1 City of Lake Forest Park - 12 Degrees North (formerly Southern Gateway Village) Project Daily Information Inspector s Name: Michael Maranan Date: 11/25/2015 Inspector s Shift Hours: 7 a.m. to 4 p.m. Periodic Weather: a.m.: p.m.: Prime Contractor: Representative & Title: 30± F, clear 42± F, clear Universal Land Construction Company Paul Ellison, Superintendent; Russ Bernard, Foreman Contractor A: Burke Electric Approved? Representative & Title: Sub-Contractor A: Representative & Title: Tim Harper, Foreman Northshore Paving Mark, Foreman Contractor s Work Activity Location of Work: Description of Work: NE Bothell Way 35 th Avenue NE Asphalt Pavement 1 st Lift / Base of Pavement; Temporary erosion and sedimentation control (TESC) Approv? - Inspection Time What was inspected? In Conformance? Comments / Action Hot-mix asphalt pavement - TESC - - Proof roll inspection was reported done and addressed yesterday. Prime contractor or developer should include the City inspector when notifying developer s geotechnical inspector regarding subgrade proof-roll inspections. Two lifts were poured and compacted over the parking areas only along 35th Avenue NE. Only the base of pavement along the street was poured and compacted. Exposed ground located downstream of installed silt fence in the northwest corner should be stabilized. Muddy discharge was noted in the 11/17/2015 report developer s CESCL reported no discharge during inspections dated 11/18/2015 and 11/24/2015. Inspection Diary Time 8:50 AM 1:00 PM Discussion Approximate time of arrival on site was 8:50 AM. Building construction work was ongoing. A 4-man crew from Universal Land (UL) continued working on the roadway grading over 35th Court NE, between NE 146th Street and NE 146th Place. The following construction equipment were used: Hot-mix asphalt (HMA) paving by subcontractor: Bomag asphalt paver Bomag DD-28HF big 2-drum roller 1 of 6
2 Bomag BW small 2-drum roller Deere 250 skid steer Miscellaneous grading on site, etc. by prime contractor: Deere 544J loader Deere 50D excavator There were 7± laborers tending to the HMA distribution behind the paving equipment. The following were noted prior to and during the HMA pavement: The edges of cement concrete gutter in contact with HMA were tarred prior to paving. The proposed HMA section was 5 inches deep HMA Class ½ over rock subgrade, as per Section A of the approved Field Change Order No. 1 dated March 18, The subgrade was reportedly proof-roll inspected yesterday. Prime contractor or developer should include the City inspector when notifying developer s geotechnical inspector regarding subgrade proof-roll inspections. There was 1 operator on the asphalt paver; 1 operating each roller (x2); 7± laborers, and; multiple dump trucks that hauled in the asphalt. A flagger was made available to assist traffic for trucks entering and exiting the site. The pavement within the parking areas was done in two lifts to ensure better compaction. Only one lift was done for the HMA pavement along the roadway; final lift was planned to be done at a later date. The compaction test technician arrived around 11:00 AM, conducted asphalt pavement compaction density testing using a nuclear gauge over multiple spots. The following TESC items (since last 11/18 inspection) have been updated: 1. Discharge: No discharge. Approximate amount of precipitation since last inspection: 0.55 inches* Approximate amount of precipitation in the past 24 hours: 0.23 inches* * Based on nearby rain gauge as recorded by King County. 2. Construction Entrance: Accesses to both NE 145 th street and NE 147 th Street were available. The approved construction access on NE 145 th Street was closed, but another access east of the tree protection area was open in its place. Dirt tracks were observed as minimal. Mud starting to build up on the rock pad maintenance recommended on the NE 145 th Street entrance. Rock pad was replaced on NE 147 th Street entrance. 3. Perimeter protection: OK. 4. Tree protection: OK. 5. Silt fence: OK 6. Inlet protection: OK. 7. Stabilization of exposed soils: Contractor should be aware that the areas that will not be worked on for at least 2 days will need to be covered/stabilized. 8. Dust control: Not applicable. 9. Source control: a. Stabilize the exposed roadside landscape (area between silt fence and the asphalt pavement). Only a small area on the northwest corner was stabilized with straw mulch; could need some more to the east. Inspector left at approximately 1:00 PM. 2 of 6
3 Michael Maranan 11/25/2015 (Inspector s Printed Name) Signature Date 3 of 6
4 City of Lake Forest Park 12 Degrees North (formerly Southern Gateway Village) Project Subject: Right-of-Way Improvements Hot Mix Asphalt Location: On site, 35 th Avenue NE Comment: (1) Parking areas along 35 th Avenue NE. 2 lifts of hot-mix asphalt (HMA) were poured and compacted. (2) Roadway was reportedly proof-roll inspected and additionally compacted the day before, in preparation for today s roadway HMA base pour. (1) (2) 4 of 6
5 Subject: Right-of-Way Improvements Hot Mix Asphalt Location: On site, 35 th Avenue NE Comment: (3-a) (3) Only 1 lift of HMA poured compacted along the roadway. Pictured are the southernmost (a) and northernmost (b) limits along 35 th Avenue NE, and the easternmost limit (c) at the NE 146th Place intersection. Only 1 lift of HMA was poured and compacted along the roadway. (3-b) (3-c) 5 of 6
6 Subject: Temporary Sedimentation and Erosion Control Location: On site Comment: (1) Construction accesses to NE 145 th Street had some dirt (top) while NE 147 th Street (bottom) was minimal. Street sweeper was on site during site visit. (1) (2) Maintenance was recommended for the construction accesses. Rock pad for the NE 145 th Street access (top) still looked dirty, but the NE 147 th Street access (bottom) looked clean. Developer s field manager reported that the rock pad was replaced. (2) 6 of 6
Activity Yes No N/A Notes
CE 2020 (Rev. 12/11) Page 1 of 5 PROJECT NAME AND SITE ADDRESS: CONTRACT NUMBER: ORACLE NUMBER: WDID NUMBER: CONTRACTOR NAME AND ADDRESS: PROJECT SITE RISK LEVEL: Risk Level 1 Risk Level 2 Risk Level 3
More informationDESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
More informationVILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL
VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial
More informationSection 300 Base Courses
Table of Contents 1. Importance of Base Courses... 300-1 2. Types of Bases... 300-3 A. Cement Treated Permeable Base Course... 300-3 B. Bituminous Concrete Base Courses... 300-6 C. Superpave Asphalt HMA
More informationCONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT
Volkert Field Office 80 M Street SE, Suite 725 Washington, DC 20003 RIVERSMART WASHINGTON - CONSTRUCTION RIVERSMART MACFARLAND, RIVERSMART LAFAYETTE AND GREEN ALLEYS CHEVY CHASE D.C. Contract No.: DCKA-2013-C-0160
More informationSECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
More informationMATERIALS CERTIFICATION SCHOOLS
MATERIALS CERTIFICATION SCHOOLS 2011, Virginia Department of Transportation Registration Process Online Registration Enrollment and payment for all personnel in the Materials Certification Schools may
More informationBeseck Switching Station Inspection
Page 1 of 5 Docket No. 272 Development and Management Plan Inspection The Connecticut Light and Power Company Certificate of Environmental Compatibility and Public Need for the construction of a new 345-kV
More informationSTORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date
STORMWATER POLLUTION PREVENTION PLAN TEMPLATE Disclaimer: This template was developed for guidance purposes only in an effort to assist Construction Storm Water permit applicants in meeting state and local
More informationSITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)
More informationCONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE The following template may be used as a general guide for development of a Stormwater Pollution Prevention Plan (SWPPP) for construction activities.
More informationMATERIALS CERTIFICATION SCHOOLS
MATERIALS CERTIFICATION SCHOOLS Registration Process Online Registration Enrollment and payment for all personnel in the Materials Certification Schools must be done online through the VDOT University
More informationDivision 2 Section 32 14 13.19 Section 02795
Note: The text must be edited to suit specific project requirements. It should be reviewed by a qualified civil or geotechnical engineer, or landscape architect familiar with the site conditions. Edit
More informationMATERIALS CERTIFICATION SCHOOLS 2016
MATERIALS CERTIFICATION SCHOOLS 2016 2014, Virginia Department of Transportation Registration Process Online Registration Enrollment and payment for all personnel in the Materials Certification Schools
More informationCity of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
More informationConstruction Site Inspection. Inspecting to Keep You in Compliance
Construction Site Inspection Inspecting to Keep You in Compliance Inspection/Monitoring/Reporting Know if your plan is working Document corrective actions Ketchikan A Contractor that destroys their site
More informationSUBDIVISION ROAD CONSTRUCTION AND INSPECTION PROCEDURES
BOARD OF COUNTY COMMISSIONERS ST. MARY S COUNTY LEONARDTOWN, MARYLAND SUBDIVISION ROAD CONSTRUCTION AND INSPECTION PROCEDURES APRIL, 1991 AMENDED: JUNE, 2002 DEPARTMENT OF PUBLIC WORKS & TRANSPORTATION
More informationSECTION 4Aggegate Subbase
The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages
More informationSECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) Note: This guide specification for U.S. applications describes construction of permeable interlocking concrete
More informationSECTION 31 20 00 EARTH MOVING
SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to
More informationPermeable Pavement Construction Guide
Permeable Pavement Construction Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems that reduce
More informationSITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific
More informationAppendix I: BMP Inspection Form CASQA SWPPP Template 91 January2011 BMP INSPECTION REPORT Date and Time of Inspection: Date Report Written: Inspection Type: (Circle one) Weekly Complete Parts I,II,III
More informationCity of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting
More informationBuilding Your Interlocking Concrete Pavement to Last a Lifetime
Building Your Interlocking Concrete Pavement to Last a Lifetime A Guide for Consumers Contents Building Your Interlocking Concrete Pavement to Last a Lifetime.... 3 What Does Installation Involve?....
More informationStorm Drain Inlet Protection for Construction Sites (1060)
Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain
More informationSAMPLE COPY. Stormwater Pollution Prevention Plan. A site map must be developed and must contain, at a minimum, the following information:
Stormwater Pollution Prevention Plan "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure
More informationPROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS
C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates
More informationGuidelines for. Permeable Pavement
What is permeable pavement? Guidelines for Permeable Pavement When rainwater falls on conventional pavement, such as concrete, it accumulates and then flows across and off of this impervious surface as
More informationVehicle Tracking Control (VTC)
Vehicle Tracking Control (VTC) SM-4 Description Vehicle tracking controls provide stabilized construction site access where vehicles exit the site onto paved public roads. An effective vehicle tracking
More informationRESIDENTIAL/COMMERCIAL
RESIDENTIAL/COMMERCIAL CONTRACTOR S INFORMATION MANUAL FOR City of Senatobia Disclaimer The residents or contractors using this information are responsible for complying with the applicable ICC Residential,
More informationNevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005
Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005 Purpose The purpose of this review is to capture for technical deployment the most advanced
More informationCOLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project
More informationVehicle Tracking Pad
Stormwater Quality Best Management Practices Construction Sites s When to use: Where construction vehicles leave active construction areas onto surfaces where runoff is not checked by sediment controls
More informationCONSTRUCTION PERMIT REQUIREMENTS
CONSTRUCTION PERMIT REQUIREMENTS Any work to be done in the City right-of-way (ROW), in a utility easement, and certain work on private property, requires an Engineering Inspection Permit from the Department
More informationSECTION 02795 UNI PERMEABLE INTERLOCKING CONCRETE PAVEMENT
SECTION 02795 UNI PERMEABLE INTERLOCKING CONCRETE PAVEMENT Note: This guide specification is intended for use in the U.S. It describes construction of permeable interlocking concrete pavers on a permeable,
More informationSECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) Note: This guide specification for U.S. applications describes construction of permeable interlocking concrete
More informationChapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile
Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality
More informationOhio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES
Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices
More informationAsphaltic Wedge Paving
OFFICIAL NOTICE ADVERTISEMENT FOR BIDS Notice is hereby given by the Town of Oregon, Dane County, Wisconsin, will receive sealed bids for Road Construction as listed in this request until 4:00 P.M., Local
More informationSAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING
SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING 1 TABLE OF CONTENTS 1.0 Introduction and Purpose 3 2.0 Description of Work 3 3.0 Site Supervisor/Foremen Responsibilities 4 4.0 Equipment
More informationAdvancements in Permeable Pavements
Advancements in Permeable Pavements Engineers Workshop Saint Vincent College March 14 & 15 2013 Permeable Pavements There are several different words that are used to describe a pavement that water drains
More informationSolutions Library Solution 4: Permeable Pavement
SOILS TREES RAINGARDENS Solutions Library Solution 4: "Think like water. Go with the flow." -Frances Kato, Issaquah School District Student 59 60 How Works? Explanation of Diagram The most significant
More informationCID STREET INFRASTRUCTURE ASSESSMENT
ABSTRACT An evaluation of the street infrastructure in Foxberry Estates Phase 1, including pavement condition, verification of construction techniques, and subgrade quality. Recommendations and costs for
More informationDefinition of Tower from the Bradley County Zoning Resolution
Definition of Tower from the Bradley County Zoning Resolution 43. TOWER. Any outdoor structure designed and constructed to support one (1) or more transmitting or receiving devices for telephone, radio
More informationCity of Beaumont, Texas Grading Permit Information
General Information City of Beaumont, Texas Grading Permit Information The permit application shall be signed by the property owner (or lessee) or his authorized representative and by the contractor (if
More informationFigure 3 Pipe Cracking
The illustration shown below depicts the system analyzed. As-built drawings and survey information were not available; aerial photos and survey shots of inverts were used to determine the system s geometries.
More informationPICP Construction. Why PICPs The Big Picture. Key things to know about PICPs
PICP Construction Permeable Interlocking Concrete Pavement Presenter: Frank Gandora, President Creative Hardscape Why PICPs The Big Picture Germany was first to develop PICPs 2005 Clean Water Act Federal
More informationVILLAS OF TRADITIONS AT GREY OAKS
Report of Turnover Survey VILLAS OF TRADITIONS AT GREY OAKS Grey Oaks Development Naples, Collier County, Florida Forge Engineering Project Number 2907-001.01 March 2015 Richard P..Lundberg, P.E cn=richard
More informationGuidelines for Control of Water Runoff on Small Lots. Revised 6/09
Guidelines for Control of Water Runoff on Small Lots Revised 6/09 Table of Contents Introduction and Purpose 3 Administrative Procedures 3 Plan Submittal Requirements 3 General Design Criteria 4 Dry Wells
More informationDeveloper s/consultants Field Services Guidelines
Developer s/consultants Field Services Guidelines 2007 Engineering and Works Department DEVELOPER S/CONSULTANT S FIELD SERVICES GUIDELINES Fourth Electronic Edition February 2007 STATEMENT OF COMPLETION
More informationPreventing Storm Water Pollution: What We Can Do
Preventing Storm Water Pollution: What We Can Do ~Employee Training Series~ Streets and Drainage Maintenance PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND U.S. ENVIRONMENTAL
More informationC. Remove all existing asphalt shingles, underlayment and any loose debris into contractor provided dumpsters.
SCOPE OF WORK Project Title: Replace Deteriorated Roof Singles at Cape Lookout National Seashore Maintenance Shop PMIS # 159350 Prepared By: Mike Baker Cape Lookout National Seashore 131Charles St Harkers
More informationHow to Estimate the Cost of Support of Excavation for Foundation Installation. CPE Candidate No. 0113013. May 15, 2013
How to Estimate the Cost of Support of Excavation for Foundation Installation CPE Candidate No. 0113013 May 15, 2013 1 How to Estimate the Cost of Support of Excavation for Foundation Installation Table
More informationGEOTECH ENGINEERING and TESTING
GEOTECH ENGINEERING and TESTING Geotechnical, Environmental, Construction Materials, and Forensic Engineering ACCREDITED GEOTECHNICAL AND CONSTRUCTION CONSIDERATIONS FOR A TYPICAL RESIDENTIAL STRUCTURE
More informationINDEX 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6
03010_Dec22_2009.pdf Page 1 of 5 INDEX Page 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6 03010_Dec22_2009.pdf
More informationRight-of Way Use Permit Application
Right-of Way Use Permit Application 400 SW 152 nd Street, Suite 300 Burien, WA 98166 Phone: (206) 439-3161 Inspection: Line 206-439-3162 Email address: rowpermits@burienwa.gov For City Use Only Reviewed
More informationSTATEMENT OF ACKNOWLEDGMENT
General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities, issued 8/21/13, effective 10/1/13 Stormwater Monitoring Report SITE INFORMATION Permittee: BNE Energy
More informationBasic Elements of Reading Plans
Center for Land Use Education and Research at the University of Connecticut Basic Elements of Reading Plans University of Connecticut. The University of Connecticut supports all state and federal laws
More informationConstruction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources
More informationSNOW REMOVAL AND ICE CONTROL OPERATIONS MANUAL TABLE OF CONTENTS
1 TABLE OF CONTENTS SECTION: 1) Introduction Page 2 2) Scope of Program Page 2 3) General Instructions Page 3 4) Storm Procedures Page 3 5) Snow Removal Operating Procedures Page 4 6) Snow Ordinance Page
More informationStorm Drain Inlet Protection for Construction Sites (1060)
Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain
More informationCity of Hilshire Village Pine Creek Ln Reconstruction
City of Hilshire Village Pine Creek Ln Reconstruction OVERVIEW The City will be soliciting bids for the Pine Creek Reconstruction Project with construction scheduled to begin in January 2015. This project
More informationTCEQ TPDES CGP EPA NPDES GCP Inspection of Controls Report
TCEQ TPDES CGP EPA NPDES GCP Inspection of Controls Report Complete this form every seven days and after every rain event of 0.5" or greater and retain in your SWP3. General Information Name of Project:
More informationConcrete Waste Management
Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category
More informationBMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.
BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems
More informationCivil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.
Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer
More informationIndex. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
More informationSTANDARD INSPECTION FORM GENERAL PERMIT FOR STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY
STANDARD INSPECTION FORM GENERAL PERMIT FOR STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY Project Name Permittee NOI # Start Time Inspector s Name(s) Green Card Certification # Inspector s Contact Information
More informationSection 000 Organization of an Engineering District (Construction)
Table of Contents 1. General Policies and Provisions... 000-1 2. District Executive... 000-2 3. Assistant District Executive Design... 000-3 4. Assistant District Executive Maintenance... 000-4 5. Assistant
More information2011 NACE Conference by. Ken Skorseth SDLTAP Program Manager
2011 NACE Conference by Ken Skorseth SDLTAP Program Manager Paving or constructing asphalt surface treatments when asphalt prices were low. May not have been justified based on traffic, but it bought political
More informationBond Release Process for New Subdivision Developments in Fairfax County
Bond Release Process for New Subdivision Developments in Fairfax County An Overview for Homeowners Associations A Fairfax County, Va., publication April 2009 For more information or to request this document
More informationCW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS
December 2014 CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications...
More informationINSTALLATION SPECIFICATIONS FOR AQUAPERM TM PAVER
INSTALLATION SPECIFICATIONS FOR AQUAPERM TM PAVER Applicable to all AquaPerm TM Permeable Unit Paver Systems FOREWORD These outline specifications have been prepared for the general guidance of architects,
More informationLand Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
More informationCHAPTER 7: SUBDIVISION CONSTRUCTION, INSPECTION AND BONDING. 7.05 Subdivision Improvement Performance Bond Requirements
CHAPTER 7: SUBDIVISION CONSTRUCTION, INSPECTION AND BONDING 7.00 Construction 7.01 Inspection and Testing of Improvements 7.02 Approval of Improvements 7.03 City Engineer s Acceptance of All Improvements
More informationState of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR HOT- MIX ASPHALT (HMA) BINDER AND SURFACE COURSE
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR HOT- MIX ASPHALT (HMA) BINDER AND SURFACE COURSE While its use is not required, this checklist has been prepared to
More informationInstalling Porous Pavement Waukesha County Dept. of Parks & Land Use Storm Water BMP Design and Installation Workshop March 11, 2009
Installing Porous Pavement Waukesha County Dept. of Parks & Land Use Storm Water BMP Design and Installation Workshop March 11, 2009 Presented by Willie Gonwa, P.E., Ph.D. West Allis, Wisconsin Porous
More information2014 ANNUAL REPORT. Department: Highway Department Head: David Hartman Departmental Employees: 27
2014 ANNUAL REPORT Department: Highway Department Head: David Hartman Departmental Employees: 27 Department Mission: The Yates County Highway Department is responsible for the construction, maintenance
More informationSANITARY SEWER SERVICE CONNECTION INSTRUCTIONS
1 SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS TABLE OF CONTENTS I. Introduction II. General Information and Requirements A. Applying for Sewer connection B. Excavation C. Cutting Concrete and Asphalt
More informationMinimizes sediment and debris from entering storm drains that lead to waterways and watercourses.
4.5-p DRAIN INLET PROTECTION Alternative Names: DI protection, Drop Inlet Protection DESCRIPTION Storm drain inlet (DI) protection slows and ponds stormwater, and filters sediment and debris before it
More informationLocal Road Assessment and Improvement Drainage Manual
Local Road Assessment and Improvement Drainage Manual Donald Walker, T.I.C. Director, author Lynn Entine, Entine & Associates, editor Susan Kummer, Artifax, design Transportation Information Center University
More informationSection 600 Incidental Construction
Table of Contents 1. Pipe Culverts... 600-1 A. Endwalls, Inlets, Manholes, and Spring Boxes... 600-5 2. Grade Adjustment of Existing Miscellaneous Structures... 600-8 3. Rebuilt Miscellaneous Structures...
More informationSECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE
PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE 311.1 DESCRIPTION: This item shall consist of a cement treated subgrade base course composed of a mixture of local soil, portland
More informationSECTION 32 14 00 PERVIOUS INTERLOCKING CERAMIC PAVERS
SECTION 32 14 00 PERVIOUS INTERLOCKING CERAMIC PAVERS Pervious interlocking pavers.doc Note: This guide specification for U.S. applications describes construction of permeable interlocking ceramic pavers
More information2014/2015 PAVING PROJECT MILLING AND PATCHING BID DOCUMENTS JASPER COUNTY, GEORGIA
2014/2015 PAVING PROJECT MILLING AND PATCHING BID DOCUMENTS JASPER COUNTY, GEORGIA Issued on January 7, 2015 1 ADVERTISEMENT FOR BIDS 2014/2015 ROADWAY PATCHING PROJECT JASPER COUNTY, GEORGIA Separate,
More informationStorm Drain Inlet Protection
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category
More information40-9 PERMEABLE INTERLOCKING CONCRETE PAVEMENT
40-9 PERMEABLE INTERLOCKING CONCRETE PAVEMENT 40-9.01 GENERAL 40-9.01A Summary Section 40-9 includes specifications for furnishing and installing concrete pavers for permeable interlocking concrete pavement
More informationTOWN OF FARMINGTON, CT REQUEST FOR PROPOSALS FOR CONSTRUCTION EQUIPMENT RENTALS AND ON CALL CONSTRUCTION SERVICES
TOWN OF FARMINGTON, CT REQUEST FOR PROPOSALS FOR CONSTRUCTION EQUIPMENT RENTALS AND ON CALL CONSTRUCTION SERVICES The Town of Farmington Department of Public Works is seeking proposals for the purpose
More informationGUIDE SPECIFICATION COMBINATION SURFACE SYSTEM FOR NEW HOT MIX ASPHALT TENNIS COURTS I. PART 1 - GENERAL
COMBINATION SURFACE SYSTEM FOR NEW HOT MIX ASPHALT TENNIS COURTS I. PART 1 - GENERAL 1.1 SUMMARY A. This section is a part of the entire set of Contract Documents and shall be coordinated with the applicable
More informationProject Procedures Guide. Sampling Frequencies for Materials Testing and Inspection
Project Procedures Guide Sampling Frequencies for Materials Testing and Inspection PREFACE This Project Procedures Guide is intended for use as a resource in determining reasonable sampling frequencies
More informationPermeable Pavement Operation & Maintanence Guide
Permeable Pavement Operation & Maintanence Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems
More informationPublic Works Operations Manual Standard Operating Procedures for Water and Sewer WS-A412 Water Connection Repair
Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS-A412 Water Connection Repair 1. Objective: 1.1. To repair the water connection in a timely and efficient manner, minimizing
More informationTemporary Batch Plants
Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category
More informationTENNESSEE GAS PIPELINE COMPANY, L.L.C.
TENNESSEE GAS PIPELINE COMPANY, L.L.C. SILT FENCE DESIGN CRITERIA AND METHODOLOGY FOR THE ACCESS ROADWAYS CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,
More information7.2 CONDITIONAL APPROVAL
SECTION 7.0 GUARANTEE OF PERFORMANCE 7.1 GENERAL REQUIREMENTS In lieu of requiring the completion of all improvements previous to the final approval of a subdivision plan, the Commission may accept a bond
More informationSTANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall
More informationCatch Basin Rehabilitation Road Commission for Oakland County, Michigan
Date: Location: September 14, 2011, 9:45a.m. start East side of street in front of 4656 Maura Lane, West Bloomfield Participants: Oakland County Michelle Belanger, Rick Hall, Matt Mountain, Gary Flounory,
More informationDRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS
DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS The City of DeSoto s Department of Development Services is the point of contact for storm drainage related issues. The following are some frequently
More information3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.
The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:
More information