In Admin Building 7025 Air Force Vandenberg AFB 544 Repair Roof at Launch Vehicle Fab Shop, Building 8305 Air Force Vandenberg AFB 516 Base-Wide Facility Painting Contract Air Force Vandenberg AFB 500 Repair 30 Mission Support Group HQ Overflow Parking Lot Air Force Vandenberg AFB 495 Repair Roof at Delta IV Solid Rocket Motor Facility Air Force Vandenberg AFB 473 Construct Parking Lot Extension for Building 8314 Air Force Vandenberg AFB 432 Repair 35th Street Air Force Vandenberg AFB 395 California 8 June 8, 2009

9 Repair 8th Street Air Force Vandenberg AFB 291 Maintain Backflow Prevention Devices Basewide, FY09 Air Force Vandenberg AFB 269 Repair Chillers for Electronics Lab at Missile Maintenance Fac Air Force Vandenberg AFB 262 Repair North Edge of Road West of Building 441 Air Force Vandenberg AFB 253 Renovate Training Facility at Civil Engineer Horizontal Shop, Building Air Force Vandenberg AFB 241 Construct Storage at Fire Station #1 Air Force Vandenberg AFB 218 Replace Kitchen Floor, Building Air Force Vandenberg AFB 215 Replace HVAC Unit, Civil Engineer Maintenance Shop Air Force Vandenberg AFB 207 Repair Comm Ground Tracking Radar Facility Air Force Vandenberg AFB 206 Renovate Men's and Women's Restrooms, Building 6523 Air Force Vandenberg AFB 184 Install Communications Room A/C, Building 8401 Air Force Vandenberg AFB 157 Replace Roof at Material Supply, Building Air Force Vandenberg AFB 126 Repair Fitness Center, Building 9005 Air Force Vandenberg AFB 122 Replace Chiller 1 at Administrative Building 8500 Air Force Vandenberg AFB 111 Repair Missile/Space Research Lab, Building 7408 Air Force Vandenberg AFB 103 California 9 June 8, 2009

10 Maintain San Antonio Creek Environmental Monitoring Ph 1 Air Force Vandenberg AFB 98 Replace Taxiway Lights at South Alpha Taxiway Air Force Vandenberg AFB 93 Repair Ladies Restroom, Building 9320 Air Force Vandenberg AFB 65 Erosion Control, San Antonio Creek Air Force Vandenberg AFB 63 Repair/Replace Uninterruptable Power Supply, Building 8401 Air Force Vandenberg AFB 43 Construct 70 Storage Cages for Dormitory Air Force Vandenberg AFB 40 Install Ceiling Fans, Building Air Force Vandenberg AFB 36 Replace C-17 Apron Blast Fence, Tango Antiterrorism Cable Retention Around Perimeter Fence Replace Portion of Taxiway Alpha Shoulder Replace Parking Lot at Facility 602 Restoration to Dental Clinic Mechanical Systems and Interior Finishes - Naval Hospital Repair Structural IT Vulnerability Restore Mycology Clinical Spaces Air Force Reserve Air Force Reserve Air Force Reserve Air Force Reserve TRICARE Management Agency TRICARE Management Agency TRICARE Management Agency March Air Reserve Base 1,931 March Air Reserve Base 755 March Air Reserve Base 705 March Air Reserve Base 654 Marine Corps Base Camp Pendleton 1,500 NAVMEDCEN San Diego 500 NAVMEDCEN San Diego 260 California 10 June 8, 2009

Maryland. American Recovery and Reinvestment Act. 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009

Maryland. American Recovery and Reinvestment Act. 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009 Maryland American Recovery and Reinvestment Act 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009 Project Title Component Installation Repair Building 316 Electrical, HVAC, Plumbing,

More information

Virginia. American Recovery and Reinvestment Act. 83 DoD Projects ($ 75.7M) Completed or Under Way by August 31, 2009

Virginia. American Recovery and Reinvestment Act. 83 DoD Projects ($ 75.7M) Completed or Under Way by August 31, 2009 Virginia American Recovery and Reinvestment Act 83 DoD Projects ($ 75.7M) Completed or Under Way by August 31, 2009 Project Title Component Installation Repair/Replace Bathrooms in Wilcox Barracks Army

More information

Georgia. American Recovery and Reinvestment Act. 119 DoD Projects ($ 107.7M) Completed or Under Way by August 31, 2009

Georgia. American Recovery and Reinvestment Act. 119 DoD Projects ($ 107.7M) Completed or Under Way by August 31, 2009 Georgia American Recovery and Reinvestment Act 119 DoD Projects ($ 107.7M) Completed or Under Way by August 31, 2009 Project Title Component Installation Barracks Renovation to Correct Safety Issues -

More information

CENTRAL OHIO NORTHEAST OHIO

CENTRAL OHIO NORTHEAST OHIO CENTRAL OHIO Military Defense Supply Center Columbus Warehouse upgrades Columbus 1,000,000 Military Defense Supply Center Columbus Fire protection Columbus 500,000 Military Defense Supply Center Columbus

More information

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Les Butler Associate Commissioner for Business and Regional

More information

The University of Akron Main Campus Biennium 1 July 2016- June 2018. Priority Project Budget Description 1 Electrical Infrastructure Loop

The University of Akron Main Campus Biennium 1 July 2016- June 2018. Priority Project Budget Description 1 Electrical Infrastructure Loop The University of Akron Main Campus Biennium 1 July 2016- June 2018 1 Electrical Infrastructure Loop $2,400,000 Scope: Replace center campus deteriorated 4,160 volt cable and duct bank with 23,000 volt

More information

Naval Facilities Engineering Command Southwest. GSA Opening Doors

Naval Facilities Engineering Command Southwest. GSA Opening Doors Naval Facilities Engineering Command Southwest Brief to the GSA Opening Doors August 2010 1 Naval Facilities Engineering Command Southwest 1 Outline NAVFAC Southwest Who are we and what do we do? How to

More information

PLUMMER ELEMENTARY SCHOOL

PLUMMER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Building Description Project Description Estimated Cost Notes Total Deferred

Building Description Project Description Estimated Cost Notes Total Deferred Building Description Project Description Estimated Cost Notes Total Deferred Athletic Fields & Grounds Baseball dugouts 125,000 Surface level/inground? Relamp Baseball field 16,000 Relamp Softball field

More information

LOS ANGELES AFB, EL SEGUNDO, CA:

LOS ANGELES AFB, EL SEGUNDO, CA: LOS ANGELES AFB, EL SEGUNDO, CA: Contract #: FA2816-11-D-0001 / DO #001 Title: Building 284 Repair Lighting Location: Los Angeles AFB, El Segundo, CA Amount: $61,062.00 Start date: 4/13/12 Completion:

More information

BUNKER HILL ELEMENTARY SCHOOL

BUNKER HILL ELEMENTARY SCHOOL INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

HOUSTON ELEMENTARY SCHOOL

HOUSTON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1962 BUILDING AREA 59,900 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 291 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan HOUSTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

November 3, 2015 Bond and District Additional Assistance Election Information

November 3, 2015 Bond and District Additional Assistance Election Information November 3, 2015 Bond and District Additional Assistance Election Information Proposition 432 - $22 million General Obligation Bond 150+ facility projects across all schools Building renovations and improvements

More information

Print Shop/Mail Room

Print Shop/Mail Room Chapter XVIII Print Shop/Mail Room Page 110 CHAPTER XVIII Print Shop/Mail Room ARCHITECTURAL/STRUCTURAL A. BUILDING EXTERIOR 1.0 EXTERIOR WALLS The exterior walls are comprised of stone veneer. There were

More information

UNIVERSITY OF CALIFORNIA, SAN DIEGO

UNIVERSITY OF CALIFORNIA, SAN DIEGO UNIVERSITY OF CALIFORNIA, SAN DIEGO UCSD BERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANTA BARBARA SANTA CRUZ UNIVERSITY CENTERS - 0076 PHONE: (858) 822-4987 9500 GILMAN

More information

PEABODY ELEMENTARY SCHOOL

PEABODY ELEMENTARY SCHOOL INITIAL YEAR BUILT 1880 BUILDING AREA 37,800 SF CURRENT PROGRAM CAPACITY 210 ENROLLMENT 2008 165 WARD 6 PROPOSED PROGRAM CAPACITY 220 Site Plan PEABODY - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

DRAPER ELEMENTARY SCHOOL

DRAPER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal

More information

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development

More information

Facilities Maintenance Standards rev 9-1-2015

Facilities Maintenance Standards rev 9-1-2015 Facilities Maintenance Standards rev 9-1-2015 Purpose The purpose of these standards is to outline the minimum requirements for maintaining state owned facilities and infrastructures in a manner that will

More information

NAVFAC Hawaii Construction Outlook

NAVFAC Hawaii Construction Outlook 1 NAVFAC Hawaii NAVFAC Hawaii Construction Outlook Billy Borengasser Construction Product Line Coordinator NAVFAC Hawaii 10/20/2015 NAVFAC Hawaii Commanding Officer: CAPT Dean Tufts Executive Officer:

More information

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT 1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.2 Water damage in many classrooms. Replace tiles. 1.1.3 Cabinets, Equipment 1.1.4 Portables

More information

Project Name Year Paid Cost

Project Name Year Paid Cost Project Name Year Paid Cost CFO 202 Renovations 2006 $ 391,964.00 Jones Hall asbestos Abatement 2006 $ 35,650.00 Hubbard Hall Electrical 2006 $ 940,352.00 Hubbard Hall Theater 2006 $ 1,786,297.01 Old Main

More information

MURCH ELEMENTARY SCHOOL

MURCH ELEMENTARY SCHOOL INITIAL YEAR BUILT 1929 BUILDING AREA 47,700 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 491 WARD 3 PROPOSED PROGRAM CAPACITY 500 Site Plan MURCH - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

NAVFAC HAWAII. NAVFAC Hawaii Construction Outlook. CAPT John Coronado. CAPT David Bustamante

NAVFAC HAWAII. NAVFAC Hawaii Construction Outlook. CAPT John Coronado. CAPT David Bustamante NAVFAC Hawaii NAVFAC Hawaii Construction Outlook Billy Borengasser Construction Product Line Coordinator, NAVFAC Hawaii 10/18/2011 1 NAVFAC HAWAII Commanding Officer: CAPT John Coronado Executive Officer:

More information

Vision Home Inspection

Vision Home Inspection Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the

More information

Current as of 11/10/08 1 of 1

Current as of 11/10/08 1 of 1 BEST PRACTICES STANDARDS FOR SCHOOLS UNDER CONSTRUCTION OR BEING PLANNED FOR CONSTRUCTION I. Site Layout A. School buildings shall be provided with a securable perimeter. A securable perimeter means that

More information

Building Condition Assessment Report

Building Condition Assessment Report Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.

More information

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT 1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.3 Cabinets, Equipment 1.1.4 Portables 1.2 Fire / Life Safety 1.2.1 Corridor, Separation

More information

APPENDIX E: CAPITAL NEEDS SUMMARY

APPENDIX E: CAPITAL NEEDS SUMMARY APPENDIX E: CAPITAL NEEDS SUMMARY Building A Foundation Hall Building to be replaced ARCHITECTURAL Roof Repair North Structural Wall Repair Flooring Repairs Ceiling Repairs Lighting Repairs Lighting Repairs

More information

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic

More information

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: Somewhere, FL CLIENT: GAIA GC ID No: 2015000 DATE: 12/31/2015 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792 FLORIDA

More information

Orlando Home Inspection Services

Orlando Home Inspection Services PLEASE NOTE: Orlando Home Inspection Services Serving Central Florida since 1999 P O Box 915451, Longwood, Florida, 32791-5451 Phone: (321) 228-2493 Fax: (407) 374-8505 Web: http://www.orlando-home-inspections.com

More information

5703 South Sossaman Road Aviation Center

5703 South Sossaman Road Aviation Center 5703 South Sossaman Road Aviation Center has an available Class A aviation center with a 10,000 s.f. hangar. This facility includes 10,000 s.f. of space for offices, avionics repair, or other uses. It

More information

OFFICE OF THE STATE ARCHITECT ANNUAL REPORT 2015 PRIORITIZED STATEWIDE PROJECT FUNDING RECOMMENDATIONS FOR FY2015/2016

OFFICE OF THE STATE ARCHITECT ANNUAL REPORT 2015 PRIORITIZED STATEWIDE PROJECT FUNDING RECOMMENDATIONS FOR FY2015/2016 LEVEL 1 1 1 Office of the State Architect M80120 $2,000,000 $0 $2,000,000 Emergency Fund 2 3 Colorado State University 2015-073M14 $967,301 $0 $2,967,301 Replace Obsolete Fire Alarm, Various Buildings,

More information

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table

More information

California - Los Angeles & Orange Counties HUD Photo List 1-7-2011

California - Los Angeles & Orange Counties HUD Photo List 1-7-2011 California - Los Angeles & Orange Counties HUD Photo List 1-7-2011 Los Angeles # 1 1-7-11 1-7-11 $211,500 Price 197-361077 144 W 1st St 1947 1 $1,073 Azusa, CA 91702 963 Disclosures: Recommend replacing

More information

Schedule B to By-law 33-2009

Schedule B to By-law 33-2009 Amended by By-law 8-2016 Note: This consolidation is prepared for convenience only. For accurate reference the original by-laws should be reviewed. Floor Area Calculation Floor area shall: Schedule B to

More information

New Jersey Army National Guard. Environmental Compliance Database

New Jersey Army National Guard. Environmental Compliance Database New Jersey Army National Guard Environmental Compliance Database All Presumend and Confirmed Asbestos Containing Materials Facility Facility Homogenious / Atlantic City Armory 1st Armorer's Supply Insulation,

More information

In Partnership with. TDIndustries 13850 Diplomat Drive Dallas, Texas 75234 Phone: 1-972-888-6751 Fax: 1-972-888-9621 Website: TDIndustries.

In Partnership with. TDIndustries 13850 Diplomat Drive Dallas, Texas 75234 Phone: 1-972-888-6751 Fax: 1-972-888-9621 Website: TDIndustries. In Partnership with Schedule Contract #GS21F0118X Contract # TXMAS-12-03FAC0110 Schedule 03FAC Facilities Maintenance and Management Federal Supply Service Authorized Federal Supply Schedule Price List

More information

www.citiesinspection.com October 5, 2015 Dear Client,

www.citiesinspection.com October 5, 2015 Dear Client, www.citiesinspection.com October 5, 2015 Dear Client, On 9/14/2015, Cities Inspection Service, Inc. completed a building inspection of the property located at 123 Oak Street, Someplace, Minnesota for you.

More information

APEC CAPABILITIES PROJECT MANAGEMENT / SUPPORT

APEC CAPABILITIES PROJECT MANAGEMENT / SUPPORT PROJECT MANAGEMENT / SUPPORT Capital Cost Savings Construction Monitoring and Assistance In-Plant Production Assistance In-Plant Maintenance Assistance Procurement Assistance Project Cost Estimating o

More information

Chicago Public Schools

Chicago Public Schools Ames Middle School 1920 N Hamlin Ave 1997 Completed The scope of this project is to construct a new school $16,913,379 2014 Construction The intent of this project is to expand existing Ames middle school

More information

COMPREHENSIVE PROPERTY INSPECTIONS

COMPREHENSIVE PROPERTY INSPECTIONS COMPREHENSIVE PROPERTY INSPECTIONS Thank you for selecting CPI for your Deficiency Observation. A full home inspection was not performed on this property at the buyers request. This inspection is a limited

More information

Bond Priorities. Repairs and Maintenance. School Safety. Capacity

Bond Priorities. Repairs and Maintenance. School Safety. Capacity Replace old windows, boilers, heating and air conditioning system. Improve accessibility for disabled persons. Keyless entry lock systems, redesign of school entrance, and wireless access throughout building.

More information

For Sale: Industrial Condominium

For Sale: Industrial Condominium 1925 E. Francisco Blvd., Unit G, San Rafael, CA For Sale: Industrial Condominium Three Office Units (9, 20 & 21) Near Home Depot & Richmond Bridge Restroom w/ Shower & Kitchenette Low HOA Dues: $493/mo.

More information

PROPOSITION E. Associated General Contractors of America San Diego Chapter September 17, 2014

PROPOSITION E. Associated General Contractors of America San Diego Chapter September 17, 2014 PROPOSITION E Associated General Contractors of America San Diego Chapter September 17, 2014 1 Facilities Centric Bond Aging Facilities Emphasis on Technology Infrastructure School Site Safety and Security

More information

Property Condition Assessment

Property Condition Assessment Property Condition Assessment Business, Wisconsin Inspection Date: 8/2009 Prepared For: Business Owner Report Number: TD999909 Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar

More information

NARRATIVE REPORT. The Asbestos Bulk Sample Results Table includes asbestos sampling data.

NARRATIVE REPORT. The Asbestos Bulk Sample Results Table includes asbestos sampling data. NARRATIVE REPORT 1.0 BUILDING INFORMATION The original date of construction for Construction Management Engineering was not immediately available; the building has had no major renovations. Construction

More information

Lindsay Thurber Comprehensive High School Red Deer School District No. 104 School Facilities Evaluation Project Page 1

Lindsay Thurber Comprehensive High School Red Deer School District No. 104 School Facilities Evaluation Project Page 1 School Facilities Evaluation Project Page 1 Executive Summary In November 1999, Alberta Infrastructure, School Facilities Branch engaged Stephens Kozak Carr and Brown Architects to conduct evaluations

More information

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Printed On: 2003/04/03 St Patrick CES, 7932 Study [03.3-050 Plumbing Piping Systems] Study condition, remaining service

More information

LAS VEGAS PURCHASING WAREHOUSE 1054 South Commerce Street Las Vegas, Nevada

LAS VEGAS PURCHASING WAREHOUSE 1054 South Commerce Street Las Vegas, Nevada State of Nevada Department of Administration Purchasing Division Las Vegas Purchasing Warehouse Facility Condition Analysis LAS VEGAS PURCHASING WAREHOUSE 1054 South Commerce Street Las Vegas, Nevada Site

More information

Finding of No Significant Impact

Finding of No Significant Impact Finding of No Significant Impact PROPOSED CONSTRUCTION AND OPERATION OF OPERATIONAL READINESS TRAINING COMPLEX FORT HUNTER LIGGETT, MONTEREY COUNTY, CALIFORNIA Pursuant to the Council on Environmental

More information

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS TYPICAL FIRE SAFETY INSPECTION VIOLATIONS The following is a list of typical violations often found by inspectors and a generic solution. You can use this list to improve the safety of your facility, to

More information

PATTERSON ELEMENTARY SCHOOL

PATTERSON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1945 BUILDING AREA 78,300 SF CURRENT PROGRAM CAPACITY 368 ENROLLMENT 2008 463 WARD 8 PROPOSED PROGRAM CAPACITY 500 Site Plan PATTERSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Vari Inspection Services

Vari Inspection Services Cover Page Vari Inspection Services Property Inspection Report Inspection prepared for: Sample Real Estate Agent: None - Date of Inspection: 5/13/2015 Inspector: Tony Vari License # HI8047 23110 STRD 54

More information

Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016

Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Year Opened 2003 Current Square Footage 391,000 Site Acreage 86.22 cherokeetrail.cherrycreekschools.org $279,200 Asphalt and concrete

More information

Development Services Guidelines

Development Services Guidelines Dear Customer/Developer: Balcones Heights 3300 Hillcrest San Antonio, Texas 78201 210-735-9148 ext 246 Fax: 210-735-9409 Development Services Guidelines Welcome to the City of Balcones Heights, we look

More information

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: 123 MAIN ST MIAMI, FL CLIENT: BUYER ID No: 2014193 DATE: 5/13/2014 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792

More information

Project Management Division

Project Management Division CAPITAL PROJECTS DEPARTMENT MONTHLY ACTIVITY REPORT February 2015 Project Management Division BELOW: Collins Construction crews complete recent exterior work and await delivery of exterior siding. Collins

More information

Repair Project for April 7, 2009

Repair Project for April 7, 2009 Repair Project for April 7, 2009 Scope of the Project HVAC Upgrades Roof Replacement Window Replacement/Exterior Openings Science Lab Renovations New Fire Alarm/Electrical AAB (accessibility) Upgrades

More information

Hartsfield-Jackson Atlanta International Airport s

Hartsfield-Jackson Atlanta International Airport s Hartsfield-Jackson Atlanta International Airport s 2008-09 Closed Projects (Posted 1/6/2009) FC-3007000038C: MISCELLANEOUS BUILT-UP ROOF AND SINGLE PLY ROOF REPAIRS AT H-JAIA Furnish all labor, equipment,

More information

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N PLAN REVIEW FOR: PROJECT NAME: OWNER: ARCH/DESIGNER: ADDRESS: Ph/Fx: Plans Dated: E-mail: Sealed By: Estimated Project Cost - $ REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

More information

Society of American Military Engineers Omaha District

Society of American Military Engineers Omaha District Society of American Military Engineers Omaha District Kim Thomas Deputy Chief, Plans, Programs, and Project Management Division Omaha District July 21, 2015 US Army Corps of Engineers Omaha District Spotlight

More information

SUMMARY OF ASBESTOS CONTAINING MATERIAL IN BUILDINGS AND BULK SAMPLE ANALYSIS

SUMMARY OF ASBESTOS CONTAINING MATERIAL IN BUILDINGS AND BULK SAMPLE ANALYSIS ASBESTOS SURVEY SUMMARY PACIFIC UNION COLLEGE ANGWIN, CALIFORNIA SUMMARY OF ASBESTOS CONTAINING MATERIAL IN BUILDINGS AND BULK SAMPLE ANALYSIS Definition of terms: Friable: Material that can be crumbled

More information

Board Seminar Facilities. School Year 2012-2013. Submitted by Joseph L. Lisa-Director of Facilities

Board Seminar Facilities. School Year 2012-2013. Submitted by Joseph L. Lisa-Director of Facilities Board Seminar Facilities School Year 2012-2013 Submitted by Joseph L. Lisa-Director of Facilities High School Installed new fence for Pre-K activities by weight room. Installed new rails and side walks

More information

A. Under Section 553.73(9), Florida Statutes, the following buildings and structures are exempt from compliance with the Florida Building Code:

A. Under Section 553.73(9), Florida Statutes, the following buildings and structures are exempt from compliance with the Florida Building Code: MIAMI-DADE COUNTY BUILDING DEPARTMENT PERMIT EXEMPTIONS Please note that the exemptions listed in this section are from Florida Building Code requirements only. Other State and County regulatory departments

More information

BUILDING DIVISION CONSTRUCTION PERMIT FEES

BUILDING DIVISION CONSTRUCTION PERMIT FEES www.polk-county.net BUILDING DIVISION CONSTRUCTION PERMIT FEES Growth Management Department Building Division 330 W. Church St. Bartow, Florida 33881-9005 863-534-6080 Fax 863-534-6016 All Construction

More information

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015 Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015 Town Hall Complete building restoration (state historic preservation award) High efficiency

More information

SAME Orange County Federal Business Symposium

SAME Orange County Federal Business Symposium SAME Orange County Federal Business Symposium Mr. Brian M. Moore Deputy District Engineer Los Angeles District US Army Corps of Engineers 19 November 2009 US Army Corps of Engineers Get to Know Us In 30

More information

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal. 2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other

More information

DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN

DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN DISTRICT "SHELL" SUBMISSION DATE: 11/13/12 questions 11/26/12 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 11/19/12 revised 11/26/12 (delete following Hearing) KBE APPROVAL DATE: FEBRUARY

More information

Facility Assessment for. 11801 East Main Street, Huntley, IL

Facility Assessment for. 11801 East Main Street, Huntley, IL Facility Assessment for 11801 East Main Street, Huntley, IL July 12, 2012 Prepared by: Dewberry Architects Inc. 25 S. Grove Avenue, Suite 500 Elgin, IL 60120 (847) 695-5840 The Village of Huntley requested

More information

CITY OF TUKWILA Mayor s Office/Human Services Division Minor Housing Repair Assistance Program 2014 Policies

CITY OF TUKWILA Mayor s Office/Human Services Division Minor Housing Repair Assistance Program 2014 Policies CITY OF TUKWILA Mayor s Office/Human Services Division Minor Housing Repair Assistance Program 2014 Policies The Housing Repair Assistance Program provides and promotes the repair and maintenance of housing

More information

HOMEOWNER S PERMIT GUIDE

HOMEOWNER S PERMIT GUIDE HOMEOWNER S PERMIT GUIDE WHEN IS A PERMIT REQUIRED? Department of Development and Permits 306 Cedar Road, City Hall 2 nd Floor P.O. Box 15225 Chesapeake, VA 23328 Phone: (757) 382-6018 Fax: (757) 382-8448

More information

CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES PLAN

CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES PLAN DISTRICT "SHELL" SUBMISSION DATE: 4/17/13 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 4/19/13 (delete following Hearing) KBE APPROVAL DATE: JUNE 2013 CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES

More information

Schedule B to By-law 33-2009 Part A Fees Payable for Permits

Schedule B to By-law 33-2009 Part A Fees Payable for Permits Floor Area Calculation Floor area shall: Part A Fees Payable for Permits (Effective January 1, 2015) a) be calculated by measuring to the outer face of exterior walls and to the centre of party walls or

More information

Architectural Condition Survey

Architectural Condition Survey Architectural Condition Survey Santa Fe Railroad / AMTRAK Depot, Lawrence. Kansas for the City of Lawrence, 2002 Survey: (student) PI: William Carswell, Associate Dean, School of Architecture, University

More information

School Board Proposed Capital Improvements Program. Fiscal Years 2014-2023

School Board Proposed Capital Improvements Program. Fiscal Years 2014-2023 School Board Proposed Capital Improvements Program Fiscal Years 2014-2023 TABLE OF CONTENTS Summary Page 1 Capital Projects Pages 2-6 Capital Projects Description Pages 7-14 SCHOOL BOARD PROPOSED CAPITAL

More information

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES A Residential Owner s Guide to PERMITS CITY OF Elgin PLANNING & NEIGHBORHOOD SERVICES CITY OF Elgin A Residential Owner s Guide Welcome! This booklet has been prepared to provide residential property owners

More information

SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES

SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES 1. CALCULATION OF PERMIT FEES SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule: Permit Fee

More information

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer

More information

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES All searches and notifications on Bid4Michigan are based on National Institute of Government Purchasing (NIGP) codes. It

More information

Water Leak 1: Intrusion Policy

Water Leak 1: Intrusion Policy Water Leak 1: Intrusion Policy {Non-Casualty) 1. Determine Source of Leak Roof Leak- 11 See roof leak" Pressured Pipe leak- 11 See pressured pipe leak" Water Intrusion- See 11 see Water Intrusion leak"

More information

Inspecting to a higher standard.

Inspecting to a higher standard. Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com

More information

Disaster Prevention and Protection Checklist

Disaster Prevention and Protection Checklist Preservation Services Leaflet 1438 West Peachtree Street, Suite 200/Atlanta, GA 30309 Phone: 404-892-0943/Fax: 404-892-7879 Website: Disaster Prevention and Protection Checklist The inspection

More information

Attachment #23 Health Safety Table. Client Education Inform issue and document. How to clean & maintain gutters. How to adjust sprinklers

Attachment #23 Health Safety Table. Client Education Inform issue and document. How to clean & maintain gutters. How to adjust sprinklers Exterior Visual Health & Safety Issue Allowable Action Site Drainage Exterior grade does not slope 2% within the first 10' Site drainage causing bulk moisture in crawl space or basement Repairs to existing

More information

Name Of Occupancy Date. Yes No Describe

Name Of Occupancy Date. Yes No Describe FIRE PREVENTION INSPECTION CHECKLIST For Class A Occupancy (For Assembly Buildings, Bars, Restaurants, Gyms, Churches, Arenas, Theatres or wherever people gather) Name Of Occupancy Date Physical Address

More information

EXPRESS PERMITS (No Plan Check Required)

EXPRESS PERMITS (No Plan Check Required) EXPRESS PERMITS (No Plan Check Required) Following are the lists of different types of construction for which an express permit can be issued. Express permits can be issued where work does not require

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Paul Revere School Modernization and Interim Housing ADDENDUM NO.

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Paul Revere School Modernization and Interim Housing ADDENDUM NO. SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Paul Revere School Modernization and Interim Housing ADDENDUM NO. 1 PROJECT: Paul Revere School DATE: March 25, 2015 Modernization

More information

Point Auditorium Design Narrative PROJECT NAME: Point Auditorium DATE: 06/25/15 TO: Lance Francis FROM: Leslie Ellsworth

Point Auditorium Design Narrative PROJECT NAME: Point Auditorium DATE: 06/25/15 TO: Lance Francis FROM: Leslie Ellsworth INTRODUCTION: Kronberg Wall Architects is pleased to present the Design Narrative for the Point University Auditorium conversion from the existing warehouse space. General Project Description: This project

More information

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST It is essential to perform a Basic Damage Assessment (BDA) following an adverse event to help ensure the safety of building occupants as well as prevent additional losses from occurring. This checklist

More information

2000 Bachelor of Science in Civil Engineering University of Central Florida, Orlando, Florida

2000 Bachelor of Science in Civil Engineering University of Central Florida, Orlando, Florida ENGINEER: CIVIL/STRUCTURAL NICHOLAS K. PONTILLO, P.E. Engineering Design & Testing Corp. Post Office Box 40026 Overland Park, Kansas 66204-0926 Telephone: (913) 859-9580 npontillo@edtkc.com EDUCATION:

More information

Springfield Township Board of Education March 10, 2015 Referendum Questions and Answers (updated 2/19/2015)

Springfield Township Board of Education March 10, 2015 Referendum Questions and Answers (updated 2/19/2015) Springfield Township Board of Education March 10, 2015 Referendum Questions and Answers (updated 2/19/2015) What is a referendum? New Jersey school districts hold public referendum votes to seek approval

More information

31289 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JANUARY, 5.00 12, 2012

31289 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JANUARY, 5.00 12, 2012 31289 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JANUARY, 5.00 12, 2012 BOARD OF TRUSTEES OF COMMUNITY COLLEGE DISTRICT NO. 508 COUNTY OF COOK AND STATE OF ILLINOIS JOB ORDER CONTRACT

More information

NW/SW Joint Engineer Training Symposium

NW/SW Joint Engineer Training Symposium NW/SW Joint Engineer Training Symposium COL Mike Farrell Sacramento District Commander November 6, 2014 US Army Corps of Engineers Agenda Sacramento District overview Civil Works and Military Programs

More information

MARKET SCOUT CONTRACTORS QUESTIONNAIRE (complete in addition to an Acord application) 1. Applicant:

MARKET SCOUT CONTRACTORS QUESTIONNAIRE (complete in addition to an Acord application) 1. Applicant: 1. Applicant: 2. Type of all work performed by or for applicant (check You if performed by applicant and Subs if performed by subcontractors and both if done by both): Air Condition Systems Installation,

More information

PARKVILLE HIGH SCHOOL LIMITED RENOVATION

PARKVILLE HIGH SCHOOL LIMITED RENOVATION PARKVILLE HIGH SCHOOL LIMITED RENOVATION DESIGN BRIEFING For Dr. Joe A. Hairston BALTIMORE COUNTY PUBLIC SCHOOLS August 11, 2009 Smolen 3 Emr + Associates Architects 1355 Piccard Drive, Suite 200 Rockville,

More information

Items in red were complete 2-22-10. Items in green were complete on 8-2-11. Lined out items are Life Safety Codes.

Items in red were complete 2-22-10. Items in green were complete on 8-2-11. Lined out items are Life Safety Codes. Office of Safe and Orderly Schools Facility Safety Assessment Dennis Meador, School Facilities Supervisor Mark Hobson, School Facilities Supervisor Division of School Building September 18 19, 2007 Items

More information