1 SECTION 0990 PAINTING PART GENERAL 1.01 SCOPE OF WORK: A. WORK INCLUDED: The Contractor shall furnish all necessary labor, materials, equipment and services to complete all field painting work indicated on the drawings and/or specified herein, including but not necessarily limited to the following: 1. Painting of exposed exterior ferrous metals and miscellaneous metals. 2. Painting of patch work and defaced areas resulting from demolition. 3. Painting of interior exposed ferrous miscellaneous metals including exposed metals embedded in concrete. 4. Painting of interior ferrous metals. 5. Painting of hollow metal doors and frames. 6. Painting of exposed piping for natural gas system. 7. All construction not factory finished shall be painted or finished as specified unless specifically noted otherwise. B. WORK NOT INCLUDED: The following items shall not be field painted: 1. Items made from brass, bronze, copper or stainless steel. 2. Manufactured items furnished with factory applied finishes, etc. 3. Electrical panels, switchgear, substations, transformers and other electrical equipment. 4. Compressors, air handling units and other mechanical equipment. 5. HVAC louvers and dampers. 6. Aluminum surfaces except where specifically noted otherwise. 7. Glass. 8. Rubber and fabric surfaces. 9. Interior finishes other than painted surfaces. C. RELATED WORK SPECIFIED ELSEWHERE: Refer to other Sections of these specifications for specific information concerning materials and construction requirements of work to be painted under this Section

2 1.02 QUALIFICATIONS: A. QUALIFICATIONS OF WORKMEN: All personnel engaged in the application of painting materials shall be thoroughly trained and experienced in the proper application of each material in accordance with the material manufacturer's written instructions and recommendations. B. QUALIFICATIONS OF SUBCONTRACTOR: The painting subcontractor shall have a record of successful completion of painting work for projects of similar scope and nature for a period of at least three years. The subcontractor shall be approved by the material manufacturer for application of his materials SUBMITTALS: A. COLOR CHARTS prepared by the paint manufacturer shall be submitted to the Engineer in accordance with Section 0130 for selection of colors. Colors will be selected by the Engineer from the manufacturer s standard selections. Selected colors will be returned to the Contractor in the form of an approved color schedule. The Engineer, however, reserves the right to vary colors of any surface to obtain the desired effect without increasing costs. No more than 10 different colors will be used for the project. B. Manufacturer's installation instructions shall be submitted to the Engineer in accordance with Section Maintain one set of these instructions at the jobsite for reference by the Engineer PRODUCT HANDLING: A. PROTECTION: 1. All necessary means shall be used to protect materials specified under this Section from damage before, during and after installation. 2. The work of other trades shall be adequately protected from damage resulting from work specified under this Section. 3. Protect factory finished work and work not requiring field painting from overspray, accidental spills, dripping, etc. 4. Protect all painted surfaces from the accumulation of dust during painting operations and thereafter until time of final inspection. 5. Protect Underwriter's labels on doors and other construction from paint coverage during painting operations. B. STORAGE AND HANDLING OF MATERIALS: 1. All materials shall be stored in field storage warehouses or the equivalent. Provide temporary space for the exclusive use of paint storage and paint mixing. No space will be allowed in the building for these purposes

3 2. Observe all regulations applicable to storage and mixing of paint and post all necessary safety signs, etc., as required by local and state codes and in conformity with good safety practices. Damage to any building or its contents caused by failing to exercise proper precautions to prevent such loss shall be made good by the painting contractor in a manner directed by the Engineer. 3. All paint, enamel, oil, turpentine and any other combustible or inflammable materials shall be stored in receptacles having tight covers each night or after each work period. All such receptacles shall be kept tightly closed. 4. All oily or paint-saturated cloths, rags or waste shall be removed from the buildings after each day's work or other work period. No flammable or combustible material of any kind shall be left unenclosed while inside buildings. C. REPLACEMENTS: 1. In the event of damage to materials or work in place, all necessary repairs and replacements shall be immediately made to the satisfaction of the Engineer at the sole expense of the painting contractor. 2. Work having factory finishes that are marred by the painting operation shall be replaced or field painted at the discretion of the Engineer at the sole expense of the painting contractor. D. PACKAGING AND MARKING: All materials shall be delivered to the jobsite in the manufacturer's standard unopened containers bearing the manufacturer's standard identifications and markings ENVIRONMENTAL CONDITIONS: A. TEMPERATURE: During application and drying of paint, a minimum temperature of 65 degrees F shall be maintained and held constant as possible. Surfaces whose temperature exceeds 120 degrees F shall not be painted. B. HUMIDITY: No painting shall be undertaken in damp, rainy weather or where relative humidity in area or spaces to be painted is greater than 65 percent. C. WIND: Paint shall not be applied when winds may cause dust or dirt to be embedded in the coating, nor when winds may interfere with proper spraying operation. D. VENTILATION: Provide adequate ventilation in all building areas where painting work is being performed. E. SAFETY: All painting shall be done under conditions and in a manner dictated by safe practices, using materials, tools and rigging of safe character. Comply with recognized safety rules and practices necessary to permit safe working

4 conditions for the workmen as well as to prevent hazards to others who may be in the vicinity of the work. Paint on or in the vicinity of energized electrical or rotating equipment, apparatus or lines shall not be done without the approval of the Engineer, and then only in accordance with all laws, rules, ordinances or regulations which apply. Precautions recommended by paint manufacturers in mixing and application shall be followed explicitly. F. JOB CONDITIONS: All building spaces shall be swept broom clean prior to commencement of painting work in the area. Painting of interior surfaces will not be permitted in an open unprotected environment COORDINATION: A. Cooperate with all affected trades in the preparation of surfaces and application of paint on work furnished under other sections of these specifications. B. Examine and study all drawings, specifications, schedules, manufacturer's data and other pertinent information relating to all work receiving field paint as required to produce and insure a proper painted finish. C. Materials shall be delivered in ample quantities sufficiently in advance of the need, to avoid any delays or interruptions in the work due to lack of proper materials. D. Surfaces left unfinished purposely to meet the requirements of other trades shall be painted or finished as part of work under this Section after all such work requiring unfinished surfaces is complete ACCEPTANCE AND TOLERANCES: A. Final acceptance of painting and finishing shall be based upon an inspection by the Engineer. Work failing to meet the requirements of these specifications will not be accepted. B. If the finished work, using the number of coats specified, does not yield a uniform color and texture acceptable to the Engineer, apply such additional coats as required to meet approval without additional cost to the Owner. PART PRODUCTS 2.01 MATERIALS: A. PAINTING MATERIALS: All painting materials shall be as manufactured by ICI Paint Stores, headquartered at 925 Euclid Avenue, Cleveland, OH (consisting of DEVOE, GLIDDEN, DEVOE COATINGS, AMERITONE,

5 DECRATREND, FULLER O BRIEN and SINCLAIR company-owned stores) or approved equal. 1. Generally, manufacturer shall mix all paints. Materials shall be thoroughly stirred. No materials shall be reduced or changed in any way except as specified by manufacturer. 2. Primers, sealers and undercoaters for paint work shall be of the same manufacture as the brand of paint specified. 3. Paint shall be well ground and mixed, and shall not settle or cake in the containers. Paint shall be readily broken up with a paddle to a smooth uniform paint of good brushing consistency, and shall dry hard to a smooth finish without streaking, running or sagging. 4. All colors and shades of paint shall conform to the approved color schedule, the manufacturer's color chart as submitted for color selection, and sample panels as approved by the Engineer. Any tinting or matching of colors shall only be done with the approval and concurrence of the Engineer. 5. Painting materials shall be furnished in accordance with the painting schedule at the end of this Section. ICI product identification names and numbers have been used in preparing the painting schedule. PART EXECUTION 3.01 EXAMINATION AND PREPARATION OF SURFACES: A. EXAMINATION OF SURFACES: The painting contractor shall examine all surfaces that are to be painted, work conditions under which painting work must be accomplished, and any other conditions affecting the proper painting of all work. Report to the Engineer any and all conditions which adversely affect the work and thereby preclude a high quality job of painting and finishing. No "waiver of responsibility" for incomplete, inadequate or defective underlying or adjoining work will be considered by the Engineer unless notice of such unsatisfactory conditions has been filed and agreed to, in writing, by the Engineer before the painting work begins. Application of first field coat on any surface shall be construed as evidence that the surfaces are acceptable to the painting contractor as being in proper condition for application of paint under this Section. Where there is any question of dryness of surfaces, test surfaces in the presence of the Engineer. B. GENERAL PREPARATION OF ALL SURFACES: All surfaces shall be cleaned and prepared in strict accordance with the paint system manufacturer's instructions and recommendations. Immediately prior to paint application, all surfaces shall be made perfectly clean, dry, smooth and free of all dust, dirt, grease, oil, mildew, splinters, rust, scale and other extraneous matter which might adversely affect the finished work. All surface defects shall be corrected prior to painting. Oil and grease shall be removed with solvent intended for such purpose. Loose scale and rust shall be removed by

6 scraping, wire brushing or sand blasting. Rough areas and spots in smooth surfaces shall be sanded and rubbed smooth to match adjacent areas. Enamel undercoats shall be sanded smooth after the undercoats are dry and prior to recoating. All holes, cracks and blemishes shall be filled with appropriate putty, filler, caulking or spackling compound after application of prime coat has become hard and dry and before second coat is applied. All abraded areas in shop applied prime coats shall be touched-up with matching primer. Apply appropriate barrier coating over any shop primed surfaces that are incompatible with the field paint system specified. Remove electrical switch plates, receptacle plates and exterior door hardware prior to painting. Replace such items after completion of painting in each area with skilled mechanics. C. ADDITIONAL PREPARATION OF FERROUS METAL SURFACES: Clean unprimed ferrous metal surfaces including bolts, nuts, washers and welds to bare metal with wire brush and appropriate solvent. Apply field prime coat to such items. Remove defective shop prime coats and field prime where necessary to insure a high quality finish. Galvanized metal shall be thoroughly cleaned of all foreign matter and etched to a dull paint-receptive surface, unless otherwise specified INSTALLATION AND WORKMANSHIP: A. PAINT APPLICATION: 1. Manufacturer's Instructions: All paint materials shall be applied in strict accordance with the manufacturer's written instructions and recommendations except where more stringent requirements are set forth by these specifications. 2. Mixing: Mixing of paint materials shall be in accordance with the paint manufacturer's written instructions. Provide new mixing containers of suitable size for mixing paint. No mixing will be permitted outside of these containers. With the exception of ready-mixed materials, all mixing shall be done at the jobsite. All paints shall be thoroughly mixed prior to application. Thinning, if required, shall be done with the type of reducer recommended by the paint manufacturer in accordance with the paint manufacturer's written instructions. 3. Painting of Shop Coat: Field prime coats may be omitted on materials shipped to jobsite already adequately primed except where an additional prime coat is specified in the painting schedule. Shop prime coats that have been damaged, marred or abraded shall be touched-up or reprimed. Any surfaces where shop prime coats are not compatible with special coatings shall receive a proper barrier coat of paint applied before applying subsequent coatings

7 4. Paint Film Thickness: Paint covering shall not exceed the spread per gallon recommended by the paint manufacturer. Paint shall be applied in such a manner as to yield the dry film thickness recommended by the manufacturer. Film thickness indicated in the painting schedule are expressed in mils of dry film thickness. B. SPECIAL APPLICATION INSTRUCTIONS: 1. Paint top, bottom and side edges of all metal doors. Paint metal doors prior to installation of hardware. Seal top, bottom and side edges of all wood doors. 2. All gas piping shall be painted ANSI Safety Yellow. C. SEQUENCING AND SCHEDULING: 1. Painting work shall not begin until after the Engineer's issue of approved color schedule and approval of field sample panels. 2. The painting contractor shall be responsible for the final finish on his work and should, therefore, sequence and schedule his work to be performed under conditions that will yield first quality work conforming in every respect to these specifications. 3. Painting work shall not be started until the building structure is properly dried in and ready for painting. 4. Painting work in an area shall not be started until all other work has been completed and all materials requiring field painted finishes are permanently in place. Any extra painting work resulting from the failure to comply with this requirement shall be performed by the painting contractor at no additional cost to the Owner. 5. Stop exterior work sufficiently early to permit paint film to set up before condensation, frost and moisture caused by night temperature drop occur. 6. Each coat of paint shall be allowed to thoroughly dry before application of next coat. Unless otherwise specified, exterior oil paints shall dry at least 48 hours between coats. Interior paints shall dry at least 24 hours between coats. 7. Paint hollow metal doors two coats prior to installation of door hardware. Paint top and bottom edges of doors prior to erection

8 D. WORKMANSHIP: 1. All workmanship shall be of the highest grade. All materials shall be applied to completely cover all surfaces evenly so as to dry uniformly in color and sheen, free from runs, sags, laps, skips, holidays, pinholes, wrinkles, shiners, streaks, and brush marks. Each coat shall be applied smooth, worked out evenly and allowed to dry before subsequent coat is applied. Paint shall not be floated on or applied in thick, heavy coats. The priming coat shall be thoroughly applied to fill all pores, crevices, etc. All brushes, spray nozzles and rollers shall be clean and in good condition. 2. Make edges of paint adjoining other materials or colors sharp and clean without overlapping FIELD QUALITY CONTROL: A. Before applying each coat of paint, the painting contractor shall thoroughly inspect the previous coat making certain that it is ready to receive the next specified coat. Previous coating shall be thoroughly cured. Allow specified drying time and check film with fingernail to be certain it is cured. Noncompatible and nonadherent materials shall be removed from previous coat. B. The Engineer shall be notified and given an opportunity to inspect each paint coat in major building areas prior to application of next coat. Failure to make such notification may result in additional coats at no additional expense to the Owner. C. Immediately prior to final inspection, the painting contractor shall thoroughly inspect the project for defective painting work. All defects in paint application and surfaces damaged during the course of construction shall be repaired and repainted prior to final inspection CLEANING: A. During the course of construction, the painting contractor shall periodically clean up all surplus materials, debris, and rubbish resulting from the painting operation and remove same from the jobsite. B. Upon completion of the work, the painting contractor shall remove all surplus materials, scaffolds, debris, etc. from the premises. All rooms and spaces shall be left broom clean. C. All misplaced painting and paint dust shall be removed from glass, light

9 fixtures, floors, mechanical equipment, electrical equipment and other building construction elements. Cleaning operations shall be carried out in such a manner that finished surfaces will not be marred or damaged. D. The building premises and all painted surfaces shall be left clean in a condition satisfactory to the Engineer. E. Factory finished surfaces that cannot be properly cleaned without damage, shall be electrostatically painted as directed by the Engineer. (See Attached Painting Schedule)

Section Painting and Finishes (General)

Section Painting and Finishes (General) Section 099100 Painting and Finishes (General) PART 1 - GENERAL 1.01 Conditions A. The general provisions of the Contract, including General Conditions and Special Provisions apply to the work specified

More information

PAINTING OF CLARIFIER

PAINTING OF CLARIFIER 1 PAINTING OF CLARIFIER PART 1 GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required for the surface preparation and application of shop painting systems on ferrous

More information

Prior to beginning work, Contractor shall furnish to Owner the following:

Prior to beginning work, Contractor shall furnish to Owner the following: DIVISION 8 PAINTING SPECIFICATIONS 8.1 General 8.1.1 Scope Contractor shall provide all labor, material, and equipment and perform all operations necessary for all painting work specified including the

More information

1. Concrete. 2. Steel. 3. Galvanized metal. 4. Aluminum (not anodized or otherwise coated). 5. Wood. 6. Gypsum board.

1. Concrete. 2. Steel. 3. Galvanized metal. 4. Aluminum (not anodized or otherwise coated). 5. Wood. 6. Gypsum board. SECTION 099123 - INTERIOR PAINTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION EXTERIOR PAINTING

SECTION EXTERIOR PAINTING SECTION 09911 - EXTERIOR PAINTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION EXTERIOR PAINTING

SECTION EXTERIOR PAINTING New Football Stadium 09.91.13-1 PART 1 GENERAL 1.01 SECTION INCLUDES A. Surface preparation. B. Field application of paints. SECTION 09.91.13 EXTERIOR PAINTING C. Scope: Finish exterior surfaces exposed

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 099113 - EXTERIOR PAINTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Contract drawings, Division 0, Conditions of the Contract, and Division1, General Requirements, apply to the Work of this Section

Contract drawings, Division 0, Conditions of the Contract, and Division1, General Requirements, apply to the Work of this Section SECTION 09900 - PAINTING Contract drawings, Division 0, Conditions of the Contract, and Division1, General Requirements, apply to the Work of this Section PART 1 - GENERAL 1.1 SUMMARY A. Provide materials,

More information

PART 1. GENERAL 1.01 Requirements: A. Any changes from this standard shall be submitted to and be approved by the Project Manager.

PART 1. GENERAL 1.01 Requirements: A. Any changes from this standard shall be submitted to and be approved by the Project Manager. December 2013, Rev. 01 09 9100 - Painting PART 1. GENERAL 1.01 Requirements: A. Any changes from this standard shall be submitted to and be approved by the Project Manager. B. All design, remodeling and

More information

STUCCO PATCHING AND REPAIR. B. Stucco Crack Repair

STUCCO PATCHING AND REPAIR. B. Stucco Crack Repair STUCCO PATCHING AND REPAIR Existing system: 2-coat stucco system with a polymer-based system finish coat. The base system is a product similar to a LaHabra Fastwall 100 with an El Rey Stucco PermaFlex

More information

DIVISION 9 FINISHES 09900-1 PAINTING

DIVISION 9 FINISHES 09900-1 PAINTING DIVISION 9 FINISHES 09900-1 DESIGN STANDARDS 1. GENERAL: This section includes cleaning and touch-up painting of structural steel connections and miscellaneous metals, painting, and finishing of interior

More information

CROWN PAINTING SCHEDULE

CROWN PAINTING SCHEDULE CROWN PAINTING SCHEDULE ALL PAINTS AVAILABLE THROUGH SHERWIN-WILLIAMS PAINT STORES. PLEASE GO TO sherwinwilliams.com store locator to find the store closest to you. These paints are mainly commercial/industrial

More information

SECTION 807 PUMP STATION REHABILITATION

SECTION 807 PUMP STATION REHABILITATION SECTION 807 PUMP STATION REHABILITATION 807-1 DESCRIPTION: Rehabilitation of pump stations shall be defined as the cleaning, removal, repair and/or replacement of any and/or all components including but

More information

BRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment:

BRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment: 412.1 DESCRIPTION BRIDGE FIELD PAINTING, REPAINTING, 412 This specification contains the requirements for the removal, containment, and disposal of existing paint on steel surfaces, preparing the steel

More information

COATING & WRAPPING OF UNDERGROUND PIPING

COATING & WRAPPING OF UNDERGROUND PIPING CONSTRUCTION STANDARD SPECIFICATION DOCUMENT NO :SEC-PJ-000-SPC-PI-008 TOTAL PAGES : 8 Page 1 of 8 CONTENTS 1. SCOPE 2. DEFINITION 3. CODES AND STANDARDS 4. MATERIALS Page 2 of 8 1. SCOPE This specification

More information

SECTION 15420 WATER STORAGE TANK PAINTING

SECTION 15420 WATER STORAGE TANK PAINTING SECTION 15420 WATER STORAGE TANK PAINTING PART 1 GENERAL.01 SCOPE A. Section Includes Surface preparation, shop priming, and field coating for interior wet, interior dry, and exterior surfaces of steel

More information

ACRYLIC COLOUR SURFACING AND LINE PAINTING

ACRYLIC COLOUR SURFACING AND LINE PAINTING CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02765-1 PART 1 GENERAL 1.1 Related Work.1 All Division 1 Specification Sections.2 Section 02701 Aggregate Materials.3 Section 03300 Cast-In-Place Concrete

More information

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,

More information

East Central College

East Central College SECTION 096810 - TILE CARPETING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Colors should be variations of tans or grays. Champagne is too light and other special colors should be approved on an individual basis.

Colors should be variations of tans or grays. Champagne is too light and other special colors should be approved on an individual basis. CARPET/VINYL MATERIAL & INSTALLATION GENERAL PARAMETERS Bids shall include all materials, labor, tools, equipment, debris/removal, transportation, services, permits or anything else required for completion

More information

SECTION PAINTING. 1. General Requirements: Division One is applicable in full hereto.

SECTION PAINTING. 1. General Requirements: Division One is applicable in full hereto. SECTION 09-900 PAINTING A. GENERAL 1. General Requirements: Division One is applicable in full hereto. 2. Scope: Include all surfaces required for complete and finished job unless expressly eliminated,

More information

PAINTING OF UNPAINTED SURFACES

PAINTING OF UNPAINTED SURFACES SECTION 09900 PAINTING OF UNPAINTED SURFACES PART 1 GENERAL 1.01 SUMMARY: A. Section Includes: 1. Section 09902 - "PAINT, PUTTY, AND CAULKING MATERIALS FORM", pages 1 through 11, attached to and a part

More information

SECTION PAINTS and COATINGS MASTER ARCHITECTURAL PAINTING SPECIFICATION

SECTION PAINTS and COATINGS MASTER ARCHITECTURAL PAINTING SPECIFICATION SECTION 09 90 00 PAINTS and COATINGS MASTER ARCHITECTURAL PAINTING SPECIFICATION December 2, 2014 Behr Process Corporation 3400 W. Segerstrom Avenue, Santa Ana, California 92704 (714) 545-7101 SECTION

More information

A. Related work in other sections of these Specifications includes but is not limited to:

A. Related work in other sections of these Specifications includes but is not limited to: PART 1 GENERAL 1.01 GENERAL Work includes but is not limited to the following: A. This work shall consist of one or more courses of plant mixed asphalt concrete placed on a prepared foundation or base

More information

The City of Winnipeg Section Turtle Island Community Centre Renovation Page 1 of 5

The City of Winnipeg Section Turtle Island Community Centre Renovation Page 1 of 5 Turtle Island Community Centre Renovation Page 1 of 5 Part 1 General 1.1 SECTION INCLUDES.1 Shop fabricated ferrous metal items..2 Shop fabricated aluminum items..3 Steel pipe handrails balusters, and

More information

ITEM 446 CLEANING, PAINT AND PAINTING

ITEM 446 CLEANING, PAINT AND PAINTING ITEM 446 CLEANING, PAINT AND PAINTING 446.1. Description. This Item shall govern for the type, source, quality, testing, surface cleaning, surface preparation and application of paint. This Item also includes

More information

SECTION BROADLOOM CARPET PART 1 - GENERAL

SECTION BROADLOOM CARPET PART 1 - GENERAL SECTION 09680 BROADLOOM CARPET PART 1 - GENERAL 1.01 DESCRIPTION: A. Work of this section is subject to requirements of the Contract Documents including the General Conditions and Supplementary Conditions

More information

GUIDE SPECIFICATION COMBINATION SURFACE SYSTEM FOR NEW HOT MIX ASPHALT TENNIS COURTS I. PART 1 - GENERAL

GUIDE SPECIFICATION COMBINATION SURFACE SYSTEM FOR NEW HOT MIX ASPHALT TENNIS COURTS I. PART 1 - GENERAL COMBINATION SURFACE SYSTEM FOR NEW HOT MIX ASPHALT TENNIS COURTS I. PART 1 - GENERAL 1.1 SUMMARY A. This section is a part of the entire set of Contract Documents and shall be coordinated with the applicable

More information

ONBOARD MAINTENANCE PAINT GUIDE

ONBOARD MAINTENANCE PAINT GUIDE ONBOARD MAINTENANCE PAINT GUIDE CONTENT Page A practical Onboard Maintenance Paint Guide 1.0 2.0 3.0 INSPECTION AND PLANNING 4 HSE 6 SURFACE PREPARATION 8 The purpose of this guide is to provide easy and

More information

METAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES

METAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES METAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES REFLECTICLEAN ACRYLIC/URETHANE Elastomeric Roofing Systems, Inc 6900 Bleck Dr. Rockford, MN 55373 800.403.7747 -or- 763.565.6900 fax: 763.565.6901 email:

More information

Tractor Painting Tips

Tractor Painting Tips Keeping your tractor or equipment well kept & free from rust & corrosion will extend the life of your investment & help retain its value for a longer period of time. It can be difficult, in many cases,

More information

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 16050 A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1

More information

SECTION PAINTING AND COATING

SECTION PAINTING AND COATING SECTION 09 9000 PART 1 GENERAL 1.01 SECTION INCLUDES A. Surface preparation. B. Field application of paints, stains, varnishes, and other coatings. C. Scope: Finish all interior and exterior surfaces exposed

More information

General Surface Preparation

General Surface Preparation General Surface Preparation Proper surface preparation will contribute significantly to the longevity of Ace Paint products. Follow these general guidelines for best results. CLEAN: Paint will not adhere

More information

INFORMATION REGARDING THE BIDDING PROCESS

INFORMATION REGARDING THE BIDDING PROCESS SCITUATE SCHOOL DEPARTMENT 197 Danielson Pike, North Scituate, RI 02857 INFORMATION REGARDING THE BIDDING PROCESS A. GENERAL The Scituate School Department is conducting competitive sealed bidding for

More information

A. Work on this project shall consist of, but is not limited to, the following:

A. Work on this project shall consist of, but is not limited to, the following: PART 1 - GENERAL CLEANING AND RESTORATION OF SECTION 05900-1 1.1 SUMMARY A. Work on this project shall consist of, but is not limited to, the following: 1. Clean and treat all exposed anodized architectural

More information

T R A N S F E R A B L E F U L LY

T R A N S F E R A B L E F U L LY HSTOPS A WALL OF WATER 22 FT. HIG! F U L LY T R A N S F E R A B L E RESISTS10 PSI ! 1 F U L LY T R A N S F E R A B L E HSTOPS A WALL OF WATER 22 FT. HIG RESISTS10 PSI Guaranteed To Stop Water Even Under

More information

A. The latest published edition of a reference shall be applicable to this Project unless identified by a specific edition date.

A. The latest published edition of a reference shall be applicable to this Project unless identified by a specific edition date. SECTION 09 68 00 CARPET PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION STRUCTURAL STEEL

SECTION STRUCTURAL STEEL SECTION 05200 PART 1 GENERAL 1.01 DESCRIPTION A. Section includes specifications for structural steel, including steel designated as structural steel on the Contract Drawings. 1.02 REFERENCE STANDARDS

More information

Walls Low sheen: They are cleaned more often but are susceptible to critical lighting.

Walls Low sheen: They are cleaned more often but are susceptible to critical lighting. Stage 3: Fixing/Pre-Paint Stage Information on Painting The First Coat of Paint is the Most Important Most project homes are specified with a 2 coat finish. Master Painters of Australia recommends 3 coats,

More information

SECTION 01 50 00 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

SECTION 01 50 00 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS SECTION 01 50 00 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS PART 1 - GENERAL 1.01 GENERAL REQUIREMENTS A. Regulations: Comply with industry standards and applicable laws and regulations of authorities

More information

Preformed Metal Roofing and Siding

Preformed Metal Roofing and Siding Page -1-1. GENERAL 1.1. Description This specification along with the drawings covers the furnishing of all material, products, equipment, accessories, tools, services, transportation, labor and supervision

More information

Mechanical Installation

Mechanical Installation Page -1-1. INTRODUCTION AND PURPOSE 1.1. This specification covers the installation, testing and precommissioning of mechanical equipment. Work is to be performed in conjunction with the manufacturer s

More information

THERMOTEK SELF ADHESIVE MEMBRANE OVER METAL SYSTEM DESCRIPTION SELF ADHESIVE SYSTEM METAL (10 YR) AP-SABS-SACS

THERMOTEK SELF ADHESIVE MEMBRANE OVER METAL SYSTEM DESCRIPTION SELF ADHESIVE SYSTEM METAL (10 YR) AP-SABS-SACS THERMOTEK SELF ADHESIVE MEMBRANE OVER METAL SYSTEM DESCRIPTION SELF ADHESIVE SYSTEM METAL (10 YR) AP-SABS-SACS 1 0 No 0. SUBSTRATE 1. ASPHALT PRIMER. THERMOTEK SELF ADHESIVE 1.5 FV SMOOTH. THERMOTEK SELF

More information

SECTION PAINTING AND COATING

SECTION PAINTING AND COATING SECTION 09900 PART 1 GENERAL 1.01 DESCRIPTION This section described the requirements for the preparation of surfaces and subsequent application of protective coatings. The Contractor shall furnish all

More information

4. Preparatory Work. preparatory work 4.1 PLANNING 4.2 SURFACE PREPARATION

4. Preparatory Work. preparatory work 4.1 PLANNING 4.2 SURFACE PREPARATION 4. Preparatory Work 4.1 PLANNING Quality control starts with good planning and management. An Inspection and Test Plan, ITP (refer to Appendix D) which lists down the project s inspection and testing requirements

More information

RAMAPO COLLEGE OF NEW JERSEY PHASE I HOUSING REHABILITATION C 2012

RAMAPO COLLEGE OF NEW JERSEY PHASE I HOUSING REHABILITATION C 2012 SECTION 04235 - BRICK PANEL SYSTEMS PART 1 - PRODUCT & DESCRIPTION Structural Support Panel System for Thin Brick shale be Tabs II, manufactured by Tabs Wall System, LLC, Grandville, MI 49468, (616) 261-5656.or

More information

WARRANTY POLICIES. Following is a list of criteria that is essential in receiving a WARRANTY for the specified time.

WARRANTY POLICIES. Following is a list of criteria that is essential in receiving a WARRANTY for the specified time. WARRANTY POLICIES Following is a list of criteria that is essential in receiving a WARRANTY for the specified time. EXTERIOR DOORS (Harring standard construction) Harring Doors will provide a 3 year warranty

More information

SECTION PAINTING AND COATING

SECTION PAINTING AND COATING PART 1 - GENERAL 1.1 SUMMARY SECTION 09 90 00 A. Provide painting and coating as shown and specified. Work includes: 1. Coating system materials, including sealers, primers, stains, fillers, emulsions,

More information

Warranty Information from The Maiman Company s Stile and Rail Doors Terms & Conditions How to Store, Handle, Finish, Install and Maintain Wood Doors

Warranty Information from The Maiman Company s Stile and Rail Doors Terms & Conditions How to Store, Handle, Finish, Install and Maintain Wood Doors Warranty Information from The Maiman Company s Stile and Rail Doors Terms & Conditions How to Store, Handle, Finish, Install and Maintain Wood Doors Care and Installation at the Job Site To preserve the

More information

A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents.

A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents. POLYURETHANE COATING ON STEEL PIPE PART 1 -- GENERAL 1.1 THE REQUIREMENT A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents. 1.2 REFERENCE SPECIFICATIONS,

More information

SECTION PAINTING AND COATING

SECTION PAINTING AND COATING PART 1 GENERAL 1.01 SECTION INCLUDES A. Surface preparation. SECTION 09 90 00 PAINTING AND COATING B. Field application of paints, stains, varnishes, and other coatings. C. Scope: Finish all interior and

More information

SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING

SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING PART ONE GENERAL DESCRIPTION This section includes pre-formed standing seam metal roofing and related flashings, closures, trim and accessories including,

More information

Active and Passive Sash Replacement

Active and Passive Sash Replacement for Andersen Gliding Windows Read all instructions carefully before attempting this procedure. If you have any questions about your ability to complete the procedure, call Andersen at 1-888-888-7020 for

More information

UFGS-09 96 00 (July 2007) UNIFIED FACILITIES GUIDE SPECIFICATIONS

UFGS-09 96 00 (July 2007) UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-09 96 00 (November 2014) ----------------------------- Preparing Activity: NASA Superseding UFGS-09 96 00 (July 2007) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

FUNCTIONAL SPECIFICATION FOR CHAIN PULLEY BLOCK

FUNCTIONAL SPECIFICATION FOR CHAIN PULLEY BLOCK SHEET 1 OF 9 SPECIFICATION FOR SHEET 2 OF 9 1.0 GENERAL 1.1 This specification along with data sheets, other specifications & attachments to inquiry / order describes and constitutes the minimum requirement

More information

Application Instructions for Keystone Kool Deck on Existing Concrete

Application Instructions for Keystone Kool Deck on Existing Concrete Application Instructions for Keystone Kool Deck on Existing Concrete REQUIRED MATERIALS Keystone Kool Deck PTA Bonding Agent Water 20 Mesh Marble Sand White Portland Cement OPTIONAL TOOLS Mortex Ad-Tex

More information

Premium quality tools are important; not only will high quality rollers, brushes, and products create a better result, they ll make your job easier.

Premium quality tools are important; not only will high quality rollers, brushes, and products create a better result, they ll make your job easier. How to Paint your Pool Introduction Painting is one of the best ways to protect and beautify your pool. In addition to adding a vibrant, fresh color, a new coat of paint can be a cost- efficient way to

More information

NEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

NEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 09 - FINISHES

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 09 - FINISHES SECTION 099123 - INTERIOR PAINTING PART 1 - GENERAL 1.1 SUMMARY A. This Section includes surface preparation and the application of paint systems on the following interior substrates: 1. Concrete. 2. Concrete

More information

SCENIC VIEW SV 10 SECTION 08 87 13 SOLAR CONTROL FILMS

SCENIC VIEW SV 10 SECTION 08 87 13 SOLAR CONTROL FILMS PART 1 GENERAL SCENIC VIEW SV 10 SECTION 08 87 13 SOLAR CONTROL FILMS 1.1 SUMMARY A. Optically clear dual reflective, neutral sputtered and aluminum metallized polyester film for solar control. 1.2 RELATED

More information

SECTION 33 12 19 FIRE HYDRANTS

SECTION 33 12 19 FIRE HYDRANTS SECTION 33 12 19 FIRE HYDRANTS PART 1: GENERAL 1.01 SCOPE A. Fire hydrants. B. Adjustment of fire hydrants and gate valves. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 - Submittals.

More information

A D D E N D U M # 3 QUESTIONS FROM BIDDERS: DATE: November 5, 2012. All Bidders. Jenne dos Santos, CBI Consulting Inc. City of Chelsea, MA

A D D E N D U M # 3 QUESTIONS FROM BIDDERS: DATE: November 5, 2012. All Bidders. Jenne dos Santos, CBI Consulting Inc. City of Chelsea, MA Page 1 of 10, Addendum No. 3 Temporary Garage Structure City of Chelsea, MA November 5, 2012 CBI Job No.: 12055-A A D D E N D U M # 3 DATE: November 5, 2012 TO: FROM: PROJECT: All Bidders Jenne dos Santos,

More information

PLASTERING, PAINTING AND POLISHING

PLASTERING, PAINTING AND POLISHING Plastering, Painting and Polishing :: 95 13 PLASTERING, PAINTING AND POLISHING 13.1 INTRODUCTION After the completion and making the building infrastructure strong in order to save it and its fittings

More information

INDUSTRIAL FLOORING INSTALLATION CHALLENGES. James C. Ziegler, ArmorSeal Product Manager Sherwin Williams Cincinnati, Ohio, USA

INDUSTRIAL FLOORING INSTALLATION CHALLENGES. James C. Ziegler, ArmorSeal Product Manager Sherwin Williams Cincinnati, Ohio, USA INDUSTRIAL FLOORING INSTALLATION CHALLENGES James C. Ziegler, ArmorSeal Product Manager Sherwin Williams Cincinnati, Ohio, USA Abstract: Specifier's and contractors not only need to properly evaluate the

More information

SECTION OUTLOOK INSULATED SAFETY GLASS AND METAL SKYLIGHT PANELS

SECTION OUTLOOK INSULATED SAFETY GLASS AND METAL SKYLIGHT PANELS SECTION OUTLOOK INSULATED SAFETY GLASS AND METAL SKYLIGHT PANELS PART 1 - GENERAL 1.1 DESCRIPTION OF WORK A. Extent of the Glass and Metal Panels as indicated on the drawings. B. Principal Work in this

More information

EXHIBIT A - SCOPE OF SERVICES CITY OF BREA GRAFFITI REMOVAL SERVICES. March 9, 2015

EXHIBIT A - SCOPE OF SERVICES CITY OF BREA GRAFFITI REMOVAL SERVICES. March 9, 2015 EXHIBIT A - SCOPE OF SERVICES CITY OF BREA GRAFFITI REMOVAL SERVICES March 9, 2015 Graffiti Removal Specifications GENERAL DESCRIPTION The services to be provided under this Proposal shall include the

More information

POLYURETHANE LINING AND COATING ON PIPE RAW WATER

POLYURETHANE LINING AND COATING ON PIPE RAW WATER POLYURETHANE LINING AND COATING ON PIPE RAW WATER PART 1 -- GENERAL 1.1 THE REQUIREMENT A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents. 1.2

More information

JOB READY ASSESSMENT BLUEPRINT PAINTING AND DECORATING. Test Code: 2060 Version: 01

JOB READY ASSESSMENT BLUEPRINT PAINTING AND DECORATING. Test Code: 2060 Version: 01 JOB READY ASSESSMENT BLUEPRINT PAINTING AND DECORATING Test Code: 2060 Version: 01 Specific Competencies and Skills Tested in this Assessment: Wood Finishes Identify thinning products Identify wood finish

More information

FIRESTOPPING & SMOKE SEALS

FIRESTOPPING & SMOKE SEALS SPECIFICATION SECTION 07 84 00 FIRESTOPPING & SMOKE SEALS 1 GENERAL 1.1 SECTION INCLUDES 1.1.1 Comply with Division 1, General Requirements and Documents referred to therein. 1.1.2 It is the intent of

More information

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials SECTION 03 92 50 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings,

More information

GRAND DOOR COMPANY FINE HANDCRAFTED ENTRANCES

GRAND DOOR COMPANY FINE HANDCRAFTED ENTRANCES GRAND DOOR COMPANY FINE HANDCRAFTED ENTRANCES Grand Door Company Inc., located at 4258 State Highway 6 South, College Station, TX, 77845, warrants, subject to the conditions and restrictions contained

More information

Overview. Prior Repairs. Gaps in Panels. Turned Bolts. Paint/Body Defects 2

Overview. Prior Repairs. Gaps in Panels. Turned Bolts. Paint/Body Defects 2 Overview 0 Paint & Body Defects is one of the 3 most consistent indicators when inspecting for prior repairs that could ultimately indicate structural repairs, existing damage or alterations. 0 Use this

More information

SC4000 CEMENT BONDING PROCEDURES

SC4000 CEMENT BONDING PROCEDURES Pg.1 SC4000 CEMENT BONDING PROCEDURES The REMA TIP TOP SC4000 Bonding System is free of chlorinated hydrocarbons (CFC), and consists of the following products: REMA TIP TOP Cement SC4000 + E40 Hardener

More information

Automotive Body Shops. Fact Sheet

Automotive Body Shops. Fact Sheet Automotive Body Shops Fact Sheet The following information provides information pertaining to Auto Body Shops and some of the associated hazards and safeguards. It also provides an overview of some of

More information

SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word

More information

SECTION PLASTIC LAMINATE PLASTIC LAMINATE

SECTION PLASTIC LAMINATE PLASTIC LAMINATE SECTION 06240 - PLASTIC LAMINATE 06240-1 PART ONE: GENERAL 1.1 Description PLASTIC LAMINATE 1.1.1 Work of this Section, as shown or specified, shall be provided by the Interior Contractor and shall be

More information

Finishing SITE Finishing Instructions Painting Tips Aluminum Astragal Painting Doorlite Frame Finishing... 2.

Finishing SITE Finishing Instructions Painting Tips Aluminum Astragal Painting Doorlite Frame Finishing... 2. Finishing... 2.3 Painting Tips... 2.12 Aluminum Astragal Painting... 2.15 Doorlite Frame Finishing... 2.17 SITE 2 2014 2.1 2.2 2014 SITE 2 SITE 2 2014 2.3 2.4 2014 SITE 2 SITE 2 2014 2.5 Painting Tips

More information

WATERPROOFING FOR CONCRETE STRUCTURES

WATERPROOFING FOR CONCRETE STRUCTURES MANUAL OF CONTRACT DOCUMENTS FOR ROAD WORKS VOLUME 1 SPECIFICATION FOR ROAD WORKS SERIES 2000 WATERPROOFING FOR CONCRETE STRUCTURES Contents Clause Title Page 2001 General 2 2002 Protection of Bridge Deck

More information

Epotec Primer Surfacer

Epotec Primer Surfacer Product Data 408 Epotec Primer Surfacer PRODUCTS Epotec Primer Surfacer Epotec Primer Hardener Thinners 408-Pack A 414-9105 Pack B R202-Normal conditions, R270-Hot conditions Product Description A polyamide

More information

SECTION 560 COATING NEW STRUCTURAL STEEL

SECTION 560 COATING NEW STRUCTURAL STEEL 560 COATING NEW STRUCTURAL STEEL. (REV 10-1-132911121-131416-1213) (FA 1-162-1-13) (7-13) SECTION 560 COATING NEW STRUCTURAL STEEL 560-1 Description Coat new structural steel in accordance with the requirements

More information

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS AN ERGONARMOR COMPANY TECHNICAL INFORMATION SPECIFICATION FOR INSTALLATION 07/11 SUPERSEDES 04/00 PAGE 1 OF 6 CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS 1. SCOPE 1.1 This specification

More information

A. Extent of painting work is indicated on drawings and schedules, and as herein specified.

A. Extent of painting work is indicated on drawings and schedules, and as herein specified. 09900 - PAINTING PART 1 - GENERAL 1.1 STIPULATIONS: A. The specifications sections General Conditions, Special Requirements, and General Requirements form a part of this section by this reference thereto

More information

Window and Door Care and Maintenance

Window and Door Care and Maintenance Window and Door Care and Maintenance 1. Installation 2. Paint/Stain 3. Hardware/Operation/Adjustment 4. Initial Cleaning 5. Ongoing Maintenance 6. Avoid 7. Problems/Trouble-Shooting 1. Installation: Your

More information

BESSEY Training BESSEY Tools North America Alvin Products

BESSEY Training BESSEY Tools North America Alvin Products BESSEY Training BESSEY Tools North America Alvin Products Page 1-1 Lab Metal A ready to use, aluminum filled metal repair, filler and patching compound. Easy to use Ready to use straight out of the can.

More information

High-pressure (3000 p.s.i.) power washer with turbo tip. Condensation test material: Several one-foot square transparent pieces of plastic Duct tape

High-pressure (3000 p.s.i.) power washer with turbo tip. Condensation test material: Several one-foot square transparent pieces of plastic Duct tape Application Guide Type EP Epoxy Overview Supplies Needed Ramuc Type EP Epoxy offers a hard, tough, durable finish, providing stain, chemical, and abrasion resistance for protection of concrete, plaster,

More information

Alumigrip 4200 Application Process Instruction

Alumigrip 4200 Application Process Instruction Application Procedure Characteristics Product Information is a 3-component high solid durable polyurethane topcoat that provides premium gloss and distinctness of image (DOI) designed to meet and exceed

More information

PPG HI-TEMP 1027 PRODUCT DATA SHEET. June 30, 2014 Revision of January 28, 2014 DESCRIPTION

PPG HI-TEMP 1027 PRODUCT DATA SHEET. June 30, 2014 Revision of January 28, 2014 DESCRIPTION DESCRIPTION One component, high-build heat-resistant inert multipolymeric matrix coating to prevent corrosion under insulation (CUI) of carbon and stainless steel to temperatures ranging up to 650 C (1200

More information

Minor Cracks in Horizontal Surfaces

Minor Cracks in Horizontal Surfaces Cracks, chips and broken or flaking areas in concrete are not only unsightly, they can lead to further deterioration of the surface. The result is a costly replacement project as opposed to a simple repair.

More information

09/07/07 GLASSFIBER REINFORCED CEMENT (GRC) C. S. I. Spec 03500 Master Spec. 03 49 00 Page 1

09/07/07 GLASSFIBER REINFORCED CEMENT (GRC) C. S. I. Spec 03500 Master Spec. 03 49 00 Page 1 C. S. I. Spec 03500 Page 1 PART 1 - GENERAL 1.01 SUMMARY:.01 Provide special glassfiber reinforced cement (GRC) shapes in accordance with the requirements of the contract documents..02 The installing contractor

More information

SECTION METAL STAIRS, LADDERS, AND WALKWAYS

SECTION METAL STAIRS, LADDERS, AND WALKWAYS SECTION 05510 METAL STAIRS, LADDERS, AND WALKWAYS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Technical requirements for metal stairs, ladder, and walkways. 1.2 REFERENCES A. General: References to

More information

2. Division 05 Structural Steel Framing for steel framework requirements

2. Division 05 Structural Steel Framing for steel framework requirements SECTION 131200 - CLIMBING WALLS PART 1 GENERAL 1.1 SUMMARY A. This section includes the following: 1. GFRC Rock Realistic Climbing Wall System B. Related Sections 1. Division 04 Unit Masonry 2. Division

More information

RUST BULLET, LLC 300 Brinkby Avenue, Suite 200, Reno, NV 89509 775-829-5606 www.rustbullet.com

RUST BULLET, LLC 300 Brinkby Avenue, Suite 200, Reno, NV 89509 775-829-5606 www.rustbullet.com PROJECT: Specifications for Surface Preparation and Paint Application ~ Ceiling / Steel Pickling Facility The Product Data Sheet and Material Safety Data Sheet are an integral part of these instructions.

More information

SECTION 07 61 13 STANDING SEAM METAL ROOFING

SECTION 07 61 13 STANDING SEAM METAL ROOFING SECTION 07 61 13 STANDING SEAM METAL ROOFING PART 1 GENERAL 1.01 SCOPE OF WORK A. The Work shall include all labor, materials, equipment and supervision required to complete the work of the above referenced

More information

SC2000 CEMENT BONDING PROCEDURES

SC2000 CEMENT BONDING PROCEDURES Pg.1 SC2000 CEMENT BONDING PROCEDURES Widely recognized as the world s finest cold vulcanizing cement REMA SC2000 is the solution to your industrial bonding problems. By using REMA UTR20 hardener with

More information

SECTION 03 35 43 POLISHED CONCRETE FINISHING

SECTION 03 35 43 POLISHED CONCRETE FINISHING SECTION 03 35 43 POLISHED CONCRETE FINISHING PART 1 - GENERAL 1.01 SUMMARY A. Provide polished concrete finishing system where indicated on drawings, complete. This section includes the following: 1. Concrete

More information

SECTION 07 XX XX. Poly-Rubber Gel Injection Restorative Membrane System

SECTION 07 XX XX. Poly-Rubber Gel Injection Restorative Membrane System SECTION 07 XX XX Poly-Rubber Gel Injection Restorative Membrane System NOTES TO THE DESIGNER THIS SPECIFICATION SHALL BE USED FOR THE USE OF POLY-RUBBER GEL TO SEAL WATER LEAKS WITHIN STRUCTURES AND PERFORM

More information

.2 This Section includes surface preparation and field painting of the following:

.2 This Section includes surface preparation and field painting of the following: Part 1 General 1.1 Summary.1 Unless otherwise indicated, follow the standards below when specifying re-painting. These standards are not intended to restrict or replace professional judgment..2 This Section

More information

INSTALLATION OF ECOWORX MODULAR CARPET

INSTALLATION OF ECOWORX MODULAR CARPET INSTALLATION OF ECOWORX MODULAR CARPET INSTALLATION GUIDELINES THE FOLLOWING INSTRUCTIONS SHOULD BE REVIEWED PRIOR TO INSTALLATION AS WELL AS MEETING THE REQUIREMENTS OF AS2455.1:2007 & AS2455.2:2007 (WHERE

More information

SECTION 1081 COATING OF STRUCTURAL STEEL

SECTION 1081 COATING OF STRUCTURAL STEEL SECTION 1081 COATING OF STRUCTURAL STEEL 1081.1 Scope. This specification covers coating new and existing bridges and structures made of structural steel and miscellaneous metals. 1081.2 Systems of Coatings.

More information